City Council - Regular Meeting

Monday, July 20, 2026

The Rochester City Council addressed several key issues, including public safety concerns regarding speeding and annexation, and debated the future design of Elton Hills Drive. The council also approved funding for a senior cooperative housing project and discussed economic development initiatives.

About this meeting

Government Body
City Council
Meeting Type
City Council
Location
Rochester, MN
Meeting Date
July 20, 2026

Transcript

474 sections

1:25Speaker 16

Please rise. I pledge allegiance to the flag of the United States of America,

1:41Speaker 20

is full and with a degree of injustice for all.

1:56 – 3:22Speaker 16

Welcome everybody to our July 20th city council meeting. We begin every council meeting with our open comment period. This is an opportunity for members of the public to speak on items that we will not be taking public testimony during a public hearing later on the agenda. Each person has up to two minutes to speak for a total of 20 minutes. If we have more people Then there is for 20 minutes, I will ask my colleagues if they would like to suspend the rules to continue hearing from members of the public. I've never seen them not grant that. But that said, I would request that each speaker be concise to allow more people to speak during the designated time. Participants are also encouraged to limit comments generally to topics that are within the scope and jurisdiction of the council's ability to affect policy. Council members and staff do not respond to your comments during the public comment period, but will instead follow up on any specific requests separately. If you have materials to share with the council, please give them to the city clerk who is sitting to my right, and she will distribute them. You will be invited to speak in the order of which you signed up and we will start with Mr. Jared Lucker. Good evening.

3:28 – 5:28Speaker 3

Mayor Norton? Yep, there you go. My name's Jared Lucker, resident of Rochester. Good evening, Mayor Norton, council members, and fellow friends and neighbors. My name's Jared Lucker, I'm a resident of Rochester as well as a candidate for mayor. Tonight, though, I'm speaking not as a candidate but as a concerned citizen. On Friday, July 17th, from 11.30 to 1.30 p.m., my son, a volunteer, and I were out door knocking the Falwell neighborhood where I live nearby and my sons attend Falwell Elementary. We were on Falwell Drive Southwest as we noticed numerous cars driving at excessive speeds. We were just finishing up when I spoke with a resident on her front steps, and I asked her to share with me her concerns for the city. She mentioned the speeding cars and that there was an in-home daycare nearby, and she was worried about the safety of everyone in the neighborhood. She also mentioned that she has a disability, so it was difficult for her to attend meetings such as this. Several hours later, at around 4 a.m., a car crashed into a home right across the street, smashing right through the front window. Thankfully, no one was seriously injured. I told her that she had my word that I would advocate for her and her neighbors, and expressed to you the situation of speeding in the Falwell neighborhood, but the speeding throughout the city as well, which I've heard from many people, and something absolutely must be done. I told her that she had, oh sorry, in addition to the concern about speeding, the State Patrol recently reported that the rate of motorcyclists killed has more than doubled since the last year. In Rochester in recent months, I have read numerous stories just like these, and for me this is particularly personal. One month ago, my little sister, just 31 years old, was killed by a drunk driver while riding her motorcycle. Although this did happen in the Twin Cities, the trend is troubling here in Rochester as well. I want you all to continue to bring attention to this issue as it is also relevant to the Elton Hills Drive concerns as well with speeding. We need to band together as a city to do more than just words. We must increase enforcement, think outside the box, and recognize that this is a danger to public safety that must be addressed with the most urgency possible. Thank you so much for your time.

5:29Speaker 16

Thank you, Mr. Lecker, and our condolences. Next we have Matt Hempel.

5:42 – 7:39Speaker 19

Good evening, council members. My name is Matt Hample, resident of Hadley Valley. I'm here tonight to oppose the Hadley Valley annexation. Forcing a high density housing development in a rural area like this is a prime example of prioritizing developer profits over public safety. Squeezing 275 dwelling units onto roughly 70 acres will funnel all neighborhood traffic onto a single narrow bottleneck on Hadley Valley Road. This poorly planned configuration creates immediate safety hazards for residents, motorists, and pedestrians alike. The developer deliberately skipped a direct connection to 48th Street Northeast simply to avoid the financial costs of crossing a wetland. The city must not reward a flawed design that compromises public safety and guarantees daily gridlock for local residents. Furthermore, I must ask, why was the traffic analysis done in the middle of December? The golf course is closed, it's not a peak time of traffic. Additionally, where is the infrastructure improvement plans for 48th Street and Hadley Valley Road? No concrete plans have been made available to the public. This property is also a vital piece of Hadley Valley Watershed, which serves as a critical drainage system for Northeast Rochester. As local residents, we have witnessed severe flooding on this exact land during intense storms and spring thaws. Replacing natural, absorbent terrain with acres of concrete, roofing, and asphalt will drastically increase stormwater runoff and intensify local flooding. Finally, the citizens who live alongside this massive project have been completely shut out of the decision-making process. Pushing this type of density forward while silencing neighbor local leadership sets a dangerous, heavy-handed precedence. It sends a message to Haverhill Township residents that their voices, their elected leaders, and their community identity does not matter to the City of Rochester. Growth must be responsible. Annexation should be a collaborative, good faith partnership, not a hostile takeover. I urge this council to reject the annexation. Our entire neighborhood is watching tonight.

7:40Speaker 16

Thank you. Next up we have Bill Dunn.

7:50 – 9:59Speaker 17

Thank you for this forum. Council the city I don't live in the city pay plenty of taxes to the city otherwise, but nonetheless I'm a resident of Haverhill Township I Serve on a on a rapidly created self-proclaimed task force, which we call ourselves the Hadley Valley Community Task Force, representing multiple neighborhoods within our township in a non-elected fashion. But nonetheless, it had to happen fast. But this group represents the presidents of the Pine Tree Estates Property Owners Association, the president of Hawthorne Meadows Town Homeowners Association, and a variety of folks across the area of the township affected by a proposal associated with the annexation you're discussing this evening. This Hadley Valley Community Task Force recognizes that it's probably unlikely that the annexation is not going to occur. But the orderly annexation agreement that was agreed upon between the township and the city in 2005 underscores the importance of an orderly transition of density. In this R2 area that is being proposed, it is maximally squashed into the 140 acres that is pending annexation. And the momentum of this project seems excessive to those that are already there with a lot of earth moving already happening. And there's been a general development plan which has been submitted and was in fact denied in part, but in fact, in the response to that.

9:59Speaker 16

Thank you, Mr. Dunn, your time is up.

10:01Speaker 17

The street connectivity score targets were modified unreasonably, so. Thank you. We'd just like you to be aware that there's more to come.

10:09Speaker 16

Thank you. Next up we have Troy Pullen.

10:19 – 12:05Speaker 22

Good evening. Thank you for your time, council, mayor. New resident of Rochester. I've been here about three years and current resident living on Elton Hills Drive for the last two years. And I'm about halfway between the point because every time I pull up my driveway, it tells me either go left or right, depending on where I'm going. I just want to talk a little bit about it. Living there the past two years, the designated lines for like parking, the center line, even the divider line, even when it's raining or we're so faded, you can't really even see them when you're driving down the road. So I'd like to say, I think there's things we could do that would improve it without going to limiting the thoroughfare and cutting down the traffic lanes. So what I would suggest is that you go with option three, leave it four lanes, but instead add designated bike markers to the outside lanes so the drivers clearly realize that, hey, this is a shared parking lane. put curb outs in that shorten the distance pedestrians have to cross. Both these measures are going to help the traffic, the driver, think about they need to limit, they need to slow their speed down. Because I will agree, right now, it looks like a wide open racetrack because we haven't limited that space. We haven't created lines for people to color inside of while they're driving. I think that probably a lower cost effective approach to consider. I know you only have the three options, so I'd say look at four, but maybe stick with the four lanes and see if you can come up with something, a better improvement. Thank you.

12:06Speaker 16

Thank you. Next, we have Craig Ugland.

12:17 – 14:22Speaker 1

You have the right. Thank you for having me here. My name is Craig Ugland. I was originally a 40-year resident of Alton Hills or off of Alton Hills Drive, and I led the Take Back Our Streets fight to keep Alton Hills Drive as four lane that was shot down back in 2020. The big concern, or the big feedback that I've gotten from the council members that replied to me earlier today was concerns of safety. There have been two deaths on Alton Hills Drive. The first was many, many decades ago from a drunk driver, and unfortunately we had another one just a few weeks ago. Neither of those would have been changed by the current design of Alton Hills Drive. That would be disingenuous to use that as a justification to change Alton Hills Drive. Per the study that the city did last year, There have been six incidents between cars and pedestrians. Five of those incidents were on Alton Hills Drive and Broadway, which is already being addressed. The last incident was at 9th Avenue. We'll come back to that. Back in 2020, Take Back Our Streets and other community members gave several recommendations to how to improve on the short-term Alton Hills Drive. Not one of those things has been done in six years. And I will not say that that would have changed that incident from two weeks ago. You're promoting a center lane. You're pushing cars to approach each other head on. Is that not defeating the purpose of improving the safety of Alton Hills Drive? The city has policies and goals, green steps, complete streets. These are guidelines, these are not laws. Alton Hills Drive is an extremely unique road that none of these guidelines can fix for us. We need to have common sense as part of the discussion. If it's truly about safety, put your bike lanes on Assisi Drive and 14th and 13th Avenue. It's faster to get from Broadway to 52, straighter, shorter, less driveways, or put a bike path over Assisi Heights.

14:24Speaker 16

Thank you, Mr. Euclid. Next, we have Brenda Quayle. Quay.

14:36 – 15:45Speaker 35

Good evening. My name is Brenda Quay. I'm the owner of Venstar LLC. I'm also the majority owner of the Klimt, an 80-unit market rate workforce housing project that is under construction right now in downtown Rochester just south of Discovery Square. I'm here tonight not to talk about the Klimt, but to talk about the Civic Center North project. Our friends over at Sherman & Associates are great developers. They've worked a long time to try and bring that project to fruition. But if they can't, we wanted to bring you a plan B. Our team would be willing to do 200 units of workforce housing on two-thirds of the site, leaving one-third for a future affordable developer. We'd bring our whole team, Venstar as the developer, Weiss Builders as the general contractor, and ThinkBank as the lender. I've had conversations with the president of ThinkBank Rochester, and she has assured us that she would stand behind that project if it made financial sense. I brought Pro Pharma's. We appreciate your consideration.

15:47Speaker 16

Thank you, Ms. Quay. Next we have Jennifer Denhigene. I may have missed that.

15:56 – 18:06Speaker 33

Good evening. I'm Jennifer Denz-Hagano, and I'm the mother of three kids, ages two, four, and six. Most mornings, sunshine, snow, rain, we all climb into my cargo bike, also known as my bike minivan, and head out together. We feel the breeze on our faces, we chatter back and forth, and we have the freedom of not being stuck in traffic or in the school drop-off line. It's one of my favorite parts of the day when we bike together. But that freedom depends on feeling safe, and on Elton Hills, we don't. I appreciate the reduction in lanes proposed, and I'm here to ask you to choose the option that has the protected bike lane on Elton Hills Drive. This corridor serves three schools and is a key east-west connection in our city. Kids walk and bike it every day. Several cyclists, as previously mentioned, have been injured or killed on this stretch recently, and there have been car crashes onto the sidewalks near the schools. These are places our children are supposed to be safe. The active transportation plan for the city specifically calls for all ages and all abilities bike infrastructure on Elton Hills. If it's not done now, it likely won't be another opportunity until my kids are almost adults. A protected bike lane here is not a luxury. There is not another feasible route to build a bikeway on this side of Assisi Heights because of how the neighborhood streets were designed, and this option connects directly into our existing bikeway network, including the recently redone Broadway routes. It will extend the safety of the routes that families already use. Your choices on this decision as our city council are about convenience versus safety. Parking on Elton Hills is a convenience with alternatives as there are ample other parking spaces around the corners and within the neighborhood and relatively few destinations without dedicated parking lots. There's not an alternative route for safety past these three schools. Public roads should move people through our city safely and this should come before storing personal cars. This is also about freedom of choice. Right now, it's not a real option for Rochester families who live near Elton Hills Drive. With a protected lane, families would have a choice. Not just a car is the only safe way. In closing, I would like you to imagine yourself as the kid who gets to hop on a bike, feel the breeze, and get some physical activity before school, maybe ride to a friend's afterward, or on a weekend. Wouldn't it be great for all kids to have this choice? I urge you to add a protected lane to Elton Hills Drive. Thank you.

18:06Speaker 16

Thank you. Next, we have Molly Dennis.

18:16 – 19:59Speaker 5

Hello, from lived experience, being right there as a council member, I sadly have learned that city leaders have private meetings behind closed doors and preset agendas to silent residents and to control the legislation. When elected in 2020, I learned quickly that the city doesn't hesitate to present orchestrated propaganda to residents to protect the image of powerful people. Residents deserve to know the truth. This Elton Hills traffic study should be in a public hearing to amplify voices of residents, not in a reports and recommendations, which is the agenda of the city staff. I believe the main, myself and others, believe the main reason local leaders refuse to answer honest questions, why the city government destroys all emails, all emails after six months, and the reason residents do not get all the data and their freedom of information requests is because information is control. City prioritizes image over truth and self-interest over transparency. Why do world leaders still limit information and burn books? Because a resident who knows the truth is harder to control. If social media feedback and city council virtual comment sessions are eliminated, democracy begins to slowly die. Please let us cut this veneer. When huge local legislation is presented within hidden rubber stamping consent agenda items, it is clear the agenda is of the city staff, not of the people of Rochester. Please do better. Thank you.

20:00Speaker 16

Next up we have April Souter.

20:07 – 20:59Speaker 4

Good evening, I'm April Souter, residing at 1538 King Court Southeast in Rochester. I'm honored to come before you this evening as you consider my appointment to the Park Board. A resident of Rochester since 1992, I've served the community as a non-profit leader, community volunteer, Rotarian, and avid parks, recreation, and trails advocate. Like most residents and visitors, I view our parks, trails, and recreational amenities as critical to the quality of life in this city. I look forward to guiding the work around these invaluable resources, ensuring access and quality today and for generations to come. Thank you for your support.

21:00Speaker 16

Thank you. Next we have T. Garia.

21:15Speaker 30

Good evening, President Schubring, Mayor Norton, Council. To recap, for those who are not here.

21:24Speaker 16

Can you state your name again? I wanna make sure I said it right.

21:27Speaker 30

Tiki Garcia.

21:29Speaker 16

Okay, thank you.

21:31 – 23:05Speaker 30

To recap, for those who were not here last week, it's not too late for the construction of the safe North Loop-Mayawood bike and pedestrian path. One, the path has been completed behind the stone fence successfully, connecting the existing bike path on the existing side all the way to the corporate event center and running east behind the stone wall all the way to the green space. which has been quit claim deeded back to the city, confirming that running a continuous north side path, running the boundaries of the preserve on Mayo Wood is a win-win viable option for our community. Two, it is not too late. G-Cube confirmed last meeting that the engineering plan is not in and Public Works is still working on it with G-Cubed, who is paid by the developer. We are excited as a community to finish the safe Zumba loop bike path loop as originally planned, existing in the active transit plan of 2012, also honoring the established unbiased MnDOT engineering study stating the opposite side of the road where the developer wants to outsource the path is dangerous and not feasible. The topography has not changed. The City of Rochester, if the City of Rochester moves forward with a developer designed and financed path, we do not consent to quit claim deed at back. The liability and maintenance need to remain in perpetuity with said developer. Thank you, we're looking forward to this, thanks.

23:06Speaker 16

Thank you. Next we have Luke Doskey.

23:16 – 25:22Speaker 8

Good evening, Mayor Norton, President Shubring, and the City Council. I'm here to discuss or give my public comment about the Elton Hills Drive pavement preservation. I humbly urge you to choose option two for the pavement preservation, which includes three lanes of travel lanes, one turn lane, one lane of parking, and then a bi-directional cycling path. I am a father of a daughter who we've just welcomed home this January. And we are in Ward 5, and we are in the walk zone for Elton Hills, as well as John Adams. Our family walks all over Rochester, cycles all over Rochester, and uses a car. The configuration as it is now is unsafe. Everybody has talked about speeds. And in Rochester, we hear that drivers are concerned about all motor cyclists, e-bikes, scooters on the roads as well as pedestrians on sidewalks with scooters, cyclists in the paths as well. I've experienced this with walking with my daughter in a stroller and not feeling comfortable on the sidewalk. As cyclists we feel squeezed out of the roads, out of the sidewalks. We want a safe place. And then also, as the configuration is now, the three with the two lanes of parking, if there are no cars parked there, there is no visual narrowing of the road. And narrower roads have been shown to reduce speeds. Therefore, if you have one lane of parking, you will have more occupancy of that one lane, and then you'll have a cycling path that is delineated. And this will help everybody.

25:23Speaker 16

Thank you. And next up we have Vivian Yip.

25:33 – 27:32Speaker 2

Good evening, council members. My name is Vivian Yip. I am a working mom, an eye doctor, and a daily bike commuter through Elton Hills. I ride to get exercise into my day and to be a healthy role model for my three daughters. This summer, I bought an e-cargo bike to bring my daughter to summer school-age child care because despite her being a very capable bicyclist, I do not feel safe letting her ride through the current Elton Hills corridor. The demand for safe routes from local families is undeniable. I have helped lead a bike bus at Jefferson Elementary and a bike to school day with over 50 students and attended the Mayor's America 250 Bike Parade. I wish you could see the joy on all the kids' faces as they bike through the streets with their peers fearless. Parents and children want to ride, but they need infrastructure that protects them. The city's recommended design overlooks the thousands of students who travel along Elton Hills. Keeping underutilized parking on both sides preserves a wide, dangerous roadway that actively encourages speeding. Installing protected bike infrastructure would narrow the roadway, naturally slow down traffic, and make the streets safer for everyone, including drivers. As an optometrist working with visually impaired individuals, I see the stakes firsthand. Walking safely is a necessity for my patients because driving is no longer an option. Street designs focus solely on vehicle use, alienate the 30% of our population that cannot drive. I urge the council to ask city staff and the engineering consultants which street design option is the safest for all users. Please choose a protected bike lane.

27:33Speaker 16

Thank you. And that is everyone who signed up, so I will close the open comment period and ask Clerk Kasel to please call the roll.

27:43Speaker 31

Good evening, Council Member Keene.

27:46Speaker 31

Council Member Miller.

27:48Speaker 31

Council Member Wall.

27:50Speaker 31

Council Member Fredericks.

27:52Speaker 31

Council Member Palmer. Here. Council Member Doering.

27:56Speaker 31

Council President Shubring.

27:58Speaker 31

Mayor Norton. Present.

28:00Speaker 16

Next up we have our city administrators report. Take it away, Administrator Zones.

28:07 – 30:43Speaker 6

Thank you, Council President, Mayor, Council members, members of the public. We start the administrator's report by thanking our teammates for acting with respect, integrity, safety, and excellence in everything they do. Really appreciate all of the work that happens every day across all of our different departments to serve the community. Did want to point out a bit of work that's forthcoming. So sidewalk repair and replacement project is beginning in District 2, so that is going to be getting underway. There's a lot of great information available on rochesterinman.gov forward slash sidewalks. There's an interactive map as well, so you can really zoom in on what is a little bit difficult to see here and check and see where you are within that area. It's a large area, generally east of Highway 52, you can see there. and a little bit south of Highway 14. So if that's something that is where you live or where someone that you know lives, that is important information to check out on the website. You should have received a notice, but that should be getting underway here. Also an opportunity for the community to help create a public poem for the 19th Avenue link station that is being built. It's very easy to participate. The glass panels are titled Everyday Analemma, and so residents are invited to respond to the prompt Everyday I. Please be judicious about how you respond. We might not pick things that are not appropriate, but we just are looking for daily habits, a small moment of joy, or a personal ritual. The responses are able to be submitted online, rochesterinman.gov, before August 15th. Also, the Community Development Block Grant Public Service Grant applications opened today. They will be open through Monday, August 17th at 4.30 p.m. There's an open house on Wednesday, July 22nd from 2 to 3.30 p.m. at the Development Services and Infrastructure Center. That's at 4001 West River Parkway Northwest. um so there's also a significant amount of information available on our website again rochestermn.gov also a phone number to call if you have questions or aren't available to go to that meeting and then we're hoping to bring you fireworks that look more like this so the rochester fireworks take two is scheduled for friday september 4th and the rain date is Saturday, September 5th. We are still working out the details on an event. We will be having darkness a little bit earlier at that time of September, so we'll also be announcing the time for the fireworks to go off as we get going, but we wanted to make sure people were aware of the make-up date. And that's all I have.

30:44Speaker 16

Thank you, Ms. Elms. Next up, we have the Mayor's Report. Mayor Norton.

30:51 – 33:59Speaker 24

Thank you, Council President. I have just a couple things today. I want to let you know that I'll be heading to Madison to speak at a conference on behalf of the city. I'll be doing a presentation on the regulatory justice work that we've been doing. You'll be hearing about that this evening. And I'll be presenting at that conference and be back Friday around noon, or I'll be done with the conference at Friday at noon. And in my absence, of course, Council President Shubring, if there's an emergency, will step in, but I am available the entire time by phone and email. Safe City Nights is happening. We've had two. There are two left, July 28th at Bishop Elementary and August 11th at Franklin, Ben Franklin Elementary. So put those on your calendar and hopefully most of the council members will show up. I know there's a lot of people walking around with passports that need their little sticker from council members. So bring your stickers if you come. Just a reminder, I'm not sure I've talked about it here, but I'm hosting a Youth Leadership and Success Summit with the Rochester Olmstead Youth Council. It will be on a day where students are released in Rochester and we're working with schools in the whole county and inviting them as well. Should be really interesting. It'll be over at the Civic Center. A lot of career learning and opportunities, some great speakers. If all goes well, the governor plans on coming down. Larry Jacobs from the Humphrey School and some others as well as some really great local business people who will talk about their careers and encourage these young people to kind of think outside the box about what many careers there are in our community for their future success. Also, just a reminder, Rochester Voices is on the city's, on our YouTube channel. So if anyone wants to follow those, we've been this month, well, this started back in April. We've done it on the drone program, Parks and Rec, Our Neighbors, Cradle to Career, Fire Prevention Month, on and on. So we try to keep you informed about what's happening in the city and by interviewing people staff members as well as community nonprofit leaders and perhaps some of you. Also, we have a newsletter. We've been doing this for some time. If anyone wants to take a picture of the QR code or go online, we do have a monthly newsletter. I would say a lot of pictures and little paragraphs, so it's not a lot of heavy reading, but at least to let you know what's happening in the mayor's office in the city. And lastly, as I close out, just a reminder, the City takes Board and Commission applications year-round. You don't have to wait for an announcement that it's open. Boards and Commission applications are on the City's website, and you can just click in and select up to three. So feel free to share your talents with the City of Rochester. Thanks. That's it.

33:59 – 34:52Speaker 16

Thank you, Mayor. Next up, we have the order of the agenda. I have been notified that the applicant for item G1, a conditional use permit, has asked for a continuance on that or a delay to September 9th. My recommendation to my colleagues is that we keep this on our agenda and that we hold the public hearing just in case there are members of the public who are here to speak on that item and then we will keep the public hearing open and consider whether or not to grant that continuance. With that, are there any other changes to the order of the agenda? Seeing none, is there a motion to approve the order of the agenda? Moved by Council Member Fredericks. Second.

34:52Speaker 21

With the adjustment that you made of taking G1? Yes.

34:56 – 35:29Speaker 16

Yes. Seconded by Council Member Keene. All in favor say aye. Aye. Opposed say nay. Motion passes. Moving on to our consent agenda. I've received notice that Council Member Palmer has pulled item F2 and Council Member Wall has pulled item F4. Anything else? Seeing nothing, I would invite a motion to approve and block items F1. F3 and F5 through F23. So moved. Second. Moved by Councilmember Doering, seconded by Councilmember Palmer. All in favor say aye.

35:30 – 36:12Speaker 16

Opposed say nay. Motion passes. Moving on to our public hearings. We have four public hearings on the agenda tonight. As I mentioned with item G1, which is a conditional use permit by MJK LLC, I'm going to bypass the staff report if that's okay and at this time open the public hearing. Does anyone wish to be heard on this item? Anyone wishing to be heard on this item? Step forward and state your name.

36:17 – 36:40Speaker 28

There we go, Tom. Sorry, Mark Walsh with G-Cube Engineering, representing the applicant on this item. I've been having some going back and forth with the airport staff on some items here, really, to answer any questions you may have. I understand we asked for the continuance. We do have the blasting expert here. We don't know if we'll have him at the next available meeting, but he is here if you had specific questions from the staff report, understanding that it wasn't presented.

36:44 – 37:07Speaker 16

Thank you. Anyone else wishing to be heard on this? We will keep the public hearing open until we bring this item back. Is there, as I mentioned, the applicant did request that this item be continued to September 9th, 2026. Is there a motion as such?

37:08Speaker 23

So moved. Second.

37:09Speaker 16

Moved by Council Member Palmer, seconded by Council Member Wall. Any further discussion?

37:19 – 37:43Speaker 21

Just a point of order. I'm unclear whether the developer was asking that the expert should testify tonight or is that, because it doesn't appear that we're going to have that the next time, but it didn't sound like he was going to just use the open comment or the public hearing. I'm just looking for some... insight into how this could or should work?

37:44 – 38:00Speaker 16

Well, I mean, Councilmember, I guess the applicant is who has asked for the continuance, and so I guess that's incumbent on them if they want to provide that expertise to us, since they are the ones who's asked for the September 9th date.

38:05 – 38:22Speaker 28

I think in all fairness to all parties involved, waiting until the September 9th is probably best. Otherwise, it's going to be a lot of trying to remember what was discussed here. So if you had specific questions based on his expert testimony or his letter, you could ask him that question. But otherwise, we'll have a full presentation at the next available meeting.

38:23Speaker 16

Thank you. Appreciate that. Thanks. Thanks. All in favor, say aye. Aye. Opposed, say nay. Motion passes.

38:34Speaker 22

I forgot your thing.

38:37 – 38:49Speaker 16

Next up we have item G2 which is an appeal by Broadway Enterprises LLC and our community of development staff Anthony Cheeky will present this item.

38:51 – 39:45Speaker 27

Thank you, Council President Shubring, members of council. Good evening. My name is Anthony Cheeky. Before you is application CD 2026-002-AP by Broadway Enterprises LLC to allow for continuation of development that had an approved site development plan under the former LDM that has since expired. The property is located immediately west of the intersection of Broadway Avenue North and 16th Streets Northeast at 1405 Broadway Avenue North. The applicant originally appeared before the Zoning Board of Appeals for variance request under file CD 2026-002 VAR at their June 3rd hearing date. At that time, the board had approved a motion to deny the variance request for this appeal. The development review team is recommending denial of the appeal request, which would uphold the Zoning Board of Appeals decision. That concludes my presentation, and I'm available if there are any questions.

39:46 – 40:16Speaker 16

Thank you, Mr. Cheeky. Is the applicant here and you have and I did not go through the guidelines for the public hearings, but quickly, if the item has an applicant, then they have up to 10 minutes to speak. After that, I will open the public hearing. Members of the public have up to five minutes to speak on items in public hearings. With that, if you will introduce yourself and you have up to 10 minutes.

40:17 – 42:12Speaker 25

Thank you, good evening, President Shubring, Mayor Norton, members of council, my name's John Beatty. I am appearing on behalf of applicant Broadway Enterprises this evening and represent that this case is much simpler than perhaps the record that's in front of you. We're not asking you to approve a new development as has already been indicated by staff as a continuation of a previously approved project. We're not asking you to take any steps to weaken the newly adopted UDC. We're simply asking you to allow completion of what is a two-phase project that the city has previously approved. And the variance process, whether it's through statute, through the UDC, through the LDM, it exists precisely for this situation. Not to avoid the rules, simply to recognize that when a strict application of those rules no longer advances the very purposes of which they were written to serve. And in this instance, we submit that this project that was previously approved satisfies the reasonable, comprehensive, harmonious nature of what already exists on North Broadway and we'd be seeking to continue a unique previously approved two-phase integrated development phase one of which that Starbucks immediately to the south and which was integrated and designed built precisely around this remaining parcel that you see on the screen to the north and I may in a moment ask staff if they would help cite to some of the sections of of our submitted documents. I'll cite you to the pages if I can. But for the council tonight, the question is whether it's reasonable to require final phase of a previously approved project with standards that did not exist at the time that that project was first approved to move forward, particularly where the city's significant public investment in North Broadway improvements satisfy significant number of those pedestrian friendly, pedestrian walkability requirements that you might see now in the UDC. To give more background on the timeline and the details of the project, I offer Mr. Ryan Schoenfelder with WSE.

42:17Speaker 16

Welcome, Mr. Schoenfelder.

42:19 – 45:25Speaker 37

Yeah, Ryan Schoenfeller, WSC Engineering, President Shubring, members of the council, Mayor Norton. Just want to talk about this site as a holistic design that was approved back in 2020. You can see it was intentionally designed so that there was vehicular pedestrian circulation. With the challenges of COVID-19 that came in during 2020, right when this project was approved, caused a delay that the owner didn't want to start open a bank building. Of course, no customers are out and about. In addition to that, you have the Broadway North reconstruction that again disrupts this corridor and makes it very difficult for a newly constructed building to open up. Both things that the owner obviously didn't create themselves. Talking a little bit more about the site circulation, the Starbucks building, which is completed on the south, and the Spank building, they share that drive-through. They both share an exit to the north. You can no longer turn into the site from the south to the Starbucks. Staff kind of cut that off after the building was constructed for just safety reasons. Between the two buildings, there is a dedicated ADA accessible route so that someone who parks in this center can travel safely between both buildings. Again, I think meeting the intent of the comprehensive plan, which is promoting the pedestrian and vehicular accessibility. Speaking a little bit more towards an integrated plan, which the UDC and the comprehensive plan promotes, this is zoned MXT, which is a corridor district. You look at the buildings to the south, the east, the north, their drive-throughs, single sites, 20, 22 feet tall, just like our site. We're fitting the intent of what's there and what's constructed now. Constructing a building that the UDC requires 40 feet tall doesn't seem appropriate like it would fit in this area. We're asking that you consider multi-tenant building, that we fit the center mindset, especially if you look north to the shopping area with all that parking available. we're meeting the intent of the UDC. Finally, just wanna touch on that the MXT district is a transition, the node is a transitional district, so it makes more sense to transition from Broadway, kind of step back towards the residential, see on the north and east, and then transitioning to the west where we have multifamily or senior housing North is the center again. This just fits the character of the neighborhood and Developing anything on the site other than the building that was approved previously really doesn't make sense So I'm available for any questions that you have after mr. B finishes our presentation Thank you Thank You Ryan Focusing just on a couple points raised in the staff report

45:26 – 50:00Speaker 25

One of the bases recommending denial is that this fails to maintain compatibility. The project that's in front of you fails to maintain compatibility with the comprehensive plan. And I ask very seriously, what's changed? Nobody's pointed anywhere in the staff report to a policy of the comprehensive plan that this project violates today that had previously satisfied when it was approved part of this integrated development back in 2020. Our comprehensive plan for the city was a 20-year plan adopted in April of 2018. That is a 20-year plan. Two years into that plan, this project was approved. Six years after it was first approved, we're back in front of you. The comprehensive plan, which is planning to succeed 2040, has not changed. What's changed? The streetscape has changed. The UDC has changed, but to make findings tonight to say that this project does not comply with the comprehensive plan would not be based on any policy that's been pointed to me. I hope that someone could raise what's been changed in that comprehensive plan that no longer supports approval of this project and supports instead something that's significantly out of character on this site, a 40-foot building built to the zero lot line. That doesn't fit, in my view, with the character harmonious with the neighborhood. Second point the site does not prioritize pedestrian activity. That's one of the findings if you look at page 9 of our presentation I think that'll demonstrate the concept of all of those North Broadway public improvements and enhancements those public improvements include a significant broad promenade with decorative walls decorative landscaping canopy trees and a number of the issues that are raised in the UDC insisting that this project satisfy certain walkability. Just 200 feet to the south of this project, one of the points that we needed a variance for tonight is for a public transport, a bus stop. And that bus stop is located right there in front of the The Starbucks, we're just slightly beyond whatever is permitted because we're over an acre in size. And those are the sorts of issues that we submit. For those pedestrian walkability nature, this is gonna be a building similar to what we see at Beatles on 2nd or that south, Buffalo Wild Wings with the associated bank and a professional service piece comprising it, both walkable, approachable, and here, given the drive-through uses on each side of the project, a brand new Caribou, a brand new Starbucks. This is a project we submit will attract and enhance that site. It was formerly a Wendy's that had been scraped many years ago. Some may recall what we're bringing, I think, brings other users and all users that can use bus, bike, walk vehicles, supportive of the Northbrook and Silver Lake shopping centers. Lastly, I think the staff and zoning appeals board took the position that the developer self-created these practical difficulties by choosing to move forward with this project. And we submit that, as Mr. Schoenfelder already suggested, the developer didn't choose a multi-year pandemic, a multi-year north construction improvement on North Broadway, nor the intervening adoption of the UDC. What the developer did choose was reliance on a previously approved phase one of this project, invested millions of dollars, integrated that Starbucks design. If you look to the west half of the site, Mr. Schoenfelter mentioned, it's really critical, I think you see it on page 18 of our presentation, the way that all of those cars are cued through there, it necessarily dedicates about half of the west side in order to get to the Starbucks site and then come back around what would be this building centered in what's the remnant. But so much of this site has been committed to irrevocably. We aren't dealing with an undeveloped Greenfield site. This has already been designed. It's been engineered. It's been integrated into traffic circulation that's there. And those were decisions that were made based on the city's previous approval under the same comprehensive plan that we have today. And I submit that reliance cannot simply be ignored. I stand in front of you recognizing the tremendous amount of careful, thoughtful work that went into the UDC and its development. And this does not seek for any sort of precedent to allow or find an end around that UDC. This is very unique. These are unique practical difficulties established by the fact that this is a previously approved project that has been built to a degree, and now we're looking to find some way to finish it. So we're not asking for a new project We're asking for you to allow us to finish a project that had been previously approved one that's proven successful through phase one Something the neighborhood is definitely liked and the city's like something that meets the comprehensive plan. We welcome your questions Thank you for your consideration.

50:01 – 50:25Speaker 16

Thank you. Mr. Brady At this point I will open the public hearing anyone wishing to be heard on this item, please step forward I Anyone wishing to be heard on this item, please step forward. Seeing no one, I will close the public hearing and invite Mr. Beatty and Mr. Schoenfelter up to any closing comments.

50:30 – 52:11Speaker 25

I think we stand on the concern related to the practical difficulties are not self-created. If you look closely at our packet, you'll see that there's about eight points that are raised for subtle or variances, specific variances that are required now as we've transitioned from the LDM to the UDC. Primary of those is the fact that this is a 40 foot minimum height requirement. We believe that that variance is absolutely necessary to To be made in order to allow continued future development of this site. Likewise There's about four of those variances that are walkability or pedestrian oriented variances as I argued previously I think that the The public improvements have been made through that area and the fact that it's oriented now with that wall and those landscaping cut off largely some of the benefit. We can't have a front-facing, street-facing door that looks straight into a wall on North Broadway. So the design would be to orient and change it consistent with the ADA points that Mr. Schoenfeld already raised. But that gets to some of the glazing. It's a professional service building. Those are points that, if necessary, I think the developer can go to work on. But at a minimum, the setback that now requires the queuing to allow the integration of both sites for that setback would be beyond the 15 foot minimum. We're only getting to 30 feet. Inside of that is already a 10 foot public utility easement. and the minimum height issues are the ones that we really are here tonight and hoping that you can just look at this project as a whole and agree that when we approved it six years ago, it stood on its own as a good project for the site and continues to do so even if we have to get a variance.

52:11Speaker 16

Thank you. At this point, I will invite my colleagues for questions of staff or the applicant. Council Member Palmer.

52:20Speaker 18

For Mr. Beatty, I've got a couple questions for you. If I read this right, and if I'm understanding it, the plan was set up in 2018 for this site?

52:31Speaker 25

The comprehensive plan was adopted in 2018. This site was, I think, first engineered in 2018, ultimately approved by city staff in May of 2020.

52:40Speaker 18

And the Starbucks was built when?

52:44Speaker 37

Right after, in 2018. 21?

52:45 – 52:59Speaker 18

Yeah. OK. And then we had Broadway construction for two years. We had COVID before that. Is that kind of circumstances what you're saying is delayed everything?

53:00 – 53:11Speaker 18

OK. Staff question. If they're 22 feet tall versus the 40, what is the rationale for having 40 feet?

53:13 – 53:43Speaker 27

So the reason that the minimum 40 foot building height is triggered is due to the site's proximity to Broadway Avenue. In the UDC for this zone district, the additional district standards, there's even higher level if you're in proximity to certain high level streets, which this site is. So that's... what ties the additional density or the height requirement that's likely to achieve, again, other comprehensive plan goal of the higher density incorporating mixed-use development at these higher transit-oriented corridors.

53:44 – 54:11Speaker 18

So south of this site, you've got a 22-foot tall building. The Starbucks was just recently built. You've got the Caribou on the other side, which is 22 feet, and you've got Northbrook Shopping Center that's been there probably since the 60s, and that's 22 feet. and across the street is Silver Lake Shopping Center, which is 22 feet. How is this, wouldn't a 40 foot tall building kind of be odd in that situation?

54:14 – 55:01Speaker 27

I think with kind of the existing context of neighboring properties, it may stick out a bit. However, the original site development plan was applied for in 2018 when the standards for those existing building heights were lower. The Starbucks was built under those standards. The inaction to initiate a project it caused the expiry under the LDM timeline. It limits an STP approval to one year. There was no request for an extension at any point that staff could entertain to kind of continue the original approval. And again, the additional district standards are a UDC standard. And Broadway Avenue is again identified as one of those higher order streets that these standards are required at.

55:02Speaker 18

In front of that is MXT. Is that the zoning district?

55:06Speaker 27

MXT node, I believe.

55:07 – 55:22Speaker 18

Okay. So MXT node went all the way up to 37th Street. We moved it to Elton Hills right by our new parking ramp. It's kind of an arbitrary number or arbitrary location? It's easy to move?

55:22Speaker 27

I don't think I'd be able to comment on that.

55:27Speaker 16

Ms. Woodward.

55:29 – 55:58Speaker 13

We did adjust the MXT after some discussion, but we also are aligning that MXT and still have the node up at 37th and Broadway, recognizing there's potential future growth there. That also aligns with the primary transit network. So those two were in alignment of how we were choosing MXT areas. And we went up to Elton Hills Drive and then we shifted from north of there up until 37 to MXS after some discussion of where the future growth would happen and how we prioritize certain areas for MXT.

56:01Speaker 16

Okay, thank you. Council Member Wall.

56:04 – 56:21Speaker 23

Thank you. This perhaps is a question for Mr. Schoenfelder, and I'll ask it of the city as well. Is there any documented communication between the developer and the city about the intended completion of the project since its approval in 2020?

56:23Speaker 37

Yeah, good question. I'm not familiar with any at this point in time. John, maybe you are.

56:28Speaker 23

Okay, so to your knowledge, the developer has been quiet on the issue.

56:33Speaker 37

Correct. They were working at that time on the Starbucks building.

56:35Speaker 23

Thank you. I would ask the same of the city. Is there any communication that we have?

56:42Speaker 27

As stated, I did not come across anything.

56:46Speaker 23

A second question for the city. How tall is Aviva River Bend, which is fairly adjacent to this project?

56:57Speaker 27

I do not have that figure in front of me at the moment. If you bear with me, I could likely find something.

57:06 – 57:23Speaker 23

I know I've been in the building a number of times. I know it's at least three stories tall. I don't know if it's four. That's okay. If you find it, you can come back to it. I'm complete, Mr. President.

57:27Speaker 16

Council Member Miller.

57:28 – 57:47Speaker 7

Thank you. Question for staff. The issue was raised as the order of planning, so the comprehensive plan is adopted. Does the land development plan manual get updated based on the comprehensive plan or is the UDC instead that update for planning purposes coming out of the comprehensive plan?

57:51Speaker 16

Who wants to take that? Ms. Woodward.

57:55Speaker 13

Just to note for Councilmember Wall, Aviva is four stories tall.

57:59 – 58:40Speaker 13

Four stories tall. based on the quick image in that. As it relates to the comprehensive plan, the comprehensive plan was adopted in 2018, and that led to the update. So the comprehensive plan is providing that overall policy. And then the mechanism for enforcement is the zoning ordinance. So that led to the UDC update. In addition, we have made commitments. So we updated the comprehensive plan again in the fall of 2025, looking at every five years to update the comprehensive plan, making sure there's alignment, recognizing things also change over time. So those two work together in terms of policy documents and then how we kind of go about aligning that policy out within the city.

58:40 – 58:55Speaker 7

But I guess to the specific question of the land development manual, the zoning policy guiding document of enforcement of development was quite different in its execution from the UDC, correct?

58:56 – 59:13Speaker 13

Yes, the land development manual had predated and had been for a number of years and then really the intention of updating the comprehensive plan in 2018 was recognizing that both the land development manual was out of date and making sure there was alignment and needing to do that first step before then moving to the unified development code.

59:13 – 59:34Speaker 7

So by adopting a new comprehensive plan, the former council set in motion an update to our zoning enforcement documents. And that was not an update to the land development manual, but the creation of the UDC. So there was an interim period where the comprehensive plan had been adopted. The land development manual was still in effect until the UDC could become in,

59:36 – 59:53Speaker 13

Yes. And I would just make two corrections. There were some interim changes to the land development manual, including looking at TOD and updating that prior to the UDC being updated. So there were a couple of changes between the comprehensive plan and the UDC taking effect when the land development was still in place.

59:53Speaker 7

OK. And so I guess a question for the applicant. You acknowledge there was a one year expiration. Correct.

1:00:03 – 1:00:15Speaker 25

Yeah, we've disagreed with city staff about what the LDM provides with respect to that. They've taken the position that it expired at one year. We took the position that that zoning did not ever change.

1:00:16Speaker 7

And these are separate parcels, correct? The Starbucks parcel and the parcel in question today?

1:00:22Speaker 25

That is correct.

1:00:22Speaker 7

That's what it looks like here. OK.

1:00:23Speaker 25

But as approved and presented, they were presented together.

1:00:26 – 1:01:05Speaker 7

So the phase one was on a parcel that was completed. And your proposed phase two is on a separate parcel, uncompleted. And now we have the UDC in effect. And I guess my question is, in terms of extending that approval, You've noted challenges of the pandemic, construction challenges. Did you attempt to clarify the length of that approval, or where is this coming up now that you're saying you don't feel like there was ever an expiration and staff say there was? Where is that miscommunication happening?

1:01:06Speaker 25

Those communications don't happen until 2025 when the project becomes viable again.

1:01:13Speaker 25

You're welcome.

1:01:15 – 1:01:41Speaker 21

Councilmember Keene. Yeah this is again I'm gonna try to direct us at staff just because I'm trying to understand I mean I'm hearing words here about variances from certain things but but in fact this project didn't come in to be approved under the UDC and the zoning in fact what we're trying to do is take the project that was approved back in 2020 and create variances for anything that has changed up to now is that is that accurate?

1:01:42Speaker 27

That's an accurate description of the applicant's request. Okay.

1:01:45 – 1:02:05Speaker 21

And then going through the narrative, again, this is my prep here. The previous site plan failed to commence development within the one-year approval date and therefore became null and void. Is that what the staff's position is here or is it that this project needs to be higher or is it just that you can't come in with that plan because it's out of date?

1:02:06 – 1:02:33Speaker 27

So the reason that the approval is null and void is due to that lapsing timeline of the one year. Since then, it's been a few years, and the UDC came into effect 2023. There's new policies currently in place that that development in its current form do not meet. And that's why the list of variance requests, that's a long form of what deficiencies there are with the current design.

1:02:34 – 1:03:05Speaker 21

Okay, but again, I'm just trying to get across I even if the even if there weren't all these variances needed if a if a site development plan or a general development plan goes null and void you can't just bring it back and say but now we want to build it and if we start doing that is that a precedent that anything approved in the past could come back as we still need to be able to do this because I think that's an important standard that if nothing's done in a year or whatever a time frame is or no extensions are requested the plan is null and void.

1:03:07 – 1:03:49Speaker 27

Yeah, so both the LDM and the UDC have that limit on approval timeline. It's laid out in the LDM, and it is in the UDC document. And again, that's to kind of ensure the situation doesn't happen, because again, Comprehensive plan documents, the Unified Development Code, they're living documents. They are meant to be updated on a regular basis to reflect current standards, development goals, objectives that a municipality has. So really extending approval from an old former development manual, that wouldn't meet today's standards. It's kind of a situation we're trying to avoid here.

1:03:49 – 1:04:48Speaker 21

Okay, that's helpful, because I'm getting testimony that makes me feel the issue is certain sort of variances, but in fact, the issue really is do we allow things to just live in perpetuity, because they were approved back in 2020. I was trying to follow Councilmember Miller's questions, but in fact, there was a time, a transition period where we had projects that had been approved under the Land Development Manual that had to follow that even though the UDC was in place. It's just you've got to have a point where you move off of one and onto another. I consider this less about variances from what the new things are and much more about We can't just allow things to be resurrected back into the system and said, we're gonna start building this now after we've moved on after a year of, or whatever it is, whether it be a year or extensions requested. And so that's kind of what I'm thinking about this. And if anyone thinks I've got it wrong, let me know. Councilmember Doering.

1:04:48 – 1:05:10Speaker 9

I really appreciate Councilmember Keene's approach to this because that's what I've been sitting with as well and I have a couple follow-up questions for staff. The first one is what is that extension, what does that extension process look like? If a development is approved and that year time frame doesn't happen, what does the developer need to do to get that extension?

1:05:13 – 1:06:07Speaker 27

So really, it would start off with a basic communication of we're running in some roadblocks. If it's funding, I don't really want to give too much information just because we want to try to avoid this situation. Sure. If at all possible. Really, it would be a request. We'd have a meeting to see kind of where the deficiencies are or what the timeline, true timeline will look like. And we'd probably evaluate that on a case-by-case basis. That being said, I don't think we've come across it very often. It's pretty rare. I think really in practice it would be similar to essentially a continuance request, much like the earlier item today. We'd formally note that, give a new extension date, and the reason why we're allowing it. So I think it would have to be a supportable reason that staff can lean on if, to allow that extension.

1:06:07 – 1:06:19Speaker 9

And then you probably won't want to answer this question too, and I appreciate that. Has there been a history in Rochester where a reasonable extension request has been placed where that extension has not been granted?

1:06:20Speaker 27

I'm not aware off the top of my head. Well, of either side, right? I think they're pretty quite rare.

1:06:27 – 1:07:04Speaker 9

OK, yeah, so thank you for that. So where I see the issue, too, is a lack of communication on the developer's part at this point to talk about why the project was being And without that communication, I kind of agree with my council member colleague Keene here about we have to draw the line somewhere. Otherwise, we could have a far out development that was approved in the 1980s and we could come back and talk about it at this point. And that makes no sense to me on a policy level. So yeah, I think that's my questions.

1:07:05Speaker 16

Council Member Fredericks.

1:07:06 – 1:08:06Speaker 15

Thank you. I'll put myself in the developer's shoes a little bit here. I just want to say when you're going through these projects like this and you're ramping up and you're trying to get things going and you do run into projects on Broadway, you run into COVID issues, which I ran into personally in a big way and ill-advised open during it and had a bit of a disaster. You know the first thing you're not thinking about is I gotta run and tell the city that I'm having these issues. What you're doing is you're covering your rear end and you're trying to make sure you can get it put together still and make it happen and have it work. Ultimately have a plan that works. So, With that being said, that covers the first part of it, and the second part of it is, I've heard of things kind of getting looked down their nose at when people want to go bigger, higher, in an area that's not zoned for it and such. That becomes an issue, but when they're actually asking to go smaller, is that correct? John?

1:08:06Speaker 25

That's the variance that we're seeing.

1:08:08 – 1:08:54Speaker 15

You're trying to stick to your original plan. And there's a lot that goes into redesigning and such. Just common sense tells me, let the person that's investing the money do what they want to do, because these are the type of things that developers, even just home builders, even just personal business owners. These are the very things that get upsetting to the people that are trying to do things in this community. And you feel like your hands are tied. You feel like the city owns your property until it comes time to pay the taxes. Then you get to pay them and it's yours. So they have to have the freedom to operate within their space, within reason. We don't want a junkyard on Broadway. I mean, that's obvious. This seems to me like we're getting caught up in policy, this, that, and everything. Just use some common sense on it. That's where I'm at.

1:08:55 – 1:09:21Speaker 16

Thank you, Councilmember. So I have a question for staff on, so if we deny this appeal and the developer continues to want to develop the property, what process would they go through if they did want to build the 22 foot building rather than the 40 foot building?

1:09:27 – 1:10:02Speaker 27

So in the event the appeal is denied this evening their request is denied they'd have to take it back to the drawing board. I mean they can come forward for a new variance request if they're changing the scope of the project if they're just focusing on the height for example. It's a single variance request just the building height. if they addressed the other items that are deficient, then it's a new request in itself. So it would go back to the Zoning Board of Appeals for approval. Really, this is kind of their avenue for getting a reduced height building here.

1:10:03Speaker 16

Mr. Cheeky, can you go through, again, those other areas that are deficient that may not align with the UDC?

1:10:12 – 1:12:09Speaker 27

Sure. A lot of them are those MXT additional district standards. So there are a few, so bear with me. For the first floor, the front facade of each primary building, it needs to be located at not more than 15 feet from the front lot line. That would be 65% of the building needs to be located within, 15 feet of the front lot line. Broadway Ave is the front lot line. In this zone district, there is a minimum zero lot line, a maximum 15-foot lot line in the MXT. So they're currently outside of that. The setback areas between public or private streets, excluding alleyways and the structure, shall be occupied with pedestrian-oriented space. Currently, there's a drive aisle in their proposal, so that's an item that does not match up. The minimum building height of 40 feet due to the proximity to Broadway Avenue. There needs to be one at least one pedestrian entrance on each side facing a public right of way. And then if the lot has frontage on those portions of North and South Broadway Second Street Southwest Fourth Street Southeast calls for your road. 12th Street, Southeast, or 3rd Avenue, the required entrance shall face those streets. I get it. I get it. Thank you. Thank you. There are a couple more. Window transparency requirements require 65% at the ground floor facade area. Needs to be glazing between three and eight feet. 30% or more for each facade level above the ground floor requires a glazing. pedestrian design and accessibility requirements would also apply. And again, that's entryways, pedestrian-oriented spaces, pedestrian focal points. There's quite a few in that list.

1:12:09Speaker 16

Thank you, Mr. Cheeky. Council Member Palmer.

1:12:12 – 1:12:34Speaker 18

Thank you. Well, one of the reasons that we have an appeal board and it comes to the City Council on Appeal is that we can look at something and say, boy, that doesn't really fit the rule book. But I've got a question. When we did the UDC update, I know that we reached out and looked at other developers and other pieces of property that were going to be changed. Did we do that with these guys?

1:12:35Speaker 27

Based on the timing of this application, they were intending to come in under the LDM with their original file date to get ahead of the UDC standards coming into effect.

1:12:45Speaker 18

So what date would that have been?

1:12:49Speaker 29

Council President Shubrin, can I chime in here?

1:12:52Speaker 29

I just want to note that the broker of this deal was actually on the UDC steering committee. So they were well aware of the changes that were taking place at the time.

1:13:05Speaker 27

The site development plan was applied for in 2018. 2000 what? 2018.

1:13:10 – 1:13:32Speaker 18

Okay. I'm not an attorney, but we have one sitting here for the city. So Mr. Spender, Craig, when I was a building inspector, we had a permit, and that permit stayed in effect until we actually sent a letter saying we voided out your permit. Why would zoning be different than the building code?

1:13:36 – 1:14:08Speaker 20

Council Member Palmer, Council President, Council Members, Mayor, I think the short answer, Mr. Palmer, is that this is just an entirely different process. There's already an agreement. The party is on notice of the one-year timeline in effect already. It doesn't need a reminder email or a status check as to... an update on where the project is at. So I think it is not part of the typical process to attempt to reach out to a developer and get a status check.

1:14:10 – 1:14:26Speaker 18

Okay, I'll go back to Mr. Yasser. Because you were with zoning when we did this, or community development, didn't we reach out to different builders and developers and say, hey, we're looking at your property and we're gonna change the zoning? Am I remembering that correctly?

1:14:27 – 1:15:02Speaker 29

Yes, notification would have been sent directly to this property owner, as was along the entire corridor at the time of the overlay, which is different than the UDC. But I think that's what you're getting at is when we did the overlay zone, the property owners were directly mailed like three, if not four times, which is how they knew to submit this on the eve of the change. So they were definitely aware at the time. Additionally, their consultants at the time, Mr. Schoenfelder's colleague as well as others were involved in the process. So there was certainly an awareness of changing rules, yes.

1:15:08 – 1:15:46Speaker 24

Thank you. I'm certainly... as we've heard from some of the colleagues, sympathetic to wanting to do something that you can't do any longer. And I'm sure that's a frustration. But as I understand this, we're making a quasi-judicial decision. And so we've been down this path before where feelings get in the way of the quasi-judicial nature of a city council. And so I was hoping perhaps our city attorney could define again As he often does when we have quasi judicial rulings what that actually means and what how we should be making the decision

1:15:51 – 1:16:36Speaker 20

Thank you, Mayor. I appreciate the chance to review that piece. I do think that the materials that are in the packet do address this pretty squarely, do remind you of the nature of a quasi-judicial proceeding, that you're really bound by the criteria as well as the specific areas of findings that are relevant to law here. So again, If you need specific reference back to the specific criteria that were in question here, and if you are considering a different direction, which criteria you need to make different findings on, we can certainly talk that through in more detail.

1:16:38Speaker 16

Thank you, Mr. Spindler. Craig, is there a motion on this item? Council Member Keene.

1:16:46Speaker 23

I'll move to deny appeal number,

1:16:49 – 1:17:07Speaker 21

I'll move to deny appeal number CD2026002AP to allow for continuation of a development under the previously approved site development plan application prior to the UDC standards for the subject property based on the findings outlined in the community development memo.

1:17:08Speaker 16

Motion made by Council Member Keene. Is there a second? Second. Seconded by Council Member Miller. Council Member Keene.

1:17:15 – 1:18:08Speaker 21

Yeah, yeah, this is, I don't like going through this. This does look like a project that fits into what's built there, but realize when we're dealing with the UDC and these things, we're talking about what this council perceived and what the UDC and the Unified Development Code was trying to do with those first and second tier neighborhoods right outside the downtown. It does have a 20, a two-foot drive-in coffee shop, but that's not what the future wanted to be there. It does have some of these other things, but what our zoning and what the UDC was trying to look is saying, in the future, we want it to be different. So to go back to a project that was approved in, I believe it was 2020, and not acted on, which is key to me, that's the key standard here, that we have to have projects, once they're approved, they have to act on them or their approval goes away. So that's where I'm coming from today. Councilmember Miller?

1:18:09 – 1:18:51Speaker 7

Sure. I'd just add, I appreciate Councilmember Keene's questions earlier. And I agree that we can't have zombie approvals that could always just come back to life. And I think we're talking about kind of a chicken and egg problem here. Does the comprehensive plan and the UDC set the direction of development or does the existing development pattern? WE'VE TALKED ABOUT THIS WITH THE URBAN 3 ANALYSIS ABOUT LAND PRODUCTIVITY ABOUT BUILDING THE CITY FOR THE FUTURE AND I APPRECIATE THE CHALLENGES THROUGH THIS PERIOD BUT WHEN I LOOK AT OUR POLICIES WE'VE SET QUITE CLEAR POLICIES WE'VE SET EXPLORATIONS WE'VE SET PROCESSES AND IT SEEMS VERY CLEAR THAT BASED ON THE FINDINGS THAT THIS ONE DOES NOT MEET OUR QUALIFICATIONS FOR APPROVAL OF THIS PROJECT SO THAT'S HOW I PLAN TO MOVE FORWARD TONIGHT.

1:18:53 – 1:19:25Speaker 18

Yeah, I won't be supporting the motion. I think that part of the UDC is that we have the ability to have appeals and we need to listen and things do change. I would have done criteria C under the circumstances are unique, not created by the owner and would have been the two years of Broadway reconstruction and COVID. um i think that uh if you look at the whole area that that would make more sense to have a building that's about the same size and type of building because these buildings aren't going to go away for a long long period of time caribou indoor starbucks

1:19:30 – 1:21:00Speaker 16

I'll just weigh in. This is a really hard one. I am someone who wants to see development, economic development, but I think with this issue and what really drives it for me is it's not just one thing that's not a part of the UDC, but there are others there. And we do have a process with the UDC. I can think back. I was on the Planning and Zoning Commission when the UDC was being discussed. It did not come out of nowhere. And so those standards were combed through by Planning and Zoning, by this council, and very clearly understood by the development community as well. standards. There was a transition period that seems to have been missed as well. And what I would say is that I encourage you to come back with a development and work with staff under the UDC. If there are some variances that you're asking for, I'll certainly be open to those. But with the issues surrounding this, it really doesn't feel like it's something that I can support this evening. With that, all in favor of the motion say aye.

1:21:02Speaker 16

Opposed say nay.

1:21:04 – 1:21:24Speaker 16

Motion passes five to two with council members Fredericks and Palmer voting nay. Moving on to item G3, major land subdivision by Bigelow Homes LLC to be known as Westbury First. Mr. Cheeky.

1:21:25 – 1:22:31Speaker 27

Thank you, Council President. Good evening, Council Members. Anthony Cheeky again. Before you is final plat application CD 2026-014 plat by Bigelow Homes, LLC. This is a final plat request for 105 single family lots over approximately 34 acres. This is located in an R2 zoning district in the northwest end of Rochester, southeast of the intersection of 60th Ave Northwest and Kingsbury Drive Northwest. This is the first phase development under the Westbury General Development Plan. This plan is consistent with the approved GDP and with the major land subdivision that was approved in January this year. This plot provides continuation of local streets, stormwater management, and the stormwater management will be addressed by utilizing proposed treatment areas shown on the GDP. The proposed subdivision helps address the city's current shortage of single-family residential units, and development review team is recommending approval of the application subject to the five conditions contained within the report. This concludes my presentation. Happy to answer any questions.

1:22:33 – 1:22:44Speaker 16

Thank you, Mr. Cheeky. Is the applicant or a representative of the applicant here? Please step forward. You have 10 minutes to discuss the item.

1:22:45 – 1:23:05Speaker 26

Good evening, Mayor and Council. I'm Kyle Scove with WHKS representing the developer Bigelow Homes. We are in agreement with the five conditions as presented and looking forward to having some homes available. Should be seeing some later this year.

1:23:06 – 1:23:34Speaker 16

Thank you. We'll invite you back up after the public hearing. This is a public hearing. Anyone wishing to be heard on this item, please step forward. This is a public hearing. Anyone wishing to be heard on this item, please step forward. Seeing no one, I will close the public hearing. Mr. Stove, if you have any additional comments, council members, questions for staff or the applicant. Is there a motion on that?

1:23:34 – 1:23:53Speaker 15

I take the motion. Adopting a resolution approving major land subdivision number CD2026-014PLAT by Bigelow Homes LLC to be known as Westbury First with five conditions subdividing 34 acres into 105 residential lots and four out lots.

1:23:53Speaker 16

Motion made by Council Member Fredericks. Is there a second? Second. Seconded by Council Member Doering. Council Member Fredericks.

1:24:00Speaker 15

Happy to see you addressing a housing need in this community. Thank you to Bigelow Homes. No additional comments from me.

1:24:06Speaker 16

Council Member Wall.

1:24:08 – 1:24:23Speaker 23

As well, I'm thankful to Bigelow Homes, doing a lot of business in Ward 3, and that they continue to provide a great product for people at a wide variety of price points. So I look forward to this new home addition as well.

1:24:24 – 1:24:38Speaker 16

All in favor say aye. Aye. Opposed say nay. Motion passes. Next up, we have G4, which is a major land subdivision by Roger Payne to be known as Century Valley Fifth. And Mr. Desmond McGill.

1:24:39 – 1:27:28Speaker 36

Hey, yes. Thank you, Council President Shubring, Mayor Norton, members of the Council, good evening. Desmond McGill with Community Development. This is a request for a major land subdivision for Century Valley Fifth. The 17.6 acre is zoned R2. It's located between Silver Creek, road northeast on the south side, and then the terminus of Bella Vista on the north side. And this is located just south of Century Valley, fourth final plat. This development consists of 16 lots and two streets, each terminating with a cul-de-sac. The subject lots on the southwest and southeast sides are oversized, and so those areas are generally not developable. due to having steep slopes. Stormwater for the subdivision is collected on street and then routed over to a pipe that daylights at a retention basin south and west of the subject property. Preliminary plat major land subdivision for this site was approved in February of 2024 with the same number of lots and same street configuration. Only a portion of that was final platted at that time. That application has since expired and therefore this is application for revisiting and bringing that back to fruition. So this plat is consistent with the R2 zoning, the 2023 revised general plan for Century Valley. The previous plat submitted for this site is identical. And Commission unanimously recommended eight, zero, that the Council approve the application subject to the four conditions of approval. After the Commission decision, the applicant has provided staff documentation showing compliance with two of those conditions, which are conditions two and three, They have addressed the issue of the wetland replacement order of the LGU and provided new documentation for the floodway, flood fringe being shown on the plaque. Therefore, condition two and three can be stricken if the council so decides. Staff is recommending approval subject to condition one and two found in your staff report, and that concludes my presentation. I'd be happy to answer any questions after the public hearing.

1:27:28 – 1:27:41Speaker 16

Thank you, Mr. McGill. Is there the applicant or a representative of the applicant here? Please step forward, identify yourself, and you have up to 10 minutes. You do not have to use all 10 minutes.

1:27:42 – 1:27:57Speaker 34

Thank you, Council President, Council Members, Mayor Norton. Yeah, so thanks, Desmond, for giving us the overview. Like I said, items two and three have been complete.

1:27:57Speaker 16

Can you identify yourself?

1:27:59 – 1:28:34Speaker 34

Oh, yep, sorry, Connor Burke with SDH, representing owner Roger Payne, and then the developer, Bob Fleming. Bob Fleming couldn't make it tonight. So yep, items two and three are subsequently addressed. Item number one, they'll be working with Public Works on getting the plans submitted, reviewed, and approved, and then subsequently we'll come back and apply for the final plan at that time, which will be accommodating item four. With that said, I have nothing else to add. I will be happy to answer any questions.

1:28:35 – 1:29:03Speaker 16

sounds good we will invite you up after the public hearing this is a public hearing anyone wishing to be heard on this item please step forward anyone wishing to be heard on this item please step forward seeing no one i will close the public hearing and invite my colleagues to ask any questions of staff or the applicant or a motion go ahead council member fredericks

1:29:04 – 1:29:23Speaker 15

I'll make a motion adopting a resolution for major land subdivision number CD2026-009PLAT by Roger Payne with four conditions to be known as Century Valley Fifth, subdividing 17.62 acres into 16 residential lots.

1:29:24Speaker 16

Motion made by Council Member Fredericks. Is there a second? Second. Seconded by Council Member Keene. Any further?

1:29:32Speaker 15

It will sound like a stock record. Thanks for providing for our community.

1:29:37 – 1:29:59Speaker 16

All in favor say aye. Aye. Opposed say nay. Motion passes. Thank you. Next up, we are on our reports and recommendations. We have H1, which is Elton Hills Drive Northwest Traffic Study and Alternative Selection. And we have Mr. Sam Budzina here to make a presentation.

1:30:02Speaker 12

Yes, thank you. President Schubert, council members, Mayor Norton, Sam Bozzino, Public Works, City Traffic Engineer. I do have a presentation.

1:30:16Speaker 14

There it is. Push the button.

1:30:19 – 1:41:05Speaker 12

Haven't been up here in a while. Here to talk about Elton Hills Drive. We did just have a study session just a month ago on June 22nd. So... Try to not recap a whole lot of that, but I do want to go through how we got here, go through the remaining options that are still up for your consideration. There were some good questions from the study session that we feel like we have some better answers for you here tonight, and then get into our final recommendation. So to recap, we did do a traffic study, wrapped it up this spring, we analyzed 14 different options. We then hosted a neighborhood meeting, we did a public survey, and we had our study session I just mentioned where we presented seven options. That was three three-lane options, three four-lane options, and a five-lane option. And then here tonight, we've got three options left. They're listed there, I'm about to go through them. And then just a quick recap of our survey results there too, which again, I went over at the study session. So our remaining options, option one, this is our recommended option, not to spoil the presentation, but three lanes with parking on both sides. We did draw up what that could look like on this stretch of Elton Hills, and there is a higher quality PDF attached to your council packet if you want to zoom in and really get a good look at it. We are looking at curb extensions at the intersections. There is a section of median there close to 14th Avenue. That's a T intersection where you don't have to, there is no westbound left. You don't get to go anywhere. So add a median for traffic calming, improve the crosswalk location there. So this is just kind of an example, right? We'll do as much of that kind of stuff as we can get in within the project budget. We might have to scale it back a little bit, but this is just giving you the idea of what to expect with option one. There is no bike facility with this. So, if somebody wants to ride their bike along here, it's either gonna be sharing the lane or in the parking lane. Parking, we have said, is underutilized, so a good stretch of that you can ride in the parking lane. Obviously, when you get to these curb extensions, you will have to enter the drive lane. Otherwise, you can ride on the sidewalk. This is not downtown. Riding on the sidewalk is allowed. You cannot ride your scooter on the sidewalk anywhere in the state of Minnesota. Just things to keep in mind with this option. Option two, so this option was recommended by the Pedestrian Bicycle Advisory Committee, which I'll talk about a little bit more later. three lanes, one lane each way, a center turn lane, parking on one side, and a two-way cycle track on the other side. I'll say this also aligns with our complete streets policy and our active transportation plan as far as what we can achieve with a retrofit project. Pedestrian Bicycle Advisory Committee, well, I'll talk about them later. There's a whole slide on that. So this is what option two could look like. Again, curb extensions, they're a little bit smaller here. The median again, and then sections of what could be a raised concrete median island in the buffer between the drive lane and the cycle track for short sections. We'll talk about barrier options a little bit later on too and what that'll look like. At the study session, we did hear that you all would like to see a four-lane option, so we brought this one back too. It's keeping the four lanes undivided, and then we'll add some curb extensions at intersections. So again, this is what that would look like. Again, no bike facilities. We still have parking on both sides, and we would do as many curb extensions as we could fit in with our project budget. So at the study session, we were asked about snow clearing. How would that work? So options one and three, no real changes. Seasonal parking restrictions are in effect. So there's alternate side parking every other day. We'd get the curb on one side, come back the next day, get the other curb. With option two, it would definitely take us more time to clear. We may potentially need to bring in smaller pieces of equipment. I'm not saying we need to buy smaller pieces of equipment. We do have plows or like your one ton trucks that clear cul-de-sacs. We do have skid steers that clear our paths and things like that. But they are in use at those times. So again, it would just take more time to get them in here to clear another space. With option two, there's only parking on one side. So seasonal parking does not apply. So cars that wanna park on the street, they're always gonna park on that one side. So what that means is we may not be able to get to the curb. If that happens, snow can continue to build up along that curb line, parked cars may eventually shift further and further away from the curb, potentially encroaching into the travel lane. If that becomes a problem, what we would do is go out and stick sign, no parking. So we would displace all the parkers for 24 to 48 hours until we can get in there. That gives them enough time to notice that they need to move their car before we would actually tow them out. So that is how we would clear that one side if it became an issue. Garbage collection, again with options one and three, wouldn't change anything. They would just place their cans at the end of their driveway or in their boulevard. With option two, they would have to bring that out further into what would be the buffer between the cycle track and the drive lanes. It could be challenging when there's snow piled in that space. Um, obviously if the wind blows, uh, I I've certainly come home and my garbage can was not where I left it because of the wind. So it's more likely to either get blown into the cycle track or into the drive lanes. Um, would not get blown back into the yard most likely. we were asked about safety. So Council Member Palmer had reached out to us previously asking for some comparables of what does safety look like with some other projects where we've added bicycle facilities. So we only have 10 years of data, so it only goes back to 2016. These are three projects that we did in 2018, so we left 2018 out of it to get a real before and after. So it's two years compared to seven years, not exactly apples to apples, but this is what is available to us. 19th Street Northwest has a section of four to three lane conversion. The others really don't. Those were more taking parking on one side to add the bicycle lanes on the street. So they still have parking on one side. But Sixth Street Southwest, we saw an increase of 33%. That's only one and a half crashes per year. So it's a large percentage, but not a really big number. 19th Street Northwest, so that's the stretch where there is a portion of four to three lane conversion where we saw a reduction of 23%. And then 14th Street Northeast, again, we went to parking on one side with bike lanes and saw a reduction of 43%. In general, FHWA does report crash reduction can be expected between 19% and 47% and speed reductions of three to five miles per hour. and that is in the 85th percentile speed, which on Elton Hills is about 38, so that would get us between 33 to 35 miles an hour. As far as what a barrier could look like, so these are real cycle tracks that are in the United States. Top left option there is, I believe, First Avenue South in Minneapolis. I showed this slide to our street maintenance team and they first looked at that one like, where do they put the snow there? Questioning maybe they actually haul it out. I hope we don't have to get into a situation like that. I don't think that we would. I think we do have boulevard space and a much wider buffer than what is depicted there where we would be able to pile snow. The top middle picture is actually the same cycle track, it's just around the corner on First, did I say, one of those is First Avenue South, one of them Second Avenue South. Same facility, all they have there is some flexible delineators. I don't think that would provide enough protection. So that's not directly what we would propose to do, but that could be an option, that's what we've done in other areas. Top right, they do not have any flexible delineators. That is in Miami, Florida. We would probably want something a little bit taller that would stick out above the snow. But between the top right and the bottom right, those are the same, it's called a Zebra product. So just showing some different configurations of how that could work. Bottom right is in New York City. They did a one or maybe two block pilot project on the east side of Union Square. That was back in 2022. I'll say if you look at that facility now on Google Street View, they have April 2026 on there. It doesn't really excite me with those products. Some of them are missing. Some of them are just sitting there, clearly not in that orientation anymore. Where they're missing, you see some bolts sticking up out of the pavement. So it doesn't excite me. I think something like that would give us some headaches, needing to go back in and replace it. Bottom left, that is the south side of Kansas City, Missouri. So where I said we'd use top left close to intersections, we'd probably do something like bottom left on the longer stretches between intersections. And then if you look closely at that picture also, there's some gaps where there's some driveways. So we would leave gaps for the driveways. We may need to talk about where the buses stop. If they are going to pull all the way over to the curb, we'll need a gap for that. But that would be the general idea if option two is the selected option. So final recommendations, talked about Pedestrian and Bicycle Advisory Committee. They did pass a motion for these three things. Support our overall project goals. They support the fully separated cycle track with what is essentially option two before you here tonight as an alternative if budgetary constraints do not allow for full separation of this project. And I can confirm that budgetary constraints do not allow for full separation.

1:41:07Speaker 16

Can you hold for a minute? Mayor, do you have a question right now? OK.

1:41:12 – 1:43:34Speaker 12

Okay. And then they added a couple, a project goal, increasing neighborhood connectivity and increasing safety for pedestrians crossing hills. I spoke to citizens advisory on transit. This is the motion that they passed. So they also support our project goals. They did not take the step of actually selecting a preferred alternative. Um, so leave that open to your interpretation, but, um, obviously with all things cat, they do, uh, primarily have concerns about transit and how people get to the stops, making sure that our buses are on time and provide good service and all of that. We did receive a letter of support from Rochester Public Schools, which is attached to your packet. Just a couple snips from their letter here. They support either of the two proposed three-lane options, so either option one or option two, based on the benefits that a three-lane section would provide over a four-lane section. At our study session, we went through these key decision points. We talked about the number of lanes, so we do recommend three lanes. Bicycle facilities, that was kind of open-ended at the study session, but tonight we were saying no bike facility for ease of implementation. Long-term maintenance and the survey feedback that we got, it was not a very popular option among the respondents. So we would still plan to implement all ages and abilities facility with the future reconstruct. It'll be a while from now. parking lanes keep parking on both sides that was important to the residents that are out there i would say they definitely need it on at least one side which would be reflected in option two as well then traffic signal at 14th or 15th we looked at whether that should be relocated we say keep it at 14th avenue we'll bring a separate project forward for that so nothing that you need to take action on tonight so our recommendation option one three lanes with parking on both sides So if there's a decision here tonight, then we'll immediately go into final design and hope to get construction going as soon as school ends in the spring. And I want to say genuinely thank you. I've been working on this for a very long time and I know you've all gotten a lot of emails and phone calls and had a lot of conversations. A lot of people came to our neighborhood meeting and I know Council Member Doering was out there helping set up chairs for us, so really thank you very much. Appreciate it and I'm here to answer any questions that you have.

1:43:36 – 1:44:08Speaker 16

Thank you. I'll start off. You said the staff recommendation for the option one without the bicycle lane was due to ease of implementation. Can you talk about if you did do the option two with the bike lane, what implementation would look like for that? What would be the timeline and the barriers to implementing that?

1:44:12 – 1:44:57Speaker 12

It's just the amount of the level of design that would need to go into making sure that we aren't having any negative impacts on transit. We impact the residents along the corridor as little as possible. The center line of the road will shift a little bit with that option, so we need to make sure that our traffic signal mast arms are long enough to actually get a signal indication out over the road. There's just a lot of little things like that. We'll have bikes traveling on your right-hand side coming towards you, so we call that contraflow, which will require dedicated bicycle traffic signal heads at the signalized intersection.

1:44:58 – 1:45:36Speaker 16

a lot more design needs to go into making sure that we get that right so you say that that's going to take 20 years if i mean why is it now or 20 years from now is there a medium option for if if this council chooses to go with the three lane is uh is there an option to three years from now, five years from now, to move to the option with the bicycle lanes?

1:45:37 – 1:46:09Speaker 12

You mean the fully separated, like with a full reconstruct project? That would probably be a good 20 years out, just due to age of utilities and things that really don't need to be replaced right now. So I think option two that's here tonight, We wouldn't be presenting it if we said this is not achievable. I do think that this is a good retrofit project. It's not impossible. We can certainly do it, and our goal would still be to start that construction as soon as school is out in the spring.

1:46:10Speaker 16

Mr. Niemeyer, did you have something to add?

1:46:13 – 1:46:39Speaker 14

Sure, thanks, Council President. What I was going to add to the first question was what this corridor really deserves, in our opinion, is a separated bike facility where we're grade separated. So the list of things that Sam was listing there, as far as implementation goes, a lot of those challenges come from the nature of the corridor and how that doesn't exactly fit with the ideal situation to achieve the all ages and all abilities planning that's been laid out.

1:46:39Speaker 16

Thank you. Council Member Miller.

1:46:42 – 1:47:02Speaker 7

I guess just a quick question. What is the overall project budget? So that is in the packet I believe it was around two million dollars total and For these kind of products that you're showing for potential separation What percent of that project budget would that be or what would be the cost of those just rough estimate?

1:47:03 – 1:47:28Speaker 12

the if we were to do a So if we were to do the bottom left and do that on the whole corridor, it'd probably be in the ballpark of $100,000. Okay. So by the time you add in all the medians and everything at intersections, it would go up quite a bit, a lot faster.

1:47:28 – 1:48:04Speaker 7

Okay. So I frequently see grant application opportunities, technical assistance grants, implementation grants, IS SOMETHING LIKE THAT POTENTIALLY POSSIBLE AS A FUNDING SOURCE TO HELP WITH THESE ADDITIONAL CONSIDERATIONS OF PROGRAMMING, ALIGNMENTS, SHIFTING THE CENTER LINE, ADJUSTING THE MASTS. I FEEL LIKE MAYOR NORTON JUST PRESENTED AN OPPORTUNITY FROM A CONFERENCE THAT SHE ATTENDED WHERE IT FEELS LIKE EXACTLY A CORRIDOR LIKE THIS WOULD HAVE BEEN THE TARGET. HAVE STAFF CONSIDERED OTHER FUNDING OPPORTUNITIES TO HELP SUPPORT WITH THE STAFF TIME AND THE PROJECT COST FOR OPTION TWO?

1:48:05Speaker 12

I would say that we have not, that I'm aware of.

1:48:07 – 1:48:29Speaker 7

Okay. Would it be possible for us to advance a three-lane design tonight and still leave that option open since the construction documents would be under consideration and a parking lane versus a separated bike facility feels like a relatively limited infrastructure modification across those two. Is that fair to evaluate other funding opportunities?

1:48:32 – 1:48:43Speaker 12

It wouldn't, if you were to approve option one tonight and then come back later and say that you want to convert the parking lane to a cycle track, I think that would be quite a big change.

1:48:43 – 1:48:59Speaker 7

I guess let me ask that question differently. If we were to approve option two on the condition that we find an alternate funding source, could it be converted back to a parking lane if we do not find one and successfully achieve one

1:49:01Speaker 12

It would be a very wide parking lane. Okay. But it could be done. Okay.

1:49:13Speaker 16

Council Member Palmer.

1:49:16 – 1:50:21Speaker 18

Thank you. You said something that kind of upsets me. At the very beginning, you said that you may not have the budget to do all the curb extensions for all the pedestrian crossings. And to me, that would be the number one concern is that we're able to get those curb extensions at every single intersection. So I don't know where extra money is going to come from if we can't even do that. So I would expect next spring that every one of the corners had a curb extension on it. You know, you're talking about cost, and the email you sent to us, the actual cost to install all the poles, and snow removal is an annual cost, and somebody's going to install them, someone's going to take them out, and really what the pedestrian bike people want, and I agree with them, is that they want a raised, separated bike like we have in North Broadway. And part of the problem I have with the survey that was done is... I think I got this right, is the average speed on the road, the average speed is 32 miles an hour?

1:50:21Speaker 12

That was in your presentation, yes. I don't have the average speed memorized.

1:50:29 – 1:51:23Speaker 18

Okay, and that was off of that. And so the perception is that everybody's speeding down the corridor, and granted, some people are, but average speed is 32 miles an hour. And overwhelmingly, since the last 10 years we've been working on this project, the neighborhood has spoken overwhelmingly that they want four lanes. They want to have the curb extensions for safety. And that's what they're pushing for. So that would be option three. And to me, that makes more sense. And that's something that I would support is the option three with the four lanes. Um, because I don't know what you do in front of those businesses. And I know your accident report, you know, percentage wise, but you're talking two more accidents, I think is what you saved when you, when you did the other ones, not, not a large amount, but we also just did for a large cost. We redid Broadway and north, um, Elton Hills drive. And so that's been improved already. Correct.

1:51:24Speaker 12

At the intersection, yeah, that was part of the Broadway project.

1:51:26 – 1:52:11Speaker 18

And then the other end of it is you've got 19th Street up there by the bridge. We're not touching that, so you're going to come off the bridge at four lanes, and then you're going to go down to two lanes, one in each direction. I see that as a huge bottleneck on that bridge, and it's already a bottleneck. But again, we ask citizens to come out and do a survey. They do the survey and, and then the results come up and it's overwhelmingly, um, uh, four or more lanes, um, in, in overwhelming, not, not wanting bike lanes. So to me, at some point you have to add, you know, if you're asking the citizens and they come back, you have to kind of listen to them. So that's my push or my motion would be for the, for option number three, mayor Norton.

1:52:13 – 1:55:15Speaker 24

Thank you. So a couple things come to mind here. I do like the three lane options as I'm looking at this. My frustration is that this council and the previous councils voted for complete streets and they voted for active transportation. Those are the policies that we're supposed to be working within. And here we are bringing back recommendations that don't follow the two policies that the board has adopted already. So that's a frustration for me just from a conceptual, what's the point of having policies? We're always told you can't do this because of the policy. Well, now the recommendation actually is against the policies, right? So I'm a little frustrated. I want us to support the policies we put in place. The reason we have things like complete streets and the active transportation policies are because we want to make sure that people with disabilities, people that are on bikes, people that are in strollers, you know, walk, roll, whatever, ride. that everyone is safe. And so as someone who is a special ed major and has worked with people with disabilities for years, if we had rules that didn't care about that person with the disability, we would build nothing for people with disabilities. And even though they're in the minority, they would be hurt. And I feel a little bit like this, saying, well, the majority of people drive cars. We know that, right? A growing number of people are riding bikes. But because they're not in the majority, they don't get a safe route. And so this idea that people have weighed in, it makes sense that people in cars would have a higher proportion, percentage, but that doesn't mean that we shouldn't be providing the safety for walkability, for bikeability, and for rolling. And in particular, with this particular area, I'm concerned because this is a road I take nearly every day, and it has three schools on it. And lots of children walk around. I walk by moms who are walking their kids to school. And we heard from someone who wants to ride their children to be able to ride their bikes to school. And yes, for young children that aren't supervised, certainly if we don't have protected bike lanes, a sidewalk would be safer. They still need to cross the streets. So I guess I'm just... My gut says that we should spend the extra money and put in protected bike lanes. That's my gut. Have parking on one side of the street. They do it during the winter when it's single side parking. It works just fine. And my personal belief is if there's parking on the one side of the street and just the three lanes, it will make people drive slower. I really worry about the three with parking on both sides, that it's still gonna look like a roadway that people are gonna speed on. So I guess I'm encouraging us to do our complete streets and our active transportation plan and put in protected bike lanes.

1:55:16Speaker 16

Thank you, Mayor. Council Member Keene.

1:55:19 – 1:55:45Speaker 21

Yeah, I'm gonna refer back to what you talked about with the funding. There's the 1.59 that's in the levy funded that's funding for the mill and overlay and that's really how we got to here today. We have this mill and overlay and because that now does that also cover the work to do these bump outs and things like that or is that part of the mill and overlay or is that part of the improving the street with the state aid money?

1:55:46 – 1:56:07Speaker 12

The $500,000 in state aid is for the intersection improvement project at West River Parkway. So it was scheduled both in 2027, so we're gonna pair them together and do them together. But the 1.5 million that you mentioned, that's going to include our bump outs or potentially barriers.

1:56:08 – 1:56:25Speaker 21

So I want to drill down on this a little bit just to make sure. Is it possible we're going to be able to do that with the 1.5, or do we have this design to the point that that is part of the project? Because I heard a lot of things in the, you know, we could do it this way, we could do it that way, but that also means we might not be able to.

1:56:27 – 1:56:46Speaker 12

We'll be able to do a lot of it for sure and we're gonna start from a point of looking at every single intersection But we're also going to try to stay within our budget. So if we need to You know choose priority prioritize them You know some of them the intersections may get dropped or maybe we choose to only do one side of an intersection or something like

1:56:47 – 1:57:10Speaker 21

Okay, again, I'm just a little gun shy here because I heard some words that, I mean, I know we're not fully engineered and done and saying this is exactly what we can do and have bid. So I understand the differences there, but I am also worried that we're going to show some things here that would be good ideas and maybe we'll come up short. And I think that's possible, but I think your feeling experience tells you that's probably not gonna happen with the intersection work.

1:57:12Speaker 12

No, I don't think we'd be coming up short. Again, our concerns with option two is that we really want to make sure that if that's the one that we do, then we want to make sure that we do it right.

1:57:21Speaker 16

Yep, okay. I do want to go back to that option. Mr. Niemeyer was going to add a little to that question.

1:57:27 – 1:57:48Speaker 14

Yeah, thank you, Council President. I was just going to add quickly that the intersection improvements, the bump outs are of a cost scale that probably falls within a lot more of our flexibility with the budget than for example, building a whole separated facility. So there's a scale of those costs and a likelihood we'll be able to fit those into the budget or modify the budget down the line.

1:57:48 – 1:58:05Speaker 21

Okay, thank you. I did want to just follow up too because I heard, you know, Public Works being worried about this and I think this is the difference between option one and option two is, option two is this is what we can do versus this is the right way to do it if you were doing a real street reconstruction.

1:58:08Speaker 16

Mr. Niemeyer is shaking his head up and down.

1:58:10Speaker 21

Yeah, I guess.

1:58:12Speaker 16

Signifies yes.

1:58:12 – 1:58:57Speaker 21

Yeah, again, I know there's always this, do as much as you can, but I think what I'm concerned about here is we don't have the funding and the right way to do a real protected bike lane, but we can do something. But when I look at Elton Hills on both sides, from the whole length of this, there's sidewalk pedestrian facilities on both sides, all the way from end to end. So, I mean, I'm finding it that if we were gonna do a real protected bike lane and do it such that it had safety and buffering and didn't cause problems with the garbage cans and with the snow removal, I would think I'd be for that. But I think what I'm hearing is that we're not recommending that because we don't have the exact right way to do it.

1:58:59 – 1:59:25Speaker 12

It would just be a much, much more expensive project. I mean, we're talking about the difference between installing some curb stops and delineators versus raising up the whole thing and moving it over, maybe planting a row of trees behind it. But that would also involve moving all of the storm inlets to a different location. which could affect the spacing from the water line to the sewer line. And so it would just be a very, a much larger project, full reconstruct.

1:59:25 – 2:00:04Speaker 21

Yeah, yeah, okay. Again, I'm just trying to make sure I understand. I'm reading it and have my own interpretation. So I'm interpreting it as this is the one that we can do and it does reflect the public input that we got too. The combination of street safety, road safety, roll walk bike facilities if you can but then also and really focusing more on what we're doing with since we're doing the mill and overlay since we have this thing in front of us what can we do with that and i think that's where i'm starting out here yes council member wall thank you

2:00:06 – 2:02:00Speaker 23

In the study session last month, the presentation said that there was no perfect answer, at least until the road might be rebuilt in 20 years or so. With no perfect answer, it's going to be hard for me to vote against the people who actually live in the neighborhood. All of us council members have received any number of communications through email, calls, personal conversations. My analysis of the addresses provided by the emailers when they did provide an address is that the people that favor continuing with four lanes are dominated by people who live in the Elton Hills neighborhood, including those who live right on Elton Hills Drive. Not all, just a significant majority. On the other hand, those promoting a road diet with bike lanes come predominantly from people who live outside the neighborhood, not all, but a significant majority. That is backed up by the responses in the study session presentation. When given a choice of the number of lanes, 115 out of 177 preferred a four or five lane option, that's 65%. When asked if there should be bike lanes, 108 of 175 said no, that's 62%. So the issues are many. Some people have talked about them here. Safety, conveyance of traffic, garbage collection, snow removal, perception of the road as an east-west corridor or a neighborhood road, or more and more. I'm in favor of option three, keeping the road at four lanes, but adding safety features that were suggested six and seven years ago, as suggested by a couple of our early speakers. We can make Elton Hills drive a safer road, and we should do so, and as a community, we need to drive more slowly and more safely in every neighborhood.

2:02:02Speaker 16

Thank you, Council Member. Council Member Fredericks.

2:02:06 – 2:02:21Speaker 15

Thank you. Are you sweating a little yet? You're doing all right, okay. So what I heard you say is schools in that area are good with the three lanes, right? And I also heard that the residents in vast majority were against bike lanes, correct? Okay, thank you.

2:02:23Speaker 16

Council Member Miller.

2:02:24 – 2:02:35Speaker 7

So one of the questions that came up from an open comment speaker was which of the three options proposed here is the safest for all users? How would you respond to that statement?

2:02:38 – 2:03:03Speaker 12

Think either of the three lane options certainly safer than the four lane option both for the benefits to drivers Removes the weaving from having to change lanes Which one is the safest would you recommend if I know we're talking about project constraints, but on that item of safety Which one would you as a professional in the space say is the safest? I would probably go with option two.

2:03:03 – 2:03:26Speaker 7

Okay, so And my other question is, I know we've talked about sidewalk riding is legal here. It's my understanding that sidewalk riding for bicyclists is actually less safe than riding in other spaces because they're often traveling faster than pedestrians and are unexpected by people using driveways or intersections. Is that true?

2:03:28 – 2:04:02Speaker 12

There has been research that has reached that conclusion. I will say I... In my opinion, I would look at it the similar to a cycle track that's off the street and protected. Should not be sharing the same space with pedestrians. But if you look at the type of people that ride on sidewalks versus in the street, they're typically more likely to get in crashes anyway. So I would not immediately come out in my professional opinion and say that riding on a sidewalk is significantly less safe than a separated cycle track.

2:04:03 – 2:04:20Speaker 7

Okay. And then my other question is, I brought this up in the study session about if we were to do a separated cycle track on the north side, how long are we committing to that? And you at the time said three years roughly. Is that true as far as when restriping would be to again?

2:04:22Speaker 12

So typically when we mill and overlay a street like this, yes, we'll come back in three years and do a chip seal project. So if there are striping modifications, that would be the time to do it.

2:04:32 – 2:04:45Speaker 7

And do we often use temporary pilot projects to determine whether or not something is feasible, what increase in use, what changes to crash profiles, all of that? Do we collect data when we try something new?

2:04:47Speaker 12

We do, and we certainly will with this project for sure.

2:04:53 – 2:06:52Speaker 7

Yes. So I guess I'm I'm struggling and I'm in agreement with the mayor. If we have adopted policies of a project budget, we have an opportunity before 20 years from now to implement that policy. And then we have people coming to talk to us who are not all in the neighborhood, but are proposing connections to that school or one of many schools along there. I've also noted in the comments that many comments that come in as vehemently opposed to any lane reductions, any changes, start with, I've lived in this neighborhood for 30, for 40, for 50 or more years. And I would just acknowledge change can be hard. I've also noted that in many of the responses in favor, there have been very detailed personal stories about connections to children. And so I'm noting a difference between I've gotten used to using this one way versus I am concerned for my child who I wish had more independence in the world. And so I'm just noting that as well. I know Council Member Wall has received many of the emails I've received. I've tried to respond to as many as I can. spent much of my day in open comment period for this item. But when I look at what we're building for the future, I find it hard to say, well, you've got to wait 20 years. And so if you have kids today, my daughter won't experience any ability to travel this corridor safely until she's an adult. And I have concerns about that, especially when there are ample grant opportunities to solve the problems that you are addressing of implementation, of budgetary design, of technical assistance, of all of the features that would change. And I'm unfortunately shocked that we're not recommending option two in the staff recommendation, which I would say aligns with policy and looking for funding opportunities.

2:06:54Speaker 16

Councilmember Doering.

2:06:58Speaker 14

I'm gonna make a motion, so.

2:07:02 – 2:07:21Speaker 9

I move to approve the design concept and advancing to final design a three-lane street with a two-way cycle track and parking on one side along Elton Hills Drive Northwest from Broadway Avenue North to 500 foot east of Assisi Drive Northwest, project number J7313. Second.

2:07:22Speaker 16

A motion made by Councilmember Doering, seconded by Councilmember Miller. Councilmember Doering, go ahead.

2:07:28 – 2:09:36Speaker 9

yeah i might speak at length a little bit about about this motion um i live in the elton hills neighborhood and have had the opportunity to talk with many of my neighbors uh over a number of years about this project i remember uh the project when it came in 2020 and how that was divisive in the neighborhood um and and how that how that ultimately came to the council not taking any action on making elton hills drive safer at that point During this process, I do agree that we have heard from residents who would like the four-lane, I think I'm going to use a word that was said in open comment, thoroughfare to continue on Elton Hills Drive. But we've also heard from a number of residents who are concerned and who have read the data supplied to us by city staff who have worked with engineers and experts in the field who have stated that three lanes is significantly safer, especially through a residential neighborhood. As for the cycle track, I am a cycler in this community. I choose not to commute by cycle. I choose to be on recreational trails, which also has its dangers, which we'll talk about later this evening. But I think that 22 years is way too long to wait to make any improvement given the policies that this body has adopted to create cycling infrastructure along Eldon Hills Drive. So again, I appreciate every constituent who has reached out to me. I have paid absolute attention to your thoughts and have taken them into consideration. I was prepared to not bring forward a motion for the cycle track if it was not protected at all. So I was glad that our city staff provided us with that option, that there was some protection to create that. So I'm gonna leave my comments there. So that's why I support the three lanes with a cycle track and parking on one side.

2:09:36 – 2:11:39Speaker 16

Thank you, Council Member Doering, and I really appreciate you making that motion, and I will also support that motion. And to take your last point, I also was looking for a separation that was beyond just paint, and the options that were presented here today seem like a good option for... for now. I also believe with the great comments that the mayor made that this is our complete street policy. This is the direction that we are going as a society. I am a recent commuter cyclist. And I have been to many events that are in our close neighborhoods. And the number of cyclists in Rochester is growing. And we have to be able to accommodate multimodal transportation throughout the city and starting on a thoroughfare that is a problem thoroughfare for the people that live there. They know that it has been a problem. And we do know that... that narrowing the street, going to three lanes, and adding a protected bike lane does add to that calming effect for that street. As Councilmember Miller said, change is hard. It's always hard, but change is really what moves public policy and good public policy, whether it's healthcare, safety, People didn't want to put on seat belts. Now we wear seat belts and we're safer. And so I will be supporting this motion. Council Member Palmer. I was the second. I'm sorry?

2:11:39Speaker 7

I was the second on the motion.

2:11:41Speaker 16

Oh. Council member Miller.

2:11:44 – 2:12:03Speaker 16

I didn't want to interrupt the council president and I I did I I do apologize council member Miller I did recognize that you were the second But I also recognized that I was the only council member that had not spoken on the item So that's why I take no offense. I just took that so I will go to council member Miller Then I will go to council member Palmer.

2:12:03 – 2:15:02Speaker 7

yeah i i really appreciate all the folks that have reached out and i've tried my best to respond to everyone whether they're a war ii constituent an elton hills neighbor a user of this space and i've heard from a lot of folks who don't live in the neighborhood and say i drive this frequently i travel through here frequently or i have some other connection i'm a bus driver i i don't live in the neighborhood my daughter attends school at john adams middle school which is in the neighborhood so i think Couching this as what the immediate folks who have been most opposed and have some immediate proximity to the street as the most important constituents in this space, I don't want to discount their perspective, but I would just say that we are making policy for the whole city. Our active transportation network considers a network across the entire city. we don't say that people own the street in front of their house those are used by all city members so with that said some things that have changed and just i think that are worth noting since 2019 2020 when this was last discussed The active transportation master plan has been adopted, prioritizing this corridor for facilities, for protected facilities, which I would argue that option two gets us toward. We've completed additional work on North Broadway that creates a connection to the rest of the active transportation network, creates a connection potentially with this project to the recreation center, to 125 Live, to the trail network. to places for socialization silver lake park other improvements are best utilized when they are connected to other pieces of the network and so i would say those other improvements that we've made are worth less if we don't build out the network and close the gaps and this is a significant gap i took my daughter to a babysitting training class at hoover elementary over the summer we biked there i biked in the outer lane wasn't my favorite time but we did it And I biked to the public hearing. I bike around town and I use a bike that is on the trails, in the bike lanes, and when necessary on the streets. And that's a risk that I take, but we are building the network for the city of the future. I would also just note that other cities, cold climate cities, including Montreal, have twice the amount of snow, very similar climate, and have made meaningful investments that have gotten to the goals that they have adopted, that we too have adopted in our mode shift goals. So we have set the framework for this, and this is our opportunity to say that the policies that we adopt mean something, or well that's just too hard so we'll push it off for 20 years and so i think that we have funding sources that are readily available that we can apply for i think this is readily possible and i would encourage everyone to think about who we are protecting and how we are building a city that works for everyone that is america city for health that we are designing for well-being for social connectivity and i think this could be a meaningful investment in that policy and in that vision for our city thank you council member council member palmer

2:15:05 – 2:17:03Speaker 18

I won't be supporting this motion. I would have made the motion for option number three with bump outs at all corners. If you listen to what Public Works is saying, they don't have the money to do all the bump outs. So I don't know where this magic money is coming from. As one of my colleagues likes to say, hope is not a plan and we need to be planning to do this project. I think that having the bike lane there, two-way direction is going to throw people off and it's going to be very dangerous for them. I think not having people using it seven months out of the year is going to have it be open, which means you're going to have higher speeds. I think that garbage trucks are going to be sitting there trying to pull garbage up and once a week you're going to have traffic backed up. And I think that you have to remember, and I've said this many different times, and people going to work on bikes is less than 1% of the people in Olmstead County. And so I don't see the advantage to doing this. There's a plan. I'm a little insulted that people go out, they're just old people and they don't want to change. I don't think that that's the case. I think people are open to it. I think that it was pointed out by Mr. Wall, the number of people making comments I'll throw out weren't even from Rochester. We have a lobbyist group that did a very good job of sending out a letter to say this is what you should do. Most of those key words were used when I read the letters. I read every letter. I tried to respond to everybody. I believe I did 90% response for or against. But we did ask the residents, and if we're gonna take the staff time to go out and ask them for their opinion, I think we should use it. And I go back to my original statement. We don't have the money to do option number two. We barely have the option to do option number one with bump outs. I don't see going to do something we don't have the money for.

2:17:05Speaker 16

Council Member Keene.

2:17:06 – 2:18:20Speaker 21

Yeah, again, I'm still coming to this project as it started as a mill and overlay that creates opportunities for us to do other things. And that's kind of why we're here. The idea of going to the three lanes, this is difficult because you've got this, For whatever reason, the local people's kind of saying they want it the way it is. They have their own reasons. But then you have your engineers and your city experts and your transportation people saying there are better, safer ways to do it. I come down on supporting the better, safer ways and going with the professional opinions. And I know we've had trouble on 19th Street West that there's complaints, but it does end up working. As far as the... cycle track though this is one that's hard on me because this is something that is not the right way to to implement these things it is an opportunity that you can do it here but now we've created these other problems with garbage pickup with snow removal um and And and I I also look at something like Elton Hills and say with the sidewalks on both sides All the way back and forth. I just don't think it's needed for the extra risk and financial risk and also Operational concerns it puts on the street.

2:18:20Speaker 16

So I'm not going to be supporting the motion at this point Thank You councilmember Clerk K so, can you take the role?

2:18:31Speaker 31

Councilmember Keene nay Council Member Miller.

2:18:35Speaker 31

Council Member Wall.

2:18:38Speaker 31

Council Member Fredericks. Nay. Council Member Palmer.

2:18:44Speaker 31

Council Member Doering. Aye. Council President Schubring.

2:18:51Speaker 16

Is there an alternative motion?

2:18:53 – 2:19:07Speaker 21

I'd make a motion to approve the design concept advancing the final design of three-lane street with parking on both sides along Elton Hills from Broadway Avenue north to 500 feet east of Assisi Heights Drive, project number J7313. Second.

2:19:08Speaker 16

Motion made by Councilmember Keene, seconded by Councilmember Fredericks. Further discussion?

2:19:14 – 2:19:45Speaker 21

Yeah, I mean, we've gone through it here. It's one of these things that I kind of went through this with the staff as far as like, is this the right way to do the bike things? And I do understand the debates with I voted for the active transportation thing. I want us to be able to do this. You shouldn't have not being able to do it perfect be the to get in the way of doing something. But I really don't like when the traffic is on one side blocking residents from getting out to the street. So this one I was not gonna support. So that's where I'm at.

2:19:46Speaker 16

Council Member Palmer.

2:19:48Speaker 18

I'm gonna make an amendment to the motion. And that is that the Public Works has bump outs at all corners on the route.

2:19:58Speaker 16

Is there a second to Council Member Palmer's amendment? Second. Seconded by Council Member Doering. Go ahead, Council Member Palmer.

2:20:07 – 2:20:18Speaker 18

I just think that it's very important for pedestrians and bike people that each corner has a bump out to shorten the length of walking across there. I'll leave it at that.

2:20:21 – 2:20:34Speaker 16

Let me ask, okay, so we do have an amendment, and if our mover and our seconder agrees with the amendment, I don't see a nod. So, Councilmember Keene.

2:20:36Speaker 21

I mean, I don't think I, as a motion, I don't think I have to agree with the point of order.

2:20:40 – 2:20:52Speaker 16

No, you don't. I was just trying to speed things up a little bit. I got you. If you would have agreed to it and Council Member Fredericks would have, we could have just done it all together. But you have the floor, Council Member.

2:20:52Speaker 21

No, I wanted to reach out to Public Works and see what is happening here. Did we just change the project in a big way or is this, I can't tell.

2:21:04 – 2:21:47Speaker 11

I can answer this one, Council President, Mayor, members of the Council. Until we get into design and understand all the curb lines we're moving and have better quantities, we can't tell you tonight that we can, with the current budget, that we can do every corner, every intersection. We would love to do that. And if the council gave us that direction, we'd have to work to find the budget to make sure we can provide that. But we can't assuredly say tonight that we're going to be able to get every intersection. We're going to want to focus on, if we were, as Sam noted, have to scale some back, we're going to want to focus on the highest volume intersections, the highest use, so we can shorten that crossing for pedestrians.

2:21:48Speaker 16

Thank you. Council Member Fredericks.

2:21:51Speaker 26

Thank you. Hate to do it to you, buddy.

2:21:55Speaker 15

I wanna stick with our original motion, because we're trying to stick to budget here. We're trying to stick to the plan, what we had in place. I'd just like to stick to the original motion.

2:22:05 – 2:22:39Speaker 6

uh administrators elms council president council member um and this is to both prior questions the way that this would come forward though after design is as you've seen in many projects it is possible to bid this in a way where you have bid alternates and it is possible for you to determine outside of the budget process that you either want to use contingency or reserves or something of that nature if you wanted to do something like that if you gave that direction there are steps proceeding forward that could happen in future discussion and votes that would allow you to make that final determination once the design is complete.

2:22:40 – 2:22:52Speaker 16

Thank you, Administrator. So there's a motion, there is an amendment on the floor by Councilmember Palmer, seconded by Councilmember Doering. All in favor say aye.

2:22:53Speaker 16

Opposed say nay. Nay. The nays have it. We are back to the original motion. Is there any further discussion? Councilmember Miller?

2:23:02 – 2:23:33Speaker 7

I HAVE A QUESTION FOR STAFF. WITH BUMP OUTS THAT MIGHT BE PUT ANYWHERE ALONG HERE WITHIN THE BUDGET, DOES THE CONSTRUCTION OF THE BUMP OUT PROCLUDE FUTURE CONVERSION TO A PROTECTED OPTION TWO IN AN INTERIM 20 YEARS? WOULD WE BE SPENDING MORE MONEY OVER TIME IF WE DO OPTION ONE BECAUSE OF RESTRICTION IN BUDGET AND FORCE OURSELVES TO SPEND MORE MONEY IN THE FUTURE IF IT IS A PRIORITY OF A FUTURE COUNCIL MAJORITY? to advance a protected design ahead of its full reconstruction?

2:23:35 – 2:23:48Speaker 12

It would make it more difficult. I think it would. We would have to scale all of them back. Everything that we put in, we would have to take it out essentially.

2:23:49 – 2:24:08Speaker 7

Yeah. Okay. So I'll just say again, I can support this reluctantly because I do think it is an improvement in safety, but I'm disappointed because I feel like this goes against our planning and I would love to see a design that allows flexibility for future councils at this point of transition of our community.

2:24:11Speaker 16

Thank you, Councilmember. Seeing no, Councilmember Wall, I'm sorry, go ahead.

2:24:18 – 2:24:34Speaker 23

A question for the engineers. Is it possible from the river to Broadway to move it to four lanes so that the commercial properties have the opportunity for more access?

2:24:36 – 2:25:15Speaker 11

Thank you, Council Member Wall. With this project, we aren't changing any access, so we're not proposing consolidating driveways, removing driveways, so we wouldn't be advocating for a four-lane section. I mean, we'll have some transition as we approach the turn lanes at Broadway to fit that intersection design, but we would essentially start that three-lane section near the rec center. We would even have space for parking, which is a big challenge for events at the rec center, so that would also help with that. We'd be able to get parking for events at the rec center. So we would really want to use that section that's being presented for the length of the corridor.

2:25:19Speaker 21

Clerk Kasel, can you call the roll?

2:25:22Speaker 31

Councilmember Keene.

2:25:23Speaker 21

I'm sorry, just point of order. This is on my original motion for option one.

2:25:27Speaker 16

This is on the motion for the three lane with parking on both sides, option one.

2:25:34Speaker 31

Council Member Keene.

2:25:36Speaker 31

Council Member Miller.

2:25:38Speaker 31

Council Member Wall.

2:25:41 – 2:25:52Speaker 31

Council Member Fredericks. Aye. Council Member Palmer. Aye. Council Member Doering. Aye. Council President Schubring.

2:25:54Speaker 31

Motion passes six to one.

2:25:56 – 2:33:13Speaker 16

We will take an eight minute break. Even though we have a minute left in our break, I'm going to get us started since we're all in our seats and ready to go, and we've got lots of items on our agenda here. So we're going to move on to H2, which is supporting economic growth and vitality, an update on the economic development ecosystem with Ms. Irene Woodward. Go ahead.

2:33:14 – 2:53:59Speaker 13

Good evening, Council President, Mayor, Council Members. Thank you for the opportunity to provide an update. I also just want to take a moment and thank all the teammates that also do this work within the city and have been working on these projects. Just because I'm presenting, there's a lot of other folks behind here that are doing some of this work. So just wanted to say thank you to them. Really wanting to start out with grounding us with our council priorities, really seeing that the supporting economic growth and vitality is important to note that aligns with council's economic resilience with that strategic priority. There's also several action items that were approved earlier this year that center around economic development and what is that city's role within economic development and some of this work has related to those action plan items and bringing those forward. In addition, I kind of wanted to center on kind of where some of this work started and that why. And first and foremost, as Rochester continues to experience unprecedented growth and accelerated investment from the private and medical institutional sectors, there's strategic opportunities to create a more integrated economic development ecosystem. Collaborating to map the system can help us better attract, retain, and grow emerging sectors, which really led to the start of identifying where we started to look at that. the economic development ecosystem and what does it currently look with our partners. There's also been several other initiatives that have been happening within the city and presentations that have been before you recently that also align with some of this work. First and foremost, you just recently got an update on the TIF policy as it relates to investments within the city and really looking at that data in terms of how do we get to that long-term growth and how do we support strategic economic growth. and leveraging that data and seeing how that work aligns with the broader economic development system. On top of that, the Urban 3 presentation was really looking at different land uses and how there's impacts over time in terms of densities and what type of development are impactful and where that's happening. So all of this work is really aligning with it. This work, in addition, back in 2023, as I'm sure you all remember, we talk about this a lot, that there was $50 million allocated for academic vitality in the voter-approved sales tax renewal. Within that 50 million, we often talk a lot about housing and the creation of housing, but there was an additional bucket that was identified for workforce and business development. These are a couple of different categories within that, but really recognizing that we need to continue to look at how we support workforce and business development and what does that really look like. And so it was important, as we had started to look at, we have some funding available, and how does this align? What does our current system really look like? And to do that, we really needed to work with our existing partners. There's a lot of different entities. They're all listed on there that had participated in this work that we were doing. They're all centered around doing work within Rochester, so that's kind of how they were selected. The first priority is, who's already doing work within the system? Who's here? What are those resources, and what does that look like? So as we started to look at some of these questions that were floating to the top, we wanted to really start there. And the approach we really used to gathering our partners, and we kind of convened them back first in August 2025, And we really established this kind of timeline of saying, here's kind of this work that we're looking to do. And we really wanted to make sure that we kind of moved through this. We probably extended a little bit beyond January 2026. We were a little, I'm going to say, hopeful that it would take a little less time. But we also saw a lot of great questions coming about. And we continued to re-engage with our partners. So we initially convened back in August 2025. And one of the key first steps was having what we called self-assessments. And we asked each of the different entities to answer a number of different questions that we put together to really understand what is the work that they're already doing within these different categories, as well as providing feedback on how the overall system is working. And from that, We provided, and this is a very high level summary of really starting to break down each of the different categories within the ecosystem. On the screen, the stars really represent those primary services that are provided by the different partners. These are the things that they are, you know, that's the main reason people are going to them. The additional services are also things that are happening in the work they're also doing, but wanted to recognize those differences and really started to pull these out. This is intended to be high level. As we start to share some of this, one of the notes we would say, when you look at probably the financing and incentives, there's gonna be some differences in each of the organizations in terms of what services or what incentives they may offer, and they might have more targeted for individuals, but we really wanted to really look at the assessments as an overall in terms of what might be gaps and opportunities across the whole ecosystem. And this really started to help shape that work and be able to kind of see where those things are happening. I will say the partners were really helpful and they really provided a lot of information to us and were really a part of this process. The other piece, and this was like some of the key takeaways we took from the self-assessments, this was feedback that the economic development partners really shared with us in terms of some of those priorities and what those takeaways were for what they viewed some of the needs for Rochester. And really supporting entrepreneurs and small businesses was at the top. It was one of the main focuses, I think, that kept coming up through this work of how do we do that better? And also how are we strengthening downtown vitality? And then continuing to look at innovation beyond Mayo, advancing equity inclusion, and then building trust through community engagement and continue to share that work out. Beyond, once we kind of evaluated the assessment piece, we also recognized and we did do a short survey using those economic development partners to share out the information on the survey. It was only about 35 businesses that responded, but it was really trying to understand some of what they're kind of seeing in the environment and how they access services if they did. When we were doing this, we recognized that the majority that filled out the survey were probably in business for 16 plus years, about 51%. So they were more established businesses, where only 37% had operated for seven years or less. We had a range of different ones that really provided responses to it. It was anonymous. And what we saw was some of that were these takeaways, including a communication gap that exists, a workforce concern in terms of what's their long-term needs, needing growth stage early support of how they're going to scale, how they're going to grow their business, and then additional navigation and help would add value. So I think understanding what regulations exist, how do you maneuver through those pathways? And these are some of those items that came up through that process. So through all of this, then we kind of took the assessments. This drawing is probably a little hard to read all of the different pieces. It was kind of intentional too. But at the center of it is the entrepreneur and small business. And what we're trying to build from that is really understanding where all of the primary services are lying within that whole network so that we start to see If you're looking for marketing and branding, who is doing some of that work, the policy advocacy. And these align with those primary services and making sure we start to see what this work really looks like and what is being done by our partners along with this also helps us to move to next steps potentially of what does that really look like going forward. Now, what we also found during this process is that we probably weren't reaching everyone that we could in terms of gathering insights into what services may or may not be provided. And so one of the items that came up was identifying a co-design process for this economic development work, recognizing that we're not necessarily capturing all the voices that we could, and really looking for an opportunity to gather impact from those that might not be the first ones to fill out a survey, but will be impacted by future decisions. And so we really view this as what the next step in this work. We've kind of identified the ecosystem, but as we were identifying future gaps in some of those needs, we view that this was a missing piece to this work in terms of what does this really look like in terms of gathering that input. And so this is a process we're kind of in right now in terms of starting to put that together. And as I will mention, as we go forward, we're also aligning it with some of the economic mobility work that I'll speak about and finding a way that we can probably combine those efforts to kind of start out and then see where that work leads us. The other, you know, within, after the ecosystem, we also have some other initiatives that are actually going on as well and wanted to kind of provide some updates on that as well because I think they are, while they're not all the same, they are related to each other and they're all happening together. The first and foremost is, I think the mayor spoke about this briefly earlier, the regulatory justice initiative. The mayor's office identified this opportunity back in, June, actually in 2025. It's a cohort for the city's work and mayor's innovation project. I think this was the first cohort they did in this regulatory justice initiative. There were five other cities selected besides Rochester. We had an opportunity to very focus in on small business regulations. So for example, through this process, we took and mapped the process to start a business within Rochester and the number of steps that that takes. And that also really recognizes that includes working across with the county and the state of all the different ones. We also recognize through this process we were a bit different from other communities. For example, some communities have a business license. So they have one department that really starts and ends with a business. And we don't necessarily have that. We have some businesses that are going to the clerk's office because they're going to get a liquor license. and they're helping funnel people, or they're just looking for a building permit as part of what they needed to do. So this was an opportunity to kind of identify what are some of those challenges that are existing? What are some recommendations? The city's work team also evaluated some of our regulations as we went through. So for example, and I'll talk about it a little bit more, they looked at kind of the UDC as it relates to home-based businesses. and kind of scoring some of those things. And then ultimately providing recommendations. I would also note throughout this work, we worked with the RDA and Collider. They also provided recommendations and feedback from clients that they have worked through with this process. So that also helped inform some of this work and also some of that engagement of the information they had talked to or heard, or this is an issue, or this is what we continually hear every time, or this business comes to me with this particular issue. And through this, there was some different recommendations that were brought forward. One was to establish a one-stop shop. Really what that is entailing is how do we pull the information together in one space within our city website so people know, like, if you're going to go about opening a restaurant, here's the general steps you need to follow. And how do you go about doing that so that you know, yes, you're going to also need to contact the county. The county is engaged with our development process through some of our pre-development meetings, but how do we make sure that that entrepreneur needs are going to need to do that for a particular restaurant? In addition, it's kind of a development of an inspection checklist. This is really to help, and what we heard a lot is someone goes and signs a lease for a different space, and then they realize they might have to do all of these code things, or there's zoning requirements with the UDC. And so this is really intended to be a proactive tool for somebody to kind of be able to take with them. And so our attendants also kind of build this to make it accessible, but then share it with our partners who can give out information in terms of where can you find the zoning information? Where can you find the building code information? Here's things that you should be thinking about. We're in the process of also making sure that we're getting it reviewed by other departments. So they will be seeing that too to make sure that we have the correct information. so that we can share that out with them. And then the last was really looking, as I noted, on home-based business in terms of some of those requirements around what's allowed number. And so some of those will probably take a little longer for us to review. We viewed the first two as really being something that can be shared and updated and implemented fairly quickly. And so I think those really align not only with some of the stuff we're hearing with the ecosystem from our partners about information sharing, but also what we're hearing from entrepreneurs and small businesses. And then the next thing that I really wanted to provide an update on is the economic mobility. This is the initiative underway through ICMA. The work is being led by Amanda Leitner, who joined the city earlier this year. And this grant provides both implementation funding and technical assistance. it's kind of taking a separate approach to really looking at economic mobility, which is a little bit different from economic development, which we're going to kind of talk through because I think there's probably some questions of what does that really look like. When we're talking about economic mobility, we're really looking at how do we ensure residents can benefit from the growth that's happening, and whether that's access to quality jobs, ownership, long-term financial stability, and removing barriers to participation. compared to that overall economic development, which is really the growth within the local economy in terms of business attraction and expansion, the industry growth and investment, commercial development, and job creation and tax-based growth. They work together, but there are very specific things in terms of what we're looking at with economic mobility under this ICMA grant and also how that fits into the larger economic development system. So as part of this initial steps that are happening in the past several months, it's been kind of this discovery phase where the local systems either expand or limit access to economic mobility. There's been kind of this explore and refine stage of understanding where the challenges are and identifying areas where there is an opportunity for the city to have a unique opportunity to have outcomes that come out of this. The discovery process has included over 30 one-on-one interviews to date. There's been two cross-departmental workshops with about 50 plus participants. There's also been analysis of data, which is a key component of this as we start to establish what data do we have to be able to look at long-term outcomes and track them. And then there's also been analysis of city priorities and plans and how these things align, along with other technical assistance and peer learning from ICMA as part of this overall cohort of 15 other cities. And so as these things align, it's how do they look in terms of these first systems, in terms of land use, transportation, housing, and economic development, and how they merge together to provide those outcomes in economic mobility. We kind of have an overall timeline here and I've kind of discussed, touched on the discovery piece, but this is also really taking those initial things and further refining them, asking questions, doing both community engagement and stakeholder engagement of what does that really look like and continuing refinement of the work and assisting in the potential of what might be a pilot work going forward. It's been kind of an iterative process of what does that look like and how do we refine that. to be able to keep moving that forward. But what is starting to emerge through this work, which probably will not be, there's a lot of alignment with some of the city priorities within this, but across that we've really seen long-term economic opportunity depends not only on continued growth, but whether residents can successfully access, navigate, and remain connected to the systems that help shape housing, transportation, employment, entrepreneurship, and community participation. And some of those the city has a lead, sometimes we support, and sometimes we influence in those spaces that are identified on the screen. But we see opportunities to approach that in looking at how do these things over time, the initiatives that are already underway, along with what are these others, are they aligning to be able to increase economic mobility within the community? Some next steps within the economic mobility work. Let me make sure I'm on the right side, is continuing stakeholder and resident engagement to more precisely map where the system breaks and validate with lived experience. So as we're starting to identify these drivers and these information, we're still kind of testing, are those the right ones? Are other things coming up? These are very complex things. You could have a number of them, but being able to also hone in on what data is going to help support and be able to track over time. The other piece is really mapping the workforce ecosystem. It's understanding that bringing partners together to validate and really look at some of that. And when we're looking at workforce, we're looking across the entire, including like, for example, the school district. How do all these things work together as it relates to the workforce, which also builds off of kind of the economic development ecosystem work as well, because those sometimes are often... they're integrated but also have some separate policies and processes that they follow. And then also starting to test potentially some internal pilot projects that could address immediate economic mobility needs while informing longer term community strategies. And then at the same time, there's also kind of a look at co-design within this, as I kind of already mentioned, of how we can align both the ecosystem, economic development, and economic mobility into one co-design. While we might have some different questions, I think there's some alignment there that we're going to kind of approach together. So one that we're also recognizing there is some engagement fatigue in the community. And so how can we make the best use of our time and our partners and individuals to really engage with this work and be provide us some really recommendations and feedback as we continue to move forward. So the next steps. I mentioned co-design. I won't go into too many more details on that. The other piece is really incorporating information and resources. This really aligns with both the information we're hearing from the ecosystem and the overall of how can we better, as a city, share the resources that our economic development partners are already doing. and being able to have a source so that people can find that and share that out, as well as being able to build out for a specific small business, how can we better support them in the long run by having some information in a particular area within our website or materials like the inspection checklist so that we can better help them navigate that process and hopefully reduce the challenges that they're facing through that process. And then the third item is really looking at creating a citywide economic development strategy. Where this kind of came from was, one, identifying within the action plan, how do we really identify the city's economic development role? As we asked all of our partners to provide feedback as they're doing their self-assessments, I think the question that kept popping up for all of us is, where do we align as a city and how do we establish that overall vision? Not that we are going to be taking on that work of our partners, we're there to support them, but there's also a role for the city as we establish this longer-term vision. And also understanding that as the city continues to grow, are we... Are we appropriately aligning resources and policy to be able to accommodate that? And so really looking at all of those different needs, including also workforce needs. What might the job growth be going forward? How are we going to accomplish that? These things also align really well with some of our other initiatives that are happening. How do we envision this work happening? We would still build off of utilizing and working with our partners. All of this work that we've done to date would help really become a basis of we're starting to build out this strategy, but also really further engage and build out an engagement strategy for other businesses that still can provide feedback. It would also be additional residents feedback, city teammates. All of the work of the co-design would also help inform this and be kind of ongoing so that those could be incorporated in those voices. We would expect this to be an RFP process. We don't have one yet drafted. It would be kind of identifying and finalizing that scope of work and being able to move forward with this to really help establish that longer term vision. And with that, I will open it up for questions.

2:54:00Speaker 16

Council Member Palmer.

2:54:02Speaker 18

Can you go back to your last slide, please?

2:54:06 – 2:54:37Speaker 18

So on slide 61, you got all the stars to tell you who's doing what and DMC had eight stars and Ready had seven for economics and I think the city had one star. So you're asking here to hire a consultant. Don't we have people already in the community or these organizations that have seven and eight stars? Wouldn't it be better just to ask them how do you want to do development and send people to them instead of saying you've got to work with the city?

2:54:38 – 2:55:31Speaker 13

I don't think we are taking away from any of the work that the partners are doing or will continue to do as we are suggesting developing an economic development strategy. Part of the overall strategy is also identifying where does city policy align with where is this longer term vision. The city really hasn't specifically focused on economic development. We have various people who do different parts. And as we kind of talked about earlier, we have kind of TIF policy. We're kind of doing some of these initiatives. We're also doing economic mobility. And how do all these things kind of come together in terms of a longer term vision is how we're starting to see the economic development strategy. I think it takes into account the work that is being done by our partners and then also starting to identify are there other gaps that whether they're seeing or not seeing or we are starting to see that has that alignment so that we can start to really look at what does that future look like.

2:55:32 – 2:56:30Speaker 18

Well, I guess I'm not thinking we need to hire a consultant to do that. I think for me, from my perspective, the number of phone calls I get about this project is being hung up or this is happening and that's happening and having someone research that and get back to us. And as we've talked before, 90% of it is on the developer or the engineer's problem, but still. I think it would be nice to have one person just to say call this person instead of saying call your council person, because I'm assuming everybody gets the same calls that I get. My permit's held up, this is held up. The economic development, the other thing is, We're doing darn good, and I don't know how we can do much better than we are. I think unemployment is less than 3%. We're moving ahead. We have the advantage of having a large employer and subgroups off of that large employer. So I'm not particularly sure where else you go with economic development.

2:56:30 – 2:57:48Speaker 13

Well, I think what we're also looking here is also identifying like, yes, there's a lot of great things happening in Rochester, but there's also gonna be some challenges as we continue to grow in terms of workforce development. How many jobs are really are we expecting over time? What does that really look like? And do we have the structures in place to be able to support that. And I also think where we go with that economic development strategy is also as we kind of go back to that economic vitality and some funding, how do we support if there is this gap that we identify from the city and through this engagement, we can align those things. I also kind of view it as like a larger overview that also helps our partners understand some of those priorities. I sometimes think of it almost like the Maxfield study as it provides housing. It's kind of that big picture in terms of what is in our environment and what's going to happen. And then it allows others to kind of plug in as our partners are going to have priorities of their own. But it also provides some framework of like we all recognize that these things are going to be happening within our community and we're all working together in our various ways. And that kind of goes back to that chart. Like not everyone's going to be doing the same thing and nor would we want them to. And we're not suggesting they replace it, but they might have to shift or Now that we know in five years, this is going to be this concern that we need to address. We're kind of trying to get ahead of that with this strategy.

2:57:48Speaker 18

Well, I'll end with this is that I remember we had a grant to get jobs. I think we had nine jobs and it cost $2 million they spent to get those nine. There's got to be a better, more efficient way.

2:58:03 – 2:58:19Speaker 13

I don't know all the specifics, but yes, we're trying to look at how do we align and have impact. So I think part of really that strategy of economic development strategy is setting some of those benchmarks of what do we need to accomplish over time and being able to track them and setting up those metrics as well.

2:58:20 – 2:59:02Speaker 16

Thank you, Council Member. So I've got a couple questions, and one, I appreciate you defining economic development and economic mobility and kind of clarifying that. I have questions on both. So from an economic development standpoint, one of the – Issues that we've talked about a lot at this dais is we have all these small area plans We have community development that really brings it to the place where this is what we think should be there would economic development be the one that kind of sells that land is that a function of economic development

2:59:03 – 2:59:25Speaker 13

Often that's the case that economic development is kind of looking or saying, hey, there's these gaps within our current system or there's these businesses that we don't have or these other opportunities for workforce and how do we align to create that more specific economic development as opposed to some of the planning documents that might be looking at a specific site of what could be there in that future planning.

2:59:26 – 2:59:46Speaker 16

So this consultant would identify either partners here that are local that can help peddle our properties, small area plans to bring economic development to those sites or we could do it ourselves.

2:59:46 – 3:00:27Speaker 13

I think what we're looking for the consultant to do is identify where are those resources. So how are we doing alignment in terms of, are we needing to go out and do X, Y, and Z and find somebody for that site? Is that work happening? Or do we need to align with a partner that's already doing some of that work? And maybe that somewhere, OK, that's happening here. There's alignment that's missing right now. So I think it's building off of where our partners are doing work, but also refining What we're seeing in the gap overall from that consultant when we're looking at the city and the structure that is continuing to grow compared to other communities, here are things you need to really think about in terms of where you're going to need to go to and be able to provide that framework.

3:00:28 – 3:02:04Speaker 16

That's what I was looking for. Okay, on the economic mobility, and I think this is a really important piece from a... And looking at the presentation, it felt like it was more coming from a business side. I really look at it from the resident side. You know, do they have a job that they can provide that provides them a livable wage, one job rather than two? Do they get the benefits? Do they have mobility? And that's what this sounds like. And one of the things that we really have to consider here in Rochester is recognize we have a major employer in this community that hires 50,000 people. They have an advancement of programs, and one is Pathways to Healthcare, which brings in new immigrants and trains them to be phlebotomists, they get into the Mayo ecosystem, they're able to then have options to move in other places. So one of the things that I would really encourage on the economic mobility front is really tighten that relationship and those other workforce development relationships and find out what do they need so that we're being the handoff and working with our major employer to make sure there's access to them, to our residents.

3:02:04 – 3:02:17Speaker 13

No, I appreciate the comment. And I think some of the 30 some interviews, some of them have been with providers and nonprofits and various organizations, not just individuals. So that work will also continue. So I appreciate the comment.

3:02:17Speaker 16

Yep. Great. Mayor Norton.

3:02:22 – 3:04:29Speaker 24

Thank you. A couple things. One, I want to dispel the kind of belief that cities don't have a role in this. If you look around the country, most cities our size and larger have someone whose job it is to focus on, and they're named different things, economic mobility, economic development, small business development, it goes on and on. So it's not unusual at all, and I'm thrilled that we're finally digging into this. I would say one of the things that was for me participating in this tiny little piece of it was doing interviews with people who have either looked to buy a building here or start a building business here or have a business here and the lessons they learned. That was pretty eye-opening, I think. I'm excited for the future of taking that next step at some point we're going to do the the maybe stage one things the easy things first but really delving into how can we improve those processes for people who are giving sometimes their life savings and loans to open something only to find out that you know they can't open for six months and you know they don't have the building isn't in the shape it needs to be in order to open the kind of business they were looking for and they didn't know that to start with. So that's part of the important work that's being done here. And lastly, I just wanted to say on slide 73, I wrote down, you have, I think, business development or workforce training. And I would just say, I also think one of the key pieces missing, and I don't think it's really missing, but it's not stated explicitly, which is education. And we can do workforce training, and that's great. We have great places in town to do it. But we also have a community and technical college and several major universities who need to be partners with us in training that workforce for these really either high tech or jobs, you know, specific things that we need in our community for people to stay here. So I think that's a component while you may have talked about it as training. I think it's education and training. And hopefully those partners will come to the table and be part of this as well.

3:04:30Speaker 13

Yeah, I think as part of that workforce ecosystem is building out where do our educational institutions also align and what programming and making sure that we're identifying that as part of this process.

3:04:42Speaker 16

Other comments? Council Member Keene.

3:04:45 – 3:05:56Speaker 21

Yeah, I'll just, again, comment. I did like the idea that differentiation between economic mobility and development, and there are initiatives, and it's good to see us identifying the partners up front right away, because this isn't something, I mean, I still think the city has got to focus first and foremost on what our job is and not on what somebody else's, but that idea of regulatory justice and making sure that too many times I think we start out with our regulatory and I know the community developments through this on their permitting and on their inspections is do you assume somebody's there doing it wrong and it's just adversarial and unfortunately it is sometimes but those are the things I hope a program like this could help root out. But then again, when you start talking about economic mobility and access to quality jobs and entrepreneur support and stuff, it's a vast front. It's not something that you can tackle with bringing a new person on staff and that. It's just a big thing. The only thing I would try to say is if you're going to talk about that access to quality jobs, how do you start from the individual's perspective versus the city's at the center of it and try to see what our issues are that way as opposed to

3:05:57 – 3:06:16Speaker 13

Solving individual problems No, that's a great and I think that's also why we're starting to look at getting some of that lived experience and perspective So that we're not just isolating but seeing over from numerous Engagement efforts what some of those themes are in terms of individuals and those experiences Councilmember Miller.

3:06:16Speaker 7

Yeah, just a couple of logistical questions about this slide specifically you're not asking for action tonight from the council, correct and

3:06:23Speaker 13

I'm just trying to gauge general interest. Any formal action would need to still come back before you.

3:06:29 – 3:06:40Speaker 7

So just for an RFP consultant, how much money are we thinking that would cost? What is the funding source for it? What is the timeline and specific deliverables and how would that come back to us?

3:06:41Speaker 13

So I don't have a specific timeline. I think next step would be developing an RFP. In terms of budget, I don't necessarily have a specific, but I would envision.

3:06:50Speaker 7

These are not funded by the grant, so we have.

3:06:51 – 3:07:13Speaker 13

I would envision it being funded through economic vitality funding to help guide that overall where we're going to spend some of that funding, recognizing, I think, those things align with that funding source. But then building out the timeline as part of the RFP. We wanted to get some general feedback today before we went and entered and got into the more specific details, which we would next need to build out for this process.

3:07:13Speaker 7

Okay, thanks.

3:07:15 – 3:07:30Speaker 16

So just to clarify Councilmember Miller's question, so you have a future study session to share the findings. Does the RFP come after that, a potential RFP?

3:07:32Speaker 13

We would, the RFP would probably be for the economic development strategy. I believe the, I'm not certain what is exactly the phrasing for the study session. So apologies for that.

3:07:42 – 3:07:55Speaker 16

Current momentum and next steps. It's slide number 23. Let's see here. Maybe that has to do with the economic mobility.

3:07:55 – 3:08:14Speaker 13

That might be for the economic mobility work. So there's some separate actions kind of being pushed in terms of next steps there. But really pulling together the economic development strategy would be next steps would be establishing and drafting that RFP and then kind of going through that process and then making sure there's alignment with council.

3:08:14 – 3:08:25Speaker 16

And on the economic mobility, do you have a sense of when that study session, sharing the findings for that would happen, likely?

3:08:27Speaker 13

I don't know of the exact date, so I apologize for that.

3:08:31 – 3:08:44Speaker 16

Quarter, is it? You have summer, fall 26, you've got some pressure testing, is it after? I mean is it like.

3:08:44 – 3:08:55Speaker 13

I think it would likely be this fall in terms of being able I think there needs to be some additional engagement in terms of some of the community experience and pulling that to make sure some of what is coming through aligns.

3:08:55Speaker 16

So this fall not next winter. Okay that helps.

3:08:59Speaker 6

It's actually currently scheduled for August 24th.

3:09:01Speaker 16

Oh it's sooner rather than later. Okay good.

3:09:04Speaker 13

My apologies I did not realize.

3:09:07Speaker 16

Any other questions, thoughts? Thank you. I hope you got some good feedback, and we look forward to talking in August.

3:09:20 – 3:09:32Speaker 16

Next up, we have H3, which is Home Ownership Creation Program, the American Cooperative of Rochester Recommendation. Ms. Taryn Edens.

3:09:33 – 3:16:33Speaker 32

Good evening, Mayor, Council President, members of the Council, Taryn Edens of the Community Development Department. I'm here to provide a request for funding through the Home Ownership Creation Program for the development named the American Cooperative of Rochester. So I'll give you some quick context that you've seen before, but good for the public record to kind of remind us about this program and why we've supported it and it's been approved in the past. This specifically aligns with the council's strategic priority to support housing access. Just as well, the home ownership creation program in this particular development aligns with some of our community housing needs. This was updated in 2025 and the priorities essentially remain the same in recognizing two of them are met by this development, both the creation of for sale housing and creating additional senior housing options. A lot of you are familiar with different shortfalls in the supply of owner-occupied homes in our community, and a lot of them aren't really known and they're vast in nature, right? But three to kind of remind us to consider is essentially we have large demands for for-sale housing in our community, almost 7,000 in 10 years, in the next 10 years, and we haven't exactly been keeping pace with that need. And so I'll talk a little bit more about that data. Just as well, there's certainly other external factors, such as the cost of construction has increased. So there are certain challenges that exist for meeting this need. And therefore, the city has made the decision to support the creation of forest hill housing through this program. This is an example of what our production has been in Rochester, specifically of single family homes. And what you'll see and what you're likely already aware of is we're averaging around 200 a year, which won't get us to our goal in the next 10 years. So with that, the home ownership creation program was launched or approved in February 2022. Since then, it's been used to support about 600 housing units to date. I would say support, so they aren't all constructed yet, but we've allocated funding to support that many units. About 9.9 has been allocated. Once again, allocated, not entirely spent, as each project has different milestones and must meet for payouts, such as this one that you'll hear on tonight. A lot of these have leveraged other funding sources. For example, the Coalition for Rural Area Housing has a zero interest construction loan. And then all three of those subdivisions you've approved previously shows you the number of units, and those all leverage that funding source. Just a reminder about the program, there are two ways for eligibility. The one that is going to be used for this evening is we wanted to essentially recognize ways to spur the creation of housing development in large volumes. So if a proposal comes forward with more than 50 units, we can entertain essentially an upfront subsidy, and that's our goal of incentivizing those developments. The trade-off we ask for is that a portion be priced under a certain price point. We look at that price point annually. I'm happy to talk about how we arrive at that number, but essentially we're looking to get a ceiling, I would say that, a ceiling price point based on households of four earning 150% of our area median income. So it's a ceiling, recognizing we look for flexibility in price ranges just as well. Also reminding you how we fund this program, similar to the last presentation, we use the Economic Vitality Fund that specifically calls for using those funds for housing creation, housing preservation, and as you heard, workforce and business development, much of it to support housing creation. Specifically within the housing creation, we use about, we allocated about 14 million to the home ownership creation fund as a portion of that EV funding. So you saw before, we've allocated about 9.9 million. We anticipated to allocate up to 14 million. So the project before you tonight is located in the Danielson Farms General Development Plan at the intersection of 18th Avenue Northwest and 55th Street Northwest. It is a senior cooperative that proposes 95 units. All homes have a range in price between $188,500 and $439,000. Therefore, all of them technically meet our requirements below that price limit affordable to folks earning 150% of the AMI. The amount of subsidy requested is $1.9 million, which equates to $20,000 per unit. That's what we have laid out in our guidelines, once again, as sort of being the ceiling of what it might cost in city-related fees for new development. The development will house a five-story building. The overall design is intended to require low maintenance. We could talk more about that if needed, but essentially saying because it's a cooperative, there's some responsibility of the homeowners to maintain the property, and that's considered as well. Units range in size, and the target market for this project is seniors, since it is age-restricted as well. It's worth noting that this project secured a HUD Section 213 loan. And that's different besides the fact that this is a senior cooperative, so different from other projects we've seen, but still meets the eligibility by being a for sale development. So with that loan, there are additional restrictions than we would typically see or have in other subdivisions we've had. So typically, when we're looking at each project, we're looking at a trade-off for a number of things. We want to see large developments. We want to see quick timelines. In this case, the development has two years to complete after development commences, and there's an ultimate end date as well. And we're looking to restrict rentals. We want this to support for sale property owners specifically for a period of time. In this case, this property comes with a lot of additional requirements from the homeowner, such as a common interest community declaration. bylaws and an occupancy agreement. So therefore, it can never be rented. So it already satisfies that requirement. Often, we're also looking for a resale restriction. So the intention behind that is we're providing a subsidy. And the trade-off is that sale price is lowered by the amount of the contribution made, right? And so the resale restriction, what that does essentially is it carries for a period of time. So if the unit were to transfer, the next homeowner would essentially get a similar benefit and that was our value or priority essentially to see that benefit sustained for a period of time. In this case, a similar requirement already exists via the loan and essentially limits equity to 4.5% annually. So more stringent than what we'd require and essentially satisfies what we would typically look for. So that's the context I have. I have additional questions. I would like to make note that the developer is here this evening, McComlin with Gramercy Companies. If you have additional or specific questions on this, but the request is to adopt a resolution approving the contribution of $1.9 million to the American Cooperative Rochester development to support the creation of 95 owner-occupied senior cooperative units via the home ownership creation program. I'll pause for questions.

3:16:34Speaker 16

Thank you. Council Member Palmer.

3:16:37 – 3:17:21Speaker 18

Well, you know, my first question is gonna be. Yes. We'll start out with $1.9 million. We got about $4 million left in the pot. Is that about right? Essentially, yeah. Okay. And they have an age restriction. I asked and I don't understand really why we can't have it be that you gotta be from Rochester to move into these because I think the plan would be for seniors is to move out of their home, Country Club Manor, Sunset Terrace, those type of homes and move into this and then we incentivize that, then that house becomes for sale in an existing neighborhood Why can't we make it a requirement that it's just for Rochester residents? Because you can do age. Why not Rochester residents?

3:17:21 – 3:18:06Speaker 32

Yeah, it's a great question. I'll answer it, and I'll invite the developer to answer it as well. And recognizing the intent here aligns with the intent of the program. What we're trying to do is add housing units in our community, add to the housing supply to reduce that market tension and market pressure. Essentially, there are legality concerns around residency requirements. So that's more or less the rationale. I would say, the question did come up, right? So we did inquire about this. And what Mick would say is that majority of the residents will come from Rochester within a five to 10 mile radius of the project specifically. Subtargeted marketing is already occurring in Rochester as it stands. But I'll let him answer any other thoughts on that.

3:18:08Speaker 16

Thank you and welcome. And if you could restate your name.

3:18:11 – 3:19:52Speaker 10

Thank you, Mick Conlon with Gramercy Development. Councilmember, thank you for the question. I think it was, when I read it, I was impressed that the stewardship of city funds is obviously Very important. And what I'll tell you is, as Tara mentioned, we do all of our marketing here in Rochester. So our sales office is here in Rochester. We're on KTTC a couple times a month. We do all of our social media advertising, Google advertising. All of it's here based in Rochester. We will get some stray folks from outside of the city who inquire about it, who either want to come back and be closer to family. Usually that's what it is, is they want to be closer to grandkids. and have an interest in coming back to Rochester, but the vast majority of folks who are on our interest list, currently there's about 150 of them right now that we're kind of working through the sales cycle. The majority of them are based here in Rochester. The concern that I would have with that is if we were to just offer it to folks that were, outside of the legal questions, if we were to offer it just to folks who reside in Rochester, there's going to be that perception of well, how come they're getting a better deal than I am and maybe this isn't right for me and that ends up slowing down our sales cycle and makes our project less viable. Obviously the thing that's most important to me is that I can actually produce this building for the folks who have signed on with us and are interested in buying this building just with pictures. Right now, we're putting a lot of faith in us to get this done. And if I were to slow that down at all, I would be hurting them and their expectations for this project. So that would be my concerns with it is just how successful we'd be if we were to do that.

3:19:54Speaker 16

Thank you. Further questions? Council Member Miller.

3:19:59 – 3:20:19Speaker 7

Just a question, Mr. Conlon. Could you talk about how cooperatives work? I think many people in our community would see a building like this and assume that that is not a for sale opportunity. So there are some senior cooperatives in town. And I just wonder if for the record and for the media who are here, if you might talk a little bit about how a cooperative works, how the community works, how the equity works. Sure.

3:20:20 – 3:22:16Speaker 10

Thank you for the question, Council Member Miller. My father built one of the first co-ops here in the cities at Gramercy Park, and that was in 1997. And since then, there's been, I believe there's four now in the city of Rochester. Extremely popular product. All of them have wait lists with hundreds of people on them who are waiting to get into the building, and I would encourage them to come check us out. if they are interested in moving forward. The idea of a co-op is that you're forming a not-for-profit company, so there's no landlord involved once the building is built. The members own the corporation. There's 95 shares within that building, and those will all be owners within the building. They have self-governance, they have control over the decisions that are made by the board, and of course, the property management company works for them, carries out the actions of those folks. Everybody in the building is an owner. It's one of the requirements in the CIC declaration is that at least one member of the family needs to be 62 years old and it needs to be owner occupied. So everybody within the community, it's kind of a microcosm of a neighborhood. Everybody knows each other in a first name basis for the most part and it's an incredibly popular model. They essentially purchase a share in the building that becomes their equity. And as Tara mentioned, our HUD 213 product that we use limits appreciation. It's a limited equity co-op. It limits appreciation. And we set that number here for this project as the developer at 4.5%. So we can literally peg for folks the day they place their share payment into escrow with our title company. That appreciates out. If they told us they have a five-year plan to move, we could tell them exactly what their share value would be when they sell to somebody on the wait list. So it's incredibly predictable. It's very easy to get into and out of. And it's a community of friends and neighbors who own their housing and have agency and control over that. So it's a very popular model.

3:22:17Speaker 7

Great. Really glad to see it. I think it's a great model and I think it's really good land use too.

3:22:22Speaker 16

Council Member Doering.

3:22:27 – 3:22:49Speaker 9

How is the sales cycle going? Because I know for the HUD loan, you have to secure 60% of shares before those loan funds are released. And as we're talking about a $1.9 million city investment. I just want to be assured that we're getting close to that 60% to free up that other funding source as well.

3:22:50 – 3:23:54Speaker 10

Yes, thank you for the question. We began really sales in earnest when we had our legal docs approved by HUD. That's one of the requirements, our CIC declaration, the rest of it, in April. We've been moving forward now. I think we're at about 15 sales. Our goal is to hit about five to six a month until we get to that 60% threshold. One of the things that I worked with city staff on is structuring our agreement with the city so that we're not taking any funds until we hit that 60% threshold because I didn't feel comfortable with that A. And B, I think that's just good policy from my perspective is that if the city is making a commitment, it's not fully committed funds until we are hit that 60% threshold. my goal is to hit that in quarter one of next year and get off and running co-ops can take up to two years to market and sale experience tells us that that can be the case although Rochester has quite a need and there's it's a really known product for our market in in the city so I anticipate that will do well but I'm kind of hedging my bets it's it's outside of my control but we're pushing very very very hard to get that done thank you yeah

3:23:56Speaker 18

Council Member Palmer. Quick question. HOA fee right now?

3:24:01 – 3:25:39Speaker 10

The HOA fees for these buildings, which includes their share of the master mortgage, all of the real estate taxes, operating and replacement reserves, professional management, and all of their utilities except for electric. So they'll start at $2,000 a month and they work up, it's basically about $2 a square foot. So as you get into those larger home plans, it's roughly about $3,800 a month, but includes all of their expenses. So folks will come to us and they'll say, Boy, I'm used to townhome HOA fees. And we say, well, that's like comparing apples to oranges. Because in a townhome, you have maybe some snow removal. The lawn gets cut. In a co-op, the co-op owns everything within the building, right? So it includes if your refrigerator breaks, that's paid for by the co-op. If you have some sort of a plumbing issue, that's taken care of by the co-op. So because the co-op owns everything, it's responsible for maintaining everything, which is completely different than what you would have in a townhome or a it's a condo even so it's it's more involved it is it is more money but it includes all the costs of your housing so it makes it very predictable and most important and there's there's no sliver for a landlord profit at the end of every month that can be raised over time it's it's run at cost and that budget process is controlled by the members who live there and it's also overseen by HUD to make sure that it's not being personality driven as that's always a concern with HOAs that there's one or two personalities get on there and they're using funds in a certain way so the hud how to access an additional protection for our members as well thank you council member wall thank you

3:25:42 – 3:25:56Speaker 23

Thank you. I think I enjoyed Midwest Access with you and your sister some little while ago. You're very pleasant. I think you did a very good job selling.

3:25:56Speaker 10

I'm going to tell my wife you said that. I appreciate that.

3:26:00Speaker 23

Some indelicate questions, however. If you did not get the $1.9 million, is the project defunct?

3:26:07 – 3:27:13Speaker 10

What we are doing with this $1.9 million is we included in the materials, we took all of our share prices and just lowered them. So if the $1.9 million wasn't there, our share prices would be more expensive for the people who are buying into our building. I didn't set out to use these funds when we first started. We've never used TIF or anything for a project that we've done, but the opportunity was there. It aligned with what we were doing, and I thought it was a great opportunity to make this happen. More affordable for folks. I think the toughest thing for me is when people come into our office, they are right on the cusp of being able to afford this. They think it's the beginning and ending of everything that they've been looking for. Community stability, control over their housing, and they fall short with being able to afford it. And so what I'm looking forward to being able to do, if this is approved, is to be able to go back not only to the folks who are our buyers now, but the people that are out there on the wait list and say, look, we've the city of Rochester's made an investment in this. We now have the ability to lower our share costs so that more people can afford to live there and hopefully accelerate the sales cycle so we can get this bill quicker.

3:27:14 – 3:27:48Speaker 23

But it's it's not a but for test in my mind, which you've kind of answered my indelicate question. Number two, Many months ago, you put up a sign that says, coming soon. Sure. Now you have one on the corner, which is cited like this, with nice pictures, much nicer than what we see on our screen there, which says, coming soon, now selling. So say I've already bought in at $300,000. Should you get this 1.9, you're going to come back to me and say, we've reduced your cost to $280,000?

3:27:49 – 3:28:43Speaker 10

We are, and the reason I'm doing that is because I don't believe that we should have different levels of ownership within the building. If something is offered, now granted, we're at about 14 or 15 sales right now, so it's not a dramatic number, but it's real dollars, and those are dollars that are contributed by sales tax, and so I understand the question. um i don't want to have to go back to those folks and say because you had faith in us and you believed in us from the very get-go before we had all these other pretty pictures and we just had this to show people you you had faith in us and wanted to move forward you don't get the benefit of this program but everybody else does. And so in the interest of fairness, my plan was to open it to, we've published a price list for every home plan within our building. It showed the before price and the after price and how we were planning on allocating these funds. And so my plan was to go back to those folks and share with them that we had received this award.

3:28:43Speaker 16

Okay, thank you. Is there a motion on this item?

3:28:48 – 3:29:00Speaker 7

I'll make a motion adopting a resolution approving the contribution of $1.9 million to the American Cooperative Rochester Development to support the creation of 95 owner-occupied senior cooperative homes via the Home Ownership Creation Program.

3:29:00Speaker 16

MOTION MADE BY COUNCIL MEMBER MILLER. SECOND. SECONDED BY COUNCIL MEMBER DORING. COUNCIL MEMBER MILLER, ANY FURTHER TO ADD?

3:29:10 – 3:29:36Speaker 7

JUST TO ADD, WE'VE SEEN ONLY SINGLE FAMILY HOMES AND MORE TRADITIONAL DEVELOPMENT PATTERNS WITH THIS PROGRAM BEFORE. I'M REALLY GLAD TO SEE A MULTI-UNIT, MULTI-FAMILY BUILDING COMING OUT AS A VIABLE OPTION FOR USE OF THIS. WE'VE TALKED ABOUT HOW WE MOST EFFICIENTLY USE LAND INFRASTRUCTURE AND I THINK THIS IS A GREAT WAY that we provide housing alternatives that also are pro-community, bring people together and create that sense of shared community and shared ownership. So really happy to support this.

3:29:36Speaker 16

Council Member Palmer.

3:29:39Speaker 18

It hits two of our things. It hits home ownership and it hits senior living. Is that correct? Correct. That's a good goal, isn't it? It is. Thank you.

3:29:49 – 3:30:10Speaker 23

Council Member Wall. My parents moved here from a cooperative in Edina and they came down and looked at many things and they were hoping to buy into a cooperative and they were not able to find when they came so I too am grateful to have more options as Mr. Miller has suggested.

3:30:13 – 3:30:36Speaker 16

Thank you, all in favor say aye. Aye. Opposed say nay, motion passes, congratulations, thank you. Next up, we have H4, which is amending the effective date of the City of Rochester financial microcontracts process policy. This is brought to us by Mayor Norton. Take it away, Mayor.

3:30:37 – 3:34:10Speaker 24

Thank you. We had a brief study session, and this issue did come up. I was unaware at the time. There wasn't a lot of discussion about it. I was unaware that it was going to be brought forward so quickly on an agenda. And as you know, the council president and I were out of time when it came to the floor, so didn't have a chance to share my concerns at that time. So I've talked with the administration. And they rightly pointed out that this council voted for it on a consent agenda item. And so in having that discussion about should I ask for a repeal or is there a way to compromise, I settled on a compromise approach. For those of you who don't know, and I think most of you probably do, I don't always think the community knows, my name is on all contracts and documents signed by the city, I know. Council the council member that served while I was gone knows from the number of contracts that I get There are many that I sign every week one of the things I look for all the time when I sign those contracts is has this gone before the council and I know for contracts under 50,000 we've had a process where they didn't need to they were just if they were in the budget they got you know, somebody could bring something forward and I And that's fine. That's the way it's been for my entire time as mayor. But when I see this, and I see us moving from that $50,000 limit up to $150,000 to $175,000, I paused. And at the time, I said, this makes me feel uncomfortable. I thought we'd have more time to discuss it before it was on an agenda. I just had not expected it there. Personally, I would always err more on the side of more transparency than less. As I state here, we do know that community trust in government is low. It's low at other levels, but it's also, we've struggled in the community right now. And so I've asked as my compromise that you continue as we have currently and use that $50,000 limit, which I personally think is more appropriate. You guys have made a decision maybe that's a little different than that. But I would like to ask you to honor my request to implement that on January 1st or 5th or whatever when possible. when I'm done with my term and another mayor steps in. And I just want you to know, I take those contract signings very seriously. My name is on them, and as you all know, I don't have the vote, right? So I have to sign things, whether I like them or not, that come before me, but I take it very seriously. And I am more comfortable with you all seeing those items that are between $50,000 and $175,000. That makes me feel more comfortable in signing them. I already look at them for heirs. I found a few over my years as mayor. I'm not an attorney, but sometimes there have been errors and I've caught those. I do take that job very seriously, but I'm asking you tonight to, you don't need to retract your vote, but to have the implementation date be at the completion of my term in January. And so I'm just asking that of you and would appreciate your support for that.

3:34:10Speaker 16

Thank you, Mayor. Are there any comments, council members? Council Member Palmer.

3:34:17Speaker 18

I would just ask the city administrator a question. If I remember correctly, at the first meeting of every month, isn't every check that's written published?

3:34:27Speaker 6

Every expense for the city that is more than $0 is on a detailed report and a summary report at the beginning of every month on your first council meeting.

3:34:38Speaker 18

So really the city council does see all the money that we spend?

3:34:45Speaker 6

Arguably yes.

3:34:47Speaker 18

I saw checks for $4.13. Correct, also any credit card purchase also goes there.

3:34:58 – 3:35:50Speaker 21

Council Member Keene. Yeah, again, I'm familiar with this. I do agree that we went through the finance policies, that it made sense to look to move the dollar amount different. But as I remember in the discussions when we were having the discussion the public or the meeting where we discussed the different changes, we talked about different timings of them. So I don't consider this to be a big change in policy. We did say that we're gonna change the dollar amount. We didn't in the meeting say a specific date, but then we did pass it that way. So I'm comfortable with the mayor's suggestion of just moving it to a January 1st date. So I'd like to make the motion to amend the effective date on the financial policy entitled MICROCONTRACTS PROCESS POLICY TO JANUARY 1, 2027.

3:35:51Speaker 16

A MOTION HAS BEEN MADE BY COUNCIL MEMBER KEEN AND SECONDED BY COUNCIL MEMBER PALMER. COUNCIL MEMBER KEEN.

3:35:59 – 3:36:26Speaker 21

Yeah, again, there probably are, as Mayor said, there's different ways to bring this to us. You could say that we've already passed this and we shouldn't do it, but I feel this is an easy compromise because I don't think we had a full-throated discussion on what those issues were. I still support the idea of changing the dollar limits for council things, so I think this is a good middle ground.

3:36:27 – 3:36:42Speaker 16

Any further discussion? All in favor say aye. Aye. Opposed say nay. Motion passes. Moving on to H5, which is appointments to boards and commissions. This is a item that was pulled by Council Member Palmer.

3:36:44 – 3:37:10Speaker 18

Yeah, this is an appointment to the park board and the mayor makes those appointments and we are the body that approves them. I went back to three different meetings and there was no opening for this opening published. And so I think it would be better to table this and then turn around and have an application out there so if people want to apply, they would know to be notified and they could apply.

3:37:12Speaker 16

Thank you, Council Member. Mayor Norton.

3:37:15 – 3:39:04Speaker 24

Thank you. I'm not going to go into the long and ugly history of how we got where we got, but I will tell you that, as I mentioned earlier this evening, board and commission openings are there all year round. Anyone can put their name in any time. I went and looked back and since 19 or 2022 or 2023 till now, we have had 12 people apply for that board and they've come in periodically throughout the year. of those 12 there was one for Ward 4 during that time and so when the board reps year or term was up I As I told the committee that I would do at the time when the last person was approved I would continue to find look until I found someone who wanted that position someone stepped forward from word for and they are a dedicated community member with interest in parks and So I was very pleased to be able to fill the position and the other thing folks need to know is I Take applications all year I interview people all year and we save those names until the next opening occurs often So I have people for instance on the library board that I interviewed a year ago sometimes boards Board of Appeals, you know, they may have a applied a year ago and I hold that name after I interview them and I make notes that this was a very qualified person, we just didn't have time to fill it. When the next opening occurs, we slip them in. It doesn't necessarily mean we repost it if we have qualified candidates. So both of those things are true. So this is the first interest we've had in the last four years and a very qualified person and I was pleased to bring it forward to you.

3:39:04 – 3:39:30Speaker 16

Thank you mayor and I'll just say yeah, we all sit here at this dais and during the mayor's report I don't think there is one mayor's report that doesn't talk about boards and commissions and opening so I I do believe the mayor does a a great job of letting the community know that there are openings on boards and commissions so is there a motion on this item.

3:39:30Speaker 15

I actually had a question.

3:39:31Speaker 16

Oh, you have a question? Yep. Council Member Fredericks.

3:39:35 – 3:39:47Speaker 15

I agree that April is a qualified candidate and engaged in this community. I see you're out, I see you're working hard doing things within the community. I just, was Mark not interested in continuing his role on the Park Board?

3:39:50 – 3:41:09Speaker 24

I didn't want to really get into the ugly history of this, but you weren't on the board when all this went down. Several of you were. When I brought Mr. Bilderbrock's name forward a number of years ago after having done some interviews and talked to him personally, and he applied, this council voted no to instate him, and I asked for them to consider putting him in until another board member could be found. And so they said yes. and until the end of that term, which was one month, month and a half maybe, and until another board member could be found. And so for these last years, I talk regularly. We have posted regularly about this particular ward as well as others because that was the direction of the council. And so he finished his term on June 26, I believe. And I made a personal call and talked this through with him. And he was very understanding. in fact says if the new council would be so inclined, he would love to continue his service in this community in some other way. So I certainly will keep that in mind and if he's interested in another position, I'd be happy to bring him forward. He's an excellent public servant.

3:41:09Speaker 16

Council Member Palmer.

3:41:13 – 3:41:35Speaker 18

I think Mr. Bilderback has done a good job, and I'd like to see him renewed. And we have not had, again, no posting. This is a little different. This is one of the charter boards. Of the three charter boards, this is a very important one, and they work very hard for our park department. So I'll make a motion to delay this until the second meeting of August.

3:41:37Speaker 16

Motion has been made by Council Member Palmer. Is there a second? but with a lack of a second, is there an alternative motion?

3:41:47Speaker 7

I'll make a motion approving the mayoral appointment of April Souter to the Park Board Ward 4 effective immediately to their first four-year term ending June 30th, 2030. Second.

3:41:56 – 3:42:17Speaker 16

The motion made by Councilmember Miller and seconded by Councilmember Fredericks. Further discussion? All in favor say aye. Aye. Opposed say nay. Motion passes. H6, which is a parking restriction changes to various locations for today's date. Council Member Wall.

3:42:20Speaker 23

I move to adopt a resolution amending the Comprehensive Traffic and Parking Resolution book to amend parking restrictions on various streets as of July 20th, 2026.

3:42:31Speaker 16

The motion has been made by Council Member Wallace. Second. Seconded by Council Member Keene. Council Member Wall, go ahead.

3:42:39Speaker 23

I move to amend this motion to eliminate changes to Prosper Avenue Northwest.

3:42:46Speaker 16

A motion for an amendment has been made by Council Member Wall and seconded by Council Member Palmer. Council Member Wall, go ahead.

3:42:55 – 3:44:02Speaker 23

In my door knocking on Prosper Avenue Northwest this summer, the subject of parking came up and possible changes. Since the agenda came out with this item, I've had good interaction with residents and I'm grateful to Mr. Budzina for sending me the actual surveys that were completed. One resident has reached out to neighbors and reports that they would have answered the survey differently given his experience of parking and traffic on the streets. My computer went wild. He even sent a picture to me this weekend of cars that were already parked on both sides of the street in spite of the fact that there is no legal parking on either side of the street, noting that he could not get his truck between the two cars without folding in his mirrors and that emergency vehicles would never be able to navigate the narrow space. And so certainly with those residents' concerns, that's my plea for eliminating prosper, just prosper from this resolution.

3:44:05Speaker 16

Staff, do you want to speak to the amendment and what it does to your recommendation?

3:44:14Speaker 12

Yeah, it's fine. I mean, we did send out a survey and the results for, I don't have any major concerns with it.

3:44:23Speaker 11

All right. We sent out a survey and, you know, with the surveys we got, it was based on the response.

3:44:28Speaker 16

Good answer. Council member, can I,

3:44:32 – 3:44:47Speaker 23

Just as an aside, on the same night that, no, no, no, it was a couple nights later, I actually met Mr. Budzina on his bike in that neighborhood with his daughter, I think it was. So it was fun to talk to him there. Council Member Miller.

3:44:47 – 3:45:09Speaker 7

I guess my question in response to Council Member Wall is how are staff planning to enforce the no parking restrictions, which seem to be violated by this anecdote? I mean, it doesn't seem like this is getting away from, if there's no parking allowed today and it's parked, but not enforced, none of these situations address that.

3:45:10 – 3:45:35Speaker 12

So I think part of our recommendation of removing the parking restriction from one side is that there is clearly a demand out there. It is pretty close to the edge of town and parking control officers primarily being downtown, they're not gonna get out there every day for that proactive enforcement. So it is primarily going to be complaint based. And I think the neighbors out there just know that sometimes people park on the street.

3:45:38Speaker 16

So there is an amendment on the floor and by Councilmember Wall, seconded by Councilmember Palmer. All in favor say aye.

3:45:47 – 3:46:37Speaker 16

Opposed say nay. Motion passes six to one with Councilmember Miller voting nay on the amendment. Yes, that's right. Moving on to the main motion. I'm sorry. Main motion, we have a main motion with an amendment. All in favor say aye. Aye. Opposed say nay. Motion passes unanimously. We are now at council initiated actions. We have a council initiated action on the history of the Red Owl and the Time Theater. Time, is it Time Theater or Times Theater? Time. Time, one word. I mean, without an S. And the small area plan update. Council Member Palmer.

3:46:37 – 3:47:04Speaker 18

Thank you, it's a pretty simple proposal. The city owns the two buildings, one's the old Red Owl, the other one's the old Time Theater. A history was presented by Judge Lund that a couple council people attended and I thought it would be great and Mr. Wall agreed that it would be great for a presentation for the public and the council at a study session to bring Judge Lund to give a little 30 minute presentation on both of those buildings.

3:47:08Speaker 16

Okay. Council Member Wall, do you have any?

3:47:13 – 3:47:42Speaker 23

Yes. I think I recall at least three of us council members who were there that night. and we were invited, and it was really an informative presentation about buildings that we currently own, and it was such a good update about current city-owned property that when Mr. Palmer suggested that might make a good study session, I thought, boy, that does seem like information that we could profitably use.

3:47:44 – 3:48:24Speaker 16

Administrator Zelms, can you talk about this, do we often have presentations on, I mean, this is a small area plan, a city small area plan, and we're asking a non-city expert to discuss. I respect Judge Lund. I just wonder, should it be wrapped in a greater presentation, just to kind of save 30 minutes for, I don't know what it is, so.

3:48:25 – 3:49:18Speaker 6

Council President, Council Members, Mayor Norton, I don't know what it is either when it is a council-initiated action. I know what is in the council-initiated action which indicates that it would not just be a presentation from Judge Lund on the history of the Red Owl and the Time Theater and city staff to provide an update of the progress of the small area plan along with a possible funding source on the October 12th, 26th study session. So it would be helpful to have more clarity on what is being looked for. Is it a presentation? narrow presentation from judge lund that is on as a council initiative action to determine whether or not you want us and for you to spend your time in that manner which is atypical which is why it's coming before you in this way uh can i ask the council member palmer a question what is the possible funding source of this i'm unclear on that portion of this cia

3:49:19 – 3:49:52Speaker 18

Well, maybe we need to narrow it to just a presentation on the history of the Red Owl in Time Theater by Judge Lund. And I would say that he's a local expert on our history. And I think if we narrowed it to 30 minutes, he would abide by that. He could probably talk for hours. But I'd like to narrow it to 30 minutes. so we could eliminate the funding source in the small area plan. So if you wanted a motion, I would make a motion to invite Judge Lund to do a history of the Red Owl and the Time Theater at an upcoming study session.

3:49:53Speaker 16

Can you hold on your motion? I do think we have some more questions. Council Member Miller.

3:49:59 – 3:50:58Speaker 7

I just say I attended the presentation as well. I thought it was a very well done presentation. It was open to the public. We received invitations. I am glad that many of us took a judge lined up on that opportunity. There was a series that the Chateau was hosting of history of the city. I also went to the lower town presentation. These are all great. I feel uncomfortable with a precedent independent of this topic of inviting community members who are actively engaging on these topics in the community. to come and present formally to council. I know Judge Lund has been quite active in this space, has done a lot of research, has made himself available to all of us individually, but I don't feel comfortable with setting a precedent of inviting community members to the dais. I would be interested in a broad update from staff on where we are with our small area plans, what progress there has been, what are some of the infrastructure, other barriers to development that we're hearing, and how we might advance those. But I think these in my mind are separate things and I'm not inclined to support the CIA for those reasons.

3:51:00Speaker 16

Council Member Keene.

3:51:02 – 3:52:04Speaker 21

Yeah, my concern here early on was, you know, the precedent, but I also see that thing then, now Council Member Palmer has pulled it off, that it was also the city staff coming with an update, which implied to me we were putting this more into the active projects thing, which concerns me because we have enough active projects things going on right now, but Council Member Palmer has sort of pulled that back. At the same time, that's my concern reading this, is that it's, basically changing the agenda between now and year end to say we need to start focusing on other than our main projects, which I'm still concerned that those, I don't think we have enough bandwidth to be trying to do Second Street and then take those same people and take them back to a project they were working on and have them do other things. That's my concern as I read this. I did appreciate Council Member Palmer's change to take the staff out of that, but to me, you can't have an update at a study session where the staff is not going to have any viable interactions with it.

3:52:05Speaker 16

Council Member Wall.

3:52:08 – 3:52:49Speaker 23

We regularly ask consultants to come in and give us expert testimony. I see this as a consultant giving us expert testimony, information that can be helpful to us without any expectation of action, simply giving us an update of what is happening to a city-owned building. So I I just don't see how it's setting a precedent. It would be by invitation of the council. So it's not asking Norm Wald to come in and do a presentation on the Minnesota Vikings, which likely is not going to get a half an hour, probably not even a half a minute, Dan Doering.

3:52:58 – 3:53:41Speaker 24

I'll just say, like many of the great presentations we have across this community, whether it be the History Center or the Chateau, there are lots of great presentations with lots of very talented people in this community. Sounds like three or four of you attended it already. It doesn't sound like it's appropriate for a study session. And as far as this other issue, I'm not sure this is the time, as it was pointed out, to be bringing up these other topics and until the staff is ready and it moves up on the priority list is something we're going to work on so i guess i just i but i think the chateau is great i've known kevin since i was back on school board with him he loves history he knows a lot about history i'm glad four of you got to to see it i'm sorry i missed it but i don't think it's appropriate for the setting

3:53:44 – 3:54:24Speaker 16

I wish I were there. I love I would love to hear more about the Red Owl and the time theater. And but I do agree with the mayor and some colleagues in that it has to fit into the context of what. what we are doing and with the small area plan I don't know where that is in kind of the cadence of it I'd like to see it move up and have a developer there but I am interested in the Red Owl and Time Theater as a part of that but I don't know that it's appropriate at this time it seems to

3:54:25 – 3:55:01Speaker 18

that it would just be there and with nothing wrapped around it to uh bring us to decision councilmember palmer well it was an interesting um presentation we do own the buildings and i think a half hour of our time to see the history of of a building from an expert in rochester is different than just a random um HISTORY FOR SOMETHING ELSE IN ROCHESTER. SO I'LL STICK TO MY MOTION AND MY MOTION IS THAT TO ASK JUDGE LUND TO COME TO A STUDY SESSION AND PRESENT THE HISTORY OF THE RED OWL IN THE TIME THEATER PERIOD.

3:55:02Speaker 16

MOTION MADE BY COUNCIL MEMBER PALMER. SECONDED BY COUNCIL MEMBER WALL. FURTHER DISCUSSION? Council Member Keene.

3:55:10 – 3:55:34Speaker 21

Yeah, I appreciate the update on that. I want to make some statements here. It's my understanding then that this would just be a one-off discussion. I would not expect staff to be ready to come back with it. I saw something in the write-up that talked something about funding sources, which implied to me that we were going to try to resurrect this. But now I'm hearing that's not part of the resolution in front of us. And based on that, I think I can support it.

3:55:35Speaker 16

Thank you, Councilmember. Any further discussion? Clerk Caso, please call the roll.

3:55:42Speaker 31

Councilmember Keene.

3:55:45Speaker 31

Councilmember Miller.

3:55:47Speaker 31

Councilmember Wall.

3:55:50Speaker 31

Councilmember Fredericks.

3:55:53Speaker 31

Councilmember Palmer.

3:55:56Speaker 31

Councilmember Doering.

3:56:01Speaker 31

Council President Schubring.

3:56:04Speaker 31

Motion passes five to two.

3:56:08Speaker 16

Thank you. Thank you. Moving on to ordinance second readings. Mr. Spindler-Craig.

3:56:17 – 3:56:38Speaker 20

Thank you, Mr. President. Item K1, an ordinance repealing in whole chapter 7-1 through 7-10 and replacing with new chapters 7-1 through 7-10 and creating chapters 7-11 through 7-15 of Title VII of the Rochester Code of Ordinances relating to housing code.

3:56:39Speaker 16

Move approval. Second. A motion made by Councilmember Keene, seconded by Councilmember Wall. All in favor say aye.

3:56:46 – 3:56:58Speaker 16

Opposed say nay. Motion passes. We have no tabled items. Council Member Doran, you have a other business. I do. Dogs and Trails, I believe.

3:56:58 – 3:58:01Speaker 9

It is about Dogs and Trails. I encourage and would like to remind the public that we do have a dog leash ordinance here in Rochester. that your dog is required to be on a maximum, well, is required to be leashed on public city trails, and that leash can be no longer than 10 feet long. This ordinance applies whether your dog is friendly or not. I met a very friendly dog last Friday, Burmese mountain dog named Bailey, who, in her exuberance, knocked me off my cycle and broke my knee. very remorseful licked my face all that kind of stuff it was a nice interaction but nonetheless as an active trail user in this community i see this particular ordinance being broken far too often so just out of uh out of concern for public safety i wanted to to raise this up again as a reminder for our larger community thank you council member

3:58:02Speaker 16

Is there any other business? Seeing none, is there a motion to adjourn? So move.

3:58:08Speaker 16

Motion made by Council Member Wall, seconded by Council Member Fredericks. All in favor say aye. Aye. Opposed say nay. We are adjourned.

This transcript was automatically generated from the official public meeting video and is presented unedited. It reflects remarks made on the public record by elected officials, staff, and public commenters. Transcript accuracy may vary; view the original recording for reference.