The Minneapolis Planning Commission approved applications for the Democracy Center at 3000 Minnehaha Avenue, including a two-story addition and alley relocation, despite concerns from adjacent businesses regarding access and parking. The decision moves the project forward to the City Council for final review.

About this meeting

Government Body
City Planning Commission
Meeting Type
City Planning Commission
Location
Minneapolis, MN
Meeting Date
June 22, 2026

Transcript

187 sections

6:20 – 7:50Speaker 13

Audio check, test one, test two for the captioners. Audio check, test one, test two. Audio check, one, two, three, four. Audio check, testing for the captioners. Audio check, test one, two, three, four. Audio check, audio check, test one, two, three, four. Audio check, audio check, test one, two, three, four for the captioner. Audio check, test one. Audio check, test two. Audio check, test one, two, three, four. Audio check. Audio check for the captioner, test one, test two. Audio check for the captioner, test one, two, three, four. Audio check for the captioner, test one, two, three, four. Audio check. Audio check for the captioner. Audio check, test one, two, three, four. Audio check. Audio check for the captioner, one, two, three, four. Audio check. Audio check. Test 1, 2, 3, 4. Stop making me laugh. Audio check. Audio check. Test 1, 2, 3, 4. Audio check. Test 1, 2, 3, 4. Audio check for the captioner. Test 1, 2, 3, 4. Audio check. Audio check for the captioner. Test 1, 2, 3, 4. Audio check. Audio check. Test 1, 2, 3, 4. Do you not know I'm doing an audio check? 1, 2, 3, 4. Audio check. Test 1, 2, 3, 4. Audio check. Test 1, 2, 3, 4. Audio check. I could be wrong. Audio check. Test 1, 2, 3, 4. Audio check. Test 1, 2, 3, 4. Audio check. Test 1, 2, 3, 4. Thank you so much.

38:16Speaker 11

One minute to start, tech team.

38:20Speaker 2

Okay, one moment.

39:02Speaker 11

Welcome, everyone, to the regular meeting of the Minneapolis Planning Commission for June 22nd, 2026. I'm Chris Meyer, chair of the commission. At this time, I'll ask the clerk to call the roll.

39:12Speaker 19

Commissioner Baxley.

39:19Speaker 19

Commissioner Chaudhry. Present. Commissioner Conley. Present. Garcia.

39:27Speaker 19

Gordon is absent. Jones is absent. Shefty is absent. Shepherd?

39:35Speaker 19

Vice President Wagner? Here. President Meyer?

39:39Speaker 19

There are seven members present.

39:42Speaker 11

We have a quorum. First, we'll turn to the minutes of June 8, 2026. Is there a motion to adopt those minutes?

39:48Speaker 8

So moved. Is there a second?

39:50 – 41:11Speaker 11

All right. Any discussion? All in favor, say aye. Aye. Opposed? Abstentions? The minutes are adopted. Next, we're going to organize our agenda. Staff is recommending that we discuss item number four, 3000 Minnehaha Avenue, and that the rest of the items be on consent. So I'm going to read through the other items. If you were here to speak against one of the staff recommendations, let us know when we call that item. If you wanted to speak in support or make neutral comments, you'll have a chance to do that in just a little bit. So first, we're going to discuss item number four. Item number five, 1221 Broadway Street, Northeast. Was anyone here to speak against the staff recommendation for item number five? All right, we'll keep that on consent. Item number six, 3401 to 3409 Boardman Street. Was anyone here to speak against the staff recommendation for item number six? All right, we'll keep that on consent. Item number seven, 2125 James Avenue North. Was anyone here to speak against the staff recommendation? Okay. So we'll leave that on consent, and to review, we're going to discuss item four, and items five, six, and seven will be on consent.

41:17 – 41:42Speaker 11

So... I'm going to open the hearing for our consent agenda. If anyone wants to make any comments on 5, 6, or 7, you can do so now. Not seeing any, so I will close the hearing. Commissioners, is there any discussion or any questions on our consent items? All right. Would someone like to make a motion to approve items 5, 6, and 7 with the staff recommendations?

41:43Speaker 4

So moved. Second.

41:45 – 42:03Speaker 11

Is there any final discussion? All in favor say aye. Aye. Against, nay. Abstentions? That is adopted. So if you're here for five, six, or seven, your item is passed. Good luck with your projects. All right, and now for the main event, the Democracy Center at 3000 Minnehaha Avenue. Staff is Andrew Fentz.

42:13 – 47:26Speaker 5

Good afternoon, Chair Meyer and Commissioners. Before you today are several applications to allow the construction of a two-story approximately 16,600 square foot addition, the relocation of a public alley and site improvements at 3000 Minnehaha Avenue and 3033 Snelling Avenue. This is the former third precinct site located at the intersection of Lake and Minnehaha. These applications were previously continued from the May 18th and June 8th meetings. Because we previously had a very robust conversation on this topic at the May 18th hearing, I'm not going to run through the whole project and the applications, but I'm instead going to focus on what has changed between May 18th and what is in front of you today. So this here is the updated architectural site plan here. The largest change that has been made since May 18th is to reconfigure the southeast corner of the site to provide additional maneuvering area and to widen the proposed dead-end alley segment to allow for larger commercial vehicles serving the adjacent property at 3010 Minnehaha to travel between Minnehaha Avenue and Snelling Avenue. The dead end portion of the alley is proposed to be widened from 15 feet to between 27 and 31 feet in width through the dedication of additional right of way as part of the plat. This additional maneuvering area would allow for buses, RVs, and trucks of up to 50 feet in length to make the turn between the private driveway on the 3010 Minnehaha parcel and the dead end alley and then to make the turn to the east-west alley segment and travel out to Snelling Avenue, as well as to do the same thing in reverse. And this change reduces the lot area of the northern parcel by about 700 square feet with that additional area going to the enlarged alley. The applicant has also moved the parking garage for the community voting trailer further to the north, recessing it further into the logistics part of the building. This shortens the north-south dimension of the proposed addition by about 11.5 feet and reduces the building footprint by a little over 260 square feet. The applicant has also proposed a new designated walkway on the project site, which would connect from the public sidewalk on Snelling Avenue through the property to the north-south alley to the rear entrance of the building as well as to the rear property line of 3010 Minnehaha. And these changes have also come with some smaller changes to the site improvements. The backup generator has been eliminated from the project scope. The landscaped area and shrub count have been increased slightly. And there have been some changes to the needed alternative compliance. The amount of alternative compliance needed for active functions and for blank walls has been reduced. And there have also been some changes to the alternative compliance for parking and loading, landscaping, and screening. I can flip through. So this here is the civil site plan and we can come back to this if needed for the updated change that shows the widened dead end section of the alley there. And then these are the turning diagrams. These ones in particular are for an RV of just over 50 feet in length. I'm showing what that turn would look like heading from Snelling to Minnehaha and then the next one is the opposite direction. And then we have some sort of comparisons between the two different versions of the project that you've seen. So in this image, you're looking at the architectural site plan. The top here is what was in front of you on May 18th. And then the bottom is what's currently proposed. And I recognize there are some differences in the symbology and coloring that's used between these. And then the same here with the landscape layout plan showing that widened alley, the change to the landscaping, the walkway that's been added. And then this is that sort of, again, the same comparison. I know there's a little bit of a difference in the rendering styles, but it's a very similar view showing the two different versions of the project. Quite a few different public comments have been submitted regarding this project. I think there were seven comments included with the published staff report and you should have received, I believe, eight or nine. just now. I'm happy to go into detail on the specific findings and alternative compliance responses if needed. But staff is recommending that the commission approve the conditional use permit site plan review and vacation subject to the conditions that are listed in the staff report and here. Recommend approval of the rezonings and the vacation to the city council and return the CUP for the PUD. I'm happy to answer any questions. Thank you. Thank you.

47:26 – 47:50Speaker 11

Are there any questions for staff before we open the hearing? Okay. I'm not seeing any, so thank you, Andrew. So we'll open the public hearing. Do we have the applicant with us? Yeah. All right.

47:51 – 51:47Speaker 17

Thank you, Chairman Meyer, members of the commission. Following the time we were here last May 18th, when we heard some concerns about maneuverability at that point seemed to be the primary concern. We did schedule a follow-up meeting with Hook and Ladder. We had a meeting on May 29th, so about 11 days following the last commission meeting, we met with them and went over a number of concerns. At that point, the concerns became more explicit to us that they also concerned view corridor as well as parking use in addition to the widened maneuverability. And so we began working on the changes. that Andrew Friends just walked you through. We also, following that May 29th meeting, had another meeting with them to share the diagram that was presented this evening, and that was on June 10th. So we've had two meetings with them since the last meeting and spent quite a bit of time working on the changes that you saw in addition to coordinating those with the consultants. You have the view corridor images here as well. So you can see here just keynoted what those changes were that you were just walked through. I don't think Andrew walked through all of those. Number one, one of the concerns in accommodating the view corridor as well as the maneuverability, we moved the generator from where it was currently located up to... the roof location. So there is some added cost involved likely for structure, for additional wiring. We moved the transformer as well to a different location. There will be some added cost to relocate that, but we moved it so it would not be in the way of the circulation widening that hallway or that drive lane to 33 feet. So yeah, that was the number three is that widening. It was previously a 19-foot alleyway. We widened that to 33 feet. So it provides some additional temporary parking perhaps for an RV as well as maneuverability for RVs. It can accommodate some of those uses that they have as well. There is an added sidewalk now that goes from Snelling directly to the back of that building, which will provide access both for staff into the building as well as bring you to that private drive. So that was not there previously. And then five was that garage shift that Mr. Friends discussed that will to the private drive. I think we have an image that shows Again, those were, so this is the view previously. So the garage did, if you were standing straight on, the garage did block that view corridor of their entry. And then the next view is of the change that we have made that shows how you get that full view of everything other than what would be seen if the Democracy Center wasn't there at all. So you get a pretty wide view. And then we're showing an image of signage on the back of their building that is, of course, brighter and larger than they currently have, which might be an idea to highlight kind of where their private drive entry is, which is in a somewhat difficult place to find in the first place. So just wanted to highlight those items for you and then certainly open it up to any questions you might have.

51:49Speaker 11

Thank you. For the record, can you tell us your name?

51:51Speaker 17

I'm sorry. Jennifer Anderson Tuttle. I'm the principal director of public sector at LSE Architects. I apologize. And this is Tunde Olasanya.

52:00Speaker 11

Thank you. All right. Questions for the applicant? Commissioner Shepard.

52:06 – 52:19Speaker 6

Thank you, Jennifer and Tunde. In our last meeting and in your meeting subsequent with Hook and Ladder, you probably discussed the size of vehicle which they were concerned with. What was it and did you run out of turn on it?

52:20 – 52:56Speaker 17

Yeah, thank you. Wonderful question. At our last meeting here with you, I think they referenced a 45-foot RV, which is what we at first tracked. And then when we had our private meetings with them, they shared that they had had a big event the night before we met with them. And at that event, they had a 50-foot RV. And so we re-ran all of the maneuvering plans. modeling and had civil engineer do that. And 50-foot RV is what we have now modeled, and that is what they shared at that. They had that evening.

52:57Speaker 6

Excellent. Thank you. And that's what we just looked at? Correct. Thank you.

53:03 – 53:39Speaker 17

And I just also wanted to, because I think the way that it's been maybe interpreted is a little confusing. I think the existing parking lot is 80 stalls. The proposed new parking lot is 59 stalls. It's 46 south of the alley and 13 north of the alley. And then there are 14 bicycle stalls in addition. So that is a total of 73 if you consider both vehicular and bicycle access.

53:39Speaker 11

Commissioner Chowdhury and then Conley.

53:43 – 54:20Speaker 4

Thank you, Chair Meyer. Just for our clerks, is it possible to get this presentation added to the public record for us to view it? We will try to get a copy of it. Okay, great. Thank you so much. And then a question for the applicant. You mentioned 59 parking stalls. It's my understanding that there is a commitment to give use to the public businesses and this there's been conversations about that could you speak to that a little bit more

54:21 – 55:00Speaker 17

Yeah, I'm limited as to how I can speak about that. We don't really have any connection to parking negotiations of that lot as the architects were really just developing the site plan and the use of that with the city will be determined following our involvement. And so I can only speak to the fact that my understanding is from meetings I've been in that the city is planning to negotiate shared use of of some kind at a point once the project is You know Approved and moving forward.

55:00Speaker 4

So great. That's what I've heard through the grapevine as well Is there anyone from finance and property services the city of Minneapolis?

55:09 – 55:43Speaker 17

To answer that question here today with us Not here today But I do have and have had communications with Barbara O'Brien, who has said that there will be considerations for a parking use agreement for after hours and hours that the Democracy Center is not needing that parking that will take place. So like, for example, during an election day, that would be a difficult time for shared use parking. But yeah, I think those conversations will come.

55:44Speaker 4

Thank you. That's very useful information. Disappointed to see that Finance and Property Services doesn't have a representative here today to answer some of the questions that they can answer.

55:55 – 56:12Speaker 17

I was made aware that that was a change. I think Paul Miller maybe had a death in the family that just happened, and there were actually two deaths. Medical emergencies, a medical emergency and a death in the family. Well, I'm sorry to hear that.

56:14 – 56:27Speaker 4

My condolences. I'm trying to see if there's any other questions. I think things will just come up as we listen to the public hearing. Thank you for the presentation. It was really helpful. Yeah, thank you.

56:29Speaker 11

Commissioner Conley.

56:31 – 57:06Speaker 16

Thank you, Mr. Chair. I had a question on the slide right before the one you had just showed. It showed like the, yeah, so, yep, go back one. So if someone's coming in from Minnehaha, can you tell me, it looks like the public alley has been expanded to 37 feet, but that turning radius from the private drive to the public alley, can you tell me if that's been widened from what we saw on the 18th versus today?

57:09Speaker 12

Where you have to turn.

57:10Speaker 16

You're coming in from Minnehaha. You're going through the private drive. You're turning to the alley. Yep, right there. So that curve right there, has that been extended?

57:18 – 57:31Speaker 17

Yeah, that curve has been widened to 33 feet. So it is widened by more than 13 feet of what it was previously. Thank you. Yeah, that's before. You can see the difference.

57:35Speaker 11

Any other questions for the applicant? Commissioner Wagner.

57:40 – 57:54Speaker 10

Thank you, Chair Meyer. Thank you for the presentation. Could you speak to whether you and I don't even know the right phrase for this, but whether you modeled large semi-trucks or similar and what that modeling looks like?

57:54 – 58:05Speaker 17

Is this a semi? Yeah. OK. So we have a bus and a semi modeled. Yeah. Thank you.

58:07 – 58:46Speaker 11

Any other questions? All right. Thank you. All right. Proceeding with our public hearing, I have six names that signed up. If you're not on here, please go over to the clerk over here and add your name. I'm looking at the yellow sheet on this, so it's not always clear, but I'll do my best with reading off your names. And each person will have two minutes to speak. So first I have Chris Mazina. Mazina? Mazina? I'll come introduce yourself, and you have two minutes.

58:46 – 1:00:54Speaker 2

Thank you. My name's Chris Mozena. I am one of the founders of the Hook and Ladder and have served as its executive director for the past decade. I want to say that I appreciate the commission taking the time to hear us out on this subject. It's very important to us and our entire community. And I also want to thank Jennifer and LSE for taking the time to meet with us. It was constructive and there were some adjustments made. The list of seven or eight points that we made and submitted as part of the formal record back in May spoke to two primary issues, access and parking. The access issue was narrowly focused on, in my opinion, to the turning radius issue, which thankfully was addressed. The old standard of 30-foot box trucks is no longer the reality we live with. 53-foot trailers plus tractors are what deliver beverage product to commercial businesses today. I just want to point out the significance of this organization and my limited amount of time to TO POINT THE TWO ISSUES THAT WE BRING UP THAT WE THINK SATISFACTORILY RESOLVE THIS IS SIMPLY RELOCATING THE RV GARAGE THAT IS CURRENTLY CAUSING THE REDIRECTION OF THE ALLEY AND THE ELIMINATION OF THE 88 PARKING SPOTS TODAY INCIDENTALLY OF ABOUT 40% OF THOSE SPOTS. WE DO HAVE ADEQUATE BIKE PARKING TODAY INCIDENTALLY AS WELL. We just anchored a Juneteenth celebration this past weekend, and we're embarking upon Pride Week this week. We serve a large amount of people in South Minneapolis. I think I mentioned this last time. We are the last remaining performing arts venue from Highway 35 to the Mississippi River, and I think we deserve to stick around more so than a new parking spot for an RV. Thank you.

1:00:56 – 1:01:07Speaker 11

Thank you. Next, I have Christine Smith. Welcome. Introduce yourself, and you have two minutes.

1:01:07 – 1:02:12Speaker 12

Yes. I'm Christine Smith. I'm the owner of record of 3010 Minnehaha. I have owned it for 27 years. I have suffered through 27 years of this city disregarding me as a property owner and as a person. This is more of the same. I'm not happy. The architects did a fabulous job of listening to us. But the same issues remain. You're cutting off the access to the front of my building. You're cutting off people's ability to come in. You're cutting off our delivery. And quite frankly, if I was not... It was not the city next door to me if it was just another property owner and this issue was coming up. There's no way the city of Minneapolis would permit another property owner to impinge that much on an already established business. Because it's the city, here we all are. And I'm not happy. That's all I have to say.

1:02:14Speaker 11

Thank you. Next we have Brian Bell.

1:02:23 – 1:04:48Speaker 7

My name is Brian Bell, and I represent FG&C LLC with respect to this matter, and I just want to talk quickly about the legal issues. As I noted in my comments, there's a taking issues with respect to this development. The Minnesota Supreme Court has stated repeatedly that ensuring reasonable access to a building or eliminating reasonable access to a building based on a public works project results in a compensable taking. Having access to their main door obviously requires the performers to have access. Metro mobility vans to have access. It's not just single vehicles that need to have access. And so it's our position that approving this plan as drafted would cut off that access. access and constitute a compensable taking. Based on the land use approvals itself, as you're aware, the comprehensive plan in numerous locations discusses encouraging the arts, promoting the arts, not frustrating the arts. And this proposal will put a death nail on a valued cultural institution in South Minneapolis. As I understand it, the Pangea Theater is also contemplating a development immediately to the south of the Hook, and we welcome that, but this development would also potentially impede those plans. And so, again, that's in violation of the comprehensive plan, which as a knock-on to that, would prevent the rezoning, the conditional use permit, etc. The development also, for the reasons that we stated, would frustrate pedestrian access, would cause traffic issues due to cars circling for parking, which are all requirements of, or preservation of parking are requirements for the preliminary plat. Just the final thing that I'll say is it's great to have you know, commitments secondhand or thirdhand, but until we have a signed agreement on parking, that's not something we can take to the bank. And it's great to rely on modeling, but when this is built, it's simply too late to go back and change. Thank you.

1:04:49Speaker 11

Thank you. Next, we have Patrick Scully, who will be followed by Jesse.

1:05:00 – 1:07:09Speaker 8

Good afternoon, I'm Patrick Scully. I won the lottery without buying a ticket. Christine Smith bought the firehouse for Patrick's Cabaret, gave me a 20 year lease at a dollar a month. We arrived in 1999 to a sleepy neighborhood, but Patrick's cabaret's presence helped drive the flowering of the Lake Street corridor in Longfellow. Continuing this, 10 years ago, Hook and Ladder replaced the cabaret. Unfortunately, Derek Chauvin worked next door, and the neighborhood is still reeling. For over six years, the hook and ladder has suffered next door to this blight which repels people. How many years were there with razor wires surrounding it? In the spirit of reparation, this plan should try to fix that and not further penalize the hook. Listen to each and every concern that they detail. They know. They work there. They are trying to survive there. Involve the hook and the building owner as you plan, working with them, not against them. The closer a business is, the better you have to listen. Work with them and all the neighbors, local forces of generosity, persistence, vision, and inclusion. One quick question to sum up. Why 6,000 square feet of retail? The Coliseum building right down the street has over 30,000 square feet vacant today. Thank you.

1:07:10Speaker 11

Thank you. Next we have Jessie B. I can't quite read your full last name. And that will be followed by Lisa Boyd.

1:07:21 – 1:09:28Speaker 14

My name's Jesse Broad. I own or partner with Noble Presents and we present a lot of shows at the Hook and Ladder and in the neighborhood for years. And my main concern is parking. If we're gonna develop and continue to develop a entertainment district in the downtown Longfellow neighborhood to revive that neighborhood and put some restaurants and some other stages and whatever it might be, we're gonna need parking. So we definitely need to have, and what happened was is we came used to using that parking lot, and our customers are using that parking lot. And so to reduce it or remove it or make it hard to access is a concern for the vitality of our business. And I didn't see an economic study done. What would it be to have this building come and the way it's set up has been an impact study for economics. I haven't seen one. So I'm concerned about that. And the main thing, too, is safety. of the neighborhood and having people be there and use it and so parking again comes into play and it's a very critical thing for all of our businesses and I'm we're super happy that the city is finally redeveloping this property because it has been a real problem for us um it hasn't it has impacted us financially and so to have it redesigned and redeveloped is amazing but we just ask you to listen to the people here and just kind of some of these little details because the details matter in a project like this and when you're affecting the neighborhood like this and so what can we do to keep access to keep it easy for trucks and rvs and people to come and use the space that we've been using for six years with no word from the city and now all of a sudden this so let's all work together to make this thing happen thank you next we have lisa boyd

1:09:36 – 1:10:55Speaker 15

Hello, and thank you to the Commission for this opportunity to speak. My name is Lisa Boyd. I'm the staff person for Longfellow Rising, a nonprofit organization formed to focus on the rebuilding of the area around this intersection we call downtown Longfellow. We fully support the Hook and Ladder Theater's request that the city and the architects it's hired slow this process down and consider the Hook's design change proposal, as well as to conduct an economic impact study of the current site proposal. We continue to be disappointed in the lack of consideration the city has given to the impact of its proposed changes to this site on this formerly thriving creative commercial node that has seen so much trauma in recent years. All of the businesses along this block of Minnehaha Avenue were involved in mutual aid support of their neighbors during Operation Metro Surge, in addition to the day-to-day running of their businesses. They deserve our recognition and support. We share everyone's frustration with how long it is taking to rebuild downtown Longfellow, including the Democracy Center, but it should not happen at the expense of a beloved anchor institution. Thank you.

1:10:56Speaker 11

Thank you. Is there anyone who didn't sign up who wanted to speak? All right. Not seeing anyone, so I will. Commissioners, does anyone have any questions before I close the public hearing?

1:11:11 – 1:11:24Speaker 11

I will close the public hearing then. Commissioners, is there any discussion, motions, questions? Commissioner Chowdhury, do you want to start?

1:11:26 – 1:11:39Speaker 4

Perhaps this should have remained for the public hearing, but I did have a question for the applicant in terms of the issues noted around access.

1:11:40Speaker 11

I'll reopen public hearing.

1:11:42 – 1:11:58Speaker 4

The testifier shared that it was narrowly focused on the turning radius of the vehicles. What were the considerations made in terms of cutting off access to the front of the building and then delivery.

1:11:59 – 1:12:11Speaker 17

We have, so I'm assuming when you say front of the building, you're referring to the private alley, not this front of the building that's on the street. Correct. Right.

1:12:11Speaker 4

Because for us, that's the front of the building. That's how you get into the hook and ladder. Right.

1:12:15 – 1:13:39Speaker 17

Okay. So one of the concerns that I believe they're referring to, we provided a new sidewalk that leads you through from Snelling. through towards the private alley. And so currently there isn't one. We added that. That was something that wasn't in the site before. And so that's a benefit that they didn't have before previously. The other is a visual view corridor access is what I'm assuming they're referring to. And that's where we pushed the building in by, was it 11 feet? 11 and a half feet, yes. And then delivery access? Yeah, the delivery access has been improved. There isn't any delivery that we understand can't access. We've shown the turning radiuses for vehicles up to semi-trucks, and so we're not sure what kind of delivery could come larger than that. You know, a semi-truck and just for, I think Andrew Friends could probably speak to it as well. I don't think anyone along a public private alley who gets deliveries from, you know, anything beyond that can be accommodated in a private alley facility. I'm sorry, public alley. And so, yeah.

1:13:41 – 1:13:57Speaker 4

Thank you. And maybe I could ask a representative of the hook and ladder if they could maybe more clearly lay out what they meant by front access and delivery access, just so we understand in this public forum what your need is. Thank you.

1:14:01 – 1:15:20Speaker 12

One of the nicest things about the current situation is a straight pass-through. It can be viewed from either side, from Minnehaha or others. So when people aren't familiar with the building, are pulling in, they know where to pull in, they know how to do it, they have a clear sight line that takes them from Minnehaha all the way to Snelling. It also, for people who are coming in from out of the Minneapolis area, and we have many events where we're bringing in people from as far away as Minnetrista, Minnetonka, and Minneapolis. It's pretty scary to them. So being able to see a straight sight line between where they park their car and the front door is really important. And let me tell you that under the current economic conditions, The difference between red ink and black ink at the bottom of the page is as few as five people. And if those five people don't have adequate sight lines, can't see, can't get there, don't feel safe, lights aren't on, They're not coming. Yeah. And it's really critical. If we were in a different economic situation, maybe this wouldn't be so critical, but it's really important to have a straight shot through.

1:15:20Speaker 4

And, Kristen, I don't want to cut you off too much, but could you speak to the delivery? And then if you want to just take a little gap from the mic, there's a little bit of popping when you're speaking. I'm sorry.

1:15:31 – 1:16:23Speaker 12

I'm used to, you know, when you're on stage, you need to get right to the lips. Just the other day I was there and I came up from Minnehaha with the intention that I was going to go to the front door and there was a beer delivery and it literally took up the entire side of the building. from where we have the taco truck, because it's not allowed to park on Minnehaha, so we have it on our property, and the back door. It was everything. It was the whole way. Now, yes, could it get around that ratio? Yes, it could. Would they take out a part of the building if they weren't paying attention? Yes. If they go straight on through, buildings are not going to get bumped by giant trucks. So that's why. Is that enough?

1:16:24Speaker 4

Yeah, that's helpful. Thank you so much. I don't want to hog this time, so I'm going to take a step back, and if others have questions.

1:16:34Speaker 11

Does anyone else have any questions for the applicant or any of our testifiers? Commissioner Conley in the Jeopardy.

1:16:41Speaker 16

Thank you, Mr. Chair. I think I heard, this is to the applicant, I think I heard that there's ADA parking that's being removed.

1:16:52 – 1:17:19Speaker 17

I'm sorry, did you say ADA? ADA parking. No. There are three or four? Three ADA parking stalls being designed into the spot. I said 8080 is what I was recalling the existing parking lot has in terms of number of stalls. And we're reducing that down to 73 when you consider also bicycle parking.

1:17:20Speaker 16

So that doesn't reduce the number of ADA stalls?

1:17:25Speaker 17

No, it does not. It actually increases it from what's there today. Okay. Thank you.

1:17:33Speaker 11

Commissioner Shepherd.

1:17:34Speaker 6

Thank you. My question is for Mr. Bell. Mr. Bell, with respect to the site plans which are available, can you demonstrate the taking of the drop off?

1:17:47Speaker 7

Do you want to pull it up? I mean, it's just the access issue and not being able to have reasonable access to the building.

1:17:54Speaker 6

More specific than reasonable, please. Can you show a plan what is being taken today? Thank you.

1:18:03 – 1:19:09Speaker 7

Well, I mean, it's basically all the issues that have been discussed here today that if... I would say reasonable access has to consider what the access is for. So my house, reasonable access would be for, I call them single family vehicles, but commuter vehicles for consumer vehicles. Whereas reasonable access for something like the hook and ladder is to be able to have semi trucks, to be able to have patrons who can access it easily. And so, to my mind, that is what a court would look at when it considered whether access was reasonable, not just whether a pedestrian can walk up to the building, but can all of the access that is required for that property owner be realized? And here, delivery trucks, pedestrians coming from Snelling Avenue, vans, things like that, their access will be frustrated, which frustrates access to the hook and ladder.

1:19:10Speaker 6

And I believe the applicant has demonstrated access to delivery trucks.

1:19:14 – 1:19:51Speaker 7

Well, I mean, not to our satisfaction because we currently have access, apologies, of being able to go straight through. And Straight through from Minnehaha to Snelling Avenue straight without having to make this harrowing turn And so it is our position that that that would not be reasonable access But for patrons that the drop-off is to the west of the building to the north of the building and For patrons, it's in the northwest, basically. To the north side of the building, between the buildings, basically.

1:19:51Speaker 6

Correct. So if there is a van parked there to drop patrons off, is it wide enough to still get another vehicle past it? Not a semi. They shouldn't be there during those hours.

1:20:01 – 1:20:42Speaker 7

I don't believe so. I mean, my understanding is that no. 33 feet? Well, that's the turn radius. That's not, I don't, I mean, the private alley is not being expanded, to my understanding. I mean, it's a private alley. I don't know that the city has the ability to expand our private alley. My understanding is what they propose to do is move their building back from the turn radius to allow for greater turns, but I don't think that's going to prevent backups in the private alley as they're turning onto the public alley.

1:20:48Speaker 11

Any other questions? Commissioner Garcia.

1:20:55 – 1:21:21Speaker 9

All right. If I could possibly have somebody representing the hook and ladder, I guess my... Thank you. My question is basically, do you see any acceptable outcome on your side that isn't the alley remaining straight through?

1:21:25 – 1:22:49Speaker 2

That wasn't the question I was expecting. Probably not, no. The drawing that's up that we were just looking at and this turning radius, this is all with the assumption that there's no, and this goes to the ADA question I believe, goes to the assumption that there's no ADA parking currently happening there, that there's nobody in those spaces. That radius is not going to work for any of these vehicles that have been described with a vehicle parked there. The width of a vehicle will prohibit that so we're looking at the maximum capacity of width of an unparked space Which is rarely the case Which is where our ad a parking is so we would effectively lose that that's correct I want I don't know that this is the correct question to address this but since our last meeting on the subject of safety The lights have been turned off in this parking lot, and I find that curious, and I'm hoping perhaps somebody on this commission can look into that for us because we entered these conversations in good faith, and we're left with a much more dangerous space at night, and we don't understand why that is. These lights have been on for six years. Commissioner Chaudhry?

1:22:51Speaker 4

When did you notice these lights being off?

1:22:54Speaker 2

Within a week of our last appearance before this commission.

1:22:57Speaker 4

Okay. It's my commitment that I will follow up and figure out why the lights are off. Thank you.

1:23:03 – 1:23:15Speaker 2

It has happened before in the last six years, but not in the last three or four. And they're off. They're on during the day and off at night.

1:23:21Speaker 11

Are there any further questions from commissioners?

1:23:23Speaker 4

I have a question.

1:23:24Speaker 11

Commissioner Chaudhry.

1:23:26 – 1:23:38Speaker 4

This is regarding the ADA parking that the hook and ladder provides. Could you just share the nature of the parking for what vehicle sizes and how much parking you provide in your private drive currently?

1:23:39Speaker 2

Basically, all of the parking inside our private drive is dedicated to ADA guests.

1:23:45Speaker 4

How often is it used?

1:23:48Speaker 2

Every show. I mean, it depends on show whether every spot is utilized or not, but staff doesn't park there. They're marked for ADA guests.

1:23:58Speaker 4

And so you're saying the biggest issue is with the dead end and then the turn. It would be impossible.

1:24:08 – 1:24:27Speaker 2

For example, if we had a performance happening and there were guests inside the building and they were parked in an ADA spot and a typical performance may have three acts over the course of the evening, they don't all load out at the same time. If there's guests in the facility and they're utilizing one of those parking spaces, navigating that turn is not possible.

1:24:29Speaker 2

With a larger vehicle, a tour bus or something like that.

1:24:32 – 1:25:11Speaker 4

A tour bus or something like that. Okay. Thank you. I had a question for the applicant. So my question is regarding, no, you're all right, take your time. My question is regarding engagement with businesses and other stakeholders in the area, particularly the businesses directly adjacent to 3000 Minnehaha and other stakeholders in downtown Longfellow. What has been the nature of that in proposing this plan?

1:25:13 – 1:26:21Speaker 17

And a timeline, if you have it. Sure, sure. So our initial city council workshop was August 25th. Following that, it was determined we worked with Alexander Cato and Nick Cato. Noy? Nicknoe. Nicknoe, sorry for the mispronunciation, on an approach for engagement that would work with the city's process. We determined there would be, there was a community meeting on September 3rd with the Longfellow Equitable Development Committee that happened at 6 p.m., Following that, there was a Committee of the Whole meeting on September 22nd that we presented at, so a public meeting. And then we had a community open house at Moon Palace on October 3rd. That was all prior to a schematic design package being issued. Yeah, and then that brings us to Planning Commission on May 18th.

1:26:22 – 1:27:02Speaker 4

Thank you. That's really helpful. And just for your awareness, I sit on the city council, so I'm the city council member appointed to this body. I'll just share, like, in our committee of the whole meeting, we didn't have a presentation on, like, the impacts of what would happen to local businesses and any information on responses from local businesses. And it sounds like these prior meetings, while important and glad that we had them, didn't really engage with rezoning and the alley vacation and what we're looking at here. Do you think that's a fair assessment?

1:27:03Speaker 17

Yeah, I think when we met with you initially early on, there wasn't really a determination at that point that an alley vacation would be necessary.

1:27:11 – 1:27:35Speaker 4

Right. What we were discussing was architectural design. I think we got a great video of what that would look like and some of the components on that. Okay. Well, thank you. That's all my questions for you on that. Thank you. And then I have other comments, but that can wait until after the public hearing closes.

1:27:35Speaker 8

May I address the question?

1:27:38Speaker 11

I'm only calling people if commissioners have a question for them. So, commissioners, are there any other questions? Commissioner Conley.

1:27:45Speaker 16

Thank you, Mr. Chair. Was a straight pass-through one of the considerations during the design?

1:28:00Speaker 17

Yeah, it just doesn't work with the deliveries that that building is going to require as well. We did try to see if there's a way to do that, but yeah.

1:28:13Speaker 16

Can you speak a little bit more about that? So where are the deliveries coming in now in the current design? Here, we're going to open the plan again here.

1:28:23 – 1:28:57Speaker 17

So there is a receiving area right in that area. And so for them to also be able to maneuver in and out of the site, they need to be able to back in and off of or back out onto the private alley and then out also to Snelling. So they're able to maneuver their semi-trucks from that receiving area onto Snelling as well. So this was a solution that looked as though it allowed both properties to have access and maneuverability from the back service area.

1:29:02 – 1:29:20Speaker 11

Any other questions from commissioners? Last chance. I'm going to close the hearing for the final time. All right. All right. I'll close the hearing. Commissioners, are there comments, questions, or motions? Commissioner Chowdhury.

1:29:22 – 1:34:43Speaker 4

Thank you, Chair Meyer. I'm struggling on where to start with this. So I think the place that I will start is what my role is, obviously planning commissioner, but also council member. And my job is to represent 34,000 people on the body of the city council. And then I'm appointed to this body. And I think for me, It has been a major point of frustration since we have started talking about 3000 Minnehaha over the years on having Finance and Property Services work with my office in highlighting areas in which We require constituent involvement and this is nothing against the folks at LSE. I think you guys are doing a great job and doing your part of this and nothing against our planning staff. I think they're doing a great job as well. This, I think predates this work, but since I was elected to the city council in 2022, I have over and over and over again. have chased after meetings with finance and property services to have some inclusion of the constituents that I represent that work in downtown Longfellow, that operate businesses in downtown Longfellow, that are there all the time, even if it's outside of the boundaries of my ward. It's probably, what, like eight or nine blocks out of my ward. And that's really frustrating. It took years for me of me staying in public meetings to get some sort of accountability on the burnt vestibule and the dilapidated nature of that building. The barbed wire that stood there that was placed by the military and was just left there. And it is really frustrating to me after repeated requests of inclusion of my office and also sitting on this body as a planning commissioner that there had not been any prior communication. to my office about the needs of constituents in this area. And I think at this point, after years and years of work on this, it would be a little bit of a no-brainer in a step of collaboration to connect with this office because it's not about me. It's about the 34,000 people that I represent. And it's also really tough for me as a council member in the role that I play to hear that the business right next to something that we should be proud of a democracy center, something that I've supported that is an important activation for the corridor did not notify them that this was going to have such a significant change. to their business plan. And downtown Longfellow is a place that unfortunately has had to struggle for a very long time and is trying its hardest to come into its next era. Like we had a wonderful Juneteenth celebration with Soul of the Southside, and Hook and Ladder has always been a major part of that activation. Hook and Ladder has always embodied the values of inclusivity. And I know that we're talking about the planning matters, This context, I think, is important and this is the charge of the work that I'm set to do. I also think it's pretty hard to hear that there is existing ADA parking that the business provides to its patrons that will go away with the changes that are made here. I'm seeing a head shake no, but we've heard over and over again here that they would not be able to park at the same time. And if we can prove that, if I can have that proven to me, I would accept that. But that has not been proven to me that they would lose their, they wouldn't lose their ADA parking. If someone from Finance and Property Services wants to make that clear to me, that would be really helpful. But I think the way that we have handled this To make a decision that feels like it hasn't taken the time to account for the stakeholders in the area, the council members in the area, which, again, our job is to represent people, and to make that decision in 22 business days from May 18th to June 22nd is a really unfair ask. Um, especially given the history of this location. And again, like, I think we've learned this lesson over and over again in city hall that there is a right way to handle 3000 mini haha. Um, and I think a lot of that falls on the shoulders of financing and property services. But I have made requests and before we voted on the architectural designs for there to be this type of stakeholder meetings for the people that work in this area that run businesses and that's something that hasn't occurred. So that's definitely factoring into my decision today. It feels really difficult to vote for a plan ahead where I can't ensure the future of the constituents that I represent one way or the other. And I'm never going to vote for something that I don't feel certain about.

1:34:48Speaker 11

Thank you, Commissioner Chowdhury. Commissioner Buckner.

1:34:52 – 1:38:11Speaker 10

Thank you, Chair Meyer. I'll take a moment here to maybe help shape the discussion for this board and offer some information for the public. So we have a number of applications before us today. We have conditional use permit. We have site plan review. We have a preliminary plat. when we have a vacation. I went through at the last meeting with city staff what is required application type and like what type of vote they are and we have like Legislative action votes and we have quasi judicial votes and when we have quasi judicial votes We need to find a finding to attach to if we are going to vote a certain way So when I look just like when I looked at it last time when I look at the conditional use permit And I look at the site plan review. These are quasi judicial votes I don't really see a finding that would lead me to be able to attach to to vote No, I'm not gonna accept this conditional use permit. I'm not gonna accept this site plan review and We also discussed last meeting the vacation of the alley, item G on the agenda. And I asked staff what is needed to vacate an alley. They said public works, I believe it was, reviews whether the alley is needed for utilities or for property access. And they have included in their statement that I believe it's in the packet. Someone could correct me if I'm wrong, that the alley, like they're okay with the alley vacation and the change of alley, change of the alley location. So just like last time for me, this item kind of comes down to one item on the preliminary plat. And I honestly don't know how I feel about it yet. I want to hear from the rest of this commission and continue to think about it and it's really marginal for me. On the preliminary plat in the staff report on page 24, it says the subdivision will not be injurious to the use and enjoyment of other property in the immediate vicinity. So obviously a lot of work has been done between this meeting and the last meeting to ensure that to be true, right? The alley has been widened. The different people involved in this project have met and worked together to try to find a solution that works. Commissioner Garcia asked the hook and ladder representatives here today, the business next door, whether any single outcome other than a straight alley would be okay. And They said no, and that's totally their prerogative to say that. A straight alley would mean that this new building would be smaller. They need to have a place to load their supplies and whatever this new democracy center needs. And the semis can turn, as demonstrated in the plans. So is this injurious to the use of... the properties in the immediate vicinity as the city code reads. I'm not sure. I still honestly don't know how I'm going to vote on that. But I think that we as a commission, as we consider this application before us today, I think that is probably the item that we could perhaps vote on. And For items D, E, and G, I think they're all fine. Obviously, I want to hear what other commissioners have to say. But I think that could at least help us kind of frame this conversation as we consider this item. Thank you. Thank you.

1:38:12 – 1:38:24Speaker 11

And just to clarify, the staff did say last time that for both the quasi-judicial and quasi-legislative items before us, you have to have findings either way for both of them. Commissioner Chaudhry.

1:38:27 – 1:38:38Speaker 4

Chair, could you or staff lay out which parts are quasi-judicial and which parts are quasi-legislative and highlight where we need to have findings?

1:38:40 – 1:39:33Speaker 3

I can answer that. So all of the applications in front of you do have required findings. So regardless of whether it's a legislative application or a quasi-judicial application, findings are required to be made. The findings in the staff report are draft findings. If the commission's decision detracts from what's in the staff report, the commission would be responsible for coming up with alternate findings. So that said, Items A and B are both rezonings. Those are legislative actions. They do require findings. Those automatically go forward to the city council for a final decision. The conditional use permit under C, D, and E, and one of those is being returned, but CD and E and the preliminary plat under F are all quasi-judicial applications. And then the vacation is a legislative item as well. They all require findings.

1:39:36Speaker 11

So regardless of what we do today, the legislative portions go to the council. That's correct.

1:39:44Speaker 3

The vacation and rezonings automatically go forward to the city council for a final decision.

1:39:49Speaker 11

So if we were to go with the staff recommendation today, those parts would still go to the council. The quasi-judicial parts would not. Is that correct?

1:39:58Speaker 11

Unless there is an appeal.

1:39:59 – 1:41:17Speaker 4

Correct. And just to go off of that, I mean... For me, I think I play a unique role here and it's constituent representation as it goes to a city. process so I'm always going to speak to that and contextualize that for this. I do think like I'm having a really really hard time with the vacation in particular less so the rezonings because again I'm a supporter of this project and I'm not saying that like the thing that we do is, um, it just seems like there needs to be more discussion and negotiation on what can happen here, but I'm struggling with the vacation given, uh, the lack of information on impact and other options and just also the expedited timeline in which we have handled this. Um, and I think like, since this is something that goes to the council, I'd be interested in a motion to deny the vacation for a greater discussion. I don't know if a finding on this could be injurious to the adjacent businesses, but that's something that I would look to make.

1:41:18 – 1:41:46Speaker 3

So I can clarify the finding on the vacation application really comes down to whether or not the alley is needed for a public purpose. So finding that it would somehow be injurious to the adjacent property could not be a finding to support denial of the alley vacation. We do also have staff here from Public Works right-of-way if there are questions specifically to how Public Works came to the conclusion that this alley is not needed for a public purpose.

1:41:47 – 1:42:12Speaker 4

Okay. That's helpful. And like, I'm, I appreciate commissioner Wagner taking a step to help shape the conversation, interested in hearing what other commissioners think on this. Um, just, I'm just really struggling with full approval on this. I think there needs to be a mechanism in which we have a greater discussion on what this looks like for the area.

1:42:16Speaker 11

Other questions? Did anyone want to hear from Public Works? Okay. Got a couple hands. So can we have the representative from Public Works come up if they're? Kimberly said you were here.

1:42:28Speaker 3

Thanks, Jeff.

1:42:30Speaker 11

Thank you. Can you please introduce yourself and tell us about your reasoning for the vacation finding?

1:42:41 – 1:44:19Speaker 1

President Meyer, members of the Commission, my name is Jeff Handeland. I'm a principal professional engineer in the Transportation Engineering Design Division of Public Works. Public Works reviews right-of-way vacation applications and vets those with the different areas of Public Works and CPED. Public Works reviews for things like access and utilities, any easements that need to be preserved with the vacation and recommends vacation if Public Works judges that to be in the public interest. Public Works does not require development projects to provide public parking or align alleys with private driveways or design alleys for semis or tour buses. So those, I just want to explain, those are not in, you know, part of Public Works review for making our recommendations for alleys. We just recommend, we just require alleys to be designed to our standards. So, for example, 14 feet of pavement on a 16-foot alley right-of-way is one example.

1:44:22 – 1:44:33Speaker 11

Thank you. Are there any questions for staff? Not seeing any, so thank you. All right, further discussion. Commissioner Conley.

1:44:34 – 1:45:01Speaker 16

Thank you, Mr. Chair. I wanted to kind of talk through a little bit. Commissioner Wagner was on the plat, and I think you were going somewhere with that that I was following. But F was where my sticking point was, too. So I'm trying to get to a place where the plat makes sense, and I'm not there yet. But I think Commissioner Wagner was going somewhere with that.

1:45:02Speaker 10

Commissioner Wagner.

1:45:02Speaker 16

Let's talk through it.

1:45:04 – 1:45:59Speaker 10

Sure. I'd be happy to maybe ask, maybe this is a question for Kimberly. So on page 24 of the staff report, under the preliminary plat, it says, and I think this is the standard that must be met, and then their staff's response, it says in italics, the subdivision will not be injurious to the use and enjoyment of other property in the immediate vicinity. And then under that, in normal text, the city responds and says, In this case, I should say staff responds in the staff report and why they feel that it would not be injurious and why we should approve the preliminary plat. I would say that we as a board, if we wanted to, could find that it would be injurious to the property in the immediate vicinity for a lot of the reasons discussed today. Would that finding, like would we need to support that finding or like would we need to say why it would be injurious or thoughts from Kimberly on that item?

1:46:01 – 1:46:41Speaker 3

So if we're referring to finding number two under the preliminary plat, yes, I would recommend having specifics as to why the plat would be injurious and how that's not mitigated through the site plan proposed by the applicant. And just to bring a little bit more clarity to the issue, which I think everyone's following, but The vacation is what eliminates the current alley. The preliminary plat is what dedicates the new alley configuration. So the new alley design is tied to the preliminary plat, not to the right-of-way vacation.

1:46:41Speaker 11

And just to reiterate, the preliminary plat is quasi-judicial, correct?

1:46:50Speaker 3

Correct. And the preliminary plat also will require a final plat at a later date. But yes, this is quasi-judicial.

1:46:58Speaker 11

Commissioner Chowdhury, did you?

1:47:04 – 1:47:40Speaker 4

Yeah. Thank you, Chair. And thanks, Commissioner Wagner. I think I'm interested to see what the body thinks of this, but I think for F, if a motion is proper for denial on a preliminary plat and staff wants to, the city wants to come back with something different or appeal it, I don't know. I think, actually, let me take a step back. If we denied the preliminary plat, what would be the next steps to follow?

1:47:43 – 1:48:16Speaker 3

I mean, denying the preliminary plat would essentially mean If the alley is vacated and the preliminary plat is denied, then the current alley goes away and the new alley is not dedicated. The building addition could technically be constructed without a preliminary plat as proposed. But yes, if it were denied, then the new alley would not be dedicated as proposed on the plan.

1:48:20Speaker 4

And I think that's where compromise and discussion would need to play a role.

1:48:25 – 1:50:53Speaker 11

Okay. I'm going to say a little bit about where I'm at. So first, I just want to acknowledge all the struggles that the businesses in this area have gone through. And we really want to do what we can to help those businesses, which is why I supported continuing this and I hope the city does everything that they can. I'm appreciative that they're willing to have discussions about using their parking and not wasting it. I understand for things like Election Day that you're going to need that, but I hope any time that you don't need it that you let them use that. I guess for all the quasi-judicial items, I feel like the findings are met in favor of the applicant. I think where there's leeway are on the quasi-legislative items, like for zoning. the council, the planning commission, they have a lot of discretion on those items. That's where you can make a finding that something is not consistent with the 2040 plan, some of the different components that were cited in the legal letter, like supporting the arts. I mean, that's where that fits in, is in the zoning. I think my thought is that the quasi-legislative parts have to go to the council anyway. So if the council wants to make adjustments, they would have an opportunity to do that. And then if it was appealed, there would be an opportunity for them to review all the quasi-judicial ones as well. But my opinion is that the applicant has made some reasonable accommodations, and I'm inclined to support the staff report, not having... any findings that I think go against it for the quasi-judicial components. So my suggestion would be if there are more details to work out, either way the council is going to have to take this up. So I would suggest moving it forward to them. That's my thought. Other commissioners? Commissioner Shepard.

1:50:54 – 1:52:38Speaker 6

Thank you, Chair Meyer. I'm going back to the alley on the north side of the hook and ladder. From the May 18th meeting, we discussed parking and we discussed getting vehicles through there. And those are the goalposts that are not going to move, in my mind, that I'm not really interested in any changes to. I believe the applicant has satisfied vehicular access for delivery vehicles, which was the big sticking point back in May, as well as parking. As far as using the word take to describe things, if the alley hasn't changed north of the hook and ladder, but it's been made more accessible, I'm not clear what's being taken. If the parking belongs... belongs to the Democracy Center project in the first place, then nothing is being taken there either. So the word take confuses me, even now, because I'm not seeing how anything is changing to that west or north elevation of the hook and ladder that is not true today. This is really just about the reduction of parking, which it is ironic for this body to be concerned with. The precedent we'd be setting, one of you mentioned, that if this were a private concern, we would never permit this. But I'm not sure that's true. I'm going to indulge that for a moment and say, God, the precedent we're setting, is the precedent that we are setting that that private concern's parking would be entitled by other adjacent landowners? I don't think we'd ever make that argument, and I don't know that we should make it here. So, Chair Meyer, I'm inclined to concur with you. Thank you.

1:52:38 – 1:53:05Speaker 11

And thank you for mentioning that because that was something I meant to say as well as the concerns that have been brought up about parking. If we followed that line of logic, if we were to describe that as a taking, that would go very contrary to our climate goals and many of the other goals that are in the 2040 plan. So I'd be very opposed to making those suggested findings. Commissioner Connolly.

1:53:06 – 1:54:57Speaker 16

Thank you, Mr. Chair. So it's not just any parking, it's their ADA parking. And so this feels very incomplete to me. I really appreciated the continuance on May 18th. And that gave a lot of time for the architects to go meet with the business owners and other stakeholders, which was desperately needed. And I think that that is something that should have happened before September of last year, which is when I think August was the first meeting you had with the city about how to engage. And then you met in September, and then October, and then May. So there was a big gap there. And I think that had conversations started a lot sooner, then we could be at a better place right now. Again, this feels incomplete. I'm really struggling with F&G, although it's been very well explained up here about what our duty is today. I still... I'm grappling with not feeling like this is complete to me. It's not complete because it wasn't really, I don't know, I think the engagement might have been off a little bit. I think we've got the turning radiuses down. We probably have the width of the alley, which is fine. But I think in design, there's a number of different ways that you can be creative, especially when working with anchor businesses who have been here for quite some time. So, yeah, I'm not, like, arguing for parking, but I do feel like the current configuration takes away a significant asset to the Hook and Ladder for accommodations, for people coming to see their shows, and for people who are patronizing other businesses in the area, too. Because when you're downtown Longfellow, you might be going to see a show at Hook and Ladder. You might grab some books from Moon Palace, et cetera. So I'm not in a position to vote yes on this today. Thank you.

1:54:58 – 1:55:36Speaker 3

Chair Meyer, if I may clarify, we're hearing a lot about ADA parking on the north side of the building. While I fully believe that that may be how the parking is used, it's not legally ADA parking. There's no accessible route from these parking stalls to the front entrance of the building. It's not signed accordingly. There's no drive aisle. So I just want to be clear. This would not take away legal ADA parking that Hook and Ladder is required to provide. These are parallel stalls next to the building that would not meet ADA requirements.

1:55:37Speaker 11

Thank you for that clarification. Commissioner?

1:55:41 – 1:56:07Speaker 16

So just to clarify, I heard from the business owner that when you have four parking spots in the back of Hook and Ladder that they use for ADA. They may not be legal to the city, but that's what they're using. When a large vehicle is coming and turning, they're not going to be able to make that with the cars parked down there, right? That's what I'm referring to when I'm saying they're losing that, which they're using for ADA.

1:56:09Speaker 11

Mr. Frenz, did you have a comment you wanted to make? Sure.

1:56:26Speaker 3

Andrew is pulling up the turning radius.

1:56:28 – 1:57:12Speaker 5

Yeah, I just wanted to pull this up. We don't have a diagram of the parking layout that they have there. But this is the turning diagram in question, right? So what they're talking about are the parking stalls along the north side. And there's been a lot of different terminology used to describe this space. We would call it a driveway. The parking stalls that are striped on the north side of this driveway are not shown here. I don't know how much this turning diagram overlaps with those parking stalls, and I don't know whether those parking stalls are legal ADA stalls or not, because it's not included in the application materials. Thank you.

1:57:12Speaker 11

Were there any further questions for him? All right. Commissioner Todry.

1:57:19 – 1:57:32Speaker 4

Thank you. And I mean, if we don't want to use the term ADA, that's understandable because it's a legal term of art. But we can say that this is parking that this business allocates to people with disabilities, and that would go away.

1:57:33Speaker 3

That's what we're contending.

1:57:37 – 2:00:24Speaker 4

And if it wouldn't go away, there has not been enough accurate time and engagement to show otherwise to this business or this body I think we can agree with that. And the thing that I'll just quick say here that shows me that this isn't complete for me and a point of frustration from my perspective is especially Representing so many people who work here and representing so many people who patron here and care about this area is we as a city spend so much effort and time in bringing back the vitality of downtown Minneapolis and the vibrancy of downtown, which is a good thing, which is an excellent thing that we should do. But we do take huge steps and take huge budgetary steps to make that happen. We as a city have not made that type of effort for downtown Longfellow, and this is what community members are asking for, and including an anchor business in this conversation up top in the front end, along with a well-organized corridor would have been really prudent in this matter and would have made the 3,000 Minnehaha project a lot smoother going forward. And you don't have to like what I'm saying, but it's just fact of the matter. This is what year three going on for me. this saying the same thing over and over again and I wish I wasn't I'd really just love to move forward with this project so that's why it won't have my support today I don't know I think some of the options that we see laid out on the table I won't be the one to make a motion on this I think it's I think commissioners have laid out that Finding findings for denial is pretty difficult here. I'd be curious to know what it would mean to continue this on for further discussion because there's only been, I'll just say this again, 22 business days. 22 business days on this. I have not had a conversation with finance and property services on this matter. I'll just say that. So there's been 22 business days. So I think those are the two options that we see here. You either move it for approval and then it goes to city council in some part or there's an opportunity if time allows for another continuation.

2:00:29 – 2:00:42Speaker 11

I'm just going to suggest that if you want to have a chance to kind of deny part of this so that there's a chance to work, I think the rezoning is the place to do it.

2:00:51Speaker 4

Yeah, thank you, Commissioner Meyer. I'll just say it into the mic. I don't think there's an issue with the rezoning, and so that would be tough for me to do. Okay.

2:00:58Speaker 11

Does anyone want to put a motion on the table? Commissioner Meyer.

2:01:08 – 2:02:12Speaker 10

Thank you, Chair Meyer. I'll just share one more comment on the project, kind of in line with a lot of the other comments said. And I think... Maybe this will get me into trouble, but the applicant is the city. So I think I can criticize the applicant a little bit here. I think this process has been a bit, insert word here, I don't even know what word I want to reach for. But I'd love to see a little bit more transparency about everything going on and why this alley needs to be moved in the presentation. alternative designs considered, things like that. But with all that said, we are here as the Planning Commission reviewing an application before us. And in my mind, this application meets all aspects of city code by a sliver, by the smallest sliver, but it does. So for that reason, I will be supporting staff findings. I'm happy to make that motion. I don't see any other comments, so I will make a motion to support staff findings as it relates to item number four.

2:02:12Speaker 11

All right. Is there a second one? Second. All right. There's a motion and a second to adopt the staff findings.

2:02:20Speaker 10

Is there further discussion on it?

2:02:24 – 2:03:07Speaker 11

I'm just going to say I appreciate all the frustrations. It's frustrating to me, too. I do think the findings are met, so I'm going to vote in support for this. But I'll just note, once again, that the legislative components have to go to the council. And if this is appealed, which I feel like there's a good chance it will be, and then the judicial components also would go to the council, and hopefully there would be an opportunity to work out any other details that can be. Is there any other discussion? All right, so we'll put this one to a vote, and if it fails, we can make an alternative motion with findings. All right. Clerk, please call the roll, sorry.

2:03:09Speaker 19

Commissioner Baxley.

2:03:12Speaker 19

Chowdhury. Aye. No. Conley? No. Garcia?

2:03:20Speaker 19

Shepard? Yes. Vice President Wagner? Yes. And President Meyer?

2:03:28Speaker 19

There are four ayes and three nays.

2:03:30 – 2:03:54Speaker 11

That is adopted. And that concludes our business for the day. Our next full planning commission is on July 13th. And we do have Committee of the Whole this Thursday. It's an interesting one. We're going to be starting our discussion for the 2050 plan, and we're also looking at the 600 Main Street project. So I hope you guys can attend that if you're available. Are there any other updates from staff or commissioners?

2:03:55Speaker 4

Nothing additional for me.

2:03:56Speaker 11

Commissioner Chaudhry?

2:03:57 – 2:05:06Speaker 4

Yeah, I just wanted to clarify for the folks that are still remaining. So the next step is going to city council. I would follow along with that. I'm sure some of you would know how to get in touch with your city council members. For those who don't, talk to those someones. And we'll have conversations about that. I also... will highlight to this body that on the city council we're moving forward actions on regulating data centers currently there is a data center moratorium on place with a exemption made in downtown the first stop that the regulations ordinances that we've noticed and are going to be referring to staff in our final council meeting on june 25th is the planning commission of the whole on July 16th, so this is my notice to you to get ready to think about data center regulation. And then we'll open up a 60-day comment period for the public, and we will have the privilege of taking on testimony from the public on the data center's regulations, I believe, in October.

2:05:08Speaker 11

Thank you for that update. Anyone else?

2:05:12 – 2:05:24Speaker 3

I can just, to add on to what Council Member Chowdhury just said, if this tracks according to our schedule, and I have no reason to think it won't, this would be going to the Biz Committee meeting on July 21st. All right.

2:05:28Speaker 11

Not seeing anyone else, so we are adjourned. Thank you, everyone.