The Infrastructure, Innovation & Technology Committee discussed and deferred two significant items: a nearly $2 million increase for construction engineering and inspection services for the Dadeland South Intermodal Station Project, and a request to extend a garbage collection and disposal services contract for an additional three years with an increased expenditure authority of $19.4 million. The committee also decided to postpone budget presentations until after the mayor's budget release for a more in-depth review.

About this meeting

Government Body
Infrastructure, Innovation & Technology Committee
Meeting Type
Infrastructure, Innovation & Technology Committee
Location
Miami-Dade County, FL
Meeting Date
July 15, 2026

Transcript

130 sections

0:03 – 1:14Micky Steinberg

Excellent, all right, we're going to begin our meeting of the Infrastructure Innovation and Technology Committee. Today is the 15th, and I welcome all of you here today. We're going to start with a quick moment of silence, moment of reflection, and followed by the pledge led by Commissioner Cohen-Higgins. Thank you so much. Today we have one of our young students who are part of the youth engagement program up here with us, and so we welcome Allegra. All right, with that, do we have any additions, any changes before we set the agenda?

1:15 – 2:12Speaker 2

yes madam chair um the agenda before you is the official agenda which includes the changes in the changes memo also item 3d was added to the agenda i'll read the title for the record resolution authorizing the county mayor or designee to execute supplemental agreement number one between bcc engineering llc and miami-dade county professional services agreement for construction engineering and inspection services isd project number e20 dtpw04 contract number cip207 dtpw20 cei bringing the total contract amount to five million four hundred sixty seven thousand eight hundred seventeen dollars and ninety two cents to support the dadeland south intermodal station project authorizing the county mayor or designee to execute the same and to exercise the provisions contained therein, authorizing the use of people's transportation plan bond program funds for this project, which was added to the five-year implementation plan in February 2020. That's 3D.

2:12 – 2:52Micky Steinberg

Okay, thank you. We're going to go into reasonable opportunity to be heard. Is there anybody here from the public who wishes to speak on any item? I do not have any cards, but this is the opportunity. Seeing none, reasonable opportunity is now closed. And do I have a motion to set the agenda? So moved. Second. All right, show that done by acclamation. And now we have a few items on this agenda before we get to the discussion presentations. Does anybody have any questions, would like to bifurcate any items, or ask any questions?

2:56 – 3:44Danielle Cohen Higgins

No? Yes, please, Commissioner Cohen-Higgins. Thank you, Madam Chair. On the item that was just added to our agenda, 3D, I'm looking at it for the first time. And so I have a few questions. It's asking for an increase in the professional services agreement by almost $2 million for a total contract aggregate of $5.4 million. Can you just speak to what this contract is for? I know it's for engineering, construction, and inspection services. Is this particular professional service provider getting $5.4 million for their professional services? Or is the $5.4 million inclusive of the actual construction costs of this project?

3:46 – 5:04Speaker 5

Good afternoon, Madam Chair, members of the committee, Jose Alfred Diaz, Deputy Director of DTPW. This is, as you correctly mentioned, for construction engineering and inspection services tied to the Dayland South Intermodal. The actual design build project received some supplemental services earlier this year. This is to match that. This is for additional scope that was added to that project consisting of charging infrastructure modifications to the BRT area, and general modifications around the scope of the area. Specific to your question, this is not tied to the construction. This is specific to the construction engineering and inspection. This is basically our inspector in the area, the ones that review all the construction specs, make sure that the contractor stays on schedule and on budget. And in addition to that, making sure that they review all the paperwork that comes in through the project. the total allocation this is for an additional um allocation but the total allocation with this uh supplemental for this project i'm sorry i think we're this is not working well it's uh 5.4 million dollars in total for this vendor okay and that's what i um thought you were gonna say and so you know i know we do these psa's

5:05 – 5:58Danielle Cohen Higgins

A lot, we have a lot of professional services agreement, and we've had the conversation on this dice a number of times when we had former commissioner Higgins, who is professionally by trade and engineer. She said, we really need to keep all of these contracted outside expert engineers on these contracts to make sure that obviously these projects are built. in compliance with our laws and under the highest level of safety. But when I see a professional services agreement for one project nearing $6 million with an additional ask of $2 million, what is it that they are doing? And why do they need an additional $2 million from the original allocation of $3.5 million? Before you answer that, as far as what it is that they're doing. What is the term of this PSA? How long are they getting paid? Over what duration of time are they getting paid $5.5 million?

5:59 – 6:52Speaker 5

This is over the duration of the contract. This contract was for a finite amount, I believe close to 300 days. Because of additional scope added to the project, there are 264 days added to the overall construction contract. This typically matches the construction contract because they are the construction engineering and inspection team. So they review all the material testing, all the specifications, make sure the job is done in accordance to the latest standards of safety. And in addition to that, they review all the paperwork related to, they do the first pass related to invoicing, reimbursement requests, those types of management work that they do for us. This is work that we don't do in-house, construction engineering and inspection for projects of this magnitude is we typically contract out.

6:53 – 7:05Danielle Cohen Higgins

Sure, and so the term of this contract with this PSA is what, two years? You said 300 and something days, and then there was an additional scope of 280 something days, so roughly two years of work?

7:06Speaker 5

So the total is close to two years of work, yes.

7:08 – 7:26Danielle Cohen Higgins

Okay, so this one professional service provider, engineering, consulting, compliance, is getting paid $5.5 million by Miami County over a two year period on one contract. What does that work out to monthly? Do the simple math on that, 5.5 million over 24 months. What's the math? I don't know, I'm going to actually put it into my calculator.

7:26Speaker 5

About 200,000 and change.

7:29Danielle Cohen Higgins

Okay, so we're paying one professional service provider $200,000 a month on one project. What's the aggregate value of this one project?

7:39 – 7:54Speaker 5

The difference to establish there is that typically these services, when they're tied to a particular construction project, they fall within a range of percent of the entire project cost.

7:54 – 8:14Danielle Cohen Higgins

That's what I thought you were going to say. And so that's exactly kind of my point. It has been the practice of Miami-Dade County to accept these professional service agreements based on that general formula. Like if you have a $100 million project, the PSA percentage that they're going to charge us is what's the standard percent? What's the average percent?

8:14 – 8:47Speaker 5

Depending on the type of project and the magnitude of the project, for smaller projects, the percent is typically higher. For larger projects, it's smaller. In this case, it's about a 5%, but I want to make a quick distinction. This is a time materials contract. under which is not a percent based. We've negotiated the time that they're going to spend and the materials that they're spending, the hours that they're spending, or whatever was set in terms of the hourly rate of the staff that is participating. And that's how the additional cost is developed.

8:48 – 9:00Danielle Cohen Higgins

Okay, so what is the aggregate cost of this self-date intramodal project? Since it's not based on a percentage, what is the aggregate value from your capital improvement budget for this one project?

9:00Speaker 5

So the actual design bill project is about $77 million.

9:06Danielle Cohen Higgins

And they're getting paid $5.5 million to oversee, consult, and make sure that everything is in compliance. And that's not based on a percentage, that's based on something you all negotiated independently?

9:16 – 9:35Speaker 5

Yes, time and material. So basically based on the schedule, based on the hours that are estimated by the vendor, we negotiate those hours. And what is set already per contract is the hourly rate. So the negotiation between the county and the vendor is basically on the hours that are going to be spent in the management of the project.

9:36 – 10:05Danielle Cohen Higgins

Okay, and originally again, they said that they would be paid 3.5M and they're asking for now. That's what this item is because they already got 3.5M dollars. They're asking us to authorize an additional 2M dollars in time and materials, which is an hourly calculation that someone came up with that. They said we need another 2M dollars in order to provide the engineering. Consultation and and and services on this contract. What is the justification for the additional 1.9?

10:07 – 10:31Speaker 5

It's an additional 264 days of work that were added to the actual construction project because of additional scope that has been added. That scope consists of. several items related to electric charging of the buses, some work in the station itself in the Kiss and Ride area, some work in the actual bus station itself. So there was some additional scope added to the project.

10:31Danielle Cohen Higgins

Okay, who added to the scope?

10:34 – 10:57Speaker 5

The scope has been added from a needs perspective. So it's been added as we looked at this from an operational perspective with the BRT. I'm sorry for the audio issues. We've added an additional scope based on the design of the project and request from operations. In addition to that, we've had coordination with the different permitting agencies and there's been new requirements added to the project as well.

10:58Danielle Cohen Higgins

Okay. So the answer on who added to the scope I asked, I know it's us, I know it's the county, but was it the board? Did we authorize an additional scope or did the department internally authorized additional scope?

11:09Speaker 5

The board did authorize the additional scope on a supplemental that was approved on November 2nd, 2025, the additional design scope.

11:17Danielle Cohen Higgins

Okay. But the, the cost of the engineering did not accompany that item. It was just an additional scope.

11:23 – 11:41Speaker 5

The cost of the construction engineering and inspection did not accompany that item. This is actually the supplemental that accompanies whatever work was already approved for the contractor. This is our manager on our side. This is what accompanies that additional work that was approved in November.

11:42 – 14:12Danielle Cohen Higgins

So I appreciate you answering my questions and I appreciate you answering the questions the way that you did and not saying, I don't know the answer. I'll get back to you. Right. That's number one. I appreciate you knowing the answers to my question. That is tremendous. That is really, really appreciated because we don't always get that. So thank you for knowing the answer to the questions and being prepared on an item that was just added at the last minute on our agenda. The reason I'm asking the question is because I know we've already heard Presentations and we're going to get the budget in an hour and a half regarding the financial situation of our transportation budget. Okay. And how we have a situation on our hands that we're going to have to deal with. When I see items like this asking for an additional 2M dollars, and I understand we need it. We need these engineers. We need these consultants. but it's pursuant to an expansion in a scope of work. We need to, and I'm going to look forward to working with you, and I know you're already doing this, when and why we are expanding the scope of these projects. We constantly get requests for what I like to call Bentley-style extras, whatever you want to call it, Bentley-style extras. Uh, add additions to projects, because this interest group, or that interest group, or this lobbyist, we can't continue expanding the scopes of our projects in Miami Dade County while the numbers continue to grow. And we're looking at budget. whatever you want to call it, deficits, shortfalls, gaps, that we need to figure out a way to close. And so if you represent to me that this is absolutely necessary and this professional services contracting company needs this additional $2 million, i'm going to support it because i trust you and if you say you need it i'm gonna i'm going to support it but i will tell you that i plan to take a very deep dive into our transportation budget which is now at two billion dollars look at these professional service agreements and whether or not the calculation that we have always used i.e a percentage of very large numbers or whether time and materials is the calculus that we need to present Because we have to cut somewhere, or maybe everywhere, including professional service agreements and including expanding the scopes of projects. Because I'm just not sure that we can continue to afford it anymore. Thank you, Madam Chair.

14:13 – 14:25Micky Steinberg

Thank you. And I appreciate you pulling this item because I was also going to pull it to ask a few questions just because of the late nature of the item and we didn't have a chance to fully have a chance to debrief on it. Yes, Commissioner Lopez.

14:25 – 17:21Vicki L. Lopez

Thank you, Madam Chair. So I guess this speaks to, thank you for your line of questioning, Commissioner Cohen-Higgins. I think it continues to speak to how we don't know what a project should look like from the get-go. This happens all the time here, I see. You go out for a bid, and you say this is the project, and then all of a sudden the commission is asked to approve further scopes of services without money, which I find even crazier. So back in November, the commission prior to my joining approved an additional scope of services without knowing what it would cost. I don't know anyone who would do that in their home. I certainly wouldn't increase the cost of a project and say I approve that without knowing what it was going to cost me and whether I could afford it or not. And I just keep seeing a pattern of this and I don't disagree with you Commissioner Cohen-Higgins that somehow we have to see how often we do this. What is the pattern that seemingly we don't know what the project is? Because I will say this, and of course you're going to hear me say this. In the state, if you want to spend any more money, you have to come before the commission. You have to not only tell us why you didn't figure it out prior to it, but you have to tell us. I don't think it's fair in the competitive bidding process either. Like who wouldn't want to bid on a job that has one scope of services and once you get it, then you get to keep it despite the fact that we made a mistake, right? I guess I'm still on my bandwagon from our first committee meeting this morning where I continue to see money being spent without any kind of consideration For what would be what I consider a good practice business. I mean, no business would run their business like this. They'd be out of business. But apparently we seem to have money to move around and we make decisions that I don't think aren't very thoughtful. And so I'm just putting that on the record because as we move into the budget cycle here, you know, I'm going to I'm going to really. start to look at these items and say, I am not ready to approve things that we haven't thought through carefully from the very beginning because I don't think it's a fair process then. I mean, I will bid all day long if I were a vendor and say, look, I'll just bid on this. And I'm sure the vendor probably knows they're going to need to expand this because they probably know more than we do. Sure, because they have the experience. So I just wanted to put my comments on the record as we begin this budget process, because this is yet another item that reflects that we're not thoughtful about the fact that we only have one pot of money and we have to be incredibly careful with how we spend that money. And so when I saw the item, I just thought, oh, here we go again.

17:23Micky Steinberg

Thank you, Commissioner. Yes, Commissioner.

17:25 – 17:53Roberto J. Gonzalez

Thank you, Madam Chair. And so I want to start off on a positive note. As Commissioner Cohen-Higgins said, very impressive. Thank you. Thank you for being serious. Thank you for being prepared. Thank you, Commissioner. He's probably the most prepared I have ever seen any director, right? And I very much appreciate how prepared you are. Thank you. But now.

17:55Vicki L. Lopez

Okay, that was good.

17:57 – 18:25Roberto J. Gonzalez

To echo some of the sentiments of my colleagues, I do have to agree that, for example, the original bid for the scope of work that was originally approved, what was that original bid? And I believe it was like a $3 million. But what was the scope of that work? And then this new additional work, when exactly did it come about that the Bentley style was necessary?

18:25 – 19:27Speaker 5

So let me add a couple points of clarification I think are going to help. So the project was initially done through a planning effort. There was a pre-planning and a scoping completed. And the actual vendor for the, I want to make a distinction between the two contracts. There's a design builder and then there's this contract that's in front of you today. The design builder bid on a planning effort and they put forth a cost. The design builder then has to go design. And based on that design, there were certain changes that were, one, proposed and accepted by the agency, by the county. And two, as a result of permitting a new requirements from electric vehicle charging, additional scope items that were added for fire suppression. Those types of items that were added from a permitting perspective, from the permitting agencies, we needed to grow the scope, which was not contemplated in the initial planning that was done for this project several years ago.

19:27 – 20:12Roberto J. Gonzalez

So I think, I don't want to put words into your mouth, Commissioner Lopez, but I think this is exactly where Commissioner Lopez is going, because the permitting is put forward by the county. I know they're separate departments. I understand they're separate departments, but it would only be logical that If we're the ones giving the permitting, why didn't we factor this into the original scope in the first place? I mean, we are the ones that are giving the permitting. And so that leads me to, How did this whole electric vehicle charging station come about? Why exactly didn't we consider that the first time?

20:13 – 20:47Speaker 5

So the National Fire Protection Agency codes were in the process of being written at that point. So the new standards, when this project was initially bid out, the new standards at the federal level had not been considered. And we're seeing that through several projects, not just this project. The new standards are a little bit more rigorous and therefore we've had to adjust in several projects when either electric vehicle charging is included and the actual fire suppression related to the electric vehicle charging as well.

20:47Roberto J. Gonzalez

Got it, so those new federal standards are amounting to a $2 million increase?

20:52 – 21:24Speaker 5

We have other items in this that were tied to the design build that were also accepted by the agency. We did modifications from a standpoint of how we were aligning the buses for pickup. Initially, they were supposed to be parallel. We changed to a seesaw infrastructure there, to a seesaw design. We made some changes in terms of the escalator and elevator. We added some infrastructure as well as a requirement for purposes of evacuation. So we had to modify the design accordingly.

21:25Roberto J. Gonzalez

Got it, and why weren't those evacuation requirements taken into consideration in the first place?

21:32 – 21:52Speaker 5

The initial planning report that was done had been reviewed under the, it was several years old, and it had been reviewed under the standards that were available at the time and had been vetted at that point. When this went actually for bidding, those standards had been slightly modified and we needed to add some scope.

21:53Roberto J. Gonzalez

Got it. Okay, thank you so much really appreciate thank you.

21:58 – 22:26Micky Steinberg

We appreciate the information and thank you for pulling the item again, I will say just generally speaking it's not just towards your department, I think generally speaking when we look at scope and having to do change orders of things of that nature, especially if the scope has changed by us we kind of have to take a finer look at that. But we do appreciate the information that you provided so with that. Do we have any other items? Thank you. I don't think we have any more. Yes. Please, Commissioner.

22:27 – 22:38Danielle Cohen Higgins

Thank you, Madam Chair. I do have questions on 3C. It has a similar tone. It's a request for additional allocated funds.

22:42 – 23:00Micky Steinberg

Is there anybody here to speak on 3C? for the garbage collection and disposal services. Commissioner, you're recognized for an ebb and flowing conversation.

23:01 – 23:18Danielle Cohen Higgins

Thank you. Thank you, Madam Chair. Is the requested allocation above and beyond what we've previously authorized simply due to the extension of the term of this pool? Is that the root of the request for the extension?

23:19 – 23:35Speaker 4

Through the Chair, yes. Commissioner, we are extending the time for the contract to allow solid waste for transition of services in-house. So for that additional time, The vendors have agreed at the same rates that we pay today to extend.

23:36 – 24:09Danielle Cohen Higgins

Okay, and that's what I gathered. And I understand that both of the vendors are waste management or waste connections and waste management who does the bulk, if not the entirety of our waste management in Miami-Dade County. But are there no other companies that can offer these services to us? And I understand that you're making this decision to extend existing contract rates, correct, in order to presumably provide some sort of savings. But are there no other companies that can offer these services to us?

24:10 – 24:28Speaker 4

These two are the largest providers, but for anyone to come in to provide service, they would have to invest a lot of money up front in the trucks. And if you do a short term contract, people generally don't like to invest in the loaders and the trucks and whatever they need.

24:31 – 24:43Danielle Cohen Higgins

Sure. I understand that servicing a county this size would require a company that is of substantial size. But the question was, are there no other competitors other than waste management and waste connections?

24:45Speaker 4

If there are, there are very smaller companies out there. Very small.

24:50Danielle Cohen Higgins

Okay. And when was the last time that we've done any sort of competitive procurement in this sort of waste management space?

24:58 – 25:17Speaker 4

Um... I have to go back and see what the other, we just did another one for a couple of years back, and these two were the largest one that got awarded. I think three, four, three years back. I don't remember the exact number, but yeah, we did that, another procurement for services.

25:19 – 25:43Danielle Cohen Higgins

Okay, I'm going to look more closely at this item because it has a very large dollar amount associated with it, $62 million through 2028. We're currently in 2026. This item is asking for us to extend it through 2031. I GUESS, LIKE I SAID PREVIOUSLY, TO MAINTAIN EXISTING RATES. WHAT ARE THE RATES THAT WE'RE MAINTAINING?

25:44 – 26:20Speaker 4

COMMISSIONER, THE RATES VARY BY FACILITY, AND I HAVE THAT, FOR EXAMPLE, IF AND THE SIZE OF THE CONTAINER, SO 30 CUBIC YARD CAPACITY CONTAINER FOR PICKUP, LET'S SAY ONE DAY PER WEEK. The price is $2,366. So every facility, every department have stipulated the locations and the container size and the frequency. So the rate varies for that. I have like 50, 60 different rates by facility as well as the container size and the location.

26:20Danielle Cohen Higgins

And where in the item does it state that the current rates are going to be honored through 2031?

26:28Speaker 4

So I thought we said it somewhere at the existing terms and conditions.

26:41 – 26:54Micky Steinberg

To clarify, if I may, keeping it at the same terms and conditions versus keeping it flat, do they have an increase that's built in year after year versus a flat rate of that year?

26:54 – 27:06Speaker 4

There is a CPI that's built in the contract, but that CPI is going to be based on the rates that we have. Nobody's going to agree to a five-year contract in today's market without a CPI.

27:07 – 28:35Danielle Cohen Higgins

I appreciate that, but I also think that a contract of this size, it's currently at 62 million. You're asking for another 20 million. You're talking about $80 million to the same exact people without a competitive procurement process, with a representation on the microphone that the rates are going to be the same. But it's not articulated in the item, at least not that I can see. I'm wondering why we're not giving this opportunity to other companies. That's the question. Listen, I've said before many times on this microphone regarding our waste management problems in Miami-Dade County and my extreme concern regarding relying on what amounts to a monopoly by one company for the hauling of waste in Miami-Dade County, which are these two companies, frankly. It concerns me greatly and that's just this is just departmental work. This is not the massive amount of trash that they haul out of this county as a result of us no longer having our incinerator. And so my question is. Why aren't we trying to diversify who we are using for these essential services, even if it's an amalgamation of smaller companies that may offer us better prices? Because currently, we are completely at the mercy of these two companies for all of our waste management services in Miami-Dade County, and that gives me great discomfort.

28:36 – 28:57Speaker 4

is there any kind of a discussion happening within the department about potentially putting this out to bid it's the the plan is for solid waste to bring the services in house so they're working on a plan they have um and equipment Testing phase, you want to speak?

28:57 – 30:06Speaker 7

Director, you are recognized. Thank you. Through the chair, I can speak to that. So the department actually purchased front-end loaders. Front-end loaders allow us to actually provide a different service. And so we've been doing a pilot for the last six months, account by account, so we can do a full assessment to what Namita mentioned. The frequency, the type of container, The type of service that is required by each account varies. And so we have to do a full assessment. When I first got here, we had just received those front end loaders. In the industry, it takes about a year to a year and a half to get that type of equipment. And so we had just received the equipment and it was sitting. And so now I put the equipment to use through a pilot. We actually have data so I can actually evaluate the productivity. Of the data, look at a cost per pickup to determine how we can actually bring those services in house, but it's going to take time because I have to purchase additional containers and I have to purchase additional equipment, but I need to do it by retiring some equipment and in purchasing this equipment, not purchasing additional equipment, but retiring one and in purchasing another.

30:07 – 31:35Danielle Cohen Higgins

So I appreciate that explanation. My concerns remain on this item though. Whenever I see pools that are asking to be extended years before they even expire without a competitive procurement process with dollar amounts as high as this, it gives me great cause to pause. And this item that we are extending was originally procured in September of 2013. That's what the item says. This contract holder has had this same contract since 2013. I mean, I don't want to advance this item. I don't want to advance it. You're two years before the expiration of your contract. The dollar amount is astronomical. It's an 11-page item that's asking for $20 million. One department is asking for an additional allocation of $8 million. Another department, HCD, is asking for an additional allocation of $6 million. I don't know why we need to do this right now. And I'm not sure that it's the most financially responsible thing to do to not potentially look at other service providers in this area. If you look and you find that, hey, listen, there's nobody else out there. There's nobody else out there that can provide this service and give us alternate pricing. I will accept that. But the fact that we haven't looked since 2013 is extremely, I don't understand.

31:36 – 31:59Speaker 4

Commissioner, if... We did that three years ago. We did do the analysis of anybody else coming in and switching to the new providers. If you want us to do that analysis again, we'll be happy to do that between now and if you choose to advance the item in September board, we'll be happy to bring that or we can bring back the item in September.

31:59Danielle Cohen Higgins

What's the urgency? The contract doesn't expire until 2028. It's 2026. What is the urgency?

32:08Speaker 4

We were just trying to be proactive.

32:10 – 32:59Danielle Cohen Higgins

I appreciate that. I always want the proactive step to be taken. Um, but I'm not sure that that's the, the, um. The proposition that supports this item at this time, I just would like to defer because I have a lot of questions. I want to know why each department needs the additional allocation. I want to know what the rates are. You're representing that the rates are going to remain the same. That's not articulated in the item. I think that this needs a lot of review. If it were a much smaller dollar amount, I would feel more comfortable, but this is a lot of money going to a company that has a monopoly over Miami-Dade County, and I'd like for us to consider other alternatives. If you don't mind, if you said to me it's an emergency, I need this, my departments will suffer, I will advance it, but if it makes no difference to you, I'd like to defer the item.

33:00 – 33:12Speaker 4

Commissioner, when we came for extension a few years back, I remember you said that we were not, we didn't give you enough time. We are giving you enough time. If you don't want to advance it, that's fine.

33:13 – 33:24Danielle Cohen Higgins

Okay, and it's just to work with you to get the numbers and additional facts and details to at least give me greater comfort before spending this kind of money. So I move to defer this item. Thank you, Madam Chair.

33:25Micky Steinberg

All right, we have a second on that. Yes, Commissioner Gonzalez.

33:29Roberto J. Gonzalez

Yes, so I agree with the deferral. And if I could get the director to come back up.

33:44Micky Steinberg

You're both recognized again.

33:46 – 36:10Roberto J. Gonzalez

Thank you, Madam Chair. And so, first of all, I want to thank you for bringing this up early. Because I do appreciate the fact that now, I think this has been very positive, right? Because we're able to see that two years from now, This could possibly be necessary, but the Director of Solid Waste did bring up that you folks are trying to bring this in-house. And so I understand what you're saying regarding that although this expires in 28, it's very possible that we may only need two more years in order to bring this in house. But that's also an assumption because a lot of things can happen from now to then that could stop you from being able to purchase that equipment. Maybe the pilot program doesn't go the way that we want it to go. So there's a lot of factors that would have to move perfectly in order for that to happen. And so I agree with the deferral because right now we're looking at a three-year extension from the two-year because we're looking 2028 to 2031. It's very possible, and I know that you said you just did an analysis three years ago, but it's very possible that if we procure this this year, perhaps maybe we can find some cost savings, and maybe we can even buy more time in order to roll out that pilot program properly. So I do agree with the deferral, but I don't want you to think that you're doing anything That wasn't asked of you I appreciate the fact that you brought this forward as a matter of fact I think that that's exactly why commissioner Cohen Higgins originally had said let's get these things up front because now we can properly digest we have time to go through the thought process go through the procurement process and see if this is the best course rather than just guess. But but I want to think both of you from for being prepared.

36:11 – 36:26Micky Steinberg

Yes, agreed. So I'm assuming we're going to be deferring this to September committee. So that way, will that give you enough time to run the analysis and make sure that it's back here with enough time so that we can find a path forward?

36:26 – 36:41Speaker 4

Yes, we can reach out to the companies that we know. Additionally, any small providers and ask them what is it going to take them to provide this service to the county, same scope of work. And we'll have the price comparison ready.

36:42 – 37:07Micky Steinberg

And if I may add to that, if you could also give us the analysis and kind of the plan of what you're thinking with going in-house and what that looks like and what a realistic timeline could look like. Because if we have to extend the current contract, if that's what the best path forward looks like at that point, then we also understand the trajectory of what the department's looking to do and try to, yes.

37:08 – 37:23Speaker 4

I just want to add one more, Commissioner, to your point. The contracts have termination provisions, so let's say solid waste is able to do it in six months, we could always give them termination notice and bring it in house sooner.

37:23Micky Steinberg

Termination without cause.

37:25Speaker 4

Termination without cause, yes.

37:26Micky Steinberg

Thank you, so show that item- Madam Chair, sorry, I had two questions. Yes, Commissioner.

37:31 – 38:02Vicki L. Lopez

Thank you, Madam Chair. So Director, bringing it in-house, would you be able to identify the savings? In other words, we now currently have an external vendor doing it, so Because I'm always looking to see whether we can achieve savings and sometimes it's the exact opposite, right? We privatize because we think we'll get better, better, better costs. But if you're you feel like it's in the best interest of the county to move it internally, could you identify savings?

38:04 – 38:37Speaker 7

Thank you for the question through the chair. I don't have the answer to those questions today, but that's why I was doing a pilot. When I first got here, staff had been evaluating numbers and they had some data, but I actually wanted real data, so that's why I actually told them to put a pilot in place. It's only been six months, and so now we have at least six months of data with 75 accounts, so I can actually take a look at the productivity. With a rear loader, which is what we normally run, it takes three people. with a front-end loader, it's only one person. So right there, there's some efficiencies that I can actually say that we can provide.

38:37 – 39:02Vicki L. Lopez

I think that'll be helpful for us when you bring it back. We also made an investment in equipment, I'm assuming, right? So that would have to be factored in. I mean, we made a capital... We purchased equipment to do the services in-house, and so the 75 accounts that you've been running your pilot on should give us what were those 75 accounts costing us with the vendor that was picking up the garbage and then what you're proposing. That's one.

39:03 – 39:26Speaker 7

Well, the difference is with 75 accounts that I'm running near commercial accounts that we were picking up ourselves. I am not utilize. I'm not picking up any of the accounts from the county. Well, those that are in the contract, right? But the 75 accounts we were picking up with a different piece of equipment and different personnel. So I'm going to be able to evaluate if I can pick it up cheaper. Okay, so that's different than this.

39:26 – 40:07Vicki L. Lopez

But I'm going to also do that analysis as well. Okay, because I think we would be very happy to hear that we made progress in saving money by bringing it in-house. Okay, and then the other thing is, I'm unclear. This analysis that we've asked for, do companies normally tell you what they would charge? Is it the same as if we put out an RFP on the street? What I see the exact same, because if you come to me and you tell me, well, what I can do the services for, right? But I don't see the full scope of services. I don't see an RFP. How is it that you're going to tell me that it's cheaper without putting it out to bid?

40:08 – 40:27Speaker 4

I was, we could do two ways, Commissioner, by sharing the scope of work. Not so much putting it out formally, we could informally ask, or we could, if you want us to put out formally, we could do both ways. I was going to do more formal in this because the ask here is to, I was going to ask, go out to the bid and market and ask.

40:28 – 41:25Vicki L. Lopez

was going to be my recommendation. I don't trust that someone just tells me this is the price because it never really is that price. I think a formal RFP is where you really know, one, who's willing to bid on the job to Commissioner Cohen-Higgins' point. Is there anyone else other than these two vendors that are willing to do it. And I have to believe that there may be others that have come into the market in the last three years. Again, we owe it to the taxpayer to do the more fiscally conservative thing, which is to put everything to bid and see what comes back. Because if in fact it shows that no one applies or that the services that they're proposing in the bid is higher, then we know the answer. And it's clear cut. It's black and white. I can then defend my decision to move forward. But I can never defend it when I'm just thinking, you know, what I think versus what I know that I have in front of me.

41:25Speaker 4

We'll get you real numbers.

41:26Vicki L. Lopez

Perfect. Thank you so much. Thank you, Madam Chair.

41:29Micky Steinberg

Thank you. So item 3C has been deferred to the September committee. Right, we're good with that. I'm asking was there anything else from 3?

41:39Speaker 8

There was a I know there's a motion to secondary vote. I don't think there was actually a vote by acclamation.

41:43 – 41:56Roberto J. Gonzalez

Okay. And then the rest of the random chair on reason. So. I just want to make sure, because I believe the commissioner Lopez also added that we should procure the item.

41:58 – 42:09Micky Steinberg

Okay, so the only thing I would say on that is I think she said she's going to get us real numbers. And I don't know, Namita, if you want to explain how you're going to get that. I don't know if we're going to go out on the street and do a full procurement.

42:09 – 42:57Roberto J. Gonzalez

Yeah, I think she said she was going to procure. I just want to make sure that that's what we're doing because I think that Commissioner Lopez's line of questioning was on point. If we are bringing it in-house, we want to make sure that we're saving money. And if we're going to get that analysis and we procure it, it's almost the perfect time to do a comparison. And I think this is what you were saying, Commissioner Lopez. It's the perfect time to do the comparison as to whether we should bring it in-house or not because it's not only the equipment that we've already purchased. If I'm not mistaken, the director of solid waste also said that there's other equipment that needs to be purchased in order for this to happen. So it's almost a perfect time now that we're deferring it to procure it and make that cost analysis to see which one is the bigger savings. And by the way, it very well may be that this is the best option, but we will be sure.

42:58 – 43:25Micky Steinberg

I guess I need clarity from the director and how you were getting the real numbers because to do a full procurement for however many time that we're going to look to do it could be potentially problematic because if we are looking at bringing it in house then we're going to tell all these people who bid sorry we're not going with you and then I mean I maybe there's an invitation to negotiate maybe there's some other I don't know process how are you going to get her the real numbers by September?

43:25Speaker 4

So we do have to put out a formal solicitation, and it's going to be an invitation to bid where they give us their prices. So it's not too onerous that it's an RFP.

43:35 – 44:07Micky Steinberg

That's exactly right. That's what I was going at. Yeah. That's fine. Okay. Okay. Thank you so much. Perfect. Great discussion. This is what happens when you come after a budget committee. Yes, apparently I do not. So through the lens of our infrastructure committee, are there any other items that we need to be looking at? And by the way, I really appreciate the discussion this morning. What other items or are we going to pass the balance of the agenda and get to the presentations?

44:08Danielle Cohen Higgins

Move the balance of the agenda.

44:10 – 44:37Micky Steinberg

Okay, moved by Commissioner Cohen-Higgins, seconded by Commissioner Gonzalez. All in favor? Aye. Signifying aye, I'll show that passed. And now we're going to get to the presentations except for that. I have a request that I will be making formally to the Chair's office for item 3B for the award of the contract due to time stipulations and constraints. I'm going to be requesting to add that to the agenda next week.

44:38Speaker 1

Yes, Madam Chair, and we'll supply you the memo.

44:40 – 45:10Micky Steinberg

Thank you. All right. And with that, we're going to start with our presentations. I see some of the young people in the audience. I want to thank all of you for being here. They're part of the Young Youth Engagement Program. Sorry. Yep, yep. Okay. So welcome. All right. So our first presentation is going to be with the Communications Information Technology Department. Come on up.

45:29Speaker 6

Good afternoon, everyone. My name is George Olazabal. I am the Director for the Communications Information and Technology Department.

45:39 – 46:48Danielle Cohen Higgins

Point of order, Madam Chair. Madam Chair, may I be recognized very briefly? I don't mean to interrupt at all, even though I know that's exactly what I'm doing. But we just had a committee hearing. where we had a number of presentations that visibly look identical to what you are putting up on our screen right now. And I don't know if you watched the previous committee hearing, but I don't have a copy on my desk of your presentation, and it's always helpful if I have a physical copy. So if you can Distribute that to us. I'd appreciate it. And I am going to assume that your presentation follows the same format that was followed at the last hearing of the other presentations. Does your presentation have any numbers in it? in the presentation as you see it it does not but i'm prepared to discuss any of the numbers okay i would appreciate it i want you to go through your presentation but i also want you to tell me what your budget is it is a budget presentation at the end of the day so if you could share your budget and whether or not you have met the administration's charge of not exceeding three percent growth that would be my question for you and every other director that's presenting this morning for this afternoon very good thank you i think we have the

46:51 – 47:03Speaker 6

Give me one second, you wanted Commissioner Cohen-Higgins, like physical copies? Okay.

47:09 – 47:43Roberto J. Gonzalez

Yeah, of course. And just to piggyback off of what Commissioner Cohen-Higgins is saying, so I'm a litigator by trade, and when you go in front of a judge, And you're arguing a motion, you always bring copies of the motion for opposing counsel, and then you also bring a copy of the motion for the judge. So just for future reference, we're not trying to call you out. It was the same thing with other directors, but for the directors that are going to present after, if you can have those copies given to us before you come up to present, that would be outstanding.

47:44Speaker 8

Through the chair, I'm trying to make sure you get one for each that's scheduled during this particular meeting. So we're passing them around as you speak.

47:52Speaker 1

Thank you, Chief.

47:54Speaker 8

All right, you may begin.

47:56 – 49:02Speaker 1

Yes. Madam Chair, would you mind if I set the expectation for all the presentations so you know what the directors were authorized to do? So when the budget process started, the mayor told us she would be releasing her budget on the fifteenth and she asked each department director to submit their requests to her after those submissions were made she sent them back to the department for revisions because there were more requests and proposals than there were resources that has gone on multiple times and so when when these items got placed on the agenda to have a budget review all the department directors were given the same format to follow to describe what their challenges are what their concerns are what their budget drivers are but the exact numbers would be released by the mayor on the afternoon the fifteenth which is today so some of the numbers you may be looking for will not be in these presentations and after the mayor releases her budget today then all of the department directors in the mayor staff will make their self available to you to review those exact numbers

49:05 – 51:06Vicki L. Lopez

Madam Chair, I just have a quick comment to make. So the three of us that serve on this committee were also on the committee this morning where we had so many questions based on the presentations, which really didn't help us drill down on anything. Although I appreciate very much, Deputy Mayor, your explanation, which we were given this morning as well. It's really kind of like a perfunctory exercise we're going through here. You're going to tell us about all of this, which we could read ourselves. But it's not going to help us determine what decisions we need to make or what the plan is. So, I'm not sure I'm not sure how fruitful this will be given given the discussion we had this morning in in the budget committee, which really started to drill down and it turned out that we. Spent a good hour asking questions, but we didn't really have. anything in our hands that would help us really have what i consider to be a thoughtful discussion so we may repeat the same things in the same questions but we just wanted you to be aware that for us when it says budget presentation we understand what you were told to do and we're grateful you're here and thank you so much for all of this information but none of it will assist me in making a decision as to your budget because i don't think any of them and we started out by asking what's your total budget which wasn't even on these presentations you know and so everyone scrambled and got us what the total budget was but we be so that you're ready we began to drill down as what percentage of your budget is in general fund how many vacancies did you get rid of i mean these were the questions we were posing this morning and it's somewhat unfair i think because you're not really prepared to answer the questions that we have. So just wanted to put that on the record.

51:06Speaker 1

Madam Chair, may I respond?

51:09 – 51:31Speaker 1

In defense of the directors, some of that information is not available to them because it's the mayor's proposed budget that's going to give those final recommendations. And what information they do have, they're not authorized to repeat until she unveils her budget in case she decides to change anything from the time these presentations were started until today. So please understand the directors aren't allowed to provide something they don't have.

51:33Micky Steinberg

Yeah, we understand that and thank you. Yes, Commissioner Cohen-Higgins.

51:37 – 53:36Danielle Cohen Higgins

Thank you, Madam Chair, Deputy Mayor. I think we all understand that clearly. And I think that the chairman of the board was the one that asked all of us to do these budget reviews and these analyses in an effort to work collectively towards the same goal, obviously. And so, I'm not sure that, Going through these presentations is going to be particularly helpful to us because I'm not sure that it accomplishes what the chairman aimed for us to accomplish. And in the previous hearing, we discussed having a workshop of sorts, right? Where after the 230 release of our mayor's budget, we will then have the numbers. We will have a clear picture. And I think having the presentations, frankly, subsequent to that release is probably the most prudent thing to do because everybody's operating with transparency right now. You've just represented that the directors essentially don't know what their budgets are. Until 230, when the mayor releases it, which is fine, but I don't think that that was the understanding of our chairman when he asked for these presentations to be placed on our agendas. And so. In the interest of time, I'm not sure that going through the exercise, I mean, unless my colleagues want to do this without numbers and Deputy Mayor, you're kind of digging your heels in saying the numbers are not going to be released until 2.30. I'm not sure that the interest of our time is best served going through each department's Aspirations and accomplishments as we. Have budget presentations on our agenda, so I'm not sure if my colleagues want to wave the presentations if we want to wait for our workshop that we're planning to have. But I just think that that going through these presentations without actual numbers is not the best utilization of our time. Thank you Madam chair.

53:36Micky Steinberg

Yes, commissioner Gonzalez.

53:38 – 54:34Roberto J. Gonzalez

Yes, so I have to agree, and I do appreciate the Chief's explanation, because I do agree with the Deputy Mayor's explanation, because I do agree. I mean, it's not fair to you, and I hope that you're not taking this personally. It's not personal to you. I agree with commissioner Cohen Higgins that perhaps going through a presentation talking about how great. The technology department is and I have no doubt that it's great. We've met 1 on 1 before. We have no doubt that it's great and that. You're doing a great job as a director, but. For purposes of going through your budget and analyzing what can and should not be cut. This perhaps is premature. So, I mean, it might be a good idea to wave or as commissioner Cohen Higgins is suggesting, maybe we can defer this until after.

54:36Micky Steinberg

So since I wasn't there earlier today, we are going to be having a workshop. Is that what we're looking to schedule?

54:42 – 55:29Vicki L. Lopez

Our committee decided that we would not recess in August. That as soon as the mayor releases her budget, our committee will take as long as it takes to go through every budget. Because what we discovered was that we did not find during our discussions that anyone was asked to reduce their budget. Actually, the budgets grew. They were just asked to grow their budgets by 3%. And we've said, we're pretty sure if we work with the administration, we will find ways in which we can walk away and say, we actually saved money. We didn't grow government. So that was the decision in this morning's budget that we would not recess. We would come back in August and begin to drill down on every department budget.

55:30 – 56:19Micky Steinberg

Well, I would like to be a part of that. And so I guess hearing from three of the board members right now, I think it's clear that they want to waive the presentations to an August meeting for, I guess, a more in-depth budget discussion. I know yesterday at our committee, we had these great presentations, but they were really an abstract. And so I did say at the end, it would have been nice to have some budget numbers with them. So while I do appreciate everybody's time and effort, I think this committee is now taking the direction that they would like to postpone any sort of presentation until after the budget is rolled out so that they can look at it with that lens and make sure that, by the way, we support our departments in their endeavors as well.

56:19 – 57:23Roberto J. Gonzalez

Yeah, and Madam Chair, if I could just add, and just to piggyback off what both of my colleagues have been saying, for those budget For those presentations, I don't think any of us are expecting anybody to just read off a screen. For those presentations, previously we had Josiel come up and he was very prepared um i think that that that's the level of expectation that i think everybody's going to have where you know don't just come up and read know your numbers because you are a highly capable director which is the equivalent of a ceo of a multi-million dollar organization so when you do come When you do come come prepared to to know your numbers know your departments and know exactly how to defend every penny that you're asking for and up it. Am I correct.

57:24 – 1:00:12Vicki L. Lopez

Yes, Madam Chair, I also want to remind everyone that I've asked all the department directors, and I'll do it again here. I would like a schedule of your vacancies with the aging reports. And I would further like, what occurred this morning was a discussion around telling me that you got rid of 50 staff members. But in fact, what happened was some left the county and because of their employment rights were actually transferred into another department. So that's not a savings. We're going to be really clear about what every step we're taking. We want the public to understand exactly what we're doing. The other thing we also asked is if you're moving any of your People or services to a constitutional officer that constitutional officer is going to come back and ask me for that money That's net zero savings. It's just going from us to them I want I want everyone to understand that I expect truth and budgeting and I've been very clear about that from the very beginning We have to be able to say what is really going on without sort of skimming over it because Most often I hear the complaints of they said that they got rid of those jobs, but I know the person's working in another department in another in another role in another department. So we want to be sure that we explain why we've had to move people to another department because they had employment rights. And what does that mean? Because the general public has no idea what that means. 0. so be prepared when you come and we have your numbers before you during our during the budget committees workshops that we expect to be able to talk about every penny in your budget and for you to start thinking if i had to get rid of it if i didn't grow if i if i just stayed you know because that's We do zero based budgeting in the state. You come and you don't tell me you're going to grow anything. You're going to start with what you had and then tell me you be prepared to tell me if you get if you reduce this, what would happen? Because that's the part nobody talks about either. So, because that's exactly the question I asked 12 secretaries at the state. If I tell you to reduce this line item, what will happen? What services have to go? Where can you find savings? And let me tell you something, if you can find a 3% savings in the state that has 10 times the budget that we have here, I'm pretty sure we can find savings. And we're committed, our budget committee, is committed to working with the administration to help do that in partnership, because that's what we think we can both do. So that's just a word to the wise about what we will be looking at, the kind of discussions we had this morning.

1:00:13Micky Steinberg

All right, thank you. Any other comments or questions from the DAIS?

1:00:18 – 1:01:02Danielle Cohen Higgins

Yes. Madam Chair, really quickly, just to provide clarification, I think it's the intention, I hope it's the intention, I'm sure it's the intention, that these budget hearings that we will have in August is open and welcome to all commissioners, more like a committee of the whole. um where we um engage in that deep dive that we have been uh talking about so i look forward to all of our colleagues participating in that and i see our chairwoman nodding her head and so that's the confirmation i was looking for is that i'll be open to everyone okay thank you madam chair thank you yes um deputy mayor before we madam chairman we're thankful for the clear direction uh commissioner lopez i'll warn you in advance we've been plagiarizing your

1:01:03 – 1:01:29Speaker 1

theme of truth and budget, and I think I've heard the mayor say it three times yesterday, so I think it stuck. I would like to point out to you that the mayor did put out a memo on solid waste. I think it's exactly like what you want. If we don't do this, what's the consequences? We gave it to you. We did the same thing on water and sewer rates, which we hadn't even addressed yet, but it is our intention to follow your mantra of truth and budget, and whatever we do, here's the consequences, pro or con.

1:01:31Micky Steinberg

And on that note, our meeting is adjourned. Thank you.

This transcript was automatically generated from the official public meeting video and is presented unedited. It reflects remarks made on the public record by elected officials, staff, and public commenters. Transcript accuracy may vary; view the original recording for reference.