Municipal Council - Regular Meeting

Tuesday, August 18, 2026

The Council approved changes to Logan Light & Power rates and lowered the non-resident library fee. They also adopted amendments to the wetland code, but ultimately denied the Mapleview subdivision Planned Development Overlay.

About this meeting

Government Body
Municipal Council
Meeting Type
Municipal Council
Location
Logan, UT
Meeting Date
August 18, 2026

Transcript

919 sections

0:00 – 1:37Speaker 1

you Thank you. you you you

2:13 – 2:24Speaker 11

Council meeting for August 18, 2026. And we're going to start with an open ceremony from Tron Arnold with the Alzheimer's Association. And then he will lead us in the Pledge of Allegiance after his presentation. Tron?

2:30 – 4:02Speaker 5

Council members appreciate the time to talk. So I'm Tron Arnold. I work just here on Main Street, not too far away, but I volunteer for the Alzheimer's Association every year because they have a great cause. They are looking to provide research and funding for new treatments and hopefully someday possibly a cure for Alzheimer's. But they also offer a lot of support to those suffering from Alzheimer's as well as those caregivers who take care of those with Alzheimer's. So it's a great cause, but every year, nationally, they do a bunch of different local, they call it the Walk to End Alzheimer's, amongst other events, but this is their big one. And for Cache Valley, our walk will be September 8th, sorry, September 19th at Merlin Olsen Park at 10 a.m. It usually goes for a couple hours. The idea being there'll be some local vendors there who support some booths, individuals. Anyone can really start a team that will walk along the route. And the idea is that everyone will wear purple, which is the color of Alzheimer's Association, and try to raise more awareness and funding for research. So that's what it's all about. but wanted to make you aware that it's coming up and give an opportunity to maybe ask any questions if you had any of what it's about if you weren't already familiar with it. Kind of short and sweet, I guess.

4:02Speaker 11

But any questions? Any questions for Tron?

4:07Speaker 3

How are you earning the money? I'm sorry, I might have missed that, but people are making a team, so they pay for that, and then are they asking for donations, the teams?

4:15 – 4:59Speaker 5

They will never turn away donations. When they allow local businesses or individuals to start up booths at the walk, and so you can have local businesses run a booth where they can kind of promote their own business or cause, and It costs a little bit to start up a booth, and so that funding goes to the association. And then you can start up a team. So, for example, I start up a team, and then I donate, say, a little bit of money to it, and then I try to get more people on my team who will also donate and come to the walk to participate. The more people we get there, the more we're seeing, the more the community can see Purple and start to learn more about it.

5:01Speaker 25

Do you have any of your information available in Spanish?

5:05Speaker 5

Yes, I don't have any with me right now, but yes, we do. We have some flyers in Spanish.

5:10Speaker 9

And do you have a website, correct?

5:12Speaker 5

Yes, it's alls.org, A-L-Z.org. Okay.

5:17Speaker 9

And that's the local chapter?

5:19 – 5:35Speaker 5

No, they have the search bar where you can search your local walk, and then so you'll have the Cache Valley walk to end Alzheimer's. Anyone can start up a team. Technically, it doesn't take any money to do that, but they're always looking for more donations if they can.

5:37Speaker 11

Thank you, John. I appreciate it. Yes, please.

5:49 – 6:03Speaker 14

I pledge allegiance to the flag of the United States of America and to the republic for which it stands, one nation under God, indivisible, with liberty and justice for all.

6:05 – 6:22Speaker 11

Thank you, John. I appreciate you coming in today. We'll now move on to acceptance of the minutes from our last meeting and approval of the agenda, as well as acceptance of the minutes from our Truth in Taxation meeting on August 11th.

6:24Speaker 9

I move acceptance of the August 4 and August 11 minutes and approval of the agenda for this evening.

6:31 – 7:27Speaker 11

I'll second that. We have a motion and a second. All in favor, please say aye. Aye. Any opposed? Minutes are approved and the agenda is accepted. or other way around, minutes are accepted, agenda is approved. Our regular 2026 meeting schedule is the first and third Tuesdays at 5.30 PM here in the council chambers. And our next meeting will be September 1st at 5.30 PM. This time on our agenda is for questions and comments for the mayor and council. During this comment time, you're welcome to come to the microphone. Please state your name, your city of residence. And we're asking that you keep your comments to under four minutes today. And we also ask that you keep your comments to items that are within the purview of the council and the mayor and items that are not already on the agenda for this evening. And with that, I will open up our questions and comments. And the microphone is the public's.

7:36 – 7:55Speaker 2

Hi, I'm Gail Hansen from Logan. And I was wondering if we are using flock cameras or other surveillance cameras. And if we are, if we are obligated to share the information we gain to other agencies, if we have a contractual obligation. And that was it.

7:56Speaker 11

Thank you, Gail. Given I think we have a lot of comments tonight, we're going to have staff get back to you on that one. Is that okay?

8:02Speaker 11

Thank you, Gail.

8:05 – 8:22Speaker 8

I don't know where to start. I think I sent everybody, except for Eugene. I don't know if you got my email. It came back with an error saying that it didn't go through.

8:23Speaker 9

Then I didn't get it.

8:28 – 11:07Speaker 8

You got an important vote tonight, so I've sent you guys all letters hoping to try and persuade you from the decision that's going on tonight. Multiple, multiple reasons. I'm gonna try and stay off the topic. With the topic of that vote going on tonight, I'm hoping that you take what I wrote seriously. I think that, you know, I remember campaigning, you know, a lot, you know, over the past three, last two times, and open space coming up a lot, you know, support open spaces. I think we should continue to support open spaces, even if it's not based on a tax incentive. When is this growth going to end? Is it going to end when this place looks like Salt Lake City? I mean, I wonder if that's the course that we're going on, we might as well just go all out. Maybe we should get some 20-, 30-story buildings downtown. We're looking at Salt Lake City, we could do another 20-30 density units. When are we going to start preserving this place that we claim that we love? Your vote tonight is actually going to determine a lot of how these things are going to work. You know, we are, this is a huge bird migratory pathway. Every year, you know, I don't want to tell, you know, I want people telling their grandchildren about the wildlife that exists here to look it up online, you know, because it no longer exists. Because, you know, we poisoned our wildlands because we have just, you know, turned everything into into, you know, construction. I think, I'm hoping that you guys truly consider your vote tonight on this topic. And I hope that, I really hope it's to preserve what we have left because we have sacrificed a lot. over the years with this place. I'm not going to stick around for the boat. I'm afraid I will throw a total temper tantrum if it goes any other way. So, ciao.

11:08Speaker 11

Thank you, Josh. Thank you. I appreciate your emails and discussions and the whole thing.

11:19Speaker 13

Good evening, Mayor Anderson, members of council.

11:22 – 15:04Speaker 19

My name is Megan Carollo, and I own property at 1233 Canyon Road in Logan. And I know I'm new to this room, but I know a couple of you are new to your seats up there. So I'm hoping we can find some footing on this matter together. A little bit about me. My great-great-grandfather was Herman Johnson of Herms. I'm sure you're all familiar. His daughter Hermaine was my great-grandmother. Her daughter Leona was my grandma. That makes me the fifth generation on Canyon Road. So needless to say, this neighborhood is really special to me. Tonight I'm here because I have a petition with 50 signatures requesting proof of the 99-foot right-of-way on Canyon Road that's needed for the streetscape portion of the first dam tank and water line project. These signatures represent the people most directly impacted by this project. And under Utah law, the party asserting the right-of-way bears the burden of proving it. In this case, that's the city of Logan. So if you live on Canyon Road and you're here tonight, will you please raise your hand? Hi neighbors. So why are we all here and why a petition? To date, I've met virtually to discuss the scope of this with the project team. I've requested proof of the right of way through an attorney. I've gone through mediation with the state Ombudsman's office trying to resolve this. Myself and neighbors have property surveys done that show a right-of-way on Canyon Road significantly less than 99 feet, verifiable by recorded plot maps and confirmed by every survey done in the past 70 years. Notably, that includes a survey of Mayor Anderson's property that was done in 2024 showing a right-of-way of 60 feet on Canyon Road. So now it's not just me asking, it's all of us here and everyone who signed this asking, in good faith collectively for this piece of information. Just provide the proof of the right-of-way on Canyon Road. To be clear, this isn't about the design. It's about the fact that this design is relying on a right-of-way claim that hasn't been proven. Continuing to move forward or turning a blind eye to this detail opens the city up to liability. The design can be challenged. Resulting in unnecessary costs to taxpayers and legal fees, delays, and a loss of trust And that falls on this council. I know not all of you were part of the decisions that started this project and regarding this project, but this is where we're at now and it's gonna fall in your hands. So if the city holds the reported right of way sufficient for the design, produce it. It ends the legal question immediately and the project proceeds on solid ground. If that doesn't exist, That's what I'm knowing now, not later. And that doesn't mean abandoning the vision for the streetscape for Canyon Road. All it means is working within different parameters. So prove it. That's what we're all asking. Just provide the documentation for a project that impacts our homes every single day, now and in the future. This is a document the city should have had before the project began, so Chairman Johnson, This is a little bit on you. I'm asking you to put this as an agenda item for a future meeting. Give us a clear answer on the right-of-way. And let's work through the rest of this together the way a community should. I'm also providing a sheet noting the relevant constitutional protections for private property. We're all granted under the US Constitution and the Utah State Constitution for your reference and the survey of marked property showing the 60-foot right-of-way. Thank you for your time.

15:06Speaker 25

Thank you, Megan. Thank you.

15:12 – 15:46Speaker 11

Seeing no one else moving for the microphone. We will close the questions and comments for the mayor and council. I've taken notes on all those comments and we can reach out to those of you that have commented. So thank you for that. We'll now move on to our mayor and staff reports.

15:46Speaker 12

And I will hand the time over to Mayor Anderson for his comments.

15:50 – 16:39Speaker 6

Updates. Thank you. We have some special visitors tonight. The Jarens, Jaren and Julie Taylor, excuse me. And they are with JustServe. And this year, Logan City has committed to do as many hours of service we could possibly do. In fact, our goal is very, I would say, I'm trying to think of the right word. Ambitious? Very ambitious. There you go. Thank you. That's the word I was looking for. But we're getting close. We're getting there. So service has been very important for us, and we're partnering with JustServe. And if you would like to present, that would be wonderful. And then I'll talk about the proclamation that we have afterwards. I couldn't think of ambitious.

16:40Speaker 1

That's okay.

16:50 – 18:40Speaker 10

Well, my name is Jaron and this is my wife, Julie Taylor. And we're grateful for this opportunity to explain the possibilities of Just Serve and how we can work together with the city of Logan. Just Serve is about connecting people who are willing to volunteer with organizations and people who need the help. Before we get started, we would like to acknowledge and thank each of the city council members for your service to our community. The rest of us, most of us have absolutely no desire to campaign or run for election. Fortunately, for the rest of us, we don't have to run for election to serve our community. There are countless ways we can all step forward, lend a hand, and make a difference. Sometimes we can simply just serve. And that is really what we are here to talk about today. In January, Julie and I were asked to serve as just serve specialists, just serve representatives for Cache Valley. And shortly after that, we heard Mayor Anderson speak to a group of nonprofit leaders, and he explained that when he entered that office, he challenged Logan City employees to personally provide 250 hours of service in the community each year. Very ambitious. He talked about several of the benefits that come when we give our time to serve others, both for the people receiving the service and for those providing it. He then gave each of those leaders a challenge. He asked us to help identify meaningful service opportunities for Logan City employees, residents, and especially for the youth who are the future of our community. He said, we simply need more service projects. As JustServe representatives, Julie and I took that challenge seriously, and it fits perfectly with what JustServe is designed to do.

18:44 – 21:05Speaker 13

Over the past few months, we've had the opportunity to become acquainted with hundreds of nonprofit organizations and nearly 50 different faith groups throughout Cache Valley. We meet regularly with many of these groups and collaborate on ways that Just Serve can help connect willing volunteers with meaningful and memorable opportunities to serve. Hundreds of these local needs are listed on JustServe.org. That's a website that updates continuously as new projects and events arise in Cache Valley. Anyone visiting that website for the first time would likely be amazed, as we were, by the sheer number and variety of ways to make a difference right here in our community. At the same time, it was disheartening to realize that these vital opportunities remain hidden away on a website that most people simply don't think to visit on a regular basis. To give these local needs the visibility they deserved, we launched dedicated Facebook and Instagram pages under the name Just Serve Cache Valley. Our goal is simple. By bringing these service opportunities directly into the everyday social media feeds of Cache Valley residents, we hope to connect more people with meaningful ways to serve. The community support for these new accounts has been really encouraging. Local influencers have stepped up to share our posts with their followers helping us connect with a much broader audience. However, currently there are far more opportunities to serve than there are volunteers available to meet those needs. So our challenge has changed a little. Rather than trying to find more service projects, Sorry, rather than trying to find more service projects, we are now trying to find more willing hands ready to step forward as volunteers. One of these projects we've recently posted is actually for the Alzheimer's Walk to find more volunteers for that. If you haven't connected with these pages yet, we invite you to follow Just Serve Cache Valley on Facebook and Instagram. It's an easy way to discover local needs, see featured service projects, and find simple ways to make a difference in Cache Valley. These accounts are currently connecting over 1,100 followers with community updates and needs.

21:09 – 21:42Speaker 10

We recently saw just how powerful that connection can be. During the fires on Canyon Road, I was standing on a cliff in Puebla when I heard Mayor Anderson talking with his wife as they nervously watched the flames getting closer to their home. I remember she said, do you think we should go on the other side where the firefighters are? And the mayor said, you know, that is the last thing they need is to have the mayor telling them what to do in an emergency. And I thought that was perfect.

21:42Speaker 6

Pretty close to my exact words.

21:46 – 25:49Speaker 10

So we had a brief discussion about the fire in the evacuation center. It is during moments like that when we become especially grateful for firefighters, emergency personnel, and volunteers who step forward to protect the people and things that matter most. After talking with the mayor, I drove down to the local state center where I met with Ron Gonzalez, the Logan City emergency manager. He and several CERT team members, volunteer members, were coordinating with the Red Cross and local church leaders to set up an evacuation center. It was impressive to watch volunteers church leaders, nonprofit organizations, and city officials working side by side with the same goal. That is really the spirit of Just Serve. I then reached out to my wife, Julie, and asked her to post a picture of the fire along with the address of the evacuation center, the shelter on Just Serve Cache Valley social media pages. Well, those social media pages are still relatively new, but that single post has received over 130,000 views. To us, that demonstrated that the Just Serve Cache Valley social media pages can be a powerful tool to promote awareness of service opportunities. People want to help. Sometimes they simply need to know where to go and what is needed and how they can get involved. That is exactly the gap that Just Serve can help fill. In fact, our very next post encouraged people to sign up for Everbridge, Cache County's emergency alert system. This helped educate the community on how they could receive important information during future emergencies. And again, it was simply about connecting people with information and opportunities that can help strengthen our community. Although Logan City has not officially become a gesture city yet, I think we still need a signature. That hasn't stopped us from already working together. One great example is the upcoming America 250 and Cache Valley Days of Service on September 11th and 12th. Russ Akina, Logan City's Parks and Recreation Director, along with Dana McKinnon, have been instrumental in identifying and providing many meaningful service projects for the Cache Valley Days of Service. This is exactly the kind of partnership we hope to build upon with Logan City. Logan City understands the needs of our community. Non-profit and faith organizations understand many of those needs as well. JustServe can provide another piece of the puzzle by helping connect those needs with people who are already and willing to serve. When Mayor Anderson first challenged us, he said we need more service projects. After spending the past several months getting to know the organizations throughout Cache Valley, we have some good news. The projects are here. The needs are here. And we believe the volunteers are here too. Our job is simply to connect them. And we can just serve and the City of Logan can do that together. There is one more way we'd love to work together and that is we would love to regularly recognize the youth and other members of our community who go above and beyond in serving others. There are people throughout Logan quietly doing remarkable things that make our community better. We believe their examples deserve to be shared and celebrated. We propose that on a regular basis, we highlight individuals and especially young people who just served to make the city of Logan an even better place to live. Hopefully by sharing their examples, we will inspire others to step forward and discover for themselves the joy that comes from simply serving. We invite everyone to follow Just Serve Cache Valley to discover new and exciting ways to serve and help make our Valley an even greater place to call home. However, we do caution you about service. It can be highly infectious, and we hope you get infected by it. Thank you.

25:50 – 26:33Speaker 6

Before you sit down, service is a high priority and JustServe is a high priority for me and for our city. And so I've signed a proclamation that says that the City of Logan commits to promoting volunteerism, leveraging JustServe.org to make it easier for residents to find and engage in volunteer opportunities and will regularly acknowledge and celebrate the contributions of volunteers. So thank you so much for coming. And we're going to try and get as many people to these activities coming up. We've got some amazing service opportunities on Friday, September 11th and September 12th coming up. And let's see if we can fill every slot and then some for people that want to get out there and serve.

26:33Speaker 6

Yeah, so thank you so much. Thank you. Thank you. Appreciate the information.

26:43 – 26:56Speaker 9

Next report that I have is on the Logan River Watershed Plan and Paul and Zan, please.

27:18 – 27:54Speaker 26

Good evening. Long time no see. Absolutely. I believe all of you are familiar, at least to some degree, with the Logan River Watershed Project. It recently completed a public comment period as part of its process. And so we thought the timing was good to invite the project team. This is Zan Murray with JUB Engineers. He's the project manager. To come and just give an update to the council, an opportunity for you to get caught up on it if needs be and also to ask questions with it as well. So I'll turn it over to Zane.

27:55 – 29:02Speaker 7

Thanks Paul. I have a sheet. There's two separate sheets. I'll send the first one down. Just take one. And what I'm sharing with you are a couple of fact sheets that We prepared, these are a little bit older. They were prepared probably about a year, year and a half ago, but they give an overview of the project and a lot of what I'm going to talk about tonight. And this is just for your information and perhaps you have questions that I might not get to tonight for sake of time. But if you do have additional questions, by all means check in with the project team and myself for sure. So with that being said, we're just going to thumb through a handful or a dozen slides here and then leave it up to you to answer any questions you've got. So the first thing I want to recognize is that this is an NRCS project for the Logan River Watershed Draft EIS and EIS Plan. This program that we are engaged in here is a funding mechanism through the NRCS to take care of different priority activities and we'll talk about those in just a second.

29:02Speaker 9

Hey, Sam. Yes. Just for the sake of everyone, would you just say what NRCS is?

29:08Speaker 7

Great question. It is Natural Resource Conservation Service. And it's federal government. It is. That's correct.

29:15Speaker 6

Thank you for that. How often do they do these types of projects?

29:19 – 29:41Speaker 7

How often do they do these types of projects? I was just curious. This particular program was implemented in 1953, revised in 1983, and then brought back to active funding in 2017 or 18. So it's a mechanism and a program that NRCS uses to do different things.

29:44Speaker 7

Yes, that's correct, nationwide. That's right.

29:46Speaker 6

So you're saying they've been doing this for a long time.

29:49 – 31:29Speaker 7

Yes, quite a while. So I just wanted to highlight the fact that this is a community project. The sponsor is Cache Water District. Nathan Dauks from the district is here with us today. It also includes Logan City, North Logan City, Hyde Park, and the Crockett Avenue Irrigation Company. Gordon Coulson, the president of the irrigation company, is here with us today as well. I also want to recognize Kyler Olson. He is a team member to JDB through Franson Civil Engineering. We've been partnering on this project since 2016. Just to give you a little bit of a sense of the history behind this. So the next slide I want to share with you is a little small and I apologize for this. But this is the overview of the preferred alternative. And what I want to highlight here is that there are three main components of the watershed program that are that are engaged by this environmental impact statement and potential project. The first is flood control. That is the primary flagship of the program to take care and address flooding. As such, the NRCS funds construction improvements related to flood control at 100%. Another portion of the program is agricultural water management. We're dealing with agricultural irrigation. That is funded at 75% And then another portion of the program that we've enlisted in this project is recreation. And that's funded at 50%. So there's a significant amount of benefit financially that comes. to entities that are able to engage in this program if the projects are funded.

31:29Speaker 3

Is recreation 15 or 50?

31:34Speaker 7

50. Great question.

31:34Speaker 9

And the communities have to come up with the other portion of any funding?

31:40 – 40:49Speaker 7

The sponsors and co-sponsors would work through that and come up with that additional funding. That's exactly right. Great clarification. So as we went and started working on this project, I mentioned that it started in 2016. Crockett Avenue Irrigation Company enlisted JDV in France and civil engineers to do a study on pressurized irrigation in their service area, which is essentially the twin canals which run approximately second east-west from approximately Center Street all the way out through Hyde Park. At that point in time, we prepared that study. It appeared to be feasible and something to continue to pursue, and then this funding source was available at that time, so we made an application to fund, to start the process to receive funding through the watershed program, and that grant was given in 2000 and, let's see, 2020. is when that was offered up. So we've gone after funding twice. We received funding on the second application. So the purpose of the project, as we go through an environmental impact statement, you have to define a purpose and need. And so the primary purposes that are identified for this project include protecting water rights, which we have limited rights within the valley. We have limited culinary water resources. We have different water resources, but culinary water resources come at a premium. because you don't have to treat them. Put extensive dollars and cents into getting it to a drinkable state. There was a lot of deteriorating infrastructure. A lot of canal and other irrigation infrastructure has gotten older. Some city infrastructure continues to age and needs to be replaced, and so this project can help mitigate some of those costs. There's also culinary and wastewater treatment costs and delivery costs that can be offset underneath this project. There's a lot of money that's spent in the wastewater treatment plant that Logan City has, ongoing costs, and there's some benefits that come with that that we'll talk about in a minute. And then there's also flood activities that are beneficial here as well. There's flooding that occurs off of the canals as flood water or storm water enters into those canals. They rise above the banks, they top, and then they can cause flooding to homes and different things. So if you look at this map closely, and I apologize the colors are fairly close, the items in purple are related to the agricultural water management or irrigation portions of the project. The items in blue down by the sewer lagoons indicate an ability to store water there, approximately 2,100 acre feet of water. The items in red, are flood control projects. So this includes an overflow of the canals crossing 1800 North and North Logan to alleviate water that's coming from Logan and moving to the north. It provides an overflow, if you will, that goes to the west in that area. You can also see that there are a couple of projects down in the island area in Brown, highlighted with number 11 and 12. Those are recreation projects that include extensions of the trail along Canyon Road between Center Street and 6 East. and also a revised and updated bridge over the Logan River near River Hollow Park and a connection from River Hollow Park down to Crockett Avenue. Those two projects are identified in the existing city's trails and transportation plans. So I want to take a few slides to show you what the benefits are with the project. One of the project benefits as we talked about is flood control. This was just back in 2023. Hard to believe that we had this situation after we just got through this last summer and winter. But we did hit flood stage, nearly 1800 CFS. This project will improve the diversion structure so that it will be able to pass flows and debris a lot easier. It will also be able to divert water into the Little Logan River, or canal as you want to call it, as it has done in the past. An interesting thing about this process of going through the EIS, the NEPA process goes through and provides opportunity for a lot of public input. we received public input early on in the project and we continue to talk with constituents throughout the development of the eis and continue to get input on the project as well one of the key things that we heard was the ability to continue to have water flow through the little logan And as such, we included reconstructing the diversion structure as part of that project. It was an important amenity to the local community. It's an important amenity to the city with regard to parks and even the entire county because water that's diverted from this location covers Denzel Hansen Park, Merlin Olsen Park. It goes through the Cache County Fairgrounds and then onward to the zoo. and Willow Park in that area. So there's a lot of benefit that comes from having water able to flow through that. We recognize that and incorporated that particular part into the project to meet those needs. I mentioned flood control is the flagship of the project, or the program. You can see this, this is a map. If you look at the upper colored line, that's the Logan River, and then south and east of that is the Thrushwood areas. The map on the left shows the current flood conditions where there needs to be flood insurance. And the map on the right shows the reduction in flooding that occurs because of the project. So that takes approximately 28 to 35 homes out of the floodplain, which is beneficial to citizens in the area so they don't have to have that flood insurance. As we continue on to talk about the benefits, we mentioned culinary and wastewater treatment costs that can be reduced. Annually, we estimate between the three communities that are involved with the project savings of $650,000 in water treatment costs. We estimate $1.35 million of savings in wastewater treatment costs because of all the energy and power and chemicals that have to be added into the wastewater treatment process. That's pretty significant savings on an annual basis. The benefit lifecycle of this project is estimated over 50 years. So you can take those numbers and start to see what that is over the lifetime of the project and its lifecycle. Last but not least is actually just raw infrastructure costs that need to be developed and put in. If this project were not to go in, it's estimated that about $85.5 million of infrastructure and capital projects would just need to be built. That might include water pipelines, water treatment plants, additional storage. Other things like that can be offset because of the project benefits that come by using secondary water that doesn't have to be treated, power doesn't have to be put into the systems. And so it's using the right kind of water for the right kind of application. And that's the benefit that comes here. If we go to the next slide, this just indicates a little bit of what I shared earlier in the slide before, that sometimes these projects come with an increased cost upfront, but as you think about the prioritization and the water usage, the capital infrastructure costs over time are lower when you look at secondary irrigation systems. So we might have an initial investment that's a little bit higher, but in the long term we see significant savings as we saw in those numbers previously. I wanted to talk for just a second about environmental benefits. These are important and I'll share some pictures with you in just a second. Going back to the purpose and need of the project, saving water and securing water rights, nearly 5,400 acre feet of water will be saved by making the system more efficient in delivery. The other thing that's important to recognize is that this project puts 25 additional cubic feet per second of water in the Logan River. Based on studies, that improves the quality of the fishery and the waterway from maybe an average or poor condition to a good condition. And we've worked with Bethany Nielsen at Utah State University as she has studied this extensively, and Darren Olson from BioWest who was involved with the CAP project that analyzed the Logan River. The other thing that was important, again based upon feedback from the community, we planned through that diversion that we would build in the Logan River an additional 5 to 10 second feet of water that could be delivered to continue to keep those waterways flowing and that recreational benefit in place. And you can see some of those other benefits that exist including sediment removal on First Dam and additional water to Great Salt Lake. I mentioned earlier the 120 miles worth of pipe that would be installed, which is a significant amount of pipe and additionally the 2,100 acre feet of storage.

40:49Speaker 6

Zan, what's the capacity of the Little Logan, like a safe capacity? Have you studied that?

40:55Speaker 7

Say that one more time, I'm sorry.

40:56Speaker 6

The Little Logan, what's its capacity? Because people think, 10 CFS is like tiny, but how much can it actually?

41:05 – 41:50Speaker 7

So as it operates now, as it acts as a canal and diverts water into its, you know, the canal facilities at the diversion, it'll carry up to 90 second feet. And then like any good canal, as you get closer to the end, the capacity drops. And so it gets narrower and smaller as we go. So 90 CFS at the diversion, and then as the area continues, its capacity would decrease. Now, the Little Logan is interesting, and I'm not an expert in that particular channel, but it's been there for a lot of time, right? It's wide. and not very deep, wide and shallow. And that affects the capacity of that to carry water. Right. And what to do. So that's a great question.

41:50Speaker 6

I was just curious, yeah.

41:52Speaker 25

So currently, right now, how much is flowing through it right now?

41:56 – 42:57Speaker 7

Great question. Why don't we jump into the next slide and talk about that for just a minute. So currently, I went out last week and snapped some photos. Not these particular photos, but the ones in the next frames. Currently the diversion at the river is flowing at 51 cubic feet per second. Down at the Cache County Fairgrounds there's another measuring device there. It's measuring at 6.3 cubic feet per second. And so a lot of that water that comes in the 51 cubic feet per second that's maybe being diverted gets routed into the canal system and heads north to North Logan and Hyde Park and feeds the other irrigation canals and ditches within the city. So there's some key diversions, one of which is just west of Jens Johansen Park where the flow significantly drops because Most of that flow is diverted to serve the irrigation users to the north underneath their water right that they have.

42:57Speaker 25

So when you say that it will maintain a base... Like a base flow?

43:04Speaker 7

Of ten. Five to ten second feet is the plan.

43:07Speaker 25

What happens when it reaches these locations? How much will be flowing at these locations?

43:14 – 43:39Speaker 7

So the diverting would occur at the river, that 10 second feed. Now currently there's a lot of water that's peeled off and goes to different ditches. So it starts at 51 and ends up at 6.5 or 6.3 down at the Cache County Fairgrounds. That's because there's irrigation diversions pulling water off. there's some water returning, different things are occurring in that regard.

43:40Speaker 3

I'm sorry, a lot of numbers here. So currently at the diversion, it is what?

43:45Speaker 7

51 feet per second.

43:47Speaker 3

But you're saying with this change is going to make it 10?

43:51Speaker 7

It will reduce it in that location.

43:53Speaker 3

Which would make this like zero.

43:55Speaker 7

Well, let me clarify what that is.

43:57Speaker 9

That's why I brought these pictures. That's why I'm like a little confused. Somebody behind you is trying to stand up.

44:02Speaker 11

But they're also currently pulling water out. Melissa, they're pulling out 50 and then pulling out 10 here. Which they won't be pulling that out. Which they won't be doing.

44:12Speaker 17

You're a lucky guy.

44:12Speaker 3

Okay. That's what I'm trying to say. But I'm curious.

44:15 – 44:51Speaker 17

We are currently preparing a map that shows the historical flow rates for each of the different sections. That information is forthcoming. It's going to be super helpful. There's been a lot of confusion about what areas have what capacity. From our study, there's maybe a half mile out of four and a half miles of Little Logan that has a capacity of over 15 cubic feet per second. almost maybe 80 to 85% of the low gain in the capacity is around 5 to 10 CFS. So in the majority of it, it'll be basically about the same amount of flow.

44:53 – 45:11Speaker 11

So obviously there's water loss through evaporation and seepage throughout. So if you pull out 10, what do you expect to be at the fairgrounds? on a typical July day. And I know I'm making you do math in your head, but like, would you expect five at the fairgrounds? Would you expect eight? Would you, I mean?

45:12 – 45:31Speaker 17

It's so hard to tell. I understand. Give me a range. And the other thing is that, you know, it doesn't preclude any future projects where we come in and line. Like if we feel like we're losing all that water and we're putting in that five or 10 CFS and we feel like there's a spot where there's a lot of water loss, we could come back in and line that area and make sure that flow keeps going downstream.

45:32 – 45:47Speaker 11

because would that funding be included in i'm assuming under this project so we'd have to find a way to fund that right yeah but there's plenty of there's plenty are you willing to give me a rough estimate of what you think might be at the fairgrounds with not right now can you get that for me uh

45:48Speaker 7

Actually, I think that might be difficult because there's not enough information to determine that exactly.

45:53Speaker 11

I know you're not going to get it. That's why I said rough estimate.

45:55Speaker 7

I'm going to give you some relative pictures. I want to show you pictorially what this looks like and give you a sense of what this is.

46:01Speaker 11

I like numbers, man. I like spreadsheets.

46:06 – 46:42Speaker 7

That's what we live in, right, is engineering spreadsheets. So what I want to recognize here, as Kyla mentioned, there are improvements if entities want to improve the channel to reduce seepage, they can make that investment. The other item that can occur is if other entities want to dedicate additional water rights, that they have legally to go down this channel that's perfectly fine the capacity of the channel will not change then from what it is right now it's not being enclosed at all in any way shape or form under the proposed alternative which is a misconception that's been out there in the public

46:42Speaker 11

Under both proposed alternatives. Under both proposed alternatives. First dam and then Crockett.

46:48Speaker 7

Not in a significant way. There may have been some small pipe areas just because of some pumping and other capacity that needed to be taken care of but it's relatively small.

46:58Speaker 6

So theoretically Logan could allow their shares to just keep flowing through there because we have shares in Crockett. That's correct.

47:05 – 47:24Speaker 7

If Logan wanted to dedicate shares to go through that, that's your prerogative because you have legal rights to those. The important part is the project is trying to provide the opportunity for those things to continue as they are now or enhancements to be made if the city or others elect to do so.

47:25Speaker 25

You said small areas could maybe be piped. Could you better give us an idea of what those small areas are?

47:33 – 48:28Speaker 7

So in the Crockett alternative, which is the other alternative that was proposed, there would be a pump house that would pressurize the entire system. We would have to enclose a small section, let's say, I'm just going to guess 150 feet to be able to get the infrastructure built, and that would be located in River Hollow Park. So if you can see that, we're trying to create a trail through River Hollow Park to get down to Crockett Avenue. We've got to put a pump house in under that alternative. So it gets quite tight. And so there may be a need to pipe a small portion of it. But I will say this, that under the current alternative and the proposed alternative that we're looking at, there's no change to the little over here. That's all I'm going to say. There's no change to it. It just stays intact in how it is. Any changes can be made otherwise.

48:28Speaker 25

You mean to the route? To the volume?

48:32 – 48:43Speaker 7

To the shape, the route, the alignment, to the vegetation. What about the flow? The flow, by legal right, that the irrigation companies have can be diverted where it needs to go.

48:44Speaker 3

So it could be dried up, I mean all summer long.

48:46 – 48:57Speaker 7

The project, because they understand the importance of it, is dedicating five to ten second feet of their water right to this. In perpetuity? Yeah.

48:57Speaker 11

In perpetuity? Yeah.

48:59 – 49:12Speaker 7

Yeah, the intent there is that that's given. That's a pretty big deal if you think about the cost of water and what it can do. That's a sacrifice by the irrigation companies and those that hold the water rights because of the importance of the project.

49:14 – 50:00Speaker 9

So, Zan, instead of being the canal and the, let alone being the vehicle for the canals that feed houses and go elsewhere, those will all be piped and what will be left is the 10 CFS that is dedicated to that flow. So they're basically changing the way that system works by putting the majority of it under some kind of a pressurized system that would service all of the service area of Crockett Irrigation Company.

50:00 – 50:26Speaker 7

I just want to recognize and clarify again though, but the significant flow amount that everybody is understanding, right? We talk about 52nd feet being diverted. Once you get west of Jens Johansen Park, that flow is not that high. It's much lower because of the significance of the canal that's diverted to go to the north. I want to try to make sure people don't get fixated on that number.

50:27Speaker 9

So that diversion that exists today, will continue to divert but into a system?

50:38Speaker 9

Or it will be someplace else?

50:40Speaker 7

The diversion, that's a great question and I did clarify that. The diversion point will be a first dam.

50:47Speaker 7

So there would be a connection made there to pressurize the system to not have to pump it and use ongoing power.

50:52Speaker 9

So why is it that the diversion at

50:58 – 51:26Speaker 7

the the current diversion needs to be redone it's in poor condition if it's not going to be used anymore because we want to provide the opportunity for the little logan to continue flow it's in poor condition and gets plugged up quite often logan city has to go down and pull branches and limbs and trees out of there so if you're diverting at first dam how much flow is coming down the logan river before the diversion

51:28Speaker 9

And then how much is in the Logan River after the diversion?

51:32 – 51:50Speaker 7

Great question. So that upper reach between first dam and the diversion because we're pulling water out at the first dam will be decreased by whatever that diversion amount is. The one thing again that the project is dedicating is 25 CFS or cubic feet per second to continue down the river.

51:51Speaker 9

But do they have the right to the entire flow of the river?

51:56Speaker 7

The rocket Avenue, no, no, there's other water right holders that are on the river.

52:03Speaker 9

So, do the water right holders that currently exist on the river have right to the entire flow of the river.

52:12Speaker 7

Collectively or collectively collectively. They have, there's, okay, there's paper water.

52:25Speaker 9

I understand that part. I do understand that part.

52:32Speaker 17

The quick answer is yes. When we get down to like Logan, Blacksman Fork, Trapper Park area, the Logan River is pretty much dry. They have the ability to take all that water.

52:41Speaker 9

The Logan River is?

52:42Speaker 17

The Logan River, yeah.

52:44 – 53:01Speaker 9

Because historically, and I'm sort of asking these in a way that, but historically the water has only been considered, it had to have a beneficial use.

53:02Speaker 9

And flowing downstream was never a beneficial use until very recently.

53:08 – 53:25Speaker 9

And so it's an interesting concept when you think about it, that we enjoy the flow of the river and the flow in the canals. But it's technically, according to Utah state law, somebody else's water.

53:26 – 53:45Speaker 17

Correct. Okay. It is water that is, other folks have water rights to it and it has been utilized as a public benefit or a public amenity and that's what it's been recognized as for this long. But in reality, these folks are the ones who have the water rights. Yeah.

53:46 – 54:48Speaker 17

So yeah, a lot of benefit coming from the irrigation side to dedicate an in-stream flow to make sure that we do have water in the Logan River below Travel Park and to make sure that there is a base flow into Little Logan. All of this project is basically making a flexible operation system that could be changed in the future and like right now there's not really many options of how to operate this or how to change things in the future and us putting in this infrastructure would allow so many changes and you know like Zan said if there's other water that becomes available that people want to get dedicated to either the Logan River or the Little Logan they're more than welcome to and all of the infrastructure would be in place to make sure that that works that the accounting is there that the measurement is there so that from from our perspective it really takes us a big step does it cover everybody's needs and everybody's wants We can't make that happen, but it puts a huge step forward and then it allows that to continue to expand and change in the future.

54:50 – 55:02Speaker 11

Can I ask a question? So you're leaving the water in the river for I think you say 14 miles? Correct. I'm assuming most of it's coming out at the West River pump station? Correct. To go into the storage? Yep.

55:03 – 55:47Speaker 7

cutler tail water what what do you expect to be in the lower river below that uh that's cutler tail water so basically from cutler back it's it's it's probably sitting yeah it's sitting what at that elevation due to the dam yeah okay yeah it's about static cool level at that point okay yeah and that recognized too that that's another amenity that the irrigation company is the project is planning to do to allow the water to run through those 14 miles below the river and improve the quality of it and then use pumps and energy to get it back in and use it as storage so again it's a it's a flexibility item that kyler brought up and i think it's hugely important so okay

55:48Speaker 11

And Ernesto has a question after you. We're going to sit here for a while. That's okay. Our time is yours.

55:54 – 56:18Speaker 25

We received an email where it says... that in the impact statement it mentions that if we have an extreme drought year or season, that the 10 CFS that would flow through the diversion would actually, I guess it would be the decision of the canal to allow it or not to allow it. Is that correct?

56:19 – 56:51Speaker 17

That has not been defined. So any agreements regarding any water use or dedication of that would happen during the design phase of the project. Right now we're just in the planning phase. So we would have to request funds from NRCS, move into the design phase. That's where we would set up all our design criteria. agreements, that's where all of the legally binding agreements would happen, with all of the different groups that would be connected or impacted by the project. So that's where we would have time to say, you know, in an extreme drought, we're going to provide X amount of water, or there's a schedule or something, just like it's done for the Kimbell Decree.

56:51Speaker 25

So, follow up to that very same question. What is this year, for example, considered?

56:58Speaker 17

This is an extreme year.

57:00 – 57:14Speaker 25

So in today's type of situation, water situation, if what I asked about was true, then there would be no flow doing through the... That has not been defined, no.

57:14 – 57:47Speaker 17

So there's still room for discussion from the stakeholders and that would be a point of talking between each of the project stakeholders, so Logan City, the irrigation company, and the other municipalities because you're balancing you know, secondary use that people could be putting on their lawns and gardens versus this public amenity use going through the Little Logan. So those are all key pieces that need to be discussed and worked out during the design phase. So yeah, I guess to answer the question, there's been no determination of exactly what that would look like. That would still come in the future.

57:48Speaker 11

So that 10 cubic feet per second could go up or down?

57:51Speaker 17

Depending on that potential agreement.

57:53 – 58:07Speaker 7

They're saying 5 to 10 and then there's room in the agreement to work out the detail. If the city were to or an entity were to put where water rights in then that's secured by them Yeah, right. It's it's all worked out by David.

58:07Speaker 25

Can you can you repeat that?

58:09 – 58:23Speaker 7

If the city let's say except let's say the Logan City puts their shares that are in Crockett and say we want them to flow through on the little Logan Then that's whatever you put in is there you manage that because that's your water except

58:24 – 58:40Speaker 9

If everyone is in a drought condition, everybody's water is less. So it wouldn't be a consistent, you wouldn't say my one share is one CFS, it will always be one CFS. Correct. Because if it's in a drought, it could be a half.

58:40Speaker 17

That's right. That's all based on the Kimbell Decree, the education and how the river is governed. The overlying water.

58:46Speaker 9

Okay, my question goes further downstream. Okay. So you're going to pump out of the Logan.

58:54 – 59:45Speaker 9

put it in the lagoons, theoretically. I don't know when you get it back out again, what happens to it, but that removes water from the river that goes into the Bear River, which becomes part of the dam and the electric generation and also moves into the Bear River Irrigation Company in Box Elder County. how do you account for the fact that they also have water rights and expect a certain flow and how do you say that you're saving water other than you're putting it in the lagoons that's a good question so basically any water would be taken back out of the pump station would be subject to the water right we can't pump out any more than they have water rights for

59:46 – 1:00:13Speaker 17

so they have consumptive water rights for up to 140 cfs the profit group and so um we would be taking as much of that as we can at the upstream side leaving the in-stream flow up to 25 cfs and then taking that additional 25 but none of that that we would be pumping back in would be going above and beyond the consumptive water rights of the project group on a good year Yes, obviously the 140 CFS is nowhere near realistic on a year like this.

1:00:13Speaker 9

But, okay, so you're pumping it into the, that is your storage and your savings?

1:00:20Speaker 9

So nothing additional is actually going to the Great Salt Lake.

1:00:24 – 1:00:47Speaker 17

Not necessarily. There will still be opportunity if the ag water users decide not to take their water. There are programs in place now that that could be pushed down to the Great Salt Lake. So again, it comes back to this. We're setting the infrastructure. It's giving flexibility. If groups decide that they don't want to use that water for the agricultural beneficial use, then that can be sent further downstream to the Great Salt Lake.

1:00:48 – 1:00:59Speaker 7

I would add to that is the efficiencies of the system. will lessen the demand. And that provides greater opportunity as well and greater probability for water to go downstream.

1:00:59Speaker 11

And those efficiencies are coming from a less seepage and less evaporation.

1:01:05Speaker 11

Have you calculated what you expect through seepage and evaporation in the old sewer lagoons?

1:01:11Speaker 17

Yes, we have. We've taken that into account.

1:01:13Speaker 11

And is that calculated into your savings number? Correct. It is? Yep. Ernesto? Yeah, good question.

1:01:20 – 1:01:41Speaker 25

So pardon my ignorance. I think you called it adjudication, which I'm assuming is who claims however percentage of the water. Is that an actual percentage, and is there a priority of who gets the water first, or is it an actual number of CFS?

1:01:41 – 1:01:52Speaker 17

It is a schedule. It's called the Kimmel Decree. It's public. You're welcome to go take a look at it and detail who gets what amount of water at what flow rates in the Logan River.

1:01:53Speaker 25

So it's not a percentage. It's an actual number.

1:01:56Speaker 17

It is a percentage. It's a percentage of the total. So they split it up between all the different groups so that everybody kind of takes a little bit less.

1:02:03Speaker 9

But it is 100%.

1:02:05Speaker 17

Of the river. Of the river.

1:02:06Speaker 11

Correct. You add them all up. In a good year.

1:02:08Speaker 3

But at the current flow.

1:02:09 – 1:02:27Speaker 11

It's always technically 100%. Just 70% more water. Yeah. Good questions. You can keep presenting. I've got more but we'll get to them. Maybe you'll cover them and then we'll get to mine.

1:02:27 – 1:03:51Speaker 7

All right. I'm just going to share a couple of slides with you. This is just a couple of things to give you a visual of what different flow rates look like. So Kyler and the group measured the flow of Central Park and Merlin Wilson Park. That picture on the left is a five and a half second feet. The picture in the center is a measured flow at seven CFS at Jens Johansen Park. That's quite a bit less than we would see today, but that's actually a seven CFS flow at Jens Johansen. And then that's a flow of 9.2 CFS down at the fairgrounds at that area. So we can go through and thumb through the next slides just quickly, just to give an explanation of where things are at. So again, these photos were taken last week. with 51 cubic feet per second being birded out of the Logan River and then 6.3 CFS at the fairgrounds. So the picture on the left is at River Hollow Park looking to the east. You can see the flow there in between the vegetation and areas there. The next picture is Jim's Johansen Park. That would probably be approximately 51 second feet as well. And then when you get down to Merlin-Holson Park, that flow has been diminished or decreased significantly because the water has been routed in the canal to the north. Um, and then that that's where that flows currently, you know, we all see it. There's a couple of young ladies out there having a great time just enjoying the summer day.

1:03:52 – 1:04:04Speaker 17

Maybe maybe flip back and forth between this slide and the upstream and the other ones that you can see the difference between gentle hands and at seven versus the fifty. Yeah, that's right. That's that's the difference that we would be seeing in that one stretch.

1:04:05 – 1:04:44Speaker 7

It's probably I would say similar to what we see in Merlin Alton. Correct. Yep. So the next set of slides just continue on to show a little bit more perspective. Another picture of Merlin Alton Park. There's a picture just west of 200 East. Now one might ask themselves, when you look at Merlin-Holton Park, you see what appears to be more flow. There's ripples, there's little waves and other things like that. When you get just to the west side of 200 East, it becomes quiet, slow moving. It doesn't look rapid, it's smooth. And you would say, well, there's not as much flow there. That's actually not true. It is the same amount of flow at that location.

1:04:44Speaker 9

It's just the conditions of the flow. I'm sorry? The children haven't put rock dams.

1:04:51 – 1:05:03Speaker 11

Can I make a request, Suzanne? On the next set of photos, can you stand in the river so I can get a judge on a hike? No, no, every photo, just stand in the middle so I know how deep it is.

1:05:03Speaker 3

It's hitting on your leg.

1:05:04Speaker 11

No, no, I want pictures of Zan in the river.

1:05:07Speaker 17

Merlin Olsen is often about 8 to 10 inches deep is typically what I've seen. And it's generally between 5 and 7.

1:05:15Speaker 11

So is that knee high for Zan?

1:05:18Speaker 7

I'll be honest with you, it's probably about 4 inches deep. 5 to 7? Yeah, as I watch those kids play in there.

1:05:24Speaker 25

I was going to say, I've been there.

1:05:25Speaker 6

It's really wide there. It has eroded. It's eroded over the last 50 years a lot.

1:05:32Speaker 9

It's about this deep, because that's how much my dog's feet get. So it's up to your dog's knees.

1:05:39Speaker 26

Dog knees. Sorry, Zad. This flow is in St. Myrna and Olson today, approximately? Five.

1:05:46Speaker 17

I measured it last week for four. It was five CFS, like 4.6.

1:05:51Speaker 11

Do you remember that by standing in the river?

1:05:54 – 1:06:22Speaker 7

I stood on the bridge. The picture on the right just gives you an indication just further downstream of the picture in the center is where some additional flow comes off of the Logan and Northern Canal, or excuse me, off of the Crockett Canal and it flows down through a power plant and the mill, the central mill. So that's a return flow. So this is the dynamics of water rights changing the flow up and down as we go down the region.

1:06:22 – 1:06:56Speaker 9

So that brings up one more question. Just one more, probably. Historically, the theater has been cooled by the flow of the canal. I don't know at what CFS that works the most efficiently, but I assume we will be maintaining that level of flow to make that system continue to work efficiently.

1:06:57Speaker 7

That's it. Which theater are we talking about? Ellen Echols.

1:07:00Speaker 9

Echols Theater.

1:07:03Speaker 9

Echols. Echols? Yeah.

1:07:04Speaker 7

Yeah. If they have a water right, an ability to use that, then that would be- Have to provide that. Yeah. There.

1:07:12 – 1:07:31Speaker 26

Paul? My understanding is it would still be maintained. There's actually a pump that pumps it over to Echols and then back on the return load. I don't think- it's fully dependent on a level of it. There's a little stilling basin there that it takes out of. So yes, my understanding it would still be maintained as long as there's water in there.

1:07:33Speaker 7

actually be incorporated into the design of the project. It wouldn't be that difficult to put a loop in and allow it to do what it does now. That's perfectly acceptable.

1:07:43Speaker 9

Yeah, well, we need to maintain that.

1:07:47 – 1:08:03Speaker 17

I think the important question that would come up during the design phase, all of these questions, all of these details, that's where we get into it is in the design phase. And so we would look at, yeah, what's our current level of service, what irrigation company is providing the water, and then we can work on it.

1:08:03 – 1:08:40Speaker 9

Well, I do think that there was some conversation that the EIS set certain limitations on future choices. And so I don't, you know, that's why I'm asking these types of questions because I don't know whether indeed it does set limitations on future choices because you picked X. And maybe Y is part of one of the things you really wanted, but it's not in X. So you can't do it. And I don't know if that's true or not true.

1:08:40 – 1:09:20Speaker 7

Okay. I think, per Kyler's point that he made earlier, I think it was really valid that we created a system here under this alternative that's highly flexible to meet a lot of different needs. Can it meet every need, as Kyler said? There's going to be something out there that's not exactly how it is right now, but the flexibility of the system to continue to serve the needs and the purposes of the project and the community. Again, public comment is weighing in on this, and we've adapted it to address those items in the way that we can underneath the program to continue forward with the project to benefit the community.

1:09:22 – 1:10:51Speaker 7

I would say that. Just a couple more photos if you're interested. These are photos of the fairgrounds. The photo on the left is the actual measurement structure where you would have seen six CFS. And then as you continue further down, you can see the flow, what it looks like there a little further down the stretch in the center. And then just west of Willow Park, you can see the flow there in the river. Those are just some pictorial items to show you what the aesthetics look like, what the potential recreation opportunities look like there, because I know that's been a concern. I will state that we received approximately 550 comments in the final comment period. Let's keep going, Paul. Right there is a summary of the the bigger text indicates the more percentage of comments that were received for the project. So we took all the comments, we split them into 57 different areas, which we respond to. You can see that the top three are the Little Logan flows, the costs, and the Little Logan classification, and then the Great Salt Lake. So per the project, we've outlined a lot of those items and they've been addressed. We have to address all of the comments, either individually or as a group, and most of that work is complete now, getting that done to finalize the environmental impact statement.

1:10:52Speaker 11

Remind me what total estimated cost was?

1:10:55Speaker 7

Total estimated cost is a little over $300 million.

1:10:58Speaker 11

And is that estimated in today's dollars?

1:11:01 – 1:12:00Speaker 7

We actually inflated that for a couple of years because we knew construction dollars and construction wouldn't start for a few more years, so we include some inflation factors on that. One of the things to recognize, I mentioned earlier, the different programs in the project, like flood control is at 100%. Ag water is at 75% and recreation is at 50%. The estimated project match on that total construction cost is about 11%. So about $33 million of the 300 and something million would be the participants or sponsor, co-sponsors cost, as the project is outlined correct now. So about 89% funded. And we are looking at other avenues to find matching funds through the state of Utah that can help with some of the offsets, some of the additional funds as well. $33 million or $30 million is still a significant amount of money.

1:12:00Speaker 25

And what is the, is this split even amongst the sponsors? It would be distributed according to the benefit each is receiving.

1:12:10Speaker 7

So a very simple example is the trails that would be enhanced in Logan would be the 50% cost match would come from Logan City, right? That's a pretty straightforward.

1:12:22Speaker 11

Right. So if we wanted to do that trail on Canyon Road from Center Street to 600 East, we'd be expecting Logan to pay roughly $1.5 million of that. About how much? $1.5 million.

1:12:32Speaker 7

Yeah. You're looking at those costs? Yeah. Right. Okay.

1:12:37Speaker 11

So it's on page two of the one with the grass. Right. I understand. I understand. I'm just...

1:12:44Speaker 17

Theoretically. Russ is pretty good about finding other funds. Other grants.

1:12:50Speaker 6

We could match that grant with another grant.

1:12:54Speaker 17

You can't do federal with federal. It's got to be federal with state, federal with something else, but you can whittle that down.

1:13:02Speaker 7

This is just a summary of the comments and the categories that they came in. Again, this is the top five. You can see what those comments address or what those interests were in those different areas.

1:13:18 – 1:13:46Speaker 17

And I'll just say that because the Little Logan had so many comments, that's why we're making a map. So that should hopefully dispel a lot of the confusion, concern about that. I think it will give a much clearer picture of what's currently happening today and how it could be expected to change just the flow rate. Obviously, the physical characteristics of the Little Logan channel would all remain the same.

1:13:47Speaker 9

But the classification is not our responsibility.

1:13:50Speaker 17

That is not the project's responsibility and it is not the city's responsibility. It's the state. Okay. Good question.

1:13:59Speaker 11

Other questions for Zan and Kyler? If you guys don't have some, I have a couple still.

1:14:08Speaker 11

Ernesto, got anything? Melissa?

1:14:10Speaker 3

I might, but go ahead.

1:14:11 – 1:14:34Speaker 11

Okay. These ones are more financial. You've got a little table on your second paper here that shows the estimated secondary user rates with the connection rate. That's assuming, so this would be the monthly bill to a user at a 50% adoption or 100% adoption, correct? Correct.

1:14:36 – 1:15:01Speaker 17

And the reason we did it, thank you. The reason we did it this way is because the feedback that we got from all of the municipalities was that we're not going to do a mandate. We're not going to make sure we're not going to mandate that everybody who is within that service area is required to connect. If there's a change there, we can assume 100% adoption rate. And if everybody connects on, the cost is shared between more people and everybody has cheaper water.

1:15:02Speaker 11

Does that change the feasibility of the project as a whole? No. OK. Does that change?

1:15:09 – 1:15:20Speaker 17

I guess another way to state that would be that the monthly cost would absorb any of that difference. So the number of people that connect, that is what will absorb the remainder.

1:15:20Speaker 9

Because the infrastructure is still installed.

1:15:23Speaker 11

Yeah. Right. And so that's assuming you're going to install pipes everywhere on this. Yes. Yeah. No one's going to want to live in Logan when you're installing these pipes. Can I be honest?

1:15:30Speaker 17

It's every road in the city. It will be phased. It will be phased.

1:15:34Speaker 11

Yeah, so is Google Fiber. It's still a nightmare.

1:15:36Speaker 17

Yeah, we understand. We understand. What's that?

1:15:39Speaker 11

So it's almost done. Almost.

1:15:41Speaker 3

Let's start this next. Let's do this. We can roll right into this.

1:15:46Speaker 17

Yeah, good question.

1:15:47Speaker 11

This will be so much worse than Google Fiber.

1:15:49 – 1:16:01Speaker 17

The other thing I'll say is that this is riding on the assumption that we don't get any other funding. So if we were to get some other match funding on that, that brings those rates down even more. Sure.

1:16:01 – 1:16:22Speaker 11

So a couple more questions on that. My understanding is that Hyde Park and possibly North Logan already have a mandate for secondary water connections if it's available for new build. I have family along the Wasatch Front that are on secondary water. What is the anticipated schedule that that would be turned on throughout the year?

1:16:22Speaker 17

It would be the same as the irrigation flow we currently have April 15th through September 30th. April 15th?

1:16:28Speaker 11

Yeah. April 15th through September 30th. I believe that's correct.

1:16:32Speaker 17

April 1st. April 1st. How much does that change?

1:16:41Speaker 11

on heavy drought years? Because I know I get family that you know they're like oh we got cut off earlier this year which I understand but I'm just curious.

1:16:48 – 1:17:00Speaker 17

I think it's too hard to say exactly on that. I will say that the benefit that we have is the storage, the lagoons down at the bottom would definitely extend our late season. We would have much less cut off early.

1:17:00Speaker 11

But you'd expect some flexibility on that?

1:17:03Speaker 11

Shut off day out.

1:17:05Speaker 17

Just like any other sector.

1:17:06 – 1:17:23Speaker 11

Do you know, and this is outside your expertise probably, do you know average expected cost to a resident? So if we say, okay, you can have a secondary, what's that going to cost? That's a good question. To get somebody to come out and hook up on? Well, sure. But do we know what that?

1:17:24Speaker 7

The meter connection to the home is included in the project cost. Okay. But the question is how do I get it connected to my sprinkler system?

1:17:32Speaker 11

And that team ranges from 300 up to 5,000.

1:17:35Speaker 17

It's like connecting to Google Fiber. I doubt it would be in the 5,000 range, but it depends on where your sprinkler system starts.

1:17:42Speaker 3

My house it would be.

1:17:46Speaker 11

But it's not included. So with Google Fiber, it's included in your monthly bill. They don't charge you anything to hook up. It would not be included in the monthly bill here.

1:17:54 – 1:18:05Speaker 9

There would be- They charge and we don't do it right then. Like if I decided now after they already came around- I hooked up a few months after they came through and they didn't charge me. Okay.

1:18:05 – 1:18:37Speaker 11

Never noticed that I use Google Fiber. But it's not included in this monthly bill. You'd have to hire an outside company, a sprinkler company to come through and hook up. Okay. This one's more for you, Paul. We're talking, there's been a lot of numbers. We're talking water savings, I don't remember the exact amount, to the culinary system. And then we will have to build out, you have that really basic graph here, which I understand, you know the numbers. We're gonna have to build out less infrastructure for culinary water if this project goes forward.

1:18:39Speaker 26

What's your question?

1:18:40 – 1:19:04Speaker 11

Is that true? Because isn't our base, like we build water flow, we've talked about this, but we build water flow for culinary, not for, I mean, not for fire flow, not for sprinkler systems. Would we in the future actually have to change our minimum storage, our minimum pipe site? Or is that going to be the same because we're building for fire flow, which is always our heaviest possible use?

1:19:05Speaker 26

It's obviously very conceptual at this point. I couldn't tell you which projects or what size.

1:19:10Speaker 11

I understand that.

1:19:11 – 1:19:41Speaker 26

But I would say there is potential for less infrastructure to be required if there's less demand on the system. Now there are three main components, obviously, demand, fire, and storage are what we size the system on. And so that demand component will be reduced. Fire doesn't always dictate, but often does, especially on the smaller pipes in the distribution system. It doesn't always dictate like our storage tanks and our big transmission.

1:19:41Speaker 11

Our storage and transmission are based on fire.

1:19:43 – 1:20:12Speaker 26

That's typically not the driving factor. It's one of the three, but it depends on where you are in the system, whether it be... the supply wells, the storage tanks, or the distribution system, which of those three really drive the day, if you will, or the size. So yes, I think there's potential for reduction in infrastructure to tell you exactly like how much it is. We had to make estimates and say, we think it's this percentage or this amount.

1:20:12Speaker 11

Roughly $600,000 a year, give or take.

1:20:13Speaker 26

It was based off the master plan.

1:20:15 – 1:20:40Speaker 7

It was based off the current master plan. So my... No, we did actually work with the engineering company that was doing the city's master plan during this process and had them evaluate what the capital infrastructure needs would be if this system went in. And they said, basically, you're taken care of right now. You would have to maintain your system, but capital expansion would not necessarily be necessary. That was the outcome of that.

1:20:40Speaker 11

But we don't need a capital expansion for a few decades after what we're doing right now anyway, correct?

1:20:45Speaker 17

It depends. Because right now your summer demand is really high. But if you put the secondary system in, your summer demand goes away and your system is more uniform.

1:20:53Speaker 11

With our canyon road line, we're not going to be close to... Maxing that out in the next.

1:20:58Speaker 26

Not that line down.

1:21:00Speaker 11

Yeah, not that area. Correct.

1:21:02 – 1:21:31Speaker 26

And I'll admit, early on in the project, as they were making these assumptions of future infrastructure costs, those sort of things, I was probably, I don't know, a loud voice for being, I don't know, making less estimated savings. The project identified more in working with the master plan and that sort of thing. And I said, unless I want to assume all of those are accurate, can you back off those estimates a little bit?

1:21:31 – 1:21:42Speaker 11

So you're comfortable with that number in there that I think was $650,000 a year? Yes. I'm going to ask a follow-up question if that's okay.

1:21:43 – 1:22:13Speaker 26

On that $650,000, a big part of that is, Kyler just mentioned summer demand versus winter demand. It's huge. If you look at our winter base flow, I mean, we go up by... you know, exponentially, almost three or four times at least. And majority of our culinary water cost is energy and pumping, and that all happens in the summer. And so that's where a huge part for Logan City, that reduction in cost is. If you can take that peak out, you're likely pumping a lot less, spending less energy.

1:22:14Speaker 11

So we're not drastically reducing infrastructure costs, but we are reducing operations costs.

1:22:18Speaker 26

That's a big part of the annual.

1:22:19Speaker 17

I'm talking about the annual operations costs. And it means less groundwater pumped. Because that's where a lot of the summer supply comes from.

1:22:29Speaker 25

I'm assuming less maintenance as well. It's running less.

1:22:33 – 1:22:45Speaker 11

Which kind of takes me to my next, I don't even know how to answer this question. I have one more. I figured, why not go for 10 o'clock again? This is my last one, I think. I'm kidding. It was sarcastic.

1:22:45Speaker 17

I was in a meeting till 9.45 last night.

1:22:49 – 1:23:02Speaker 11

I'm trying to think how to ask this. Our culinary water rates pay for our water department, right?

1:23:03 – 1:23:37Speaker 11

So what we charge our users for their water pay for our employees and our trucks, but they also pay for the infrastructure. If we're suddenly not getting four times the income in June, July, and August, what does that do to our demand for the employees, but also what does that do to our employee and our rolling stock? How do we run a water department business if we're cutting our revenue? that heavily? This is an internal city question, but I'm curious.

1:23:38Speaker 17

Because it's not the first time it's been brought up.

1:23:41Speaker 26

I don't know that I have a perfect answer other than there would be a reduction in revenue now.

1:23:47Speaker 11

Which would likely to some extent have to result in a rate increase because people are using less.

1:23:53Speaker 26

To some extent? If we maintain the exact same operating costs, yes.

1:23:58Speaker 6

But if you're operating costs are less, you don't need as much revenue.

1:24:02 – 1:24:36Speaker 11

Yeah, but you're still going to have just as many meters that need to be checked and read and just as many pipes that need to be fixed. We're not reducing miles in pipe. That's all digital. What was that? That's all digital anyway. That's all digital anyway. jem and i will do it for us right like there's a lot of work that goes on in maintaining our system and and part of that is not going to go away sure our pumping costs might go down but we suddenly have less revenue but the same employees to maintain the same miles of pipe the same number of connections right and how do we and your question the point you're making is exactly why

1:24:37Speaker 26

I pushed to be less aggressive in those estimates for that reason. They were a lot higher.

1:24:42Speaker 11

Is that rolled into this expected savings?

1:24:45Speaker 26

Yes, and they were adjusted for that reason.

1:24:47Speaker 11

So that is incorporated into what we're expecting to save on cost.

1:24:51Speaker 26

They're estimates, so we don't know exactly what that reduction will be.

1:24:54Speaker 11

Estimates are always accurate.

1:24:56Speaker 26

Always. But yes, that was a huge part of my concern with those estimates and why they were reduced fairly significantly.

1:25:03Speaker 11

So you're going to hate this question publicly. Well, thank you. Do you expect there to probably have to be a change in rates?

1:25:12Speaker 26

For this project?

1:25:13Speaker 11

If this project goes through, do you think water rates would have to go up to cover operating costs in your apartment?

1:25:19Speaker 26

I would have to say I don't know. Okay. That's a valid answer. I don't think I can answer that right now.

1:25:23Speaker 6

That's a valid answer. I'm just curious. We'd have to dig into the fixed and the variable costs and see where some trimming could be done.

1:25:29Speaker 9

Well, plus time. I mean, this is not going to happen tomorrow.

1:25:33Speaker 11

And I understand that. I just know that he's in it every day and I'm not, so... That's okay, that's a valid answer.

1:25:40 – 1:26:15Speaker 7

One comment that I would add to that is, you know, it's important to look at the overall water bill for an individual and what that looks like. To the point of that one graph with the blue and orange line, what that does look like. What does it look like now? We sort of indicate a little higher rate, perhaps, and then as you get down the road, because of the different costs that come up because of capital improvements or other operational costs, that delta gets a difference. So long-term savings, definitely you're going to see that come about with the second system. There's going to be a There's going to be a difference in the beginning.

1:26:15 – 1:26:36Speaker 9

But some of the long-term savings in culinary water allows for, I'll say that G word, growth. So it would also allow us to thoughtfully add to our system with people.

1:26:40Speaker 7

There are children right now.

1:26:43 – 1:27:00Speaker 26

Just one thought, having the infrastructure and the future costs. We have projects come for a variety of reasons. Some of them are growth and they're undersized. A lot of them are just deteriorating infrastructure. And so it's going to happen regardless of that.

1:27:00 – 1:27:17Speaker 11

Yeah, that's why a lot of our costs aren't going to change purely because it's a secondary system. A lot of our capital projects I don't expect to have a water department that's half the size because you still have 150 old pipes all over the place. Agreed. So, good questions.

1:27:17Speaker 25

Other questions from the council?

1:27:19 – 1:27:39Speaker 3

I was just going to ask, this seems like, I mean, a huge expense. Even though, yes, it's not coming from city dollars, it's still our tax dollars because it's federal, right? And so we're still paying for it. $308 million. Plus what's the upkeep every year? It's like $2 million? $2 million.

1:27:40Speaker 7

Approximately five and a half million.

1:27:42Speaker 3

Five and a half million.

1:27:43 – 1:28:39Speaker 7

But that will mostly be paid to the users. I'll put it into context a little bit. If we think about the current water project that the city's undertaking at this point in time, That's about 22,500 feet of pipe being installed at a figure of about $47 million. So four-ish miles? Four miles. This is 120 miles of infrastructure being installed. plus flood control projects to overflow the water from the canals on 1800 North, plus the recreational components as well. So it does feel like a lot of money, but if we think about it on scale compared to what we're familiar with, It's not, it looks big, it feels big because it is big, but relatively the cost is not.

1:28:39 – 1:28:54Speaker 3

And I get that, but I understand it's big, but it's for secondary water. Where we're trying to tell people to save water and plant wise and we live in a desert and all this and we're spending this much for secondary water for people to water their yards.

1:28:55 – 1:29:14Speaker 17

The other perspective I offer is the money has already been allocated to this funding, so there's no turning it back to people. We have an opportunity to take it and bring it here, or we can let it go somewhere else. That's another perspective to consider. Okay.

1:29:14Speaker 3

And am I looking at this map correctly, that it really doesn't affect the east side of Logan?

1:29:19Speaker 6

At least our tax dollars are working here.

1:29:20Speaker 3

And why is that?

1:29:22 – 1:29:34Speaker 7

Because the service area is below that. Yeah, there's a limitation. So currently the Logan Hike Park-Smith Canal or Cache High Line Water Association runs the upper canal that feeds the upper part of the community.

1:29:35Speaker 3

And that's not getting touched.

1:29:37Speaker 7

No. They've got some existing pipelines in place and have some pressurization that you put in, but the hydraulics in that system haven't been changed. Okay.

1:29:45 – 1:30:20Speaker 26

I'll just mention in addition to your question on the four secondary water, that's definitely the majority of it. Agribusiness secondary water is the same amount of water as can be. as public works we're not just water a huge part of that is stormwater and flood control and even though it's not 50 percent or majority of the project uh impact to the city it's a big part of the project we would have to we will have to address and do something for flood control if this project goes through or not this is one way to get it paid for without city money

1:30:20 – 1:31:18Speaker 7

That's a big thing to me. You bring up a really valid point about are there alternative methods to save water and prolong what we're doing rather than building millions of dollars in infrastructure. If we think about it utopianly, that would be great. What's the practicality of that? What does that look like with full city adoption? I ask myself and I don't know the answer, how much would it cost to make that conversion to get the same benefit out of it? I don't know the answer, but it would be an interesting number. It could be more, it could be less. So there's a conversation to be had there that the municipality can look at ways to help conserve water through, Billing rate structures charge more for more demanding water, you know, and that helps people concern.

1:31:18Speaker 17

Metering, everything will be metered. Which, I mean, if we get metering for all the ag users, that's a huge benefit. I think you start to see some conservation there.

1:31:28Speaker 7

They've studied that and do see just the fact of having a meter brings education to the table.

1:31:33Speaker 11

So would all the residential homes be metered? Correct. And they'd be paying for water usage? Every connection would be metered.

1:31:42Speaker 7

Whether it's paid by water usage or not, typical systems just pay a flat rate per month. So that's a consideration, but that's not been determined yet.

1:31:53 – 1:32:32Speaker 17

And I will say there's a big criticism of the project that we haven't looked at demand reduction or water conservation. All of this, I'm going to say it again, all of this is putting in a system that allows those decisions to be made in their proper orders, right? If it's conservation of water, if it's reduction in use, those are decisions that should be made by the entities that own or have water rights. So we are designing a system to be able to take what is currently being done or what state code is for residential connections. All of this is putting in a system that would allow flexible operations into the future that could continue to compound on this infrastructure improvements.

1:32:35Speaker 9

Suzanne, next step.

1:32:37 – 1:33:46Speaker 7

Next step. So we are completing the EIS document at this point in time, responding to all of the comments. Those will be reviewed by the project team and then the final EIS will be prepared and will be presented to NRCS for their signature. So there are a couple of things that take place. There are watershed agreements that the sponsor and co-sponsor enter into that they are supportive of the alternative and moving forward with the project. As we've talked with NRCS about that agreement and what that looks like, Craig has been part of those conversations and been learning about that and trying to understand that a little bit more. The intent is that it shows a commitment to move forward into design with the project. but there's still an off ramp after design is completed. So we're completing the first milestone and then we would request funding to move forward with the second milestone of design. And then after design is complete, agreements are entered into again and then funding for construction can be requested. So we're at step one.

1:33:47Speaker 9

But all of the next two steps are very dependent upon the federal government's ability.

1:33:54 – 1:34:39Speaker 7

Federal government funding that's available. The other thing that we talked about a little earlier was the phasing. of the project. One portion of the project might be ready to move forward sooner than another. So that could be funded. You could ask for funding on the trails. You could ask for funding on the flood control aspects of the project. And so there's different things. You have to design the entire project before you have to do that. You'd ask for design funds for those particular parts or the entire thing. There's some flexibility that you work at as you work with NRCS and the funds. 300 million is a lot of money at one time and so it will be a phased project if it goes forward. It'll have to be.

1:34:41Speaker 11

Two short questions. If everything went smoothly, what's your estimated total timeline for the project?

1:34:49Speaker 7

We're figuring probably a 10-year construction window.

1:34:54Speaker 11

10 years to construct?

1:34:56Speaker 7

Or done in 10 years? We would be done in probably, I'm going to say 13 to 15 years. It's three to five years. Three years probably to get the designs ready to go.

1:35:05 – 1:35:34Speaker 11

Is that 13 years of digging up our roads to put in pipes? Different phases. I'm just teasing. Just in line with Google Live. This is maybe a naive question. What is our role as a council? I get asked all the time, are you supporting this project? Do you not support this project? Where do you feel on it? And honestly, I don't even, my understanding is I don't have a vote anytime soon. We get updates occasionally, but what's my, what is the council's role going forward?

1:35:34 – 1:35:52Speaker 26

Yeah, I would say, and maybe Rich can help me here to make sure, but When it comes time to sign financial agreements for construction or phasing or our commitment on the match, council's role would be to allocate that money to this project.

1:35:53 – 1:36:04Speaker 11

If we love this project, can we push it through faster as a council? And if we hate this project, do we have any way to change that? That's a blunt way to ask the question of, because I get asked all the time.

1:36:05 – 1:36:22Speaker 26

I don't know about pushing through faster. I think that's going to be dependent on federal funding and applications there and our support of that. Second part to slow it down or whatever it was, it would be that allocation of funds, I would say. So did not fund it? we wouldn't have the match money.

1:36:22Speaker 11

And when you say fund it, you're talking the portions that require a match.

1:36:26 – 1:36:37Speaker 11

So the trails and the, but regardless, hypothetically, portions of this project that are 100% funded by the NRCS could go forward with or without any council input.

1:36:38Speaker 26

I believe council would need to accept that grant and appropriate that money still, even if it's just a grant. 100% grant without...

1:36:48Speaker 11

I mean, but it's not coming into the city to construct it. Was that Rich?

1:36:51Speaker 16

I don't know that we're receiving the grant.

1:36:54Speaker 11

I say the grant's not coming to us.

1:36:56Speaker 16

That's true. Yeah. So... But whatever part that we play...

1:37:01Speaker 11

So the only part we really play is whether we require our users to hook up and whether we want to fund portions of the project that require a match from the city.

1:37:08Speaker 9

And whether we allow them to dig up a hundred and some miles of road.

1:37:11 – 1:37:32Speaker 11

A public driveway, yep. So we could say, no, you can't take up our roads and foot pipes. I'm just asking. I'm not saying I'm going to say that. I'm just asking. I get asked from people all the time, why are you guys supporting this question, that question? And every time I literally go, well, I've never voted or signed on any. I don't understand, actually, what the council's role in this project at this point is.

1:37:32Speaker 9

Well, Logan City is just a partner.

1:37:35Speaker 11

It's a co-sponsor.

1:37:36 – 1:38:09Speaker 9

Yeah. Sure. It's a partner in the project that Now this is me speaking as a Water District person, so I'm trying to interpret it that way. My understanding was that all of the partners have agreed that the project that is sponsored by Crockett, as probably the major motivator of all of this, is appropriate for their different municipalities.

1:38:09Speaker 11

So did the council vote on that before I was on the council at some point? No. Or did the city just?

1:38:15Speaker 11

How do we become a co-sponsor? How did that happen?

1:38:21Speaker 25

Who signed that paper?

1:38:21Speaker 11

That was years ago. Well, I'm just curious.

1:38:23Speaker 26

And when the project started, we had a cost in that. Each sponsor.

1:38:27Speaker 11

OK, so at some point, the council didn't.

1:38:29Speaker 26

When we started the initial study with Crocodile, the new company, yes, we had a cost. I shared a cost in that study.

1:38:36Speaker 11

Make sure, Theresa, that you get it on the record that Mike has no idea what he's doing up here.

1:38:44 – 1:39:12Speaker 7

I think one thing that I would. Thank you. If you want to understand a little bit of the obligation um if if you do construct the trail there's an obligation to maintain it and keep it up if you do build the overflow infrastructure and a portion of that's within your municipality that's the responsibility of either the individual entity or agreements of combined entities yeah that's yet to be determined and i think it's a great discussion to have as we get into the details and that's more during the design part but for example

1:39:14 – 1:39:52Speaker 9

The Crockett Irrigation Company has determined that the diversion is a critical component to their operations. So they are moving forward trying to secure money to do that piece of this giant thing. So we could pick out pieces after this is all signed and available and they sort of, is it true that it just unlocks potential federal money for us to acquire to do the pieces?

1:39:53 – 1:40:07Speaker 7

Yes. It's the first, it's the requirement you have to go to the next step. Okay. You've got to have an approved EIS. Before you can do it again. Before you can request design funds. It has to be. And before you can build it with federal money. Correct, yes. Okay. Yeah, for sure.

1:40:08Speaker 11

So did that help? It did.

1:40:10Speaker 11

Any other questions from the council after the longest mayor staff report that this group has ever seen? This is the longest ever.

1:40:15Speaker 3

So are we allowed to just email you more questions and.

1:40:17Speaker 11

I've got some for me as well.

1:40:18Speaker 3

Yeah, you've gotten some for me. I have a few more. I'm sorry.

1:40:23Speaker 11

It's still your mayor and staff report.

1:40:25Speaker 6

You've answered all my questions. Thank you.

1:40:27 – 1:40:38Speaker 25

Last question. Given all the cuts we've seen from the federal government for grants and other programs, what is the risk that the money will not be there?

1:40:39Speaker 3

What's the risk? What's your confidence that we're going to have the money to see this project through?

1:40:44 – 1:41:15Speaker 17

That's a great question. And that's why people are starting to diversify and look at some other funding options. And take the pieces that are the most important and get those through. because there is the time of this too i mean it's been a long process and these guys have been going to see conversions happen for 10 years so they're saying let's go after some other funding opportunities maybe it's not as good a cost match but we're going to get it pushed through faster so we're going to go after it so any of those pieces could be sectioned off and done separately we've been after everything's approved

1:41:19 – 1:41:36Speaker 7

We've been in communication with the city's funding team to talk about specifics related to the benefits we talked about today and how to leverage that and be able to receive more grant dollars or other ways because exactly we would exhaust the program if we funded this whole thing at once so we're diversifying.

1:41:36Speaker 11

I think that's everything. Thank you both. I'm sure you'll get emails from all of us.

1:41:46Speaker 6

That's it for my mayor and staff reports. Seven o'clock?

1:41:52 – 1:42:14Speaker 11

How are we doing on our timeline? Oh, we're only an hour behind. Sorry, Teresa. She does her best. Yeah, we're an hour behind schedule. Okay, we're going to move on with our agenda. Thank you, everyone, who was waiting for other items that we'll now get to for being patient. Planning Commission update, Councilwoman Simmons.

1:42:14 – 1:42:37Speaker 9

Their last Planning Commission, there is a rezone that we will hear later. So I won't go into that. The only other thing that is kind of interesting is where the old Wendy's is on Main Street between 10th and 14th North will now be a Chase Bank. It's gonna be torn down and a Chase Bank will be built there. That's it.

1:42:38Speaker 11

Okay. Do we have any short brief council announcements from everyone on the council?

1:42:43Speaker 9

Oh, let's save it for another time.

1:42:46Speaker 11

Perfect. That sounds wonderful. You too? Any council announcements before I move on?

1:42:52 – 1:43:13Speaker 25

I don't remember levels. I mean, just quick, maybe exciting announcements there. The EV chargers that were planned for the gym wall plus, I understand that they are about to or ready to be used. And I believe that there will be a level three charger in that location. Don't quote me on that.

1:43:15Speaker 25

Fast one. Fast one, yes. Fast one, yes.

1:43:18Speaker 11

I thought he said level three, briefly. Level three.

1:43:24 – 1:43:44Speaker 25

And then the mural that is by the arch on that building is coming along pretty good. Looks nice. Will be done probably in the next week or two. Yeah, some other art work coming to the bus stations. If you guys remember, we approved that as part of the CDBG grants.

1:43:44 – 1:44:03Speaker 11

Thank you Ernesto. We're gonna try to keep moving if that's okay. Our first item is Mr. Mark Montgomery from Logan, light and power. You want to give us a brief? Everyone had a chance to meet with Mark, correct?

1:44:04Speaker 11

Okay, so hopefully we made you wait an extra hour again another time. I'm sorry. It's just my luck.

1:44:11Speaker 9

I never fail.

1:44:11Speaker 16

The only thing I would add is

1:44:19 – 1:44:48Speaker 18

When we spoke, we talked about, especially Ernesto and Katie talked about, they were worried that on the special event fee that some were planning this fall that maybe We did put some language, if you were able to look in the rain, that kind of said, hey, if you've already signed up, this is grandfathered till December 33rd. Cool.

1:44:50Speaker 11

Will you give a brief 60-second rundown for the public, since this is a public hearing?

1:44:56Speaker 18

Would you like me to go through my little slide deck?

1:44:58Speaker 11

Can you do it in 60 seconds? Go for it.

1:45:02Speaker 12

Now run through your slide deck.

1:45:04Speaker 5

OK. I'll do it fast.

1:45:09Speaker 11

I just feel bad that we're always so far behind schedule recently.

1:45:14Speaker 6

No one to blame, but. Did I ask every single question? No.

1:45:27Speaker 25

Don't blame that on us.

1:45:29Speaker 11

It was a team effort.

1:45:30 – 1:46:22Speaker 18

There's kind of three, and we discussed this, there are three material changes kind of in the rate booklet as it were. One is the rates, and you'll see that most of those rates are adjusted by fractions of pennies. We've added a special event rate, and to this point, Logan City Power has been doing events for free. And we met with the special events committee and decided to come up with this rate. The third thing is the power prop adjuster, which really isn't much different than the electric surcharge we had before. Other than this has maybe a few extra guardrails and checks in it that the previous version did not have. You can see the rates on the markup. I did make a note here that if we take the average amount of energy that a home uses, their bill will increase about $2.90 a month.

1:46:23Speaker 11

What's the average homes bill typically?

1:46:26Speaker 18

Probably 600 to 700 kilowatt hours.

1:46:28Speaker 11

And what does that look like for numbers? I know my electric bill costs. I don't have any idea how many kilowatt hours I use.

1:46:35 – 1:46:59Speaker 18

Probably 70, $70-ish. It'll go up to 90. Okay. Special event rate... You guys have seen this. If it's a permanent pallet like we have mounted down on Center Street, $70 on the bed for two days. And if it's one that we have to take out, physically set up, open up a transformer, plug it in, get it set up for the event, then it's going to be $250 per bed.

1:47:00Speaker 25

And for those that may need just one day, there's no one-day rate?

1:47:04 – 1:48:12Speaker 18

No, that just covers two days of setting up. Because it costs us the same to roll a truck and guys and open a transformer and all that stuff. And then this is just that paragraph that kind of says, hey, if you've already signed up for a special event, it's kind of grandfathered until December 31st. Kind of grandfathered. So these fees will be delayed if you've got something planned this fall. I threw up this. There were some questions as to what other cities were doing. It's kind of all over the board. Provo City charges $300, and that's not really a special event rate. That is just their temporary hookup fee. of which we don't actually have a temporary hookup fee. So essentially this becomes that temporary hookup fee. Hiram charges $75. They're kind of in the same boat as Provo City. I called the Hiram director to get this information from him and he said, I've never done it. All this stuff happens in Logan. And then Lehigh is kind of similar, I guess, $80 to set it up. And then if they have manpower on site, it's $150 per hour labor to make the connections and do all the stuff.

1:48:12Speaker 3

What are we calling ours again? Not a setup fee.

1:48:14Speaker 18

It's a special event.

1:48:15Speaker 3

Special event. Special event fee.

1:48:17Speaker 9

But all of those, I mean, except Lehigh, Hiram and Murray and Bountiful and Brigham, they're all on...

1:48:25 – 1:48:38Speaker 18

No, Murray, Bountiful, Brigham are all municipally owned. So they have no charge which is basically what we are now, unless this event rate passes.

1:48:39 – 1:48:56Speaker 6

Having run special events, it would be fairly easy to charge those that are using power to cover this cost. Because we know who's using it, those that are going to use power, their booth charge would just be, I'm just saying this is what I would do. Right.

1:48:56Speaker 18

We just don't usually have a meter, right, on those temporary hookups.

1:49:01Speaker 6

Yeah, that makes sense. So running events, I find it reasonable. And that's a charge you can pass on to those that are consuming. Something about faster meetings? Yeah.

1:49:11Speaker 23

I'm just saying.

1:49:12Speaker 6

Just trying to clarify. I'm just teasing.

1:49:17 – 1:50:40Speaker 18

Okay. Sorry. Did we finish? Keep going. I'm standing by 60 seconds. PCA power cost adjuster. Currently our system is that if we are short what we budgeted, we just pass on those costs the next billing period by spreading that dollar amount over the kilowatt hours. This is essentially the same thing other than it says we can't really do more than three cents per kilowatt hour without getting permission from someone. Three cents additional. Right. So say if you're a resident, your first level is 10 cents a kilowatt hour, we can go up to 13 cents. If we need to go more than that, we need to talk to the mayor. And if we need to really get up in there, we need to talk to city council. Also, there hasn't been a mechanism in this rate to if we think we can catch it in a month and we don't want to go talk to the mayor to get to four and a half cents we can defer that balance to the next month and just add two cents or whatever we think it'll be so that we can try and catch that right now we don't have the ability to do that we just have to do it the next month period so there is code that would stop you from doing that pardon currently the code says that No, we just do it.

1:50:42Speaker 25

So you're choosing right now to just do it on the following month?

1:50:45 – 1:51:28Speaker 18

Right. Right now, we do not do that. If we're short, we charge it on the next month. And if we're short again, we charge it on this month. This is saying, if we're really short, but we think we're going to catch it, we'll defer that balance and not make it quite so heavy on the next month's billing. um i i looked into other cities some of them have no power cost adjuster in place but they're working quickly to get them because this has cost them millions when power gets kind of wonky the rest do it very similar to the way logan is now i didn't find anybody that kind of puts a guardrail in and says hey if it's got to go over this amount we need to go talk to the mayor this is the council nobody does that they just do it the way we're doing it right now

1:51:30Speaker 3

But we're adding the garden.

1:51:31 – 1:51:45Speaker 18

We're adding that a little bit so that council and mayor are aware of, maybe more aware of what maybe is going on in power costs. And that would be the extent of my remaining slideshow.

1:51:48 – 1:52:21Speaker 16

Thank you, Mark. Thank you. On the resolution, it does say for utility bills billed after September 1st, just to make sure council's aware of that, that could include usage for the month of August, including usage prior to today, up till today, and through the end of the month. We bill weekly, so the first bills in September would likely be nearly four weeks worth of August usage, and then it decreases from there. So just keep that in mind as you contemplate this rate.

1:52:23Speaker 11

But we could change the resolution to change that date.

1:52:25Speaker 16

You could, and that's why we're on it. If you decide. If you decide.

1:52:35 – 1:53:05Speaker 11

um is the council okay if i open public hearing yeah okay this is a public hearing anyone from the audience who would like to speak on resolution 26-27 so i'm going to come to the microphone state your name city of residence and please take three minutes or less that's why i often make eye contact with everyone and see nobody looking anxious uh seeing no one i'll close the public hearing and bring it back to the council for further discussion or A motion or questions for Mark before he wanders too far.

1:53:05Speaker 3

Mark doesn't want any questions. Mark's leaving.

1:53:08Speaker 11

He expects us to.

1:53:09Speaker 9

I will move we approve resolution 26-27. I will second.

1:53:15Speaker 11

Are you okay with that September date?

1:53:24Speaker 11

Ernesto, are you okay with that second date, September date?

1:53:28Speaker 25

Sorry, you're contemplating just pushing everything to start.

1:53:33Speaker 11

It is not something I caught before.

1:53:36Speaker 3

Is that something you what?

1:53:38Speaker 11

Caught before that moment.

1:53:39Speaker 3

Oh, caught before. No, I didn't either.

1:53:40Speaker 11

I know. OK. We can have a discussion before a vote is called. Correct, Rich? I mean, Craig?

1:53:49Speaker 11

We have a motion and a second, but we can still have a discussion.

1:53:57Speaker 11

Rich? Since you brought this up, how far back is someone possibly getting back-billed on a rate changer?

1:54:11Speaker 11

Up to four weeks.

1:54:12 – 1:54:27Speaker 16

So the first bills in September would be nearly four weeks worth of usage. Just depends on the rate dates, but more likely four weeks of usage in August, half of which occurs after today, roughly.

1:54:27Speaker 11

Mark, if we pushed it back to October 1st, what would that do? Are there any...

1:54:37Speaker 25

I thought you had research.

1:54:40Speaker 11

Do you foresee any issues of pushing it back?

1:54:46 – 1:54:57Speaker 11

Okay. We do have a motion and a second. So all in favor of approving resolution 26-27 as written and presented, please say aye.

1:54:58Speaker 11

Any opposed? Nay. Nay. So the motion fails. Told you guys we should have some tutus tonight since Katie's gone. Here we go.

1:55:08Speaker 25

I move we approve the resolution with changing the date to be effective on October 1st.

1:55:16Speaker 17

We have a motion.

1:55:23Speaker 3

I'm fine with that. I'll second it.

1:55:25 – 1:56:24Speaker 11

We have a motion and a second. Mark, are you okay with that date? Does that feel, do you want a different date that makes us comfortable? Do you want November 1st? I'm sorry. I should have caught that before. Okay. All in favor of approving? Craig, do I need to just state the date? Do I need to state the line it's on? Can we just state it with the date? the motion change yeah amending the date the effective date october 1st to october 1st okay all those in favor approving resolution 26-27 with an amendment to approve the date to move the date to october 1st 2026 please say aye aye any opposed motion 2627 passes with an amended date sorry mark sorry to make you wait forever always we'll try to put you first on the agenda again next time Our next resolution is resolution 2602 with our library director, Michael.

1:56:26 – 1:57:31Speaker 15

I'm going to keep this as short as possible. So just kind of as a reminder, last fall I investigated the origin of our current non-resident fee of $163 a year for use at the library. It is based on a 20 plus year old formula that I don't believe is sustainable. So I worked with our library board who passed an update to our policies which would move our non-resident rate to the fiscal year instead of from the year of purchase to allow for month-to-month purchases and to lower the annual cost from $163 to $125 which is based on the average property tax paid to users, which is what we've been telling people the number was based on, even though that was incorrect. The board has since implemented the fiscal year and the month-to-month purchasing, since that does not involve any dollar amount. So at the moment, we are pending your vote on our proposal to lower the annual fee from $163 to $125.

1:57:33Speaker 25

Plus the $10 transit.

1:57:35Speaker 15

Oh, that's right. Yes, plus the $10 transit. It's been six months.

1:57:38Speaker 11

If we hypothetically approve this tonight.

1:57:44Speaker 11

How many cards have you sold since July 1st that were paid?

1:57:48Speaker 15

I do not have that number.

1:57:50Speaker 11

Would we be refunding those users the difference in their card rate, or is it just...

1:57:55Speaker 15

The board would just be the day we implemented the changes. Okay. Because how far back... Well, because it says beginning July 1st, 2026. That was written in February. I know it was written. So, yes.

1:58:05Speaker 11

Do we need to amend that?

1:58:07Speaker 15

You would probably want to amend that.

1:58:08Speaker 9

If you implemented month by month, you're only talking about one month.

1:58:13Speaker 11

Two months, July and August.

1:58:19Speaker 15

All we've been doing is allowing people, instead of buying three or 12 months, we've been saying, do you want to buy two months? Do you want to buy? We just prorated them. Oh, I got you.

1:58:28Speaker 25

Yeah. Were you still charging the $10?

1:58:31Speaker 15

No, no, that was not.

1:58:34 – 1:59:01Speaker 11

If I remember correctly, I think a big part of our debate hinged on whether we felt like We can get numbers from anywhere sometimes to some extent, right? Are we comfortable with $125 being the expected average cost to a Logan resident? And there was some debate about whether that is the average cost the Logan resident pays, because that's hard to calculate. You're confident in the $125?

1:59:01Speaker 15

I like that number.

1:59:04Speaker 11

Rich, are you confident in $125 as an average rate? I'm not trying to cause an argument here. Sure.

1:59:15Speaker 3

What do you say the average rate to the Logan taxpayer is for a library card?

1:59:21Speaker 16

It's the, it's not the cost. Logan City is taxed. So you can't compare a tax with a charge of service.

1:59:30Speaker 3

What is the taxpayer paying? What is the average house paying? Because every house is paying a certain amount for a library.

1:59:38 – 1:59:51Speaker 16

The average house pays $125. but half the houses don't use the service. So the cost of service, so you can, I'm confident that the tax is $125 per home.

1:59:51Speaker 11

Is that including commercial?

1:59:55Speaker 16

It's the cost per home. Okay. So the benefit of commercial is rolled into the cost per user.

2:00:03 – 2:00:20Speaker 16

So the tax is $125 on the average home and book. That is absolutely true. The cost In order to get to the cost per user or the cost per household, take the total cost of providing the library divided by the number of households gives you that figure. And that figure is roughly 280.

2:00:22Speaker 11

For those who are using the library.

2:00:24Speaker 9

For those that are using it. But everybody's paying the 125.

2:00:31 – 2:00:52Speaker 11

Right. But a lot of people pay it, don't use it. But if everyone used it, we wouldn't be able to do it for 125 is what you're saying. but you do feel like we are charging roughly 125 to every household on average.

2:00:53Speaker 16

That is absolutely correct.

2:00:55Speaker 11

Absolutely correct. There are a lot of roughlies in averaging.

2:00:59 – 2:01:28Speaker 16

It's just you can't conflate the two together. You can't talk about cost and conflate it to property tax. It does not work. Sure. Right. You can decide to charge whatever you want, But those two concepts are different. The cost per home is $125. The cost per household, $280. Use of household, right?

2:01:28Speaker 11

Yes, per household that uses that car.

2:01:30Speaker 16

Cost per household based on usage is $280.

2:01:38Speaker 11

Well, counsel, this was continue. Oh, sorry.

2:01:40Speaker 16

Can I just add one thing? That also was only operational cost.

2:01:44Speaker 16

That's not capital. The $20 million that the library cost roughly is not included in that 280. If you do that, then it's something much greater.

2:01:53 – 2:02:22Speaker 11

I thought it was free to go to the library. You paid your ten cents. This would continue without a public hearing council. So questions, comments, discussion, or motions. And we could, Craig, stop me if I'm doing illegal things again. We can pick a number too, to some extent. The library board recommended 125, it was 163. We could.

2:02:27Speaker 17

You can't pick any number.

2:02:29Speaker 11

Well. It's got to be something that offsets. 1,000. Right. But we can say 140 if we wanted to complicate everything.

2:02:38 – 2:02:53Speaker 3

What happens though, this was a question at library board yesterday is we were asking like if we set another number like 140, does it go back to library board to approve or is that the standing? The fees are set by the council. The fees are set by the council. Just saying. Okay.

2:02:53Speaker 11

283? Uh-huh. I can make a connection. Don't worry.

2:02:58Speaker 3

And the $10 is just when they first sign up. They don't get that charge. It's a renew it.

2:03:04 – 2:03:23Speaker 15

The discussion with the board was the $10 was to encourage people to buy longer cards. So instead of being like, I'm going to buy a month and then buy another month and then buy another month, that would be like an extra 30 bucks. So the idea is to encourage people to buy that longer card through the end of the fiscal year. And reduce staff time. And they buy one. Yeah.

2:03:24Speaker 3

So it's $10 each time.

2:03:25Speaker 15

It's $10 per transaction for purchasing a car.

2:03:29Speaker 3

So if they're paying monthly, they're paying $10.

2:03:31Speaker 15

Yeah, they would be paying.

2:03:37Speaker 15

That was an attempt to kind of address Rich's concerns.

2:03:47Speaker 3

It comes close. So they are charged yearly though, they're charged $135 essentially because of the tax value.

2:03:56 – 2:04:22Speaker 25

Okay. Can you remind us, was there something aside from being more accurate with the amount that was being communicated to people that was costing the people of Logan? Was there another reason why the board recommended lowering the fee?

2:04:23 – 2:05:35Speaker 15

From the research I've done, the 163 that we're charging now is one of the highest annual fees for a non-resident card in the country. There's a couple others that reach like 200 something, but it's like LA. Super, super large. Kind of a comparison with other libraries in the Valley. It just, to me, the existing formula is kind of based on cost per circulation. But the problem is, is as the circulation goes up, the cost goes down, and eventually you reach zero. Or if circulation goes down, then the cost reaches infinite. And so just kind of picking that number that is the average taxpayer cost is paying this, which to me seems the fairest of all of the options. Although I understand Rich's argument, but to charge $280 would literally make us the most expensive non-residential library in the country that I've found. And then nobody would buy it. So then usage would go down. And as a librarian, yes, I understand the taxpayers support it, but more usage is better. It just supports everything that we do.

2:05:35Speaker 11

Except for on the digital side.

2:05:38Speaker 11

Except for on the digital side.

2:05:42Speaker 15

Maybe. We don't know that. We can assume digital usage will go up, but I have no way to predict how much. Sure.

2:05:47Speaker 11

It's a pleasure to counsel.

2:05:57 – 2:06:19Speaker 9

Well, considering the fact that they didn't close the county library, and considering the fact that I do believe that the board spent time thinking this through, and although I do understand Rich's I would move approval of resolution 26-02 as written. We have a motion.

2:06:40 – 2:07:11Speaker 3

My biggest being, to be honest, that I struggle with is charging the same amount that our taxpayers pay. I would rather it be a little bit more for non-residents because, I mean, they're the ones, I mean, everybody voted. That would be the transaction fee. Yeah, and that's the transaction fee. And so I appreciate that being in there. And so that's why, and if that is charged every year, that's where I was kind of like not sure on if that was charged every year. And if it is, then... Yeah.

2:07:11Speaker 25

Do you have an amount in mind?

2:07:13Speaker 3

Well, it's $10. No, but I mean... An amount you're comfortable paying.

2:07:17Speaker 11

We're going to make a number up.

2:07:18 – 2:07:35Speaker 3

No, no, I wasn't going to make a number up. This is what I'm thinking is because that $10 is in there, then that's showing that they are charging $10 more. I mean, it's minimal, but yeah, it makes me comfortable enough, I believe.

2:07:37 – 2:08:01Speaker 25

Generally speaking, I'd say I could be supportive of lowering it to the 125 plus the transaction fee, mainly because I feel non-Logan residents still contribute to Logan in various ways, but in one main way, tax sales, which is a huge part of our budget.

2:08:02Speaker 11

Do sales tax fund the library at all?

2:08:04 – 2:08:24Speaker 16

No, not at all. But it brings them in. One thing to add, I apologize, I should have added this earlier. That 125 was calculated prior to the tax increase we just passed. We didn't pass any tax increase on the library portion, so that part is still relatively accurate.

2:08:25Speaker 15

And the board is willing to adjust as taxes fluctuate like annual or something like that.

2:08:33Speaker 25

Rich, do you have an estimate of what it would be now?

2:08:38Speaker 16

I don't. It's negligible.

2:08:39Speaker 11

It's going to be a couple bucks difference, max.

2:08:44Speaker 16

Because the tax increase doesn't apply to the library levy, but if you were to do it another time,

2:08:50Speaker 11

So we do still have a motion pending with no second. The motion can die if there's not a second, which is an acceptable path forward.

2:09:00Speaker 3

I don't want it to die.

2:09:05Speaker 11

So the motion, it's going to be a fun night. Does that motion die then? Is that the procedure? No second, yes. Thank you. No second?

2:09:13 – 2:09:27Speaker 25

I haven't received any emails or calls regarding people opposed to making this change. So I will second the motion.

2:09:27Speaker 17

Okay. The motion just died. So I'm going to have Jeannie make the motion again and then second.

2:09:32Speaker 3

What's her time limit?

2:09:33Speaker 11

Well, I said the motion had died because I'm sorry.

2:09:36Speaker 9

I move we approve resolution 2602 as written.

2:09:42 – 2:09:57Speaker 11

We have a motion. And we have a second. Is there any further discussion before I call it up? Okay. All in favor of approving Resolution 26-02 as presented, please say aye.

2:09:58Speaker 11

Any opposed? Nay. You are an aye, Melissa?

2:10:02Speaker 11

Motion carries 3-1. Thank you.

2:10:06Speaker 16

Thank you, Michael.

2:10:06Speaker 11

Appreciate your time and coming back six months later and waiting two hours for us. Mr. Hawley, 26-14. Mr. Chair, thank you.

2:10:19 – 2:16:09Speaker 14

quick thank you for waiting as well you bet quick recap and update so again in 2023 logan city adopted our current wetland code prior to that logan city had no setbacks to wetlands wetlands themselves are under the federal jurisdiction. So they fall under the Army Corps of Engineers. They have an office in Bountiful. So if a wetlands delineated, let's say it's a quarter acre, that quarter acre is under federal jurisdiction. The Army Corps allows a couple of options. One can go through a permitting process to fill a tenth of that acre. or excuse me, a tenth of an acre of the delineated wetland. Or you can go through a mitigation process which essentially fills the wetland in and replaces it in a watershed, the same watershed. That replacement could be outside the City of Logan. or it could be nearby. Now that does require extra costs because you have to purchase additional land and sometimes it's a larger square footage, but CORE does allow mitigation or filling of wetlands. No other city in the Valley has wetland setbacks. They all have zero setback to wetlands. The changes that we looked at or most recently changed. So I talked to the four of you as well as Katie via email. We made some adjustments based on what you wanted me to change and increased setbacks to streets from 25 to 35. which would mean a sidewalk would sit at 25 feet because the measurement is to the curb, and when you account for the park strip and the sidewalk, that's about 10 feet. The other setbacks in these types of projects remained as is, and this has been an evolution as it went through Planning Commission. They tried to break up some of the setbacks and change them for public versus private, and then we've changed them based on our first meetings. So the setbacks to things like trails, landscaping would be 15 feet, setbacks to things like commercial buildings, 50 feet, and then parking lots, 50 feet. Public and recreation, 15 feet to trails. Landscaping, just like the other except for this one, carves out a new category for things like restrooms, pavilions. Any building that's less than 1,200 square feet, 25-foot setback. Same setbacks for larger buildings and parking lots and same setbacks for streets and sidewalks. This exempts boardwalks. through and in and around wetlands. And then one of the other changes was to single family residential lots. This now shows a increased setback of 35 feet to a new lot line, which would put a house at approximately 45 43 feet away depending on if it's a side or rear yard setback streets again would be the same sorry this is wrong thank you i forgot to change that slide that is wrong that should be 45 okay put to that home 45 for the home but 35 because it's 35 to the lot line correct 35 to the lot line side setback but the back setback is bigger the back set looks 10 and the side setbacks eight so it could be 43 to the house if it's a side or 45 that's the back okay okay so again i'm trying to strike a balance between being too restrictive which could result in developers not developing going to another city and developing or it could result in more mitigation and filling in a wetland and then not even worrying about setbacks between the other flip side which is a valid argument too is setbacks will likely improve the health of that wetland of the function of that wetland. If you build a building or a parking lot at zero setback, there's going to be impacts to that wetland, negative impacts. If you have a buffer around it, it's likely going to improve the health of the wetland, which I think is important. The changes also better define when a delineation is required. So the city can look at this map and require a developer to perform a delineation prior to a permitting or review process. It also changes the previous blanket 50 foot setback with a 20% disturbance allowance within that setback to a new 10 foot do not disturb immediately around the delineation. So that 10 foot, you just don't disturb that.

2:16:09 – 2:16:43Speaker 11

Can I ask a clarifying question on that? You bet. Can they disturb anything outside of that 10 feet during construction? Right. So right now they can disturb 20%. Yeah. We're changing that to whatever the number becomes with a 10 foot do not disturb. But the other 15 to 40 feet. 15 to 50 feet? Yes, they could. Well, it would be 15 to 40 because minus the 10. Okay. Yeah. So that other, can they disturb 100% of it? Or are we keeping any sort of 20 or 30 or 10% disturbance allowed?

2:16:47 – 2:17:06Speaker 14

uh they can disturb based on these categories so if they're building trails they can disturb to the 15-foot line but currently it's 50 feet but they can disturb it during construction but only 20 of it correct

2:17:09 – 2:17:32Speaker 11

Yes. If we pass this as it's written now, someone's going to build a house, they have the 35-foot line to the lot, 45 to the back of the house with a 10-foot no disturbance, does that mean the additional 25, is that the right math I'm doing, in that wetland, they could disturb 100% of that during construction? Will it be 25 to the top?

2:17:32Speaker 14

No, because in that case, a lot line isn't requiring construction.

2:17:38 – 2:17:50Speaker 11

Okay, a commercial building that's at 50 feet. So commercial buildings at 50 feet, then no disturbance lines at 10 feet. Can they disturb 100% of that 40 foot difference during construction as currently written?

2:17:53 – 2:18:41Speaker 14

Potentially they could. So yes. When the project's finished, the building's at 50 feet, the landscaping might be between you know 40 and 10 or the storm water or the trails that they build or things like that so you can put landscaping inside the 40 that 50 foot buffer yeah the landscaping can be in this 15 foot buffer okay i don't know if i need that so yeah the setback can be disturbed you can put landscaping in it too yeah just only for 80 percent of it And that's typical of a normal development when you go to build a house. You're digging up the foundation. You're doing all this stuff. And then when you put it back together, the house sits outside of the setback.

2:18:42Speaker 11

But you could landscape currently 80% of that 50-foot setback.

2:18:50 – 2:19:01Speaker 14

I'm not sure about 80%, but you can landscape or do these other improvements up to 15 feet or within 15 feet of the delineation line.

2:19:02Speaker 11

Sorry, I'm talking about the code as it's written right now? Right now. Right now it's a 50-foot line, but you could landscape 80% of it because that's a 20% no disturbance.

2:19:12 – 2:19:25Speaker 14

Yes. Or you could disturb a section that gets within one foot of the wetland because it's a linear disturbance.

2:19:25Speaker 3

Now we're making it a 10 foot.

2:19:28Speaker 14

Do not disturb.

2:19:29Speaker 3

Do not disturb from that wetland.

2:19:31Speaker 3

That's what this is proposing.

2:19:32 – 2:20:01Speaker 14

Now there are a couple of exceptions to that. So if they file for that 10th of an acre wetland disturbance or allowance that Do Not Disturb would align with that. But in general, Do Not Disturb means don't even go in there during construction. And it requires a temporary fence around its signage that says Do Not Disturb this area.

2:20:01Speaker 11

I don't know if I realize that you could landscape 80% of your wetland buffer right now.

2:20:08 – 2:20:47Speaker 14

in my mind it was buffered like it was left alone yeah with the smaller setback at 15 feet yeah it'd be common for them to disturb that build a building and then re-landscape it after the project's complete that is landscaping which will contribute to the habitat and benefit of the wetland because that landscaping will have a minimum tree and shrub count And it will also be softscape, so it's not, you know, running stormwater or pollution into the wetland. Hopefully. Hopefully.

2:20:48Speaker 11

Okay. Thank you for the clarification.

2:20:50 – 2:21:05Speaker 14

Trails will have a little bit of runoff, but in general that softscape will have less impact versus hard development. Sure. I shouldn't realize that our code allowed that currently.

2:21:06Speaker 11

Sorry to derail that for a moment.

2:21:08 – 2:21:38Speaker 14

No, it's a good clarification. So that is the current numbers aside from this. There were additional emails back and forth after the packet deadline. I have some alternative ordinances that increase setbacks back to 50 for collector streets. And arterial. If you want to entertain that. And arterial.

2:21:42 – 2:22:09Speaker 11

Which was a discussion I had with Russ last week was. Are you saying arterial? Melissa and I went out and measured lots of wetlands in my area, my neighborhood, because I live surrounded by the wetlands as most of you have heard. And we decided to take a tape measure and go tromp through some of my neighbor's backyards. until they came out and said, what the heck are you doing in my backyard? But I felt like it was informative.

2:22:10Speaker 16

And I am tentatively comfortable with these changes.

2:22:16Speaker 11

I think my biggest concern was I don't feel like a residential street at 35 feet is the same thing as 10th West at 35 feet.

2:22:27Speaker 3

And I would agree with you. What is an arterial or something like that?

2:22:30Speaker 11

An arterial is like 10th West and a collector's.

2:22:32Speaker 3

But is that the same setback? Currently it's the same setback. So we haven't added anything.

2:22:38Speaker 11

I was making it more complex at the last minute.

2:22:41 – 2:23:06Speaker 9

Because why not? I know somewhere in the ordinance it says that you can build a concrete patio within the setback. And I would think that would be a significant disturbance.

2:23:09Speaker 14

Yeah, that 15 foot includes trails, decks, patios, landscaping, stormwater retention.

2:23:25 – 2:24:39Speaker 11

That's all in this category here. Sorry, when I read this, I don't understand how landscaping is included in that, if I'm being honest, because it says a 15-foot setback is required for stormwater retention facilities, sidewalks, trails, patios, and decks. I just, I know I'm circling back and on and on again, but I just, I mean, yeah if to be blunt fertilizing your grass 10 feet 15 feet from a wetland is sure it's probably better than a parking lot in a commercial building but it's also i guess my impression was that the setback area was not to be i understand there was a 10 foot zero disturbance but i thought the rest of it was in general not disturbed outside of like construction or which I understand we have to allow a vehicle to get through places sometimes during construction. But then for the next 50 years, it's not landscaped and fertilized in pebbles and rocks and that it was more native and natural in the buffer zone. Was that a wrong assumption?

2:24:40 – 2:25:00Speaker 14

No, we can add some language. But it's, I guess, typical that any setback area is default landscaping. That becomes default open space or landscaping because if it's not in a setback area, it's either a building, a parking lot, a driveway. But is it a setback or is it a buffer?

2:25:01Speaker 25

I don't know. So currently, how much of this do you think gets landscaped from the setbacks?

2:25:08Speaker 11

Is that legally different, buffer versus setback?

2:25:12 – 2:25:44Speaker 14

Well, the commercial projects are required 20% to 30% open space. And depending on the size of the project, most of your setbacks become that open space. And in some cases, beyond the setback becomes that open space. All this is saying is within all that open space, there's some allowances for some things to happen near a wetland. And that's what the 15-foot setback would allow.

2:25:44Speaker 25

So currently the majority of the setback space is being already landscaped. Currently landscaped.

2:25:52Speaker 14

Right. That's standard development practice.

2:25:56Speaker 9

The 10-foot buffer now, the 10-foot fence buffer around it would preclude that within 10 feet of the...

2:26:04 – 2:26:15Speaker 14

That would preclude anything like a stormwater retention, a trail, anything. That's saying don't touch that. That is your native don't touch.

2:26:16 – 2:26:31Speaker 11

I do not think the general public had any idea that the 50-foot buffer could be landscaped to an 80% completion, whatever. I mean, I understand that that's how the codes were written. I just... I did not realize that.

2:26:31 – 2:26:52Speaker 14

What else would go into that space, I guess, is my question. Nature? Well, that's what landscaping could be. Your backyard is nature. You have to know that moment twice a week. You could seed an area and let nature do its thing. And that would be considered landscaping.

2:26:52Speaker 11

There is a difference. And I'm not necessarily arguing one way or the other right now. I'm just...

2:26:58 – 2:27:14Speaker 6

There is. I'm saying if you have a 100-foot lot and you're doing 50 feet away from it for your back door, you're telling people you can't put anything in your backyard and you now have 20 feet of a front yard. Well, no, because they have a 10-foot...

2:27:16 – 2:27:37Speaker 11

I mean, it depends on the lot size. It depends on the lot size, but there's a 25-foot setback. So if you can't put anything in that buffer, you have no backyard. But in my head, the lot line, I know it's only for residential, was at 25 feet. So I assume that that other 25 feet is just native vegetation, not the HOA came in and... spread fertilizer all over it.

2:27:38Speaker 3

Well, that's what I was thinking.

2:27:39 – 2:27:52Speaker 11

That was my assumption. And I understand that that was my fault and my flaw making assumptions. You know what that turns me into, but anyway, I'm going to take another drink of water.

2:27:52 – 2:28:26Speaker 14

Yeah. Now in the case of a residential subdivision, that will be a separate HOA owned piece of land around the wetland. And the land will probably include the wetland itself. It'd be a parcel with both the wetland and the setback. Now, since a subdivision doesn't require, you know, backhoes and track hose to put in a property line, that area likely will remain native. There's no reason to disturb that now unless there's an underground utility or something.

2:28:27 – 2:28:53Speaker 11

and that can happen and then it gets re-vegged and and major but on a commercial property if we leave it if we adopt this 50 feet set back to the building and then they can landscape 40 feet of it and then there'd be a 10 foot buffer correct which is substantially better than what we have right now because you could currently landscape up and to the edge of the buffer to the wetland in some cases yeah but you can only do it for 80 percent of the

2:28:54Speaker 14

Yeah, you could tear out all the native and bring in Kentucky bluegrass for 80% of that area.

2:29:04Speaker 11

I've spent like six months reading this code. How did I not realize that?

2:29:11Speaker 3

on a building, like a commercial building, you have to keep up from the building, but what's the lot line for a commercial building? What's the buffer?

2:29:19 – 2:29:38Speaker 14

So commercial is subdivided differently. Sometimes you'll have a commercial development that's all one parcel and there'll be five different buildings. Sometimes they divide it up. Setbacks will again be based on where the wetland line is drawn and not necessarily the property line.

2:29:40Speaker 3

So we don't have a buffer from where the wetland line is drawn in a commercial property line, but we do for a residential property line.

2:29:52 – 2:30:05Speaker 14

Correct. But in the case of commercial, you can't put the building within 50 feet of the wetland regardless if there's two property lines or one property line or zero property line between those two elements.

2:30:05Speaker 16

That makes sense.

2:30:10Speaker 11

Okay, well, I'd like to learn something tonight. I don't love, I think the big change I don't love is the arterials at 35.

2:30:20Speaker 25

That's to me a... And those types of roads were the ones that pushed me to...

2:30:26 – 2:31:17Speaker 11

Right. I think, I walked down my street, which has wetlands on numerous... I was going to say parcels, sections of the area of the street. And most of the road in the area is at 35 feet right now, even though it was built decades before we had the code. And I don't want to speak for Melissa, but when we walked and looked at it, I felt like 35 did a decent job at buffering that wetland area in a residential complex. But also, I run 10th West regularly. It's full of garbage on the side of the road, well beyond 35 feet out in a lot of areas. And I don't know if 35 feet is, in my opinion, adequate for an arterial. And a collector, to me, falls in that gray area, personally. I don't know. But council.

2:31:30 – 2:31:50Speaker 9

I move we approve ordinance 26 test 14 with the following change that arterials and collector roads will be 50 feet away from the wetland area.

2:31:50 – 2:32:05Speaker 25

I got a motion. So I'm not 35. So modifying what we just heard to be 50 feet.

2:32:05 – 2:32:33Speaker 11

Can I clarify where I think we're at so that everyone knows? Is that okay? Russ, correct me if I'm wrong. Boardwalks are exempt. Public trails, sidewalks, and such are at 15. Lot lines for single family are at 35. Residential roads are at 35. collectors and arterials are at 50 and commercial, industrial and multifamily is at 50. Is that correct as Jamie has? That is correct.

2:32:33Speaker 3

What's residential home?

2:32:35Speaker 11

That's at 35. Oh sorry, residential home has a 10-foot zoning setback so the home would be at 45.

2:32:43Speaker 25

I will second.

2:32:44 – 2:33:00Speaker 11

Could be at 43 if it's a sidewalk. A motion and a second for Ordinance 2614 with the amendment for collectors and arterials at 50 feet. All in favor please say aye.

2:33:05Speaker 3

I'll say aye.

2:33:07Speaker 11

Is that an opposed or an aye?

2:33:08Speaker 3

That was an aye. Is that an aye? No, it's an aye. It's an aye? Late aye, sorry.

2:33:13 – 2:33:59Speaker 11

No, you're okay. Ordinance 2614 passes at 4-0-4. With amendments. I just did not realize that you could build right up to it right now with the buffer. What was that, Mark? Thank you, Russ. I appreciate all your hard work on that. I know it was a lot of back and forth. So thank you. Aaron and Brad. Thanks for hanging out for two and a half hours, Brad. I hope it's been the most exciting evening of your week. Aaron, are you ready for me?

2:34:00 – 2:37:20Speaker 12

Take us away. All right. Thanks, Chair. Thanks, Council. So this is Ordinance 26-15, the Mapleview subdivision PD overlay. We discussed this concept in workshop. Now we're on 350 South and 1400 West. It's 10 acres. The PDO is an opportunity to apply site specific changes to the zoning code to allow for more variation when we met in workshop a few couple weeks back there was a couple directives given and feedback provided one was to go down to 40 lots subdivision with emphasis on more even split between the lot sizes with more larger lots and to utilize a portion of land to overlay backyards. Essentially this green column over there is sort of the target given. The proponent has provided an updated site development plan. It's shown here. This includes, and we're really just looking at, I want to highlight, we're just looking at the 10 acres here there is one proposed lot shown above that's on city property and would require an executive action its own public hearings to do but there is potential in the future that city does something with that that for the sakes of this project we are only looking at the 10 acres so on that 10 acres there's 14 lots that are larger than 10 000 15 lots that are larger than 6 000 and 11 lots that are less than 6 000. I want to highlight a few other changes here. So real quick in this little highlight diagram, the pink lots are the, or is that magenta, are the 10,000 square foot or greater lots. The blue lots are the 6,000 or greater lots. And the green lots are the 6,000 or less. Now other changes here or updates to the development plan that you haven't seen previously on the development plan. uh is the connection to 290 south as shown instead of a trail going through the open space the trail is instead intended to be coordinated through logan city with the parks department to find a way to put a trail through the park actually just use the park space instead of trying to double up the the open space since we have plenty there so that would be in coordination with local city parks And then you see the lots that are on the landfill overlay area include the back setbacks within that space. And then this plan shows the landscaping buffer and eight foot trail along 14th West. Changes to the code amendment were to update the numbers of lots. So that was changed from the following workshop to 40 lots. In the code amendment, it says 14 as 10,000 square foot lots and 13 as 6,000 square foot lots. If council was amenable to this plan, they'd want to amend the amount of 6,000 square foot lots to 15. So again, the breakdown ended up being 14, 15, and 11.

2:37:23Speaker 3

And we had told them what?

2:37:24 – 2:37:36Speaker 12

That's the size of lots. We told them . The green was 14, 13, and 13. So you lost some smaller lots, gained a couple of medium lots.

2:37:36Speaker 9

Okay. So it's not 14?

2:37:38 – 2:37:52Speaker 12

It's not exact. It's 14, 15, 11. There's more medium sized lots, less small lots. Okay. Unless there's anything else you want me to go into, I'm going to pause there.

2:37:55Speaker 3

Those narrow lots in the middle, how wide are they? Like are they buildable? I'd have no clue.

2:38:04Speaker 11

I mean, I'm sure they're buildable.

2:38:05Speaker 3

Like is it, yeah, is it like it's just going to see a garage and the house is all behind it?

2:38:11Speaker 11

They put a soccer field in together.

2:38:12Speaker 12

I would guess they're around 50-foot frontages, but that would be my estimate.

2:38:20Speaker 25

Maybe more. No, they're more.

2:38:28 – 2:38:40Speaker 12

Do you have an estimate? We're going to be right close to that. I have a key on here. I didn't measure them out. The key on here indicates that they're right around 50, especially these ones are definitely right around 50. These ones might be slightly less.

2:38:40Speaker 24

I think it was 54 if I remember. Yeah.

2:38:47Speaker 3

You did? Okay. And they're normal looking homes, not like a weird just garage in the front.

2:38:54Speaker 11

They need state code.

2:38:56Speaker 3

I know. Okay.

2:38:59 – 2:39:40Speaker 25

I have a question. Looked at the previous one that we were presented and on the left side along 1400, I think there used to be less lots. Fewer lots. Fewer lots. And now that there is more, They seem to be bigger lots as far as the, what do you call it, the size of the lot itself. Did I miss something? Did you make them longer? Is that what you did?

2:39:40Speaker 24

Should I come up with an answer?

2:39:47 – 2:40:06Speaker 24

If you remember when we talked about it, I said fitting them exactly is tough. It really comes down to, you mentioned those longer ones in the center, those are, That's where our awkward space was, so trying to stretch and make everything fit as usual as possible.

2:40:06 – 2:40:21Speaker 25

So I'm actually asking about the green ones on the left. There used to be one less lot, and they used to be .09 acres. Now you have more, and they say they're .12, .13 acres. So I think that 13...

2:40:25Speaker 12

1350, I'll highlight that.

2:40:31Speaker 25

I guess I'm wondering where did the extra space come from for those specific lots?

2:40:39 – 2:40:55Speaker 12

I'll highlight it. So the 1350 West Street, that north-south street there, shifted to the east to create more acreage. So yes, there's an extra lot there, but the sizes of them are actually larger now.

2:40:56Speaker 11

And that shift happened, I'm assuming, because the private road disappeared and there weren't middle lots in the island.

2:41:03Speaker 11

Okay. Thank you.

2:41:14Speaker 3

I have another question.

2:41:17 – 2:41:59Speaker 12

what does this i mean original zone was nr4 this new design that he has brought us with what does that make it it's four units to the acre this is nr4 this is four units to the acre now developing at maximum density in r4 isn't very feasible because of the amount of that comes out for roads and in this case that comes out for the landfill overlay. Our estimates in our floor development, this is completely estimates, this isn't laying out houses in the area between 23 and 25 lots. This is developed at four units an acre.

2:42:04 – 2:42:19Speaker 11

If the council's okay with it, I know there are some people from the neighborhood here that want to give public comment, and I'm wondering if you guys are okay, or if you have further questions, if we move to public comment, share what the neighborhood has to say, and then come back for a discussion.

2:42:20 – 2:42:35Speaker 9

Before we do that, Aaron, could you and or Russ sort of review for us what the purpose of the PD overlay was as we codified it.

2:42:37 – 2:43:30Speaker 12

Yeah, I can cover that. So some of the highlights that I have from my notes, PDO overlay is intended for flexibility in the city zoning. It allows for unique, innovative, and well-planned developments. And then also another point in the code is that it's intended to be used where there's no existing zoning that is sufficiently permissive or sufficiently restrictive to accommodate what's being proposed there. And that's the case in this one. The NR4 zone is not sufficiently permissive to allow smaller lots and then rezoning this to MR9 isn't sufficiently restrictive to eliminate future development of town halls. So that's where a PDO is perhaps an appropriate application of that code.

2:43:36 – 2:44:02Speaker 11

Everyone okay if we move to public comment? Okay, this is a public hearing. If you'd like to comment on ordinance 26-15, please come to the microphone, state your name, city of residence, and take three minutes or less, and I will open the microphone. Oh, first one. Start the timer, Craig.

2:44:03 – 2:44:51Speaker 24

I think so. I just wanted to say thank you for your time and your input and your efforts over several months. We hope that we have struck that balance. We hope that we've been trying to listen. We hope we have and came back with kind of that target view. gave for us and have made a meaningful reduction from original to climate commission to now and i feel like this is a good positive project for the city and uh you know just um you know what i i'm grateful for your input over there for what you asked for so thank you very much thank you brad

2:45:02Speaker 20

What am I supposed to say before I give my name?

2:45:04Speaker 11

Name and city of residence.

2:45:05Speaker 20

OK. I live in Logan. I'm the property right next to the bottom on 350 South.

2:45:12Speaker 11

And if you'll say your name just for the record.

2:45:14Speaker 20

Friederike Hendrickson. Did you get me? Yeah. Good luck. Do you need me to spell?

2:45:20Speaker 11

Do we need it spelled?

2:45:22Speaker 20

Did you sign in in the back? No.

2:45:25Speaker 2

If you do that, I can get the name. OK.

2:45:29 – 2:47:10Speaker 20

we have had several discussions with the neighborhood and we or i feel i can't speak for the neighborhood but it seems like the public opinion in the neighborhood is that that is still too dense of housing for the character of the neighborhood and for the kind of community that we've all built for decades and for many years and tried to establish. We have already made room, whatever you want to phrase it, for a lot of higher density and lower income housing in our area. We don't think that it's necessary or warranted to put this high density in there. Another question I had was if there was a wetland delineation made for that field. like i said we live next to it and the groundwater is really high and there are areas that show wetland plants so i'm curious if that has been considered if that was mandated i don't know what the rules are for that um and if it were up to me i would say that it would need more of a transitional phase in between the almost acre lots and the three lots to to the west as well as that that middle circle shouldn't have those lower green that were green homes but that they should continue with the large lots that are on the top and keep that consistent so those people that live in that little circle or place there feel like they all have a similar use of that space i don't know if that makes sense thank you thank you thank you aaron will you go back to our beautifully color-coded one

2:47:11 – 2:49:25Speaker 23

thank you i took a lot of pride in this that's right i like the magenta a lot of good contrast going on there hi i'm jacob hendrickson uh also live on 350 south right there on the west end um i sent an email a while back about um opposing the this overlay the plan development overlay Really, my highest concerns would be the safety. We want to make sure that the kids don't have all the extra traffic and issues with safety along there. keeping the character of the area. This is the equestrian estates. People have their horses or their animals or whatever. Keep that character on there. We also know a lot of people that end up moving out of the neighborhood because they're looking for some larger properties and there just aren't any. So safety, character, then also the pedestrian and bicycle access through here, safety for that, and also just being able to reach the amenities here. I would recommend that the lots remain larger. Understood in the initial zone However, these three points would be higher on my priority list honestly and I Feel like this plan that we're seeing today is a lot better than the last one I do feel like there could be a little bit more of a transition zone from the larger lots to the smaller But Anyway, so I do oppose the overlay. If it were to happen, I think we have to be really careful to make sure that we have those . So, thank you.

2:49:26Speaker 9

Thank you, Jake.

2:49:37 – 2:49:50Speaker 11

Seeing no one else coming from the public, we'll close the public hearing. Oh, sorry. We will reopen the public hearing. Is that what I technically have to say? It was closed.

2:49:50Speaker 17

Can I reopen it? Okay.

2:49:52Speaker 11

You guys are good.

2:49:58 – 2:51:10Speaker 22

jason tubs city of logan the property that is just on the east side of the top three magentas there question that i have not being a part of this as intimately as i wanted to be question that i have is twofold and it may have been addressed in which case i can just be pointed that way one is traffic and the bottleneck that is already there on 600 South in the elementary, sorry, it's already been addressed, but you cannot get onto that road in the morning currently. This will exasperate that issue right there. Second question that I have has to do, does any of these 10 acre, this 10 acre have water rights associated with them? And if so, what's the impact there? I do have shares in water rights and the impact of that may have for me as a resident there. And the third, besides the more of a transitional that was already stated, so that being as it is, as well as the safety of going from the neighborhood that's low density to all of a sudden a high density area there and the transition in between and the safety factors there. Those are the concerns that I have against this layout right here.

2:51:11Speaker 9

Can you explain where your water comes from?

2:51:16Speaker 22

Southwest irrigation.

2:51:18Speaker 9

And where is Southwest irrigation?

2:51:20Speaker 22

It's on the top of the magenta, the top right magenta. There is the ditch with the water rights that goes there.

2:51:28Speaker 4

Does it here?

2:51:30 – 2:51:51Speaker 22

And that, I know it goes, it goes east. I don't know if they continue west where this subdivision is. And there's also the same situation on the south side, down the blue boundaries as well, on both sides of that 10 acres.

2:51:55Speaker 9

I know the owners are here. I would be really curious to know how the water works through the property.

2:52:05Speaker 11

We can invite them up to ask them.

2:52:07Speaker 9

That's up to you.

2:52:07Speaker 11

It is. Thank you. Any other comments or questions? No, thank you. Thank you.

2:52:15Speaker 21

Sorry, I'm nervous.

2:52:17Speaker 11

Me too, always.

2:52:19 – 2:53:54Speaker 21

Okay, so I'm Tawny Tobes. His daughter. Also have lived here my whole life. But my stance on it is I would be someone interested in new developments and purchasing this property. that would be built. From my point of view, much like how our neighbors are saying, it's so condensed. And again, living there my whole life, a lot of what we've seen is with the new subdivision to the north, as well as one to the south that have been built in the last few years, is you're getting a lot of people who are not from Logan. and it's a lot of people you're finding these younger families who are finding jobs here and moving into those and a lot of people in that neighborhood are pushed out because there's no longer the right um size of home for them and so again me who for my future and my family i would want a larger larger law i don't want to be condensed to a home where i have no backyard i have My neighbors are two feet away living from me. And so I also, like everyone else was saying, feel that it is too condensed with how it is. And it's looking into how we can make just larger lots to where we've already compromised into all these smaller lots. It just brings in a whole new demographic of who can stay here.

2:53:55 – 2:54:42Speaker 11

And so that's all I have. Thank you. Thank you. Last time I cut people off, so I'm double checking this time. Okay. Seeing no other one else, we will close our public hearing. Bring it back to the council. There are a couple of questions. Jeannie, you had a question about water rights and you wanted to ask the sellers of the property. Would you guys be willing to come up and share that? I believe you are the two that own the property, correct? I believe Jeannie's question is, where does the water currently run? Where are the canals and where's?

2:54:42Speaker 9

Where are the canals existing?

2:54:44 – 2:55:33Speaker 4

Dean Adams, excuse me. The water comes from 10th West. It used to be an open ditch, but now it's enclosed. And we used to get our water from the south side of the equestrian estates. When they put the equestrian estates in there, they blocked our ditch. So we cannot get the water down. If they had put that in a pipe or if the developer or the city or the county whoever was in charge at that time had required them to keep that ditch, we would get our water down that way. Now they have to pump it out of the ditch on the north side of equestrian estates. We do have 10 shares of water.

2:55:35Speaker 9

So there's no ditch existing on the property, correct?

2:55:40 – 2:55:55Speaker 4

We have a ditch on the west side, no, the east side and the south side. And we have a well in the southeast corner and that's how we irrigate.

2:55:57Speaker 3

But the ditch on the south side you said is covered up?

2:56:02 – 2:56:13Speaker 4

East of the property. The ditch way clear up the 10th West has been filled in. Bring it in on the north ditch and then take it south. You can't see it on that.

2:56:13Speaker 3

But there is a ditch on the north side?

2:56:15Speaker 11

There is a ditch on the north side.

2:56:17Speaker 25

Along the entire property?

2:56:18Speaker 11

Directly behind the Tubbs house, correct?

2:56:20Speaker 25

Along the entire north side of the 10 acres?

2:56:24Speaker 4

Yeah. And it feeds a lot of people further west.

2:56:29Speaker 9

Yeah, it is. It goes all the way. Okay.

2:56:33Speaker 12

And I'll note any water conveyance across the property will be preserved. Sure. And it's something that's shown on the plats.

2:56:40Speaker 9

What about the existing property?

2:56:44Speaker 9

So I don't know what happens to the lot.

2:56:50Speaker 11

Whoever buys that quarter lot's real lucky.

2:56:54Speaker 9

They'll sell water.

2:56:55Speaker 11

That's the one we buy. Thank you, Dean.

2:56:58Speaker 9

That's the one you should keep.

2:57:00 – 2:57:11Speaker 11

I know there was another question or we closed the public hearing.

2:57:11Speaker 27

It was about water, that ditch on the south side. It's up to you. I don't have to make sure.

2:57:18Speaker 11

Sure, come on up.

2:57:27 – 2:57:52Speaker 27

So I live on the south side, and the ditch does come about halfway down, and it keeps going with a lot of people filled in their ditch. So I give the water rights to my house, and a few people pass me, but after that, I don't know where that water would go. If we let it go, it would probably cause some real problems. So there is a possibility. It would just require digging out that ditch. So that's all.

2:57:52Speaker 11

Thank you, Aaron. Erin, there was a question about wetlands.

2:57:59 – 2:58:14Speaker 12

Were there wetlands delineated on this property anywhere? There were none delineated or required to be delineated. As you may recall from Russ's presentation, we defer for our initial review to the National Wetland Inventory, which showed no wetlands.

2:58:15 – 2:58:27Speaker 11

Thank you. And the other main point brought up by the public was traffic. How are we going to fix 600 south? That's a big question.

2:58:28 – 2:59:02Speaker 12

As someone who lives just off 600 South, it is. Yes. This ties in nicely to, there are improvements required with this development to connect to 200 South, which is also signalized. And so things don't just flow in that one direction. It has mobile connections. It has future stuff South. It cleans up dead-end streets. And it will provide improvements to 14th West and connection to 200 South. Redundancy, I guess, is the answer for this subdivision that's not dependent on one intersection. Yeah.

2:59:06Speaker 11

Sorry, Paul. Council?

2:59:21 – 3:00:18Speaker 3

I appreciate, Brad, all that you've done to come back and, you know, listen and bring plans. It's hard. This is a really hard one because it's my neighborhood and it's what we have fought for for a long time is trying to get fair lots in our neighborhood. And you've tried. And I've got to give you credit for that because there is something to say for people who also own the property and being able to sell it and that as well um besides that i i can't make a motion yet so i'm not going to but i just want to let you know that i do appreciate all that you've done and the work you've done to try to accommodate the neighborhood okay ask a question aaron

3:00:19 – 3:00:41Speaker 11

I'm here for. Assuming we approve this as is or modify it more tonight and approve it. If it's in some way or another, this PDO is approved, can he just build the base zone if he wants to or he has to build exactly what's in the PDO? Ooh.

3:00:44 – 3:00:58Speaker 12

He is subject to the ordinance of the PDO. So anything that's in that would have to go forward. That's a really good question. It can be abandoned, but it is adopted as ordinance.

3:00:58 – 3:01:15Speaker 11

So no. So I assume when we made modifications tonight and he didn't like them, he still has to do them or not by the prep, right? Like there's no, like just going back to the base zone because what you did was worse. That's my question.

3:01:15Speaker 12

We've done so few of these that I haven't had to answer that question before. I am going to look over at Russ. He's still behind. I'll look at Craig at the same time.

3:01:23Speaker 17

It's a map amendment.

3:01:26Speaker 14

Yeah. So it would require a future map amendment to pull the overlay back off.

3:01:36 – 3:02:02Speaker 11

So essentially, I guess, whatever is, if it's passed tonight, whatever it's approved has to, obviously has to completely agree with it or, because he can't just go back to the base zone without another amendment. Correct. Okay. Yes. Okay. Well, this was our only item not continued for the night, so we can continue it for the night.

3:02:09 – 3:03:43Speaker 25

I also want to comment that this to me is much better than the original one that I saw. Those changes that were made to me reflect a lot of good intention in listening and implementing the feedback to provide something to the community that is better than was initially proposed. Since I've been in council, we have approved quite a few multifamily projects, some town homes, some condos or apartments, And one thing that I've listened from state conferences and even local conferences is that middle housing that is missing from the stock that's available. I think this addresses a lot of that, those initial concerns that I had because I am very concerned of all the multifamily that we've approved on the west side. If you were still willing to put a couple more larger lots here, it would definitely make me happier to vote to in favor of this. For example, where you have, go back to the color area. We like the color one area.

3:03:43Speaker 12

I know. It was covering up where there might be a ditch, so I've gone back.

3:03:47 – 3:04:03Speaker 25

I mean, I personally think that those five, six green lots below the larger don't fit. To me, they don't fit along with those larger odds. So for me, that's an opportunity for you to go back.

3:04:03Speaker 11

The ones in the middle?

3:04:04Speaker 25

Yes, the ones in the middle. And maybe instead of six, four. I don't know. I'm just throwing the number out there.

3:04:20Speaker 11

So the council has a couple of choices. We can approve as written, approve with amendments, continue or deny as written.

3:04:31Speaker 3

Remind me of this fair footage of the blue and the green.

3:04:35 – 3:04:52Speaker 12

The blue are larger than 6,000. 0.14 acres, give or take. They vary and the majority of them on the south end are closer to 6,000. These ones on the north end are closer to... More around 7,000. Okay.

3:04:53Speaker 3

So then we're from 0.14 to 0.16, yeah. 0.18. Yeah, 0.14 to 0.18.

3:04:57Speaker 11

I can't see that. I'm really blind.

3:05:06Speaker 3

You just gotta zoom in a lot.

3:05:08Speaker 12

These greener ones here are generally around 4,400. And these ones along the west side are closer to 52 to 55.

3:05:17Speaker 11

I've still never converted to square footage lots. I'm still thinking.

3:05:22Speaker 3

I know. I can't picture. It's hard. 4,400 feet doesn't translate into anything for me.

3:05:29Speaker 11

I know. That's why.

3:05:32Speaker 11

Well, I don't know about multiple houses. I know what size they were in Anchorage. Yeah, you can think it.

3:05:37Speaker 9

So 3,4400 lots makes 1,12,000 worth of a lot. Is that right? Yeah.

3:06:02 – 3:06:27Speaker 11

Given I'm not really supposed to make motions without Jeannie giving me a hard time about it, I will make a suggestion that if we're not comfortable enough with it or it's not close enough to what you want, maybe continuing it for two weeks is the right choice, despite me joking about it three minutes ago. But it's up to you guys.

3:06:29 – 3:08:04Speaker 9

Brad, I know we've asked you to do a lot of things. We've asked you to change a lot of things and I hope that you also can appreciate how hard it is for the community to have what that it's it's hard for us to put we have a large lot subdivision then we've got a multi-lot subdivision then we've got a small lot subdivision then we've got a multi-family and it it begins to fracture the whole area because there's so many different kinds. I do think you've tried really hard to get closer to what we would like. I would, if it's possible that you could put at least two more larger lots in there, it would make it feel, especially down there where that one green area it seems to be It does seem to be disjointed from having large lots and then going to the smallest size right next to it. I know that you did it because you were trying to maximize your use of the property as well. I just am still struggling with the idea that it's not as special as I wanted it to be and I don't have a definition of special.

3:08:05Speaker 3

What's that unique part of PDO that we keep thinking about I think?

3:08:11 – 3:08:37Speaker 9

Yeah and I just you know I would like to as Ernesto said it's true there is some you know we talk a lot about affordable housing but there is a missing middle as well and it's housing for those people that have already bought one house and want to buy a second one. So I don't really have an answer.

3:08:37Speaker 11

Do you guys want to bring Brad up to the microphone and ask him questions?

3:08:48Speaker 9

He can come up saying whatever he wants.

3:08:50Speaker 11

Brad, microphone's yours.

3:08:52Speaker 9

I don't really have a question.

3:08:53Speaker 11

I know. I just, we're all sitting here silently. I think that's a hard decision, but let's move in a direction.

3:09:00 – 3:11:27Speaker 24

And Jeannie, I do appreciate what you're saying and where you're coming from, where this is a hard decision. And I think that the premise of a PDO and what's special is hard to define and establish when it's just lots. And there's competing things that you guys are having to deal with. The missing middle is a real thing. And one of our specials that we were bringing to this and we discussed, which is in the missing middle literature, one of the best things for that is having, they call it filtering, where you've got Apartments, townhomes, small lots, bigger, medium lots, larger lots. And so that is something that is special about this, that if we just had a straight zoning, you would not get. But there's a balance between, does it feel disjointed because there's some small lots, some big lots? Or is that a positive because we're meeting that need? We're creating a community where somebody can filter out. If she wants to buy a house now, And new houses in the 4,500 range, we've got something. But she wants to stay in the community. OK, now you can move up to a quarter acre lot. That is something that is unique for a lot of subdivisions. If you look up on 290 South, everything is exactly the same. So it does provide something that that is unique and and while it might be uncomfortable because you don't see it very often it is something that leads to overall better community in my opinion and with the research shows because there is that people can stay in the community and you know not have to move from a cottage to a bigger house and now I gotta go to a different. So I know there's that balance between what feels congruent and then having that element of variety of housing, which is what the direction I got was, let's have more variety of housing.

3:11:28 – 3:11:39Speaker 9

So I think that what I will say is, I understand what you're saying and I appreciate what you're saying, but I also understand that you're not going to build this.

3:11:41Speaker 24

I'm going to build the roads. I'm not going to build the infrastructure.

3:11:44 – 3:12:07Speaker 9

You're going to build the shape, but that community feel will come from what is actually constructed on the lots too. And I think that we're a little nervous about what that comes up looking like because it can be really good or not so good.

3:12:07Speaker 11

So you could add more character, or you could get a bunch more variables.

3:12:10 – 3:12:25Speaker 24

And I think that the element of uncertainty there is mostly architecture. I mean, the housing sizes are pretty locked in. And yeah, that's nothing that can be controlled.

3:12:25 – 3:12:49Speaker 11

Can I ask you a couple questions? I know a couple times that when I've talked with you, I've mentioned possibly including the landfill overlay zone in the lot lines of some of the houses up there, which obviously they can't build their house in it, but it could be included inside the yard. Is there... A reason of that?

3:12:49Speaker 24

So it is included in there. Not, I mean, it's not widely extensive as we talked through this. Okay. Where we...

3:12:57Speaker 11

I guess it is inside just a little bit, huh? Right.

3:12:59Speaker 24

Okay. And that's based on the size of the detention, which is...

3:13:03Speaker 11

Okay. Is that what that purple is, is a retention facility?

3:13:06Speaker 24

Yeah. And the discussion is, do people want to have detention in their backyard or not? And that is something that happens sometimes.

3:13:14 – 3:13:29Speaker 11

Is the size of that retention, detention, I don't know what the term is. Detention is what I did in high school. Retention is for water. Is the size of that dictated by, that's how big it needs to be? It can't be smaller.

3:13:30 – 3:14:04Speaker 24

Well, I mean, if you want to get into the weeds, Logan City has a, if there's a high water table, you have to do a mesometric study for several, so this is as it is above the water table. And anything more would take a year of testing to be able to change, which is possible, but just takes a year. So, and we didn't want to have, we wanted to have a separate Parcel just for the detention, because that's what makes the most sense in this type of neighborhood.

3:14:07Speaker 11

Two of the council members have asked about the possibility of combining some of those green lots along 375 South.

3:14:19 – 3:14:53Speaker 24

Well, at this point, we have exhausted our both timing and, you know, financial capabilities on this. And so we really thought that we, you know, followed the direction and had something that can be approved. So could that be done? I mean, maybe if they're willing for a new contract and we can...

3:14:54Speaker 11

I'm just asking. These three are being a little quiet at the moment, so... How much do the lots cost?

3:15:03 – 3:15:30Speaker 6

Green, purple, blue? I mean, just a rough guesstimate, what are they going to cost? Because 10,000 square foot lots right now are going $140,000 to $250,000 in Logan, so depending on location. because that makes a difference. I mean, if you're trying to build a house and you're starting with a $200,000 piece of property, you do 1500 square feet, you're over 500,000 already, $200 a square foot.

3:15:33 – 3:15:48Speaker 12

I pulled some comparables from the area around it and the 1,500 square foot home on a 4,000 square foot lot was $400,000. A 2,000 square foot home on a 5,000 square foot lot was $480,000.

3:15:48Speaker 9

But that's already built, right?

3:15:50Speaker 12

Those are built. Those are for sale on the market.

3:15:53Speaker 25

Can you repeat those numbers?

3:15:55 – 3:16:20Speaker 12

The 1,500 square foot home on the 4,000 square foot lot was 400,000. These are in the neighborhood, just around this. And the 2,500, excuse me, the 2,000 square foot home on a 5,000 square foot lot was 480. And for reference, a 4,500 square foot home on a 10,000 square foot lot in Mountainside State is 685.

3:16:22 – 3:16:33Speaker 6

It's great to have lots, but $700,000, you know, so.

3:16:33Speaker 3

But there's still the argument that people go to the Valley and build their houses.

3:16:40Speaker 3

So people are buying those still. That's your middle income that like Ernesto was saying that's.

3:16:48Speaker 6

Do you want affordable houses or do you want houses?

3:16:51Speaker 3

We need that middle size.

3:16:56 – 3:17:30Speaker 6

I'm just throwing it out there. It's expensive. It is expensive, but we're not getting that middle size. My son just moved here from Arizona. He had a 2,000 square foot house on a 5,000 square foot lot. It's like they're economizing in space because they're running out of space. You can do half acre lots, but... They fill up really fast. I think they will. So you've got to decide what you want. Do you want sprawl or do you want more affordable homes?

3:17:32Speaker 9

Maybe we want all of it.

3:17:34Speaker 6

I like my neighborhood because it's got a little bit of everything in it. Which I live in this neighborhood. It's got town homes and it's got apartments. So does this neighborhood. That's what I like about it. So does this neighborhood.

3:17:44Speaker 3

I like the diversity. The neighborhood has a little bit of everything.

3:17:46Speaker 6

Yeah. Diversity is good.

3:18:06 – 3:18:19Speaker 3

So you're saying we can't do anything about those green lots there at the bottom? Or could we extend it for two weeks maybe? Maybe we extend it for two weeks and see if there's something that could be done.

3:18:19Speaker 24

Like I said, I don't have any more contractual time on this. We got extended to this one specifically.

3:18:28 – 3:18:49Speaker 25

I am willing to move to approve a modified version of this to make those 6.1 acre lots into 0.15, making four. I'm willing to do that, but only, I guess, if that is something.

3:18:49 – 3:19:14Speaker 11

That's a reading of agreement from Brad, but I don't want to lock him into something that he doesn't want. And I know we're putting on the spot. I would be willing to call a five-minute recess if you need to call a team member or considerate or something. But that's a motion. You'd need a second before anything happened.

3:19:27Speaker 9

So your motion was to make the six into four?

3:19:31Speaker 25

Yeah. So they would go from roughly the 0.1 to 0.15.

3:19:39Speaker 11

And your 38 houses instead of 40 for the whole project.

3:19:43 – 3:19:54Speaker 9

I would second that motion, but I would also ask for a recess so that Brad can sit for a minute and talk and think and decide whether that's appropriate for him.

3:19:54Speaker 11

Unless he wants to answer now, obviously.

3:19:57Speaker 24

If we could have a recess, can we stop talking for a minute?

3:20:01Speaker 11

Can I have a recess with the motion on the table, Craig?

3:20:05Speaker 22

Yeah, you could.

3:20:09Speaker 11

We can call a recess with the motion on the table. Don't talk to each other.

3:20:13Speaker 3

We won't talk. Yeah, we can move on to the workshops.

3:20:23Speaker 10

Continue back to the end of the meeting? Just let this motion pan while we continue on the workshop items.

3:20:28Speaker 9

I really was going to hope we could have a party. I was going to say, I kind of want to... She just said that out loud.

3:20:34 – 3:20:50Speaker 11

Okay, Brad, how about we do this? Let's call a five minute recess so that I can also use the restroom. Then let's come back and let's do our workshop items and we'll do yours at the end of the meeting. So that gives you probably 20-ish minutes. You want that much time or you want five? I'm sorry.

3:20:53 – 3:21:07Speaker 11

Okay, so let's call a five-minute recess, use the restroom, don't talk to each other in the toilet, and then we'll do our workshops. Five-minute recess. Please be back on time at 8.54.

3:21:07Speaker 25

We can't discuss this?

3:21:09Speaker 11

No, do not discuss it. And do not go out and talk to them. Melissa, don't go talk to Brett. Don't discuss it with him.

3:21:17Speaker 25

Just stand there.

3:21:37 – 3:25:48Speaker 1

you Thank you. you Thank you. you Thank you. Thank you. . . Thank you. Thank you. Thank you.

3:26:33 – 3:28:48Speaker 16

Population split allocation from cash accounting for 2027. Skip down to the fourth item. Request to appropriate $450,000 of RAPS tax funds received from Cache County for the Coomber Trail Improvement Project. Oh, yay! And $126,624 for our after-school grant program. Now I'll go back to the one that's a little more unique. This is a request to appropriate $883,206 toward replacement or utility billing software. toward a software offering that is called Sprite. Over the last 18 months, we have researched various software offerings. Our current software, New World by Tyler Technologies, it hasn't been designated end of life, but it's close to it. They're not bringing on any new clients. They're maintaining it at a certain level. and anticipating and encouraging clients current clients to look at their other offerings and maybe move their new this offering or one of the others so as part of this evaluation we have already started moving community development software off to elements and we've been looking for the last 18 months at various Utility billing offerings and we have we've documented we've looked at over 40 different pieces of software Arguably some of them much less time invested than others But we heavily looked at three we've narrowed that to two and now we're Confident that the strike point offering is the one that's best for our city. So requesting eight hundred eighty three thousand two hundred six This will pay for implementation, which is estimated at $731,000. And then it will also pay for the first year of software as a service fee of $151,000, which would be anticipated that would go up year over year as software does in the future.

3:28:48 – 3:29:03Speaker 25

So it doesn't... There's no... contract that would give us any leverage on that annual fee to be lower or keep it?

3:29:04 – 3:29:18Speaker 16

We did get pricing proposals from several different vendors. I think the specifics on this one we do have kind of guaranteed pricing for five years as part of the contract.

3:29:18Speaker 9

So is this over and above, is this something you all have been budgeting for? It's just coming out of reserves?

3:29:26 – 3:31:22Speaker 16

So this would come out of reserves. It would pay for the first year of SAS fees as well as implementation. It's anticipated that as part of the 2028 budget we would work that into the IT budget. The annual fees. The annual fees and everything else would be worked into the IT budget. So you can expect that the IT requests would go up, the information technology requests. They manage most of our software contracts in addition to our existing tile technologies. At the end of that year, we hope, if all the things align, that our tile technologies contract would go down, not by the same amount. This one's going up, but it would go down. And then eventually, as we replace our financial software at some point in the future and our payroll software, We bring forward those separately. 800 this and 800 that. Oh, that's expensive. I mean, so it's a different offering. Right now we host our own software. And so it's at least double the cost to go to a software as a service where it's hosted by the other company. But what we get with that is increased security, hopefully a more modern offering, and hopefully, most importantly with utility building, something that our platform, our citizens can monitor their own usage. It'll also give us the ability to go to a time of use rate There is another piece of software that would be necessary if we do that. That would be a meter data management software piece that houses all of those 15 minute interval reads. But that would come at a future date, hopefully after we've implemented SpritePoint. Then we would tackle time of use rates with our electrical service. That would be, we would get that meter data management software integrated with SpritePoint.

3:31:23Speaker 3

So how come this isn't something that we budget for, you know, for years like you do for equipment and things like that? How come we're not doing that with the software?

3:31:33Speaker 16

It's not a capital project, I guess. It's a one-time. So we implemented New World about 10 years ago.

3:31:40Speaker 25

And how much was that implementation, by the way?

3:31:42 – 3:32:36Speaker 16

Probably 700 grand, something like that. And that included utility building, financials, payroll, and community development all in one. So 10 years ago we implemented that. We have been saving for it. We do have reserves in our IT fund, but this is specifically serving basically six entities. It is 901, stormwater, then water, sewer treatment, electric, and environmental health garbage. Those are the main components that are related to this. So they will budget, each one of those entities will budget for the, they will be charged for the ongoing fees of the SAS fees. And we're requesting we pull out of their reserves for the implementation of this.

3:32:36Speaker 9

So it says it's coming from enterprise fund reserves, but there is a reserve for each enterprise fund. Correct.

3:32:44 – 3:33:08Speaker 16

So have you allocated it by fund? Yes. I gave you the estimate. It's about $207,000 for each of the water, sewer treatment, electric, and garbage, and then about $30,000 for 911 and the store. And that mirrors kind of our allocation per administrative fees, how much we charge them for billing.

3:33:10Speaker 11

All of those fund reserves are within tolerance with this change. I know some of them are much smaller and bigger reserves, but all of them are within a range of comfortable still.

3:33:22Speaker 25

will it allow to itemize surcharges like from the electric?

3:33:28 – 3:33:51Speaker 16

We have not discussed that specifically, but the way we have it currently established, I imagine it will work very similarly. I'm sure it does have that capability, but every software company is different. That one's a little bit weird because what it is in essence is a rate that we don't apply unless certain things happen.

3:33:52Speaker 25

Yeah, which makes it for not super clear communication on your bill.

3:33:59Speaker 25

So I would hope that this addresses that.

3:34:02 – 3:34:25Speaker 16

And we'll have to get into the specifics of that with SpritePoint when we get to that stage. As we've looked at it, we feel like it will be a good communication method with the customer. It gives us a greater capability of communicating with the customer and the customer with us, other than simply calling in.

3:34:27Speaker 3

That part alone will be wonderful.

3:34:32Speaker 11

It'll be easy to see last month's bills.

3:34:34Speaker 16

Yes, they'll be able to see their bills, see their usage.

3:34:37Speaker 11

Can I compare July this year to July last year?

3:34:40 – 3:34:55Speaker 16

Exactly. And for the reason we're selecting SpritePoint, they are, we think, one of the best companies out there providing these services. City of West Jordan and one other city in Utah have selected them and are in process. We anticipate several of those will go to them as well.

3:34:57Speaker 11

Further questions for Rich before we move on? Thank you for the details. 2629.

3:35:05 – 3:35:30Speaker 16

Tyson's here. He's our utility building manager and our treasurer. He wears two hats, just to let you know. He and I have gone lockstep in investigating and looking for the best software. Along with our IT department, the mayor obviously has been involved in every step as well. So it's not just me. It's a whole team of people who are selecting this. That's a good thing.

3:35:32Speaker 6

We trust you, but we trust more. Sometimes it's a good thing. It's smart.

3:35:35Speaker 3

We like multiple people.

3:35:37Speaker 6

Do you want to move on to 2629? Yes. And I can cover this, but one quick comment. You have exhaustively researched this, like more than we've researched anything else.

3:35:47Speaker 16

More than everything else. All of the software services we've selected combined. It's the four vendors that we've talked to.

3:35:58Speaker 25

That's a good thing. It is.

3:36:01Speaker 16

But it's still going to come with some disappointments, surprises, changes, and there's always some things that come with software changes. It's a learning curve. Yeah.

3:36:12Speaker 6

A 10-year-old software is showing its age.

3:36:15 – 3:37:08Speaker 16

It is. Well, and the company they are, so. Yeah. Agreed. Okay, so 26, 28, sorry, 26, 29, we can cover fairly quickly. As a general practice, we carry forward large capital projects that are incomplete at the end of the year. We bring those requests to council who carries those things forward. There are a few operational that are unique or very large to the department. Other than that, it's mostly capital. So if you have any questions, I can answer those. But a few of them, element software implementation, that one's $16,000. I am going to adjust as well as we get final invoices in. But other than that, it's large capital, as well as restricted funds, as well as grants. If you have any questions on any of them, I'd be happy to answer it otherwise. That's all I have to say.

3:37:08Speaker 11

I like those kind of workshops. Any questions for Rich? We're only an hour and a half behind schedule.

3:37:14 – 3:37:27Speaker 16

They are huge amounts. We recognize that. There are some that are asked by the department and we say we don't feel comfortable bringing that to council. That's kind of an annual thing. Your budget covers that.

3:37:27 – 3:37:48Speaker 9

But you've also said in the past, and it's very, very true, that we work on a mid- We changed the year in the middle of the big building season, most possible time. And so you've always got stuff that you started, but it hasn't finished yet. So you've got to move it forward.

3:37:51 – 3:38:20Speaker 11

There's a lot of moving parts in the city. No questions for Rich on carryovers? No. Carry forwards? Okay, it looks like Brad's back in the room. Is everyone okay if we go back to our motion that's hanging like a guillotine over our heads? Okay, council. There's motion. I'm assuming there needs to be some further discussion. Brad, you want to take the microphone? And council, what questions do you have for Brad?

3:38:21Speaker 9

Well, I just need to know what Brad decided. I'm just wondering if you had other questions.

3:38:27 – 3:39:07Speaker 24

Well, thank you for the opportunity to deliberate. And, you know, we went back and I had him run the numbers. And unfortunately, we dropped it, 51 to 40. And any further drop we just can't because it makes it unfeasible. So we're still hopeful and respectfully ask to approve of the 40 as presented. So... I still think it's going to, I don't think it would necessarily change the neighborhood, you know, those couple lots, but unfortunately it does make it invisible.

3:39:10Speaker 11

Craig, can I rely on you again? There's a motion on the table. If the motion wants to be withdrawn, is that the technical term?

3:39:17Speaker 17

And there's a second. You want to deny the motion?

3:39:23 – 3:39:40Speaker 11

You can withdraw or deny it. Or we can vote and just deny it. Vote to deny it. Okay. I just want to know what my options were here. It's denying the amended motion made by Ernesto. Right. And then we could make another one if we wanted. On the original. Or another amended. Well, she made a motion.

3:39:40Speaker 25

No, he didn't.

3:39:41Speaker 11

Oh, you made a motion? Oh, sorry.

3:39:42Speaker 25

I withdraw my motion.

3:39:44Speaker 11

Motion withdrawn.

3:39:47Speaker 11

Second withdrawn. So we are back to... Do we get it past go? Can I get 200 bucks?

3:39:55Speaker 24

Sorry, I wish I could make an easy answer. Yeah, you're okay.

3:40:04Speaker 11

Sorry to keep making dumb jokes. It's late. Council.

3:40:13 – 3:40:33Speaker 3

Is it possible, this is a weird request, but the two homes on... What street is that again? Is it 350? Yeah, 350 South coming from Equestrian Estates, but those driveways come out on a 350 South so that it kind of continues the neighborhood and doesn't make it feel like it's completely separate. I know that's a weird request.

3:40:34Speaker 14

When you have a single family lot on a corner, the homeowner can choose to orient

3:40:40 – 3:41:04Speaker 24

to either street or the person we could not dictate that okay or the builder at the time if it's s.com almost i mean it's curious there's a question that was asked so i feel like that and if you look at the setbacks there i think they're they accommodate that okay

3:41:36Speaker 3

What do you do when no one wants a motion?

3:41:40Speaker 17

So if the council is unwilling to make a motion, if they want to make a motion, then the next step is if the absence of motion, the proposal fails.

3:41:50 – 3:42:01Speaker 14

Let's say if we don't vote it in, then it isn't voted in, right? And in that case, it would default back to the base zone of NR4. It'd be essentially a no vote.

3:42:07 – 3:42:18Speaker 24

And I hope we're not bringing anything new or changing anything. We're just asking you to act on the direction you gave us to bring back a four-unit plan.

3:42:19Speaker 11

Either make a motion for yes, a request for any other changes, or make a motion for no, because it's the same as not voting.

3:42:33Speaker 25

You guys live in that neighborhood. What's your gut tell you? Melissa?

3:42:43 – 3:43:34Speaker 3

Again, like I said, it's super hard because I mean, I haven't been on the past councils when neighborhoods have been approved that have less or higher density than this one does. I still... don't like it because I don't like the idea that developers can come in and just change a zone that we have in place. And so that makes me want to say no. And listening to the neighborhood. I mean, we've attended many meetings. I've gotten many emails and texts. And so that's why I have a hard time wanting to say yes on this. But I do know that you have done a lot of changes and I appreciate that. And it is better than the original plan.

3:43:35Speaker 11

You've been more willing to be more flexible than most.

3:43:37Speaker 3

That's for sure. Yeah.

3:43:38Speaker 11

And we appreciate that.

3:43:40 – 3:44:04Speaker 24

Well, and I appreciate your work with me. And I've spoken with almost all of you individually about it. And you are very thoughtful. And I know it's not just capricious. Sometimes when negotiating, when it's really painful for both, we know we've hit a good middle ground. It's been as painful as we can go.

3:44:05Speaker 11

Brad's never coming to Logan again. I'm sorry. I'm sorry it's been that painful. I truly am sorry. I joke about it.

3:44:12Speaker 24

I didn't mean about the process. I just meant arriving at it.

3:44:16 – 3:44:48Speaker 11

I know, but it's been a lot of work. I mean... I know a few of us have attended neighborhood meetings and online discussions and email discussions. I think most of us have got those. I think the neighborhood's still not happy with where it is. Part of me asked if the neighborhood would ever be happy with where it is, because I've said this before. I ran by it this morning. It's so dang pretty, just as a field. But you can't leave everything as fields all the time. And I get that, too.

3:44:49Speaker 9

So there's not enough at all? It seems like not at all.

3:44:53 – 3:46:17Speaker 11

Yeah. I still have big doubts on whether constant up zones are driving up land value. whether Sugar Creek makes landowners in the area look and say, oh, we can sell for more because the council were up zone, and this would be an up zone. Does the next parcel come in and say, oh, well, Mapleview got an up zone, so I can sell for more because the council up zone, and it's It's a big concern of mine. Housing is unaffordable, and I agree with Mark. We've got to build houses, right? And like we do, but also if we constantly allow an up zone, then the property owners know they can get an up zone, and the land is now more valuable, which then makes it harder to build more affordable housing. How do you fix that feedback loop, I think? I don't think I have an answer, but it's a big concern of mine. I don't think it's terrible where it is. I don't think the neighborhood loves it, and I don't think it fits the plan, and I have doubts about it. But Brad's been great to work with, and it's a lot better than where we started. But I'm in the chair, so I'm not making motions, because I'm not supposed to.

3:46:19Speaker 25

How many units did you say the NR4 would allow to build there?

3:46:24Speaker 14

Yeah, around 25. Once you take out the roads, you lose some acreage when you do that. So it's 15 more houses, give or take. 13 to 15.

3:46:34Speaker 24

Theoretically, it would be a little bit more. It's just with the odd shape with the buffers.

3:46:39Speaker 11

Right, with the buffer and then the roads. This is 13 to 15 more.

3:46:44Speaker 15

It's a nice spot.

3:47:02 – 3:47:46Speaker 11

Craig? How long do I leave them to make a motion before I say a no motion is a no? There's no time frame. I know. But I'm asking for guidelines here. And I'm not trying to push you guys too hard, but it is 9.15. And we still have another item with poor Kirk, who's never going to talk to me again either in the background. So my opinion, but if you're not comfortable enough to make a motion yes, then A motion no is the same thing as not making a motion. So, and I'm not trying to get them to say no. I'm just, it's just a direction would be great. Rich, or I'm sorry. Mike.

3:47:46Speaker 10

Mike. Someone can make a motion to deny if that's where the council wants to go, except for the council. Right.

3:47:54Speaker 11

But it's on them.

3:47:57Speaker 25

I move we deny this resolution, which is? 2615. 2615.

3:48:11Speaker 11

I have to tell you that I do really like all of you.

3:48:14Speaker 25

But at the moment... Oh, I know.

3:48:21Speaker 11

It's getting late, but I'm about to get snarky. If I'm not already.

3:48:34 – 3:48:57Speaker 11

We have a motion and a second to deny ordinance 2615. All in favor of denying, which denying would be an aye at this point. Say aye. Aye. Aye. Any opposed? Motion's denied. Sorry, Brad. I appreciate all the hard work. I really do.

3:49:04Speaker 17

Hold on. The motion was approved. The motion...

3:49:07Speaker 11

The motion to approve or deny ordinance 2615 was an aye. So we denied it.

3:49:13Speaker 22

We approved the motion to deny it.

3:49:17Speaker 11

Yes. The motion was denied. Oh, ordinance 2615 was denied. The motion was approved.

3:49:24Speaker 9

Thank you. Thank you for... We know what we did.

3:49:28Speaker 11

But it needs to be cracked on the record because I don't want... I get that.

3:49:34Speaker 22

Russ, thank you.

3:49:36 – 3:49:55Speaker 11

Tell Erin, thank you as well. I think unless there are other considerations, we're adjourned. And now we're going to adjourn the Logan. Reconvening Logan Redevelopment Agency with Kirk Rich.

3:49:57 – 3:50:08Speaker 16

Sorry, I didn't look that far ahead. This is just a request to carry over 50,000 for development agreements from last year's budget to the 2027 budget.

3:50:10Speaker 11

Any questions on this workshop?

3:50:14Speaker 11

We're adjourned.