City Council - Regular Meeting

Monday, June 15, 2026

The Gilroy City Council held a study session and regular meeting, addressing city administrator performance metrics, a Caltrain presentation, and public comments on various issues including a proposed ICE facility and a data center. The council also appointed members to the Youth Commission and discussed amendments to the architectural and site review permit process.

About this meeting

Government Body
City Council
Meeting Type
City Council
Location
Gilroy, CA
Meeting Date
June 15, 2026

Transcript

640 sections

0:16Speaker 1

We're getting...

0:47 – 1:11Speaker 69

ALL RIGHT. WE'RE GOING TO GET THIS SESSION, SPECIAL STUDY SESSION CALLED ORDER AT 5 P.M. JUNE 15, 2026. ROLL CALL, PLEASE.

1:14Speaker 55

Council Member Bracco, Council Member Klein, Council Member Fugazi, Council Member Hilton, Council Member Marks, Council Member Ramirez.

1:24 – 1:59Speaker 69

I'm here too. Thank you. Okay, we're going to get right to it in item 1.3. Just for the public to know where they are right now. They're in a study session, a 5 p.m. study session. This will last 30 to 45 minutes, maybe 50 minutes. and then we will get into the regular public meeting at 6 o'clock. That doesn't mean that you have to leave, but my instinct tells me that there might be a few folks here right now that think they're at the beginning of the regular city council meeting, but that will begin at 6 o'clock. So with that being said, take it away, city administrator.

2:01 – 4:24Speaker 21

Good evening, Mayor and Council. So in March and April, we together conducted a couple of study sessions to look at performance measures, organizational goals, and sort of where we wanted the organization to be with respect to my performance over the next 12 months. This was a result of contract language from when I was hired that lined that out for us to work through. At our last meeting, I had a couple of to-dos that I needed to put together and bring back to you. The request was to bring it back at a five o'clock study session, so here we are. Within those to-dos were a couple of things. One was to revamp the matrix for scoring to make the special initiatives equal to the performance measures, sort of the top and the bottom of the chart that we utilized, so that they were 50 points each, 10 points per item. So we've done that, and we've adjusted to make it a 100-point scale. So I think that that will hopefully meet that need. We also were asked to put together milestones associated with our top five priorities. So we went through the five priorities and I'll say these priorities come from the legislative agenda. Because we've identified these five does not mean that we're ignoring the other nine I guess on the list. The list we'll continue to work through and our goal is to accomplish all of them on schedule. But these top five we wanted to provide with more detailed milestones for you. So you have additional milestones in the attachment that identifies each legislative agenda item of the top five with a little bit of a description and an approach. And with that target completion date, revised completion date should we have it revised since it was originally set so that we're tracking that. And then additionally individual milestones that tracks us over the course of the project. So with that, I wanted to present that to you to get your feedback on how this is looking. The ultimate goal is to finish this up today and then be able to come back at a regular agenda meeting sometime in the future as a normal business item for ratification of an amendment to the city administrator's contract. So I'll stop there and turn it back to you, Mr. Mayor.

4:26Speaker 69

All right, folks, any questions or comments from that so far with the information that we have so far?

4:35Speaker 20

Depending on what happens with the sports park, is there anything else that might slot into that space if for some reason we decided to ditch the LAFCO thing?

4:46Speaker 21

That slot in terms of sort of filling in the gap in workload?

4:50Speaker 20

Well, yeah, exactly, in terms of a deliverable, so to speak.

4:53 – 5:36Speaker 21

Yeah, I think, as I mentioned, the rest of the list is going to continue, and it continues as a priority. Certainly, there's other priorities that come up over the course of the year that take things on. I'll use the mayor's ad hoc for homeless as an example of a priority that came up mid-cycle that we were able to add and adapt. So we're constantly doing that. It's a living list, and things come on and fall off. We'll always want to have a conversation with council about additional priorities, should we want to add them. I think having an item complete, whether it completes because it's done or because our priorities have changed, I think is okay over the course of the cycle. It allows us to balance in some of our normal workload with the council-identified priorities and make progress on both.

5:39Speaker 69

Council Member Ramirez.

5:41 – 6:55Speaker 58

So I have been really pleased with this process so far in terms of the process itself. I just want to clarify a couple of things. So we have this, and we agree on it tonight, whatever. What is the expectation moving forward with the use of this document as we go through it? So are we going to do quarterly check-ins, that type of thing? I would prefer to not have it then be set aside and then brought back in a year and then decide. Because I think, like you said, it's a moving, living document. And as such, you know, if we were to look at something, let's take Council Member Fugazzi's example with the LAFCO. Maybe that does need to be, let's just say, completely removed and replaced with the unhoused ad hoc committee with expectations there. I would rather see that happen as we progress along and things do change. or if we do it kind of intermittently, quarterly, or whatever, we look at this rather than wait until the end of the year and say, well, that came off, but hey, I did the ad hoc thing, right? So process, can you speak to that?

6:56 – 7:25Speaker 21

So certainly bringing updates on a regular basis, whatever seems to work for council would work for me. Quarterly may be a little too frequent, maybe three times a year, something like that. Fine. But, yes, I think regular updates would be fine for me. It provides a great way to provide communication. We can do it as a, you know, unless there's something unusual in the change, we could do it as a consent item on a council meeting so that it's there for everybody to see. And if we want to provide input, have a discussion, that provides us that opportunity.

7:25 – 7:42Speaker 58

Yeah, and I – Because I do know that certain things, a hiccup comes along and whatever, and it's not necessarily a reflection of what you are doing, but something outside of your control. Let's adjust it accordingly, that type of thing. That makes sense. Thank you.

7:44 – 8:55Speaker 20

I think, yeah, quarterly is too much to do something like that. I think that twice a year, and I do like the idea of the study session methodology that we already had to put this together. Did not feel rushed. It felt like a lot of thought went into it, a lot of discussion went into it. And it wasn't crammed into what are now becoming longer agendas for these meetings. And so I would definitely consider that. One other thing, too, to bring up on one of these topics is the gateway beautification part. It seems a little light on exactly what that means, and I want to make sure to clarify in my mind at least, that it's not making sure the weeds are clipped in the clover leaves and that it also has to do with things like making sure the truck stop area down in the south end of town continues to get better and stay better and and many of the other types of things that we see as activities, homeless collection at the underpasses and all of those kinds of things. So at least putting it on the record here, that's my intent. I don't know about the rest of the council, but for the gateway beautification.

8:56Speaker 58

I had that noted as well. I'd like it a little bit more specific because I agree. I don't want it just to be weed abatement.

9:06 – 9:27Speaker 21

Yeah, I thought through that as I was creating the list. I purposely took what was originally on the document and then didn't modify it for exactly the reason. We've had a couple shots at making adjustments and this would be sort of the next one and I wanted to be able to do that intentionally with the entire council versus me sort of interpreting input from random conversations.

9:30 – 9:48Speaker 20

I think the beauty of the way that we have worked together to set this up is I get to score you in the way that I think it should be. So that's definitely each of us gets to look at it. It would be fair, of course, but if it's left more open, it also gives us more opportunity to be more subjective in how we rate you.

9:49 – 10:15Speaker 69

Let me add a comment before you go. I'm going to almost repeat what you guys already said, but I'll just throw in, especially so in economic development. I think that I'm going to want, if possible, some areas where there could be more details, something that we can measure. And that doesn't mean, you know, how many new gas stations we got, but maybe some areas of town that we all have talked about in the past that we can have some specific information about. So go ahead, Council Member Ramirez.

10:18 – 11:07Speaker 58

I'm just going to say... based on my experience with executive evaluations or any evaluation of an employee, the more objective you can be, the more fair it is. And so I would rather see far more specific information. You know, I certainly don't want to, you know, if we take the beautification, I don't want to be, you know, 10 trees in a long month, you know, that type of thing. But... something more tangible that is, you know, a more measurable objective that we can say, yes, you did, or no, you didn't. Not, well, in my opinion, you did, and in someone else's opinion, you didn't. I would like it to be a little bit more specific.

11:09Speaker 69

Yeah, go ahead, Dion.

11:10 – 11:53Speaker 31

Yeah, I agree with Kelly. That's a mistake. Councils in the past have made is not being specific on what we want. You know, beautification, what's that mean? I think when we were talking about originally, we were talking about motorhomes and trash and weeds. But if we don't be specific, some council members are going to have a different view of what they think it should be than other council members. And I think that just causes... some issues down the road. So I think the more specific we can be, the more headaches we're going to save ourselves in the future.

11:57Speaker 17

You want to comment before I go to public comment?

11:59Speaker 21

Why don't you go to public comment?

12:01Speaker 69

Did you want to have a few questions? Then I'll go to you first right after public comment. Any public comment? I have no speakers. Council Member Klein.

12:08 – 12:25Speaker 30

No, I was just going to agree with Council Member Rocco and Council Member Pagazzi, just civics and, you know, just honing that in. So I'm good with this document as it is. It's a good starting point, especially what we've been through over the course of these last few years and everything. This really gives metrics we need.

12:26Speaker 69

Okay. Council Member Ramirez.

12:29 – 12:46Speaker 58

One area I would like to look at is the – police analysis, police department service level evaluation and strategic plan. Is there any way we can move that up, that timeline?

12:50 – 13:47Speaker 21

Yeah, that's a good one to talk about on the timeline. And what would be a timeline that would be more enticing to you? I think when I put this together, this is the original schedule. I had actually ran through a schedule that would complete it a year earlier. My feeling is that we need to do some more intense data collection and data processing to get ourselves right sized to begin with. My hope would be that that happens and that we're collecting data now, but I'm not 100% sure of that, so we're working with the new chief on making sure that we have the data that we need to be able to report out. The reason the data and the timeline is important if we don't have the right data is we need a runway in order to collect data to be able to react to it and to put that into the analysis. So that was the thought process there. Certainly if we're collecting data now in a way that is functional for us and we can report on it, then this timeline would change absolutely.

13:47 – 13:59Speaker 58

Okay, so as long as that's something that is on your mind and can be brought up sooner, I'm happy with that, thank you.

14:02 – 14:16Speaker 69

Further comments? So we're just, we're looking for direction, it's not action, we're just looking for direction. Everybody's happy with what they said so far and the comments they heard from Matt? Yeah, with the additional comments? Any final comments?

14:16 – 15:13Speaker 21

So I will say that in terms of trying to be more specific, in each of these items, I tried to put the milestones in there very specifically, so if we use the beautification, which it's been a little bit of a moving target on that project, but if we use that as an example, I tried to define it a little bit through the use of the milestones. So within that, I talked about increasing staff attention on a regular basis to the gateway, so that would be something that you would see an impact from visually. Then I also talked about a project and outlined the schedule on a project and what that schedule of the project would look like as a way to get that structure in place to have increased beautification there. The item that did not get included here was sort of the code enforcement side of things. I think that what's going on from that perspective. And that was simply because it wasn't included in the original language and I didn't want to take too much freedom in terms of what your priorities are and redefining them.

15:14 – 15:52Speaker 20

I THINK IF YOU JUST LIST OFF SOME OF THOSE THINGS, IT WOULD BE A BETTER UNDERSTANDING OF THESE THINGS KIND OF FIT IN THE SCOPE OF THAT OTHER THAN JUST LANDSCAPE, RIGHT? I THINK THAT'S WHERE KIND OF THE HOLDUP IS, AND COUNCILMEMBER BROCKO BROUGHT UP, FOR INSTANCE, MOTOR HOMES OR ABANDONED CARS. I MEAN, IF YOU GO OVER RIGHT NOW, across from Jack in the Box and south into town, you're going to find about seven or eight completely dilapidated cars sitting on the side of the road in front of the mobile home park there. I want the landscape done too, but I think focus on having it look like you would want to bring somebody to that area to invest in that area. Council Member Ramirez?

15:53 – 16:12Speaker 58

That's what I was going to say. Landscaping is important, but But if you do the landscaping and then there's still all the other stuff, then it's... I appreciate your holistic approach. I just would like it a little bit more specific to benefit you.

16:14Speaker 30

It's perception, not just looks. It's the perception people have that we need to change.

16:19Speaker 69

And as Council Member Brock has said, in half of a year, there's going to be new people sitting up here. I think the specifics are going to be really important at that point. Go ahead.

16:29 – 17:51Speaker 31

I think we need to, when we look at our landscaping, try to do something that'll last, you know, with people walking through it and stuff. You know, on Leesley, at one time it looked good, but now it's terrible because people walk all over it. The sprinklers are all broken. The sign's hanging down. So if we could... Try to put things in. I mean, even if it's gravel, that looks better than just dirt. And do things, you know, it doesn't have to be a million dollars worth of landscaping. You know, maybe it's $25 worth of rocks put in there. And, like, we have that issue with somebody that climbs up underneath the... the bridge on Leavesley and throws trash all over everything. And there's ways to solve that, you know, rocks and things like that, rather than put a fence because they'll just cut a hole in the fence. So we need to push our people to think, use their imagination and come up with some solutions.

17:53 – 1:00:48Speaker 69

All right, so it sounds like we have some good direction for Matt. And I think we have a thumbs up from everybody. And we're going to move forward with that. All right. Thank you. So that concludes. That concludes. Feels weird. That concludes the 5 p.m. study session. And for better or for worse, we have 45 minutes until the 6 o'clock meeting begins. Feel free to roam about, and we'll get started sharply at 6 o'clock again. Meeting adjourned. All right. Well, welcome, everybody. We're calling this meeting to order 6 p.m. on June 15th, 2026. Roll call, please.

1:00:48Speaker 55

Council Member Bracco. Here. Council Member Klein.

1:00:51Speaker 55

Council Member Fugazi.

1:00:52Speaker 55

Council Member Hilton. Council Member Marks. Here. Council Member Ramirez. Here. Mayor Bozo.

1:00:58 – 1:01:11Speaker 69

Here. Um. Okay, please rise for the Pledge of Allegiance, which will be led by Councilmember Ramirez. And please remain standing for the invocation by Pastor Trevor Van Laar from Gilroy Presbyterian Church.

1:01:14 – 1:01:26Speaker 40

I pledge allegiance to the flag of the United States of America and to the republic for which it stands, one nation, under God, indivisible, with liberty and justice for all.

1:01:42 – 1:03:23Speaker 29

father tonight we gather for more than routine approvals budget discussions and policy decisions we gather the community and its leadership to stand in the gap to intercede for the citizens of gilroy and ask for peace and justice to take root in this place we bring before you our concern regarding detention centers on the edge of our city we pray that justice would always be pursued with mercy and that dignity of every person will be upheld, and that no one would ever be unlawfully detained or treated as less than the image of God that they brand. We ask for wisdom over data centers that may be reshaping our city. May growth and progress be a blessing to this community, not a burden on it. We pray that development will serve our community, not consume it. On a grateful note, we celebrate our graduates. Go with them, Lord, in every new chapter ahead. May they carry with them the very best that Gilroy has given them, and may they offer that, and more, back to the world. Lastly, as Father's Day approaches, we pause to give thanks to the fathers among us, for those who show up day after day, who work hard, love well, and point their children towards what is good and true. We are grateful for every father who stayed, who sacrificed, who led with both strength and tenderness. Encourage them, Lord, sustain them. Remind them that their faithfulness matters more than they may ever fool them. And we hold gently before you those whose fatherhood was not that simple. For those who have lost their father, those whose relationship with their father carries pain, and fathers who carry their own weight of regret, may each one be with your grace. Your kingdom come, your will be done, here on these streets, amongst these people, as it is.

1:03:30 – 1:04:23Speaker 69

THANK YOU, PASTOR VAN LAAR. AND MOVING ON TO ITEM NUMBER 2.6, ORDERS OF THE DAY. WE WILL BE MOVING ITEM 9.4, THAT'S CONSIDERATION OF OPTIONS FOR AMENDING THE ARCHITECTURAL AND SITE REVIEW PERMIT PROCESS. THAT'S A FAIR MEMO THAT WAS SUBMITTED TO COUNCIL BY COUNCIL MEMBER MARKS AND COUNCIL MEMBER RAMIREZ. So instead of that being heard tonight at probably 10.30 or 11, it will be heard tonight very soon. So for those of you who are here for 9.4, your topic will be coming up quite soon. Okay, next, moving on to item 2.7, employee introductions. Police Chief Brandon Sanchez to introduce Stephanie Tilly.

1:04:27 – 1:05:56Speaker 72

Good evening, Brandon Sanchez, Chief of Police. I want to welcome Stephanie Tilly. Stephanie is the oldest of three girls and was born and raised in Hollister on a cattle ranch. She has very fond memories of hanging out with her cousins, learning to drive a stick shift truck, and hunting with her dad. Stephanie graduated from San Benito High School in 2002, moved to San Luis Obispo in 2004, 2007, in which she received her AA from Cuesta College. She then transferred to San Jose State, where she received her bachelor's of art in communication. In the workforce, Stephanie has enjoyed working in Santa Clara in the sheet metal machining industry for the past 16 years. She started in the office in an accounting position for a few years. From there, she transferred to outside services, helping order material, hardware, and getting parts painted and plated, and keeping jobs on schedule. She took a break to start her family, and when it was time to return, she went into outside sales for the company. She disallowed her to interact with more customers and get their feedback. Stephanie has been married for 14 years and has two children. Her kids keep her busy with her extracurricular activities, but she wouldn't change it. She loves being their mom. In her spare time, Stephanie loves to play slow-pitch softball and hunt. She's also been playing softball since she was very young and played slow pitch when she turned 18. She's played women's and co-ed, coached for Hollister Heat softball, and served on their board for a few years. Please welcome Stephanie Tilly.

1:06:05 – 1:06:21Speaker 7

Hi, everyone. My name is Stephanie Tilly. And I just wanted to say thank you for letting me join the team. And I look forward to learning about more of what we do internally and start my training. And thank you for the warm welcome. And I'm happy to be here.

1:06:31 – 1:06:47Speaker 69

Thank you very much. Moving on to item number three, presentations to council. Today we have a brief presentation from Caltrains. So welcome to the podium right here over on the left. You guys can speak from that one please. Thank you for being here.

1:07:03 – 1:09:28Speaker 60

MEMBERS OF THE COUNCIL, MY NAME IS MICHELLE BOUCHARD. I'M HERE TO INTRODUCE MY COLLEAGUE, JASON BAKER, WHO WILL BE PRESENTING THIS ITEM TONIGHT. BUT I DID WANT TO MAKE A FEW OPENING REMARKS. CAL TRAIN HAS BEEN NAMED RECENTLY THE FASTEST GROWING TRANSIT agency in the United States by the American Public Transportation Association. And that is as a result of really transitioning into what we call a regional railroad. So we're no longer just serving commuters going one way to jobs. We really have diversified the types of trips we serve. The South County Connector down here has been a really great complement to the electrified service. And Jason will talk to you a little bit more about what we see in terms of riders who are getting on in your community and going to destinations on the peninsula. It's also one of the most unique segments of our corridor because we basically operate between San Jose and Gilroy on Union Pacific owned freight tracks and we are governed by a joint powers agreement that was signed in 1991 and that dictates the times of day and the amount of service that can be provided. Notwithstanding that we do have a few trains that operate between San Jose and Gilroy, we are seeing explosive growth on that segment as well. And so we did want to talk to you just about the service and how well we hope that your community is receiving the service. But we also wanted to talk about some work that we've been doing to really take a look at Caltrain's long-term financial outlook. We are in need of a significant external source of funding. over the course of the next 14 years to really be able to have the railroad survive and thrive. So it's sort of a difficult position to be in. We are really serving our customers better than we ever have, and that is proving itself out due to the ridership increase And we also find ourselves in this post-COVID era with a significant gap in funding. And so Jason's going to talk to you about some of these things. And then if we have any time left, we will be happy to answer any questions. Thank you.

1:09:31 – 1:27:02Speaker 15

Let's see if I can get the technology going. Let's see. Maybe I'm just clicking it in the wrong way. All right, now hopefully the technology works. Thank you all. Again, I'm Jason Baker, Director of Government Affairs for Caltrain. I really appreciate you taking the time tonight. I'll go through this relatively quickly because I know you've got a full night but there's a fair amount we want to say about the situation we're in and just sort of as an overview. I know you all are familiar with the Caltrain corridor, but just as a brief overview for the members of the public, we've got 77 miles connecting San Francisco, San Mateo, and Santa Clara counties. That's 31 stations across 20 communities, and we've been in this business for over 160 years of continuous rail service. Earlier this, I think last year, we did a survey of the public and just asked, like an actual survey, scientific poll, and we had an 82% favorability rating with voters. So it's just not writers, but just random people. You call them, they're a voter. What do you think of Caltrain? 82% thought of Caltrain favorably. And that jumps to 91% with our regular writers. So people, if you write it, they really do love the system. Caltrain is a part of everyday life. We help millions of people get to where they need to go, reduce traffic on Highway 1, and we connect communities across the peninsula. We support access to jobs and opportunities. And as Michelle said, it's not just a commuter railroad anymore. We run half an hour service on the main line, seven days a week on the main line. So weekends, weekdays, your trains come in at least every half hour with new electrified service. Every day we provide regional benefits. We remove the equivalent of three freeway lanes of traffic at the peak times. We help build a stronger economy. Again, we touch 2.9 million people. 37% of the nine counties Bay Area's population live in the 20 cities served by Caltrain. And we do help to reduce the air. The new trains are cleaner, 100% electric energy, and that electric energy comes from our partners, San Jose Clean Energy and Peninsula Clean Energy, as clean energy from the source. We also help support local economies. There's evidence to show that there are higher property values near our stations, increased business activity and office demand, and that helps local tax bases. There's a lot here on this slide. I'll talk to just a few of them. A lot's going on along the corridor. We've got transit-oriented development. We're trying to put people near the line. We've got a big potential development at 4th and King in San Francisco. We have another substantial development we're working on around Deerdon at a building that we got entitled. And so we're really trying to bring riders to where the trains are. We also, and this is one I wanted to specifically highlight, because when I go out and about, and me and my team have been tabling in various places, including in Morgan Hill and Gilroy, that we have a dollar youth fair and a $2 all day for youth. So you're 18 and under, you can hop on a train, two bucks all day. And we do that both because we want to attract the writers of tomorrow today, and because we know kids and students often bring their parents along, and so they'll have full-paying fairs. One of the things we're trying to do to promote the railroad and also get riders interested in more things. And then finally on that slide you'll see at some of our crossings up north, we're using AI technology to make crossings safer. So at the Burlingame Crossing, about three cars a week would drive up the tracks, just following their GPS, turn left, I'll turn left, I'll keep going. With AI helping us learn about that behavior and then putting in sort of what I call dumb solutions, bollards and lights, we've cut that down to zero vehicles driving up those tracks. I wanted to touch a little bit on the South County Connector, because I know that that's the part of the train that serves you most. Although we know that people in Gilroy and Morgan Hill do ride the electric train, they might drive to Derredon to take it from that place as well. But we've really, in the last while, been having a concerted effort to do what we can to make sure that the South County connector is known in Gilroy and Morgan Hill and that we do what we can, see if we can tweak the service. So we've had marketing, print and digital ads, tabling, bus station ads. We also surveyed riders. I was on a train handing out surveys to riders on the South County Connector saying, look, we've got limitations, the kind of limitations Michelle talked about with our contract with UP. But within those limitations, can we tweak the times a little bit to see if we can make people's rider experience a little bit better? I've got a couple of slides in sort of the appendix after conclusion. I'm not going to go into the details. That's another night because there's a lot here already. But the answer is what we found is We really couldn't tweak within our limits and make the majority of the people more happy than they are now. But we did the work. We talked to the people and learned a lot along the way. We've also been working with VTA on ensuring our schedules and connections work as well as they can. So here's a little bit of a taste of our digital marketing campaign, 160,000 impressions in South County. Here's a look at what the VTA bus and shelter adds. And this is a partnership VTA let us put ads on their bus shelters that help remind folks that we are here and give people a QR code. And then here are those bus ads. And then we've also been doing partnerships with cities and city councils. We really appreciate your staff helping us get the word out about our survey and about the other work we've been doing. This is us. We've tabled the Ofrenda. We've tabled the Morgan Hill Open Streets event. I was there in May. And then we've been working on partnerships. Can we hand out, like, maybe a few free Caltrain tickets at a coffee shop nearby so that people try the product and then maybe use it. I did want to touch a little bit on the improved mainline service. We electrified and the new trains are faster, more frequent, they can start and stop faster, which means we can run them closer together. And like I said, every 30 minutes, every station, seven days a week, compared to what we used to have, which was once an hour. And that makes a big difference for people. We've got 20% more service, and importantly, 26% equity priority stations more service. Free Wi-Fi, outlets at every seat, bathrooms have changing tables, and it's quieter inside and out. And with the new trains, in part because they perform well, we have a 95% on-time performance. Michelle talked about this. I do want to talk about the bottom piece here, which is our ridership is more diverse than it used to be. 30% of our riders are low-income. 10% are youth, seniors, and people with disabilities. So 47% of our riders fit into one of those categories. Here's what folks often want to take a look at, which is our ridership trends. And this is an increase since electrification. You see August 2024, pre-electrification, and then the percentage increase. And what you can see is Gilroy had a 32.9, almost a 33% increase since electrification. What that tells us is, A, our efforts at marketing and getting the word out have helped some, but also, even when folks are riding the South County Connector, they see value in being connected to that new, faster, modern electric train service. So we're really proud of these numbers, and like Michelle said, these are nation leading in terms of ridership growth. This slide is really about us wanting to have partnerships with cities. We've done very well, I think, with Gilroy and Morgan Hill, especially because of that focus on the South County Connector Service and trying to get the word out. But we're trying to highlight downtown destinations and say, look, folks, here's where you can take the train, and here's what you can get when you get there. Really nice downtown places with a nice bowling alley. Nice place to watch the game. You can hop on a train and be there in no time. And then we're also working with GO Passes with city partners. And we've reworked that system. This is where a city or an institution can buy passes for their employees and be able to take the train based on the pass. And it used to be you had to be all in and be five days a week. But we know that's not how it works anymore. People are commuting two, three days a week. So we've reworked that system to make it work better for cities like you. All right. So here's the kind of meat of the program. So I'll go maybe a little less Jason speed for this part, because this is kind of, at least for our purposes, why we're all gathered here today for this presentation, the Caltrain fiscal outlook and ridership. So you can see our ridership trends pre-pandemic fiscal year 18 and 19. We were doing very well. And then we dropped down to about 2% of our ridership down to the pandemic. And that was more even than many transit agencies. So we've really had a really hard hill to climb coming out of there. But we've been doing it. And we can see our ridership in fiscal year 26 is expected to be 25% year over year. And math is not my strong suit. But what I do know is those year over years get harder every year because you jump up more and jump up more. And then those percentages get tough. And year over year, we're surprising ourselves of how well the trains are getting people to ride. Here is the fare box revenue, how much money we get basically selling tickets. Before the pandemic, we were nation leading. 72% of our operating costs were funded by selling tickets and parking revenue or the ridership revenue. That's not normally how transit works. Usually transit has a pretty decent sized subsidy and they make a lot less fare box and a lot of the other agencies around don't have anywhere near that. And that was nation leading. We went down and now we're at about 30% fare box recovery, which is still nation leading. We still have less subsidy than Essentially any any other agency like it in the country because people are writing and buying tickets So you'll ask like if we got it one of the nation leading fare box recovery and our ridership is growing up going up why do we have 75 million dollar annual operating deficit and and that's where we're at and Michelle Michelle led us into this a little bit. Year 27, we've got a balanced budget, in part because we got a loan from the state, and in part because our ridership was a little better, our fare box recovery was a little better, we saved some money on some energy costs. But the big piece of this is that commutes pattern shifted. People aren't commuting five days a week anymore, we aren't getting that fare box, and we were relying on that fare box. We had ridership drop, less revenue, We also had costs rising with inflation, and those costs grew faster than revenue across the transit agency. That's not just us. That's kind of how it worked. And then you do have a new train system that performs very well, brings riders on. You also have some additional costs. It costs more to insure them. It costs more to maintain 51 miles of 25,000 volts electrical infrastructure. So together, these factors led us to have about a $75 million on average operating deficit. Here's what that looks like in graph form. It starts a little smaller, gets a little better, and that's where we get that average of 75 million. We know that we can't just go talk about our deficit without saying, what are you doing yourselves to help fix it? And so we wanted to talk about that a little bit first. We've got cost containment strategies. We've got a strategic hiring freeze. So we aren't hiring new positions unless they would pay for themselves for some reason. So we've got a business development manager who's making us money, but other than that, we've got a freeze on positions. We are really proud that we held our operator contract to previous levels. A lot of our, you know, most of our budget goes to operating trains. And we held it to the previous level, which means after inflation, it actually went down. And that's an unusual thing to do, and we're proud we were able to do that. And then we also were able to get a sort of unique thing to us. And it took some, you know, some doing, including some smart people on my team, to get us to be able to get some money back for the energy that our trains were giving back to the grid. Because these trains... Just like a Tesla or Prius, they regenerate energy. And they were regenerating, and they are regenerating about 40% of the energy they were spending. About 20% of that was going right back to the grid. The other 20 was going to other trains and helping them run. That's good. But we weren't getting a dime for it. And now we're getting about a million dollars a year back in our pockets by getting some money for that energy. And that's just one of the things we're doing to try to sort of look at any options we can to contain costs. The other piece is we know that we can't rely on Fairbox revenue like we used to. That's just not the world we're in anymore. So how can we come up with non-Fairbox revenue strategies? Because even if we did get new funding, new external funding, it wouldn't last forever. And we know that we need to get to a place where we're more self-reliant and less reliant on the Fairbox. So that means everything from special events. We've run private cars, charter trains. what we can do with advertising and naming rights. I think you're seeing some trains get wrapped, and that's been a successful program. Two, we've got fiber optic cable running up our 51 miles, and we want to see if we can monetize that. And then kind of longer term, the transit-oriented development, commercial leasing, the kind of things that will help make us money in the long term to, again, try to shift that balance between being, you know, fare box reliant and being able to make our money. Our board is having this discussion right now, real time. You can see the yellow dot in June. The board just adopted a no external funding framework. They adopted the fiscal year budget, and again, that was balanced. But then they adopted a framework for what if we don't get external funds to fill that $75 million a year deficit? And what that really did is tell us to go back, look into the details, bring back detailed information about what that would mean and what cuts we might instill. You can see sort of two clear paths there. Fiscal year 26, service levels continue if we do get external funding. If we don't, we would have to plan and prepare for service cuts, and then in that fiscal year 28 is when those cuts would come into effect. So it would be in that sort of first pink time when we would really be coming to nuts and bolts about what the exact cuts are. But the board has already directed us to kind of go down that road and think about what the kind of scope and scale of those cuts would be. And this is what that is, and this is probably the most, you know, among the most important slides in the deck. On the left side, you see what our service is now. It's fast, it's frequent. We've got weekend service. We've got long hours from 5 a.m. to 1 a.m. And special event service to support special events and any games that might be going on these days. On the right side is potential service cuts. The board has not voted on any specific cuts to happen, but they did ask us to look into these. And this is kind of the scope and the scale that we would need to try to work on that $75 million deficit. And I will tell you now, even these cuts, which are significant, don't balance that $75 million. And I'll talk about that in a bit. But this doesn't even get us there. So cutting to hourly service, which is what we had before. No weekend service at all. Early shutdown, so we would shut down at 9 p.m. No special event service. And we would have to cut about a third of our stations, we think. But again, even that doesn't fill our deficit because you cut service to an hourly. We know what that looked like before. We get fewer riders, less revenue from riders, and that creates kind of a cycle where you've got to cut. You lose riders, you cut more, you lose riders. So it's really a tough spot we're in. Now, up to now, we've been only talking about Caltrain. There are other agencies, BART, Muni, AC Transit, also are experiencing significant cuts. Several of them are contemplating very similar cuts about closing stations, cutting service at 9 p.m. So you'd start having to plan, if I'm on this station, this system, and it stops at 9 p.m., and I'm trying to get to that station, and it stops at 9 p.m. you'd have to do a little more work. It really would be a very different system. And then at the end of the day, if we didn't get external funding long enough and we didn't find ways to fill that deficit, there is a scenario where we'd have to look at a shutdown or a pause of service. And that's a two to four year thing because it's not just a switch to flip to shut a train down and put it back up again. So we are calling this a critical inflection point. You see on the left the no external funding scenario. Ridership and revenue are growing. Things are going well. People like the trains. But we know we can't cut our way out of this. We know we can't raise our way out of this. There has to be some source of external funding. So we are at a crossroads. We thought it was incumbent on us to talk to you about it, to tell you about it as the conversation's happening, because you and your citizens are our customers, and this is an important time in the history of Caltrain. And I think I'll leave it at that and offer it through the mayor if you want to have time for questions or not.

1:27:04Speaker 69

I'll go Councilmember Ramirez, and then I'll go Councilmember Fugazi.

1:27:07Speaker 58

Thank you for your presentation. So I'm getting the impression you're alluding towards potential tax.

1:27:15 – 1:27:26Speaker 15

I will tell you that this is the exact same. There is a measure on the ballot, or we expect a measure to be on the ballot in November 2026. I will tell you this is exactly the same presentation we would give if there were not a measure, because it would be the same problem.

1:27:27 – 1:28:18Speaker 58

Thank you. So I appreciate a lot of the points that you brought up, electric line enhancements, the limitations in terms of sharing the tracks down here from San Jose down this way. But I represent this group. And so if they support this tax and they take on this tax, can you identify what specifically, specifically, will benefit them. I see a whole bunch of benefits, you know, in terms of BART and all the different, you know, interconnections and all that kind of stuff. And I see a lot of benefits for those north of us. But I want the people here in Gilway to understand that if they support this tax and they take on this tax, what specifically they will get. So can you help with that, please?

1:28:18 – 1:28:40Speaker 15

I can't. I would love to, but I'm a public employee on public time, and so I can't speak to the benefits or detracting pieces of a measure. I can tell you what this slide says. It's if we don't get external funding from some source, then we would have to prepare for some pretty significant cuts. If we do, then we expect we would be able to keep our service at least what it's at and maybe a little better.

1:28:42Speaker 69

Council Member Fugatti.

1:28:43Speaker 15

But there are people who will talk to you about that, but I can't do that because I'm on company time.

1:28:48 – 1:29:09Speaker 20

To your best guess, how many individuals ride Caltrain here in Gilroy? I saw 2,600 and change rides, right? Isn't that what I saw on your slide? I'm sure that's down and back, so that's 1,300 a month, right? 300 and some odd a day?

1:29:09Speaker 15

Sorry, a week? Yeah, that's about right.

1:29:18Speaker 15

No, it's more than that. Some of this counts lightings and boardings.

1:29:23Speaker 20

How many unique people do you think in Gilroy ride the train? Let's put it that way. How many unique?

1:29:29Speaker 60

Yeah, I mean, I think from what I saw the data, it's about 126. Yeah. Is it close to that? We know the whole extension is about 900.

1:29:38Speaker 20

Yeah, I mean, you can see... 126 people in Gilroy ride Caltrain.

1:29:43Speaker 60

So... Those are one-way trips, so it's you double that.

1:29:47 – 1:30:11Speaker 20

Right, but that's people, though. I mean, they go down, they come back, right? I mean, I hope. And so, yeah. When you look at there and you say 50% is moderate or above or high income, I guess that's what you put on there. What is moderate? Is that the county's definition of moderate?

1:30:11 – 1:30:29Speaker 15

So 67% of county, we just did a survey. We did our tri-annual survey. And about two-thirds of South County Connector riders report household incomes below $150,000. And about more than a third, 37%, earn less than $100,000. And again, that's household income. That's not individual income.

1:30:30 – 1:30:46Speaker 20

In the statistic that you had up there, which said 50%, you said you have a very diverse ridership, and 50% of it was moderate to above. So what is considered moderate? Because I know when we're talking about county stuff, moderate is like $200,000 a year or something like that, I think, for the household.

1:30:47Speaker 15

Yeah, so it's 37% with our low income and 50% moderate. I'm trying to remember, that is county AMI. That's the same numbers you're talking about.

1:30:55Speaker 20

Right, so it's north of 200,000, I think, for moderate and even more than that for the other.

1:31:00Speaker 20

So have you considered with your fare box, a sliding scale fare box, to help pay for this so that it's distributed more evenly to people's income levels?

1:31:10 – 1:31:23Speaker 15

One of the ways we try to deal with that is to try to, we've got that go-pass program where companies buy passes for all their employees, and then some of those don't get used, and so we have a pass-forward program where the companies can get that.

1:31:23Speaker 20

I get that, but no idea to double the, let's say double the fare box for people who are moderate to high income in order to help cover the cost.

1:31:33Speaker 15

I don't think the board, you know, we have been for a long time.

1:31:35Speaker 20

Okay, thank you.

1:31:37 – 1:31:58Speaker 69

I have a question. Any other questions from council? I have a question. Could you go back to the page where it talked about your hours, when you're open, when you serve? I think it was blue. Yeah, yeah. And at that point, you were referring to what you guys do. Mainline. And then later, you referred to if you get funding, you'll continue with that. And if you don't, you'll go to red.

1:31:58Speaker 69

Right. So if you don't mind, so when I see this here, it says frequent service day seven days a week. As you know from other council members, we want to talk about Gilroy.

1:32:07Speaker 69

That doesn't include Gilroy, correct?

1:32:10Speaker 15

No, it doesn't. But we do know that Gilroy folks do ride that service. But you're right, that's not.

1:32:15Speaker 69

But it also says every 15 minutes. That certainly does not include Gilroy.

1:32:19Speaker 69

Okay. I just want to make sure that people knew that you're talking about your train services that are broadly applied.

1:32:29Speaker 69

Okay. All right. Public comment, please? Stefan or Kim? Any public comment?

1:32:37Speaker 55

Oh, no. No speakers. Thank you. Sorry about that.

1:32:40 – 1:33:04Speaker 69

All right. Well, thank you very much. Thank you very much. Thanks for coming in. Appreciate it. All right. So next item is reports of council members. And I'm going to start with Council Member Bracco, please. Respect our time. No report. Council Member Fugazi. No report. Council Member Mark. No report. Council Member Ramirez. No report.

1:33:05 – 1:35:44Speaker 58

Just real quick, participated in another League of California Cities Housing Community Economic Development Policy meeting, participated in our first unhoused ad hoc meeting, which was great information and collaboration, and participated in my first focus agriculture session through Agriculture Santa Clara. I do want to address one other thing if you do not mind. Sure. I have to say, and I have to go on public record, I am appalled by the hateful emails and voicemails that have been sent to our staff. This is so difficult for me to keep my composure because I am mortified but by what I have read and heard. It is incredibly inappropriate to speak to staff, any staff, in this way. We are fortunate as a city to have the professionalism, the knowledge that this staff provides to this community on a daily basis. If you sent me an email demanding termination of staff or provided any disrespectful comment, you did not get a response from me. I deleted your email. You do not warrant a response. I understand that there are some things that are going on in this community that bring fear, fear of the unknown. I get it. And it is okay to disagree. That's what makes our democracy the beautiful thing that it is. But you have to remain respectful and kind in your comments. Ms. Goey, I'm going on record right now that we are fortunate to have you and your staff. Thank you for your service.

1:35:52 – 1:36:31Speaker 30

Council Member Klein. I don't have any reports, but I do. echo those sentiments of Council Member Ramirez with Sharon and what she does for us and the staff. We have a great staff, and they work their tails off. And there's a right way to do things. There's a wrong way to do things. And, you know, it's great to have a discussion, but keep it to the point, and don't make it personal like that. There's no room for it. And for someone like her to take what she's taken, we stand with her. We protect her because she does a great job. She works her tail off. And I'm just happy with working with her, and thank you for your sentiments.

1:36:33 – 1:38:04Speaker 69

Thank you very much. I am going to comment about, so we're at the end of the school year, and every year comes some of the most generous and giving people and organizations in this community is when they get highlighted. So this year, we've just gone through the cycle of where scholarships and things are given out to the students around our community. And just as a reminder, I believe Gilroy Assistant League, they just gave out their annual $45,000 or so. And most every single one of their givings went to Gilroy Unified School District. Gilroy Foundation has just finished their competitive grant recipients. PROGRAM FOR THE YEAR WHERE THEY GAVE OUT $548,000 TO SOUTH COUNTY ORGANIZATIONS AND PEOPLE IN NEED. AND AT THE SAME TIME, GILROY FOUNDATION, AS PART OF THEIR GILROY FOUNDATION SCHOLARSHIP CYCLE, THEY GAVE OUT $459,000 TO STUDENTS IN GILROY. AND INCREDIBLY, THERE'S IN PARTNERSHIP WITH SILICON VALLEY COMMUNITY FOUNDATION, There's now $20,000 scholarships that go to kids in Gilroy that are anonymous. And this year there was 15 of them. So it's pretty incredible, Gilroy Foundation and the generosity and the giving of this community, those people in front of us. So congratulations, Gilroy.

1:38:04Speaker 58

Can I add Rotary? Rotary also gives about 200,000 out every year.

1:38:11 – 1:40:24Speaker 69

Thank you. Thank you. And surely it's not just Rotary and Gilroy Assistant League and Gilroy Foundation. This community always continues to give. So thank you for doing that. I already made my first mistake of the evening. I skipped over public comment, which is quite important. Item number 3.2. So as a reminder, this part of public comment is by members of the public on items not on the agenda. but within the subject matter jurisdiction of city council. So I just want to remind everybody, thank you for coming in this evening and your interest in participating in the city council meeting. But I would also like to remember to ensure that this meeting proceeds efficiently and fairly and with decorum that we are going to ask people during public comment not to clap. I asked folks to do this a couple weeks ago and thank you very much for responding. It's not conducive to a great meeting when some folks are clapping against something that other people don't feel as strongly about. So please keep in mind we would like this meeting to move at a great pace. So we will not be having clapping. And I would also like folks to remember, once we start the public comment about this item, which is number 3.2, once we get through the first three, then we're not going to continue to add public speakers, or just it goes on and on and on, and then I choose the wrong minutes for them to speak. So with that being said, I'm going to move into public comment. Remember, this is for items that are not on the agenda. And for example, I get a sense that there are people here that want to talk about a data center this evening, which is quite fine. That is something that you will talk about in 9.4, right? And that'll be in 9.4. But don't worry, as I said earlier, we're moving 9.4 up from the very end of this evening to right after the consent calendar, which will not be long from now. So with that being said, I'm going to turn it over to Kim and Stefan for a public comment.

1:40:25 – 1:40:36Speaker 55

Thank you. I'll call three speakers at a time so you can be prepared and line up or be prepared to come up. Jan Guffey, Michelle Nelson, and Perla Garcia.

1:40:37Speaker 69

Kim, how many speakers do you have?

1:40:42Speaker 55

24, currently.

1:40:43 – 1:41:00Speaker 69

Okay, put them down for one minute, please. For one minute. And I want to remind folks, if you're speaking about an item that's somewhere else in the agenda, please... Wait until that item on the agenda comes up, please. Otherwise, take it away, Jan. You have one minute.

1:41:00 – 1:41:13Speaker 55

All right. Can I make one more note? Sure. One more note, really quick. The speaker timer, which you're used to seeing here on this screen, will now be shown up here, and you'll get a 10-second warning, and then your minute will chime as well.

1:41:13 – 1:41:32Speaker 45

Great. Thank you. Thank you. Thank you, Kim. Honorable Mayor and City Council members, my name is Jan Guffey. I'm a resident of Gilroy. Thank you for your courageous vote opposing the proposed ice facility on county land just outside city limits. Please do the next right thing and ban ice from staging their operations anywhere inside Gilroy. Thank you.

1:41:43Speaker 55

Michelle Nelson, Perla Garcia, and Georgine.

1:41:49Speaker 39

Before I start, this is about the environmental impact report for the data center.

1:41:59Speaker 39

This is not about the process, which is 9.4.

1:42:05Speaker 34

I think we are going to be taking comments on the data center on 9.4. You're correct that 9.4 is devoted to process. However, we are furnishing that time to talk about data centers.

1:42:15Speaker 39

So I disagree completely. We'll hold your comment until then.

1:42:19Speaker 69

At 9.4, please, which will only be in a few minutes.

1:42:21Speaker 39

I had a separate comment for 9.4.

1:42:25Speaker 69

Well, Michelle, you've heard me ask the whole room.

1:42:28Speaker 39

Okay, just a complaint because I want to talk about the noise, not the process, the noise.

1:42:33Speaker 69

Thank you. 9.4, thank you very much. Next, please.

1:42:39Speaker 55

Sorry, the timer's up there now.

1:42:43 – 1:43:52Speaker 51

Good afternoon. My name is Perla Garcia, and I'm a resident of Gilroy. This is my first time coming to a city council meeting, and I find it important to be here for a couple of reasons. But one of the topics that I want to just, like the First Lady spoke about, is the detention center. I understand that this was privately done. We are hoping that as representatives of this city, you will fight for us and fight against the detention center. Gilroy has a population of 58.9% Latinos, and a lot of our Latino members here and citizens are farm workers. Having a detention center here is gonna affect all of us. It's gonna affect our farm workers. It's gonna affect our children. Racial profiling exists, as you know that. I don't know if you follow the news, but the Delaney Detention Center in New Jersey is all over the news right now for inhumane conditions. California is not going to be any different because ICE is doing whatever they want. So I'm really hoping that you will take our public comments and understand that our community is going to suffer if more detention centers come this way. And so I truly, truly hope that you will represent us in our interest and the interest of our farm workers. Thank you.

1:43:52Speaker 69

Thank you very much. Can you guys hold the applause, please? Can that bell be louder? I know that she did a great job speaking, but I don't think she even heard the bell. I just turned it up a little bit. Thank you.

1:44:03 – 1:45:24Speaker 64

My name is Georgene Scott-Kodiga with Americans for Transparency. On June 5th, this council was formally asked to issue a written determination under Sequel Guideline 15162 addressing changes to the data-centered water employment figures and certification. That determination has not been issued. It remains outstanding tonight. Here are the facts. Amazon's certified final EIR states this project will use 7,494,550 gallons of water per year, 23 acre feet. On May 29th, Amazon's VP published a column stating the project would use approximately four million gallons, roughly half. At the June 3rd open house, Amazon's own representatives acknowledged on video that the numbers had changed. The certified EIR states employment may grow to 50 full-time employees, while Amazon now says approximately 90. That's an 80% increase over the baseline used to determine the traffic and air quality analysis. These are not rounding errors. Since 15162 doesn't give this council discretion to ignore changes like this, It requires a documented determination of whether they trigger supplemental environmental review. I'm asking the council to acknowledge that this request remains outstanding and to direct staff to issue it.

1:45:24Speaker 69

Thank you very much. Your time is up. Thank you very much.

1:45:28Speaker 55

Next three, please. Ellen Martin, followed by Santa and Rebecca Armendariz.

1:45:39 – 1:46:43Speaker 9

Good evening, Council. I've been in Gilroy since 1975. I recently retired from the Santa Clara Valley Water District. I was a water measurement technician. I measured all the data on all five of your wells every month, so I know what's going in and out. So my concern is just that you and your staff be sure to take due diligence on your water use on groundwater. So groundwater, you know, we don't want to have the overdraft, subsidence, which is what caused a lot of problems in other parts of the county. So Gilroy Foods was a big user of water, but they have their own wells out there. And so that didn't really affect your city water. So I would just say that when you're looking at industry and policy, Maybe think about, you know, not delving into too much groundwater to cause too much problems for all of your other people around. I personally now am out of city limits with 12 acres of organic apricots, and groundwater is super important to me. Thank you. Thank you.

1:46:43Speaker 55

Sana, Rebecca Armendariz, and Kelly Larson.

1:46:51 – 1:48:07Speaker 67

Good afternoon, honorable mayor, honorable council members. On behalf of the Ice Out of Gilroy Coalition, we are here tonight to ask that you prioritize the following. That the city file an amicus brief with our county and state attorney general lawsuit to stop the ice processing center from being built in Gilroy. And that it be part of the agenda for the special meeting on the 29th of June. Second, that you declare any city-owned property in Gilroy as ice-free zones. Our county and many cities across the country, including five in our own county, have successfully passed these policies. Gilroy needs to do the same to protect its community members and reassure them of our commitment to support them as best we can. And lastly, to create an emergency operations plan in case of increased ice enforcement, such as workplace raids and the kidnapping of our community members from their homes, schools, or work sites. It's no secret that our economy thrives because of our immigrant community members, but their value is far beyond the financial contributions, direct or indirect. They're human beings with families and friends who love our community as much as any of us do. They deserve to be here not just because of the work they do or the products that they buy, but because of who they are and how their presence strengthens the diverse cultural fabric of our community. Thank you.

1:48:08Speaker 69

Thank you, Rebecca.

1:48:11Speaker 55

Kelly Larson, followed by Clarita and Perla Flores.

1:48:22 – 1:49:27Speaker 8

Good afternoon, council members. I'm here to echo what you've heard from many of our community leaders and request that our county and state attorney general's lawsuit to stop the ice processing center from being built in Gilroy, and second, that you declare any city-owned property in Gilroy as ice-free zoned. Every time we all stand in this hall and recite the pledge that says liberty and justice for all, I want that to mean something. I want this community to know that our words are paired with action. And right now, our community is looking to you all to see that your words are paired with action. And we need those actions to unequivocally say that you will do everything in your power to defend this community, our neighbors, family, and friends, not just because they give us something and to be sure, our city would be nothing without our immigrants, but because we are all human and we are all deserving of life, dignity, and respect. And so I and the many beautiful people behind me are here to urge you to listen to your constituents and use the power we as voters have entrusted with you to use it responsibly and humanely, ice out and no data processing center.

1:49:28Speaker 69

Thank you, Senator.

1:49:34Speaker 55

Clarita, followed by Perla Flores and Sally Armendariz.

1:49:39 – 1:50:17Speaker 57

Hi, my name is Clarita. Thank you for the opportunity and for approving the resolution opposing the proposed ICE facility. I'm asking you to build on three actions. Join the amicus brief being filed by the county of Monterey. Agenda, sorry, I can't speak today. No staging some policy to your add the no staging policy to your decks council meeting Establish an emergency response plan to the city is in case we need to protect our community and These issues matter deeply to me Because I love my community

1:50:28 – 1:50:44Speaker 12

And today I work with you, the Youth Alliance. I coordinate the San Benito County Solidarity Network. And every day I witnessed the fear, uncertainty of our community. And I urge you to stand with our community and take action. Thank you.

1:50:45Speaker 69

Thank you, Carita.

1:50:47Speaker 55

Perla Flores, followed by Sally Armendariz and Julie Klein.

1:50:51 – 1:51:55Speaker 33

Good evening. My name is Perla Flores. I'm an immigrant from Mexico, the proud daughter of hardworking immigrant farm workers and also an immigration attorney. And I spent the last 25 years working with immigrant survivors of gender-based violence, particularly in South County. You've heard three concrete steps that you can do to further support our immigrant community. And I strongly support these... because I've seen firsthand the impact that fear has on immigrant and mixed-status families. Throughout my career, I've worked with thousands of immigrant survivors of domestic violence, sexual assault, human trafficking, and other crimes. When people are afraid to report violence, seek support, or cooperate with law enforcement, seek medical care, the entire community is less safe. Gilroy has always been shaped by immigrant and farmworker communities. There are neighbors, there are coworkers, business owners, and friends. They help power our local economy and enrich the fabric of our city. The question before us is not simply about immigration policy. It's about what kind of community we want to be. I believe Kiroy is strongest when all residents can live, work, learn, and seek help without fear. Thank you for your leadership, and we look forward to your support.

1:51:57Speaker 55

Sally Armendariz, Julie Klein, and then Aaron O'Brien.

1:52:08 – 1:53:11Speaker 24

Good afternoon, my name is Sally Hernandez and I'm a Galway native. I've always lived in Galway, all 84 years of my life. So do I care about Galway and who lives in Galway and how Galway is compromised? Yes, I do. But since I didn't see any of you yesterday at the protest against the building of the ICE jail in our town, I'm here to ask you that you Give and show our undocumented residents some type of reassurance that you care about them by creating that emergency plan for their protection. Join the lawsuit filed by the county and state and declare Gilroy an ice-free zone. Protect your community. That's why you were elected. And if you want to know what Gilroy is going to look like, if you let that detention jail, because that's what it's going to be, be built, I suggest all of you watch the movie, A Day Without a Mexican, and you'll see what Galway's gonna look like. Thank you. Thank you, Sally.

1:53:14Speaker 55

Julie Klein, Aaron O'Brien, and Ruby.

1:53:22 – 1:54:45Speaker 53

Honorable Mayor, honorable council members. I'm sorry if I get a bit emotional. I wrote to you earlier today about my beautiful daughter-in-law and I'm going to try and keep it together. I'm Julie Klein, a small business owner with Indivisible South County. Please. agendize a no staging policy prohibiting ICE from using city property for enforcement operations. You can't cry foul about it being called a Gilroy detention center and yet be a party to ICE actions by providing staging space within city limits. Please develop an emergency response plan. There are ICE bounty hunters rounding up our family and friends to fill for-profit detention centers. The price paid for each detainee is the same, regardless if they get the facts wrong. It's cruel. It's inhumane. Lastly, join the amicus brief and the lawsuit filed jointly by the county and California's AG. You can't control how the public refers to this facility, but you can control Gilroy's perceived response. Thank you, Julie. And how it is remembered.

1:54:46Speaker 69

Thank you very much.

1:54:48Speaker 55

Erin O'Brien, Ruby, and Yuli. Thank you.

1:54:55 – 1:55:56Speaker 63

Good evening. I'm going to start by asking people in chambers if they are opposed to the ICE facility and are asking you to take action to please stand. So I am here tonight because the proposed ICE detention facility just outside Gilroy City limits will have devastating impact on our families and neighbors. The people who are at most at risk are not strangers. They are our neighbors, our coworkers, our friends, our families, our loved ones. We have a responsibility to do everything we can in our power to keep them safe. You have a responsibility to do everything in your power to keep them safe. Silence is a choice. Inaction is a choice. And today I'm asking you to choose courage and leadership and solidarity with the people of Gilroy. And I'm asking you in a very urgent manner, you must agendize and pass the amicus brief because time is running out for that. It's incredibly important. Be brave.

1:56:02Speaker 55

Ruby, Yuli, and Diane.

1:56:12 – 1:56:55Speaker 3

Good afternoon, Mayor and City Council members. I acknowledge that my issue is very, very minor compared to the issue that everyone else is discussing today. I'm a member or resident of the Milius Apartments on 6th Street and Monterey, and the parking lot that all residents have been parking in for many years has now changed its hours, so we're no longer allowed to park there overnight. We park several blocks away on residential streets that are dark and not lit well. see this as a safety concern for my personal safety, my vehicle's well-being, and I am formally requesting the city at least consider a parking permit program for the residents of the Milius apartment complex. Thank you.

1:56:56Speaker 69

Thank you very much.

1:56:58Speaker 55

Yuli, Diane, and Gretchen.

1:57:07 – 1:58:07Speaker 35

Hi everyone, my name is Yulia Boundis and I'm a local educator. Yesterday, more than 500 people from our community and surrounding areas marched in protest of the potential construction of an ice concentration camp in Gilroy. Today, I stand alongside concerned community members regarding the potential harms and psychological distress that would be inflicted by the possible expanded ice presence in our area. It is our responsibility to establish safety and unity among all of its residents. By adopting the no staging zone policy and implementing emergency response plans, you have the opportunity to uphold these values and reinforce the trust that community members have placed in their local government. Without this policy, our immigrant neighbors would undoubtedly continue to face barriers to accessing essential services, including health care and education, due to increased fear and uncertainty. I urge you to consider lasting harm caused by family separation. Please reflect on your responsibility to protect the safety, stability, and dignity of all of its residents. I ask you to vote in support of the no staging policy and protect the individuals at greatest risk.

1:58:10Speaker 55

Diane, Gretchen, and Raymundo.

1:58:18 – 1:59:26Speaker 54

Good evening, City Council members, staff, community. My name is Diane Ortiz. I'm the CEO of Youth Alliance, serving Gilroy youth and families. Thank you to the City Council for passing a resolution opposing the harmful ice activity in our community. Your action sent an important message that Gilroy values the safety, dignity, and rights of all residents. While the resolution is meaningful, many families continue to live with fear. And when residents are afraid to go to work, take their children to school, seek medical care, or participate in civic life, the entire community suffers. Gilroy has an opportunity to demonstrate what local leadership looks like during this moment, and we respectfully urge the city of Gilroy to join the amicus brief being filed. To meet this deadline, we urgently request that you add this amicus decision to the city council board agenda at the upcoming special meeting on June 29th. By joining the brief, Gilroy can stand along neighboring jurisdictions in defense of our residents and community values. Adding Gilroy's voice would strengthen a regional message that local communities support constitutional rights, due process, and family unity. This is an opportunity to show that Gilroy is committed not only to words, but also to action. Thank you.

1:59:27Speaker 69

Thank you, Diana.

1:59:28Speaker 55

Gretchen Raymundo Angelique.

1:59:35 – 2:00:36Speaker 47

Good evening. My name is Gretchen Yoder shock. I am a resident of Gilroy and I want to express my appreciation for some of our city council members that have issued formal statements opposing the federal plan to build an immigration facility on whole school road and that our city. has a policy that the police department will not participate in federal immigration operations. As our community clearly is expressing, we are strongly opposed to the government's plan. I encourage you to file an amicus brief in support of our county and state lawsuit to stop this proposed facility. We have all experienced in this past year and a half how this federal government just barrels ahead with any and all of their ideas. We need to be prepared. I encourage you and urge you to pass a policy that will prevent any city-owned property being used by ICE. Thank you.

2:00:37Speaker 69

Thank you, Gretchen.

2:00:38Speaker 55

Raymundo, Angelique, and Tatiana. Tatiana.

2:00:51 – 2:01:57Speaker 13

Good evening, Mayor and City Council. My name is Remundo Armendares. I'm the Executive Director at CARAS, Community Agency for Resources, Advocacy, and Services. And I am here tonight to request that all of you please continue to support the immigrant labor and Latino community of Kilroy. by a couple things. One, if you could please commit time and resources to creating an emergency response plan to support immigrant farm workers here in Gilroy. In case of ICE raids that may be escalated with the creation of this ice detention processing center to that the city contribute resources in time to Join and file an amicus brief in support of the county and state of California as well to support immigrant labor and residents and here in Gilroy, and finally, also to pass a policy that would bar the use of city-owned property from being used by ICE detention or ICE staff and facility members. Thank you.

2:01:58Speaker 69

Thank you, Raimundo.

2:02:00Speaker 55

Angelique, Tatiana, and Lauren.

2:02:10 – 2:03:13Speaker 6

Good evening. My name is Angie, and I'm 15 years old. And I live in Gueroit, but I'm here with Youth Alliance. First, I want to thank the City Council for passing their resolution opposing harmful ice activity in our community. It means a lot that our leaders are listening to our local families. As a 15-year-old, it's hard to see people in my community worried about being separated from our families. Everyone deserves to feel safe at school, in their neighborhood, and in the city they call home. I'm asking the city to continue taking action by joining Monterey County's mission brief, exploring a no-stage zone policy, and creating an emergency response plan so families know where to go for support and resources if they need help. Thank you for listening and continuing to support our community. I hope you'll keep taking steps to make sure all families in Garoy feel safe and protected. Thank you.

2:03:13Speaker 55

Thank you, Angie. Tatiana and Lauren.

2:03:28 – 2:04:31Speaker 41

Good evening, my name is Tatiana Villaseñor Carrillo. I am a community organizer with CARA South County here in Gilroy. Thank you for unanimously opposing the proposed ICE detention facility. I urge the city council to take the next step by joining the growing coalition supporting the lawsuit against this project and by advancing policies that ensure city property cannot be used for immigration enforcement staging. These actions matter because detention harms families, creates fear, threatens the economic well-being of our community. Gilroy was built by immigrants and farmworker families, and we have the responsibility to protect the people who make our city strong. I respectfully ask you to continue your leadership and take concrete action to keep Gilroy safe, welcoming, and united. I understand that people may disagree about immigration policy, but regardless of where we stand politically, we should be able to agree that families deserve dignity, children deserve safety, and no one should be subjugated to conditions that dehumanize them or separate them from their loved ones. Thank you.

2:04:31Speaker 69

Thank you very much.

2:04:42Speaker 69

Lauren? Yeah, she's outside. She's coming. Okay.

2:04:48Speaker 55

Lauren Lauren Houseman.

2:04:58Speaker 69

Here she comes.

2:05:10 – 2:05:30Speaker 56

everyone, the council members to agenda a formal moratorium on all future data centers and battery storage facilities in the city of Gilroy. I have children and I'm a teacher and I love children and I love clean air and clean water and everyone needs that and we don't need any more data centers.

2:05:34 – 2:06:23Speaker 69

Thank you. You got your hands full there. Cute. I have no further speakers. All right. Thank you. Thank you, everybody, to the community. The signs are great. Thank you very much for the decorum in this part of the meeting. Very much appreciated. Okay. We are going to move on. to item number five and this is the appointment of our youth commission youth commission appointment so this is the background for some of you that are here and are sticking around of course you're not required to but two weeks ago we had young members of Gilroy come in and apply for the youth commission and they did short interviews and now we're going to go through the selection process so We will start with probably Council Member Bracco. Go right down the line, and he will announce who he voted for, and we'll keep a tally.

2:06:24 – 2:06:43Speaker 55

Yes, thank you, Mayor. We currently have five vacancies on the Youth Commission with terms ending June 30, 2028. We did interview 11 applicants on the June 1st meeting, and so I'm going to start with Council Member Bracco, and if you could give me your top five, and then we'll go down the line.

2:06:43Speaker 31

Okay. Estrad Balanos.

2:06:49Speaker 69

Is your mic on? Yeah. Can't hear you.

2:06:54 – 2:07:13Speaker 31

Did you get that, Kim? Okay. Cormac Stumpf. Sorry if I'm butchering your name. Jackson Liu. Jeremy Vu. Casey Walker.

2:07:14Speaker 55

Thank you. Council Member Fugazi.

2:07:18 – 2:07:35Speaker 20

Yeah, let's see if I can get this one of my glasses on. Cormac Stumpf, Jackson Liu, Jeremy Vu, Lizeth Gomez-Rodriguez, and Robert Garive.

2:07:37Speaker 55

Thank you, Council Member Marks.

2:07:39Speaker 65

Abigail Nguyen, Astrid Bolanos, Jeremy Vu, Casey Walker, and William Purdy.

2:07:49Speaker 55

Thank you, Mayor Bozo.

2:07:52Speaker 69

Abigail Nguyen, Jackson Liu, Casey Walker, Sarah Isaac, William Purdy.

2:08:02Speaker 55

Thank you, Council Member Ramirez.

2:08:04Speaker 58

Abigail Nguyen, Jackson Liu, Casey Walker, Robert Garive, William Purdy.

2:08:15Speaker 55

Thank you, Council Member Klein.

2:08:17Speaker 30

I'll give you the first name, Abigail. Jeremy Vu, Robert Garive, Sarah, and William.

2:08:29 – 2:09:19Speaker 55

Okay, just give me one minute. It looks like we have five applicants with four votes each. So that would fill the five vacancies. They are Abigail Nguyen, Jackson Liu, Jeremy Vu, Casey Walker, and William Purdy. Congratulations.

2:09:21Speaker 69

Congratulations for those who are here. I think there's a couple of them out here. All right, go ahead and stand up, you two that are here. I think there's two of you here that are present. All right, congratulations.

2:09:45 – 2:10:02Speaker 69

All right. Moving on to item number six is the consent calendar. ANY COMMENTS FROM COUNCIL MEMBERS ON CONSENT? ITEMS ON CONSENT? ANY QUESTIONS? DIDN'T SOUND LIKE IT. PUBLIC COMMENT? EXCUSE ME, GO AHEAD.

2:10:04 – 2:10:26Speaker 30

I JUST NEED TO POINT OUT ONE THING. THIS ITEM IN THE CONSENT IS I APOLOGIZE. Yes, 6.5. I have a conflict of interest with that, and so I need to recuse myself from that vote. 6.5. 6.5, yes.

2:10:26Speaker 69

We'll recuse from 6.5. Yes. Okay. Any public comment on the consent calendar, please?

2:10:36Speaker 55

No, I have no speakers.

2:10:38Speaker 69

Okay, then I will entertain a motion.

2:10:41Speaker 58

Motion to approve. I'll second.

2:10:43 – 2:11:00Speaker 69

I have a motion by Council Member Ramirez and a second by Council Member Marks to approve items 6.1 through 6.12 on the consent calendar with Council Member Klein abstaining from 6.5. Roll call, please.

2:11:00Speaker 55

Council Member Bracco. Yes. Council Member Klein.

2:11:03Speaker 55

Council Member Fugazi.

2:11:05Speaker 55

Council Member Marks. Yes. Council Member Ramirez. Yes. And Mayor Bozo.

2:11:11 – 2:11:58Speaker 69

Yes. Motion passes 6-0. OK. As I said earlier, in orders of the day, I decided to move item number 9.4 to the beginning of the meeting. I'LL READ THAT TO YOU MOMENTARILY. ITEM 9.4, CONSIDERATION OF OPTIONS FOR AMENDING THE ARCHITECTURAL AND SITE REVIEW PERMIT PROCESS. FAIR MEMO BY MARKS AND RAMIREZ. STAFF REPORT, PLEASE.

2:11:59 – 2:17:35Speaker 32

MICHAEL. GOOD EVENING. THANK YOU, MICHAEL VASSATI, PLANNING MANAGER, CITY OF GILDEROY. GOOD EVENING, MAYOR AND COUNCIL, MEMBERS OF THE COMMUNITY. TONIGHT IS THE FAIR MEMO REGARDING THE ARCHITECTURAL AND SITE REVIEW PERMIT PROCESS. Staff is ready to present the outline, provide some options for council to consider, and provide a recommended path moving forward. Oh, it's not showing. MY APOLOGIES, COUNCIL AND COMMUNITY. THIS IS THE PRESENTATION. THIS ITEM IS RETURNING TO COUNCIL AFTER DISCUSSION EARLIER THIS YEAR. IN JANUARY THE FAIR MEMO BROUGHT UP QUESTIONS ABOUT THE CURRENT ANS REVIEW PERMIT PROCESS AND IN MARCH COUNCIL DIRECTED STAFF TO COME BACK WITH OPTIONS TO CONSIDER. The current AS review permit process applies to new construction in several zoning districts. As shown on the slide, some large projects have been approved administratively under the current code without an initial public hearing or planning commission approval. These include Performance Food Group, the McCarthy Industrial Buildings Project, and the Gilroy Data Center. Next slide. Apologies for the technical difficulties. Under the current code, the community development director or designee has decision making authority for standard ANS review permits. For most major AS projects, we create a web page to show the project's current status in the entitlement phase. There is no public notice or hearing unless a project already requires it or if someone appeals the decision. If there is an appeal, the planning commission and possibly the city council can review the case. If the appeal is withdrawn, there will be no public hearing. This slide summarizes where approval authority currently sits. Standard ANS review permits are handled by staff, but certain permit types must go to the planning commission and city council for consideration. Staff has identified three options for the council to consider to increase public involvement. Option one would expand public outreach. Option two would set a CEQA-based threshold for planning commission review. Option three allows council to propose an alternative approach. Staff's going to provide a recommendation to combine option one and option two for your review. Option one would increase public outreach. It aims to increase community awareness earlier, specifically once an ANS application is deemed complete. We would keep the current web page posting process intact and add the additional following steps. We'd require the applicant to send mailed notices and host a public meeting to discuss the project. And the applicant would need to provide the documentation to the project planner once that community meeting is over. In our staff report, we identified pros and cons for this approach. OPTION ONE PRIMARILY RAISES AWARENESS AND ENCOURAGES COMMUNITY INVOLVEMENT WHILE KEEPING THE CURRENT APPROVAL PROCESS UNCHANGED. HOWEVER, IT COULD LEAD TO HIGHER COSTS, REQUIRE GREATER STAFF OVERSIGHT AND TAKE LONGER TO PROCESS. FURTHERMORE, EVEN WITH SET STANDARDS, THE QUALITIES OF THE COMMUNITY MEETING MAY BE COMPROMISED. OPTION TWO WOULD SET A NEW THRESHOLD ON WHETHER A PROJECT REQUIRES A PUBLIC HEARING. This approach reserves public hearings for projects with the greatest environmental impacts. All other development proposals would go through a more predictable administrative design review. Administrative review is usually more efficient and less costly. Projects with major unavoidable impacts would still get a higher level of public review and decision making. If adopted, this change would mean more staff time and higher processing costs for fewer projects that need to go to planning commission. This includes time spent on scheduling hearings, managing agendas, and providing extra support. Again with this option, as identified in the staff report, there are pros and cons. Option two reserves public hearings for projects with the greatest environmental impact, including community involvement. However, for projects that meet the CEQA threshold, this could mean longer timelines, higher costs, and more uncertainty for the development. With that, staff recommends pursuing a zoning code amendment to adopt option one and two, which would enhance the public outreach and planning commission review for projects that require an EIR with significant and unavoidable impacts. This approach balances and supports transparency, public participation, and administrative efficiency. This concludes staff summary of the proposed project, and I'd be happy to answer any questions. Thank you for your time.

2:17:37 – 2:17:50Speaker 69

I'm going to go to Councilmember Ramirez, then I'm going to go to Councilmember Marks, and then I'm going to go to Bracco, because I saw your hands go up. But I also, first I want to get some comments from Andy, just to give context to the community and to us up here about this item.

2:17:51 – 2:19:04Speaker 34

Thank you, Mr. Mayor. Just briefly, this item is agendized to relate to options for amending the architectural and site review permit process, and that's what Mr. Fossati has presented a staff report on. The city will be considering the possibility of changing its system in some respect with respect to architectural and site approval considerations. This is not the time for a referendum on the Amazon project, which of course was approved a year ago. Although we recognize, however, that Amazon was the impetus for much of the concern here about the actual process and has brought that really to our attention. So the council will not be considering specifically the Amazon project or whether its documentation is accurate or not. That's not the issue tonight. However, those of you who wish to talk about Amazon, as the mayor mentioned earlier, this is the time to do it because it is here on the agenda. Although, as I said, the council deliberations will deal with questions about what to ask the staff to bring back in terms of possible changes to the city's process for treating architecture inside of Google Projects. Great.

2:19:04Speaker 69

Okay, I'm gonna go to a councilman mark.

2:19:07 – 2:19:19Speaker 58

Excuse me Ramirez marks then Bracco to start it off So I just want to clarify this this is for discussion or comments or questions right now for staff. I have no question It's I have just comments.

2:19:19Speaker 69

Sure councilmember marks.

2:19:20 – 2:20:00Speaker 65

Okay. I do have a question and I'm asking this so it's clarified for everyone who's listening and Because when I first read this in option two about significant and unavoidable impacts. I can't read my own handwriting here. I was thinking it was too subjective. And then when they explained it to me. and what it meant, all of a sudden it made a lot of sense. So I'm sure there's people out there that are confused as I was when I first read that. So could we have someone explain what these significant and unavoidable impacts actually means?

2:20:01 – 2:21:08Speaker 32

Sure, if you allow me. Sure. I'll give you a couple moments. Give me a couple moments. Every project that's within the city, the state of California, requires to go through what they call CEQA, the California Environmental Quality Act. That has multiple elements associated with it that a project needs to be reviewed against. If there's a determination that the project significantly impacts one of those elements, it's considered significant and unavoidable. Let me give you an example. The state recognizes and some cities recognize scenic views via scenic public routes. So if there's a public route that has a certain view, it can be designated as a scenic view. If someone proposes a development project that impacts that view because the building is too high, if it has a certain look, that would be considered a significant unavoidable impact because the state of California, as well as the local city, had determined that was a scenic vista. So that's where it's objective. Hopefully that's an example that you can handle.

2:21:09 – 2:21:51Speaker 65

Okay, and I do have one more. I noticed that in the recommendation, it goes to Planning Commission, and say Planning Commission says yes to the project, But the council doesn't like it. I'm a little surprised that the council doesn't weigh in on this also. So I don't know. Well, I guess when we get to discussion, I guess the council could discuss that, that we could ask the question if that could be amended. Because I think when we did the fair memo, Council Member Ramirez and I had planning commission and council involvement.

2:21:53 – 2:22:29Speaker 21

So through the mayor, the process for reviewing land development items is that it would be reviewed through the Planning Commission first, that's why you hire them. So they come on board to do that review. Doesn't necessarily mean that that's the end of the process, so either side can appeal that decision, and that appeal would come to the City Council. So there is a process to get to the City Council for your insight. THE GOAL IS THAT THE PLANNING COMMISSION HAS CLEAR DIRECTION FROM THEIR KNOWLEDGE OF YOU AND FROM THEIR WORK PLAN OF WHAT YOU ANTICIPATE, WHAT YOU EXPECT, AND WHAT THE CODE SAYS, AND THAT WOULD DRIVE THEIR PARTICULAR REVIEW AND DIRECTION.

2:22:30Speaker 65

ALL RIGHT. THANK YOU.

2:22:31Speaker 69

COUNCILMEMBER BROCKO.

2:22:35Speaker 31

HOW LONG HAVE WE BEEN DOING THIS PROCESS THE WAY IT'S BEING DONE NOW?

2:22:40 – 2:23:04Speaker 32

I DID A LITTLE RESEARCH AND I CAN'T FIND A TIME WHERE WE HAVE NOT BEEN DOING THIS PROCESS. AT THE BEGINNING OF THE SLIDE, I DEMONSTRATED SOME PROJECTS THAT HAD RECEIVED THE SAME PROCESS, ADMINISTRATIVE REVIEW VIA AN EIR. AND THE LATEST ONE WAS THE PERFORMANCE FOOD GROUPS. THAT WAS APPROVED IN 2016. THANK YOU.

2:23:05Speaker 69

COUNCIL MEMBER FUGATI.

2:23:08 – 2:23:23Speaker 20

First question, because Mr. Morley brought it up, he said either side could appeal. What are those sides? Obviously there is, if it was denied, the applicant could appeal to, but what would be the other side?

2:23:25Speaker 21

So if it was denied, the applicant could appeal. If it was approved, then anybody and any member of the public could appeal it at that point.

2:23:34 – 2:23:59Speaker 20

Okay. Thanks for that clarification. Now, as far as examples, since we have just done the Amazon one, would this have kicked in, gone to the Planning Commission and given the opportunity for the public to be that appeal should they have approved it? If we had this in place, would that have covered and kicked in accordingly for that project?

2:24:03Speaker 69

Could you give some examples of other projects? Sorry, I'm catching you off guard here. Some other projects where that would also kick in.

2:24:10 – 2:25:00Speaker 32

Sure. Both that and the best I can use, the performance foods, they both have the same impact. The Amazon project had a significant and unavoidable impact on vehicle miles traveled. They were speculating a certain amount of cars going into that area. And the project required more vehicle miles traveled to propose that. That's exactly the same. IMPACT THAT THE PERFORMANCE FOODS GROUP HAD DONE ALSO. I THINK THE OTHER DIFFERENCE FOR THIS ONE IS THE AMAZON PROJECT, IF I RECALL, HAD IT FARMLAND THAT NEEDED TO BE MITIGATED. THIS ONE WE CAN MITIGATE IT BECAUSE I BELIEVE THE APPLICANT CAN PURCHASE FARMLAND AND DEED IT TO AN APPROPRIATE AGENCY TO SUPPORT THAT FARMLAND COMPONENT LOSS.

2:25:01 – 2:25:26Speaker 69

SO ANOTHER EXAMPLE WOULD BE A BUSY GAS STATION ON THE STREET CORNER SO THAT MAY HAVE SOME ENVIRONMENTAL IMPACTS POSSIBLY WITH THEIR GAS TANKS. MAY HAVE SOME IMPACTS BECAUSE OF TRAFFIC. THAT WOULD GOING DOWN THE PATH AS COUNCIL MEMBER FERGAZI JUST ASKED, THAT WOULD NOW GO THROUGH THE PLANNING COMMISSION AND THEN THE CITY COUNCIL. WHEREAS BEFORE IT WAS ADMINISTRATIVE. IS THAT CORRECT?

2:25:26Speaker 32

CORRECT. The council so wishes we would create a zoning amendment to create that provision.

2:25:34 – 2:26:40Speaker 34

May I interject for a moment? The proposal is that only projects with unmitigated impacts would go to the Planning Commission. And normally under CEQA, the environmental analysis has to look at all impacts and mitigations that are available. And the goal is to mitigate impacts if possible. So in the gas station example, probably whatever impacts it had WOULD BE MITIGATABLE. FOR EXAMPLE, YOU CAN DO SOMETHING TO IMPROVE THE TRAFFIC FLOW, FOR EXAMPLE. IN THAT CASE, IT WOULD NOT NEED TO GO TO THE PLANNING COMMISSION. IT'S ONLY WHEN THERE ARE IMPACTS THAT EVEN THOUGH THE CITY HAS ADOPTED MITIGATION, NONETHELESS, THE IMPACT IS NOT FULLY MITIGATED. AND MANY PROJECTS DO NOT OCCUR THAT WAY, BUT SOME DO. AND ALSO, JUST ONE OTHER COMMENT. MOST LARGER PROJECTS INVOLVE SUBDIVISION ALSO, AND THAT GOES TO THE PLANNING COMMISSION AUTOMATICALLY AND THEN CAN GO TO THE COUNCIL. THE AMAZON PROJECT WAS UNUSUAL IN THAT, LIKE SOME INDUSTRIAL PROJECTS, IT DID NOT REQUIRE SUBDIVISION. SO THEREFORE, IT DID NOT TRIGGER PLANNING COMMISSION OR COUNCIL REVIEW UNDER THE PRESENT ORDINANCE.

2:26:43Speaker 69

OKAY. FURTHER QUESTIONS? YEAH, GO AHEAD.

2:26:45 – 2:27:04Speaker 20

THIS MIGHT GO TO ANDY AS WELL. If there's a resident appeal, does it then go to our legal to see whether it rises enough to that it's an unmitigated issue and then it rises up to where it will come to council? Or no matter what, it's going to come to council because it was appealed by the residents?

2:27:05Speaker 34

Well, if under the new policy the matter goes to the planning commission, then that can be appealed to the council.

2:27:12Speaker 34

It would not go to the Planning Commission unless the environmental impact report showed an unmitigated impact.

2:27:19 – 2:27:31Speaker 20

Right. And do we get a lot of these every year? I mean, is this going to be a swarm of potential appeals? I have no idea for the volume.

2:27:32Speaker 34

I think it's a small number, but perhaps Michael can explain.

2:27:36 – 2:27:53Speaker 32

No. ONLY IS IT A SMALL NUMBER, AND SPEAKING TO CITY ATTORNEY FAVOR, THE MAJORITY OF PROJECTS OF THIS SIZE HAVE MULTIPLE ENTITLEMENTS, WOULD AUTOMATICALLY BRING IT TO CITY COUNCIL FOR REVIEW. THIS IS AN ANOMALY, AN ARK IN SIGHT WITH AN EIR. IT'S NOT VERY COMMON.

2:27:59Speaker 69

All right, so we have no further questions. We will jump to public comment. We have quite a few speakers. So we're going to do one minute, please. And Kim, you can start introducing them, three at a time, please.

2:28:10Speaker 55

Thank you. Noah Hayes, Arianna Casey, and Rachel.

2:28:29Speaker 67

Good evening, City Council.

2:28:31 – 2:29:28Speaker 5

I attended the Amazon open house and was not impressed. The Amazon representatives are overtly enthusiastic about the project and eager, borderline aggressive to convince me this was a net good for Gilroy. They were also extremely supercilious when I told them I had a lot of questions. When I asked why Gilroy was chosen as the location for the data center, the prevailing response from Amazon was our welcoming economic environment and availability of resources. Please do not fall for this rhetoric. When they say this, they mean they saw a city with lax codes, ordinances, and laws they can take advantage of. The guardrails are not in place to keep Amazon contained and they will take and take and take. They will poison this community and then turn around and claim they are contributing to it with grants and programs that amount to a rounding error in their accounting. I employ counsel to adopt these new resolutions and to be vigilant and proactive in making sure that if they cannot stop Amazon now or any other mega corporation, that they cannot do it again. Thank you.

2:29:30Speaker 55

Arianna, Rachel and John.

2:29:35 – 2:30:53Speaker 66

Thank you for hearing me. This is my first City Council meeting, so this is all a little bit new, and I was thinking it was going to go a little bit differently. But I have a question. When we say environmental impact, what do we mean there? Are we talking about a red-toed frog, or are we talking about other kinds of impacts? Because I feel that the Amazon Data Center, as it was, may or may not have what I think of as an environmental impact. And I'm just trying to understand whether or not what I think of as an environmental impact would come before you. You don't have to answer that. You probably can't. But the next thing I would say is the two real big objections I have here is the lack of communication to the community. I know that you have a website now. with a lot of good information on it, but I just found out about it. I know there's another project coming that they're doing due diligence on right now, and I would really want the administrative process to not allow that to go forward without public input, at the very least, and perhaps control.

2:30:53Speaker 69

Thank you, Arianna. Yes. Thank you.

2:30:56Speaker 55

Rachel, John, and then Kyle, please.

2:31:01 – 2:32:16Speaker 18

Good evening, Mayor and Council Members. My name is Rachel Chambers. I moved to Gilroy just two years ago, and what struck me immediately was the deep sense of community here. People care about their neighbors, their land, their history, and the future they're building together. Gilroy isn't just a place to live, it's a place people are proud to call home. That's why I'm here tonight, to oppose the data center proposal. What concerns me most is not only the project itself, but the feeling that something significant is moving forward without the level of public awareness, discussion, and scrutiny it deserves. a decision that could permanently alter our landscape, community, character, and should not feel rushed, hidden, or quietly pushed through. The people of Gilroy deserve a transparent process and a genuine voice in shaping what comes next. The land being altered is more than a development opportunity. It's part of what makes Gilroy so special. Open spaces, natural beauty, and a connection to our surroundings are what draw people here and keep them here. Once it's gone, it's gone. We're not just speaking for ourselves tonight. We're a voice of the future. We are stewards of what makes Gilroy special for our children, grandchildren, and everyone who choose to call it home. Thank you so much.

2:32:16Speaker 69

There's your one minute. Thank you very much. Great job.

2:32:18Speaker 55

At this time, the first three speakers have spoken, so no additional speaker cards will be accepted for this item. I just wanted to make note. John, followed by Kyle and Jan.

2:32:33 – 2:32:46Speaker 11

I'm very concerned with the lack of community insight with this project, and I would like, you know, option one I'd like in the future for things that are this big and affect us this much. TO HAVE INFORMATION FROM THE COMMUNITY SO WE CAN STOP THINGS LIKE THIS.

2:32:53Speaker 55

KYLE, JAN, AND MICHELLE.

2:32:56 – 2:33:40Speaker 16

All right, good evening City Council and Mayor. My name is Kyle Short. I'm a teacher here at Gilroy. I teach at Gilroy High. I really care about this community. I really care about the students that I teach, and I really hope that the City Council will, A, have more public awareness, more public outreach about issues like this, and B, oppose the construction of the data center especially the electricity cost, the water cost on the surrounding community. A lot of our students, you know, face difficult financial decisions, and this may have a very negative impact on their future. And because I kind of screwed up my speaker card, please oppose, join the amicus brief, and declare city property ice-free zones. Thank you. Thank you.

2:33:41Speaker 55

Jan, Guffey, Michelle, Nelson, and Kami.

2:33:50 – 2:34:22Speaker 45

Hi, my name's Jan Guffey and I'm a resident of Gilroy. Thank you council members Marks and Ramirez for proposing this ordinance to make land use decisions more transparent. We were blindsided by the construction of the Amazon AI data center and have many unanswered questions about the impacts of that data center on us Gilroyans. And it doesn't appear from this ordinance that transparency is still evident in this particular ordinance, but thank you for your efforts.

2:34:25Speaker 55

Michelle, Cami, and Heidi?

2:34:31Speaker 39

Before I start, am I going to be allowed to address 8.1 in mentioning water?

2:34:37Speaker 69

Why wouldn't you do 8.1 when 8.1 comes up?

2:34:39 – 2:36:11Speaker 39

That's what I'm asking. Am I going to be allowed to address 8.1 and mention the data center in 8.1 as it relates to water? Sure. Thank you. Okay, so for this, I'll do noise. Pull it up. Okay, I did read the entire environmental impact report, and while part of my concerns have been assuaged due to the mitigations put in place, I still have some questions, and I'll focus on noise. At first glance, it appears that the impacts in this category are only significant during the construction phase, and with the sound barriers, the impacts are reduced to less than significant. The results from the monitoring stations appear to fall within the city's zoning ordinance, although other reports indicate that the noise is disruptive. The supplemental noise analysis from Trinity from 2024 mentions the EPA's recommendation of a day-night average sound level of no greater than 45 decibels for indoors and no greater than 55 decibels for outdoors to prevent interference with activities and annoyance. According to the noise project, the range of 40 to 50 decibels is associated with a lack of sleep. Prolonged exposure may also cause headaches and irritability. Chronic exposure to sound levels above this range can also lead to impaired cognitive function, especially in children. The World Health Organization also mentions below 60. The applicable noise criteria for Gilray is 60. My concern is that's too high, and that's all I have time for. Thank you. I'll send multiple pages. Please.

2:36:13Speaker 55

Cami, Heidi, Charlene.

2:36:22Speaker 69

Can you pull the mic down, Cami, a little bit? Yeah, I've been told to do that. Can you hear me? Yeah, very well.

2:36:27 – 2:37:39Speaker 40

Okay. First of all, thank you, council members, for your time this evening. I suspect we may be in some alignment in that we recognize that the process that was applied to the Amazon data center did not meet the needs or desires of the community. What happened, I believe, was that the zoning code was applied as appropriate at that time. I do want to step aside for a moment as a member of Indivisible South County that we do not and would not condone any negative or threatening comments or emails made to any of your staff. NOT APPROPRIATE, AND I WOULD NOT UNDERSIGN THAT. HOWEVER, AS YOU KNOW, IN THIS CASE, THERE WAS NOT AN OPPORTUNITY FOR PUBLIC REVIEW OR COMMENT, AS IT SHOULD HAVE BEEN. GIVEN THE SIGNIFICANT IMPACT ON POWER AND WATER RESOURCES AND QUALITY OF LIFE FOR THOSE THAT FALL WITHIN THE SOUND SCAPE OF THE FACILITY, THIS PROJECT SHOULD HAVE REACHED THE LEVEL OF PUBLIC NOTICE. OUTDATED ZONING REQUIREMENTS. I'm going to ask you that you review your process so that this doesn't happen again and that we can serve the community better that way. Thank you.

2:37:39Speaker 69

Thank you, Kimmy.

2:37:41Speaker 55

Heidi, Charlene, and Steve.

2:37:53 – 2:39:09Speaker 48

Good evening. Thank you for the opportunity to share tonight. My name is Heidi Mayer. I'm an educator. a parent and a neighbor here in Gilroy. Among the many concerns already voiced, there's one that I assert is the most important to consider. Surprisingly, it's not that these centers are known to negatively impact things like our already unstable electrical grid. We have rolling blackouts every summer or the overuse of precious resources, namely our fresh water. or the increased pollution proven to be dangerous for infants and those with existing respiratory conditions. Believe it or not, it's also not that the negative impact this would absolutely have on the farming community, which makes our city an absolute gem here in Silicon Valley. The noise pollution, which primarily impacts neighborhoods that are already plagued with the noise associated with being built near freeways. It's the fact that current residents do deserve a say in this, despite any decisions that have already been made. Thank you.

2:39:10Speaker 55

Thank you. Charlene, Steve, and then Pat.

2:39:17 – 2:40:23Speaker 46

Good evening. My name is Charlene Pewter. Thank you for letting me speak tonight. I'm a relatively new resident of Gilroy, and I love living here. However, it's been suggested that myself, an average everyday citizen or resident of Gilroy, contributed to the process, the problem with the data center, because we didn't let people know early enough that we were not in favor of this. I assume there was a process, though after tonight, I don't know, maybe there wasn't. But I don't think the process was knowable to the average everyday resident. And prior to this year, I don't think most people understood what data centers were and the impact they had on communities. So also, I don't think if I had asked questions, I would have gotten very good answers based on what happened at the Amazon session. So I would feel that even tonight's agenda, I'm confused about the data center and water usage, and that hasn't been made clear to me. So I'm asking that we pause this process and get more information. Thank you.

2:40:27Speaker 55

Steve, Pat, and Perla.

2:40:33 – 2:41:15Speaker 17

So I'm not aware of any friends or neighbors that are in favor of this project, although maybe I'll meet somebody tonight. While I'm hopeful this facility will not be completed, I understand that's probably not realistic. I would encourage you all to take a more aggressive approach in soliciting community feedback prior to projects being completed, particularly on projects that draw down on our resources that we all are asked to conserve. I think that's pretty important. And lastly, I think the community would appreciate that and I think it would be good for your collective political careers. Thank you.

2:41:16 – 2:41:32Speaker 69

Thank you very much. As I mentioned before, we want to keep this meeting moving along smooth tonight. So you can come on up. And if you guys could please hold it in the clap for after this meeting, that would be very helpful.

2:41:33 – 2:42:47Speaker 19

As a respect for everyone else who asked to speak. Well, out of respect for all of you, I think the people that have already spoken have done a great job. They've circled the wagon around all the questions that are out there. One question I do want to address is, as we are talking about amendments to the code, That actually happened in 1981. If someone wants to go ahead and take a look at the data that's out there. So where we are today where the public does not have a say, that started in 81. I commend you on actually taking a look at it, you know, in front and moving down that road. So beyond that, I think there's opportunities to hit restart. Hit, back in the day, it was pause and restart, and that was already mentioned. Okay, so you have a chance to go ahead and back up. And that being said, there's three action items I want to address. A, let's start with stop the construction of the Gilroy Amazon data center until a neutral party EIR is completed and openly shared with the public. Put it before the voters on the November 26 ballot. for a public vote on whether to proceed or not. Moratorium on or ban. I know that's the line. Thank you very much.

2:42:48Speaker 69

Thank you. Great job. Thank you. Thank you so much.

2:42:52Speaker 55

Perla, Mac, and Georgene.

2:43:02 – 2:44:07Speaker 51

Hello again. Hi. Like many have spoken about the data center, I'm here also to oppose that. I am requesting that, and not requesting, I think where a lot of us are demanding a moratorium on the data center. I come here today as a breast cancer survivor, health is important to me, and I know that we don't have enough data, ironically the word data, we don't have enough data around the data centers, but what we do know is there's places such as in Georgia where 30 million gallons of water are being utilized and now the community is getting muddy water that's undrinkable. That can happen to us here. Again, we have farm workers and we use a lot of water in our farmland here. And we are also sometimes being prohibited from watering our own grass. So if we're getting prohibition from watering our own grass, how does a data center get millions of water, recycled or not? So I'm asking of you to take courage and we need to change the zoning laws. We need to do something about this data center currently. We can still stop it. Monterey just did it. Monterey just stopped any future data center building. So we can do it.

2:44:12Speaker 55

Mack, Georgine, then Debbie.

2:44:15 – 2:45:13Speaker 1

My name is Mack. Thanks for letting me talk, Mr. Mayor and Councilman. Not in my backyard has been a slogan in this manufacturing facility for years and years. It has killed many, many manufacturing jobs throughout the U.S. I come from a manufacturing industry, work in this country 40-plus years in manufacturing. Less don't kill more job. data center will be built here, there, or somewhere else. How long we gonna keep on importing everything we use in our life from somewhere else, some other countries? You guys in this room has information, have the datas, have the credentials, have the right to know everything you guys know more than most of us in the community. So please make a right decision, make a proper decision. Let's do what's good for the nation, good for the people, good for manufacturing, good for jobs. Thank you.

2:45:13Speaker 69

Thank you, Mac.

2:45:15Speaker 55

Georgine, Debbie, and Landon.

2:45:19 – 2:46:24Speaker 64

This council has now been notified four times about the same unresolved problem. The city cannot show the public the basis for its own finding that our water system can handle a data system facility this size. I've asked for the memo, the acre engineering memo by public record request. I haven't received it. That's the basis. Your own paperwork says it was modeled and evaluated after that, but we can't see it. we you have on your item 93 you're asking for an urgency ordinance we want an urgency ordinance for this to put a temporary moratorium so we can change the zone zoning until we can figure out what to do that's what we need that's all we need is a temporary moratorium on all data centers you can you keep stalling you don't get it we don't want it here you can't even prove that it's that your paperwork is sufficient for it. Why can't we get a copy of the paperwork? What do I need to do? Thank you.

2:46:28Speaker 55

Debbie, Landon, and Daphne.

2:46:37 – 2:47:19Speaker 44

Let's see if I can adjust this. There we go. My name is Debbie Carrick, and I'm a resident of Gilroy. I prepared this whole nice thing to say, but it seems that at least some preliminary steps are being taken in the right direction. I just want to echo that, you know, I think Amazon came in here to our small community and found a loophole and took advantage of it, and here we are. And maybe it's delayed, but I think it's, I really want to encourage the council to approve and adjust the current building codes the way they are so that it's more transparent and so that the community does have some input on all of this. So thank you for your time.

2:47:19Speaker 55

Thank you very much. Landon, Daphne, and then Ron.

2:47:27 – 2:48:23Speaker 2

Good evening, council members and to those in the gallery. My name is Landon Sepulveda. I'm one of the organizers of South Valley Community Resistance. You have and will hear today many people from all walks of life come to you as their representatives and plead for a ban on all future data centers to be constructed within our city. It is not a surprise that the majority of people do not want a data center within their town. It is an issue that reaches across both aisles. In fact, 71% of Americans oppose data centers, so why would we create more in our city? Amazon often cites a study about the lack of impact on the communities that they construct in. However, in that very same study, it makes it clear these are numbers for a single data center, and more data centers could indeed have an impact on the utility cost, environmental, and power grid. We understand that the current data center was not the fault of the council, but of the outdated processes that these projects have to go through. So we ask you to not only move forward with the transparency, but to ban all future data centers from being constructed in Gilroy. Thank you.

2:48:29Speaker 55

Daphne, Ron, and Armando.

2:48:34 – 2:49:37Speaker 36

Hello. Good evening. Thank you for being here today, everybody, every member of this Gilroy community that I love so much. I'm here with my two-year-old, which is hard enough, right, to have your two-year-old even at home. So I've been here for probably three hours now with a two-year-old. So I really mean this with all of my heart. I am beyond disappointed about this data center. I look at my daughter every day, and I want the best for her, whether it's her diet, whether it's her activity. And I wake up every day knowing that there is going to be something in my backyard that is known to cause a decline in her health, that is known to have an increased chance of her getting childhood cancer. My daughter's a NICU survivor, and I'm so grateful she's made it this far. And it would be heartbreaking to have something like that in my backyard for both of us as we both have grown up here. And I'm so grateful there for this place. And I know we're Gilroy strong, and I know we all know what that means. And that means we defend ourselves against any type of harm, not just imminent threats like that day. We defend ourselves through and through.

2:49:37Speaker 72

Thank you. Thank you.

2:49:42Speaker 55

Ron Kirkish, followed by Armando and Annador. Good evening, Mayor, Council.

2:49:48 – 2:50:59Speaker 26

And I don't think it would surprise you to know that I'm actually pro the dating center. And the biggest hurdle, it seems, is the water issue, along with the electronics, too. But the water issue seems to get a lot of people very upset. So I think I want to address that tonight. The Lagos water basin holds 93 billion, 20 million gallons of water. 93 billion. The data center says it's going to probably use around 4 million gallons a year. That's 0.004% of the water table that we have. 0.004%. I don't understand why people are so hysterical when it's such a minimal amount. I know 4 million sounds like a lot, but 4 billion is a heck of a lot more. Now, in addition to that, we have water. Oops, I guess I'm done.

2:50:59Speaker 69

Thank you, Ron.

2:51:00Speaker 69

Thank you so much. Armando.

2:51:05Speaker 55

Armando, followed by Anador and Diane.

2:51:08 – 2:52:16Speaker 22

Thank you, council members. You know, it was an anomaly, but it was an anomaly that the Amazon Center was an anomaly because of the fact that it was based on or approved on outdated and non-relevant zoning code. And you ask how long have we been approving these centers, and it's been forever. Yes, it's been forever, but we haven't had AI centers forever. In fact, if you look at Santa Clara County Valley water, they're just updating their code so that they do get or deal with zoning issues in regards to water. I think what needs to do is you're representing the people, and I think what you need to do, you need to update the code. You really need to make new policies, new standards, new thresholds. You cannot just go on and accept number two and think that that's okay with the people. The people want a solution, and the solution is option three. That means you revise the code, you set ceilings, you set standards, And you represent the people, the interests of the people. That's what they want. They don't want you to just have option two. That's not a good choice. Thank you, Armando. THANK YOU.

2:52:16Speaker 55

ANNA DOR, DIANE, FOLLOWED BY BRIT.

2:52:23 – 2:53:50Speaker 59

THANK YOU, ESPECIALLY TO COUNCIL MEMBER RAMIREZ AND MARX FOR BRINGING THIS TO THE COUNCIL AGENDA. OBVIOUSLY THERE'S TREMENDOUS INTEREST IN IT. I SUPPORT THAT YOU'RE PUTTING EXTRA LANGUAGE IN THE ZONING CODE. I WOULD REQUEST, ASK, SUGGEST THAT YOU PUT ON A MORATORIUM FOR AT LEAST SIX MONTHS that has the specific language of data center in it. So that the time can be taken because having been a planning commission member for the last four years, I know that you're instructing the staff to do verbiage to put in the zoning, but that can take many, many months. And in the meantime, we might end up with a second data center. And that next data center might be a hyperscale data center of 3.8 million square feet. And if nothing gets changed or locked down right now, that can slide in under the same rules as the first one did. And then we're in even greater trouble, right? So kind of consider that. And so in addition to voting on the current language that's being proposed in the staff recommendation, which I support, add maybe an addendum or an amendment that says, let's do a moratorium for six months so we have time to study it and get the language tightened down to address all the comments and concerns of the community. And like one of the other audience members said earlier, be brave.

2:53:50Speaker 69

Thank you. Thank you very much.

2:53:56Speaker 55

Diane Edson followed by Britt Smith and Colleen Crew.

2:54:00 – 2:55:10Speaker 61

GOOD EVENING, MAYOR AND COUNCIL. THANK YOU. I KNOW IT'S TOO LATE FOR THIS DATA CENTER. AND I'M HOPING THAT THE CHANGES GO FORWARD TO STOP ADDITIONAL. BUT I WOULD HAVE SOME CONCERNS THAT I WOULD LIKE TO HAVE ADDRESSED. IS GILROY DEVELOPING A CONTINGENCY PLAN TO RESPOND TO UNEXPECTED EVENTS? LOOK AT TRACY. NO, IT WASN'T A DATA CENTER. Yeah, it happens, emergencies. Risks that disrupt normal operations for this city. In the event of leaks, fires, explosions, what is the city doing to prepare? for these possibilities because they are possibilities. Nothing is impenetrable. Ask the people on the Titanic. 1600 out of 2200 people died because they said that ship couldn't be sunk. There wasn't enough lifeboats to save people. Make a plan to address potential problems before they happen.

2:55:11Speaker 69

Thank you, Diane. Britt is next.

2:55:15Speaker 55

Britt Smith, Colleen Crew, and Connie Ludwig.

2:55:23 – 2:56:38Speaker 70

Good evening to my neighbors on the council, in the chambers, and watching online. My name is Britt Smith, and I first stood before this body in January to raise concerns about the impending construction for an Amazon Web Services hyperscale data center. At the time... because the city's communication approach, even the one proposed, is quite inadequate. And there really were cited significant unavoidable impacts to groundwater that went uninvestigated, as called out by Valley Water. Many of us, six months ago, were not aware of the full extent of this project, but a lot has changed. Now almost daily, there are groundbreaking, often terrifying studies about the real impacts of data centers on their local communities. From dizzying drones of a data center to watching tap water turn fluorescent yellow, the evidence is in front of us in our news feeds and it's impossible to ignore. What's worse, those data centers were supposed to be sustainable too. This council has said many times that it's too late to act. And while that may be the case for a Royal Circle site, we are here to ensure that our voices are going to be heard going forward. This council has admitted that our ordinances are outdated, so let's start there. Next, organize a committee to open to all residences and businesses that will oversee impending data center impacts while also reviewing proposed future impacts or projects of a similar scale.

2:56:38Speaker 69

Thank you, Britt. One minute. Thank you very much.

2:56:40Speaker 55

Colleen Crew, Connie Ludwig, and Deepak.

2:56:47 – 2:58:07Speaker 38

Good evening, Mayor and Council Members. My name is Colleen Crewe and I'm proud to call Gilray my home. At a time when California communities are being asked to conserve resources, Gilray is being asked to accept a facility that will consume enormous amounts of electricity and require significant water resources for cooling operations. Residents have every right to ask whether this is the best use of our land, our infrastructure, and our limited resources. But for me and for many of my neighbors, this isn't just about power and water, it's about trust. Trust that when a project has the potential to reshape our community, residents will be informed, that trust that our voices will be heard before decisions are made, trust that the future of Gilroy will be shaped with the people of Gilroy, not simply around them. Many, if not most, residents first learned about this project after construction had already begun. Whether process followed existing rules is not what concerns me most. What concerns me is that so many people felt left out of a conversation that should have included them from the very beginning. Gilroy is a community that values relationships. We know our neighbors. We volunteer in schools. We support local businesses. We show up for one another. That same spirit of openness and community involvement should guide decisions that will impact the city for generations. The decision made today will outlive all of us in this room. Years from now, our children and grandchildren will either thank us for protecting the character of this community or one another.

2:58:08Speaker 55

Connie, Ipak, and Joshua.

2:58:14 – 2:59:22Speaker 49

Hi, my name is Connie Ludwig. I'm from San Martin, and I appreciate the opportunity to speak today. In San Martin, about 20 years ago, we did have a water problem. Some deep wells are still being studied and tested because of perchlorate, and nobody thought at the time when there was the Olin factory that something like this could be a problem. So I am concerned about the water. On June 5th, the City Council was formally asked to issue a written determination under CEQA Guidelines Section 15162 addressing changes to this project's water and employment figures and certification. The determination has not yet been issued. It remains outstanding. Amazon certified... Final EIR states this project will use 7,494,550 gallons of water per year, 23 acre feet. On May 29th, Amazon's vice president published a column stating the project will use approximately four million gallons, about roughly half. On the June 3rd, Amazon certified final EIR states, whoops, Anyway, please address this. Thank you so much.

2:59:22Speaker 69

Thank you very much. Great job.

2:59:26Speaker 55

Deepak, Joshua, and Jennifer.

2:59:33 – 3:00:23Speaker 10

Hello, Mayor. My name is Deepak Nair. I'm a techie, so it makes sense I could speak here. So I want to say one clear thing. So I went to the Amazon hearing that was conducted. They were giving us fake data as a public. The information that was provided that the data center will use water for 18 homes, and then they will use ambient temperature. for cooling the data center. That was falsification of information. That was completely false information provided to the public. I personally have built data centers, and I know it takes far more power, far more water to cool it. So please, please look at this thing very, very closely. And I, as a member of the public, do not approve of the data center. Thank you.

3:00:25Speaker 55

Joshua, then Jennifer.

3:00:33 – 3:01:37Speaker 73

I found out about the data center in January when I was driving. I just looked out my window on Arroyo Circle and saw the billboard. That was six months after it had been approved last June. And that was my introduction, all the way out by Costco. I've done research since then. I've looked at the power consumption. They're going to hook this data center up to 49 megawatt. That's 49 million watts of power, capacity power line. to the power line that supplies the Renz Lane substation which supplies all of us. Using information from the Energy Information Agency and from the California Financial Agency, I found that this is roughly equivalent to the power of 50,000 homes, and in Gilroy we have about 19,000 occupied homes with an average of three people or more. That's more than two times the amount of, that's more than two times the combined total of the electricity all of our homes are using. This is unacceptable.

3:01:38Speaker 55

Thank you very much.

3:01:38Speaker 73

Think about it.

3:01:47 – 3:03:14Speaker 4

Hello, good evening. Hi, Mayor. Just to kind of go off of what he just, can you not hear me? Sorry, thank you. I think we all know that these things are just gonna suck our resources. I think everyone's hip to the game now. If it was a good thing, it would have been announced a big celebration. We're bringing this wonderful thing into our community, but it wasn't sneaky. And now people are freaking out because they realize what their lives are going to look like. And I think that's a really unfair thing to do. to people in this community. I've lived in Santa Clara County for 44 years. I know a lot of people and the more I share about this, either people don't know anything about them or they're terrified and they don't want them. I live currently in Santa Clara and there's about five or six nearby me. I wasn't aware. I moved in there a year ago and now I'm freaking out because I need to move. I don't know where. Where's a new one gonna pop up? From what I understand, I think there's more projects going to happen here in Gilroy. i you know i think the people need to know i have no further speakers no that was the other connie there are two connies

3:03:17Speaker 59

One minute, right? You got this, Connie.

3:03:20 – 3:04:42Speaker 62

Thank you. Okay, my name is Connie Rogers, and I want to thank Councilwomen Ramirez and Marks for submitting the fair memo. And I believe we, as a city, we did not have the right rules in place, but also I'm afraid that Valley Water didn't have their right rules in place because tonight I learned that... Our water figures were based on their report of 2021 and next year, they have a deadline of next year to update their water management plan because they weren't taking into account data centers and there have been a whole lot in San Jose. So I am asking that we try to put a pause on everything until we can get accurate research, especially on the water. You were talking about significant effects. I think the water is the most significant effect, and I would like to see our new ordinance have specific numbers or percentages to avoid the problem that we're in. And I do think we need a moratorium until we figure this out.

3:04:42Speaker 69

Thank you, Connie. All right.

3:04:45Speaker 55

Now I have no further speakers.

3:04:47 – 3:04:59Speaker 69

Okay, thank you. Okay, now I'm going to bring it back to council. I don't see anybody on the board yet. I am. Okay. Go ahead, Council Member Ramirez and then Council Member Fugazi.

3:05:00 – 3:07:09Speaker 58

So first of all, thank you for everyone for your comments. A huge thank you to Council Member Marks for working on this with me, to Legal for working with us on this, and to city staff for all the work that you've done on this. So just a few comments that I want to make. When Council Member Marks and I started this, we realized that perhaps With new and emerging technology, our codes were a little bit outdated. That's why we're here tonight. We would like to update them, and I think staff has done a really good job of encompassing really what we were looking at, the end result providing the community with those opportunities. The one thing that I would like to add... In terms of public outreach, we have a newsletter that goes out every week. We have had a really good link to our current projects. Help me with the name of that link, I'm really... with all the projects, any project at all that's at the city and shows the status and stuff. We have a development project list. There we go, that. If that could be added just at the bottom of every newsletter or whatever so people can just easily click on that and they can see housing developments, business, industry, whatever, where they are in the process. I know it's already on our website, but maybe having that link... And then perhaps if there is some kind of a special project, having a paragraph or something about that with a link to that. Because I do know you do make all of these separate web pages for projects and just having a link to that. And then, yeah, I think this covers all of our concerns. So thank you.

3:07:12Speaker 69

Council Member Fugazi.

3:07:14 – 3:07:32Speaker 20

I have a question. Obviously, we're thinking about these three different options, and it would help me to understand right now how many projects would fit in the data center, and I'm using air quotes on purpose because I don't know how exactly you define it, realm right now in the city.

3:07:33Speaker 32

So just to make sure I'm clear, taking all the applications for a formal development application? Right. Zero. Zero.

3:07:39 – 3:08:20Speaker 20

Okay. And the stage at which, what's the time period it would take for somebody to put an application in to like even get to the first stage? How long would that take? Whatever those stages are, you can inform people. So I put in an application. I've got to then, I've got to go send out and do work. Maybe Andy can help with this to know, because people are asking for a moratorium, right? So if we put a moratorium in place, How does that prevent people from putting in the application? We have to still look to know whether it's a data center. Explain how that might work or not work because I don't know the process enough.

3:08:23 – 3:08:34Speaker 34

Matt. I can respond briefly. The Amazon project was under review for several years, for example, and when a project was applied,

3:08:35 – 3:08:57Speaker 69

Hold on a second, Andy. Hold on a second, Andy. If you guys don't mind, we just sat here for 35 minutes and listened to your comments, and now we have the city attorney trying to give you additional information. So as I asked for earlier this evening, we're just looking for decorum in this room. So if we listen to your comments, I'm hopeful that you'll listen to our comments, including his.

3:08:59 – 3:09:43Speaker 34

So what I was saying was that the... With housing projects, certain projects get priority from the date of the filing of an application. That's generally not true for these kind of projects, these industrial projects, because the laws simply are not the same. They're not as pro-development as they are for housing projects. As a result, a project can't slip through very quickly. and particularly with the staff option recommended of an EIR with significant unmitigated impact, you don't know that until the full EIR is done, which typically takes at least a year. So in terms of urgency of needing to stop something, Michael, perhaps comment, but I don't think there is any such urgency right now.

3:09:44Speaker 20

But at the same time, if we took a deep breath right now, we wouldn't be holding up anybody who was in the process right now because there isn't anybody else in the process. That's fair enough to say, too.

3:09:54Speaker 34

That's probably accurate, right?

3:09:58 – 3:12:22Speaker 20

So, you know, one of the things I can say is we just spent a lot of time working on something that A lot of people had strong feelings about, in terms of health, which is the smoking ordinances that we had, that we talked about. And obviously people have a strong feeling about health on this, and we have ordinances on our books for regulating things from card rooms to massage parlors to smoking. I know this is part of our building code portion of our code, but it stands to reason that if there is a significant potential more health risk, and I don't necessarily know if there is or isn't, that we might want to investigate how we might want to adjust our code to accommodate that in the approval process. Again, from my limited amount. One other thing I want to say, too, in terms of being informed, I think that it's the responsibility for every citizen, every resident to go seek out and get the information. I think some are more required to do that than others. activists or so-called or self-described activists. Information is out on our website all over for you to consume. It can't be dropped off on your front doorstep all the time in order to say you didn't know. I've been for many, many years with the City of Gilroy looking at the website, digging in, asking questions, asking questions of people on staff and everybody else, and every one of you have kind of an obligation to do that as well. I think that data centers are something that we all use. In fact, during this whole process, all of you were using them quite a lot. And they have to go somewhere. Or they might end up being relegated like fuel refineries where our fuel goes up to $7 a gallon or something. I think we have to figure out how to have these data centers in places around the state and in communities, do it safely, and if we have to make a change in our code to accommodate that and we need to look at that, I'm certainly open to doing that as opposed to rushing through and going one, two, and being done. So that's where I am.

3:12:24 – 3:12:46Speaker 69

Question? Council Member Klein, I saw you looking this way. I'm going to ask a quick question while it's fresh in my mind. I might be leaning on City Administrator or Michael for this question, but as Council Member Fregasi was asking about the application process and when does the EIR process start on that, and then I believe Andy said that could be a year or two down the road, correct?

3:12:47Speaker 28

Yes, that's correct.

3:12:48 – 3:13:20Speaker 69

Correct? So this is the question I have for you guys is, THAT DOESN'T PRECLUDE ANY TYPE OF REVIEW THAT THE COMMUNITY IS LOOKING FOR, CORRECT? SO IT WOULD STILL COME TO THE PLANNING COMMISSION ONCE THE UNMITIGATED CIRCUMSTANCES WERE REALIZED, AND IT WOULD COME TO THE PLANNING COMMISSION, IT WOULD STILL COME TO CITY COUNCIL, AND AN EIR, THEY COULD, A COMPANY COULD SPEND A LOT OF MONEY ON AN EIR AND IT COULD STILL BE NOT APPROVED, CORRECT?

3:13:22 – 3:15:23Speaker 21

That's true. The EIR is at the tail end of the process. So with a project, the application comes in. When the application is deemed complete, when there's sufficient information for staff to be able to evaluate the project, that's a major trigger point. There's, at that point, a significant amount of information that's made available on the website for the community. That project information is shared. What we're talking about now is, at that point, Should there be additional community outreach? And that's one of the staff's recommendations is that we at that point start additional community outreach to get the project information out there that would also align with Council Member Ramirez's idea of an item on the newsletter identifying projects. And then at that point, somewhere along that point begins the environmental study. The environmental study looks at California's environmental regulations, taking in a whole series of a dozen or more different components of environmental analysis done by third party separate consultants for each one. So it's a very detailed and very expensive process for a project to go through in order to identify what impact that project may have on the environment. And through that process, it's a data analysis process, so it's not a subjective, it's an analytical process to identify based on regulations that are broader than what the city has, what the impacts might be for that project, and then a whole analysis on whether those impacts can be mitigated or not. And what we're saying is if through that process it's identified that there is gonna be a definite impact to the project cannot be mitigated, it cannot be fixed, the Planning Commission and the Council need to hear about those projects and those should come forward for evaluation. So that's the long and the short of what we're suggesting as a solid process to be able to have detailed community input including hearings like this one for projects.

3:15:24 – 3:15:55Speaker 20

Can I just, one clarification on that? Sorry, the appeal process happens because of a particular unmitigated item in the EIR. And when they appeal, does the decision on the appeal reside only in that space, or it could be for any other reason or arbitrary reason that gets a majority vote on either the planning commission or the council, and that's probably for legal.

3:15:57 – 3:16:22Speaker 34

I think the answer is that In this process, it's not strictly an appeal process because if the EIR shows this kind of unmitigated impact, the matter would go to the Planning Commission for a decision or a recommendation, depending on the exact thing, and then to the Council, at which point it's a de novo hearing in either one. So it's not just on the one issue where there's one impact because an EIR might deal with 15 different impacts.

3:16:24 – 3:16:46Speaker 69

So I'm going to go one more time, and I'm going to get back to what Councilmember Marks said earlier, and Matt, I'm going to ask for your help a little bit again. Councilmember Marks earlier was talking about the environmental impact report that have significant and unavoidable impacts. I heard a lot of people say that today, and I appreciate that. And you were saying earlier that you were concerned that that was too specific, but the fact is it's broad.

3:16:46Speaker 65

Well, that it was too subjective. So maybe what... I FELT SOMEONE ELSE WOULDN'T FEEL THE SAME WAY.

3:16:53 – 3:17:08Speaker 69

CAN YOU COMMENT A LITTLE BIT ABOUT THAT? THE FACT OR MICHAEL, I'M SORRY, ENVIRONMENTAL IMPACT REPORT THAT HAS SIGNIFICANT UNAVOIDABLE IMPACTS, THAT COULD BE A LOT OF THINGS THAT BRING IT TO PLANNING COMMISSION AND COUNCIL, RIGHT? IT'S NOT JUST A NARROW ITEM.

3:17:09Speaker 32

YES. THERE ARE STANDARDS THAT THERE'S THRESHOLDS LIKE SCIENTIFIC THRESHOLDS THAT MEANT THAT It's not a subjective term if I feel like it's an impact or you feel like it's an impact.

3:17:19Speaker 65

And I felt you answered it adequately before. And even Matt, when you were to explain it to me, you had a very adequate answer too. So maybe the two of you can combine it, you know,

3:17:29 – 3:18:08Speaker 21

I think if you're looking at an analysis and you heard some of it in the testimony today about some of the objections to things like noise or the amount of water that is being used or the amount of electricity that is being used, all of that is analyzed based on data and based on calculations and available information from from the consultants where they actually go in and do an analysis. It's not something that somebody says, I feel like this is impactful. It's data analysis that drives those decisions. And that's why CEQA is such a powerful tool in California and why California's environmental rules are stronger than any other state in the nation.

3:18:10Speaker 69

Council Member Ramirez.

3:18:12Speaker 58

I forgot what I was going to say.

3:18:13 – 3:19:03Speaker 69

Well, I'll just, my point was, and I'm trying to reach the community when I, I've said this a couple times, is that it feels like the direction that we're giving council, okay, that we're giving staff, is that the, you know, that the, to require a Planning Commission review and approval for development projects that require environmental impact report that have significant and unavoidable impacts. It's going to go to Planning Commission, it's going to come to Council, It's going to go out to the community, and that is the direction that we're giving you today. And I believe, I know that this group would be interested in additional items, but at this point, I believe this council is suggesting that that's the direction that we're giving you, some of the direction we're giving you this evening. Okay? Go ahead.

3:19:03 – 3:19:59Speaker 58

So I just want to touch a little bit on the process, the lengthy process that this comes in. So are there times when a developer comes in and puts in initial plans and paperwork, if you will, and then it just sits there and then really nothing ever happens or they ask for an extension because there are time, you know, things have to happen within certain, you know, the laws require responses and resubmissions and all this kind of stuff on a schedule, if you will. But there are times when they ask for extensions. The developer does, which then extends the project. And the EIR is really the last thing because of the cost to the developer. They want to make sure that everything else has approval. FIRST. IS THAT CORRECT?

3:20:00 – 3:20:48Speaker 32

YES. THERE'S TIMES WHEN A PROJECT CHANGES WHILE THEY'RE SUBMITTING. SO THERE'S STAFF IS DILIGENT IN MAKING SURE A PROJECT IS COMPLETE. AND WHAT I MEAN BY A PROJECT BEING COMPLETE IS THAT WE PROVIDE THEM A CHECKLIST AND THEY PROVIDE ALL THOSE EXHIBITS, ALL THOSE ITEMS. BUT ONCE THE CITY FEELS AND THE APPLICANT BELIEVE THAT THE PROJECT IS COMPLETE, THIS IS WHAT THEY'RE PROPOSING, THE ENVIRONMENTAL REVIEW PROCESS GOES INTO EFFECT. What we're proposing in option one along with option two is that once we deem the application complete, we put the onus on the developer to start noticing the community members, to do a community meeting, to share the project components for this complete project, to gather feedback, and then even after that, if it's a full EIR, that EIR process would start, which would again command additional meetings.

3:20:49Speaker 58

Okay, and those original meetings that you're talking about are neighborhood meetings within a certain radius of the development?

3:20:58 – 3:21:16Speaker 32

Correct. Staff is proposing or recommending that if a project is deemed this, it's an architectural and site permit. If an applicant comes in with an architectural and site permit, even a CEQA, there's no EIR even required that it's noticed within 500 feet and a community meeting.

3:21:17 – 3:21:44Speaker 58

Okay, within that 500 feet. Anyone could attend the thing, but they don't have to notify the entire city about a project at that point. Correct. Okay, I just want to clarify. And then if this EIR report then triggers that threshold, then that changes things and then it comes forward to Planning Commission, which is a public hearing.

3:21:45 – 3:22:07Speaker 32

Right, right, if I may. Once the application is ready to go to Planning Commission, because of the government code and the standards of the city of Gilroy, we are required to notice it in a public newspaper informing residents of the project, as well as the project coming to a public hearing to get a recommendation to, again, come to council, which, again, we'd have to notice in the newspaper.

3:22:08 – 3:23:23Speaker 69

Okay, thank you. FOR THE COMMENTS? OKAY, SO I'M GOING TO SEE IF I CAN GET A CONSENSUS FROM COUNCIL HERE ON THE GUIDANCE THAT WE'RE GIVING STAFF. WHAT I'VE HEARD, THE RECOMMENDATIONS FROM STAFF IS TO ENHANCE PUBLIC OUTREACH AND INITIATE THE PROCESS TO AMEND THE GEARWAY ZONING CODE TO REQUIRE PLANNING COMMISSION REVIEW AND APPROVAL FOR DEVELOPMENT PROJECTS THAT REQUIRE AN ENVIRONMENTAL IMPACT REPORT AND HAVE SIGNIFICANT AND UNAVOIDABLE IMPACTS, AS WELL AS COUNCIL MEMBER RAMIREZ SAID, SHE WOULD LIKE LINKS EARLIER IN THE PROCESS AS POSSIBLE. SHE WOULD LIKE SPECIAL PROJECT LINKS AS EARLY IN THE PROCESS AS POSSIBLE. AND JUST FOR THE COMMUNITIES TO BE CLEAR WITH THE COMMUNITY, WE ARE NOT VOTING ON THIS TONIGHT BECAUSE WE WANT COUNCIL TO GO BACK TO HEAR WHAT EVERYTHING YOU GUYS SAID TONIGHT, TO HEAR WHAT WE SAID TONIGHT, AND THEN THEY'RE GOING TO COME BACK AT A FUTURE MEETING, MOST LIKELY IN AUGUST. I KNOW EVERYBODY WANTS US TO MOVE ALONG FAST. IN AUGUST, AND THEN THAT'S THE TIME THAT WE'RE GOING TO TAKE ACTION ON THIS ITEM. RIGHT? OKAY. SO YOU'VE HEARD GUIDANCE FROM US. ANY QUESTIONS FROM STAFF? NO, UNDERSTOOD. ALL RIGHT. THANK YOU. THANK YOU, EVERYBODY, FOR COMING IN TONIGHT. WE'RE GOING TO TAKE A 15-MINUTE BREAK.

3:23:33 – 3:43:53Speaker 1

Thank you. Thank you. Thank you. Test test test. Go, go. Thank you. All right. Thank you. Thank you. Thank you.

3:44:23 – 3:45:57Speaker 69

Maybe I should get ready. Where are we? Where are we, man? Item two? 7.1. All right, we're going to get started again. Thank you very much, everybody. Hi, Mr. Felios. Could you shut that door, please, for us? I have a feeling some people are in the foyer talking, which is fine. Thank you very much. Okay, we're going to get going again, all the way back to the top. Item number seven, bids and proposals. 7.1, award a professional services agreement to Kimley Horn for a not to exceed amount of $237,117 for the development of the City of Gilway Comprehensive Roadway Safety Action Plan. Add the project to the capital improvement program and adopt a budget amendment resolution to appropriate grant and gas tax funds to the project. Yes, sir. Staff report, please. All right, Nisha, take it away.

3:45:58 – 3:51:15Speaker 68

Great. Good evening, city council, staff, public. I'm Nisha Patel. I'm the city engineer. And this item is to obtain approval of a professional services agreement with Kimley Horn for the comprehensive roadway safety action plan. To give a bit of history behind this, FHWA awarded an SS4A, that's the Safe Streets for All grant, in the amount of $190,000 for the development of a comprehensive roadway safety action plan in January. Thank you. in January 2025, and on October 6, 2025, City Council approved a resolution amending the budget for the City of Gilroy for fiscal year 2024-25 to appropriate the SS4A grant. Then in December 2026, staff released a request for proposals for development of the Gilroy csap and then on january 23rd 2026 proposals were due and staff received six proposals then april 23rd staff conducted interviews with the top three consultants and then on april 28th staff selected kimley horn to develop the gilroy csap The CSAP aims to reduce traffic-related fatalities and serious injuries through initiatives such as implementation guidance, a list of priority projects along the high-injury network, and conceptual design plans for priority locations. The CSAP will study the most recent crash data to aid the city in identifying factors that contribute the most to local traffic crashes. It better positions the city to receive safety implementation funding from state and federal grant programs such as Highway Safety Improvement Program, Safe Streets for All, Active Transportation Program, and One Bay Area Government. These grant funds are only available to communities with adopted CSAPs. The CSAP will align with city and regional transportation planning documents, such as the City's Drone Roll Plan, Traffic Circulation Master Plan, Caltrans Strategic Highway Safety Plan, and the Safe Systems Approach. It'll analyze collision data and roadway conditions to develop a prioritized list of safety improvements. And it will also include funding opportunities, implementation, monitoring, and evaluation plans to address systematic traffic safety concerns. It will be data-driven and objective, with many opportunities to engage stakeholders and the community to identify traffic safety concerns. So the total project cost and the services agreement with Kimley Horn is in the amount of $237,117.25. Now the SS4A grant reimburses 80% of the cost. So although the grant is in the amount of $190,000, they'll reimburse $189,693.80. The city is responsible for 20% of the cost, and that'll be $47,423.45, and we'll fund that through gas tax. So a budget amendment is requested for the anticipated grant reimbursement revenue and the required local matching funds for project number 801180, the Comprehensive Safety Action Plan. So staff recommends the City Council award a professional services agreement to Kimley Horn for an amount not to exceed $237,117.25 for the development of the City of Gilroy Comprehensive Safety Action Plan, project number 26RFP-PW529, and authorize the City Administrator execute the contract and associated documents. And to add the project to the fiscal year 2026 capital improvement program with project number 801180. And adopt a resolution amending the fiscal year 26 budget within gas tax fund 205 to appropriate $189,693.80 in fiscal year 2026. 2024 SS4A grant funds to the project and along with 47,423.45 in local match from gas tax fund balance for a total of 237,117.25. And this concludes my presentation. Happy to answer any questions. Council Member Fugazi.

3:51:28Speaker 20

Question. So at the end of this, we're going to get an understanding of a lot of dangerous places in the city. Is that pretty much an assessment? So we'll know where all the dangerous spots are?

3:51:40Speaker 68

Yes. And mostly the areas with high collision, with fatalities or injuries.

3:51:47Speaker 20

And it'll be prioritized?

3:51:51 – 3:52:12Speaker 20

And if the mitigation of that, and this is maybe a question for a city administrator or for legal, if the implementation of that is stalled because funding and other things, because it costs a lot sometimes to mitigate some of these things, and we were to have another incident there, does that increase our liability because we now know about it whereas before we wouldn't have known about it?

3:52:18 – 3:52:38Speaker 34

I guess the answer would probably be theoretically yes. However, if we did not take the opportunity to learn about these things, we could be criticized for that as well because if we intentionally stick our heads in the sand and then something happens that we would have found out and could have cured, then that probably looks even worse.

3:52:38 – 3:53:01Speaker 20

We might get some leeway if it was a large amount of money and we just couldn't get it done and that would probably be okay then. I mean, because clearly there's going to be a lot of things, I think, in this that are going to cost a lot of money to mitigate. And it will also obviously be public, and there will be a lot of people who will know about this, and we're not doing anything about it.

3:53:01Speaker 34

Well, the city will have to adopt priorities, and somewhere along the line, fixing the worst things will become a higher priority, one hopes.

3:53:09Speaker 21

We do risk management on a daily basis, right? And this is part of that. It's assessing where we need to spend some time and some energy to understand where the risks are so that we can address them.

3:53:20 – 3:53:42Speaker 58

And isn't it, what I read through the packet was that by having this action plan that provides us the leverage of getting grants then that would mitigate whatever is found in the action plan. And Are those pretty forthcoming then once we have this?

3:53:43 – 3:53:58Speaker 21

There's a varying number of grants depending on federal circumstances and state funding, but the grants, a lot of the times the grants will have components that require that we have the safety plan in place and the study in place in order to even apply for them. Okay, thank you.

3:54:00 – 3:54:15Speaker 65

I have a question. Do you know how long the study is going to take? Don't remember. Do you think it's going to be longer than a year?

3:54:15Speaker 68

I think it was around a year. Okay.

3:54:21Speaker 69

Council Member Bracco.

3:54:23Speaker 31

How many fatalities did we have last year?

3:54:29Speaker 68

I don't have that information readily available.

3:54:38Speaker 69

Okay. Okay, I'm going to move to public comment.

3:54:42Speaker 55

I have no speakers. All right.

3:54:46Speaker 69

Any further? Yeah, go ahead, Councilman Bracco.

3:54:50Speaker 31

Where is the company based out of?

3:54:56Speaker 68

Well, Kimley Horn is like a national company, but they have local offices, I think, in Salinas and San Jose. Okay.

3:55:04Speaker 34

They have one in my building above the floor that I'm on, in fact, in downtown San Jose.

3:55:08 – 3:55:53Speaker 31

Okay. You know, as usual, I'm going to bring it up. We're having some out-of-town company give us a report that, you know, we respond to accidents every day. You're not going to predict where they're going to be at. Accidents are caused by people. You know, I think this is a huge waste of money, no matter if you're getting a grant or not. I understand what Andy's saying about, you know, you're damned if you do and you're damned if you don't, if you do it or not. So that's what I got to say.

3:55:59Speaker 69

Any other deliberations? Nothing? Okay, I'll entertain a motion. Anybody like to make a motion?

3:56:09 – 3:56:39Speaker 69

Okay, so there's quite a few here, so I'm going to start off with the first one. I have a motion by Councilmember Klein. to award a professional services agreement to Kimley Horn for an amount not to exceed $237,117.25 for the development of the City of Gilroy Comprehensive Roadway Safety Action Plan, project number 26RFP-PW529, and authorize the city administrator to execute the contract and associated documents. I'm looking for a second.

3:56:42Speaker 69

I have a second by Councilmember Ramirez. Roll call, please.

3:56:44Speaker 55

Council Member Bracco?

3:56:46Speaker 55

Council Member Klein? Yes. Council Member Fugazi? No. Council Member Marks?

3:56:53Speaker 65

I'm right here on the fence.

3:56:54Speaker 55

No. Council Member Ramirez? Yes. Mayor Bozo?

3:56:57Speaker 69

Yes. So it's a tie, three to three.

3:57:02Speaker 34

So the motion failed.

3:57:04Speaker 69

And there's no other action on the rest of it? Will we continue with another day? Yes.

3:57:17 – 3:57:30Speaker 21

Yeah, so if the motion fails on this one, then we wouldn't be awarding a contract for the grant. We would go back and let the granting authority know that we don't want the grant dollars, and we would not proceed with the project.

3:57:37 – 3:57:48Speaker 69

And would this ever come back to council? I know it didn't pass, but would it ever come back to council in different circumstances, or this is it?

3:57:48Speaker 21

No, I would think that this would be the council's direction, and this would be it.

3:57:54 – 3:58:19Speaker 69

Okay, motion fails. Moving on. Item number 7.2, adopt a resolution approving the plans and specifications for the Los Animas Park Pickleball Courts project, appropriating $499,190 to the project and awarding a construction contract to Monterey Peninsula Engineering for an amount not to exceed $1,226,401 with a total project construction cost including contingency of $1,288,000. Staff report, please. Yes.

3:58:28 – 4:04:36Speaker 68

Good evening, City Council, staff, and the public. This item is to obtain approval of the plans and specifications and the construction contract with Monterey Peninsula Engineering. I thought I hit it. Okay. for the Las Animas Park Pickleball Courts. So the Parks and Recreation Commission included the development of the Pickleball Courts in their fiscal year 2026-2027 work program with the budget. And in June 2025, $862,500 in fiscal year 2026 capital budget was put towards the Les Animas Park Pickleball Courts. On June 17th, 2025, The Parks and Recreation Commission recommended placement of the pickleball courts between the community room building and the dog park at Las Animas Park. On October 6, 2025, City Council gave direction on the design of the pickleball courts. So construction of the pickleball courts includes six asphalt pickleball courts, concrete and asphalt pathways, accessible parking space, paving, striping and signage, fencing and gates, storm drainage system, storm water treatment facility, landscaping and irrigation, lighting and site furnishings. And the build alternates of the project are reinforced concrete slab, a six foot high chain link fence, three covered cabana benches, an eight foot high windscreen, and then a six foot high windscreen. The project was advertised on April 10th, 2026, and bids were received on May 14th, 2026. There were six bidders listed below. There were Monterey Peninsula Engineering, MPE, Radius Earthwork, Gear Construction, Silicon Valley Paving, Galeb Paving, Ramcon Corporation, and the lowest bid was for Monterey Peninsula Engineering. And this slide shows the bid results and Monterey Peninsula Engineering with a bid of $1,226,401. And the next higher bid was only $25,000 above that by Radius Earthwork. Then there was one outlier, that's Ramcon Corporation, but about four of the bids were around $150,000 of each other. And Monterey Peninsula Engineering was found to be the responsible and responsive bidder. All bids exceeded the early project cost estimates, though. So the approved fiscal year 2026 capital program budget was $862,500. We've spent $61,690 in design and related support services. It would have been more, but we did the project in half. design in-house. MPE's construction cost is, again, $1,226,401, and the construction contingency is $61,599. We'll need design services during construction, which will cost us around $12,000. That includes materials testing. So our budget shortfall is $499,000 And that can be paid from the facilities fund 615 and also the recreation fund 290. So that budget shortfall appropriation request is 499,190. So our alternatives are you could award the contract to MPE. or you could reject all bids and re-advertise the project. If you re-advertise the project, that'll delay the project delivery and get the project into construction in the winter rainy season. And if we re-bid the project, we don't expect the bids to come in lower. Our next steps are if council approves the award of the construction contract to MPE, The contract will be executed, staff will work with MP to begin construction, and staff will secure materials testing and design support services during construction. So staff's recommendation is to adopt a resolution approving the plans and specifications for Los Animas Park Pickleball Courts and award a construction contract to Monterey Peninsula Engineering for an amount not to exceed $1,226,401, and a total project construction cost, including a 5% contingency of $1,288,000. And that concludes my presentation. Happy to answer questions.

4:04:38Speaker 69

Council Member Fugazi.

4:04:42 – 4:05:01Speaker 20

I have a number of questions. The first question is, Is there anything materially different in this plan to what was presented to us in the third option that we ultimately kind of decided on in October 6? Is there anything materially different?

4:05:04 – 4:05:37Speaker 25

Not material. I wouldn't call it materially different. Detail, obviously, design detail. Geotechnical work was done just to ensure work. Also, ADA, one of the things that wasn't fully vetted out when those original plans came was exactly the extent of the ADA improvements that would be necessary to and from the site and within the site, connecting particularly to the restrooms as a necessity that wasn't, I think, fully vetted at that point.

4:05:38Speaker 20

Okay. And that's because we just didn't have staff that knew how to draw that stuff up?

4:05:43 – 4:06:26Speaker 25

Well, I would say, again, when we came, those were still considered early estimates and early cost estimates. We disclosed that. We had looked at, if you recall, we had looked at and based our assumptions on cost. BID PROJECTS AND BID QUANTITIES AND BID MATERIAL, YOU KNOW, THAT'S ALWAYS A DANGER, LOOKING BACKWARDS RATHER THAN UNDERSTANDING WHAT THE MARKETPLACE IS GOING FORWARD. IT'S IMPOSSIBLE TO FIGURE OUT WHAT THAT GOING FORWARD IS, BUT THE BOTTOM LINE IS THAT IT WAS AN EARLY ESTIMATE, BUT STILL WHAT WE FELT WAS CLOSE. UNFORTUNATELY IT WASN'T.

4:06:26Speaker 20

SO THE WALKWAYS IN THE PLAN THAT WE HAVE NOW, THEY'RE CONCRETE, RIGHT?

4:06:32Speaker 25

The combination, some are concrete, some are asphalt.

4:06:35Speaker 20

Because on the picture I saw the ones, I don't know if they're purple or blue or what have you.

4:06:38Speaker 25

The ones in blue are both, there are call-outs there. Some of that's asphalt, some of it's concrete, but all ADA compliant.

4:06:47Speaker 20

Why is some of it concrete and some of it asphalt? I mean, because in the original plan you said all of the walkways would be asphalt.

4:06:56 – 4:07:40Speaker 25

We had, well, first of all, we were matching some of the concrete, so it made sense to basically deal with where we had tie-ins to concrete. Primarily, this was put primarily to asphalt because we weren't sure at the time. Remember, we had the additive to go to potentially the post-tension slab concrete. We assumed at that original point that if we were doing concrete slab, post-tension slab, we would have a better rate coming for concrete. So the vast majority of that work is still asphalt because it ties into the asphalt work that's going to be done for the courts themselves. But there is a small amount of concrete.

4:07:40Speaker 20

There's some additional picnic table pads as well that were created, right?

4:07:44 – 4:07:55Speaker 20

Okay. And... I didn't see in any of this when this is supposed to be completed. So is it still on track to be done by late summer?

4:07:55Speaker 25

60 construction days. We're looking at mid-July for a start, which would put us basically in early to mid-October for final completion.

4:08:06 – 4:08:26Speaker 20

Okay, so that's not going to be ready for the summer. Why do you think we're 40% over? I mean, we approved like $960,000, right? And now we're at like 1.366 or something when we're all in. Why such a huge discrepancy?

4:08:30 – 4:10:04Speaker 25

You know, I can't predict. No one on my staff can predict the marketplace. I mean, the fact that we received five out of the six bids that were all within $100,000 to $125,000 of each other is an indication that the marketplace is setting what the price of this is. So that's first and foremost. I can't control and I cannot predict that. You know, I'm... I was hoping not to be here under these conditions. Obviously, we were hoping for and believed that we were closer in our predictions. The bottom line I will say is that we had, there's questions about delays and all these things. There were a lot of things going on, including basically staff vacancy that created some of our challenges and part of that. is that what was believed to be a lot further along in design and in detail was not. You'll note that we are suggesting a 5% contingency in great part because we spent the time and effort to really detail this out and believe that this is not going to be a change order project. Our concern with the original design and the original work that we were working from is that it was set up for significant change orders. And we could be looking at a similar price increase because of a need for change orders and coming back for a modification to the contract. So we took the conservative approach, which was to get the best possible design and see where the marketplace found us.

4:10:05 – 4:10:23Speaker 20

As far as, and this might be for Matt or for finance, the $400,000 or whatever that comes out of the REC fund, what does that put us at in the balance on that? And is it going to affect any other future projects like our parks and REC plan that we have at $750,000 or whatever? Current balance...

4:10:27 – 4:10:45Speaker 25

is about a little over 1.2 million. Removing this puts us roughly at $900,000. And that already has the funding for the assessment taken from it. So it's basically $900,000 left if you allocate this money.

4:10:45 – 4:11:04Speaker 20

And out of fees and the $1.5 million out of general fund, are we still looking to be net positive going into the account at the end of this fiscal year? Because I know we have been about $3,000 to $450,000 net positive going to bank in the account. Is that going to continue, or is this going to put us to where we're in the negative?

4:11:05Speaker 21

So I'll have to look back at how the REC fund is funded. I believe it's funded through year-end fund balance up to sort of.

4:11:13Speaker 20

One and a half million direct, right?

4:11:14 – 4:11:32Speaker 21

Yeah, and I believe, here comes Harjo, so he'll be able to help us with an answer to the question. So Harjo, the annual contribution to the REC fund at a million and a half, we have that budgeted from an ongoing perspective? Correct. And this project won't impact that at all?

4:11:32Speaker 20

Correct, yeah. And we'll still end up on an upside in terms of adding money into the fund based around that, plus whatever receipts they get from their functions.

4:11:42Speaker 27

Correct. All we're doing on this project is just using accumulated fund balance that's already existing in the fund, so it's not impacting any ongoing revenue.

4:11:49Speaker 20

And you can confirm what he said, which was it's going to draw it down to about $900,000 now once this is all said and done? That's correct. Okay, thank you. Yep.

4:11:58Speaker 69

Council Member Klein.

4:12:00 – 4:12:20Speaker 30

Thanks for this, John. I know in the world I live in, you don't control your cost, just there's so many things coming. So I'm not surprised by this, but the fact that you have a group, five of them, within 100,000 of each other, I mean, at least that shows you're pretty good with your design and what you put out there.

4:12:21Speaker 21

I see the fluctuation.

4:12:23 – 4:12:39Speaker 30

Because I bid in the general market, and the low bidder is the one that gets the job. And so it's those who take the risk of reducing their costs to try to get a job is the challenge. But I'm good with this, just knowing what you have to deal with. And thanks.

4:12:39Speaker 69

I'm going to jump to public comment.

4:12:42Speaker 55

Thank you. Wendy and Emily.

4:12:51 – 4:13:09Speaker 43

Hi, guys. I don't have much to add, except I hope you just consider going ahead with this project because if we wait longer, it's just going to cost more and prices are going to go up more, and we see everything is costing a whole lot more now. So please keep it at six quarts. Thank you.

4:13:13 – 4:13:56Speaker 71

Emily? Hello, my name is Emily Miller and I serve on the Parks and Recreation Commission. Today I'm speaking in my personal capacity and expressing my own views. I'm here to express my support for awarding the contract and moving the Los Animas Pickleball Courts forward. This project represents years of community input, advocacy, and collaboration. By approving this contract tonight, you have the opportunity to demonstrate that when the community speaks, our elected officials listen and take action. I respectfully urge you to approve the contract and keep the long-awaited project moving forward. Thank you guys for everything you do.

4:13:59Speaker 55

I have no further speakers.

4:14:01 – 4:14:54Speaker 69

OK, we'll bring it back up to us. I'm going to take a, I'm just going to give a slight answer, in my opinion, on the upgraded costs, is that the majority of the products that are on this job are asphalt, base rock, and galvanized metal with all the chain link and all the pipe on the poles. And so much of those products, in my opinion, are connected to petroleum and electricity and transportation. Pardon me? But was that all-time high, right? So I believe that's why some of the prices – I mean, that's my take on it. You had asked, and that was my take on it. And everything so connected to petroleum and the transportation of everything which is connected to petroleum, which prices are still very high, that's my guess. So other comments? Yeah, sorry.

4:14:56 – 4:15:21Speaker 31

You might want to add, just being in California, everything costs us more. You know, business, all my costs go up constantly all the time. So, but, and if you put this off, they're going to come after us with torches and pitchforks. I just think it's taken way too long. All right. Council Member Fregatti?

4:15:21 – 4:17:28Speaker 20

I'll at least start out by saying I will support this. However, I think that we are continuing a long tradition in Gilroy of coming in over budget, coming in late, and disappointing some residents with projects, like the Gourmet Alley is one I can think of as an example. So my only hope with this is that it comes out better than that particular project did. I think as far as timelines are concerned, echoing what Councilmember Bracco said, I think it takes far too long when we are thinking we're going to do pickleball courts and then we approve a budget and then it's four or five months, you know, until we actually can give direction and then another six months until we get a bid and then this. We also have a real not consistent way of communicating to people. I'm all about delighting people, not disappointing them. And so when you're straightforward and transparent with people about how processes are going, you're going to be able to delight them instead of disappoint them. We have a website that says this is going to be ready by late summer, and it's not going to be ready by late summer. And we knew for quite some time it wasn't going to be ready by late summer. Also, in the packet, I looked long and hard to find – any commitment in the contract for when the contractor should be finished. I could not find it. I spoke to the city administrator to help me find it. We could not find it. It needs to be in there. I'm hoping that doesn't hold any of this up, that us you know, approving this, it's okay that that's not in there. But I expect those things to be in there when I look at, you know, our projects to approve. So definitely be approving this. I think the community wants it. The community needs to get it. But we should be able to be delighted once in a while that something's going to come in under budget and ahead of schedule. Thank you.

4:17:29Speaker 69

Thank you. Council Member Marks, did you have any comments?

4:17:32 – 4:17:49Speaker 65

No, I agree. With Council Member Bracco, this has been long in coming. And Council Member Fugazi, you're absolutely right. These projects take way too long to get through the pipeline because we've been talking about this for two years. So it has my support.

4:17:49Speaker 69

Okay. To my left. You guys good? Okay. Council Member Marks, would you like to make a motion?

4:17:54Speaker 65

I would. Can I just say so moved?

4:17:59 – 4:19:00Speaker 69

I have a motion by Council Member Marks. I'm looking for a second to adopt. Council Member Bracco. I have a second by Council Member Bracco. To adopt a resolution approving the plans and specifications for the Los Animas Park Pickleball Courts Project No. 26PW305 appropriating $155,000 from the Facilities Fund, which is No. 615, and $344,190 from the Recreation Fund. which is number 290 to the project budget, awarding a construction contracts to Monterey Peninsula Engineering for an amount not to exceed $1,226,401, establishing a 5% contingency for a total construction contract amount not to exceed $1,288,000, authorizing the city administrator to execute the construction contract and authorizing staff to approve any amendments, extensions, and change orders until completion of the project in accordance with the plans and specifications up to the project construction amount. Roll call, please.

4:19:00Speaker 55

Council Member Bracco. Yes. Council Member Klein.

4:19:03Speaker 55

Council Member Fugazi. Yes. Council Member Marks. Yes. Council Member Ramirez. Yes. Mayor Bozo.

4:19:08 – 4:19:42Speaker 69

Yes. Motion passes 6-0. All right. Moving on to item number 8. 8.1 is a public hearing, public hearing and adoption pursuant to California Water Code Section 10642 for the 2025 Urban Water Management Plan and the 2025 Water Shortage Contingency Plan. First question for council, any ex parte communications to report on this hearing? I have none. Staff report, please.

4:19:46Speaker 50

Second. I'm trying to.

4:20:01 – 4:20:32Speaker 21

The council might find it interesting. We are in preparation for next month where we have to comply with 707 and Zoom meetings. We are piloting this meeting on Zoom. So that's the technological changes that we're doing and you're experiencing today as we learn how to make it all work. So this is actually in the background, a Zoom meeting that we're using as a test meeting so that when we go live in July, we don't have to stop a meeting because of technical difficulties. Now that we're underway, please.

4:20:32 – 4:21:24Speaker 50

Sorry, I apologize. I didn't know I have to share through Zoom, so I'm sorry. Good evening, Mayor Bozo, council members, members of the public and city staff. My name is Isabella Kerloganu, and I'm the senior management analyst for the utilities department. I'm here tonight to introduce our consultant, Tony Akel, who helped us and supported us and guided us through the development of the 2025 Urban Water Management Plan. Tony has over 20 years of experience in infrastructure modeling and master plan. He also has an extensive experience KNOWLEDGE ABOUT GILROY'S COMMUNITY, ITS WATER AND WASTEWATER RESOURCES. SO I'M GOING TO GIVE IT AWAY TO TONY TO PRESENT TONIGHT. AGAIN, SORRY ABOUT THE PICKUP. THANK YOU.

4:21:26 – 4:29:59Speaker 23

THANK YOU, ISABELLA. MR. MAYOR, COUNCIL MEMBERS, PLEASURE TO BE HERE TO GIVE A PRESENTATION ON THE 2025 URBAN WATER MANAGEMENT PLAN. What is an urban water management plan? We'll talk a little bit about it, but it's a document required by the state, and it's prepared every five years. I was here five years ago. I was here 10 years ago giving the presentation about our water supplies, about our water demands, And essentially, how are we meeting the requirements that are set forth by the state? And every five years, the states add more requirements. They change the requirements. They optimize the requirements. They ask us to do a little bit more. And we'll talk a little bit about those today. They essentially release a guidebook at the beginning of the year, and they did it in January of 26, and they asked us to follow the guidebook. So the report that you have reviewed essentially follows the guidebook. Ten chapters, we followed the guidebook. In addition to the guidebook, there's a very large Microsoft Excel workbook that has a lot of information that we're supposed to send it and submit it to the state. What is the purpose? We'll talk about this very briefly. We'll talk about compliance with the Water Conservation Act, SB Senate Bill X7-7, Water Shortage Contingency Plan. What is it? Water supply reliability, and then we'll talk about serving future growth through year 2050. The purpose, really with the purpose, why the state wants us to prepare it. It's not just mandated. They want us to make sure we work on a reliability for our water. They want to make sure that we have adequate water supply that is available. Of course, water conservation. We'll show a graph about water conservation. They've been asking us to work on it for many years, and we'll see if it's been effective. And then finally, they want us to come up with a plan for dealing with droughts. When there's a drought, we shouldn't be panicking. We have a plan when there's a drought. Or when there's an emergency that requires us to cut back on water, we have a plan. And the next slide looks at population versus water use. And if I can draw your attention to this green line that shows the population over the past 25 years, population continued to grow. The bars are how much water we've been using as a city in Gilroy. And it shows that after a certain time, after a certain year, that that water has been managed. It didn't parallel. It should, in theory, continue to grow with the population, but it didn't. And that's the effect of water conservation. The bars in purple show drought years, but it shows that your city staff have been effectively managing the water. The next graph shows the SBX7-7. What is the Water Conservation Act? It's also known as 20 by 2020. Back then, in 2009, the state said, statewide, we want every community to reduce 20% of your water use by year 2020. So that was 2010. So they gave us 10 years. They said, within 10 years, we want you to reduce. How did we do? That's the graph that shows it. The graph shows that right here, this is where we were. That was our average up to 2010. And the mandate was here. They gave us 10 years, dropped 20%. And this blue line shows our annual fluctuation. So we were fluctuating up and down. And then our water conservation shows that we dropped well below our target. This line was our target for 2020. We dropped below that line, and we stayed below it since. The state, and this was called 20 by 2020. The goal was to meet that by 2020, but the state says, don't stop. You need to stay below that line. Don't exceed it. We're going to continue to monitor you. But we're doing good. Then there's a component of the plan that's called the Water Shortage Contingency Plan. And the state established those levels on the right-hand side, six levels. which are essentially different levels to address different levels of drought. Red and it's color coded also. Red means it's some kind of an extreme drought and they give it a name and they call it emergency. Orange is a crisis, critical, all the way to normal on the state level. In Gilroy, we have four levels and we are, meeting the state requirements with our existing four levels and every level has actions that will cause us to save on water so that's how we manage our water when we are hit with a hopefully it doesn't happen but if it if the water shortage happens we have a plan to deal with it then we look at reliability reliability is how are we handling our supply versus demand during a normal year. How are we handling it when we have a single shortage year, one year that happens? But the state also wants us to look at what if you have five consecutive years you're in California, these things happen. So that was what we looked at. And so we have a plan to deal with those droughts. And then they ask us to project for the next, we looked at the past 25 years, they want us to project for the next 25 years and make sure that you can meet those conditions, that you have enough water during a normal year, that you do have enough water during a drought year in the future if it happens, and also if you have five consecutive drought years. Can you meet those? And the answer to that is yes, we can, and we have a plan. And that's the plan. And the graph on the right-hand side is important to note because that's the groundwater underneath Gilroy. It's the same basin that connects us also to Morgan Hill. It's called the Yagas Basin. That's where our water comes in for Gilroy. That's our source of water. And this groundwater is managed by Valley Water. And they monitor the basin. They are making sure that there's enough supplies for the next 25 years through 2050. We use their numbers. We use their latest numbers. And they take action. And they have a very resilient portfolio that they manage. And they manage the basins. We use recycled water as a supplemental source in Gilroy. And Value Water also supplements water into the basins all the way from Morgan Hill. So it's all connected. And it's all managed by Value Water. We are in good hands. So with that... What is the next step? The next step is adopting the urban water management plan after this public hearing and then submitting this plan to the state by July 1st, before July 1st. And then, of course, making it available to the state library and making it available to the stakeholders. And state will review it like they did in the last time. They'll review it. They'll make sure we're complying with all the sections. And if they have comments, they will send us their comments and advise us to change things. And with that, that concludes the presentation. Thank you for your time. Council Member Ramirez.

4:30:00 – 4:30:19Speaker 58

I just have three. Quick questions, thank you so much for your presentation. Can you go back a few slides to the different levels, emergency, critical, there we go. How often does Gilroy fall in emergency or crisis or critical in the last 25 years? We don't fall in those categories.

4:30:19Speaker 23

Those are extreme categories that – but the state wants us to be prepared. Right.

4:30:24Speaker 58

I understand that.

4:30:25 – 4:30:55Speaker 23

So, like, can you tell me where we have gotten? We have gotten – I can tell you in – we follow – this is our guide. Our guide is on the left-hand side. Okay, so we have gotten to critical? So we haven't gotten to critical. We follow these here. We've gotten to stages one, as an example, where we have to save up to 20%. Right. So those are our categories. Minor shortage potential, save 20%.

4:30:56Speaker 58

So we haven't fallen to the moderate shortage percent or the critical shortage?

4:30:59Speaker 23

I think we have fallen here in the past. Okay. But we have not fallen into the critical shortage.

4:31:05 – 4:31:18Speaker 58

Okay. And, oh, thank you. Other cities, how do we compare to, I mean, when you, I'm assuming your organization does this for a number of cities, especially in California.

4:31:19Speaker 58

If you were to give us, like, a report card, how would we compare to other cities? Or do all cities perform this well? How would you rate it?

4:31:29Speaker 23

You've used the word that I love the most, report card.

4:31:32Speaker 58

It's a former teacher in me. What can I say?

4:31:34 – 4:33:28Speaker 23

I've done a report card on infrastructure for the whole state. That was released back in December, and that's another subject. And our grades were not as good on the report card. But this is a report card of how do we come up with a plan for managing our water. We are... in the same boat, I can tell you, as other agencies. In fact, some struggle a lot more. Some have to declare higher levels of shortage more frequently than we do. I mean, we live in California. At the end of the day, we're in California. Some communities are lucky. that they have more waters. But the state are doing this plan, requiring us to do this plan to deal with drought because they know most communities have this challenge to deal with. And this is intended to give us a guide. When it happens, we shouldn't be panicking. It happened While back and the state came in with some goals the state came in with targets for us and said City of Gilroy your target is 25% in a city of San Jose your target is 30% and Agency were going, wait a minute, how are we supposed to do this? There was a lot of complaints. And then the state went, all right, we're going to give you the tools, put them in your hands. You come up with the plans. You manage your plans. So your staff monitors this not only every five years. Every year your staff monitors this. Every year we determine, do we need to go beyond level zero, which goes up to 10% savings? Do we need to go to level one? Every year your staff make that assessment, and so you are in good hands. And every agency is doing this. Every municipality, every district, they have to do this.

4:33:28 – 4:33:51Speaker 58

Okay, thank you. I just have one last question, and it's probably for staff. If our residents are mandated to conserve X percent or whatever, our businesses, industries, all that type of stuff, are they also held to the same conservation requirements? Yes. Thank you. Council Member Marks.

4:33:52Speaker 65

Yes. So what is a water audit, and who gets audited?

4:33:57Speaker 23

I'm sorry, what is the water?

4:33:59Speaker 65

Water audit is mentioned in your report.

4:34:03Speaker 23

Isabella, why don't you step to the mic, please.

4:34:05 – 4:34:30Speaker 50

Yes, I can answer that question. So every year, starting two years ago, there is a water loss audit that the department has to submit to the DWR, Department of Water Resources, by December 31st. So we submitted a water loss audit last year, and our next one is at the end of this year on December 31st.

4:34:32Speaker 65

So do you just look at residential use for your water audit?

4:34:37 – 4:35:02Speaker 50

No. Water audit looks at the losses throughout the entire infrastructure. And basically, the state put a certain percentage, like it's It's a standard, it's a different standard for every city. And again, it's a recent report. It's only two years of history of this report.

4:35:02Speaker 65

So it's just kind of a general audit of everyone who's in the area that's using water, including businesses?

4:35:09 – 4:35:21Speaker 50

It's an audit for our entire infrastructure. We look to see how much we pumped, how much the water was sold, and if we have any losses in the infrastructure, right?

4:35:21 – 4:35:54Speaker 65

Okay. For those that know me, you know I'm heading towards something here. I was looking at your metering section, section 9.1.2.1, and this is a quote. Large industrial, commercial, multifamily water users may be required to undergo a water audit, but city staff does not conduct them. So I assume an outside agency would do it. So if those groups are not being audited,

4:35:56 – 4:36:28Speaker 50

I think probably the phrase is a bit different. It talks about our water conservation team normally looks at commercial or industrial if they have leaks. And if that happens, then they go on site and they try to discuss and possibly audit their overall consumption. But It's not an audit of the commercial. I was talking about the water loss audit overall as a department that...

4:36:28 – 4:36:46Speaker 65

So then, in essence, you, not you personally, but I mean... I don't know who I would say, I guess your department, whatever. You don't know how much water companies then actually use or large industries actually use.

4:36:46 – 4:37:18Speaker 50

We do, we do, we do, because we have another report that is called the Water Objective Report, and we look to see how the 20% users of our city are. I'm sorry. and to see what are the 1% users. So we do know the top users of the city, and then there is policy in place that we need to make sure that we conform with in the next couple of years, and look and address those.

4:37:18Speaker 65

And is that public information?

4:37:21Speaker 50

Yes, I can provide you the state policy

4:37:25Speaker 65

has been passed. I mean, if a citizen got in touch with you, they could say, how much does the ABC company use? You can tell them.

4:37:34 – 4:37:51Speaker 50

I can provide that information for you. I don't know if I'm allowed to share it this way, but yes, I think the city manager, if there is a request, or my director, can probably share that information with the public. Okay. if you want to know the top 20% users.

4:37:51 – 4:38:02Speaker 65

Well, I think as industries come to Gilroy, I think people are going to be very interested. If there's a drought, if we're conserving, I want to know that all of those businesses and industries are conserving as much as me.

4:38:04Speaker 65

And I think the public would be very interested in making sure that that was actually happening. So, yeah, that was my thought. Your concern is valid.

4:38:15Speaker 69

I think you were asking about metering, like, about usage.

4:38:19Speaker 65

Well, that's what I was thinking about what it was, and it turned out to be different from what I thought. I mean, because I was thinking it was going to be an individual measure, Like, how much water do you use? How much do I use?

4:38:29 – 4:38:43Speaker 69

But they do know, right? Just like your meter at your house, at every single commercial and business industrial meter in Gilroy, they have the same meter, they're just bigger. So they know how many acre feet or gallons. Every water user, which is almost 16,000 connections? 15,935.

4:38:43Speaker 50

I took a shot.

4:38:49Speaker 69

They know exactly how many gallons are using it every single meter.

4:38:52Speaker 69

It sounds like to me that's what you wanted to know.

4:38:54Speaker 65

Well, yeah, and then the bigger users, I would certainly hope, would be paying a lot more than the ones that are conserving.

4:39:03 – 4:39:23Speaker 50

I think so. I think we have two water tiers in the sense that it's paid by 1,000 gallons, but I think over 30,000 gallons there is a higher increase, and we paid also – the citizens, sorry, I live in Morgan Hill, pay by pressure, water pressure. We have three water pressure zones.

4:39:24Speaker 69

And that's also... What she means by that, the higher it goes up the hill, the more they pay.

4:39:27Speaker 69

So Terrence pays more than you because he lives on the hill. Did you have a question? You were getting to it.

4:39:37 – 4:40:09Speaker 20

So I don't think you, in times of drought, can just turn people's water off. So the levers that you're using generally are through the usage rates. As we get into a drought area, is the city allowed to add an additional level onto that, an additional penalty? Do you have any room to do something like that, or does it take – the study and all of the other things that we have to do for water rates, or if we have an abuser, so to speak, how does that work?

4:40:12 – 4:40:35Speaker 21

So I'll start because I experienced it in the last drought. So there's a significant amount of effort that goes into helping people to manage their water usage. So a lot of it is very hands-on, especially for the high users. Ultimately, when there is an urgency, when there's an ordinance passed by the local jurisdiction, there is an opportunity to associate fines with violations of the conservation requirements.

4:40:36 – 4:40:58Speaker 50

But I would also like to add that it's illegal also by the state of California to set up these tiers. They used to be put in place many years ago, and I think there was a loss of a few years. And since then, we adopted a different pricing, which is more fair and equitable to everyone.

4:41:02Speaker 69

Any more questions? Public comment, please.

4:41:09Speaker 55

Are we keeping it at one minute?

4:41:11Speaker 69

Yeah, please. One minute, please.

4:41:12Speaker 55

Michelle, Georgine, and Armando.

4:41:23 – 4:42:45Speaker 39

Hello again. The plan doesn't specifically mention the impact of the data center. It may be included in one of the categories, but it's not clear. It bears mentioning that the Amazon flare, that the data center will use 100% recycled water. That's not so. The target is 2030 to use recycled water. In the notice of preparation that the city sent to various stakeholders, the sentence says, potable water will be the primary water supply for cooling during a portion of phase one. Recycled water will be the project's primary cooling water after completion of the recycled water pipeline, which is anticipated in 2023. It is now 2026. How much faith should we have that the recycled water pipeline will be completed by 2030? There are some contradictions in the document itself and contradictions between the plan and the EIR for the data center, but I don't have enough time. I don't think the impacts of climate change are being taken seriously enough in the plan. Although we have enough groundwater now, we still rely on the recharging that Valley Water is in charge of. According to the plan, Valley Water, quote, is taking initial steps in developing guidance around long-term groundwater sustainability and says that We cannot meet the water demand if we find ourselves in a five-year drought without restrictions. I assume, is that? That's one minute. Okay. Thank you. The data center will take priority while the rest of us have to conserve.

4:42:46Speaker 55

Thank you. Georgine, Armando, and Connie.

4:42:54 – 4:43:56Speaker 64

Hi, Georgene Scott again. Tonight you're being asked to adopt an updated urban water management plan. I'm asking you not to, not yet. First, the certified water supply assessment for the data center says in its own words that the adequacy of the city's water, sewer, and recycled water capacity to serve the data center project was, quote, modeled and evaluated in a document called Eckel Engineering Final Technical Memorandum from November 2022. I've requested a copy of that through a public records ask, which the clerk told me they received. and they have. On May 21st, I contacted Acola Engineering, I think it was Tony that I spoke to, who said the city needs to approve the release of this document, and I still don't have it. And to my knowledge, no member of the public has ever seen it. I'm asking you to hold off on adoption until this document, which is a public record, can be issued to the public. Thank you.

4:44:03Speaker 55

Armando, Connie, and then Rose.

4:44:06 – 4:45:16Speaker 22

Thank you, so I understand that the council has to pass this urban management plan today, but I want you to consider that it's based on Valley Water 2021 data once again. Everything seems to be kind of outdated now, and in fact, Valley Water right now is actively overhauling its models to build its 2026 ground management plan. It's due to be active in December, and they are writing explicit AI cooling models for AI, explicit AI cooling models and tech assumptions, and so I would hope that you would include maybe something today, do a friendly amendment that says that that this will be revised at the end of December, 2027, when Valley Water, in fact, comes up with a new water management plan. You know, we really have to update our codes in terms of, and we're still working with old models, and I think it's important for us. So hopefully you bring it back for 2027 and adopt the new models. Thank you, Armando.

4:45:17Speaker 55

Connie, Rose, and then Pat.

4:45:22 – 4:46:23Speaker 62

Connie Rogers again. The previous two speakers spoke to the technicalities. I do want to thank the presenter for an excellent educational presentation about how our water system works. But I still have doubts because in the EIR for the data center, it says projections of the UWMP assume substantial increases in water conservation and implement water demand management measures. Well, if you've lived in Gilroy for longer than five or 10 years, you know that we've already been conserving and they reported that we have. So I guess our biggest question tonight is will the data center use so much water that we public have to conserve or will they share the burden equally? That's all.

4:46:24Speaker 55

Thank you. Rose and then Pat.

4:46:34 – 4:46:56Speaker 52

Rose Berry, longtime Gilroy resident. Thank you for your time and for all of the information tonight. So my question is, in this water report, how have proposed data centers and detention centers figured into the calculations? Thanks.

4:47:07 – 4:48:23Speaker 19

Thank you for indulging me a second time. The most important two elements on the periodic table are hydrogen and oxygen, also known as water. And the problem here is what we don't know. We don't know what we don't know. And so moving forward, great job Tony on actually showing the data, but in this case, the great unknowns, right? And so how much water is down there in acre feet? How we measure the water of users? And I think the big elephant in the room is how much is the data center going to use? Because we don't know and they don't know and there's a drought every seven to 10 years, a five year drought. In my time on this planet, 73 years, that was back in the 70s when they said put a brick in your toilet and make sure you don't flush it all the time. If it's brown, flush it down, and if it's yellow, let it mellow. That's, pardon my English, bullshit. So where we are today is about that most important two elements in the periodic table. I leave it in your hands. In your hands. and in the hands of the public, because this is what was needed, was public discussion about things that are really important. I know my minute's up. Thank you very much.

4:48:24 – 4:49:03Speaker 69

I have no further speakers. All right. Back to counsel. Any questions? Deliberations? Okay. I'll close the public hearing then. And we don't have action on this tonight. Oh, excuse me. We are going to adopt. So we're going to receive the information. So we have a thumbs up on receiving the information. Okay. Thank you very much. And I'm looking for a motion to adopt a resolution approving the 2025 Urban Water Management Plan.

4:49:06Speaker 69

Okay. I got a motion by Klein. Looking for a second. Second. I got a second by Ramirez. Roll call, please.

4:49:14Speaker 55

Councilmember Bracco, Councilmember Klein, Councilmember Fugazi, Councilmember Marks, Councilmember Ramirez, Mayor Bozzo.

4:49:22 – 4:49:44Speaker 69

Yes, motion passes 6-0. Moving on to item number 8.2, introduction of an ordinance of the City Council of the City of Gilroy amending Gilroy City Code Chapter 5D, vacant commercial space in the downtown historic and downtown expansion districts. Any ex parte communications by council? I have none. Staff report please, Bryce.

4:49:48 – 4:53:14Speaker 28

Yes, good evening Mayor and Council. I'm going to share the screen real quick. So as the Mayor read into the records, tonight's agenda item is to hold a public hearing and seek Council approval to introduce an ordinance amending chapter 5D to reactivate the vacant commercial space in downtown chapter. So this is the last step, or the latest step, I should say, in a process that started with public discussions with the downtown committee. It was one of the, two of the items that the committee took on There's plywood use in downtown, as well as vacancy issues that we have with commercial buildings. Ultimately, recommendations were made, and council added these items to the work plan, and then later directed staff to update Chapter 5D, receiving property and business owner input. That was reported at the May 18th meeting, at which point council provided final direction on a draft ordinance to incorporate those changes. So the downtown community identified issues regarding the impact that that the visual image of plywood use and vacancies have on the economic activity and the perception of community safety. The negative appearance tends to generate a feeling that the area is unsafe, regardless of the actual safety record of the area, which diminishes foot traffic, lessens tenant interest, and deteriorates downtown vitality, and therefore impacts the community. The ordinance, again, just a summary from the discussion that we've had in the Directional Council. The proposed ordinance repeals and replaces Chapter 5D, removing the sunset provisions in the original chapter. It restores registration fees for vacant buildings, but adjusts the registration fee amounts to $750 in the first year, and then $1,500 each year thereafter. It adopts plywood use regulations regarding the quality of materials, the visual image, art that can be used, timelines, so how long the plywood can be up for, and penalty fines to be imposed for violations. It creates a building report card requirement, which provides information on vacant buildings, the contact information, and the list of code violations that have been recognized in that building. And then allows collection of delinquent fines through special assessments on annual property tax rolls, in addition to the lien process and other legal remedies that were already in existence for Chapter 5D. So alternatives, council may modify or reject the ordinance. Any changes would require a new public hearing and advertisement. The next steps, if introduced by council, the ordinance would then come back to council on the 27th of July for adoption on the consent calendar. Fiscal impact, staff time to implement the programs and regulations, but those expenditures will vary based on the number of vacancies that are present, the condition of the properties, the duration of those vacancies, and ultimately compliance or resistance from property owners. The revenue assumptions from the program assume 25 vacancies in the first year, with $750 per vacancy, $18,750. That amount would vary also by the number and duration of the plywood violations that may be present as part of this process. We had done a survey a little less than a year ago, and it was 26 properties that were vacant at the time, so we anticipate something close to that this time. So the recommendation is to conduct first a motion to read the ordinance by title only, wait for the reading, and then introduce the ordinance. That completes the presentation. I'm happy to address any questions.

4:53:21Speaker 69

Nothing? Okay, then I will open the public hearing and ask the clerk if there are any public comments.

4:53:28Speaker 55

I have no speakers.

4:53:29Speaker 69

Okay, then I will close the public hearing, bring it back to council for any other comments or motions.

4:53:36Speaker 65

I'll make a motion. Hold on.

4:53:38Speaker 20

As a comment first, I just want to give credit to Council Member Marks here for pushing this stuff forward.

4:53:45Speaker 65

Four long years.

4:53:46 – 4:54:08Speaker 20

She's been doing it for a long time, and... she had the committee that she chaired and Worked with a bunch of people to put this stuff together and some of it like chapter 5d was in there But it's unsetted and so thank you for doing that and thank you to staff for putting this together and Hopefully hopefully we see some action because of it downtown. Thank you

4:54:11Speaker 69

COUNCIL MEMBER MARKS, WOULD YOU LIKE TO MAKE A MOTION TO READ THE ORDINANCE BY TITLE ONLY AND WAVE FOR THE READING?

4:54:16Speaker 65

I WOULD LOVE TO.

4:54:16Speaker 69

OKAY. AND I HAVE A SECOND? I HAVE A SECOND BY COUNCIL MEMBER FUGAZI.

4:54:24Speaker 55

COUNCIL MEMBER BRACO? YES. COUNCIL MEMBER KLEIN? YES. COUNCIL MEMBER FUGAZI? YES. COUNCIL MEMBER MARKS? YES. COUNCIL MEMBER RAMIREZ? YES. MAYOR BOZO?

4:54:33Speaker 69

Yes, motion passes 6-0.

4:54:35 – 4:54:47Speaker 55

I will read the ordinance by title only. An ordinance of the City Council of the City of Gilroy repealing and replacing Gilroy City Code Chapter 5D vacant commercial space in the downtown historic and downtown expansion districts.

4:54:48 – 4:55:02Speaker 69

Thank you. Council Member Marks, can you help me out with the second one? Introduce an ordinance of the City Council of the City of Gilroy amending the City of Gilroy Code Chapter 5D vacant commercial space in the downtown historic and downtown expansion districts.

4:55:05Speaker 65

So moved. Thank you. Sorry.

4:55:07Speaker 23

I'm sorry. Sorry about that.

4:55:09Speaker 69

So I have a motion by Council Member Marks and a second by Council Member Fugazi. Roll call, please.

4:55:14Speaker 55

Council Member Bracco. Yes. Council Member Klein.

4:55:17Speaker 55

Council Member Fugazi.

4:55:19Speaker 55

Council Member Marks. Yes. Council Member Ramirez. Yes. Mayor Bozo.

4:55:24 – 4:55:43Speaker 69

Yes. Motion passes 6-0. All right, moving right along. Item 8.3, resolution declaring results of the majority protest proceedings to renew the Gilroy Tourism Business Improvement District. And once again, any ex parte communications by council? I don't have any. Staff report, please.

4:55:46 – 4:58:04Speaker 42

Good evening, Mayor Bozo. Let me just find the presentation. Okay. Good evening, Mayor Bozzo, members of the Council, Raissa Del Rosa, Economic Development. So this item, this public hearing is the final step in the process to renew the Gilroy Tourism Business Improvement District, or TBID. Am I not sharing it? Okay. And importantly, it's also the final opportunity for lodging business owners to enter a formal objection to the renewal of the district if they so choose. I have to say, to date, we have received no written protests. And so unless there is a dramatic change of heart to the Gilroy hoteliers, and it would take 50% of a weighted vote of those members to... change the trajectory we're on to renew the district. Without that, council is clear to adopt the resolution of formation, if you so choose. What that resolution of formation is, is that confirms that the city has met all statutory requirements, including the adoption of a management district plan. And something of note in the management district plan Is that we have removed the threat ten room threshold? That was in previous editions of the of the plan and so you have a red line version attached to your To your staff report other than that there are no changes to the district plan that you've seen to date and short of some protests coming in at the very last minute today during the public hearing. Council is free to declare the negative results of a majority protest and adopt a resolution to renew the Gilroy Tourism Business Improvement District. And I'm here for questions if there are any.

4:58:04Speaker 69

Okay. Questions for Ayesha? None. That means I'll open the public hearing. Do we have any public comment within the public hearing?

4:58:13Speaker 55

I have no speakers.

4:58:15Speaker 69

Okay. Would you like to report on the written protest results?

4:58:22 – 4:58:37Speaker 55

Yes. Notice of this public hearing was provided in accordance with the Property and Business Improvement District law of 1994 and the city standard noticing procedures. No written protests were received prior to the start of this hearing. Therefore, no majority protest exists as defined by law.

4:58:39Speaker 34

All right. And for the record, that now consists of the declaration of the results of the majority protest proceedings.

4:58:45Speaker 69

Okay, then I can officially close the public hearing. It's now closed. Bring it back to council. And I'm going to do it number three, correct?

4:58:54Speaker 69

Okay, so I'm going to entertain a motion to adopt a resolution to renew the Gilroy Tourism Business Improvement District.

4:59:02Speaker 69

Okay, I have a motion by Council Member Ramirez and a second by Council Member Klein. Roll call, please.

4:59:07Speaker 55

Council Member Bracco. Yes. Council Member Klein. Yes. Council Member Fugazi. Yes. Council Member Marks. Yes. Council Member Miras. Yes. Mayor Bozo.

4:59:15 – 4:59:40Speaker 69

Yes. Motion passes 6-0. Thank you, Raisa. Moving on to item number 9.1, Introduction of New Business, Charles Lux Drives and Lopez Way All-Way Stop Control Analysts and Los Animas Elementary School Area Study. Take it away, Nisha.

4:59:58 – 5:00:25Speaker 68

Good evening, City Council, Mayor Bozo, staff, and the public. It's Nisha Patel again. And this item is to present on the Les Animas School Area Study. The city retained an outside traffic engineering consultant, Parametrics, to perform the study. And Jen Schreiber, who's with Parametrics, is here to present the findings.

5:00:30 – 5:13:24Speaker 14

Good evening, everyone. I'll be presenting a summary of the school area study, as well as the recommendations and next steps. So I will just start off with some background. Like Nisha had said, Parametrix is a traffic safety and engineering consultant. We were hired by the city. We have over two decades experience in road user safety studies, safe routes to schools, both throughout the Bay, as well as elsewhere in California and the Western United States. We were hired by the city. This was really prompted by two things, a double fatal collision near Los Animas Elementary School earlier in the year, as well as ongoing community concerns about safety in the area. So the objective of the study was to look at the broader safety of the broader school area. So we wanted to analyze the Charles Lux and Lopez Drive intersection to see if an all-way stop control was warranted. But we also wanted to look at safety holistically in the area around the school and see what improvements could be made. To do this, we collected a number of different pieces of data. So this map here shows the broader study area, which included 14 intersections, including that Charles Lux and Lopez Way intersection. So to start off with, we collected vehicle turning counts. We collected 12 hours of counts at that Charles Lux and Lopez intersection. We did this on a weekday to make sure that we got counts during the school commute period, since those really are drivers of traffic and behaviors. in the neighborhood. And during that time, we also collected counts for pedestrians and bicycles passing through the intersection. We did a field review throughout the neighborhood from 7.15 in the morning to 3.30 in the afternoon, again on a weekday, so that we could capture that school period. And during this field review, we looked at things such as road user behavior, site lines, signage, striping, just really tried to get a sense of the existing conditions and what was going on on the ground at the site, including the area around the school, the entrance and the exit to the school. We conducted a review of crashes in the area, and we did this using the latest five years of data available through the California crash reporting system. That was 2020 through 2025. And we also conducted a speed study on Charles Lux from Sanchez Place to Lopez Way. And we did this at the same time that we collected those turning movement counts. So this helped us to get a real sense of what was going on in terms of the behaviors, how many people were passing through the intersections, and what kind of existing features were there on the site. I will start off by going over the results of the all-way stop control warrant analysis. So the Manual on Uniform Traffic Control Devices Guidance includes five studies or warrants to determine whether an all-way stop control is appropriate at an intersection. And these are federal guidelines that have been adopted by the state. We took a look at all five warrants and found that none of them were satisfied, and so we would not recommend an all-way stop at this particular intersection of Charles, Lux, and Lopez. And I'll just briefly walk through all of the warrants to describe how we came to those results. Warrant A deals with crashes, and it's satisfied if there are five crashes at the given intersection in a 12-month period. or six during a 36-month period. And these have to be crashes of the type that would be mitigated by installing an all-way stop control. We analyzed again 2020 through 2025 data and found that there were zero crashes at the intersection during this time. We obviously understand that there was a fatal crash earlier this year, although even incorporating that crash, this just doesn't bring us up to that minimum number of crashes required to meet that particular warrant. Warrant be concerned site distance. So if there are visibility issues for people turning from the stop controlled street, which would be Lopez, onto the currently non-stop controlled street, Charles Lux, then this could be justification for adding an all-way stop control. When we were out at the field visit, we did review site distances, and we found that there were some characteristics of the roadway, such as the curve in the road and sunlight at particular times of the day, that might hinder visibility. However, if a driver is properly positioned at the stop signs on Lopez, they generally do have adequate sight distance and adequate visibility to safely be able to make turns. Furthermore, we did identify some improvements, such as traffic calming and trimming vegetation, which I'll get to a little bit later, that could further improve sight distance without the need to put in an all-way stop control. Warrant C we found to be not applicable. For this, a stop control would be sort of a stop gap measure, temporary measure when a traffic signal or roundabout is planned at a particular intersection. Since no such controls are planned for the intersection, it just doesn't apply in this case. Warrant D concerns road user volumes, and this is volumes of vehicles, bicyclists, and pedestrians. And this is met when there are at least 300 users entering the intersection from major street approaches, so that would be Charles Lux, per hour, as well as at least 200 vehicles from the minor streets for an eight-hour period in a typical day. And like I said, we recorded volumes at the intersection for 12 hours, and we just didn't find enough volume of users to meet this warrant. And then finally, Warrant E is other factors, and this includes things such as If there are really high left turn volumes, that could be better controlled and more safely controlled with an all-way stop control. If the two intersecting streets have similar characteristics, so similar volumes, and adding an all-way stop control would help to more easily and more safely get cars through the intersection. Or finally, if there's a very high pedestrian and bicyclist volume, and again, an all-way stop control might help help facilitate users getting through the intersection. And based on the data that we collected and the observations that we made, we determined that none of these really applied and so the warrant was not met. So while an all-way stop control isn't recommended for the intersection, there are a number of things that the city can do to improve safety, not only at the intersection, but the broader school area in general. And we've organized these into three tiers of recommendations, and I'll go through all of these in the following slides. Tier one is sort of the low-hanging fruit. These are short-term behavioral things that can be implemented relatively quickly, things such as signage and other methods of raising awareness of pedestrians and proper crossings. Tier two is operational. This is more of a medium-term recommendations, and these are things such as striping and curb fixes. And finally, term three is structural and studies. These are things that would require more time and more study before implementation, and these are things such as capital projects, studies, and further coordination with the school. I will say that really the best fixes here pair changes to what's going on on the street, as well as what's going on within the school circulation. Again, the school and commute periods are a real driver of road users, of behaviors, And so it's really critical that the city coordinates with the school district on lasting change in this area. So first off, I will jump into those short-term behavioral improvements. And these are things to improve visibility, to heighten awareness of drivers that they're entering a school zone, that they're approaching intersections, and that they should be looking out for pedestrians. This includes a lot of things such as signage, reinforcing designated crossings, which could be targeted enforcement or communications through the schools, just really driving home to pedestrians where they should be crossing the road, as well as lowering school limits per AB382. And this is something that's currently in process with the city. For Tier 2, we have a number of quick build tools that can help, again, to improve visibility, to calm traffic, to improve road user safety in this study area. And these are things such as refreshing the existing pavement markings that are already out there. Red curb daylighting, so marking those curbs around the intersections red so that cars won't park there and visibility will be improved. Lane narrowing for the travel lanes, which promotes traffic calming as well as providing more space for widened bike lanes. There's managing the curb, again, for bike lanes. And this is particularly to help ease the transition from the bike lane to parking on Charles Lux. Like I had mentioned before, selective tree trimming can also help to improve sight lines. And then lastly, installing new signage. The study team developed a concept package with some easy to implement striping and signage improvements for Charles Lux as well as the broader neighborhood. So this slide just shows the improvements that are recommended for this particular section of Charles Lux Drive. And again, these are things to improve. visibility to calm traffic and to make more space for bikes. So you see here sort of from left to right, narrowing the lanes, refreshing the striping, trimming vegetation to improve site distances and widening those bike lanes. There's daylighting the curbs around the intersection as well as installing new signage and implementing better curb management to help facilitate that transition of the bike lane to the parking lane. We also found opportunities to install these or to implement these quick build tools more broadly in the neighborhood around the school, and so you can see that here. And again, these are things to improve visibility of pedestrians, to calm traffic, and to make more space for bikes, and really to improve safety for all road users traveling through the neighborhood. Our term, sorry, Tier 3 is longer-term improvements as well as school partnership. And like I said, these are things that would require more study or longer periods and more funds to implement. And these are things such as updating curb ramps. So there were some curbs that were found to not meet ADA standards. So these could be updated through future paving projects or capital improvement plans. At some intersections, the curb radii were quite wide and this sort of encourages right turning vehicles to go faster than maybe they should. So implementing treatments that would slow those right turns. Another option or another recommendation could be to look into new or enhanced crossings. Just based on our field reviews, Saw some demand for perhaps mid-block crossing around the school area. And then studying specific areas, so really diving to the Seminole Corridor or Greenfield Crossing. The city is currently undertaking a city-wide speed survey, so incorporating these recommendations to potentially lower speeds around the school. And then lastly, grant seeking, which could be done by the city, by the school district, or partners. And for example, to develop school safety action plans, not only for this school, but also for others throughout the city. Again, I want to stress that we really do recommend school, district, and city coordination. And so one of the things that we do recommend is a jointly scoped school site circulation study. Again, to really take a look at what's going on during those commute periods, to make sure that cars can get through, that students can be dropped off, or students can walk or bike to school as safely as possible. I will just wrap up with some next steps. So this is an informational update. So we request that council receives and accepts the report and the presentation. And then the city is moving forward with a few next steps. So it will be advancing That's striping and signage package, both for Charles Lux and the wider neighborhood for those recommended safety measures. And is also planning to coordinate with the Gilroy School District for the school site circulation study. So I'm happy to take any questions at this time.

5:13:29Speaker 69

Council Member Fregazzi.

5:13:32 – 5:13:58Speaker 20

In your entirety of your report, or maybe in preparation for your report, was there anything... discussing the actual enforcement of things that are already in place. I noticed the image in your report there that showed all those cars kind of lined up there. We already have signs there that say no stopping, not even just no parking. So is there anything in your report that says, hey, you got a whole bunch of these mitigation things. You guys need to do something about it.

5:13:59 – 5:14:21Speaker 14

Yeah, and so that is one of the tools that sort of falls under that Tier 1. Targeted enforcement can be effective sometimes. you know, at making sure that people are following those signs, following those rules. It tends to have a larger effect, you know, sort of soon after the enforcement and then people sort of forget about it, but that is an effective tool that can be used.

5:14:23Speaker 69

Council Member Ramirez.

5:14:24 – 5:15:32Speaker 58

Thank you. This is great and I appreciate your report. I appreciate what the city is already planning to do and is working on and the coordination that the recommendation to coordinate with Gilroy Unified, I think that that's paramount. I also read in the report, which I also appreciate, and I don't think you called it out, but some of these are not incumbent upon the city or the school district, but rather users, if you will, in terms of drivers in the area, parents of school children. Some of the recommends were just simple things, you know, about no jaywalking, no parking in bike lanes, no parking in sidewalks, things like that. So, you know, I guess my question is, you know, wouldn't that add to the impact as well if there was some ownership there and enhance the safety overall of the school here at this school and all the schools?

5:15:39Speaker 69

If I have no further, I will go to public comment.

5:15:41Speaker 55

I have no speakers.

5:15:42 – 5:16:14Speaker 69

All right. Then I will bring it back to council. And we're just receiving this presentation from the consultants. I'm just looking for a thumbs up from everybody. Okay. Thank you very much. Thank you. Item 9.2. Fiscal year 2026, third quarter budget and general fund forecast update and adoption of resolutions amending the budget and updating the position control list. Cindy.

5:16:51 – 5:27:17Speaker 37

Good evening Good evening. Mr. Mayor members of council members of the community Sydney Murphy finance director so tonight we will be reviewing the third quarter fiscal update report and We will also be bringing forward position control updates, budget adjustment updates, and we also have an updated general fund forecast for you tonight. My presentation tonight will be focusing on actionable items for council, but if you have any questions regarding the staff report, please let me know and we can answer those as well. Okay, by way of background, in June of 2025, you adopted the fiscal year 26 and 27 budget. In October of 2025, we brought back a preliminary year-end report to council. And then in November of 2025 and March of 2026, you received quarterly update reports as well and general fund forecast updates. Tonight, we will be bringing forth the quarter three budget update, which is through March 31st of this year. And we will also be discussing general fund forecast updates, budget amendments, and the position control updates. So as part of the adoption of the budget, council adopts the position control list, which authorizes the number of positions and a list of the positions in the city for which we have authority. As part of the report tonight, we're bringing forward three additional positions, and they all have to do with the franchise agreement with South Valley Recology. As you know, we're expanding that agreement with South Valley, and it's in order to capture trash control and stormwater permit requirements. So the expanded implementation fee goes into effect July 1st of this year. And it includes funding for dedicated staff, specifically three positions listed here, the management analyst and two additional public works maintenance workers. And this is all funded from the South Valley Recology Implementation Funds. All right, so we'll be also discussing a series of budget adjustments for fiscal year 26. We have three items which will require action on behalf of council. We have police overtime, which we are finding is trending about $500,000 over budget. This is due to several vacancies in our police department which are being backstaffed by overtime. The second item was the successful award of the California Youth Community Access Grant for $83,209. And the third item is we're seeking additional appropriation of $50,000 for the purchase of a reserve fire engine in an amount not to exceed $150,000. Your council already approved $100,000 towards this, but we're recognizing that other cities are probably going to be submitting bids, and because of that, we want to increase authority up to $150,000 if needed. All right, for fiscal year 27, we have several general fund budget adjustments. These include a reduction in UUT revenues of approximately 400,000. We're recognizing that cable and energy consumption is down, and additionally, PG&E did not raise their rates in January of 2026, which they typically do, so that has affected our UUT revenues. so we're anticipating they'll be down by about 400,000 next fiscal year. We also are recognizing a reduction in TOT revenues of about 400,000, and this is due to the delay of a hotel coming on board. We thought they'd come on board in fiscal year 27, but it looks like that's gonna be fiscal year 28. And then building permit fee revenue is also down by approximately $450,000. And construction is slower than anticipated, and so we want to recognize that that will have an impact in the next fiscal year. We also have two increase in grant revenues for Jumpstart Cal OES and Blue Skies Initiative, and those combined are $140,000 in increased grant revenue. And then we also have increased administrative revenue related to the Recology Implementation Fund. So the general fund for administering that, we get a certain percentage, and that's $83,421 for fiscal year 27. And then in terms of expenditure increases, we are recognizing county services are increasing costs, as you know. So we have county emergency medical dispatch increasing by approximately 77,000 and then county animal sheltering services by 224,000. All right, we also have several non-general fund budget adjustments for fiscal year 27. As we mentioned, the Solid Waste Implementation Fund in Fund 203, we're seeking 795,000 increased appropriations as we will be bringing in a matching amount of revenues due to the expansion of the Recology Fund. We have Police Grant Fund, Fund 203, Fund 225, $12,157 in additional revenues for the Department of Justice Bulletproof Grant. We have Capital Projects Fund. These are 350,000 in additional grant revenue and expenditures for the Public Works Gateway Senior Apartments Pedestrian Walkway Project. And then the Street Tree Development Fund, we have an existing fund balance of approximately 198,000 that we're seeking council approval to utilize for tree planting projects across the city. We are recognizing insurance premium increases in both Workers' Comp Fund and Liability Fund, so we're seeking budget adjustments of 37,580 in Workers' Comp Fund, and for liability insurance, just shy of 270,000. Okay, so several general fund revenue and expenditure adjustments have been folded into the general fund forecast. Many of these we've discussed. They include, well, on the good side, sales tax increases. We're anticipating approximately 800,000 per year starting fiscal year 26. We're thinking we're going to come in higher than anticipated. Our UUTs are decreasing by approximately 400,000 starting in fiscal year 27, as we discussed. TOT, again, the hotel delay, that's about 400,000. And then the building permit fees are between 450 and 500,000 beginning in fiscal year 27. We also, as we mentioned, have the increase in county service costs beginning in fiscal year 27. We have additional overtime for police patrol in fiscal year 26 as we mentioned. And then we also had approved in the last budget cycle two limited term code enforcement officers and we're anticipating those becoming permanent beginning fiscal year 28 instead of transitioning out. And then we are also utilizing the section 115 pension trust in order to address some of our operating margin shortfalls that we'll have. So when you fold all of those into the general fund forecast update, you will see that we have a slightly negative operating margin in fiscal year 26, and for fiscal year 27, it drops to a negative operating margin of 1.4 million. So these negative margins will be offset by excess general fund balance for the first two years. And then after the first two years, we're going to use our pension trust to cover the negative operating margins from fiscal year 28 through fiscal year 31. And our pension trust will have a balance of just shy of $7 million beginning fiscal year 28. So we'll have enough money in that fund to cover those shortfalls for that five-year period. As you can see, the fund balance numbers dip slightly below the 30% required fund balance reserve. However, staff is not recommending any adjustments at this time, as the general fund typically has year-end savings that we will use to address the fiscal year 26 year-end shortfall. Any recommended adjustments will be brought forward with the 26 year-end report when we bring that back. And regardless, it is evident that adjustments will be required as part of the upcoming two year biennial budget, which we will kick off in January. So key future fiscal considerations, we are continuing to monitor and address the negative operating margin. We are looking at cost containment in several areas. We're looking at creating operational efficiencies, and we're pursuing all revenue maximization strategies. As you can see, we're looking at alternatives to the county service cost increases. We're tracking our TOT revenues. We are updating all of our citywide impact fees. That's an agreement we're entering into in the next couple of months here. We are monitoring our CalPERS rate of return. It was anticipated that we would have a rate of return of 6.8%, but that is trending higher than anticipated, which is good. So through May, certainly, it is coming back higher than we anticipated, which, as you all know, affects our UAL over the long term. We are completing a comprehensive user fee study to evaluate all of the city fees, and then we're also looking at cost allocation and internal service fund chargeback reviews, just to make sure, again, that we're collecting all revenue due us in all the categories. So our recommendation tonight, the actionable items before council are to receive the report, adopt a resolution approving the updated position control list for fiscal year 27, adopt a budget amendment resolution for both fiscal years 26 and 27, and authorize the city administrator to submit a bid for reserve fire engine for an amount not to exceed $150,000. And with that, I'm happy to answer any questions.

5:27:19 – 5:27:44Speaker 58

Thank you. I just have one simple question. You talked about, I think it was a $400,000 shortfall on TOT. Yes. If the TOT increase passes, will that, I mean, what would be the, would it balance out? I forget. I know it was kind of presented when we talked about the tax, but.

5:27:45Speaker 58

Will it balance out?

5:27:46Speaker 37

Yes, that should. If that passes, that will bring in an additional $350,000 annually. Okay. And the shortfall we're looking at is about $400,000. Thank you.

5:27:57 – 5:28:30Speaker 20

Council Member Fragatti. Two questions. First of all, on the sales tax revenue, the last projections that we had in recent reports, going back a year even, showed that we – if I'm recalling correctly, that we missed it, meaning it came in way under, and now it's coming in way over. And is there any rhyme or reason that we understand for this? Because it seems this is something we'd want to predict a little bit more on point.

5:28:30 – 5:28:49Speaker 37

Right, consistently. We did just receive a general fund forecast from our sales tax consultant. They're recommending... that it come in even higher than the anticipated $800,000, but we're always hesitant to do that until we have at least two quarters of sales tax data in front of us that recommend the same increase. So, to your point...

5:28:49Speaker 20

But this is the same person that recommended it the prior time, and then the actuals came in way under? Okay.

5:28:56 – 5:29:54Speaker 37

Yes, it is. On the utilities one can you explain that a little bit more because I didn't quite understand it from the report or from your description Sure, so our utility users tax we're finding in cable specifically That those revenues are not coming in high people are transitioning away from cable as you know to streaming services So we're looking closely at the Santa Barbara City slash Disney case, which is currently pending right now at this point it looks like streaming services will be incorporated in for especially the city of Santa Barbara, the way their UT tax is written or their ordinance is written. And that's being upheld to this point. We're hoping we'll have a settlement, that they will have a settlement in the next few months. And that will dictate what happens with a lot of cities. So once we start Once they say that streaming services are, in fact, part of the UUT umbrella, that should be beneficial to the city. So we're keeping a close eye on that, and our UUT consultant is looking at that for us.

5:29:54Speaker 20

Why does it look like it just cliffed? I mean, in other words, I would expect that to do this, not all of a sudden, hey, by the way, you're getting 400 grand less.

5:30:01 – 5:30:18Speaker 37

Right. Well, one of the things is the PG&E rates did not go up in January, so that does have a large impact for us. And I don't know the exact dollar amount, but typically as they raise their rates, the corresponding UUT is up, and that didn't happen this year. So that's part of it. And then the cable as well. So those are the two pieces to it.

5:30:19Speaker 20

Last question, probably for Matt, which is you get the $150,000 for the fire engine. Are we going to get another request for $560,000 to outfit it with the latest gadgets? Yes.

5:30:32Speaker 21

I'd much rather request $1.2 million for a new fire engine. I know.

5:30:37Speaker 20

So that's a yes or a no?

5:30:40Speaker 20

Okay. Further questions?

5:30:47Speaker 69

Okay. I'm going to move to, I'm sorry, to public comment.

5:30:55Speaker 55

I have no speakers.

5:30:56 – 5:31:08Speaker 69

Sorry. All right, back to us. So the first action is to receive the budget Update as a third quarter fiscal year. That's just thumbs up. Please. Okay, we have that. Thank you.

5:31:11Speaker 34

And then two, three, and four should be separate motions.

5:31:14 – 5:31:25Speaker 69

Okay, so I'm going to entertain a motion to adopt a resolution approving the updated position control list for fiscal year 26 and fiscal year 27. Move. Second.

5:31:26Speaker 69

Do I have a motion by Council Member Klein? Second by Council Member Marks. Roll call, please.

5:31:31Speaker 55

Council Member Bracco? Yes. Council Member Klein? Yes. Council Member Fugazi?

5:31:35Speaker 55

Council Member Marks? Yes. Council Member Ramirez? Yes. Mayor Bozo?

5:31:39 – 5:31:56Speaker 69

Yes. Motion passes 6-0. Next, I'll entertain a motion to adopt a budget amendment resolution for fiscal year 26 and 27. Somebody. Council Member Marks. And then I have a second by Council Member Bracco. Roll call, please.

5:31:57Speaker 55

Council Member Bracco. Yes. Council Member Klein. Yes. Council Member Fugazi. Yes. Council Member Marks. Yes. Council Member Ramirez. Yes. Mayor Bozo.

5:32:05 – 5:32:29Speaker 69

Yes. Motion passes 6-0. Finally, I need a motion to authorize the city administrator to submit a bid for a reserve fire engine from the Mountain View Fire Department for an amount not to exceed $150,000 and execute all related documents necessary to procure the reserve fire engine if Garoy's bid is accepted.

5:32:31Speaker 69

We have a motion by Councilmember Klein and a second by Councilmember Ramirez. Roll call, please.

5:32:35Speaker 55

Councilmember Bracco. Yes. Councilmember Klein. Yes. Councilmember Fugazi. Yes. Councilmember Marks. Yes. Councilmember Ramirez. Yes. Mayor Bozo.

5:32:42 – 5:32:59Speaker 69

Yes. Motion passes 6-0. Thank you, everybody. Thank you, Cindy. Moving on to item 9.3, introduction and adoption of the urgency ordinance amending Chapter 8B of the Gilroy City Code relating to voluntary campaign expenditure ceilings.

5:33:00 – 5:34:37Speaker 27

EVENING, MAYOR, COUNCIL. I'LL BE PRESENTING THAT ITEM BEFORE YOU. NO POWERPOINT, BUT A VERBAL PRESENTATION. WHAT'S BEFORE YOU IS BASICALLY THE LAST STEP OF THE COUNCIL'S WORK PLAN ITEM REGARDING REVIEWING CAMPAIGN CONTRIBUTIONS. SO JUST A QUICK RECAP. THE CITY TRANSITIONED TO DISTRICT-BASED ELECTIONS IN 2025. IN JUNE OF 2025 WHEN WE ADOPTED THE BUDGET AS WELL AS THE WORK PLAN, COUNCIL ADDED THE CAMPAIGN FINANCE REVIEW AS A WORK PLAN ITEM. IN MAY WE BROUGHT BACK SOME RESEARCH FINDINGS ABOUT WHAT OTHER CITIES IN THE COUNTY AS WELL AS OTHERS THAT HAVE TRANSITIONED FROM AN AT-LARGE ELECTION TO A DISTRICT-BASED ELECTION, HOW THEY TREATED THE CAMPAIGN CONTRIBUTION LIMITS AS WELL AS EXPENDITURE VOLUNTARY LIMITS AS WELL. At the last council meeting, you reviewed and considered those findings as well as gave us some directions to come back with. So that is the ordinance that's before you, which will adjust the... ADJUST THE CAMPAIGN FINANCE LAWS. SO FROM A CONTRIBUTION LIMITS PERSPECTIVE, COUNCIL DECIDED TO KEEP THAT AT $750. FROM A VOLUNTARY EXPENDITURE LIMITS PERSPECTIVE, COUNCIL DECIDED TO INSTITUTE A $25,000 for each district-based election subject to future CPI increases, and then decided to keep the $1 per resident structure for the at-large mayor seat. So that is what the ordinance reflects. That is before you, and I'm happy to answer any questions if you have them.

5:34:43Speaker 55

Um, Connie Rogers isn't here anymore. I have, I have no speakers.

5:34:48 – 5:35:08Speaker 69

Okay. Thank you. I'll bring it back for council action. I'll take the motion to approve. I have a motion by council member Bracco and a second by council member Fagazzi to introduce the ordinance by title only and waive the further reading.

5:35:12Speaker 55

Councilmember Bracco?

5:35:13Speaker 55

Councilmember Klein? Yes. Councilmember Fugazi?

5:35:16Speaker 55

Councilmember Marks? Yes. Councilmember Ramirez? Yes. Mayor Bozo?

5:35:20Speaker 69

Yes. Motion passes 6-0.

5:35:23 – 5:35:34Speaker 55

I will read the ordinance by title only. An urgency ordinance of the City Council of the City of Gilroy amending Chapter 8B of the Gilroy City Code relating to voluntary campaign expenditure ceiling.

5:35:35 – 5:36:00Speaker 69

Thank you very much. I'll also entertain... A motion to adopt an urgency ordinance amending Chapter 8B of the Gary City Code relating to the voluntary campaign expenditure ceiling, making the finding that the immediate implementation of the amendment is necessary to provide certainty to candidates and committees participating in the upcoming 2026 election cycle to promote orderly election administration.

5:36:03Speaker 69

Okay, I've got a motion by Council Member Ramirez and a second by Council Member Klein. Roll call, please.

5:36:08Speaker 55

Council Member Bracco? Yes. Council Member Klein?

5:36:11Speaker 55

Council Member Fugazi? Yes. Council Member Marks? Yes. Council Member Ramirez? Yes. Mayor Bozo?

5:36:16Speaker 69

Yes. Motion passes 6-0.

5:36:18Speaker 34

If I might, just for the record, that ordinance is now effective as of this moment because it was an urgency ordinance, so there's no 30-day wait.

5:36:27Speaker 69

Oh, yeah, that's right. Thank you. Thank you for stating that. Moving on to item number 11, city administrator's report.

5:36:36 – 5:37:07Speaker 21

Thank you, Mayor. I'll just highlight that last week I attended the Cities Association summer meeting that they have. They have a focused meeting typically. This one was focused on emergency preparedness and what you should do as a council member in case of emergency. Basically, what it comes down to is listen to your city administrator, and he'll provide you with guidance on what to do. And the reminder is that the mayor is a spokesperson for the city of Gilroy. Other than that, that concludes my report.

5:37:07Speaker 69

Thank you. City Attorney's Report.

5:37:09Speaker 34

I have no report, but I can lead us into the closed session.

5:37:14 – 5:38:01Speaker 34

All right. Item 13.1, Conference of Labor Negotiators, Collective Bargaining Units, pursuant to Government Code Section 54957.6, Gilroy City Code 17A11-4. Collective Bargaining Units, AFSCME Local 101, General and Supervisory Units, representing employees affiliated with AFSCME Local 101, Local 2805 IAFF Fire Unit, representing Gilroy firefighters, City Negotiators Matt Morley, Leanne McPhillips, Anticipate issues under negotiation, wages, hours, benefits, working conditions. Memorandum of Understanding, City of Gilroy and Gilroy Firefighters, Local 2805, City of Gilroy and Aspen, Local 101, Generations of Advisory Months. The next step is to call for public comment.

5:38:02Speaker 55

Any public comments? I have no speakers.

5:38:04 – 5:38:18Speaker 34

All right, so we will now adjourn to closed session. The first item upon entering closed session, is to hold a vote to remain in closed session. That vote is a reportable action at the conclusion of the closed session.

5:39:00Speaker 34

That is all right. Come on. At some point, I'm not going to give them a good shot.

5:39:07Speaker 1

Because I was looking around the room.

5:39:09Speaker 69

Enough of the room didn't like it either. Like the normal people. So what do you think? I think it's pretty great.

This transcript was automatically generated from the official public meeting video and is presented unedited. It reflects remarks made on the public record by elected officials, staff, and public commenters. Transcript accuracy may vary; view the original recording for reference.