Historic District Review Board - Regular Meeting
The Coldspring Historic District Review Board reviewed applications for signs, lighting, roofing, and porch renovations, and discussed ongoing code violations.
About this meeting
- Government Body
- Historic District Review Board
- Meeting Type
- Historic District Review Board
- Location
- Coldspring, NY
- Meeting Date
- September 15, 2026
Transcript
760 sections
I'm going to be running the meeting tonight. The first item on the agenda is 49th Street. Is anybody here for 49th Street?
You can sit there.
How do you feel?
Is it less intimidating? There's other options. So this, as far as we understand, is an application for a steel sign, projecting sign. new lighting and a new front door and the hardware on the door. Do you want to just tell us a little bit about what you guys are proposing?
Yeah. So yeah, so I can get through it. So opening restaurant, I don't know if you want me to talk about the project in general or just the facade stuff. The front doesn't need that much work. There's already a blade sign arm on the door. So I assume it was approved to have a sign like that in the past at some point. Maybe that's a wrong assumption, or that's why it's not there anymore.
So there's an existing armature. Arm, yeah. And you're maintaining the same one you're not replacing it?
I think we're going to replace it. It's just going to be in the same exact location that the arm exists now. It's just like kind of a more flimsy older arm. And it's a single arm. So I think we're going to add a second arm to the bottom. But it'll be the same type of hanging in terms of coming out into the sidewalk. And then the door there now is just kind of, like, flimsy and old. So we'll just replace it in this nice sort of our gold. We have this door that we found that's, like, going to be refurbished. And then the window is just, like, painting around the trim. And then I think the lighting, I think my designers wrote, like, just, I think there is a sconce there right now. So what's up?
But right where the sign.
So in an ideal, in a perfect world, just relocating the sconce and having it be a different one. But obviously, those are inflexible and all those things, just about making sure that the sign is possible. And door really is a big thing, because the one there is not going to work.
And this is the door that is existing now? Is it a metal door or a wooden door? I think it's a chunky. Yeah, yeah. Yeah, these were not included. And so this is a salvage store that you guys found? Yeah. And do you have any details of the hardware that you're proposing?
I do in a big packet of itemized stuff to buy. That wasn't on the list to bring today, so I can get that for you. Some of the things, like the guy who is going to do it, my contractor, these things are waiting slightly until... I guess it's my first time doing it here, so there's a little bit of chicken or egg element to it. Some of the stuff can't be signed for the contractors until I get the building permit, so they can... officially make the bid. And that includes a timeline for build. So I'm kind of just seeing through as much of the town stuff as I can to give to him to be able to see. I'm not really sure which thing you need first to happen. Like, can I see through this whole process before getting you some of those details?
Well, one of the things that we do review is lighting. And I think that we could not issue as of today until we see press sheets that we have heard.
I have those. Can I send those along? Because I don't have them here. Is it possible to send them without?
How close do they are?
Yeah. Is this an accurate representation? Yeah. It is the piece that has been superimposed on the door? It is.
Don't own the pieces yet, though.
So it's a globe light with a metal, a pretty simple metal armature that's that do you happen to know the rough dimensions? Obviously it's less than the sign.
Right. I do not. I can get this.
Yeah. Yeah.
And we, with renderings, I mean, it is so easy for the light to accidentally be cut in half when you're putting it on here. So I just.
In terms of that, it may be bigger than that.
Yeah. I think we need the real spec for that. I'm also just quickly flipping through our guides. I thought we could download. Is that a fixture work for lighting or fixture welding requirements?
I'm not, I mean, unless it's in our standards, I'm not necessarily opposed to that since it's below the sign and would help illuminate the sign. I mean, I think I like the idea of a reclaimed door. It's a wood frame door with a single pane of glass, correct? Yeah. So in theory, at least visually, like all of this looks good to me. I think it's just the details to have formal approval.
Yeah. Like kind of specifically this A bar across the door. That's a very unique thing. So it's good to see.
Yeah. I mean, like right now the door is in its raw state of the door that's reclaimed, right? So all of that hasn't been fixed yet, obviously.
Yeah.
Okay.
And the window, nothing is so, the signage, you were going to have a simple type on the door, glass, and then a blade sign above. And there's nothing in the glass window is staying the glass window. Yeah. Yeah. Yeah.
We like to sort of just thumbnail into a nice, warm, inviting place.
And that's the, and that is the vinyl sign, is the lettering on it?
Yes.
Or is it the panel?
No, that, no, that panel.
That's a curtain.
Yeah. Okay, great.
So Kate was checking on the light. Yeah, there's a hyperlink. That's interesting. Well, I think we could probably look. I mean, you could also review the lighting standards, but we could probably look into that for you and just send that to you. But I think what we would need to see would be the lighting specs. And maybe just the dimensions for the vinyl on the door. That would be it.
Okay. So like size of font. Yeah. Okay. Sorry. Some of this was, I started this project with Abigail and then she left. And so some of the checklists she gave me wasn't full. And so, you know, it's hard to know, but I will get this all for you.
I know. It's been a little funny with the transition.
I just want to make sure I get you everything you need.
I think the three of us are saying in general, this looks appropriate. And then it's just confirming that with these specifications. So the armature for the sign, the light, the door, the door hardware. Is the door, the size of it, is it matched to the existing opening? Are you having to like fur in... the frame or anything like that? Yeah.
That was something we talked about in the past. Yeah, no, we're going to alter the door to fit it. The door was bigger.
Perfect. Okay.
That should be awesome. Okay. Mm-hmm.
And what do we say about the downward light? It's okay, how do you think? Or should I find a stack? Or should I find something tight?
I can't, I'm not able to get it. Why don't you go ahead pursuing this? And if, can I have your email?
Or if there's like an easy downward oriented, I'll turn it off. I just want to in case you don't hear.
We'll email you in case there's a problem with it. We need a stack though. But we do need the stack.
Yeah. And the spec is the?
Like a catalog cut sheet that has dimensions. So I have, yes.
OK. Wherever you order it, we'll have that.
Yeah, those websites. Yeah, I know.
My designer sent me the whole booklet of things to purchase, every little fixture, like a set. So I'll just parse it out of that. Yeah.
So our next monthly meeting will be October, third Tuesday of October. So if you come with all of those materials, the three of us will be here. Well, you'll be, well, we're, yeah.
I mean, I might, I can try to soon.
If you send the catalog cuts and stuff by email, we can look at those.
And do you know if the building permit, just, it's new to me, right? So I went in front of the planning board, that was all approved, referrals said yes. Is that waiting on, will this need to conclude first also, or are they separate issues because one's interior, one's exterior?
Marjorie, do you know the answer? Yeah, what is the... Will the building permit not be issued until...
If you have two permits for the exterior and interior, it's just one package that you submitted to the building permit.
I believe you're building permits waiting on a certificate of appropriateness from the HDRB, but also the parking waivers resolution from the planning board.
So I didn't know if the parking was resolved.
We haven't received the resolution and the resolution gets attached when they issue the building permit. So they wouldn't issue the building permit until they have the planning board resolution on the parking waivers.
Yeah.
Because they don't want you to go ahead and start if there's an issue with the parking.
Right, right. And so, yeah, I just didn't know if it was then tied to this because this is such a separate issue, but both elements are required for the building.
Do you know the track for his parking? Is that? Is that known sort of when he should be receiving that? Is that basically wrapped up?
That's what I was wondering.
I had a brief discussion with Tyler earlier. I have not been the building department clerk, so I'm the village clerk, right? So I will call the attorney because I believe the attorney is writing the resolution that has already been approved. by the planning board. That's my understanding.
Yeah, they settled on like a number of spaces to then suggest like referral to say yes to or whatever.
Just pass the resolution, you pay for your parking waivers and get your building permit. Yeah.
Can we, because he can't get the permit again until we also approve it, right? That's correct. So for his timeline, since we're I do this every time, and it's like, can we do this or not? But we're seeing these images. It all looks correct. If the specs match what we're seeing and we're comfortable with it, can we provisionally approve it here so that he can expedite this? And if the light isn't a go, then at least he can wire port and we can take a look at the light. That won't slow you down.
Yeah, that would be my perfect world, just because I'm paying rent on a space every month that I can't touch. You know, if it's just for lighting, but I'll do whatever I have to do, obviously.
I would recommend that you send in those specs, ASAP, and then you stamp the, you know, you'll make a stipulation in this meeting that with these provisions, you will issue your certificate of appropriateness. So then you would, Tyler, you would send in whatever missing elements, the images and the spec sheet on the On the lighting.
Another option is just removing the light from us.
I think it doesn't take so long if you know exactly.
If your designer knows what they want, all they have to do is download it. Yes. And then you would issue a letter. Your letter. And stamp the plan.
Their letter. I just want to make sure I have all the docs I need.
No, don't try plagiarizing. So then the HDRB portion will be closed. And then it's for the planning board's attorney will write, or perhaps has written. They've been busy with other things. And so you might be just waiting on that to happen. And then the planning board's chair will sign the resolution. as agreed and then both of those elements will get attached sent up to the building department and you'll be issued your building permit and then you'll do the work and then it will need to be inspected right and then after the inspection you'll get your certificate of and we can all eat good food. Thank you.
Just a couple quick questions. The handle on the door, is it the steel where it's shown as being black and then like a chrome or nickel or something on the end brackets? Is that correct?
It's correct. I mean, I'm realizing now I don't know what these materials are. They sent me a whole spec sheet, and I didn't memorize those things, and I didn't know that I would need that for this, but it makes sense, obviously, that I would. So let me get that for you.
I mean, assuming that is... Yeah, as long as it's dark and as long as it's metal. And kind of the same goes for the light. I think one thing, as far as the glass globes, it is going to be... pointing upward. I think a frosted glass bulb would probably be preferable, less harsh on the eyes.
So is there a motion to provisionally approve the application as described pending receipt of the additional specifications?
I primarily approve this application, pending approval of applications that will be submitted by email. Great. Yeah.
I'll second.
All in favor? Aye.
Aye.
Cool.
Can I ask a question? Please. What kind of restaurant?
Italian. I'm an Italian citizen. My family's from Italy. But, like, we're going to be milling all them counting from the table yeah great cool awesome like my passion is like northeast wheats stone milling um for bread and pasta so we did it's cool i like it just hopefully it'll yeah you guys will it's it's not your typical uh thing but it's like more flavorful and better for you you know the signal fire they create i love them yeah yeah we have some cross i used to I don't know if you know Blue Hill at Stone Barns. I ran the bread program there. So there's some crossover with like the Signal Fire people and they're doing that similar thing that I love. So they're great. Yeah.
Well, welcome.
Yeah.
We're excited.
Yeah. We had the original towns like we used to live in a city and we just sort of isolated. We'd come up here on the weekends with a train and we're just like, we need to move up here. Yeah. Great.
Welcome. Yeah. Yeah. So just send us the stuff by email and we'll We will then do the feedback.
Thank you. This is nothing.
Do we have people for 13 person street? The application for solar, right? Hi, guys. Thanks for having us tonight. Hi, how are you guys doing about that building? Yes, did you include an overall photo of the building so we can see?
Yeah, I can start sharing my screen and I have some stuff already prepared here. Oh, unfortunately, unfortunately, the host disabled. the ability for me to screen share according to Zoom.
Yeah, give us a second.
Okay, great.
I want to request to share your screen.
Okay. Oh, yep, that seemed to work. Wonderful. Thank you. So here's an overall picture of what it'll look on the actual property. And then we also included in the packet to you a site plan that has the specs and the layout, the distances from edge to edge of the rooftop. I figured you guys might be interested in the conduit run as well. This is the conduit run. We always keep that as neat as possible.
Going straight down that side. Okay.
This is the rear. Is this the street? No, this is the rear roof. Correct.
Correct. Correct. This is the rear roof, not the front roof.
Yeah. You wouldn't be able to see it from the road.
Okay.
Correct.
And are any of these panels visible from the street or any street?
No. No, they will not be visible from the street.
So the conduit is running down the... It's a secondary facade, but is it a which cardinal direction is that facade?
That would be the west side, correct.
So it's coming down on the rear of the building, going over, over the roof, down the side, over the other roof, then hitting the ground and going across to the panel, which will be visible from the street, but it is pretty minimally visible.
Yes.
Because if they ran the condiment the other way, then it would be right directly on the front of the house.
I don't have any questions about this.
The condiment run is not on these drawings, I don't think. But we can just note it, right?
Yeah, can you go back to that? Because we do need to show it on the plan. Or is that in your packet?
It would be on the actual plan set. I believe we put it in there.
Yeah, it's on the plan set that I signed with the customer as well. Right here is a signed site plan that the customer signed off on as well.
Oh, just want to draw on a plan. It's like, it's a diagram.
Oh, yeah. Could you send us that diagram as part of your application so that we can Yeah, we get that over to you.
I could see where it's not on the action stamp.
It's not on PV to which is where it Okay, then
For our knowledge, moving forward you, you would prefer us to at least have either a on the actual plan set paper here, or at least a picture of it on TV to correct.
I think the visual you showed it makes sense because the plan won't show the elevation so. I mean, ideally, we'd like to see an elevation.
Ideally, an elevation. But if not an elevation, I think as many photographs of the property from different angles would be also helpful. That way, while we're talking about it, if we need to reference something, we can find it in the image.
So can we just have this west elevation, if they can just take a clean shot of it and then just draw a line? Yeah. To me, this image does what's needed. Can I just send this?
Yeah. Can you email this to us, like, right now?
Yeah. Great. Yeah. What's your best email?
B-C-Clerk.
B-C-S-Clerk. At coldspringny.gov.
Cold.
That would make more sense.
I can go print these out.
OK. Great.
I need just one.
Just one? Yeah, for Lawrence.
A motion to approve the application as submitted. Including the conduit image.
All in favor? Aye. Okay. Your application is approved.
Thank you so much, guys. Thank you for your time.
Now, do you happen to know how long from now until when the building department will issue the permit would be?
You'll submit. We are going to type up our C of A. Our care is away at the moment, so there's going to be a tiny little bit of lag, but it should be done by the weekend, and then we send it to the building department. I don't know.
I can't speak to the building department. When we send it to you, we'll send it to you and them at the same time, right? You'll be in the same email.
Okay, that'll be perfect. And like I said, that COA, you'll definitely have. I haven't heard back from the homeowner, but you'll definitely have it. And I'm getting ready to send out monies to you. So thank you, guys.
Thank you. Thanks again, guys. Have a great night.
Thank you. Bye-bye. 138 Main Street here.
138, 140.
And it was, I think that was a workshop, kind of a workshop that was on in August. So I did email, I don't know the names, but I emailed to see if they wanted to.
Oh, columns. Oh, right. Yeah. Yeah.
They wanted to come tonight.
And they were, when we met last in September, they, they said they were going to come tonight. I thought, They're not here.
But they don't have, as you said, they don't have a formal application yet. So we're still in the workshop. Unless they don't really submit something.
Got it.
Lucky Cats.
Do you want to just put it over until October?
Yeah. Okay. Is 72 to 76 Main Street here, Lucky Cats Guild? Mm-hmm. I'm here.
I'm here. Sorry. I was informed of this. I was not able to get the application. We're not really. So the only thing we have currently is a sign. It's not a fixed. It's sitting on top of the brick wall. Right. It just sits there. It's not a fixed or anything. We have not decided what we want to do for a sign yet. We're not even sure if we're going to, we had one that was hanging above the front door. We removed that and put it over. So what I was, you know, basically submit something for the next meeting. If we decide to do something,
for an exterior sign.
Yeah.
You'd prefer to come back next month once you have a little more time to come up with a concrete plan?
Can I just weigh in? Hi, David. This is Marjorie. We spoke earlier. Yes. So originally... sign above the door that was submitted to the hdrb for approval but today david didn't realize he was on me so i went across the street and these are actual photos that i snapped today um thank you thank you thank you thank you marjorie you're welcome so um those show that's there is a uh I guess, is that a vinyl applied sign of the cat on the glass door, David?
No, that was hand-painted.
Hand-painted of the cat. And then that is the sign that is mounted on the brick, half-brick wall.
So it's not mounted. It just sits there.
Yeah.
So that sign just sits there. We can take it down when we're not there. You know, for the next month until we meet with you guys. It can come down when we're not open. We just kind of put it up there so people know there's a differentiation between the garden, between the French restaurant and us. There's been some confusion with people just sitting in the gardens.
I think if you, at least in my perspective, if you anticipate If you can tell us that you will be at the next month's meeting with a plan for the signage to formally submit, then I don't have any issue with that signage staying where it is until the October meeting.
I think we have to be strict about October because we've run into... Issues. Yeah, we've run into people putting signs up for longer than we've...
I hear you. We will be definitely there. I was the mayor of Tannersville and I was the head of the planning board. So I'm very familiar with all this. I will be there on October and we will have a concrete plan on what we're going to do for an exterior side.
Great. Okay. And we, I mean, I think you heard with the other applicants, but we'll just make dimensions, materials, locations, ideally some kind of elevation, which could be...
Even I think just a more zoomed out kind of photo of the first would probably be okay, right?
All right. I did take one of those. I think I have one too, yeah. Yeah, so as long as we know the materials and the dimensions and how they would be affixed, et cetera, that's what you should have.
Perfect, not a problem.
All right. Cool. So we will see you in October.
All right. Thank you guys so much, and I'm sorry we weren't more prepared for tonight.
It's okay. Thank you.
Okay. Thank you. I also want to say the Village and everybody's been great with us. The turnout has been amazing, and we really appreciate it.
We're so happy you're here. Thank you, guys.
All right. Thank you. Good night.
Do we need a notice of a temporary time? Yeah, I think you should just like, yeah. For one month.
All good? Am I all good to leave?
You're all good.
Send me that application that I sent you though.
I will. I tried my best.
Thank you.
Okay. Yep. Bye.
Bye. Yeah, do we need to vote on it if we're sending a motion? I mean, if we're sending a notice for a temporary sign? You should probably make a decision. Do we have a motion?
I would move to accept the temporary signage until the October meeting.
Yeah, no longer then. The unfixed.
The unfixed temporary signage until the October meeting. Okay. Second. Second.
All in favor? Aye. Aye. Okay. 10 Stone Street. Hi. So this application is to install a new standing metal roof? Yes. Okay.
Just so that board members are aware, it was the chimney issue on this property, and the permit has been issued for the chimney repair.
OK. Repair. Right? Do you want to describe the project?
Sure. I'll do this, I guess. We've been there for 16 years. We know the person we bought the house from hadn't made any limited repairs, if any. There was a fire at the house in the 70s and most of the house was burned. The remaining of the original house is our basement. The foundation, supposedly. The house was getting to what the roof is about. The roof was probably installed sometime in the 90s, at the earliest. So it's gotta be over 20, it's when we were gonna, it's gotta be at least 26 years old. So our intention to do with the house and why we went with this stainless, well, we're hoping to go with a stainless steel roof is because of, I'm not gonna make a lot. My wife and I have a 10 year age difference. So if my wife is intending to stay in the house, we're looking forward.
Yeah.
My wife's going to stay in the house. My wife said, hey, look, you know, if I'm staying in the house, if the kids like to stay here, maybe they can take the house. So that's why we figured, all right, look, you know what? We'll pay the most right now. We'll get the steel roof out of the way. They don't have to worry about it. The replacement of a roof, the roof is taken care of. That would be something that lasts through her. It'll last, certainly for me, it'll last through her. And then the kids, eventually they'll have to replace something. But right now, to give them enough longevity, that's what we're doing. And we also like the appeal of it, the way it may look. We noticed that some of our other neighbors have something similar, and it makes it really nice. And I think that raises the look of the neighborhood, make the neighborhood look better.
The only thing maybe I'm missing it. Okay. So I'm not seeing like a detail of Oh, this, this is it.
Wait, where am I? We want to do a standing seam roof, not architectural shingles, right?
No, it's the same. Right now it's an asphalt shingle.
Right.
And we're going to sand it to a standing seamless roof.
Okay.
And we're adding aluminum gutters with a six inch round gutter, or made of aluminum.
Do you have... Um, a document that shows what that is similar to this, but for the standing theme roof.
No, I, uh, I can only say some money in the nice book, but I probably have the contract. I'm pretty sure I have it on, even on my phone. I can look it up.
Like you've agreed on what to put in.
Yeah, we, we always, we, we saw the construct already, but, uh, Oh, well, for the board. Okay.
Can you give a picture of what the... I think we're interested in what the scenes look like. Oh, that. We're interested in the profile. We're interested in how deep it is, what it looks like on... Yeah, I don't think... Because there are many different kinds of standing scene metal roofs. Yeah, I understand. I think we're interested in probably the most minimal profile for the scenes.
Right, I would think it would be because we had told we want anything to really pop or anything. We just kind of went with everybody. And that's about it, really.
I think your contractor could send you or send us just what, like, just a page or so that shows that from, because usually, I think, where we just, like the light in the earlier application, usually you can just download a page or two online, like the specification, and it will give those required, it will talk It will help tell us how high the seams are and how frequent they are. Okay.
So I'm going to try to remember this. I got some issues. I got cognitive issues. So I'll try to remember what you're asking me for. And I thought, well, hopefully he remembers.
Each of the metal seams kind of does like this. So we want to know what this looks like. They gave you the spec sheet on the shingles, but not on the... Yeah, so I think we need to see... Basically, we don't have... really any visual information on the proposed roof right now?
Instead of this page, which is for the shingles, it would be something like this for the metal roof.
Right. Break that out. So if you tell them you need that for your specific seam. If you just say, I need a specification, I need this, but for my standing seam, that's great.
Specification on that.
For standing seam and for gutter. And we can write it for you to send to him if you need to.
Okay, thank you.
This is not in the middle. We just don't have any visual information. We need something in order to do an approval. So I think we'll, if you could send us the information and then come back to the next meeting.
Yeah, so that'll be October. The 30th day of the month.
The earlier you send us that, if we have any questions, we can communicate before then. I mean, we'll have to do the approval at the next monthly meeting. October 20th.
Okay. Specification. Specification. That's fine. That's easy to remember. Do you want to write it down on there? Yeah, if I could.
Thank you.
Specification. notification.
Metal and gutter.
Oh, it's fine. And October 20.
Of that that should show the dimensions of the file, but I will send it as soon as I get an email.
Thank you. Thank you. We'll see you at the next meeting.
Thank you very much. Thank you. Have a good day, ladies.
Oh, we don't, they're not on there yet that we all have there. 55 minutes straight. The last time. Yeah. So,
You want to document say you want to like a schematics. This is all he would give me.
So last meeting. Doug's preference is we've given him. We had talked about a couple paths forward for those two windows. One was basically putting a new double hung window, the same size, but blanking out the bottom. Um, the other option was removing what's there and installing a awning window to match the size of the original top light of the windows. That is what he would like to go forward with. Yeah. So do you want to look at that in general? Well, that I have.
That I brought last time, right? Yeah. Somebody wanted, oh, this is all set up.
Oh, here we go. Okay. The last, the last page.
So basically they're talking about putting an awning, pillow window, And the top, but which one?
Like, what did I have last time? I had more documentation. I thought you with the Oh, none of the stuff is on the website for currently sent anything. See, let me try to find
What's in that packet? Nothing?
So somebody wanted specs on the actual window, right? That line of window. This is all the power representative would give me. I know it's very general. It doesn't say much. I think the only problem was somebody had a problem with the bottom of the window.
Al was very, okay, so where's my pen? um all of this you know the the here's a here's an image of the building now yeah we can see several hung one over one yes and so basically let's see if i have a better
The Wi Fi when you're trying to pick up the Wi Fi.
It's VCSP WEN or something. WEN? Yes, that one.
It doesn't? I'm sorry. No, it might have had the last month's stuff. Yeah, it felt a little. Good.
Well, we can see the other windows here.
Yeah. What's happening here, we're all familiar with it, correct? OK. So this, all of the framework is going away. Let's call it roughly here, the midpoint. Yes. On the other window. Which is where the other window is, exactly. the awning window is going to be installed right there, from this wood to that wood, the original opening. Al was very concerned with what this bottom detail was going to look like. I was not as concerned about that because it's an awning window, which is going to open from the top like that. So from a weatherproofing perspective, there doesn't need to necessarily even be a sill. it's in you know i know you guys you might have a different opinion but i don't think that there needs to be some kind of protruding necessarily to make it look well but there isn't anything over there right it would just be a meeting rail so in in a way you it would sort of be preferable to not because it would read as planes that are very kind of close together then right rather than have like a So, so you felt pretty confident that once this was all removed that you would not need anything across the bottom out.
What goes here.
Yeah, this is painted.
This is going to remain solid. It will be this plywood.
It doesn't look like that now. Yeah, the color of the house.
Yeah, you can. I mean, you can kind of It's this is this is the image from before the reclaim that was done, where the bottom was infilled, which is essentially how that is going to read once this one is painted out, but with an awning window in that opening.
Right, but we don't have an image of the audience. Maybe we get Last month.
Last month, we can pull it up and you know You probably submitted it by email, right?
No, I just brought it in here.
If I had internet, I can bring it up. I'm connected for some reason. But I thought I had submitted internet pictures of them. I didn't just show you on my phone.
Yeah.
So I thought I left them behind. You have an email from him?
I have an email from Pella.
I can just borrow the computer.
Yeah, because my computer doesn't... I'm just using it for notes. I don't have internet access right now, but I did... I had tried to link it to my phone before, and it was low, but it's all working.
I'm sorry. I really thought that I left those behind here.
I think he's trying to get them right now, actually.
While we're waiting, you know those metal posts?
Yeah.
I don't know if you noticed, but I took care of those.
Nice.
Yeah, do you like burnish it or use some kind of metal decal like paint?
I used a few different colors of paint. Is it still open?
I mean, for me, it was, but like, is that still an open item? So I don't know, for some reason,
It's like it's logging me in fine, but I must have had it saved.
She's looking. Or just something like that.
Wait, can I look up at the, oh, ah, who knew?
You can look at the, you can see about, you can look at that.
I can't remember what I had for breakfast yesterday. Um,
So you've done one metal post or? I did all. Oh, you did all.
Yeah.
I don't get it.
It's a white cloud dawning window from Ella. White. White. Correct.
But the other windows are white. Yeah. But are the tensions comparable? Or is it wider? Oh, yeah. So this is what it is. And then these are notes from now regarding your findings, right? So yeah, we just need to see the... I was spoken for all this, I understand. Yeah, the umbrella is just right out there.
They're pretty thin.
So this is dimensions.
Dimensions are, like is that a, that's the overall.
Vent and fixed units.
Oh, if you have the number, he can look at it in that. And if you have the window number, he could look at it.
33.5 by 41. It's custom. I don't know. It's a custom, so it's not copied. Here. He's trying to see if there's any.
No, that's, I mean, that's helpful to, to, that's what we had. That is what you showed us last, last meeting. I'm trying to.
Can you, um, is there a window number in that?
It's a custom size.
Okay. Yeah. Okay.
Yeah. So it's the, it's the lifestyle awning series, which is what this is all for. But, um, it's a clad wood window. We have bent area, visible glass.
This is all like, this is all the performance. This is the performance data, not like the... You want to take a look at this? Description here. Thickness frame.
Well, it's just saying general information without hinge glass panel, clad pine, five inch. These are dimensions that they're giving. Five inches, three and 11 sixteenths of an inch.
Overall frame depth, five inches.
And then?
wall depth of three and 11 16th of an inch optional factory applied sham extensions available optional factory and sold.
That's the depth of the wall.
Yeah, yeah.
So then what is the three and 11 16th inch measurement?
I mentioned it right after jam extensions. I feel like I kept talking about chat.
Oh, here we go.
That's a good drawing.
Two and seven sixteenths. So about two and a half inches.
We don't know what these are, but these are vinyl.
They are They either have that, I think they are replaced. Those are not. They also have the exterior storm window on them. I feel comfortable with this. This is good.
Okay. Right. Yeah.
Oh, I wish we knew what the other windows were, that measurement. Let me just go outside. That's right. It's easy.
Of the what? Of the original one?
Yeah, just so we know, so we're not approving. Do you want a tape measure on me?
Does anyone have a tape measure on my car? I'm not giving you.
Oh, I mean, I guess you can come back before the end of the meeting. Yeah, yeah. Please, I really need to take a picture of it.
Thanks, you don't know. So, um, so when I go down, I looked at the storm windows, you know, right? Right now, the other one of the wooden window. There you go.
Yes, if you could make yourself see that, and then just take a photo of it with you.
Oh, thanks. All right.
Right. Yeah. Okay. All right. Do we move on, but we might pause when he comes back. Is that okay?
All right.
We're pausing this application while he goes and gets measurements. And We will resume upon his return, and now we will talk to... Who are we talking to?
Well, that's been added today. This is 20 Rocks, the renovation workshop.
Yes, thank you guys for seeing me on that last minute. 20 Rock, which I... Are you going to need them out?
They're not here. Okay. Okay. Did we see you?
I was a little confused by the email that came through. Did we see you once before? No, we didn't. It was a workshop, right, I think? This is my understanding.
It's a workshop or it used to get, get a sense of existing porch, extend porch steps and replace columns. Yeah.
I submitted an application, I guess, a few days ago or last week.
I see. So you applied and it was, and this is, but now you got on.
This is yes.
It is a workshop though, right? You're not looking for Google.
Um, I mean, It's like I'm open to an approval. That would be appreciated. I understand the workflow, too.
So we want to describe whether or not the posts and the rails are going to be replaced in kind or what you're proposing. Totally.
Sure. So we're replacing the porch in kind. The main discrepancy, the main difference is we're extending the stairs. And I sketched, we have a sketch that essentially the stairs are going to be extended by 12.7 inches to be flushed to the corner of the porch now. In the pictures provided, the corner, it's currently not flush. We just feel aesthetically it would look nicer to be extended to the corner. All the material will be wood, mahogany wood for everything but the lattice, which will be cedar wood. Um, the front of the porch currently, if you look beneath the deck has a cement wall, which numerous contractors have told me is structurally unimportant. We want to knock that out and put lattice there. That's right here.
Right here.
Yeah. And we have, we have some pictures of the side of the porch that show the lattice, which we would intend to, you know, restore. And we would have that design be on the front of the porch as well. So mahogany decking.
Yes. Is the roof staying in the columns?
The roof is staying in the columns. We need to replace because the wood is, it's rotted, but I have a picture of the column we intend to purchase. These are not, those are, well, yeah, sorry. They are pre-found, but they're wood columns.
The size matching the existing?
The existing is five inches and these ones we are hoping to get six inches, but we're not opposed to five as well. Five inch diameter.
That's possible.
It is. Yeah, you can choose either.
And the floor of the porch is also being replaced?
Yes, that'll be replaced with mahogany two and a quarter tongue and groove. The railings are staying. So we're going to replace all of the wood of the railings, but replace in kind.
So you're not making it higher or anything like that?
We need to make it higher for code. It's safer anyway, right? Yeah. I mean, I was, we were told from the, from the building guy and said it needed to be replaced for comp.code.
Well, if you were keeping it. Yeah. Oh, I see what you're saying. Yeah.
The reason I ask is because it does really change the proportion. Right. The column that you're proposing. Right. In a different way.
Okay.
It's going to meet it at this curve, maybe at the tire rather than.
It starts at. much higher than what the time zones.
So the dimensions currently for the rails, the front is 27 inches in height, excuse me, 28 inches in height for the front rails. The side is 27 inches. And we intend to, the minimum code is 30, 36 inches. So we would raise it to 36.
Yeah. So it's going to be meeting the rail changes will be Oh, they can extend that up.
Yeah, you're at 42 inches where it starts to go from square to curve. Right?
Yeah.
Yeah. Yes. And they, I'm sure, do that for this exact reason.
Yeah. I felt like there was like legal room in the prefab.
Okay. So out of curiosity, have you looked at any historic photos of your house?
I would love to. Unfortunately, they don't exist.
Did you look at the National Register?
I have. I've actually reached out to the library and the historic, the museum in town. The only person in TR1 that gets an info in the background.
1905. And roofing of the porch? Unchanged. Unchanged, not too, okay.
So the major...
the the okay so the the alterations here are extending the steps to the right only when you're looking at the house correct i mean i think visually the steps are being rebuilt completely correct i think visually that might be a little bit weird if if your railings for the steps are not
So sorry, I should clarify that. So we think that, so you see how there's a little post there? Yeah. In extending these stairs, we would lose those little posts and have the stair connect with the column, and that would be the same on this side. So that post would go, and the new column installed would be where that current little post is.
Which is now that I'm looking at it, how the drawing shows it. Yeah, that seems correct. Yeah, I don't. I don't have any, I don't have any issue with that. Anybody have any more?
No, I just want to sort of see everything together, but do we have everything?
Mahogany, two and a quarter, tongue and groove mahogany.
It's essentially reflecting the width of the current boring on our deck. We wanted it to be as narrow as that boring. The research I did, that's the narrowest dimensions available.
I think that one element that could be improved would be for rather the planks of the decking to have this raw dead end here for it to be wrapped, at least the front cross. I think it'll be sealed better as well so that it doesn't see all that the planking is just kind of dead end and raw kind of that unfinished edge that if it's if it's banded and in a single plank coming across the porch so one going across the porch that way i think would be probably a visual and a weather kind of improvement so the grain of the wood is not all just exposed to all the weather
So just like one, you're suggesting just one plank at the end?
Yeah, running the same way that the treads of the stairs are going to be, parallel with the facade of the house rather than perpendicular. Yeah, that's fine.
Do we have, do we?
And how do you feel about the band going across? It's not a historically typical band. Right. It's usually a historic house. It is that edge, right? But how do you feel about it? You want it.
I mean, I think it. Performance wise. performance-wise and visually, I think it's nicer looking. And I think from a performance and kind of lifespan of the material perspective, it's a smarter way to do it. It's not a hill I'm going to die on, but I think that that's a smart way to do it.
I think aesthetically, I'm okay either way. I think I'm more historic to do it, like you're suggesting. I think when we see it, get old, it's not as nice, obviously, when it moves. Right.
I mean, wood is wood. Mahogany is a great choice, but my parents' house is 25 years old, and they just had to replace all of their mahogany decking. No, I know. About three to five years ago. Yeah. And so it's like it is going to degrade at some point, so.
But that banding would be mahogany, though? You're suggesting it's still mahogany. Yeah, yeah. I just think
it may help longevity of the if all those end grains are I mean ideally the end grains would be field whatever treatment you're doing right but yeah yeah we would only plant we're not painting we're just going to stain the boring wow I totally see what you're saying I mean, I'm happy to approve it as it's shown. But if you want to weigh in on either way. I think we let the applicant decide.
Yeah. Okay, so that's a suggestion, sure, for the band-aid.
However, I think however you prefer to do it is okay, it seems like.
Maybe look at some of the other houses. Yeah, totally.
I appreciate the, you know, because we were flirting with composite, but we don't want to do composite because it's historic. But yes, it prevents weathering, but yeah, we can treat it.
No matter what you do, though, that piece will also have to be treated. Of course. So I think I would personally, as the architectural detail usually is the rough edge on the porch. That's like what you see everywhere. That's what I would say to you, but I also understand. But I think we can, is there a motion to approve the submitted?
I would make a motion to approve this as submitted. Yes. With the new posts, the two and a quarter mahogany blank decking, The increased height of the railing to meet code. And with the porch, sorry, with the railings for the steps meeting the two posts, which is, that's a lot.
And the concrete block removed.
And the concrete block removed. And raised railing to be moved.
But aside from the railing, all of the other dimensions are going to match. Do we want to specify the dimension of the post, the five inches or six inches?
I don't particularly. Either is OK for me, but if you have a preference. What's there now is five, is that what you said? We have reason to believe that these are original.
I don't know because I don't have any
And I don't have any paperwork on that at this point, but six inch post The railings getting replaced.
Do we have specs for your railing.
It's in kind of, it's all going to be the same.
Up to Yeah. All profiles and everything too much. Yeah.
Okay.
We need a second.
We need a second.
All in favor? Aye.
Aye. Cool. Thank you guys very much. I appreciate it. Marjorie, thank you for facilitating. Much appreciated. Cool. Good luck. Thank you. Yeah. And we're excited for it. That porch is falling apart.
Okay. Bye.
Thank you. Thank you.
This is from inside. Oh, that's the bottom of it. Yeah. Almost three inches.
What's the top? It's what? One inch. But what's on the inside? The small frame on top of the inside, OK? Here we are on the outside. That comes to where it needs.
If you want to send me an image, I can .
Okay.
Oh, sorry. I was looking at sound meters.
Yes. On the first one on the inside. So it's the right hand side. So what is this? That's outside. That's the storm window. That's what's going across. That's the thing in the middle. Yes.
In the middle. Oh, okay. The bottom. Yeah. And what it's okay. So that.
That is a one. What does it say?
It's a two and a quarter.
Two and a quarter. Okay.
So you move one and two in a corner.
Okay. Okay.
And we just said this is two and seven sixteenths, I believe.
Yeah. Yeah. All right.
Seven sixteenths. And let me see. That's a half inch. So it's very close. Yeah.
That's amazing.
That's great.
Yeah.
Okay. Yeah. So I think that, can you send us that, send Marjorie that for, for the photo and then, and then we can include that as part of the package because we want to know that it is, that was close.
V, V as in cat, S as in Sam, clerk at coldspringny.gov. I'm going to take the same thing.
Well, it's doing NY.gov, G-O-V.
So anybody have any?
Actually, it's even less than that. It's the bottom is actually almost exactly the border. What about the side? Yeah. Right. Is that the same all around? 716.
I have more pictures. Yeah.
Okay. The window set. I'll make copies of those for notes.
Really just these two pieces. Okay, not all.
Yeah. Here's two sides. This is from the it's the actual aluminum is one of the quarters a little more.
Mm-hmm.
Then from the, from the wood. Yeah. Running is two and a half. It's actually a little less than four.
That's a pretty, it's very close. That's what that is on the other side too.
Yeah.
Okay. All right. So can you sign that, Marjorie, that as well? Sure. And then.
Cool.
Is there a motion to approve the proposed awning window?
I move to approve. approve the proposed awning window. Hello, lifestyle.
With the wood and fill.
With the wood, painted wood remaining in the bottom. Yes.
And can you also add on his fence cladding thing?
Oh, you were, but he's also painted the wood. Oh, and the alteration to the fence.
Yeah.
Okay.
All in favor?
Great.
Wonderful. I'm taking this moment. All right.
Thanks. Thanks for showing up all these times. It's been a lot.
I'm going to leave this here for her, OK? Thank you. Thanks. Have a great night. You too. Bye bye.
Hi. Board business. Oh, yeah, we've got board business.
Can we enter executive session the rest of tonight's meeting? Is that a thing?
It's applicant related, right?
It's not applicant related. Usually executive session.
That's something separate.
Yeah. It would usually be if there's, like, for example, a personnel discussion or something that is.
There kind of is.
There is, yeah. Let me ask Margaret.
Yeah, ask Margaret.
To do that. Well, there's very strict regulations as to that, so.
Is that a violation? Just go.
I'm going to try it. It isn't. Is it not?
It's not showing up when I open Google Sheets. It doesn't show up, but it'll pitch. Okay. You would think it would because...
It comes updated May 19th.
Yeah.
Oh, that's the goddess of the... Yeah. Which completely looks... Terrible, and degrading, and falling apart.
Well, I wonder. I don't think that Al has written a notice for her. So I guess we could vote on whether or not to do that.
I mean, do you want to just for now just specifically say that one, since that is?
Yeah.
OK. We should wait for them to come back.
Okay, so look, we can make... No, sorry.
When was it approved?
What?
The signage. Signage was approved to be temporary. But when was that? That was like a year ago. Yes, it was a year ago. And that was to get them to like January or something. So we need to know exactly when that was.
We could probably find out pretty easily. Yeah, it would be in like half emails or minutes. Well, maybe not minutes, but in half emails. But I don't know that we have all of them. We should ask Marjorie.
Marjorie.
We have so many questions.
And you enter executive session. Yes, you would need to make a vote to enter executive session and then we would Okay, I'm moved to enter executive session.
I second. I Yes.
And the time is 577 Just a moment.
And Exiting executive session after six momentous minutes. And we will resume our conversation, our board business. Violations. You want, you suggested, yes, issuing a violation to 14 Main Street. Yes.
A notice.
A notice.
Which we will see the building department. Yes. Do we have a motion to issue a notice to 14 Main Street for failing to come back before us after we approved temporary signage one year ago.
Yeah, I motion to send a notice to 14 Main Street and copy the building department. Second. All in favor?
Yeah, I was just, I found the email. It's from October around then, last year they applied, and they said it'd be done by January, and it wasn't done yet.
And then the applicants also failed to come back, even though we invited them back to them several times at any time.
So that's that. What was the other thing? Yes. OK. So I know we have on here review meeting minutes. I have no idea what meeting minutes need to be viewed.
Go ahead. There's a huge backlog. I've seen that. And I don't really know what to do about it.
I made a list of wherever I see that there haven't been minutes and I'm not sure if some of them may have been done and I just don't have access to them. So I'm going to be looking at that and then I'll try to since this board only meets monthly, I'll try to do them in small batches or whatever, and we'll just have to, as well as keeping current. So we'll always try to get the current minutes on so that we're, eventually we get somewhere with it. It may take a long time.
So I think there were a few times where you took minutes and emailed them to Abby.
That's true. But then she never really took notes.
I took notes. You can then use them and kind of compile. Can you tell me which ones you're missing? And then I'll search for those.
I'll do an email. In your Google filter, you can search Abigail. And then you can also search with an attachment.
You can filter it. But if you have emails that have attachments that you sent to her, maybe you could forward them to me or something. But I'll email all of you what I see. Now, it could be that those aren't all missing.
But that's what I see.
That would be really helpful, because we're so behind.
No, it happens. Yeah. OK. So I'll try to help you with that.
I'm going to stay on through the end of my term, which you told me was November. At least. December 1st. At noon. And I'm going to open it to you, Lauren, and the mayor to decide if you would like to... reappoint me. I don't know what's the term.
Yeah, we just go about you would get renominated if you wanted to again, you know, remain on the board while for the next year and not longer.
I mean, yeah, no, none of us can predict the future. So if it like makes more sense to just call it another term and then five-year term. Yeah.
All right. And what is the process for that?
But I would like that to be like a Yeah, obviously, you guys have to decide that.
Yeah, you should discuss among the board members what your, you know, and you would just, you know, when your seat technically becomes, it's a vacancy, it's a vacant seat when your term expires, and you would just state to your board that you would wish to continue in your term and on that date. Yeah. Yeah.
So there is no
anything else that the the HDRB would let the Board of Trustees know that they wanted to remain in your seat, which they've already made pretty. And then they would do the same thing they just did, which is both to approve the recommendation of the board got to that point, you know, it'd be great, because then we're only looking for one.
And you are going to, do we need to talk about?
So, oh, yeah, we should talk about that. So since we are only looking for one. Yeah. We would be pausing any public search. We would be pausing any search at this moment. So we'll hold off on that Instagram post and pick it up at the appropriate time.
You might want to get back to the one applicant that we've received and just let them know that the search is paused right now and that you're not filling the vacancy at present. But we will give them their application. Okay, and who does that? I think since you vet the applications first as board members and then make a recommendation to the board and the board would then interview that you should do that, but please CC me. at vcs clerk there's a there's a process i think i only did it a couple times when i was here but um yeah so we'll we'll talk about the clerk takes you know yeah the applications were coming to the clerk and the clerk accepts resignations and uh you know follows new hires and keeps a record of everything so and then you guys interview right different candidates and then
then I guess it goes to the Board of Trustees firm.
That's right.
Yeah, with their recommendation. That's what I remember.
Okay. All right. I am going to set the Cold Spring email up now that I'm staying. Great. Okay. We couldn't just get our names?
Yeah.
So now you have to, like, adopt Al's?
I'm not sure why they did it that way.
So I have to have a new email address then?
And then the new vice chair is going to just have all of your emails.
It will be the chair. You'll have the chair email.
So you lose all of your email history, which makes no sense.
That's so annoying.
No, they archive them.
So you can hang.
It just feels at home, like quickly check, oh, what did I send? You could put it on your phone, so.
I think that's how they're setting them up.
Should we shut that for a hot second?
Yeah, I think that's something to discuss with Managed Tech if that's a concern of yours.
I'll bring it up during my... Yeah, I didn't even think that I would have to switch email. It doesn't come hard for my brain. That's great.
Is all of the boards doing it this way?
They're not all as convoluted as the HDRB's email addresses, but they're all.
I'll ask them if we could just make it our names.
I mean, they bought licenses for them. Yeah.
I think you can change the name.
It's like the privacy of the board members. And so they don't have to keep buying
I mean, the good thing, at least for right now, is that this is all happening while this change is happening. So you will, there's not, what are you talking, potentially maximum is two more months of email history.
And you've been copying your other email.
And you're copying.
Your situation, I think, is a little better than some because some people were using their personal email. or work emails, and you've been very dedicated. We all have dedicated addresses. Right. So, I mean, that was one of the reasons for doing it. But it's also, if the village is foiled on anything, we need to have access to those too. And so the village doesn't have access to your personal emails, even if you've set them up to be dedicated for the HDRB.
And so this is just copy up for the next couple of months, just like copy yourself that old Gmail address until you take over the chair. Right.
The times that are calling for it. Nobody wasn't anybody's idea here. Okay.
so personnel stuff is resolved for now email address stuff I'll update after I'm able to talk to people if there's more of a seamless way of doing it especially for you and yeah both of us and violation we're going to do this notice that notice for now do you want to What happened with John Carr 159? Did we, did that, does he still need to come back? Did we approve that?
I'm pretty sure he got it.
We did.
He maybe didn't. He still had to come back with like the final door spec or something, but we, I don't know. I'd have to look and see what we sent him if anything.
Yeah. Like if the CFA was issued, I shouldn't know this.
I feel like we have, we did, we approved it in principle. Like he didn't have any, There wasn't a question that was going to get approved, but I think he was missing all his specs. And he said he had to bring cut sheets.
Yeah, I think that's what I remember.
Well, there's an email that went today, or September 3, in that whole chain that you just forwarded me. Looks like Marjorie sent, and one of them is 159, 161, Maine. And the bullet point says, was this ever heard by the HRB? I don't see either a C of A or a CO for this project, which has been all around as long as I've been here now.
And then what did I say to it? Because I know I looked it up. I don't know if this is what you're looking for.
Oh, this is him. But he's not here. But we don't know. Does he already submit this or this is new?
This is something.
This is dated August 7th.
Last month, I think that I'll send things to my Yahoo address that I didn't work. And so this wasn't on the agenda, to my knowledge. And so I didn't put it on there because I wasn't sure. I think that's the question I was asking. I wasn't sure where this was. Also, there's not sure if this is either or.
Okay, Lauren, you wrote, at the July meeting, we approved another proposal to alter the existing addition that was constructed without a permit. I believe Al is waiting on drawings electronically before he issues a CAA.
Right, and then I said, Al, is that true? And then I don't know if he or something.
Because I didn't see a CAA in any of the exchanges.
Right. Yes.
Something like this document that we use for violations, I mean, do we want to have a track under for all of these. It gives a quick status. Is that OK? Great.
We have a building department tracking Excel doc that we're trying to update because it wasn't completely. It ends when the application goes to the building department. But it would be really helpful if we continued it you know, to the referral stage and then the inspection stage and the CO. Where does that live, though? It lives on the building department share in the server, but it could.
An Excel doc?
It's an Excel doc, yeah.
And who has?
Abigail was maintaining it.
So she has editing permission?
I have been since I've been filling in a bit. And that I've been adding the new building applications and we assign a reference number to all of the and I put in the tax ID number and we have a separate document for tracking escrow funds and a check register.
And that is a village locally owned village thing that is not building department does not share access to that document.
No, it's just the bill. It used to, I don't know. I don't know. But it used to, I think, extend to the date of building permit and the date of seal. And then
They're all blank columns. They're all blank. They're there, but they're not filled in.
That would just be so awful. So this is what we created to show.
Right, it's very similar to what we have.
But the nice thing about it, and I know we can't do this now, but it's in Google Drive, so we all have access to it and to update it and make changes.
Okay, so you're putting your own notes in.
This is also like now this is... That's a good idea.
I don't know what's been...
It's faster than reading back through everything, right? It's like one line with a status. So it's just all about
So that's internal for you guys. You know, you're good. I mean, while you're doing those things, if you see something that's been lagging for like months.
I mean, all of this has been lagging for like many months.
Like some of that we know.
We haven't even, I mean, a lot of these have not even... received a first notice of violation and some of this stuff was done like over a year ago.
These are mostly violations. They're not people who come into us who are tracking that. It's just tracking, you know, when people say, hey, there's a sign or there's someone just built an addition to their property and that's gone in here. But I think there's been a hurdle with resources and having the building department be able to follow up and issue a violation and written a few notices, but they just sort of fall off a cliff into the abyss. And so I think that's changing now. Maybe there's a new inspector I heard.
We have a new inspector. It's just they're very busy. They are not dedicated completely to the village. They also do Phillipstown. And formerly, we had a part-time. Everybody's all part-time. Even our building, the liaison between the building, Jeff, two days a week and so you know that kind of and all the boards in fairness to all the boards it's volunteer boards everybody has lives outside the few hours that they spend here physically and work making the agenda it's you know it's just uh a little bit of juggling and abigail was new when she started and you know and so it's just those kind of transitions lead to difficulties in locating files. There were no standard naming conventions or places to put things. And at one point, communication between the clerk's office and the building department. And so I think it's important to, the more we know about each other's departments, the more we can help. It's like safety net for everybody, right? Right. Right. So, and Karen is here helping us temporarily. Karen had done Abigail's job. I'm trying to get her to stay, but I think for our first meeting, you know, because we, I didn't realize that I missed that one step in between the application. I thought, that the building department communicated directly to the boards when a referral was made and then the boards communicated to the applicant about the application. So we just regrouped today and luckily got all of our applications.
I didn't realize until I looked at your email and I was like, oh, it's a little different. So because you guys have to tell me what process you want to use, but I think What used to happen was that the application would go up to the building department. The referral would be made. We would send the referral and a historic application to the applicant. And we would CC the people on the floor. And you've got the referral.
That's what Sean was doing.
is once the application was complete, if they filled out their HDRP, they sent in their drawings and all that, he would put them on the agenda and CC all the applicants and us and all that so that people knew they were going to be on the agenda and their applications were ready to be heard by the board. So even, I think, some of the things that were out tonight weren't made 100% ready. I don't know how that's all going to go.
We've been trying to reformat things. And she has a document that is in final draft form to share with applicants so they know what the process is. And maybe we could share it. with you, and you can look and see from your perspective if what we're suggesting makes sense, if it aligns with what you used to do, if there's some changes that want to be made based on it.
Yeah, and you know, just going forward, how we want to process the applications, because if it was Abigail, contacting the applicant and setting up the agenda. I don't know exactly how it was being done. I think she was. She was contacting the applicant.
She was contacting the applicant and telling me who was issuing the agenda. I was issuing the agenda based on what she said.
She breaks up the windows. Now, how did the applicant address you?
I would talk to the applicant. Did you have in hand everything that you
She would sometimes, she would put it up on the website. And then she'd email it to us. And then she would email it to us. And then we would ask for additional materials. But to her, not to the applicant.
And then she would contact the applicant. Maybe an extra step.
Yeah, I mean, my personal feeling is that it would be expedite things if you just... Contact the applicant if you're able and CC the clerk so everybody knows what's going on.
Yeah, because, you know, I'm just thinking, but, you know, you would know better when you look. Let's say I send you all the materials they send to us. You would know better experience to look and say they need to do this, this, and that. It wouldn't be a problem if you said to me, can you tell them to do that? But I don't want to tell them the wrong thing or have them come unprepared or such.
Checklist. Checklist. We gave pretty clear instructions to the Forge folks. There's not that much required. So the more complete the application is at the beginning, I think we have to be pretty strict about not seeing the board unless the application is the weight of everybody I know we're all in a weird position if you're on the agenda and they come in you can actually move things along I think that's why this meeting was pretty efficient considering but if everybody comes to the table and has 25% of what they need or what we need and then we end up spending 25 minutes explaining it all and trying to get it's just such a time it's about the time to let people know what should be in the application
I think the missing part, I think, between us and Abigail was that we didn't always know when a referral came in. There was communication that we didn't know about for a while. Sometimes we'd get it.
The way I remember it is that goes immediately to the applicant along with the HDRV application. and a request for them to provide all digital materials. And you guys are CC'd on all of that. So everybody is getting the same. Now you're aware that this referral is there. We're waiting for the digital documents, which we get sent to you.
But it's kind of. That's so much more efficient, because there were so many times where I was like.
Did you mention the checklist already that you made?
Yeah, so we made a checklist, which you know, I think we could put on the website too.
Basically, and it breaks it down. So if you want to go, look at this list. Windows, look at this list.
But it's very in-depth. And that is what, once we receive whatever they've submitted, one of us can be looking at at any point and be like, they didn't do X, Y, Z. And then, like, we're not being added to the agenda.
So that you guys aren't having to have patients coming in to read. Yeah, they don't like it either. I mean, they don't have to wait much. Yes.
Okay. All right. Well, we can... Yeah.
Well, so I wanted to just go back to, sorry, quickly to 37 Main Street. And I do think that we should be sending a formal notice to the building owner about... the Angie, the new Angie's location.
I don't think Kate was here. I watched the recording.
And the email that I sent to the board where I outlined what took place last month and then also copy and pasted, I believe, the minutes from I want to say last September where we specifically... No, I did in my... Let me just find it here. HDRB notice, yes. So I, the minutes from January's meeting, which I sent last, well, two weeks ago, September 3rd. Do you want me to, I'll forward it to you guys now.
Great. And send it to me. Yeah.
I'm using. Okay. Um, Okay, so January 2026 meeting minutes, 37 Main Street, yada, yada, yada, talking about stuff. And then the board noted that they had approved windows and exterior lighting in September 2025 and that no other exterior alterations were mentioned at that time. It was also noted that the new windows that were recently installed on the building do not match the windows which had been previously approved by the HDRB. B. Torney noted that the windows, which were ordered in error, were installed temporarily during the winter months and that these will be removed and the approved windows will be installed soon. That's January, which means that January references September of 2025. So I think maybe I didn't find meetings from that month, but those minutes should reflect the original conversation.
And what September 2025. Excellent. Yeah.
So I referenced January 2026 is minutes and January 2026 is minutes reference the September meeting. All that being said, I sent it two weeks ago, but I'm resetting it right now.
I don't think I can stop it. Yeah, I just sent it. So
Ideally, we could attach January's, which I did. I had January's minutes. 2025s were not on the website. Or they were not. They didn't mention this. I don't know. Or they maybe were just so sparse that they didn't include this pertinent information. Either way, January's references it. So I do think we should send.
Do we have a motion to send a notice to 37th?
I move to send a notice to the owner of 37 Main Street regarding the windows and I think we should CC the building, the code enforcement officers and the building department on this.
All in favor? Aye. We have a motion to adjourn the meeting.
we're going to just pick up violations at a different point. Laura, do you want to keep going? I don't know. We don't have to do it right now. I mean, if you want to just talk about it for five more minutes.
Sure, we can talk about it.
I've been updating a lot. You're probably seeing me.
I found some of my past minutes notes in email that I don't want to send it to because it's really messy. I can. There's like six different emails. But I just wanted to close the loop on the minutes and Did we leave it so you're going to see what exists? And then tell me what exists.
I'm going to see what exists. Now, I don't know why there's, do you recall getting any minutes through 2025?
There's definitely one out of every three or four months, maybe.
Because I don't see them posted. But we can look for them.
Yeah, and I guess we didn't always get them emailed to us. It wasn't like, here's the final minutes. They would have been.
We didn't, OK. Yeah.
OK. We just downloaded a bunch of things from SharePoint today that we'll have a look through the files and see what exists. And if not, the recordings are posted consistently. And so we can just review. make minutes that reflect the votes and actions taken during the, including notices of violations or whatever.
OK. And then I'll know that I have some notes that I can share at the right time. So I won't send them to you right now, but once you have a sense of what exists and doesn't, you can just ask and I'll .
Maybe if you can send a list of the dates of .
Oh, that's true. They have that way.
And check. See, yeah. Something's been done with that. Or request them from you for comparison.
Yeah.
While we're talking about the notices, so we're going to be doing the 14 Main Street and 37 Main Street, will you draft? Do you want to draft the language for a notice and then send it to me?
um yes sure yeah for 14 are we sending it this to do we have the applicants we have contact information yeah we got really we got a lot of emails i think so yes we do yeah so i know that they have been on the agenda a handful of times and not shown up but have they been formally notified that they were on the agenda or were we just like, I don't know. Yeah, probably not.
So then that makes me think we need to notify them, give everyone one shot to actually come in before we start issuing.
So, I mean, I know Abigail. was in communication with her because she asked abigail to ask us if we would retroactively just approve what's there because it's more weather whatever and like it was expensive and the wood sign she wanted was not going to hold up and take it all it was expensive whatever so i know abigail there was communication there and i want to say abigail forwarded to us as a
happen because it was like well no we're not we can't yeah like we can't approve this but also I think no one responded ever so well I thought we said come to the meeting maybe that is all that was said wasn't notified okay so maybe how do we want to do it like I will email her since
say that you'd like her on the agenda for the next meeting how did she end up being on the agenda did she get a referral from the building department well we've been chasing we have we have just been chasing this because we approved over a year ago a temporary sign because she wanted to order a sign that was going to take three months and the signage laws are very specific so we kind of were We didn't want to, but we were a bit backed into a corner because we were fearful that was going to happen, but we also kind of couldn't be like, no, you can't put anything up.
How about you could put her on the October agenda and notify her that she's on.
Yeah, maybe that's the easiest way. And then, yeah.
Pause her temporary permit. Yeah, yeah.
And then I can write on the letterhead or something. I can just write a little bit of a more of a formal notice to 37 Maine. But it should come from you. So I'll type it and I'll send it to you.
Yeah.
Yeah. Yeah. And there are a lot on here, so.
Um, I don't know, we have to figure out a way to go down and see what you might want to do next meeting. Just yeah, you know, you all want to look at the what you have it open now.
But we don't even have to do it now in the meeting. But do we want to just take a look? independently and then I'm not going to be here, but I mean.
They've taken a lot down, but they still have the horizontal sign. So they've got to come back in.
So I just updated that faux greenery and fence sections have been removed summer 2026. Projecting signage has not been removed as agreed in the September 2025 meeting, which is the address.
That's 129 Main Street.
So 159, 161 Maine, which is John Carr. We are a little unclear as to how we left it.
I think Al needs to clarify.
Okay. So update summer 2026, or I'm going to say September, is that Al needs to update the board. Al needs to update board. in October meeting. 37 Main Street, we voted tonight to send them a violation notice. Goddess of the River, we voted to send them a notice. 44 Main Street, understory, that has been lingering. I don't know what, something about signage. Somebody said that the zoning board needs to see them before us.
Is there an application? Which building?
This is Oh, yeah. 44, Maine. Ethan is the owner.
Ethan is the architect.
He's the owner of the building, yeah. I mean, this isn't even one that I know of that we flagged. It just kind of appeared, so I don't know where that came from.
I think that he's come before us for that, but he was doing research to find out if his sign is over village property.
So do we just delete that off of our giant list because it's not in our, at this point, it's up to the village board or the planning department.
On the other side of the track, 14 Main Street. What was there before?
No, it's just residential.
It was residential before, yeah.
Do you want to leave it on?
Well, I'm just confused. Did they install something illegally?
This sign has been there for years since they opened.
Okay.
As far as I know. Horizontal sign?
Has it been?
I have no idea. Someone flagged that it was a new horizontal sign, and I think Ethan was trying to figure out. It was for us, even, if he needed to talk to a different board, and he was doing research, and it never really made it to us. Some of the things on here are violations that have officially made it to us and some have been noted by various people, right? There's like a hierarchy. And so with that one, I think it's pretty far down.
So I'm going to just, I'm just going to cut it and paste it down at the bottom. So we can maybe have this in some level of like importance, right?
Yeah. I mean, it's the same for O-Design.
Well, yeah. I mean, McCaffrey Realty also changed.
They're all on the same, all three of them.
Sweet Tambourine never got approved signage. McCaffrey changed their signage. O-Design added signage.
What's O-Design?
It's on Stone Street.
Perpendicular sign to the street. Similarly, sort of small and square. And it's... But it's a question of...
Depot, restaurant, the sign for Claude's was attached to a lamppost.
Some of those, that's so, and I'm, again, two different hats. Yeah, yeah, yeah. Main Street Committee hat, there's, it's a hardship to some degree to, you know, fix these when you don't realize that you're noncompliant, because it's not just coming in here and getting it approved, there's fees involved. And so I just think Well, I don't, I think we need to address them. We need to be at, walk Main Street and see these violations all the time. There's lots of other violations going on around town. And so, but I just, to, you know, beat someone over the head for a very small sign and then let someone build a stone wall without coming in. Like, I think we just need to be sensitive to who we're aggressively policing and pursuing police.
I mean yeah I agree I don't really know the right way forward then on any of this stuff because it's all it's all signage that hasn't been approved but also I mean put hanging a sign on a lamppost that's on your property without like like okay take it down like that's not a hardship take it down
But I do know that Claude's hasn't had the business they need. And so a sign that points to it closer to the train station could actually help save the business. And so it's not just take it down. It's like, oh my gosh, we need customers so badly.
I know, but I don't like, I also, there's a level of like, you make your bed and you sleep in it. Like you rented a commercial property that's like off to the side. And I mean, I understand that argument, but like, yeah. And one of them would be like, you know, like coming.
Yeah. Okay. So I have a thought. Well, I think. Wait, so what would be failure? I think a kind letter. Hey, these are the rules you might need by. Yeah. We don't even have to have them officially submit anything and give a fee or deposit and just the whole application. They can just come by with, OK, that sounds cool.
No, I don't know. Well, I don't know how to do that in any way.
Well, you can do a workshop. A workshop, you don't have to officially submit a whole application.
But if we are asking them to remedy something that is existing, it would need an application. Yeah, no, that's true. I think in terms of violations, my major concerns for issuing notices to people would be uh changes that have been done that affect the historic fabric of the building yeah like the john carr thing that was a huge one for me the window taking out historic windows and putting in windows is the big one for me like if there are other things like that that we can address and then maybe chase science later um i
yeah i mean i completely agree those are definitely bigger the big big items to tackle that to resolve it's just that the signage thing is is a just rolling downhill very rapidly i mean like in the last i just sent another like lucky it came before but there are two others that including the owners of cozy corner who have installed signage on their window of their new establishment and they know the rules and they did it without and it's just like and the compass now has a giant compass logo in a window and house of ambiance up the hill that also has a like vinyl decal in the window and yeah you could just go on and on because i think more businesses than on main street then don't have approval so i think they think the vinyl as long as it's less than 30 is compliant they don't have to come in and maybe it is but or any of them
What are the rules for signage? Don't you have to, if you put an application in- We have to respond.
Yeah.
Quickly, right? Yeah. I think it's like three days or something. And then they can go ahead with it.
But they still have to submit an application.
You can't just- I mean, one thing I think that could potentially, I don't know that it's going to make a difference, but at least then we know that the work has been done is to ask, is there a world where we ask the board of trustees to- require landlords to formally notify tenants of the pools? I don't, I mean, that, I don't know whether that's like.
Yeah. What's the consequence?
Because we don't have to. I put a sign up without coming to you. What is my ultimate consequences?
By law, $500 a day, which has never been, Enforced on the biggest violation. So there is basically, this is why no one comes before, whether they know or not, like there are no teeth.
That's what the code says.
Up to $500 a day, I'm pretty sure. Up to, yeah.
At the discretion.
Which is, again, at the discretion of not us, so. Yeah.
That could motivate some people. Motivation. That's the right thing, right? I'm sure that I don't know. I don't know. That's crazy.
So are there any big ones? But handling the signage discussion?
So well, 162 Main Street was the reconstruction of the staircase railing, which was created, made with pressure treated to life for us.
Yeah, that wasn't on the list originally. That's yeah, that's on here now.
So which ones are we voting to for you to send a notice? Just so
14 Main Street.
We're assuming that they didn't know to come in with miscommunication. We're sending a notice. We voted to send a notice to 37 Main Street regarding the windows.
I'm sorry.
37 Main Street. 37 Main. Okay. And did we vote on that? We did. Okay. So that's getting a violation notice. 14 is not.
are there any big ones the house that has the 162 a railing yeah and yeah I mean otherwise it's like it's all you want to vote to send them a notice yeah can we do a motion to vote yeah I motion to send a notice to 162 main street about their front step on the railing.
The railing that... The non-compliant railing. Yeah, it was like a railing. Who's second in that?
I'll second. So 162, Maine. 37, Maine. And what about the... What is this 129 and 150? 159, 161, you're going to speak to...
I'll need to... I mean, 129... I don't know. I mean, I just think we need to either make a decision on handling these signage things or just like, let's just not talk about it ever again. Because I don't, so much time has gone by for so many of these things that it's just kind of borders on ridiculous to have to talk about it and then not do anything. And then for someone to get a notice 14 months after they've installed a sign, like it's just like bonkers. So I think we just need to do it or not and then move on.
So can we notify them and give them a nice window where they can come in?
Well, that was another thing we talked about months ago was like, can we let, as a board, we need to establish a framework for what is tolerable, what the penalty is, what we ask the code for, you know, whether that is, yes, I need.
So for these signs, could it be a nice letter? Gee whiz, we've noticed that you have a sign up that hasn't been approved. We are... Strongly requesting you come in within the next 90 days. 90 days. First approval. Otherwise, violation. Something like that.
Yeah, I just I don't even have I don't know. I guess we would have to print these and send them by. A lot of this stuff, they've never even, they've never come before us. So we don't have contact information. The real estate agent who rented and have put a big compass on, we have no way of.
I don't know, it's just my suggestion, but if you're going to draft some kind of a letter, giving them a timeframe or whatever, just make sure it's as per the code, you know, whatever the code says has to be done. So you can reference that in your letter.
So you want a village code chapter 64. A C of A has not been issued for the signage on this storefront.
Also, that makes me think that should come from the building inspector too. Like if they are getting a permit, that should be something that he's checking.
And then we circle back to the beginning where nothing.
And this is when we all start stitching. Most of these have never come before us.
Yeah, but lots of them have not done anything.
I mean, McCaffrey Realty didn't do anything to...
The code enforcement officer needs to receive a complaint. So they don't go around policing the signs. They would need to hear from us.
from you that, well, we could easily put a list together for him.
I mean, that might be the way it should go.
I mean, we can copy and paste these cells right into an email.
Can we put a list together for him? Or are we going to send them kind letters that say, if you don't come in, we will put a list together for them?
Well, you just said it should come from the building department.
A nice letter, too. So maybe this guy is only five days over when he should have been.
The ones that you want. to appear before the board and either remedy a situation, you should, I think you're on the right track the way you're doing it.
Which is to contact them directly and not include the building. Invite them to, not yet, because yeah, give them an opportunity to remedy the situation. And the letter should say, please contact the building department, Phillipstown building department regarding this issue to be added to a referred to the HDRB or something. Right? And I guess it would have to be snail mailed by certified whatever register. I don't know the right version of mail.
Send it all the way. All the way. You could send it certified mail. That's an expense to the board. I don't know what certified mail costs in I've heard of it being done.
We don't have other contact information for any of these people. We have a physical address. That's all.
How many are there?
Signage.
1, 2, 3, 4, 5, 6, 7, 8, 9, 10. I mean, I haven't walked by Cape Cod leather cold spring candy to see what that looks like. This was, they may have taken some stuff down.
I stopped looking. I mean, is this a, I'm not policing anymore because there's no follow-through and then it just feels burdensome to everyone. Yeah, maybe this is a good person. Yeah, but it's complicated. We don't even know who to address these to, right?
Well, there should be, well, right, the ones that haven't made applications, the ones who have at some point made an application, there should be contact information on their building permit application.
Yeah, I put 10 or so that happened.
Yeah, the majority of these have not ever in my tenure been before the board, so that would be a...
So, Todd, do you want to draft a letter?
Yeah.
A general letter about a signage violation, and then we can review it, and then...
It can be hopefully just printed and mailed in a way that there is proof of mailing. And then, I mean, a 90-day window is a very generous window to expect some level of response. Do we want to, like, 60-day, like, for that person to reach out to the building department? Because... You know, three more months if then then we've got to then go to the building department to ask them to send a formal violation. And I don't, I don't know if you want to say that I haven't done anything.
There's anything in the code that It's the time frame that the violation has.
So, yeah. Right. So you have 60 days.
I don't think there is because I think we've talked the way that we have talked about this in the past was like felt like we were trying to decide how to handle it because it wasn't clearly defined. But I'll look.
Is it worth just having a conversation with the building inspector about this?
We're trying to figure out how we all are best going to work with everything. We need this. I think I once said it feels like he's this person on a different planet because I've never... Well, I can send you an introductory email.
That would be great. Yeah.
Jimmy.
And then we can figure out with him. We can say that we've noticed a lot of signage violations. We have some other ones that we voted. We have some other violations of the damaged historic fabric that we are sending notices to, but how would you best propose we deal with this? And then we'll see what he says. Does that sound okay to you? Does that sound like we're making progress? Yeah. For you? Okay.
I mean, he's new, so I think he's probably going to be like, ask us. We want to do it, but I'm going to draft. Draft 11. Great stuff.
And are you drafting for 162 Maine as well, or do you want first?
The railing? Yeah. I mean, it's literally two sentences of text about it, right?
OK. Any other big ones?
No. I mean, it's just a bunch of the most of it. It's just not much of it.
Yeah, the one you just said.
162 Maine. Oh, yeah.
Okay. Motion to adjourn the meeting.
I'll second.
All in favor?
Okay.
Well, we were doing really good there.
Well, it's like we never have a chance to talk about these things.