Municipal Code Enforcement Board - Regular Meeting

Wednesday, March 25, 2026

About this meeting

Government Body
Municipal Code Enforcement Board
Meeting Type
Municipal Code Enforcement Board
Location
Clearwater, FL
Meeting Date
March 25, 2026

Transcript

854 sections (from 947 segments)

2:47 – 3:27Speaker 1

Today's meeting of the Municipal Code Enforcement Board is called to order on 03/25/2026. Please rise for the pledge of allegiance. Please be seated. Agendas of today's meeting are on the wall at the entrance to chambers. Please remember to turn off your cell phone.

3:29 – 4:13Speaker 1

The municipal code enforcement board consists of seven members who are appointed by the city council. We serve voluntarily. It is this board's intention to promote, protect, and improve the health, safety, and welfare of the citizens of Clearwater by providing this equitable, effective, and inexpensive method of enforcing certain codes within the city. The board considers new business items in two parts. First, the violation and then affirmative relief. Formal rules of evidence do not apply. Each side is limited to fifteen minutes. The board may grant additional time. All proceedings will be conducted in a calm civil manner. Individuals who conduct themselves otherwise will be asked to leave.

4:13Speaker 1

If necessary, they will be escorted from chambers. Now I ask all who plan to speak to please rise and be sworn in by the clerk.

4:24Speaker 2

She's her firm to tell the truth, right? Thank you.

4:37Speaker 1

First order of business is to review and approve the minutes of last month's meeting. May I have a motion to approve the minutes? Motion to approve. Second. All approved?

4:48Speaker 1

All opposed? Motion passes.

4:54Speaker 4

We're gonna go a little bit out

4:55 – 5:42Speaker 1

of order today, in that rather than begin with our new business items, we're gonna take up a lean case reduction based on a request from our secretary. This is under on page six, under item five, other board action, and this will be case 97Dash24. Consider request by petitioners, RE Capital Management LLC at twenty eighty Douglas Avenue to reduce the fine regarding exterior surfaces and if approved, issue an order that specifies a fine that includes administration costs and establish the date payable or the lien will revert to its original amount. Is there anybody here to speak on this?

5:54Speaker 5

Thank you, board members and thank you, Nicole. Wonderful Nicole. Thank you.

5:57Speaker 1

Would you state your name and your address and involvement for the record, please? Yes, my

6:03 – 6:21Speaker 5

name is John Liu, that's spelled LIU. I'm a state certified building contractor filling in for the property owner. And Nicole does have an authorization letter that's notarized and signed by the property owner. My address is 5447 Haines Road North Number 235 Saint Petersburg, Florida 32714.

6:23 – 7:07Speaker 5

So, basically, the property, while you had, open case cases, it accrued a lien, and I don't know the exact dollar amount. I don't know to memorize it, it's around 70 something thousand dollars. The property has been, brought into compliance. It looks a lot better today, than it did previously, and Greg here is going to attest to that fact. I actually, the first time I stopped by the property was this morning. I was expecting to see worse than I saw. It looked looked pretty darn good. It will look even better because I'm going to be brought in to do the work from this from this point forward. So the property owner is respectfully requesting that, as you know, the lien be reduced and mitigated to actual hard costs, and we'll get that paid ASAP. And that's all I have

7:07Speaker 7

to say, really.

7:07Speaker 8

Unless you have any questions.

7:09Speaker 1

We may later.

7:10Speaker 9

Okay. I'll stay on side. Thank

7:11Speaker 10

you. Inspector Dixon.

7:15 – 7:43Speaker 11

Afternoon, board. Inspector Dixon, City of Clearwater Coating Points. What he said is true. There there was rotten wood around the roof flying, and then a a tree fell on the house after the storm since '24. And him and an associate stepped in, they replaced the roof, got all the wood replaced. The the grounds were in pretty bad shape. There's a shed that was deteriorating. The fence is deteriorating. That's all been removed. All the dead vegetation's been gone. So the city's happy to look at them.

7:43Speaker 1

K. Please step to the mic, sir.

7:52Speaker 5

I'm usually loud and overbearing, so I'm just curious. The property owner is not the same owner as who incurred the liens originally.

8:01Speaker 5

that's an important detail to know.

8:02Speaker 6

Yes, thank All

8:05 – 8:23Speaker 1

right. Does the city have a position? We're good for administrative costs, is that what your thumbs up is meant to indicate? All right. Madam Secretary, do you have a number for the administrative costs on this project?

8:23Speaker 12

I have it, Chair.

8:23Speaker 1

Oh, there you

8:24Speaker 12

go, sorry. $10.96 and 20¢.

8:34Speaker 1

And confirm with the screen, the city's content with that number?

8:41Speaker 7

Yep, we're good with it.

8:44Speaker 13

Do we have any questions?

8:48Speaker 1

No questions from the board?

8:51Speaker 1

right, with no questions, can I get a motion?

8:54 – 9:07Speaker 6

I move to enter an order reducing the amount of the lien to the administrative costs of $1,096.20 payable within thirty days. Is that what we have? Thirty days?

9:08Speaker 6

Or the lien will revert to its original amount.

9:10 – 9:27Speaker 1

May I have a second? Second. All right. All in favor? Aye. All opposed? Motion carries. Thank you, sir. Now we'll go back to one. Page two, new business items.

9:30Speaker 1

Declaration of violation. Agenda page two.

9:37Speaker 13

Agenda page two.

9:39Speaker 9

Okay. After

9:40 – 10:17Speaker 1

the cover page. All right. Our next order of business, case 3.1 has been withdrawn. Case three number 3.2 is continued until May. Case 3.3 continued from 02/25/2026. Case number 23Dash26, find respondents Connor Petron at 3804 Brigadoon Circle in violation of code for exterior surfaces and issue an order with a compliance deadline and fine if compliance is not met. Is everyone here to speak on that case? Inspector Stevens, you have the floor.

10:17 – 10:28Speaker 14

Yes, board. This case is actually we're requesting a declaration of violation. The property has been bought into compliance. It was just way after the compliance date. So we'll just be requesting that declaration, please.

10:33Speaker 1

Sir, are you here to speak on this case?

10:35Speaker 5

Well, I'm the contractor of the owner. I don't need to if everything resolved. You

10:46Speaker 14

can address the board if you like, sir.

10:51Speaker 15

You wanna fill So 3804. We're doing circle.

10:54Speaker 1

Very good. Thank you, sir. Basically, the inspector you're requesting, you're saying that the that he's now in compliance and you're simply requesting

11:05Speaker 14

Declaration of violation, which is basically like you're free bound guilty,

11:10Speaker 16

but you're not being charged anything. Fine, I accept that. All

11:14Speaker 1

right. Does the board have any questions? Can I get a declaration of violation?

11:21 – 11:42Speaker 10

I move to find the respondent was in violation of the code as referred to in the affidavit. In this case, the violation was corrected prior to today's hearing and to enter an order that no fine be imposed. If the respondent repeats the violation, the board may order a fine of up to $500 for each day the violation continues to exist.

11:42Speaker 1

May I have a second? Second. All right. All in favor? Aye. All opposed? Motion carried. Thank you, sir.

11:50Speaker 17

Thank you. Thank you, the board.

11:55 – 12:19Speaker 1

Our next case 3.4 continued from 02/25/2026. Case 24Dash26, find respondents Robin Farley, the state at 1506 South Hillcrest Avenue in violation of the code for abandoned building and issue an order with the compliance deadline and fine if compliance is not met. Is there anyone here to speak on that case? Inspector Jensen, you have the floor.

12:20Speaker 18

We might just run it from

12:24Speaker 19

It's not open up

12:25Speaker 20

to slideshow, we'll get through it.

12:27 – 12:53Speaker 19

Dave Jensen, code inspector with the City of Clearwater. This is case 2426 at 1506 Hillcrest for an abandoned building. I apologize, the slides aren't gonna slide. There's one violation for an abandoned building in 31503 B2. These are the dates of the notices and postings. That is the posting the posting

12:53Speaker 19

the notice of the hearing.

12:54Speaker 1

Oh, here we go.

13:03Speaker 19

Do what I can. It's often very little.

13:15Speaker 21

Let's go back

13:17 – 13:39Speaker 19

This is the property back almost two years ago in May 2024. There was an Inunuk abandoned vehicle on the property that was removed. However, the overgrowth was present and it's been pretty much the same way ever since. We've abated the new sits here six times under a prior board order. We just did a mowing and abatement on the property last week.

13:42 – 14:15Speaker 19

This is from, I believe, yeah, July just last year. Same thing. Probably the front and rear yards are all overgrown. Again, we've had to go and abate the property six different times. The owner of the property is deceased. Apparently she passed way back in 2023. There's been itinerant traffic through the house. However, there haven't been any utilities on at the residence since October 2023. And according to neighbors, there's been no activity there as far as anyone living or occupying the residence. So we're asking for the abandoned building.

14:15 – 14:32Speaker 19

Compliance to be met for abandoned building by utilities being turned on, property being sold, occupied, rented, demolished, and the property being maintained. Requesting compliance on for 04/25/2026, we're applying $150 per day for each day to violation of this.

14:34Speaker 1

Thank you. Board, do you have any questions? Can I get a first violation, please?

14:40Speaker 6

I have a question. Have you been in touch with the new owner?

14:44Speaker 19

There is no owner. No, owner

14:48Speaker 6

there's no heir?

14:49 – 15:03Speaker 19

According to, well, again, is according to the neighbors. There was a son and daughter that lived there at one point. However, neither one of them could keep up with the property and they had not seen any. There's been no evidence of anyone being there for, I've been looking at the property now for almost two years.

15:05Speaker 1

All right. Any other questions?

15:08Speaker 6

I just, if nobody owns it, who is supposed

15:10Speaker 23

to pay the fines? Well,

15:12Speaker 19

the deceased party is still technically the owner. It would be the estate. So basically, was gonna I would defer to our counsel to answer that probably better than I did.

15:24Speaker 24

Owns the property. It's just when you die, the property automatically goes to your heirs.

15:30 – 15:47Speaker 24

We don't track that down. We name the estates, and then we record against the property, and then whoever inherits it will then assume the lien that's created through this process.

15:47 – 16:00Speaker 19

Yes. And according to the property appraiser, it's Robin Farley is the owner's name. It's still in property appraiser as under her name. So there's there is no trust you know, state established at this point by the that's why.

16:00 – 16:17Speaker 24

That's how we choose who to name is we just look at the property appraiser and the tax collector records and then we go with that. We don't order title work unless it's we may do that for an abatement or something like that. But if for a case like this, we wouldn't do a title search. Any

16:19Speaker 1

other questions? May I have the first motion, please?

16:24Speaker 3

Mr. Chairman, I move to bind the respondent. In violation of the code as referred to in the affidavit in this case.

16:32Speaker 1

Second? Second. All in favor? Aye. All opposed? Motion carries. I have a second motion, please.

16:43 – 17:14Speaker 3

Mister chairman, I I move to enter an order requiring the respondent to correct the violations on or before 04/25/2026. If the respondent does not comply by that date, the board may order a fine of $150 per day per violation for each day each violation continues to exist. If fines and fees remain unpaid three months after such lien is filed, the city is authorized to foreclose, collect or settle such lien.

17:14Speaker 6

I have a second. I'll second it.

17:16Speaker 1

All in favor? Aye. All opposed? Motion carries.

17:21 – 17:50Speaker 1

Thank you, inspector. Our next case 3.5 has continued to May. 3.6 has also continued to May. 3.7 continued from February 20, fifth twenty twenty six. Case 34Dash26 find respondents William Black at 292390 Willow Tree Trail in violation of code for unsafe building, conditional order with the compliance deadline and fine if compliance is not met.

17:50 – 18:13Speaker 1

Is there anyone here to speak on this case? Mister Black. Inspector, I believe you have mister Black behind you. Good day, mister Black. How are you? Alright. Good. State your name and address.

18:13Speaker 21

Yeah. William Black. 2390 Willow Street Trail.

18:18Speaker 1

Thank you. I seem to remember this case from

18:26 – 18:42Speaker 1

Last month. And so it would appear city is still seeking a, inspector, that the city is still seeking a violation for a code for an unsafe building?

18:45 – 19:11Speaker 25

I'm James Larson, building inspector, Willow Tree Trail. It's all the same information as last time, but most important is for us, there there has been some progress. Remember, he had a demolition permit?

19:11 – 19:51Speaker 25

And I was out there yesterday, and I was able to get some pictures of the property. These are previous what the city is asking for is within the next sixty days that he get this house put back together. This this is the house as of yesterday. This is the dumpster in his front yard. This is interior where demolition has occurred. Drywall is removed.

20:11Speaker 3

These pictures are from yesterday, inspector. Okay. Yes, sir.

20:14Speaker 25

That's right. Put the date on there for us.

20:16Speaker 3

We all know.

20:20 – 21:06Speaker 25

And mister Black's been in communication with me throughout the process. For compliance to be met, we're looking for complete restoration to meet minimum code requirements or demolish the remaining structure and make the yard and swimming pool safe. The recommendation if the structure is not in compliance by 05/29/2026, the city asked the board to authorize entrance onto the property to correct the violations. The city will correct the violation by any means necessary with any reasonable cost to be applied as liens against property. After three months from the recording date of such lien, if the fines and fees remain unpaid, the city's attorney's office is authorized to foreclose, collect, or settle such lien using any legal or equitable remedies available under

21:07 – 21:39Speaker 24

Thank you, sir. Mister chair, before the before we pass, may I add a few things to the to presentation? Yes, please. That as you recall, if you recall last month, I specifically asked for a continuance because I wanted to look into the permit issue. There's nothing in Florida law that says that when the city issues a permit, that that would now exempt that property from nuisance codes, which is what our abandoned building code, the codes that's being brought to you today.

21:40 – 22:08Speaker 24

So, all the building permit does is authorize construction according to the plans that are part of that permit application. So, the rule still applies. That's why we to the same remedy that we requested before. The other thing to add is that this is a homesteaded property. So, this is our standard language that's in front of you right now about foreclosure.

22:09 – 22:39Speaker 24

But we are prohibited by law from foreclosing on a homestead property. But that's the only specific provision of law that changes the circumstance for a homestead property. All the other rules apply in terms of nuisance and the conditions of the property and the city's ability to go and abate through demolition. And so I just that's kind of closing note here. The request is any means necessary.

22:40 – 23:33Speaker 24

What we mean by that is demolition of the structure. So the Board, if the Board grants what we're requesting, if the house is not brought into compliance within the deadline that the board imposes, the city would then get bids from demolition contractors and then carry out a demolition and record a lien for the cost of that demolition against the property. So that lien would still show up in the public records. It would still impact the title and the ability to sell the property, but the city could not foreclose on that lien and take the property because of the fact that it's currently homesteaded as far as I can see in the records. So I just wanted to make sure that we're all clear in terms of what the proceeding is today, what the city is asking for.

23:34Speaker 24

And then also we do have some citizens, that that want to speak on this, and and I would request that the board hear from them before the board, makes a decision on this.

23:45Speaker 1

All right. Very good. Mr. Black, I'm sorry. Mr. Larson, did something you wanted to say? No, Okay.

23:52Speaker 3

There's other people I thought we

23:53Speaker 1

would say that. Mr. Black. My

23:57 – 24:41Speaker 21

intent was to just continue. So if there's a complaint specific, I will do the best I can with the pool. Main thing I need is power. My son is a pool mechanic, and maybe I could run a pool pump from a generator. I was just gonna continue the permit, and it's not realistic to put a house totally together. I would need another permit and various professionals and inspections if that runs into almost a year. I'm just trying to continue the project.

24:43Speaker 1

Understood. And you've, begun demolition?

24:47Speaker 21

Dem demolition to expose further damages.

24:53 – 25:06Speaker 21

The electrical contractor, architect, and there would be ductwork going on. In sixty days, that takes that long to order windows and have them delivered. Delivered.

25:08Speaker 21

I just need to continue.

25:13Speaker 1

Do we have any questions? Excuse me.

25:17Speaker 3

I'd like to hear from the other citizens.

25:21 – 25:34Speaker 1

Alright. Thank you, mister Black. You'd like to sit for a minute. We'll hear from our other parties involved. Can you state your name and address for the record, please?

25:34Speaker 26

Stephanie Siste. 2479 Moorhaven Drive West. I'm so sorry, I didn't get your

25:40Speaker 2

name. Stephanie Sisti. Gotcha, thank you.

25:42 – 26:02Speaker 26

S I S T I. So I'm here on behalf of Woodgate Homeowners Association. I live in that neighborhood. And this is a letter a few of us came up with and I volunteered to read it today. We respectfully request your immediate action regarding the property at 2390 Willow Tree Trail.

26:02 – 27:07Speaker 26

The structure sustained significant fire damage in September 2023 and has remained in a severely deteriorated and unsecured condition for approximately two and a half years. Since that time, no meaningful progress has been made toward repair, rehabilitation or demolition. The current condition of the property presents ongoing concerns to the surrounding community, including a visibly compromised and deteriorating structure, potential safety risks due to neglect and lack of maintenance, an attractive nuisance that may invite trespassing, a negative impact on neighboring property values and overall neighborhood standards. Despite multiple continuances and extended opportunities granted to the property owner, there has been no demonstrable progress towards bringing the property into compliance. It is our understanding that property taxes remain unpaid for multiple years, further indicating an inability to resolve this matter independently.

27:09 – 28:03Speaker 26

While we are sympathetic to the owners personal circumstances, the prolonged inaction has placed an unfair and ongoing burden to the surrounding residents and community. Given the length of time this issue has persisted and the lack of progress, we respectfully request that the board take decisive action to affirm the property status as unsafe and uninhabitable if already not if not already designated, move forward with enforcement measures requiring demolition or full remediation, Utilize any available legal or municipal remedies to bring the property into compliance without further delay. Our priority is the safety, stability and integrity of our neighborhood. Residents have been patient throughout this extended process, but the current situation is no longer sustainable. Thank you.

28:03Speaker 1

you. Board, do you have any questions? Would welcome some input from the board.

28:10Speaker 3

I have one question. Have additional comments.

28:13Speaker 12

There's board for certain reasons.

28:19 – 28:46Speaker 2

My name is Susan Huddleston. I live at 2384 Willow Tree Trail directly next door to Mr. Black. I've lived next door to him for over twenty years. Our garages and driveways are together, about 25 feet apart, I guess. Prior to the fire, Bill had difficulty maintaining his house and property. So all of this did not

28:47Speaker 2

because of the fire. Could

28:49Speaker 21

you speak up? Repeat that.

28:51 – 29:20Speaker 2

Oh, prior to the fire, Bill had difficulty maintaining his house and property. So none of this occurred just because of the fire. Examples of these are there's been a blue car parked in front for many, many years, never going anywhere. His yard was not kept. His pool has been consistently green, and his fence was broken around the pool that would present a health and safety issue.

29:21 – 29:53Speaker 2

This was all before the fire, so continues. After the fire, I was patient because I felt bad for him and his health deterioration. But since his garage door and side garage door stood ajar this entire time, the smoke smell was overwhelming for over a year. During that time, I finally called the building code inspector first asking for help for Bill. I felt bad for him.

29:54 – 30:48Speaker 2

Knowing he was unable to repair what needed to be done and neighbors were tired of the mess. I spoke with the former inspector several times, and I don't feel like anything was ever done. Recently, due to lack of care of his palm tree in the back which is next to my property, the entire top of the palm tree fell into my yard and I had to pay to have somebody cut it and remove it. Next I have wheelchair van for my daughter and I had problems when she was in it starting it a couple times and finally found out a rodent had eaten the wire in it. And right after that, my other vehicle had rodent deposits in the filters.

30:49 – 31:24Speaker 2

I never had that before. That was all reason. Now I have to keep rodent repellent in both vehicles to prevent that. A deserted vacant home with easy access for anyone to enter at any time, day or night, makes me feel uncomfortable living next door. The home value also would be affected. I've gone through the system which has failed myself and my neighbors. That's all I have.

31:24Speaker 3

Thank you. Thank you.

31:25 – 32:09Speaker 27

My name is Laurel Cavins and we live two houses. I live next door to her. And for several years, the pool at least ten years has not been had any kind of the pumping going on. Black. We've had those black mosquitoes around our neighborhood. We've had trouble with the mosquitoes. The fencing, as she had said, holes in it that a young child could probably get into. The very back of it the front is boarded up. The backyard, which does have a fence around it now, but the windows are open. So we don't know, are there critters in there?

32:09 – 32:32Speaker 27

Does anybody has anybody seen any kind of health issues because of the animals possibly being in there? And that's what a lot of us are concerned about, plus the way it looks. Our house values are going down and it's been three almost three years. Very little has been done to that. They did work on it last weekend.

32:33 – 33:02Speaker 27

They cut some tree limbs down and one couch was on the side of the road. Other than that, we haven't seen a lot of progress going on or anybody working on it. So we are concerned about this. And what she said in the letter, you know, the rodents or if that's what they are, you know, we're all kind of subjected to protect our own property. So hopefully this will get done.

33:02 – 33:20Speaker 27

Does he have proof that he's got an engineer and financial? Does he have proof that he can do it within the thirty, sixty days? That's just what we want to know, you know, how far this is going to go, how long is it going to be. Thank you.

33:20Speaker 10

Thank you. Can I ask one quick question, ma'am? Yes. Did you say ten years on the pole?

33:25 – 33:41Speaker 27

At least. We've lived there for over forty years, and we could see through the fence. And like she said, it was either green or black. It's not filled up. It's not moving. So we know that nothing, the pool is just stagnant.

33:44Speaker 1

Sir, did you wish to speak?

33:46 – 34:28Speaker 16

Yes. John Cabins, 2003 And 78 Willow Tree Trail. What I just want to know is, does he have any insurance? And does he have any income? And he said he applied for a grant last month. We were here. He said he applied for a grant. And I'm wondering if what grant for how much? And did he have the house evaluated by an engineer to determine the cost of, you know, fixing it? And we've seen notices posted up there that the house was a nuisance.

34:29 – 35:04Speaker 16

And and it said there was gonna be fines after, I don't know, thirty days. There was gonna be a certain amount of fines every day. And I'm wondering, that's been that's been over a year ago. I'm wondering the amount of fines that have that have approved. I I mean, he is he going to be financially able to do this? And we know if the house is a it's run down and it's a nuisance. But can he afford to fix it? Does he have the means? And maybe you can Bill can tell you. Thank you.

35:13 – 35:34Speaker 4

Good afternoon. My name is Patrick Grafrey. My address is 3237 Master Drive in Clearwater. I'm a vice president of Clearwater Neighborhood Coalition, and one of the initiatives we undertook in 2025 was to assist any member with respect to code violations or code compliance issues. This HOA reached out to me in June 2025 to assist them with this matter.

35:35 – 36:02Speaker 4

We've listened to the history of it. We know the details of what's been going on for how long and the fact that this is an absolute eyesore in the neighborhood. I began attending your board meetings to see what you would be doing to protect neighborhoods from a residence that looks like this. And I've not been too impressed with what's been taking place. However, on February 25, the city moved to get authorization from you to go on the property to begin the process for demolition of this property.

36:03 – 36:43Speaker 4

And to everybody's surprise, mister Black made the first appearance to my knowledge at your meeting and indicated that he had secured a permit the Friday before that caused mister Simpson to request a thirty day continuance while he looked into the matter. I also recalled his board back in October 2025 requiring Mr. Black to have a structural engineer study his property to see if it could in fact be renovated or should in fact be demolished as an unsafe structure, including his financial ability to undertake renovation if that was decided. Mr. Black did not appear at that meeting, did not have that study done and presented no evidence whatsoever of being able to renovate his property.

36:44 – 37:19Speaker 4

It continues to be a problem going into year three and listening to what he's saying today, it'll probably go into year four. My concern, this HOA's concern and the neighborhood concern of our organization is we need to do something to protect the neighborhood from a residence like this. And I hope you'll take the firm action and decisive action in spite of what Mr. Black says he will accomplish. Will he be able to do that in a reasonable period of time? I would implore each of you to go visit this residence. It is an absolute disgrace. Thank you very much.

37:19Speaker 1

sir. Questions from the board?

37:22 – 37:35Speaker 6

I have a question for the city. What occurred in October 25 as far as the evaluation of the building and finances? Was anything done at that time?

37:36Speaker 7

I don't recall what that was spoken about at the meeting. I would need to review previous meeting records.

37:45Speaker 3

Mr. Chairman, I have just one question from Mr. Black. Mr. Black, where are you living at presently?

37:54Speaker 21

Ten minutes away. Do you need an address?

38:00Speaker 3

Well, no. Are you in a home or are you in a motel or what?

38:04Speaker 21

I'm in a room and a home.

38:05Speaker 3

Okay. That's all I'll need to know. Thank you.

38:10Speaker 10

Yeah. I have a question. The last time you did ask you said that you're applying for a grant. Has there been any progress on that?

38:18 – 38:48Speaker 21

Well, I can't drive that schedule. I believe I have the well, with all the pricing I believe I can do, I could complete it myself. I couldn't have a retirement too well, and I intend to. I've started now. I don't intend to stop, but it's not realistic. Anything sixty days. You know, there are permits. There are inspections. There's windows. There's a roof.

38:50 – 39:12Speaker 21

I am actively involved with Pinellas Recover's and a grant, and we're still discussing it, but I can't run their timeline. I was going to continue demo and continue what I can do right now, and hopefully soon I hear more.

39:13Speaker 10

So have you started do you have any architects drawing up plans or renovations, electrical plans?

39:21 – 39:56Speaker 21

Well, I don't intend to change a floor plan. I I would like to get I'll get ahold of architects soon to inspect trusses so that night, they can see where I could continue. The actual structure experienced the effects of Helena and Milton after the fire. So the structure is there. It's interior work, wiring, etcetera, and all all the inspections involved.

39:58Speaker 6

Mister Black, if you do not obtain the grant, do you have the finances to restore the house to its original condition?

40:06Speaker 21

I believe yes. I cannot upgrade basic. I believe I do.

40:17Speaker 3

Are you saying that you can only upgrade the basics?

40:22 – 40:43Speaker 21

Right. Restore it to its yeah, I couldn't upgrade anything. It would be outdated kitchen, outdated baths, and they work, you can live. It's important to me to restore power. I will abandon 95 degrees and no power probably most anytime.

40:47Speaker 2

Can I ask a question? Did you say

40:49Speaker 6

that you're doing the work yourself?

40:51Speaker 21

No. It's not realistic. I'm just overseeing an owner builder contractor.

41:00Speaker 17

some topside number that you're willing to spend on renovating this as opposed to just taking it down and rebuilding?

41:09 – 41:30Speaker 21

Taking it down just costs more money. Top side of $50,000 The person that's tearing the walls out can put them up and he's already passed inspections, and that's the work he does.

41:35 – 41:56Speaker 10

Inspector Olarsson? So we are hearing testimony from different people that there's been code like that, possible code violations for the last ten years, but also within the last two and a half years, they called the office and stuff. Has code enforcement always responded to their violations, their calls, or

41:56Speaker 25

I've worked for the city for six months. I'm honestly not familiar with any history. Chairman, can I speak to that, please?

42:03 – 42:18Speaker 24

If I may. We there have been cases, and we discussed this briefly last month. There have been other cases. There are fines. Is a history of process with this property.

42:19 – 43:28Speaker 24

But I would also say that what we're here for today is specific to the code section three-1503B2, which is what was cited and brought to you today. That's the we sometimes refer to it as unsafe buildings, but this is a nuisance code, in the city's nuisances code, and it's specific to buildings which are abandoned, boarded up for a period of six months, partially destroyed for any period of time, or left for a period of three months in a state of partial construction, provided that any unfinished building, which has been under construction for six months or more shall be deemed or presumed to have been left for an unreasonably long period of time in the sense of this subsection. So that's Three-fifteen 03, Nuisances B2, and I think it's pretty clear. I don't think it's even been debated at all by Mr. Black that this is a partially destroyed building that we're dealing with here.

43:29 – 43:56Speaker 24

Most of the discussion is centered around what the remedy is and whether or not the remedies of rehabilitation is a realistic remedy. But I would just say that that's our focus today is on that code section and what we're presenting to the board today regarding the partial destruction of this building and whether or not the city should be allowed to go and demolish it after a certain period of time.

43:56 – 44:20Speaker 10

I guess, Mr. Simpson, my question is, why has it taken two and a half years for this to get to this point? It was my question I was raising to the city because the residents are quite upset, and they're looking for us to sort this out. But it's taken a long time for this to get before us, And that's what we're concerned about.

44:21 – 45:07Speaker 24

So, what I would say to that is we have broad cases. There are fines. There have been minor abatements performed on the property. As I stated earlier, according to the records, this is a homesteaded property, and it's a residential single family home, and, the remedy of the city taking the action of entering onto private property and demolishing, a home that is homesteaded according to the records is something that we are methodical and very thoughtful of. It's not something that we expedite.

45:07 – 45:32Speaker 24

It's something that a lot of people within the organization of the city need to look at and thoughtfully consider, before we do. We have had complaints. We're here now. We're putting the remedy before the board. And so we are asking for this remedy now, but it's not something that we take lightly. We do have to put a lot of time and consideration into a case like this.

45:33 – 46:02Speaker 1

I have a couple of questions. Okay. What I'm seeing here is the violation that's being presented to us is violation of code for unsafe building. And for the, I'm reading the, looking at the section three, fifteen oh three, fifteen oh two says the building shall be maintained in accordance with the building code, and we know this has been going on for at least two, two and a half years

46:02Speaker 3

Three years.

46:03 – 46:57Speaker 1

And then in section fifteen oh three, I'm looking at the resolution and it says buildings which are abandoned, boarded up for a period of six months, partially destroyed for any period of time or left for a period of three months in the state of partial construction provided that any unfinished portion, unfinished building or structure has been under construction, etcetera, etcetera. So, you know, we're well past the six month deadline. We're looking at a violation of code for unsafe building. And that begins that, we're looking at the fact that Mr. Black has a demolition permit only that to our knowledge, there's no, there's been no engineering study, there are no contractor quotes, there's been no necessarily a timeline put together, estimates from a contractor, some projection to indicate what the entire process involves and how long that's going to take.

46:58 – 47:39Speaker 1

So based on my knowledge in the industry, I believe that we're looking at a code compliance deadline of, was it sixty days? Yes, All right. That might be adequate for demo, but without any projection or any numbers and what the future brings without any of that in place. My question is, what constitutes compliance? Is it simply the demo permit being executed and the building boarded up, which keeps it in its current condition? I'm trying to understand here what what what is compliance? Is it the building fully restored?

47:47 – 48:18Speaker 25

The fact that he has demolition permit does not make the violation go away. So to be in compliance, the house needs to meet minimum codes, which it does not. The city is asking for sixty days. It's really up to you guys. If you think it's gonna take longer, what you wanna do, I mean, our opinion is, at this point, my personal opinion is he did get a demo permit.

48:18 – 48:50Speaker 25

He has done some demolition. The residents are saying, do you have the money to finish the job, etcetera, etcetera? I've spoke to mister Black. I probably got fifteen, twenty hours of speaking with him on the phone, meeting with him. You know, my recommendation has been to him to get a contractor because that's what we do. I'm a licensed contractor. I know you are, sir. At this point, it's really a matter of what's going to do next.

48:52 – 49:06Speaker 24

Mr. Chair, if I may add to that. Please. The permit that's out there now is not something that would be sufficient to bring it into compliance. It's my understanding it's just a partial demolition.

49:06 – 49:48Speaker 24

So even if he were to complete that permit, would still have a code violation for the section that's in front of you today. Now if he submitted for a new permit, for a full rehabilitation with plans and was able to get a permit that would bring it fully into compliance, then that would change the context of what, it wouldn't necessarily be an abandoned building at that point. Would be a construction site. But it would still violate the other section that's presented about it not being in compliance with the building code or the maintenance code. And at that point I saw Mr.

49:48 – 50:11Speaker 24

Garriott come coming to the podium, but it would be within the jurisdiction of the building official to determine whether or not we would continue to pursue the remedy of demolition. If it was in fact an active construction site with a permit issued, that the scope of the permit would be sufficient to bring the property into compliance. Mr. Chairman?

50:12 – 50:36Speaker 10

I think we I think our legal question is simply because he has a demo permit, do we have to wait till that permit expires? Does it start the process of getting it into compliance because in the time you could get the other plans and everything? Or I think that's a legal question for our attorney to answer.

50:36 – 51:08Speaker 1

Well, think that's, I think our answer is on the screen there. Thank you, Mr. Garriott, for helping bring that forward, that my question was about, you know, let's define compliance so that because we're playing that against a requested timeline of sixty days, and with only a demo permit in place, part of that equation is okay, so considering all of those factors, what's next? This defines compliance. It says complete restoration to meet minimum code requirements to demolish the remaining structure and make the yard of the swimming pool safe.

51:10 – 51:23Speaker 1

So complete compliance in my mind, correct me if I'm wrong, Mr. Larson, Mr. Garrett, that, that means the fence is repaired, pool is clean and working properly, the residence is restored and everything's done per code.

51:23 – 52:03Speaker 28

Kevin Garrett, Building Official City Clearwater. That's absolutely correct. That's what we are looking for. We are looking for code compliance. We want the yard, the pool, the house, everything to meet code. Minimum standards. Code is the worst building you can build. You know, that's you can always do more, but you can't do less than that. That's what we're looking for. And we are two and a half years into this, and there's been minimal, minimal until just a few weeks ago when pushed with this board hearing coming up, that then an interior exploration demo permit was obtained.

52:04 – 52:20Speaker 28

And I think the value on that was like listed at $5,000 or something. Don't quote me on that. How much do we have? So it wasn't to tear down the structure. It was to do interior exploration.

52:21 – 52:52Speaker 28

So the way this board works and the way we work with the board is if a property has gotten a board order and the date passed and they didn't comply, we turn in a notice of noncompliance. If we see somebody who is actively working, they're making progress, they're passing inspections, it looks like the road is gonna end up in the final place where we want, we are not gonna turn in a notice of compliance.

52:54 – 53:36Speaker 28

We would wait until we get the project done and turn in a notice of compliance. If there's no activity, if it's dilly dallying around, pardon the expression, but we are going to turn in a notice of noncompliance because it is not bringing the property into code compliance. That's our objective. We're not here to tear down properties. We're not here to clean up yards. We want the homeowner to have a responsibility and to take care of the property and leave us out of it basically. Any questions you have, I can try and answer them.

53:36Speaker 1

Thank you for that.

53:39Speaker 17

I have one question. We got a pool problem and a fence problem. So can you go in and do parcels or do you have

53:47Speaker 20

to it's all or nothing

53:49Speaker 17

for the city to go in?

53:52Speaker 28

For what's the question? If if he did

53:56Speaker 17

working on the interior, in the meantime, that pool's sitting out there unprotected and unmaintained.

54:03 – 54:25Speaker 28

Right. That is still a code issue that we could still pursue. It would probably take another citation to just address that. I don't know, we'd have to address how to really handle that best. But yeah, we could. It would still be a Because

54:26 – 55:05Speaker 17

into my next question, which is we've got an unsafe building order that has a timeframe that's flexible and a fine per day. Then we've got the nuisance abatement lien order which says five days and doesn't have any fines in it, so what's his incentive to move forward until the city decides to step in? So I'm not sure exactly what we're trying to do. We may need to do two different orders. One to get this building going and give that a day and a fine, and the other one

55:05Speaker 20

to get that pool taken care of.

55:08 – 55:35Speaker 24

Ma'am? Please. So to the first question about I your first question as a partial abatement. The city typically doesn't do partial abatements. We usually, if we get an abatement order, like what we're requesting here is a demolition order, which is essentially the city requesting authority to enter onto that property, demolish the structure, remove the pool.

55:36 – 55:59Speaker 24

What would be left would be sod and a grass lot essentially when the contractor was done. I don't know if Mr. Carey wanted to clarify anything there. Okay, we don't typically go in and just, if the windows are messed up, fix the windows and then leave, fix the pool and then leave the rest. We don't typically I'm

55:59Speaker 17

I'm basically concerned about the pool. How do you how do you get that done? No matter what orders we do.

56:06Speaker 12

Yeah. The pool is a health and safety issue. That's that's one that has to be taken care of.

56:11Speaker 17

It's a nuisance in the neighborhood. Nusmus. We

56:15 – 56:52Speaker 24

would defer to the board if the board wanted to put those different structures of the pool and the home on different timelines. I think that's, we don't, I don't think we necessarily would have an objection to that. We do have an issue with kind of piece milling it it's difficult us manage that. We don't want to assume some kind of ongoing maintenance obligations over anything on the property. And then I think on your second question was, can you refresh me on your second question there?

56:54Speaker 12

They just want to make sure they could do two time periods.

56:57Speaker 24

Oh, it was the fine. That's what it was the fine.

57:00 – 57:21Speaker 24

Yeah. We are not seeking a fine here because there are fines on this property. We sought fines in the past, Okay. And the the have have not had a material impact on the outcome. Alright. So those are still running somewhere in the Fines are running. We've performed minor abatements. At this point, we're looking for it ultimately. Right.

57:21Speaker 12

The fines will only end up as a lien. So there's no foreclosure action. So the abatement is the only thing that the city would be able to do in the short term.

57:33Speaker 1

Mr. Plum, you had something to offer?

57:34 – 57:50Speaker 10

Mr. Chairman, I just want to say that it's apparent that the demo permit alone is not sufficient to bring it up to compliance. And so if Steve wants to make two separate motions, I would support that or just a single.

57:50Speaker 6

ask just one more question? You're saying this is

57:52Speaker 29

a homesteaded property, but he hasn't lived there

57:54Speaker 23

in two and a half

57:55Speaker 29

years, and he can't live in it. So how can it be a homesteaded property?

57:59 – 58:38Speaker 24

Well, we, the case law on homestead is, first of all, I'll say that homestead is both a constitutional right of a property owner, but it also has a statutory place within the code enforcement process. The case law, there's a lot of case law from the courts interpreting homestead because it's a constitutional right. It's interpreted very much in favor of protecting a property owner's ability to claim homestead protection from creditors and things This like is personal

58:38Speaker 1

here, right?

58:39 – 59:15Speaker 24

As the city, we don't typically contest or try to litigate the question of homestead. If it's been determined that by the property appraisers, the tax collectors, those other constitutional officers, we typically accept that. There are claims that could be made to question the validity of the homestead. That really gets to the intent of the property owner and if they intend to live there at some point again, if the home was obviously destroyed by a fire here, It's my understanding. Know, we could ask Mr.

59:15 – 59:31Speaker 24

Black what he intends to do with the home. But the city, we typically don't take the position with regards to the validity of the homestead. If that's been determined to be homestead by the other constitutional officer, the county officers, then we typically accept that determination.

59:32Speaker 10

Thank you. Mr. Chairman, what I wanted I wasn't quite done with

59:36 – 1:00:20Speaker 10

I think before we take any motions, I think you need to explain to Mr. Black the seriousness of the matter that he needs to get his other permits applied for or Please. Mr. Black. It's become very clear to the Board that just having a demo permit is not sufficient. And you need to get everything into code compliance, so you would start to need to get all those together. Because we make a motion today, then you have the time that when this motion goes into effect to that time period to get those all together. So we just want you to be aware of that. Okay?

1:00:20Speaker 21

So pursue the next permit?

1:00:23Speaker 10

But you need to do it on a very timely basis.

1:00:30 – 1:01:15Speaker 3

Mr. Chairman, I'd like to address that. I understand my peers' consideration about the pooling yard, but it's really just putting a band aid on the whole problem. It should be and I understand mister Black's predicament. I also appreciate the residents' predicament that'll live near and around him. There's a lot of ifs on Mr. Black's part. It's either the city has been very patient for three years, so have the residents. And we have to take that in serious consideration today instead of putting everything to continuance. It's either all or nothing, Mr. Black. You have to do something and you're not doing enough.

1:01:15Speaker 21

Well, didn't start to stop. I started to continue from here on.

1:01:20Speaker 3

But you keep getting continuous for three years.

1:01:24Speaker 21

I got a permit and I hadn't before.

1:01:30Speaker 1

That's not sufficient.

1:01:31 – 1:01:55Speaker 21

You know, that's why I had a lawn service and other things during the time, you know, I got cancer diagnosis the month before the fire. You know, I didn't think I could handle both. I'm in now. That's why I pulled up exploratory in low, and I continue I intend to continue.

1:01:57Speaker 3

I just I just don't think you're gonna be able to pull anything off before in sixty days. Okay.

1:02:02 – 1:02:38Speaker 21

Well, sixty days would not be reasonable to complete the project, I'll but I think try to do something with the pool. The biggest obstacle for me is the power. I'd like to restore power. It's if the house is powered, the pool pump's powered. But many of the nuisance complaints seem to be mostly about exterior, and I'm working interior. So I can do more security. Okay. Security and pull.

1:02:39 – 1:02:56Speaker 1

you, sir. We appreciate it. Based on my understanding from what the city has offered, if there's significant progress, then the door may still be open. But I'm ready for the board to offer something.

1:02:56Speaker 17

Well, we doing a nuisance abatement on the property as a whole,

1:03:01Speaker 3

to start with? That seems to be the way it's going.

1:03:04Speaker 1

I mean, I think that's the way the city has positioned it now, so unless So there's

1:03:08 – 1:03:24Speaker 17

so then my my question to get to follow-up and just make sure we're clear on it. If we did a second nuisance abatement just for the pool and the fence, would the city take act would they go out and just take care of that under that separate order?

1:03:25 – 1:03:45Speaker 24

to defer that to the to the building official. I don't see it as a legal question because I do think that we could legally separate them, but I do see it as a potential logistical issue. Madam Clerk has given, there's also a question in terms of

1:03:45Speaker 17

Would it make wording any difference to you whether we did them separately or just did it as one?

1:03:51 – 1:04:11Speaker 28

Logistically, I think to go in and take out just the pool would be I mean, we could do it. It would be more expensive to do that way than if you had a contractor just come in and and do the whole site. So I guess, yeah, we could do it.

1:04:12Speaker 17

Under the one or would you need a

1:04:15Speaker 20

separate one? We could do it

1:04:17Speaker 28

all under one. That that was really what we had in mind and we have done on other properties and other people have done that kind of thing.

1:04:25Speaker 20

taken care of?

1:04:28 – 1:04:46Speaker 1

Well, would be the benefit of doing that? I mean, now it's breached as a whole and I mean, based on our what we've heard from the city, if he handles the pool, then the pool is off the table as part of the overall, and it's just down to the house and the other structures. I don't understand the benefit of separating it out going Exactly, through that

1:04:46Speaker 17

because one needs to be done right now.

1:04:49 – 1:05:02Speaker 1

Well, understood it needs to be done right now, but even if we ordered it now, there's still gonna be, you know, we're still following the rules and the guidelines and the timelines, it's, you know, so if we do the order as requested, then

1:05:06Speaker 3

Right now, it could have been three years ago.

1:05:10Speaker 17

Mean It doesn't make it any safer now.

1:05:14Speaker 17

And you've got people coming in from the neighborhood saying, hey.

1:05:18Speaker 3

Wait. I'm gonna mosquito got rats.

1:05:19Speaker 17

We got this. We got that. So okay. So we just go with one.

1:05:24Speaker 10

I think we just make a motion for nuisance abatement. I agree.

1:05:28Speaker 6

I wanna say something.

1:05:29 – 1:06:03Speaker 6

I think our job is to determine is the code in violation or not. It clearly is. That code that was specifically up there, that's what we have to address. And as a volunteer to this board, I've never been, never thought I'd have to decide to someone else get torn down or not. It's but it's not that. Yeah. If you could put that back up again, please. It is simply what section three dash one five zero three nuisances says. This property has been in this condition for more than six months. It's in violation. And I think that is the simplicity of what we need to address.

1:06:03Speaker 1

Thank you. Yeah.

1:06:05 – 1:06:25Speaker 24

Mr. Chair, if I may, there was a question that was raised to me on the sidebar and in terms of how the pool is a part of this case. The pool is a structure. Its current condition is clear that it's partially destroyed. And it is a structure that's subject to the building code.

1:06:25 – 1:07:00Speaker 24

So that's our position as a city in terms of how the because normally in a typical case we would bring the pool separately as an abandoned pool nuisance. So we do have a separate section that we can bring those issues separately, but we have not separated them in this case before you. But we include them as destroyed structures on the property, and we're trying to include them all together. I understand the concern in terms of the urgency. I think the board could separate timelines legally,

1:07:01 – 1:07:41Speaker 24

it does create a logistic issue. Because if we do get the authority to enter an debate today, if that time comes first off, there would be a deadline where we would come back with that as the building official described in terms of the non compliance affidavit. So that would be another point of consideration for the board. Assuming that it's still in violation at that point, then we come to the time that we actually are going to perform the abatement. We would hire contractors, get quotes, and then carry it out through our procurement process.

1:07:41 – 1:08:13Speaker 24

So we would be notifying the property owner of that process as it was ongoing. So I do think it could create some issues on the backside of the process there in terms of finding different contractors to do different things. And then the city entering the property, doing some work, leaving, coming back later and doing some additional work. Those are obviously we're going to follow the direction of the board today. So if that's the pleasure of the board, we'll figure out a way and we'll be back again to discuss it further.

1:08:13 – 1:08:30Speaker 24

But today we've asked for everything to be bundled together and for Madam Clerk and the others that have asked, that's why we've grouped them together. They're all structures subject to the building code, and they're all, partially destroyed in a in a in a nuisance state.

1:08:30Speaker 1

Thank you. Mister chairman,

1:08:31 – 1:08:43Speaker 10

I'd like to make a nuisance abatement single motion. Please. I move to find the respondent was in violation of code as referred to in the affidavit in this case. The violation was corrected prior

1:08:45Speaker 12

the wrong one?

1:08:45Speaker 3

Wrong page. Page seven.

1:08:47Speaker 10

Page seven. Sorry. Yeah. Woah. I withdraw that.

1:08:53 – 1:09:06Speaker 10

Okay. I was on the wrong page. Sorry. I moved to enter an order finding the respondent violation of code and requiring the respondent to correct the violation within five days of the board's written order. Excuse me. Is that the right one?

1:09:07Speaker 1

I believe they were asking for sixty days, May 29, am I?

1:09:10Speaker 3

Not five days, May 29.

1:09:12Speaker 10

May 29, correction. Not five days, 05/29/2026.

1:09:19Speaker 1

Let's get the correct date on this.

1:09:25Speaker 12

we just hear from the city to make sure we're getting everything that they're asking for?

1:09:29Speaker 6

Here it is right here, right?

1:09:30Speaker 12

I just want to make sure.

1:09:33Speaker 1

All right. Twenty ninth.

1:09:34Speaker 10

Say the page exactly like that.

1:09:37Speaker 24

I'm sorry. Was in the sidebar conversation again, but as far as I've heard, I don't have any objections so Are you

1:09:45Speaker 12

No. Alright. Just wanna make sure. Alright.

1:09:49Speaker 1

Alright. Let's do it.

1:09:52 – 1:10:29Speaker 10

Okay. So I moved to enter an order finding the respondent in violation of the code and requiring the respondent if the structure is not in compliance by 05/29/2026. The city has I don't know where I Yeah. The city may take responsible actions, including entry onto the property to abate and maintain the nuisance and charge the respondent with the reasonable cost, which will become a lien on the property. If cost, fines, and fees remain unpaid three months after such lien is filed, the city is authorized to foreclose, collect, and settle such lien.

1:10:30Speaker 1

May I have a second? Second. All in favor? Aye. All opposed?

1:10:35Speaker 3

Is this altogether? Before you bring that capital down, is this altogether? Yes. Yes. Okay. Yes.

1:10:44 – 1:10:55Speaker 1

One violation. Thank you. Thank you, Mr. Larson. Thank you, Mr. Black. Thank you, Mr. Garrett. Thank you, citizens. All right.

1:10:58 – 1:11:20Speaker 1

Moving on to our next item, case forty four twenty six, find respondents Cleveland Bluff Cleveland Gulf Bay LLC at 1417 Cleveland Street in violation of code for exterior surfaces, and issue an order with the compliance deadline and fine if compliance is not met. Inspector Souda, do you have the floor? Is there anyone here to speak on this case?

1:11:21Speaker 3

I'm trying to find

1:11:24 – 1:11:35Speaker 1

Item 3.8. Oh, I missed one. No, we didn't. No, 3.8. Yeah, you're okay.

1:11:35Speaker 6

Yeah, I'm fine.

1:11:39Speaker 1

Please step forward and state your name and address.

1:11:42Speaker 15

Nick Anderson. I'm property manager for 1417 Cleveland or Cleveland Gulf Bay LLC.

1:11:49Speaker 15

Real estate. Thank Thank you you very much.

1:11:52Speaker 1

We'll hear from, do we do?

1:11:55Speaker 1

do an admit or deny? All right. Mr. Anderson, do you admit violations or deny?

1:12:04 – 1:12:15Speaker 15

Yes, I admit the violation. We were ready to go. We started on it now, but I don't have it completed yet.

1:12:15Speaker 1

Gotcha. Okay.

1:12:16 – 1:12:27Speaker 15

So I've got a timeline here, which I can show you, you know, structured, I can show you pictures of the starting of what we've got. We've a whole bunch of set up to do. The building needs some work.

1:12:27Speaker 1

Got you. We're going do our first motion and then we'll have you back Thank up to you. I have a motion.

1:12:35Speaker 10

I move to find the restraint violation of the code as referred to the affidavit in this case.

1:12:41Speaker 1

All in favor? Aye. Opposed? Motion carries. Inspector Souda, you have the floor.

1:12:48 – 1:13:13Speaker 23

Vicki Souda, Code Compliance Inspector with the City of Clearwater. This is for property located at 1417 Cleveland Street, case number 4426. There is one violation here for code section three dash one five zero two b for exterior surfaces. The notice of violation was sent on 12/19/2025 with a compliance date of 01/19/2026. Certified mail receipt was received on 12/29/2025.

1:13:14 – 1:13:35Speaker 23

This is a picture of the property when I originally looked at it back in October. This was before the violation was sent out. I've got a call out to the property, and this is what it looked like at that time. These are pictures of the back of the property, the side, the very back. These pictures were taken in February.

1:13:40 – 1:13:53Speaker 23

And then these pictures were taken today. I did go back out there. Nothing has been done to the property. It's progressively getting worse. The grass was finally cut sometime over the last couple days.

1:13:58 – 1:14:30Speaker 23

This is the back of the property. Compliance can be met for the exterior surfaces by replacing any defective structural and decorative elements of any building wall and exterior surfaces are free of mildew, rust, loose material and faded peeling paint. Requesting compliance on or before 04/25/2026 are a fine of $150 per day for violation if compliance

1:14:31Speaker 1

Thank you. Mr. Anderson?

1:14:34 – 1:14:56Speaker 15

Yes. I can get most of that done by April 25, right? And I'd like to see if it's possible to separate this concept. There's three sides of the building that are easily handled, The back is a mess. And I need a lot of prep work of that.

1:14:56 – 1:15:22Speaker 15

I mean, I've got I got twenty years poor maintenance, but we've only had the building a couple of years. So we're and we hadn't had the funds to do much work on it. Finally, I've got the place all filled up and I'm starting to get enough funds to be able to do a little bit of work on it. So I'm just the I can absolutely get by the April 25. I've got the timeline here.

1:15:22 – 1:15:51Speaker 15

So I can get the painting done for the first the east side, the front and the west side with the option with a condition that I'm not sure about murals. There's a city mural on the side of that building on the west side and I have to find out what the rules are about murals. Can't I don't think I can just paint over a mural that's been done. This one's been there like fifteen years. So if I can paint over it, I will.

1:15:51 – 1:16:26Speaker 15

If I can't paint over it, then we have to treat that separately. Then in the back, if I could just have more time to do that, because I've got three, four weeks of just wires and plumbing and I've got four different AC things there. I've moved ACs to the top from the back. And people before that had done that too. And they just put boards up and they did all sorts of stuff and got a bunch of stuff back there. So my point is that yes, I can do three sites by the April 25, but I need another thirty days to be able to do the rest.

1:16:26Speaker 1

So sixty days would you think would be enough to get the project fully completed? Yes. All right.

1:16:34Speaker 10

Make it May 27?

1:16:37Speaker 1

Whatever the It's a question for the secretary of department. May 27 for the next meeting? Well,

1:16:44Speaker 3

have a question for for this veteran, miss Suddath. How long has this case been going on with Vicky?

1:16:50Speaker 18

started talking

1:16:50 – 1:17:20Speaker 23

back in October about it. I didn't send a violation out right away because when we spoke, he told me that he was going through the grant program. Several conversations we had, he told me that it was in the process. But then when I spoke to he last week, she said that the paperwork had never been turned in. She had never received anything more from him. And then when I spoke to him at the code board last month, he told me that paperwork was turned in. But according to Vicki on Friday, nothing's been turned

1:17:21Speaker 3

So it's been going on for about six months then. Okay.

1:17:26 – 1:17:41Speaker 15

I don't really think I think I told her I was in progress on that, the paperwork for that. But I never turned it in because I can never quite get the owner's agreement to do his part because that grant takes about 35%

1:17:42 – 1:18:13Speaker 15

35 to 45% owner responsibility. Never quite got his agreement to do that. So now we're just doing this without trying to go through the grant program. So that delayed me from doing this because I was trying to push it through that because we wanted to do signage and we wanted to parking, wanted we to do several things, but I couldn't quite get the owner agreement on there. So now, we've now with this deadline coming up, I said we got to do something. And I finally got the agreement to do this. So that's been you know, the delay so far.

1:18:13Speaker 3

What happened with the grant program?

1:18:15 – 1:18:44Speaker 15

It's still there. You could do it. My owner just didn't want to do the steps necessary. He'd have to go get a loan. And I kept trying to go get that to happen. And it just didn't happen. So I had to opt when we come to the point where like, we've got to get the building done, because it's causing too many problems. So I we came up with this other solution. We're not doing the grant, just doing it all the time. Not doing all the signage, not doing all the parking, just get the painting done.

1:18:46Speaker 1

So the city is requesting compliance on it before April 25. Any discussion about that from the board in terms of additional time, we're sticking with that.

1:18:57Speaker 10

I'm okay to extend it to May 27, it feels like it can get it

1:19:00Speaker 6

done. Okay. Yeah.

1:19:04Speaker 1

So sixty days.

1:19:06Speaker 1

Yeah. Okay. We're good. Ready? Yes,

1:19:11 – 1:19:36Speaker 10

sir. I moved in our order requiring the respondent to correct the violations on or before 05/27/2026. If the respondent does not comply by that date, the board may order a fine of $150 per day per violation for each day. Each violation continues to exist. If fines and fees remain unpaid three months after such lien is filed, the city is authorized to foreclose, collect or settle such lien.

1:19:37Speaker 1

May I have a second? Second. All in favor?

1:19:40Speaker 1

opposed? Opposed.

1:19:44Speaker 1

All right, motion carries. Thank you.

1:19:55 – 1:20:33Speaker 1

All right, next on our agenda is 310Case46Dash26, fine respondents affordable properties management Realty LLC, TRE at 1111 Court Street in violation of code for exterior surfaces and issue an order with compliance deadline and fine if compliance is not met. Inspector Souda, you have the floor. Is there anyone here to speak on this? Hello there. Sir, can you state your name and Michael Shimshoni. In front of the microphone, please, sir.

1:20:33Speaker 13

Michael Shimshoni. I reside at 4027

1:20:38Speaker 3

Wait this minute, sir.

1:20:40Speaker 1

Your address please?

1:20:41Speaker 13

Shimshoni, s h I m s h o n I.

1:20:46Speaker 26

Got it. Thank you.

1:20:47Speaker 13

It happens every time.

1:20:52 – 1:21:13Speaker 13

I reside at 4027 32nd Street North in St. Petersburg. I'm a real estate broker with affordable realty. We manage the trust, we manage the property for the trust. And I would like to explain the, the nature of the violation.

1:21:13 – 1:21:36Speaker 1

Okay. Sir, we're gonna what we typically do is we're gonna hear from the inspector first, and then we'll have you come back up and and address this. No. Do you admit or deny the violation, sir? I'm sorry? Do you admit or deny the violation? I admit. All right. Thank you, sir. We'll call you back up. May I have a first motion, please?

1:21:36Speaker 10

I move to find the respondent violation of the code as referred to and affidavit in this case.

1:21:43Speaker 1

All in favor? Aye. All opposed? Motion carries. Inspector Suth, you have the floor.

1:21:50 – 1:22:25Speaker 23

Vicki Suth, the City of Clearwater code compliance inspector. This is for case number 42Dash26 for 1111 Court Street. There is two violations here, code section three dash one five zero two c one and c three for door and window maintenance and code section three dash one five zero two D for exterior surfaces. The notice of violation was sent on 12/12/2025 with a compliance date of 01/12/2026 and the certified mail receipt was received on 12/22/2025. This is a picture of the front of the building on December 10.

1:22:27 – 1:23:05Speaker 23

Again on January 29. And then again this morning. Compliance can be met for the doors and window by removing all boards and covering from all doors and windows. Ensure all doors and windows are in good repair, including window frames, sills, and panes. Compliance can be met for the exterior surfaces by replacing any defective structural and decorative elements of any building wall and ensure all exterior surfaces are free of mildew, rust, loose material, material, faded and peeling paint. We're requesting compliance on before 04/30/2026, or a fine of $150 per day per violation if the violation is, well, if compliance is not met,

1:23:07Speaker 1

Thank you. Sir, tell us about this. Step in front of the microphone if you would. Thank you.

1:23:15 – 1:23:59Speaker 13

Well, since March, we've been working with some outfitted city of Clearwater that has grants and give grant money to redo the whole facade of the place. They gave us a list of items that they requested and we've been given everything they asked, we send them stuff and then it takes about another month and we get another thing. Anyway, the last thing they requested was insurance that we get to do the work just for the specific project. They said they have the money, the grant assigned for the project. But now the only hurdle was the insurance and we got the insurance.

1:24:01 – 1:24:45Speaker 13

It was a problem getting insurance because all the insurance companies would say, we'll give you the insurance after you take care of the situation. Well, how are going to take care of the situation if you get the insurance? So it was like back and forth. Look, the items of the wood, of the plywood, we can correct them fairly quick by April for sure we'll have them ready. The only thing we're going to do the job twice because we're going to do it once and then once we get the grant we got to remove the whole thing and we're to put a new glass front on the whole. So if there's no patients among the city to wait for the work to be done then we'll just go and do it and when we get the permit we'll do it again.

1:24:49Speaker 6

have you been awarded the grant based on providing insurance?

1:24:54 – 1:25:32Speaker 13

Well, no, no. The grant was given to us, granted to us based on the fact that they wanted to, I guess, to facelift the facade Of Court Street. There was some sort of And this wood was there since the hurricane, you know, put this to protect the the building. It was not meant to begin with to be, permanent but temporary, but apparently, this not, this has not been taken care of and we've been waiting for the city to well, like I said, they approved us. They gave us later.

1:25:32 – 1:25:51Speaker 13

They assigned us a certain number and they've been asking certain things. The only last item they requested, it took a little longer than anticipated was the insurance for the project itself. There's insurance on the building but there was no insurance on the construction. I think we got it resolved. You've never talked now.

1:25:52Speaker 6

And Have you talked to the city to see how fast you can proceed now?

1:25:58 – 1:26:25Speaker 13

No. We just sent this notice from the insurance about two weeks ago. We haven't gotten a response from the city. We'll probably it takes time. They don't respond quickly. It takes usually about a month from the time we send what they ask to the time they respond. So we got to work with their schedule. But like I said, if we realize the time is in the essence here and it's not gonna happen, then we'll do it either way. One of the two.

1:26:26Speaker 3

Sir, why did you wait, so long to contact your insurance company?

1:26:33Speaker 13

No, we contacted the insurance. They won't give us the insurance.

1:26:37Speaker 3

You said that you didn't contact them till two weeks ago.

1:26:41 – 1:26:54Speaker 13

No, two weeks ago we got the policy. We're able to get the policy. We just got it and we took we applied to many insurance company. They wouldn't take they wouldn't take

1:26:54Speaker 3

That's what I'm getting at. Why it took you so long to find insurance?

1:26:59 – 1:27:28Speaker 13

Because we couldn't find anyone. Finally, we were able to find someone. Okay. It's not that we didn't want. Our interest was, listen, there's there's money to be to fix the place up, not just to fix the wood, but do the whole facade. It's supposed to be glass front on the whole thing and with multiple, you know, it it will look really nice and I saw the plans. But the schedule of timing is not up to us. It's the city that's gonna approve it. They approve it,

1:27:28Speaker 30

but they have the funds to get

1:27:29 – 1:27:56Speaker 13

the money. And until we get the money from them, we can do their job. Like I said before, if it come to a point where we're gonna be in violations, we're gonna have stuff and get penalties, of course, we will do what we have to do. You know, we just change the wood, paint it, and get in compliance, which the building officials said being in compliance code is just the minimum. We don't want to be the minimum. We want to get it get nicer.

1:27:59Speaker 13

I'm sorry. It affects also our ability to rent a place. Sure. Okay.

1:28:04 – 1:28:15Speaker 1

What is your estimated timeline as far as being able to do it the way you want to get your grant and do the things that you want to About month. About a month?

1:28:16Speaker 13

Finish it up. The job itself shouldn't take more than a week. Does three weeks.

1:28:20Speaker 1

Four thirty is a month.

1:28:22Speaker 1

know if there's

1:28:23Speaker 3

much to thirty five days, yeah. Okay.

1:28:24Speaker 1

All right. Any other questions from the board? Can we get a motion?

1:28:30 – 1:28:54Speaker 10

I move to enter an order requiring the respondent to correct the violations on or before 04/30/2026. If the respondent does not comply by that date, the board may order a fine of $150 per day per violation for each day. Each violation continues to exist. If fines and fees remain unpaid three months after such lien is filed, the city is authorized to foreclose, collect, or settle such lien.

1:28:54Speaker 1

Can I get a second? Second. Do you have a favor? Aye.

1:28:58Speaker 26

Yeah, go ahead.

1:28:58Speaker 12

Did you say April 30 or April 3?

1:29:02Speaker 1

Thirtieth. Thirtieth.

1:29:04Speaker 12

We just didn't hear it clearly.

1:29:05Speaker 26

heard third. Thank you.

1:29:08Speaker 1

So the correct date is April 30. Thank you. May I have a all in favor?

1:29:15 – 1:29:43Speaker 1

All opposed? Motion carries. Thank you, sir. Next case, 311, case 47Dash26, find respondents Northwest Properties LLC at 1235 Nicholson Street in violation of code for trailer parking and residential rental business tax receipt and issue an order with the compliance deadline and fine if compliance is not met. Is there anyone here to speak on that? Inspector Dixon, you have the floor.

1:29:44 – 1:30:07Speaker 11

Good afternoon, board. Inspector Dixon, code compliance inspector for the city of Clearwater. This is case 47Dash26 for 1235 Nicholson Street. There's two violations at this property. One violation code section three Dash14O782 for a travel trailer parked between the principal structure and right of way, and section three dash twenty three zero two for a life of residential rental business tax receipt.

1:30:09 – 1:30:39Speaker 11

Notice violations went out in November. I gave them about a month for the BTR and about three weeks to move the travel trailer off the property or behind the fence. But I did receive this certified mail in the office. The trailer out in the front yard on the date the notice was issued, and there's still a trailer in the front yard today. There was a BTR at the property in 2003 for something other than residential rental.

1:30:39 – 1:31:14Speaker 11

There's no BTR on file. Utilities are in David Valentine's name, and this is when he turned the utilities on when they were asking for to turn the utilities on, so it's a rental. Compliance to the unit for the travel trailer. By removing the travel trailer from the front of the property, the trailer can be placed in the back or side yard provided with the screened by six foot high hedge fence or wall, and it must also be parked on approved surface. And for the lack of business tax receipt, you can apply and obtain a business tax receipt for the rental.

1:31:15 – 1:31:37Speaker 11

Some request compliance on or before May 1 and request a fine of a $150 per day for the travel trailer violation and a fine of $50 a day for the BTR. I am in contact with the owner. This the the renters are giving the owner trouble. He says he's gonna evict them, but and he's gonna improve,

1:31:37Speaker 9

so here we are.

1:31:39 – 1:31:54Speaker 1

Excellent. Any questions from the board? I believe that would be two separate motions, one for the VTR and one for the other violation. See a legal counsel's nodding his head. So can I get a motion on the, VTR please?

1:31:54Speaker 6

I move to find the respondent in violation of the code as referred to in the affidavit in this case.

1:32:00Speaker 1

Second. Second. All in favor? Aye. Opposed? Motion carries. Can I get a second motion, please?

1:32:08 – 1:32:20Speaker 6

I move to enter an order requiring the respondent to correct the violation on or before 05/01/2026. If the respondent does not comply by that date, the board may order a fine of $150 per day.

1:32:20Speaker 1

This is for the VTR, so that would be $50 per day.

1:32:23Speaker 6

Yeah. I'm just doing the travel trailer.

1:32:25Speaker 12

Doing the travel trailer first.

1:32:27Speaker 6

There you go. Okay.

1:32:28Speaker 1

Was in order. Very good. Thank you. Thank you.

1:32:31Speaker 6

Yes. 150 I'm going to start that over.

1:32:35 – 1:32:51Speaker 6

If the respondent does not comply by that date, the board may order a fine of $150 per day per violation for each day. Each violation continues to exist. If fines and fees remain unpaid three months after such lien is filed, the city is authorized to foreclose, collect, or settle such lien.

1:32:51 – 1:33:03Speaker 1

May I have a second? Second. All right. All in favor? Aye. Opposed? Motion carries. Can I get a motion on the, we need to do a first motion on the second violation as well?

1:33:04Speaker 12

I'm thinking we did it.

1:33:05Speaker 6

Separate, right?

1:33:06Speaker 12

Yeah, I would separate would be appropriate.

1:33:08Speaker 1

Second violation of the business tax receipt. May I get a first motion, please?

1:33:11Speaker 6

Move I to find the respondent in violation of the code as referred to in the affidavit in this case. Second.

1:33:17Speaker 1

Second. All in favor. Aye. All opposed? Motion carries. I have a second motion.

1:33:24 – 1:33:48Speaker 6

I move to enter an order requiring the respondent to correct the violations on or before 05/01/2026. If the respondent does not comply by that date, the board may order a fine of $50 $50 per day per violation for each day. Each violation continues to exist. If fines and fees remain unpaid three months after such lien is filed, the city is authorized to foreclose, collect or settle such lien.

1:33:48Speaker 1

May I have a second? Second. All in favor? Aye. All opposed? Motion carries.

1:33:54Speaker 11

Thank you, board.

1:33:55 – 1:34:22Speaker 1

Thank you, inspector. Our next case is 313Case49Dash26, fine respondents Good Shepherd Boulevard, LLC at 1746 Drew Street in violation of code for exterior storage and issue an order with the compliance deadline and fine if compliance is not met. Is there anywhere here to speak on that? Yep. Yes. Sir, can you step forward to the microphone and share your name and address with us?

1:34:22Speaker 8

Alfie Solomons, 17

1:34:38Speaker 2

When you got?

1:34:41Speaker 8

am representative, the owner of the property.

1:34:43Speaker 2

That's okay. Just need to

1:34:45Speaker 26

swear you in. Yeah.

1:34:46Speaker 2

Do you swear to affirm to tell the truth throughout your

1:34:47Speaker 26

entire testimony?

1:34:51Speaker 3

Up to the microphone a little bit. Thank you.

1:34:53Speaker 8

Thank you. For its first time.

1:34:55Speaker 3

Alright. That's okay.

1:34:58Speaker 1

Sir, do you admit or deny the violation?

1:35:01Speaker 1

You admit the violation? Do you admit or deny

1:35:05Speaker 15

the violation? Deny. We cleared it already.

1:35:08Speaker 1

All right. Sir, if you care to have a step back, we'll hear from the inspector.

1:35:17Speaker 22

All right. Good afternoon, board.

1:35:19 – 1:36:01Speaker 22

McKazy, code enforcement inspector for the city of Clearwater. This is case number 49Dash26For1746DrewStreet. There's one violation here for code section three Dash 15 on 2 f one and f two for exterior storage. This is the date notice violation was sent out. Compliance date we did get the certified mail receipt back. And I have been in contact with the owner. Maybe there was some miscommunication over the past week or so, but you'll see with the photos. Back in November, we went out to this property. You might remember this one. They had the hauling trailer running as a food truck that was hooked up to the plumbing and electric out front. Mhmm. That was taken care of. But if you remember from those other photos, there were some items being stored outdoors in the rear of the property.

1:36:03Speaker 9

So there was a

1:36:04Speaker 22

picker for an engine, some glass. There was much barrels, buckets, all sorts of items. You can see the old ductwork for the building.

1:36:21Speaker 1

Hold on there. It's chucking a bit.

1:36:31Speaker 22

There There were some kitchen equipment being stored outdoors. Let's see

1:36:34Speaker 1

if it'll work from here.

1:36:39 – 1:36:56Speaker 22

She's hurt. So if these are not clear enough, let me know, but it looks like the power point's struggling a little bit. There's kitchen equipment being stored outdoors. I went back after the compliance date. This was in January.

1:36:56 – 1:37:32Speaker 22

After the compliance date, similar items were still out. Believe this time I hadn't been in contact with the owner yet, but after this date, we did get in contact and the property was cleaned up. But when I went back the other day on the or just today, this morning, the twenty fifth, lot of the bakery equipment was then again being stored outdoors. There's a bunch of pipes from the plumbing that was ripped up or being stored underneath the black truck in the rear. And then there's a few items around the dumpster like a old bucket, old large rain bucket, and a pallet. I'm sorry. Those are small. Let's see if this. Sorry. Still not catching up.

1:37:32 – 1:37:59Speaker 22

So I did try calling the owner again. I left a message to say, hey, we just need to clean up these few items, but we're still not completely there. So compliance being met for the exterior storage by removing from the grounds of the property, all items not met for outdoor use, and ensuring all items meant to be thrown out are placed inside the dumpster. And requesting compliance signed before 04/25/2026, with a fine of $150 per day for violation for each day the violations continue to exist.

1:38:01 – 1:38:12Speaker 1

Questions? Do have any questions? And the pictures you showed us, they were smaller, and I couldn't quite make out the date. You showed us pictures from today showing noncompliance. Noncompliance.

1:38:12 – 1:38:25Speaker 22

I'll try it, see if it'll load in. So it looks like they're doing good now. This is the same bakery equipment that I've asked to be put inside before. It was inside, and then it made its way back outside. I believe there's a bed bread racks because it's a bakery

1:38:26Speaker 1

Yeah. Yeah. And I'm seeing a date of 03/25 on that.

1:38:29Speaker 22

Yeah. That was a that was

1:38:30Speaker 22

And these are the pipes. I asked them before to please remove these from the grounds of property, not store

1:38:35Speaker 15

them underneath the truck.

1:38:36Speaker 22

And then anything around the dumpster has to make its way into the dumpster. You can't just be storing items around the dumpster. So that's where it was asking. There's a little bit left to do, but it's definitely improvement from what it

1:38:47Speaker 3

And your compliance date is 04/25. Right?

1:38:50Speaker 22

Yes. Not just giving them another month to come down. Yes.

1:38:54Speaker 1

Good. Alright.

1:39:04Speaker 3

The picture say it all?

1:39:08Speaker 3

The pictures say it all.

1:39:09Speaker 1

Yeah, exactly.

1:39:10Speaker 22

Do you want to speak Yes, with the please.

1:39:16Speaker 1

What can you tell us about this? What are we going to do

1:39:19 – 1:39:39Speaker 8

It's just the owner. He's out of state right now, and this is rented properties. So they maybe know that he's out of state because of this, they are doing that. But before, a couple days ago, I went my son, I go there and check it. There was nothing like that before. So it's maybe they do it because he is not here right now. He will be here next week.

1:39:40Speaker 8

So we will take care of

1:39:41Speaker 1

that. Excellent. Thank you very much. You're welcome. All right. Can I get a first motion unless somebody else has questions? First motion, please.

1:39:52Speaker 6

I move to find the respondent in violation of the code as referred to in the affidavit in this case.

1:39:57Speaker 1

So second. Thank you. All in favor? Aye. All opposed? Motion carries. I get a second motion, please?

1:40:05Speaker 6

I move to enter an order requiring the respondent to correct the violation on or before what was our date, Daniel?

1:40:12Speaker 22

Sorry. 04/25/2026.

1:40:15 – 1:40:34Speaker 6

Thank you. 04/25/2026. If the respondent does not comply by that date, the board may order a fine of $150 per day per violation for each day. Each violation continues to exist. If fines and fees remain unpaid three months after such lien is filed, the city is authorized to foreclose, collect or settle such lien.

1:40:34 – 1:41:06Speaker 1

I have a second. Second. All in favor? Aye. All opposed? Motion carries. Thank you, sir. Next case, 3.15, case 506, find respondents Del Twain Holmes at 3087 Cherry Lane in violation of code for development code violation, and issue an order with the compliance deadline and fine if compliance is not met. Is there anyone here to speak on this case? Yes, sir. Would you come forward and state your name and address?

1:41:09Speaker 24

My name is Del Twain Holmes.

1:41:11Speaker 30

My address is 3087 Cherry Lane, Clearwater, Florida, 33759.

1:41:17Speaker 1

Thank you. And you're the owner of the property?

1:41:19Speaker 1

All right. Thank you. We will, sir, do you admit it, do we admit or deny now or later?

1:41:27Speaker 10

Yes. Good now.

1:41:28 – 1:41:39Speaker 1

All right. Sir, do you admit or deny the violation? Deny. All right. If you'll have a seat, we're gonna hear from the inspector then we'll have you back up. Thank you.

1:41:41 – 1:41:59Speaker 14

Good afternoon board, John Stephens, co compliance inspector for the city of Clearwater. And again, is case number 51Dash26, reference 3087 Cherry Lane. And again, this is a zoning violation. So this is something that you guys typically don't see that often. So it's got a couple of different things inside of it.

1:41:59 – 1:42:37Speaker 14

So we're using two code sections here for one violation on this property. We have section one dash 104 B, which is the development code violation. You can see as a description here talks about no building structure, water or land should be used to occupy and no building structure or land should be developed unless in conformity with all the provisions of the zoning district in which it is located, all applicable regulations and all development approvals. Code section six dash one zero two C for non conforming structures. A non conforming structure shall not be altered, enlarged or changed in any way that increases its non conformity.

1:42:37 – 1:43:07Speaker 14

Any structure or site improvement may however be altered to decrease its nonconformity. So what we're talking about in this case, this property is currently zoned as what's called LMDR or low medium density residential. So there are certain standards in there when you build a property, it can only be built certain way. LMDR properties have a max height requirement of 30 feet. This building is already over the 30 foot max, but it was annexed into the city.

1:43:07 – 1:43:53Speaker 14

So this was previously built in the county, and it was okay when it was built in the county. But now that it's inside of the city, even though that we basically say it's a legal, nonconformity as far as we're not gonna say you have to do something to your building to make it into that conformity. We say that you can't do anything that will make your nonconformity more or larger. So for this property, we're gonna be talking about things that have been added on to the roof structure that is increasing that nonconformity. So notice of violation was mailed and posted on December 30 with a compliance date of January 31, And the certified mail was signed for on January 23.

1:43:54 – 1:44:27Speaker 14

This is a picture of 3087 Cherry Lane from Google Maps from back in February '25. And you can see it's quite a large structure there. But if you look at the very top of the structure, up here, that's basically like a mechanical room or something like that for the elevator, I believe it is or whatnot, but there's nothing else here on the top of it. This was actually brought to my attention by our department director Lauren Matzke. As these end up popping up on top of there and she happened to notice it and notified me of it.

1:44:27 – 1:45:07Speaker 14

So this was as December thirtieth of this of last year when I actually sent out the violations. As you can see, there were several, I guess you call them awnings or almost like a pergola or something like that attached to the roof structure with some fans and it looks like there's a hot tub and several other things that are up there. This was as of February 2 after I talked to mister Holmes on the phone and after he had gotten the the notice of the violation, nothing has changed there. And then this as of yesterday on the right, March 24, again, nothing has changed. When I talked to mister Holmes on the phone, he was very cooperative.

1:45:07 – 1:45:48Speaker 14

I think he wants to try to figure out some way to deal with this and I directed it towards our our zoning department, and we have somebody here from zoning to talk about this as this case moves forward. So compliance can be met for both code sections by basically removing the added structures from the rooftop. Since it's a legal nonconforming structure and you can't increase that nonconformity, there wouldn't be a permit that would be issued for this or any type of variance I think that would be granted if I'm understanding things correctly from the zoning department. So we are requesting compliance by April 25 or a final $250 a day for each day that the violation continues to exist.

1:45:50Speaker 1

Thank you, sir. We wanna hear from the gentleman from the zoning regarding this. Do you have anything to offer?

1:46:02 – 1:46:32Speaker 31

Good afternoon, Board and members of the Board. Ted Kozak, Planning and Development Planning Manager. The case you have in front of you, what's been said is true, it's in the LMDR Zoning District. All structures are capped at 30 feet in that zoning district. It's probably my understanding that the house was under construction and built and then annexed to the city to receive city services because that's our way to attract people into the city.

1:46:32 – 1:47:10Speaker 31

So I pulled the old not that old, it was built in 2012. So the plans of the house that looks like it's 45 feet into the flat roof, five five thousand one hundred ten to the top of a I think that projection is a stair, just looking at the floor plan. So it's like a nine feet higher than so the building itself is 15 feet over the maximum. The now structures on the roof are about 12 feet 22 feet higher than the maximum of the zoning district. So there is no path to request.

1:47:10 – 1:47:36Speaker 31

There was a case requested in our portal yesterday for flexibility for height, which I closed today because you can't ask for that. So there is no path forward. Structures need to be removed. The only path forward in the future would be maybe ground mounted things like this, but there's nothing that can be placed on the roof that could be legalized.

1:47:37Speaker 1

Thank you. Mr. Holmes? So what about all of this?

1:47:47 – 1:48:24Speaker 30

Yeah. Purchased the house in September, and I left the country, and I left some people in charge of, you know, doing some stuff to it. We had no clue or I had no clue about what all this stuff, you know, was about. It is extremely hot in Florida, of course, and there's no way that I could put anything up there that would shade the roof. And we did that top part that comes it's like a part of it's on

1:48:24 – 1:48:39Speaker 30

of the elevator shaft, but those are the the the stairs that go up to the roof. And they're they're about nine, it's about nine feet that extra little spot. And built, those pergolas were built the same height as that,

1:48:42 – 1:49:16Speaker 30

know, just to have something up there for shade. I'm just kinda disappointed because I spent a lot of money for that house. And there's I'm just trying to find any type of way that I can keep them up there. It did require a couple of cranes to get the stuff up there, and I'm just trying to find out if I have to take them down, what course I have to do to get get all of that stuff down from up there.

1:49:16 – 1:49:45Speaker 1

Okay. Did you understand what the what the compliance officers were saying and what Sony was saying at this that there's no path forward in a in a way to keep them? Yeah. So that would mean your only resolution is to take them down based on how the code reads. Understood, sir. I'm sorry we can't help you with that part of it, but it's our job to make sure that things comply with the code and people find a path forward to get things corrected.

1:49:46 – 1:50:07Speaker 30

I'd say, I see it says April 25, because I'm gonna have to, it's gonna be a lot of work getting, getting those structures down. I'm gonna need more time than that if if that's what it's going to be. So I'm gonna definitely need more time.

1:50:08Speaker 1

How much time do you think you need to get them now?

1:50:11 – 1:50:50Speaker 30

I would say sixty to ninety days because they it's you know, they're bolted to the to the roof, and we have this they're just not sitting up there. They're folded to the structure of the roof. And I'm gonna have to get somebody to come back out to assess and see how we get those down because if you can't take them down we have to take them down in one piece. They can't take all that stuff apart because it was assembled up there. So it's gonna it's gonna take a little time to to get them disassembled and get them down from off the roof.

1:50:50Speaker 3

And one of the percolors discovering a sauna. One of the shades or

1:50:56 – 1:51:27Speaker 30

Yes, one of them, yeah, because it's one long one and then one of them, which I would like to keep, it comes, it just comes right off of that piece that the the there, the case comes out onto the roof. So I just have one that's coming just over a little bit, maybe 10 feet out, but the one, it's covering a spa and then the other one is covering just the sitting area.

1:51:28 – 1:51:39Speaker 1

I have a question for Mr. Stevens. You mentioned we were talking about some structural pergolas that were installed in a hot tub, is that correct?

1:51:39Speaker 14

It looks like a hot tub up there from my view. I can't say a 100% that's what it is, but it looks like

1:51:45Speaker 1

hot So if there is a hot tub up there, does that need to be removed as well?

1:51:50Speaker 14

That would be a better question I believe for sounding on that one. Don't have the answer to that.

1:52:01 – 1:52:26Speaker 31

There's no habitable structures allowed on that roof. That's why I won't be advised people when they're building a house, give yourself some leeway. It's 30 feet high. This this was 30 feet high. You still wouldn't be able to put anything up there. So if it was uncovered and you had nothing, you could leave it as is. But any house over 30 feet, you can't put anything up there because it's habitable.

1:52:26Speaker 3

He could leave he could leave the sauna up there.

1:52:29 – 1:53:00Speaker 31

No. He can't? Because that that's no. You cannot. That sauna would it has height. So any height, but because the height is 45, you can't even add an inch. It's already exceeding. So if you were at 27 feet, you have a three foot hot tub, maybe, but you can't cover it. So we tell people, hopefully, you're not going to get hot up there because you can't add any kind of covered structures. So that's why I advise people to build in some room to be able to put some shade structures on a roof.

1:53:01Speaker 1

Would it be safe to say that anything that was added post purchase has to

1:53:05 – 1:53:18Speaker 31

come off that roof? Based on the permit that I saw, there was only the staircase, and that's it. Nothing else up there. So I'm just going by the roof plans that were in the county permit.

1:53:18Speaker 1

Got you. Okay. Mr.

1:53:22 – 1:53:37Speaker 24

If I may, just for the record, the code section that's been cited says that a nonconforming structure shall not be altered, enlarged or changed in any way that increases its nonconformity. So technically

1:53:38Speaker 6

there shouldn't have been a permit even allowed for the stairs? Say that again.

1:53:57Speaker 1

She's working on

1:53:58Speaker 24

it. Any anything

1:54:01 – 1:54:18Speaker 31

anything on this this permit was there at the time of construction. So you can see the the stairway projection. That that is allowed. It was there nine feet. Okay. But just the entire roof was just stair empty. Kind of everything here, you know, is allowed.

1:54:19Speaker 1

All right. So that remains that the pergolas and the SPA essentially are the items that have to go, but the stairway does not, just for clarification.

1:54:27Speaker 24

Correct. Okay, thank you.

1:54:29Speaker 3

And Mr. Olmethorn, you had all this added at the time, you didn't notice.

1:54:33Speaker 30

No, in the SPA, I don't see how the SPA could be a problem at all because it's only it sits about this high and

1:54:41Speaker 13

That's the issue.

1:54:42 – 1:55:11Speaker 30

It has a top on it. And the the elevator shaft I mean, the staircase shaft is up there and then the they when they built the house, the house has a a drainage system for the roof for you to be able to It had a spa up there already. They took it down. It had a outdoor kitchen. It had a couple of different things up there before me. They just took it

1:55:12 – 1:55:53Speaker 30

before I purchased it because it sat there for me and a couple of years in a truss. So when I purchased it, I had no clue about any of this, and I spent probably about $90,000 on the roof alone. And that includes the pergolas. You know? So for me to have to take my spa down, like the pergolas, okay, I'll get umbrellas. But I don't see how the spa could cause any threat to anything in that area. I don't have neighbors. I own the parcel next door. I just, it's just very disappointing to me. Very

1:55:55 – 1:56:15Speaker 1

disappointing. Understood. Unfortunately, our reference is the building code and what the building code states, and that's the reference that we're obliged to follow here. So and per the inspector, it's, know, anything that adds any height since it's already overheight is violation a of the code. Am I correct Mr. Stevens?

1:56:16Speaker 30

Staircase is the height.

1:56:18 – 1:56:32Speaker 14

Understood. That's correct. I think the only thing that's in there, correct me if I'm wrong, is it does talk about that like mechanical roofs for an elevator that can be allowed. But besides that, that's the only thing. So

1:56:33Speaker 3

the spa cannot be allowed, even though it doesn't exceed the height

1:56:40Speaker 14

That would be correct.

1:56:41Speaker 10

I have a question. Is the two fifty correct or is it supposed to be 150 on this?

1:56:50Speaker 14

The two fifty is correct. Any

1:56:53Speaker 1

other questions? No. Can I get a declaration of violation? All right,

1:57:01Speaker 10

motion. I move to find the responding violation of the code as referred to in the affidavit in this case.

1:57:08Speaker 1

Do I have a second? Second. All in favor? Aye.

1:57:11Speaker 1

opposed? Motion carries. Can I get a second declaration?

1:57:17 – 1:57:42Speaker 10

I move to enter an order requiring the respondent to correct the violations on or before 04/25/2026. If the respondent does not comply by that date, the board may order a fine of $250 per day per violation for each day each violation continues to exist. If fines and fees remain unpaid three months after such lien is filed, the city is authorized to foreclose, collect or settle such lien.

1:57:42Speaker 3

Mr. Chairman, we vote, we have discussed our continuums.

1:57:49Speaker 3

Giving him more time. That's to be brought up.

1:57:53Speaker 1

Well, I'm open to the board's recommendation.

1:57:56Speaker 6

I think sixty days is reasonable.

1:58:00Speaker 3

Mr. Holmes, would sixty days be enough?

1:58:03 – 1:58:50Speaker 30

I would say ninety because I have to, it's a lot to disassemble and I have to find a crane company, their schedule, so this is nothing that I can just go do tomorrow or in the next week or the next month. I have to probably have to call the company that did the forklifts and get them to see when they can come out to find the best course to get it disassembled and to get it, you know, get it taken down. So I'm I would ask for at least ninety days. I know by then, definitely, I can definitely have everything taken down by then.

1:58:54Speaker 27

We'll do that.

1:58:55Speaker 6

Alright. Okay.

1:58:58Speaker 1

May I have a motion please?

1:59:00Speaker 10

I move, so I'm gonna correct the original motion. I move to enter an order requiring the respondent to correct the violations on or before, what would that be?

1:59:10Speaker 26

June. June 23.

1:59:13 – 1:59:33Speaker 10

06/23/2026. If the respondent does not comply by that date, the board may order a fine of $250 per day per violation for each day each violation continues to exist. If fines and fees remain unpaid three months after such lien is filed, the city is authorized to foreclose, collect or settle such lien.

1:59:33Speaker 1

May I have a second? Second. All in favor? Aye. All opposed? Motion carries.

1:59:39Speaker 3

Thank you, Mr. Holmes. Good luck.

1:59:41Speaker 14

Thank you, board.

1:59:45 – 2:00:05Speaker 1

Next case 3.19, case 506, fine respondents, decade companies income properties at 101 Coronado in violation of code for sidewalk signs, an issue in order with a compliance deadline and fine if compliance is not met. Is there anyone here to speak on that case? Yes, sir. Please come forward and state your name. And address.

2:00:07Speaker 18

How are you doing, y'all? My name is Keaton Kelly. Address is 101 Coronado Drive, Clear Water Beach, Florida.

2:00:14Speaker 1

And what's your relationship with this property, sir?

2:00:16Speaker 18

I'm the general manager of the property.

2:00:19Speaker 1

Thank you, sir.

2:00:30Speaker 2

My apologies. What item number are

2:00:32Speaker 1

I'm sorry, did I miss one? Yeah.

2:00:34Speaker 6

You missed 316.

2:00:36Speaker 1

Okay, we'll go back to 316. Apparently I overstepped my balance.

2:00:49Speaker 26

Are we on Bayside Harbors?

2:00:50 – 2:01:05Speaker 1

We're on 3.19, yes. Decade Companies Income Properties 1014. Sorry about that. Sir, do you admit or deny Oh, sorry. Do you admit or deny Oh, did not.

2:01:05Speaker 14

All right. Thank you.

2:01:08Speaker 3

Oh, we're on 3.16.

2:01:10Speaker 1

We're on 3.19, I missed one. Inspector Burkhardt.

2:01:17 – 2:01:33Speaker 20

Steve Burkhardt, site inspector for the city of Clearwater. Case is in compliance of today's although the permit has not been active, the signs are removed from the property. So just asking the board for declaration of violation.

2:01:38Speaker 1

Very good. Sir, did you want to come back and just talk about what occurred?

2:01:49 – 2:02:18Speaker 18

So from our perspective, we're just looking for some more clarification on what's going on here. So I took over as general manager of the property in August. The first violation was in May 2025. Upon me taking over, we submitted, you know, by we submitted the permit and advocate or the application for the permit. You know, upon that, we had submitted that in late October.

2:02:18 – 2:02:41Speaker 18

In November, we had not still received any communication from that. We received another violation in January '26. At that point in time, I reached back out to Stefan to clarify what had gone on. We had submitted the application to Ryan Green. Ryan Green is no longer around, so it got lost in translation from there.

2:02:41 – 2:03:09Speaker 18

Once I submitted the application, we still had not gotten the final answer on on what was going on. It seems like the violation is in coordination with a sign that is on the corner intersection. My property itself operates under that parcel of land. However, we don't control the parking garage or operate the parking garage that is putting that sign there. So it is the ownership next door that owns that property.

2:03:09 – 2:03:50Speaker 18

They own the property across the street where the entrance to the parking structure is. They're the ones that are putting the sign technically on our land. We're being held responsible for it even though we don't have any control over that. We've submitted our sign or our application for the sidewalk sign that we have that's inside of our parking garage. There's still been some, you know, miscommunication on whether we need that or not because it is, you know, inside of our parking structure, almost a 100 feet away from the actual sidewalk. So really just looking for some clarification further on if we need that application for our sign itself. And then, you know, like I said, the sign on the intersection, we don't have any control over that.

2:03:52Speaker 1

I'm sorry. But

2:03:53Speaker 6

it's on your land?

2:03:54Speaker 1

It is on our land.

2:03:55 – 2:04:24Speaker 18

That is true according to the parcel. We've had communication with the other property and we've, you know, expressed several times that it can't be there. We were issued that fine. We transferred that fine to them, worked out a deal with them, things like that. But at the same time, the sign is still being put upon our land. So from our perspective, from a Coronado, one on one Coronado perspective, that's not our sign. We don't put it there. We understand the situation, but, you know, we don't we don't put it there.

2:04:24Speaker 3

Alright. Just one second. You say that they paid the fine when you went and told them. But what was their reply to keep putting it back?

2:04:33Speaker 18

I I don't speak on on behalf of them. You know, they they continue to put it back.

2:04:37Speaker 3

What did they tell you?

2:04:38 – 2:04:50Speaker 18

Oh, they they understood. You know, they they understand the the situation. It's been a conversation going back between you know, repeatedly, obviously, since 2025. And here we are today, and it's still there.

2:04:51Speaker 3

Sound like communication broke down.

2:04:53 – 2:05:33Speaker 18

I would say so. You know? So the opening of that building is is relatively new. I'm a new general manager. There was communication between all of us. It was a problem that I took over when I got here. I've communicated with them. The person over there is also a new general manager. So just kind of got lost in the shuffle here. I've tried to, you know, apply for the permits for our location and our sign. Once again, looking for clarification on if it's so far away from the sidewalk. Do we even need that for ourselves? But then that sign that is in contest on that corner, we've made it very clear that we continue to not put that sign there and continue to communicate with that other property to make sure that it's not there, but obviously that's not happening.

2:05:33Speaker 1

Lost in translation. Inspector, can you offer anything on that?

2:05:38Speaker 20

I can. I can do I have a PowerPoint presentation. Maybe full clarification would help to show some pictures of that.

2:05:45Speaker 3

Yes, ma'am. Thank you.

2:05:56Speaker 17

Hope the call still works.

2:06:00 – 2:06:29Speaker 20

Oh, sorry. So that's at 101 Coronado Drive. That's the address. And I have also I can show a a picture from property appraiser just to give you an idea of the property that's a little

2:06:29Speaker 28

bit I have it in

2:06:40 – 2:06:56Speaker 20

So it's a little bit difficult to see. This is the hotel Pier House sixty, well, joined by Mr. Bergstrom Hotel. And that's across the street. That's Devon Drive, and across the street is the parking structure.

2:06:56 – 2:07:26Speaker 20

And that parcel, this is actually one parcel divided by Devon Drive. So that's the parking structure. And the sign, when we're talking about the sign violation occurs here at the corner over here in front, so the sign moves around there. So that's basically and the adjacent and the budding right away, including the property is the responsibility of the property owner. And I I don't hold the hotel responsible.

2:07:26 – 2:08:09Speaker 20

I hold totally the property owner responsible for for the violation. Okay. Right. So again, there's one violation regarding code section three dash eighteen oh six a temporary sign criteria limitations and code section three dash eighteen oh four j that signs without a permit. So again, one, the first quotation is regarding the placement of the sign.

2:08:09 – 2:08:43Speaker 20

It cannot be placed where it's currently placed at the corner intersection and it also doesn't have a permit. A notice of violation was mailed in January 1226. Certified mail came back in January 20 No. Notice of violation was mailed January 1226 certified mail received January 2626 and compliance date was January 2326. So that's that's one of the signs.

2:08:43 – 2:09:12Speaker 20

It's placed here on a sidewalk. See directly on the sidewalk. It doesn't leave any room for pedestrians to to utilize the sidewalk. There's a minimum of four feet clearance necessary. Sidewalk, I think this is the same sign. It just moved here. It was on January 8. It's at the corner intersection, and that's in a visibility triangle. It can be placed there. Also has no no permit.

2:09:14 – 2:09:53Speaker 20

That pictures, 01/08/2026, sign is placed there next to the sidewalk. Also doesn't have a still doesn't have permit. We're back on March 6 to the corner, the visibility triangle. Alright. That that picture I took today, same day of the parking structure, so no sign is being placed there.

2:09:53 – 2:10:19Speaker 20

So in other words, compliance is met for that violation. Compliance for the sidewalk sign can be met by removing the sign or obtain the permit. Recommendation. Yeah. Site for for case 55Dash26, Cyphok sign without permit requesting compliance on or before 04/25/2026.

2:10:21Speaker 1

Any questions? So you're looking for declaration of violation?

2:10:26Speaker 20

I'm looking because as you can see the pictures of today, they show no violation.

2:10:31Speaker 20

Right. So the sign is the case is resolved. That's okay. That's basically all we're asking for declaration of violation.

2:10:41Speaker 1

Sir, did you have any other questions?

2:10:44Speaker 18

I guess you have

2:10:46Speaker 12

to be up there.

2:10:47 – 2:11:13Speaker 18

I guess you know just to make our point clear on some of those pictures, there's now the new hotel next door to mine at 40 Devon Drive. They operate that parking structure at 35 Devon Drive. Even though it's on our parcel of land, it's their building, their ownership of that. So we just want to make sure that that's known and we are in compliance as

2:11:13Speaker 10

far as 101 Courtenay

2:11:14 – 2:11:41Speaker 20

Drive goes. Can I just say one more thing? So according to property appraiser, the current owner is still the company's income properties. So that's basically the property owner we hold responsible. Whoever owns the is actually for the case. The property owner is responsible to maintain the property and remove the signage if there's one place. So that's our position.

2:11:42Speaker 1

I guess your task, sir, is to figure out how to get them to quit putting the sign there because it's on your property. Yep. Alright. Mr.

2:11:52 – 2:12:42Speaker 24

Chair, may I also for maybe for the benefit of our new board member, the reason why we seek a declaration of violation is because that establishes predicate to bring back a repeat violation case. In a repeat violation case, normally the city has to give time for the person to correct the violation before they come to the board and seek a fine. But if it's a repeat violation, the city can come to the board immediately and seek a fine from the date of the notice of violation. Whereas on the first instance, we come to the board, the board imposes a future future deadline with a repeat violation, the board can backdate to that notice of violation. So just explaining that so that we're all clear in terms of what the declaration of violation actually does legally.

2:12:43Speaker 1

Thank you. Board have any questions? Can I get a declaration please?

2:12:48 – 2:13:08Speaker 6

I move to find the respondent was in violation of the code as referred to in the affidavit in this case. The violation was corrected prior to today's hearing and to enter an order that no fine be imposed. If the respondent repeats the violation, the board may order a fine of up to $500 for each day the violation continues to exist.

2:13:08Speaker 1

Do I have a second? Second. All in favor? Aye. All opposed? Motion carries.

2:13:16Speaker 3

Thank you, sir.

2:13:18 – 2:13:43Speaker 1

Let's go back and pick up case 3.16, which is case 52Dash26, find respondents Bayside Arbors XII LLC at 2729 Seville Boulevard in violation of code for fences and issue an order with the compliance deadline and fine if compliance is not met. Is there anyone here to speak on that case? Inspector Stevens?

2:13:43Speaker 14

Actually, this one is gonna be a declaration of violation as well. They brought it into compliance yesterday.

2:13:49Speaker 1

Okay. All right. Any questions from the board? I have a declaration, please.

2:13:55Speaker 3

I move to find oh, go ahead.

2:13:57Speaker 6

No. Go right ahead.

2:13:58 – 2:14:22Speaker 3

I move to find the respondent. What's in violation of the code as referred to in the affidavit in this case? The violation was corrected prior to today's hearing and enter an order that no fine be imposed. If the respondent repeats the violation, the board may order a fine of up to $500 for each day the violation continues to exist.

2:14:24Speaker 1

May I have a second?

2:14:26Speaker 1

All All in favor? Aye. Motion carries.

2:14:30Speaker 3

John. Thank you.

2:14:32Speaker 1

Board, we are two hours and twenty two minutes into our meeting. Saw council take a break. Does anybody else want a break?

2:14:39Speaker 3

Yes. Right. Should we take

2:14:42Speaker 1

a five minute break? Okay. We're adjourned for five minutes.

2:14:50Speaker 3

Thank you, Mr. Jackson.

2:20:47Speaker 10

Could have totally lost the

2:20:48 – 2:21:22Speaker 1

Municipal Code Enforcement Board is now back in session. All right. I believe, going through, we have a number of here that were continued and withdrawn, and unless I've over missed overlooked another one, our next case is 3Dot30, case 72Dash26. By respondents Wagner, Larry H. TRE at 643 Mandalay Avenue in violation of code for sidewalk signs and the issue of order with the compliance deadline and client compliance is not met. Is there anyone here to speak on this case? Inspector Burkhart, you have the floor.

2:21:22Speaker 20

Board, Steven Burkhart, I'm inspector for Steve Clearwater. Case is in compliance as of today, so I'm asking just for declaration of violation.

2:21:32Speaker 1

That'd great. Anybody, any questions? Maybe. All right. Does that go ahead?

2:21:41Speaker 6

I'll do it. Go ahead. There you go, Chelsea.

2:21:44 – 2:22:04Speaker 29

I move to find the respondent was in violation of the code as referred to in the affidavit. In this case, the violation was corrected prior to today's hearing and to enter an order that no fine be imposed. If the respondent repeats the violation, the board may order a fine of up to 500 for each day of the violation continues to

2:22:04Speaker 10

exist. Second.

2:22:06Speaker 1

All in favor?

2:22:08Speaker 1

opposed? Motion carries.

2:22:10Speaker 3

Good one, Chelsea.

2:22:11 – 2:22:52Speaker 1

Alright. If I remember correctly, madam secretary, we do all our affidavits and compliance as one group. Yes. Alright. So we will, I will accept the motion to include affidavits four point one point one through 4.1 well, I'm gonna go through four point one point ten because we have another case on page five listed after that that doesn't have oh, there it is, 4.2.

2:22:52 – 2:23:03Speaker 1

Okay. Can I get a motion to accept affidavit four point one point one through four point one point ten? Accepted, affidavits of compliance accepted.

2:23:04Speaker 17

I move to accept the affidavits of compliance as listed.

2:23:08Speaker 6

I'll second it.

2:23:09 – 2:23:36Speaker 1

All in favor? Aye. All opposed? Motion carries. Alright. Down to bottom of page five, four point two. Case 142Dash25, accept the affidavit of noncompliance for respondents Sugar Factory LLC at 1844 Drew Street for exterior surfaces, door and window openings, roof maintenance, and exterior storage. Is there anyone here to speak on that case?

2:23:36Speaker 4

Yeah. Where are we?

2:23:41Speaker 1

Alright. Well, this is an affidavit of non compliance. So there's no one here to speak on it. I will accept the motion.

2:23:51 – 2:24:04Speaker 17

I move to accept the affidavit of non compliance and issue an order that opposes fines and states if fines and fees remain unpaid three months after such liens filed, the city is authorized to foreclose, collect or settle such lien.

2:24:04Speaker 6

I'll second it.

2:24:05 – 2:24:25Speaker 1

All in favor? Aye. All opposed? Motion carries. All right, moving down the remainder of these in this area were withdrawn under other board action. 5.1 has been handled. The next action we have is election of chair.

2:24:26Speaker 6

And I would like to nominate Bob Kenny to be the chairman.

2:24:33Speaker 1

Greatly accepted. Anybody else want to nominate? We need to nominate any other nominations for chair? Nope.

2:24:40Speaker 6

We don't want that talk.

2:24:41 – 2:24:52Speaker 1

All right. I guess we vote on that and we go to vice chair. Is that how we do that? Yes, All right. All in favor of me being reelected or elected as chair?

2:24:52Speaker 6

Yes. Yes. All

2:24:54 – 2:25:07Speaker 1

opposed? Carries, thank you very much. May I have nominations for vice chair, please? I will submit a nomination for Mr. Ingle as vice chair. We have I'll any

2:25:09Speaker 1

Do we have any other nominations? Does anybody else like to be vice chair? Apparently not. First day. I'm sorry?

2:25:16Speaker 23

I said first day.

2:25:17Speaker 6

I'm not going to step

2:25:21Speaker 1

to step into that

2:25:22Speaker 3

cut line, Chelsea.

2:25:24Speaker 1

All those in favor of Mr. Engel being vice chair.

2:25:31Speaker 1

All opposed? Mr. Carried. Thank you. Thank you. Congratulations, Mr.

2:25:36Speaker 6

Engel. Congratulations to you, Mr. Kenny.

2:25:38Speaker 1

for your confidence.

2:25:40Speaker 3

You too, Mr. Chairman.

2:25:42 – 2:26:05Speaker 1

Moving on, next item would be a nuisance abatement lien filings, number 6.3Case89Dash26, accept the nuisance abatement lien for respondents Petrillo, Philip Benjamin, TRE, and B and G Land Trust at 202 Glenwood Avenue for lot clearing and issue an order with compliance deadline and authorize the city to mitigate the violation if compliance is not met.

2:26:08Speaker 1

to speak on that? Yes, sir, come forward to state your name and address, please.

2:26:17Speaker 28

Philip Petrillo, p e t r I l l o. Address 217 Harrison Avenue, Clearwater or Bellaire Beach.

2:26:27 – 2:26:42Speaker 1

Thank you, sir. And this is a nuisance abatement lien. So we're not doing, our typical motions of violation. We're simply considering correct?

2:26:42Speaker 26

Yes. I would just have

2:26:45Speaker 23

the inspector go through

2:26:46Speaker 2

the presentation.

2:26:47Speaker 1

Yeah. Let's have Mr. Kasman give us some information and we'll ask you to come back up.

2:27:08 – 2:27:42Speaker 22

Enforcement inspector for the city of Clearwater. This is 202 North Hollywood Avenue for a business statement, case number 89Dash26. One violation here for code section three Dash15 o 3 b 5 a and B eight for lot clearing. This is the date of notice violation done with compliance date and David Poston was done the same day as the notice violation. This is February for all intents and purposes. The main yard is well kept, but really what I'm concerned with is it's adjacent to Drew Street and the sidewalk on that side and then a little bit of the sidewalk along Glenwood needs some work.

2:27:43 – 2:28:05Speaker 22

the day of the posting on the twenty fourth. This is a little bit of the sidewalk on the Glenwood side that just needs some clearing back and forth so people aren't tripping over the plants, tripping over the leaves. It's a little bit obscured with some overgrowth and debris. But the real major concern is over here on Drew Street. Some of this grass here, this moogly grass, Focahatchee grass was cut back.

2:28:05 – 2:28:32Speaker 22

I think that's what they thought was the main area of concern. But, really, as we look look at other pictures, it's the sidewalk that's been almost half taken over by just debris and greenery growing from the adjoining property. If you see here, really, that sidewalk should be over about a half a foot. We're we're losing sidewalk there, and it's a danger for pedestrians and bicyclists. There's a lot of leaves, debris on that sidewalk as well that is slippery, and I just like that cleared and removed.

2:28:33 – 2:29:10Speaker 22

This was after the compliance date on the ninth. Same situation on the Glenwood side, and this is a better look of that area on the other side. As you can see, the sidewalk is being fully consumed by the leaves and debris and the greenery coming off from the side. Again, it just all need to be chopped back, bagged up, removed so we can have clear sidewalks. This is going looking east or west eastbound on Drew Street. Again, one by the day. This little section has still not been maintained. And, again, same story on this side. You just really need all that bagged up, removed, cut back. You'd probably be good for another month or so before you have

2:29:10Speaker 9

to do a huge cleanup. So,

2:29:12Speaker 22

compliance we have for lot clearing, lot cutting back to greenery, and removing all debris from the adjacent sidewalks so they're completely unimpeded, and requesting compliance on

2:29:20Speaker 18

it before five days from the

2:29:21Speaker 22

date the Board renders its order.

2:29:25 – 2:29:48Speaker 1

Thank you. Alright. Council, would we be out of order to hear from the property owner? I have no objection. Okay. Sir? Yep. I'd just like hear to what he has to say. I know this is not your typical Oh, That's The gentleman's here, so I'd like to give him the opportunity We're to speak with totally in the dark on

2:29:48Speaker 28

this one. Didn't didn't realize it was an issue with the sidewalk at all. He'd be taken care of immediately.

2:29:55Speaker 1

Great. Thank you very much.

2:29:56Speaker 15

Awesome. Okay.

2:29:57Speaker 1

Short and sweet. I love it. Yeah. Thank you very much.

2:29:59Speaker 3

Thank you. Thank you, sir. So so

2:30:02Speaker 21

here's the question.

2:30:05Speaker 12

If you pass what they're asking for, then you're not giving him time to clean it.

2:30:13Speaker 3

Just a moment, sir.

2:30:14Speaker 12

If you're asking if you're gonna give him some additional time, that's I mean, so I don't know how the city's position is.

2:30:22Speaker 1

Well, that's awfully hard to read.

2:30:27Speaker 3

Do you need more time than five days?

2:30:29Speaker 1

Well, hang on a second. Let's, I'm sorry, don't want to step on your toes. We're in a different area here in terms of the declaration

2:30:36Speaker 1

And I need, before I ask that question, if you don't mind, I'd like to see what the inspector has there.

2:30:45 – 2:30:58Speaker 22

It was this typical requesting compliance are before five days from the day you guys run your order. Typically, that takes about two weeks. So really, in all real serious, all realistic time frame, you still got about two weeks, fourteen days to clean up.

2:30:58Speaker 22

he does it before that time frame, I have no need to exercise that board order in any way, shape,

2:31:04Speaker 3

that satisfactory? Was getting Sorry.

2:31:06Speaker 1

I didn't wanna step on you. I just didn't understand initially. So just Iron slam

2:31:10Speaker 28

and skateboard took me two months to get the guy. You know? They're pretty backed up. So can I have a month, thirty days?

2:31:26 – 2:31:38Speaker 7

Green, co compliance manager. What we would really request is to keep our normal maintenance and if he stays in contact with us and the inspector, we're happy to work with him. We don't have to exercise our right to abate immediately following obtaining the abatement order.

2:31:38Speaker 1

Alright. So we'll go with a standard motion, but stay in touch with mister Kasman there.

2:31:43Speaker 31

it sorted out alright.

2:31:44Speaker 1

Right. Alright. Thank you. I'll let you know what it's said. Thanks.

2:31:48Speaker 6

All right. Any questions?

2:31:59Speaker 12

So it's your normal motion?

2:32:01 – 2:32:34Speaker 6

Yeah. Yeah. I move to enter an order finding the respondent in violation of code and requiring the respondent to correct the violations within five days and stay in touch with Mr. Kasman of the board's written order. If the respondent does not comply within the time specified, the city may take all reasonable actions, including entry onto the property to abate and maintain a nuisance and charge the respondent with a reasonable cost which will become a lien on the property. If the costs, fines and fees remain unpaid three months after such lien is filed, the city is authorized to foreclose, collect or settle such lien.

2:32:34Speaker 1

May have a second? Second. All in favor? Aye. All opposed? Motion carries.

2:32:46 – 2:33:29Speaker 1

Number 6.4, case 90Dash26, accept the nuisance abatement lien for Respondents Boulevard for an operative vehicle initial order with the compliance deadline and authorize the city to mitigate the violation if compliance is not met. Is there anyone here to speak on this? President. Yep, sir. Please come forward and state your name and address and relation to the property. Good day,

2:33:29Speaker 17

Good afternoon, sir.

2:33:31 – 2:33:46Speaker 9

My name is Biko Lawson. I reside at 974 Park Street Clearwater, and this is mister Don Morrison from Burns, who resides at 3 Reserve Boulevard in Clearwater. And this is regarding 1535 Gulf Bay Boulevard.

2:33:47Speaker 3

Are you representing?

2:33:49Speaker 9

Indeed. Yes. Correct. I'm representing Mr. Bunkerz.

2:33:52 – 2:34:04Speaker 1

Okay. Okay. How about if we hear from the inspector and look at this, and then we'll give you an opportunity to give us an idea of what's going on. Okay? Thanks. Inspector?

2:34:04 – 2:34:22Speaker 23

Vicky Suddath of City of Clearwater. Code inspector, this is case nine zero two dash two six for 1535 Gulf Gulf Bay Boulevard. There is one violation here. Code section three dash one five zero three b six for inoperable vehicles. There are several of them on the property.

2:34:22 – 2:34:57Speaker 23

Notice the violation was posted and mailed on 03/10/2026 with a compliance date of 03/20/2026. The certified mail was not received. This is a picture of the posting on March 10 for the one for the hearing and one for the inoperable vehicles. This vehicle, when I went out there this morning, which you will see the picture, this one did have an expired tag on it of 11/25, but this vehicle does now have a current tag, but it has flat tires. This picture was also on this one was on February 7, expired tag.

2:34:57 – 2:35:20Speaker 23

A trailer on the property expired tag. This is the semi trailer that has the broken legs on it that's being held up by a stack of pallets. There's another picture of it. There's the pallets that are holding it up. This is a food truck on the property that has an expired tag.

2:35:22 – 2:35:45Speaker 23

This is again this morning, expired tag. There's a box truck on the property, still has an expired tag. Compliance can be met for the inoperable vehicles by removing all vehicles from the property or make repairs so that vehicles are roadworthy as well as display a current license plate that is assigned to each of the vehicles. Requesting compliance within five days after the board renders its order.

2:35:46Speaker 1

Thank you, ma'am. Sir, what would you like to share with us about this?

2:35:52 – 2:36:24Speaker 9

So we're happy to report that all the registrations are paid for current. The decals are attached to the registrations on all vehicles. The tires are inflated in all vehicles. And the only item that where we while the semi trailer is still operable, we recognize the need to repair the supporting structure. And so we believe that if we could be provided a month to complete that, that would be helpful.

2:36:27Speaker 1

Okay. So you purchased the registrations, and have you put the stickers on all the vehicles? Correct. Alright. So what about the one with the flat tires?

2:36:36Speaker 9

The tires are now inflated.

2:36:38 – 2:36:52Speaker 1

Okay. With those conditions, inspectors, does that does that if that is, can, once that's verified, does that, bring everything except the, the large trailer into compliance?

2:36:59Speaker 23

Violation still exists because of the semi trailer.

2:37:02 – 2:37:23Speaker 1

Got you. Got you. So if we if we, issue a compliance, then and those have already in compliance. If if we issue the order and these things are in compliance, the the the vehicles that were mentioned outside of the trailer, if those are in compliance, then that that goes away, but we still have the issues with the trailer.

2:37:26Speaker 23

Violation and includes all of those items. So even if they brought four of them in compliance and one of them was not, it's it's Right. Violation. There's there's no separation.

2:37:35Speaker 1

I'm just I'm trying to think with this in terms of bringing everything into compliance in terms of what's reportedly done and what remains to be done.

2:37:44Speaker 23

I was there this morning. It was all in violation, so I don't know, but this morning

2:37:49Speaker 6

none of that was in compliance.

2:37:50 – 2:38:19Speaker 1

Sound like a last minute, let's get it done and get out of trouble thing, which is great. So the, if those, if those are the facts, then the remaining question is, the city's asking for five days and the, owner of the property is asking for thirty days regarding the trailer. Do we have any questions or comments or anything anybody would care to offer about this?

2:38:21Speaker 10

I just have a question. Do you have a copy of the receipts for the tags and stuff?

2:38:26 – 2:38:45Speaker 9

I believe mister Funburns has a screenshot that he presented to me. Now I do have pictures of the decals attached to all of the tags on my phone that mister Funburns provided. I'm happy to email them over or present them to you on my phone. And also the tie, inflated tires, all of that is documented.

2:38:45Speaker 23

I have to visit my gloves.

2:38:48Speaker 1

Okay. All right. Comments, questions?

2:38:53Speaker 17

What's the plan for the trailer? So

2:39:02Speaker 9

Mr. Von Burns just responded to fix it. I'm not sure how specific you would like to get. I'm I'm not sure what the plan is. Just to repair it.

2:39:11Speaker 10

How much time does he need?

2:39:14Speaker 10

How much time would he need to get it repaired? Thirty days. Should we just kick this down in thirty days?

2:39:22 – 2:39:43Speaker 1

It gets to compliance then, you know, if it's not in compliance and inspector, do you have anything to offer any disagreement with giving them thirty days so they get the trailer taken care of as well? Understood. I'm just

2:39:44Speaker 23

entirely up to you.

2:39:44Speaker 1

Give you the opportunity to share your viewpoint with us. If you have Yes, sir. If I

2:39:50 – 2:40:47Speaker 24

may, this case was brought before, if the board recalls, and the city had a different theory of the violation with regard to the trailer being used for storage. Right. That was contested at the time, and we decided to withdraw the theory based on storage and focus more on the nuisance aspects of the inoperable vehicle, the nuisance side of it instead of the zoning storage side. So if the trailer is repaired, obviously that would cure the nuisance aspects that we've presented now. Whether or not that has some other issue in terms of long term storage and parking there, those would be separate issues that the city would have to address separately through a new case and new conversations with the property owner.

2:40:47 – 2:40:59Speaker 24

But for now, we withdrew all that and we focused entirely on the inoperable vehicle aspects of this situation. And we don't have any objection to thirty days.

2:41:00Speaker 1

Does anybody else have an objection to thirty days?

2:41:03 – 2:41:17Speaker 6

My only question on that was we offered thirty days and everything got done this morning or after this morning. So there were twenty nine days that nothing was done. So maybe we should just say two weeks.

2:41:17Speaker 9

If I may, it was, ten days, I believe, that is from the date of the notice to this I can verify that now.

2:41:25Speaker 6

The date date you received in the mail?

2:41:26 – 2:41:38Speaker 9

It was received on March 10. It was to be corrected by March by March 20, it is March 25 today. So it's been fifteen days.

2:41:38Speaker 6

Okay. That was when we had ruled on it. That's what was thinking. Well, it's up to everybody then.

2:41:43Speaker 10

I don't mind thirty. Alright.

2:41:45Speaker 1

Alright. Can I have a motion, please?

2:41:49 – 2:42:23Speaker 10

I move Page seven, right? Just a I move to enter in order finding the respondent violation of code and requiring the respondent to correct the violations within thirty days of the board's written order. If the respondent does not comply within the time specified, the city may take all regional actions, including entry onto the property to abate and maintain the nuisance and charge the respondent with the reasonable cost, which will become a lien on the property. If cost, fines, and fees remain unpaid three months after such lien is filed, the city is authorized to foreclose, collect, or settle such lien.

2:42:24Speaker 1

May I have a second? Second. All in favor? Aye. All opposed? Motion carries.

2:42:30Speaker 9

Thank you. If there's nothing else. Thank you, Kevin.

2:42:32Speaker 1

I believe we are adjourned. Here you go.

This transcript was automatically generated from the official public meeting video and is presented unedited. It reflects remarks made on the public record by elected officials, staff, and public commenters. Transcript accuracy may vary; view the original recording for reference.