Planning Board - Regular Meeting

Thursday, September 17, 2026

The Brentwood Planning Board granted a driveway waiver for 444 Route 125, discussed fire inspector site plan recommendations, and reviewed driveway permit authorities and town budget drafts.

About this meeting

Government Body
Planning Board
Meeting Type
Planning Board
Location
Brentwood, NH
Meeting Date
September 17, 2026

Transcript

773 sections

0:01 – 0:37Speaker 5

Good evening, everyone Before we get started, I did send a message to the board about process. I was a bit frustrated with myself at the last meeting for not having run a more efficient meeting and kept us moving along. So tonight, if you can just kind of make eye contact with me if you want to speak and take our turns and try not to talk over one another. It may not be an issue tonight. All right.

0:38Speaker 1

So quick question. So is Bruce going to be here tonight?

0:44Speaker 1

OK. Do we know which alternate is up? Or actually, maybe the better question is, did we have an alternate for the greasy? Yes.

0:58Speaker 5

Do either any of you remember if you were both of you? OK. OK. Do you want to flip for it?

1:17Speaker 1

I will make a motion that we set Liz free this evening as a voting member. Second. No.

1:24Speaker 5

All in favor?

1:26Speaker 5

Aye. All right. Thank you, Doug.

1:27Speaker 1

Lock the doors.

1:28 – 2:06Speaker 5

OK. Anything else before we get started with the agenda? OK. Oh, OK. All right. So first item, and we have a continued public hearing for the site plan review at 444 Route 125. Peter Greasy we've had a couple of hearings on this or continued hearing a couple meetings on this and a few items to wrap up Can you reintroduce yourself for the record?

2:10 – 2:54Speaker 3

I'm Nick Lorenz with Jones & Beach engineers representing the applicant Peter Greasy who's here with me as well and The intent of this project is to construct a building addition as well as expand upon the existing gravel lay down area. Since we've last met, we received and submitted to you in a butter acknowledgement letter to construct the gravel access road to the rear of the sites. We've also submitted existing building photos to show you what the style of the proposed building addition will look like. And we've also received a variance from the Brentwood Zoning Board to construct the proposed stormwater pond in accordance with state requirements. And with that, I'll be happy to answer any remaining questions or comments that you may have.

2:56Speaker 5

Did we have a copy of the abutter? You got a letter from the abutter? We did.

3:01 – 3:13Speaker 3

We got a signed letter from the abutter. I believe, is that part of the package, Mark? I think I sent it over. I didn't see the abutter. I have a copy of it that I can pass around.

3:15Speaker 5

And that was for the road going to the back.

3:19Speaker 6

Exactly, yes.

3:27Speaker 7

You want to just read it out? It's not very long.

3:32Speaker 5

Oh, I didn't see it. No, you just brought it. Oh, OK. Yes. Do you want me to read it? Go for it.

3:38Speaker 7

OK, it says, dear Mr. Bartholomew, I don't know.

3:43Speaker 3

That's the abutter.

3:44 – 4:34Speaker 7

Oh, that's who it is. Please be advised that an application has been filed on behalf of our client, Peter Gerisi, with the Brentwood Planning Board for the above reference property. The project proposes a 6,000 square foot building addition and expansion of the existing gravel storage yard. It has been requested that you review and sign off on the proximity of the proposed gravel pathway to your property line in the northwest section of the subject parcel. By signing below, you are providing your support for Peter Garussi to complete this work on Map 201, Lot 7. There will be no impacts on your property as part of this project. If you have questions or comments in regards to the work, please feel free to call me at blah, blah, blah, or email me. Thank you for your cooperation. Very truly yours, Nick Lorenz Jones and Beach Engineers. But does this have his, did he have, did he send a letter first?

4:34Speaker 1

We sent the letter to him.

4:36Speaker 3

He signed it and sent it back to us.

4:38 – 4:51Speaker 1

Yeah, and just for the record, that Mr. Bartholomew's signature is there, yes. It does not appear to be certified, no.

4:55 – 5:20Speaker 11

You did not send that to me electronically. If you could send that to me and I can get that as part of the electronic file, I'd truly appreciate it. because I don't want it with a big line through the middle. Glenn, does that suffice for what is the intent of that letter? Because we're not supposed to put roadways within 10 feet?

5:20Speaker 12

Correct. So it would be the abutter saying that they're okay with that occurring.

5:26Speaker 10

Right. But would that require a variance as well?

5:32Speaker 12

No, because it's not a structure.

5:37Speaker 12

It's a roadway.

5:38Speaker 11

Right. But it's the roadway, the 10 feet distance that we've...

5:43Speaker 12

It is in our driveway regulation.

5:45Speaker 11

Okay, so is there a waiver that this board needs to grant?

5:49Speaker 12

Yes, that would probably be it.

5:53Speaker 5

Yeah, I think we talked about it before and said we would feel more comfortable if a butter weighed in.

5:58Speaker 12

Had given comment.

6:00 – 6:12Speaker 5

Yeah. Yeah. Okay, anything else before we go through the comments? Nope, nothing. Okay, so Glenn, your comments are in here, but are they all addressed in the SFC comments?

6:12 – 6:30Speaker 12

Everything was addressed as completed except for the one regarding the setback, the buffering, which is toward the last of my comments. And so that's something that the board should speak with with the applicant.

6:31Speaker 11

that waiver was a loose piece of paper not included in your packet.

6:37 – 7:26Speaker 12

So it's the, it's my comment 16. So if you look at their response, my comment is that regulations require landscaping in the 25 foot side and rear property setbacks. The proposal does not address this requirement and their response is although there is a proposed disturbance in the 25, Side in rear property setbacks in order to limit the disturbance within the wetland buffer We believe that the existing vegetation that will remain in these areas are sufficient to provide the required amount of trees for the site plan regulation buffer yard figures No, I did not go on the site walk so I don't really have any direct understanding of how much vegetation is there

7:28Speaker 5

If I recall, in the back there's quite a bit, but it's a matter of how far back you're clearing.

7:33 – 8:08Speaker 3

We also, when I thought that I submitted that abutter letter to you, I've got a photo log of all the existing vegetation surrounding the property. From that, you can see there's plenty of trees surrounding the whole property. The only area where it will get thin is that area where the gravel roadway is going in. And for our last meeting, with the discussion with the abutter, we think it's more beneficial to construct the roadway where we have it proposed versus going into the wetland buffer and impacting that resource.

8:12Speaker 5

Did you send him an electronic version of this?

8:15Speaker 11

Yes, he did this evening.

8:17Speaker 10

I printed out five copies and I kind of put them on the table for you to pass around.

8:22Speaker 3

That's a different photologue. I thought I had sent you one with that letter and then with this photologue of the vegetation. I think it was.

8:32Speaker 11

Here's what you sent me today.

8:36Speaker 3

Yeah, I think it was a couple weeks ago. After the zoning board meeting, maybe a day or two after that.

8:45Speaker 1

Yeah, the one we have is the existing building one. Yeah, that's what was on the table.

8:53Speaker 12

Oops, there's the vegetation.

8:55 – 9:07Speaker 5

So there's existing vegetation. In the 25-foot buffer everywhere except for where the driveway is going back.

9:07Speaker 3

And we'll be trimming that area to construct that gravel roadway.

9:11Speaker 5

And the tradeoff is then you're not going through the wetlands. Exactly.

9:16Speaker 11

I apologize, Nick. You did send that to me.

9:18Speaker 3

Yeah, no worries.

9:20Speaker 11

An existing vegetation exhibit as well.

9:29 – 9:43Speaker 3

And I believe in your regulations, the landscaping requirement is that there's X amount of trees per 100 linear feet, something along that language. And I think by these photos, you can see that we will meet that requirement.

9:49Speaker 11

Those are the only two pages. Yeah, that's pretty...

9:54 – 10:16Speaker 5

Yeah, I think the only question I might have mentioned this when we were out there is that if you have a lot of invasive stuff, like I've seen places where now something's wooded, but you've got bittersweet along the edge, and it winds up pulling the trees down in a few years anyway. So if you have that cleaned up.

10:17Speaker 3

Yeah, can we make that?

10:19Speaker 5

It's to your benefit, too, to get rid of any of that. It's not pretty when it pulls a tree down. It makes a big old mess.

10:33Speaker 5

Board questions? Doug?

10:38 – 10:53Speaker 1

Oh, sorry. Oh, okay. Pick your Doug. So, Glenn, you kind of said it already, but in terms of the vegetation, you think that that is sufficient in terms of

10:53 – 11:13Speaker 12

That what exists there now exceeds what we require for planted vegetation. Gotcha, okay. So if it's clear that they don't intend to take out that vegetation, then that does exceed what we would require.

11:13Speaker 5

Could we put a note on the plan that retain existing vegetation after some point?

11:22Speaker 3

Absolutely, yeah.

11:28Speaker 9

The space where the proposed trailers are going, is that covered with vegetation right now? Will that be taken out?

11:35Speaker 3

It's not vegetated like in those pictures. There might be some small bushes and stuff like that that will be taken out. Just small brush?

11:49Speaker 1

Just make sure you turn it, yeah. You hit the button.

11:58Speaker 2

There was an email, if I'm not mistaken, by a board member sent by Bruce Stevens.

12:15Speaker 11

Oh, about the pond? The clearing around the pond?

12:25Speaker 10

No. A removing of a stake and putting a stake in?

12:34 – 12:49Speaker 5

I think you sent it to me. So was his point to put something there so that they don't creep out into the right-of-way? Because it varies.

12:49Speaker 11

It might need new batteries, buddy. Depending on that. I'm sorry.

12:54Speaker 2

Yes, I believe that's exactly it and I didn't just make note.

13:00 – 13:22Speaker 5

Oh It's not Yeah, have we I know this has come up before we required that before I know we've required things like don't put snow, you know Here's the wetland don't put snow here have we required them to mark the Not very frequently

13:24 – 13:50Speaker 12

I mean, it's acknowledged they have to do their stuff on their own property. And if there is bleed over, the town can either address it or the state on very limited and with great periods in between do inspections and will contact property owners. But that does not happen very frequently.

13:50Speaker 5

Yeah. And there's some grandfathered in things. Mark?

13:58 – 14:41Speaker 11

This area here out front where the display area is gonna be taking place, this gravel has not been removed. The display area has creeped out right up in here into the corner. I would like this board to address that. to A, have this removed, and B, put up some sort of delineator of display area. That can be a split rail fence, that can be whatever the board really decides is fitting of the site. But this has not been removed yet. And I'd like to see that addressed.

14:43Speaker 5

Okay. Did we look at that? We did look at that, right?

14:49Speaker 11

Because that is the state right-of-way, I believe, the dotted line, or the setback. Is that the 125-foot setback? Right, the property line. Right, is the dark line with the two dashes.

15:18 – 15:29Speaker 11

And it's supposed to be seated. The gravel is supposed to be removed. This is supposed to be a seated area. Area to be replanted with New England roadside matrix upland seed mix.

15:32Speaker 5

Is that addressed in here anywhere?

15:34Speaker 12

It's on the plan.

15:35 – 15:50Speaker 5

It's on the plan. Okay. But not in the comments. OK. Other board questions?

15:53Speaker 1

Just correct me if I'm wrong. It looks like the SFC's comments have all been addressed.

16:00Speaker 5

Except for we have a waiver request still on the table. That's the separate sheet that you have next to your packet.

16:12Speaker 11

you'll have to decide whether the photo log meets the standards that you wanna see for building depictions. If you do, then the waiver is null and void.

16:28 – 16:40Speaker 12

And we have historically accepted photographs in place of building elevations.

16:40Speaker 5

That's this other packet here. So the point is you're going to, the addition is going to look very similar to what's there right now? Correct. Is that the idea?

16:51Speaker 5

Similar in height?

16:53 – 17:07Speaker 8

Yes. Yes, that's, I don't have any proposed plan for the building, but I'll probably be using the same manufacturer.

17:10Speaker 8

And even up in the front with Mark was just talking about

17:32Speaker 5

OK. Other comments or questions?

17:37Speaker 1

So just from a procedure standpoint, would we be approving the waiver first and then the conditional approval with the various conditions that we discussed?

17:46Speaker 11

If you feel that the photo log meets the standard, the ordinance, then there's no waiver needed. And we can just simply ignore the waiver. We don't need to vote on that.

17:55 – 18:07Speaker 12

But if the board is comfortable with where that driveway is, then you should grant a waiver to the requirement in the driveway regs that it has to be 10 feet off the property line.

18:11Speaker 7

How many feet is it? Yeah, I was going to say how many feet off the property line.

18:13Speaker 12

It looks like it's only a couple of feet, right?

18:25Speaker 11

without getting a scale out. Like five feet, I'd be guessing.

18:33Speaker 12

I don't think it's five feet because that setback line is 25 feet, and that is not a fifth of the.

18:39Speaker 11

But this is woods. This is what this is depicting here is a wooded area.

18:44Speaker 3

Yeah, I'd say like five feet. And then that's snow storage on the side too. So there's tree lines, snow storage, and then the gravel pathway.

19:02Speaker 5

It's hard to see it.

19:06Speaker 3

The next sheet might be easier to see too, Mark.

19:10Speaker 5

Is there another drawing?

19:16Speaker 3

The next one will just get rid of all the snow storage, so it's a little better.

19:20Speaker 1

There it is.

19:29Speaker 5

So is it just that?

19:32 – 20:00Speaker 6

area where it's where the x is really yeah well it's really it's really where the little gray dotted the little dotted line the little dots are in between those dashed lines correct that's correct yep how wide is the driveway itself 12 feet i think yep 12 feet i mean if you compare the distance to the driveway it looks like it's maybe eight to ten feet yeah eyeballing it yeah

20:02Speaker 12

But it's just that- That shows it much better.

20:04Speaker 5

That area where it's- Yeah, that's the only- Exactly.

20:07Speaker 3

The rest of it is- Yep, just the apex of that curve.

20:10Speaker 5

Okay. Yeah, it's a small area.

20:14Speaker 12

It is, but you should still vote to grant that allowance.

20:21Speaker 6

I make a motion to grant that allowance.

20:27 – 20:38Speaker 5

Do we need to specify that the waiver is only for a specific section? I don't know how we maybe describe it. Yes.

20:38Speaker 12

That would be a good thing to say.

20:40Speaker 11

Yes. No, well, you'd say we would grant a waiver from site plan. It's a driveway, so it's in our site plan.

20:50Speaker 12

No, it's in our driveway regulations in there. They're found actually in the subdivision regs.

20:56Speaker 11

The blue pages, yes. I was trying to, yeah, that's where I was going. So if it's in our subdivision.

21:06Speaker 5

But what I'm saying is that we're only granting that waiver from X to Y.

21:11Speaker 12

You could textually say you're granting it for the area where you're avoiding the wetland buffer.

21:19Speaker 11

At the rear of the property.

21:20Speaker 12

On the north side. west side of the property, yeah.

21:31 – 21:48Speaker 5

OK. So the motion would be to grant a waiver from the driveway requirement for a 10-foot setback, specifically the northwest side of the property to avoid the wetland as depicted on the plan.

21:48Speaker 5

Does that work?

21:52Speaker 7

Any discussion? Yeah, I just had a question. Is this the one that applies to the letter that? Yes. Okay, then he's fine with it.

22:00Speaker 5

Yeah, you asked the neighbor on that side, right? Okay, any discussion?

22:08Speaker 11

I would like the actual regulation put in the way, whatever it's all. Just give me one second, I'll find it.

22:17Speaker 5

Yeah, well, he's doing that conditions, so... Vegetation.

22:24Speaker 1

It's right there, A1. Or the trees, rather.

22:30Speaker 5

Yeah, so a note on the plan to retain existing vegetation in the 25-foot buffer.

22:38Speaker 12

Well, that's really on newly created lots. This is the newly created lot.

22:44Speaker 5

It's a newly created driveway.

22:47Speaker 12

On an existing site plan.

22:51Speaker 6

We don't have anything about driveways on site plan. Oh, there you go. Maybe we don't even need to vote.

23:02Speaker 12

That specifically says driveway shall be placed no closer than 10 feet from property land for newly created lots, so I think there isn't one required.

23:11Speaker 5

There's nothing in those.

23:14Speaker 4

The location of the driveway as it exists in 2010 on existing law.

23:18Speaker 5

Should there be? Otherwise you.

23:22Speaker 12

We really haven't seen the case for it, so.

23:25 – 23:38Speaker 5

Yeah, it's always the unique cases. Okay, well, we can put a condition, a note saying that we've assessed the location of the driveway and.

23:41Speaker 12

To conform with the plan. Sure. It could be part of the minutes.

23:45 – 24:07Speaker 5

Okay. So for conditions, we have a note on the plan to retain existing vegetation in the 25-foot buffer, to remove the display area in the state right-of-way. I don't know if these are necessary because they're in the plan, but remove the gravel and reseed at the

24:08Speaker 12

No, that is in the plan.

24:10Speaker 5

Okay. About the driveway, what else?

24:17Speaker 1

And Bruce's note, incorporate Bruce's note in there.

24:23Speaker 5

Yeah, so, so he's gonna take that out and reseed it. So do we want there to be a marker so that doesn't happen again?

24:50Speaker 10

Works for me.

24:51 – 25:03Speaker 5

Okay. All right. So we move display area and state right-of-way and place Fieldstone.

25:03Speaker 9

No Jersey here.

25:06 – 25:20Speaker 5

to indicate natural place, natural field stone to indicate right of way.

25:20Speaker 11

I was trying to be aesthetically pleasing. Okay.

25:24 – 26:03Speaker 5

Okay. and do we want a note that says um in lieu of building depiction that um you know the building will conform to the yeah the design of the existing building exterior materials yeah you don't really need to put that in he's met the standard so it doesn't need to be noted but if you'd like okay Are we missing anything? All right.

26:04Speaker 11

So with Steph you're withdrawing your original motion.

26:07Speaker 11

Okay. Thank you.

26:12Speaker 12

Do you want a motion as for the conditions that were just listed? Yeah.

26:17Speaker 4

I'll go with that motion for that. Second.

26:21Speaker 5

Any additional discussion questions and public comment? All right. All in favor? Aye.

26:31Speaker 12

And that's for 90 days.

26:33Speaker 5

For 90 days, yes.

26:37Speaker 5

If anything comes up, you can.

26:38Speaker 4

Good deal. So run before we come back.

26:42Speaker 5

Thank you. Thank you for coming in again. All right.

26:50Speaker 11

Make sure you don't, you give me that.

26:53Speaker 5

What's that?

26:53Speaker 11

You wrote the conditions down. I just want to make sure you don't walk out with them.

26:57Speaker 5

Okay, you have the recording too, I know. Yes, I will, okay. All right. Then, sorry.

27:07Speaker 11

For who knows how long, but anyway.

27:10 – 27:41Speaker 5

The... continued board discussion on our fire inspectors recommendations to change site plan review regulations he was not able to make it tonight so we can. i'd like to hear glenn's thoughts after reviewing it you provided us comments if you know we can talk more or if you guys want to wait until he's able to come back and we can do that so. But let's start there with your comments.

27:41 – 28:45Speaker 12

Yeah, I mean, my comments are basically, we definitely need to do one thing. We need to cite the actual codes that they use in the zoning ordinance, because we don't. We only cite one of like the four or five that he lists repeatedly. And that probably is not good. But that reference that is in there was given to us by the fire department several years ago when we made the amendment. But we need to do that one because that one then says all building needs to meet these codes. So if he ever feels like someone argues with him, that becomes the law of Brentwood. Now the state fire code is already the law for the state. We can't do anything about that anyway. But it seems he's concerned with people arguing about it. And I would be concerned if I had to tell them to look at the building code as it stands right now.

28:46Speaker 12

Because it just doesn't seem to be clear that all of those codes are what they have to comply with.

28:53 – 30:30Speaker 12

and he asks us repeatedly to make those parts of the site plan review regs, and I really don't want to do that. I don't want to have 15 pages of fire code in our site plan review. They need to be where they should be, which is the building code. And then there are places where I think there are two examples that I thought it did make sense to make it clear that we could add those to site plan review. There's never an excuse, and we always give the plans to the fire department for their review. So during the site plan review process, if they think they need us to say something more stringently, write that as a comment to us. We ask all our department heads to give us comments on these projects. And he can simply say, as required by the building code, And so but that's it that's been his concern is that If he makes a comment There's not enough to back him up to you know, so they there's I just don't understand how that is the case I mean the you you can't you can't say that something if that is required by zoning it is clearly referenced as those that hold the language for all of the different things and How do they fight that? You can't fight that.

30:31Speaker 5

Yeah, I don't totally understand the controversies that we've had.

30:34 – 31:07Speaker 12

So if the issue is he doesn't feel like it happens early enough in our process, well, we always ask for comments. They can absolutely say at that point, our comment is this is going to require the... fire alarm system that is required in the building code. And it could even become a condition of our approval if we wanted it to be. But those are codes that exist separate from us.

31:11Speaker 5

They're all, yeah, we're referencing other codes that already apply.

31:17 – 31:40Speaker 12

That already apply. I mean, anything, any time in his discussion with us where he references this is found in the state fire code, the state fire code is state law. Even if we said, oh, we don't like the state fire code, it doesn't make a rat-tiny difference. That's what overrides everything.

31:40 – 31:55Speaker 5

You can say as of a certain date, or as it stands currently, or something. So if the state were to, for some reason, make it less stringent, ours would still be where they are.

31:55 – 32:35Speaker 12

Correct. My problem with putting a lot of language in our regulations is if those codes do change, and they don't change without the fire community actively engaged in those changes. If those changed and we have something different, first off, we're not going to know. And second off, that could create a conflict that then works against the fire department. And I don't want to be wondering every time there's a code change at the national level whether or not we're still in compliance in our town regs.

32:37 – 33:08Speaker 5

On every plan set it says shall adhere to all applicable fire codes So I have two questions one is he was concerned about Site plans that don't specify what the uses in the building And that he wanted you know sort of the highest level of protection in case of something were to move in later, but. He can just say that during our site plan review process.

33:09 – 33:35Speaker 12

Because a person can say, I have no idea who my renters are. And they have every right to say that when they determine one, the water, the safety water flow capability is this. And if you don't like that, you better look for a different tenant. but that's already all legal. It's not.

33:35 – 33:48Speaker 5

So in the past when they've had a disagreement, is it that whoever was trying to defend our position didn't understand that, that they had those things to fall back on?

33:49Speaker 11

I think they just didn't want to do it.

33:51Speaker 5

They just didn't want to have conflict?

33:54Speaker 12

Yeah, I don't know how they dealt with conflict.

33:57 – 34:12Speaker 5

Yeah. And the situation where he was talking about if you don't have, I know there's been a difference of opinion about how big your cistern needs to be.

34:13 – 34:26Speaker 12

Even as it stands now, we say that our 30,000 gallon requirement is a minimum. And that the fire department is required to agree to anything if it's other than that.

34:27Speaker 10

Yeah, declare your use.

34:29Speaker 10

That's where this all comes down to. It really does.

34:32 – 34:55Speaker 12

If you don't want to, they're going to get stuck. They're going to get fireworks factory. I suppose we can say we could make that clearer during our site plan process. We could simply say, you should be aware if you're coming to us for a multi-tenant building and you don't have them declared, you may find yourself responsible for 120,000 gallons of reserve water.

34:59Speaker 11

Yeah, or make it clear to say the use will determine the fire load.

35:03Speaker 12

Yeah, and it could be a lot of expense for you.

35:08Speaker 11

But I think some of this is going to be mitigated through better communication.

35:13 – 35:41Speaker 11

Because when I send these plans out to the fire department now, I try to do so in a speedy manner, and they're very proactive of getting to the applicant and saying, hey, this is your fire codes, and this is what you're going to need, and And that during the process will help adjust that. Maybe they'll adjust. Maybe they'll declare a use instead of having to supply that type of fire load. I think a lot of this is just better communication.

35:41 – 36:09Speaker 5

Yeah. It's hard because if people change then, you know, 20 years from now, I wouldn't be opposed to having a note somewhere in our site plan regs that calls that out more clearly if it's not right now. We absolutely could do that. Just descriptive. It's not a requirement. It just says the use determines the fire-related requirements.

36:10 – 36:22Speaker 12

In accordance with our building code and give the reference to our building code that references all the fire codes. We could certainly have that be one of the requirements for site plan review.

36:23Speaker 5

That might help with his concerns. And Doug?

36:27 – 37:01Speaker 1

Yeah, just a question about the communication on the communication front. And Mark may be able to speak to this more in terms of our current process, in terms of soliciting feedback from the fire department on projects. I guess I would I'm curious sort of like how formalized that process is because I could see a scenario where if there's you know Like considerable turnover in the department or here You know that those communication structures naturally could break down if it's not like that formalized of a thing so I'm just kind of curious what what that kind of looks like on the back end right now in terms of getting their feedback and

37:06 – 38:20Speaker 10

The email address is fire inspector. So that email address should follow through with whoever the fire inspector is. I receive the plan. I start processing it. It takes me, depending on the application, either a half a day to almost a full day just to process one between everything that I'm typing in and the financial and the abutter's notices and then taking to the post. Like, it's a pretty extensive process. So somewhere in there, I will end up sending it to you guys within the next day, and then I'll look at it and I'll say, gee, does this have any wetlands involved in it? Should I get conservation involved? And I'll throw it at Rob, I'll throw it at the fire department, something that I think is gonna be a lot of traffic generated, I'll throw it to the police department. Now, I don't chase these people for comment letters. If you would like to submit a comment letter, please do so. And I put that right in the email. And I may even group them all up at one time. So I'm just sending out one email. But I'm not chasing them for comment letters. You know what I mean? But if they would like to supply one, I am more than happy to add it to the file where it's accessible to you guys.

38:20Speaker 1

And that makes perfect sense. I mean, it's not your job to hunt people down. No.

38:27Speaker 10

It's hard enough for me to keep up with the time frames of all this stuff happening. I mean, honestly, one just landed on my desk at 4.30 today, an application.

38:35Speaker 1

I was going to say, if we tasked you with hunting people down, you'd be hunting a lot, a lot.

38:40 – 39:04Speaker 10

I have a hard enough time hunting down applicants after they've been approved for MILRs and all my escrow accounts of hunting money from people. I think... The departments within the town of Brentwood can be responsible enough to submit comment letters if they seem fit to do so.

39:05Speaker 5

And sometimes we do have a requirement. It's one of the comments. Get the letter.

39:10 – 40:04Speaker 10

Yeah. And no matter what happens on our end, they have to meet NFP codes. They have to. They can't get an occupancy permit if they don't. But by including them as early in the process as humanly possible, it becomes very clear to the applicant of what they need to do to meet the standards. I know Mr. Gersey has left, but we've identified problems within his sprinkler system. So the Brentwood Fire Department is actively getting that fixed, or we actively are fixing the fire pond. who were actively fixing the pump which services his facility and the propane facility. So the process works. It's just getting everybody, getting that information out, getting them involved and starting that conversation.

40:06Speaker 5

So what this brings to mind is the process that you created with the engineering firm where they have like a cover sheet. It's like a transmittal letter, right?

40:15 – 40:44Speaker 10

Yeah, and it works great with her. I create the folder within the file. She uploads them right into that file and just sends me a quick email. Hey, I updated this file, so I'm aware of that. Um, our relationship with that and that end works fantastically. Um, but she can also, and she said she doesn't read guns comments before she reviews things, but that whole, I never read.

40:45 – 41:03Speaker 10

So you're, that whole file is available for her to, to read, to look at and to read. Um, so that relationship works really well. Um, I think we're local enough to where if they do have a comment letter, they can just send it to me via email, and I can be more than happy to drop it in the folder.

41:05 – 41:20Speaker 5

We've talked a bunch on and off about having a checklist for ourselves to make sure we've hit everything. Other discussion on Glenn's comments? Did he want to come back?

41:21Speaker 12

like next meeting or? I hope not.

41:25Speaker 10

No, I told him, I just talked to him on the phone at like six o'clock or six. I said, it'll have to be October 15th or the 17th, whatever it is there.

41:34Speaker 11

I said, the first is going to, he's like, no, no, no, I'm not coming the first.

41:40Speaker 1

I'm avoiding that like the plague. He understands. Yes.

41:43 – 41:54Speaker 10

There's something going on. Um, Maybe for transparency and better communication, we should wait to make a decision until he's here. That's completely up to you guys.

41:54Speaker 5

So in the meantime, could we have a proposed language for the update zoning?

42:01 – 42:14Speaker 12

Yeah, yeah. I think I... It's probably already... In any event, yes, I will. And what I'll do is... I will, next Wednesday, I'll ask for he and I to be able to sit down.

42:15Speaker 12

That'd be wonderful. And then maybe. We'll do that before he comes back to the planning board.

42:20Speaker 5

Okay. And then maybe a brief statement in the site plan review. Yeah, I'll come up with something about that. That says something about use.

42:28 – 42:41Speaker 5

So it's really clear up front. Because it seems like a lot of the problem has been. people design something, they miss that, or they don't think they have to do that, they get surprised later, and then you have conflict.

42:41 – 42:59Speaker 10

Yeah, as soon as we can tighten this up and you agree to the language that Glenn has created, Glenn's gonna be pretty busy for the next few weeks. I've got a lot of backlog on him. but we can schedule that public, I think everything we want to do, we can do through a public hearing process, Mr. Greenwood? Or is there one zoning?

42:59Speaker 12

I think that I suggest there were two places that we could do amendments to site plan, and then there's the one that's zoning, and so that we have to do in advance of that.

43:09Speaker 7

We've got a little bit of time.

43:11Speaker 12

Yeah, that December time.

43:12Speaker 10

For the sake of not letting things fall through the cracks, I think we should create that language now.

43:20Speaker 10

While we're hot on this topic.

43:22Speaker 12

I think that I already did it. I think it's in there. It's in there? The exact language? Yeah, the exact language.

43:29Speaker 5

And then he's welcome to have like a fire inspector guide and have the 20 pages in there.

43:36Speaker 12

Yeah, and if you wanted to make that something we hand out when somebody asks for an application.

43:42Speaker 12

Happy to do that. Okay. That's actually a really good suggestion.

43:50Speaker 12

And because it will happen, it means they're getting something immediately upon coming to the planning board.

43:58Speaker 12

Like, brilliant. There's a little light bulb above your head right now.

44:06Speaker 10

When does that packet get handed out? I have to determine whether it needs to be given a packet or not.

44:11 – 44:25Speaker 12

Yeah, it would hand it out maybe just for site plan reviews, for new construction even. not a change of use, but if someone's building a new building, give them that whole thing, whatever they come up with.

44:26Speaker 10

I would love to have it electronically. Yeah, of course. People would rather that, too. Yeah. Paper's dead.

44:36Speaker 4

Clearly not.

44:37Speaker 10

Except for these people, yes.

44:40Speaker 11

No, no. These are the lovers of dead trees.

44:46Speaker 12

I just plant bittersweet and let them take all the trees down. That's all I do. Every day I plant a little more. Because it's beautiful in the fall.

44:58Speaker 5

Are you serious? This stuff is horrible. Can I get some... Back up here? You would get horrible.

45:09Speaker 10

If anybody has Japanese knotweed, just drop it off on your glass.

45:13Speaker 12

Oh, goodness. Can I have a hallelujah? And you gave for a while.

45:16Speaker 5

I'm pretty sure there's tree of heaven on our road, too. And I don't know how to, like, can you just, like, knock on somebody's door? Anyways.

45:29Speaker 7

So is it my understanding, Glenn, this was way over my head. This was overwhelming to me to read the fire department.

45:39Speaker 1

You could say we're tricked from a fire hose.

45:41 – 45:54Speaker 7

So, yeah. But it seemed with your comments, because I did read them before I came, and it did seem like you're saying in a way a lot of what he is saying is redundant because it already exists.

45:54Speaker 12

Yes, exactly.

45:55 – 46:13Speaker 7

And you're also going to do this, cite the actual codes, you said. Correct. Okay. Because I think, you know, that would be helpful because I was like, oh, phew, this doesn't sound, when I read Glenn's stuff, it makes a lot more sense. Because this was, I just found this.

46:13Speaker 12

It was a lot.

46:14Speaker 7

It was really a lot. And if you don't really know what they're talking about, it's really hard.

46:18Speaker 5

I appreciate that a lot, Glenn. It was very helpful. Go to engineers who are working on projects and they can get moves.

46:27Speaker 4

You guys just put it like you're saying. I think it's just put like one sentence. Yeah. It says please defer to that and that.

46:36Speaker 12

But that it is a requirement. Don't think you're going to argue your way out of this. It's a code.

46:43Speaker 10

Yeah. You just list the code. Just like an RSA. You want someone to apply to an RSA, just list the RSA. They change.

46:49Speaker 4

You're just hunting them to go look at that versus them coming back and say, well, the planning board told me I didn't have to do this. Exactly. I don't have to do this for you. You're saying you might have to do your due diligence on figuring this out.

47:00Speaker 11

Yeah. There's no need to make our book 20 pages thicker.

47:05Speaker 7

How do we do that with the multiple, you know, you don't know what's going into the rental units and then they have to do the highest. They have to do higher.

47:14Speaker 12

Fireworks factory. Whatever the standard is that theirs requires, that's what they have to plan for.

47:20Speaker 7

Even if they're all different.

47:22 – 47:36Speaker 10

Yep, if you don't declare use. And I'll give you an example. The... plan that we approved where they did the wetlands mitigation on 125 down the hill.

47:38Speaker 8

The old Rulo site?

47:39Speaker 10

The old Rulo site that was up on the hill on 125.

47:42Speaker 12

Where the dumpsters were for a long time?

47:45Speaker 10

Yes. And they cleared it. Yeah, and they didn't declare use, so they had to put in 180,000 gallon cistern. And that, I think,

47:59Speaker 12

So we do 130,000 gallons, so they did.

48:02Speaker 10

180,000 gallons. And you can't even buy a cistern that large, so what you have to do is connect. A series. A series.

48:11Speaker 5

That didn't motivate them to narrow down their.

48:14Speaker 12

Who they wanted to have be there, exactly.

48:16Speaker 10

Yeah, so that is how extreme the fire load can vary between uses.

48:25 – 48:39Speaker 5

And then it becomes a question of, they're supposed to, there's supposed to be some kind of registry of businesses, and we're supposed to know when things change, and then the fire inspector has the authority to go check things, so.

48:40Speaker 12

Yeah, once a year.

48:40Speaker 5

If you said you were gonna have X, and you put in Y, and those have different requirements, then they can go in and.

48:48Speaker 5

But does that happen?

48:50Speaker 10

The problem is.

48:51Speaker 5

It's like we're, it's happening more now with a new fire inspector.

48:56Speaker 10

One of the issues is manpower.

49:00 – 49:25Speaker 10

We don't really have the manpower to be visiting every business yearly. That's a lot of man hours. Just think about how long it took to do the taxation, the audit. Right. It took a long time. And that's a couple, that was two guys going door to door, appraising houses.

49:26 – 49:47Speaker 12

So imagine having... You've got Wayne... If you go up and down 115, there's not many businesses. I'm arguing with you on that one. It's nothing like the homes that are spread all through town. We have two corridors, and there's, what, 70 businesses?

49:47Speaker 5

And a lot of them are, like, they are what they are. They are what they are, yeah. It's more of these, it's the contractor garages.

49:54Speaker 12

I'm surprised that they feel like they can't do that annually.

49:58Speaker 11

I'm just echoing one of the issues Mr. Tuttle brought to light.

50:02Speaker 5

Well, let's move on to our next topic. He doesn't work that much either, right?

50:06Speaker 11

He's two days a week, I think. I believe.

50:09Speaker 7

Is he the only one that expects those things?

50:16 – 53:02Speaker 5

All right, driveway permits. So it's my understanding, so at our last meeting we had a discussion about the driveway permit process and the fees. This all came about because our former engineering firm, we had some issues with things not being thoroughly vetted and inspected, which created problems down the line. So we tried to address that by looking at what actually needs to be done. One of the things that they said was they weren't doing certain things because the fee wasn't high enough to cover those things. But those are things that need to be done. So we asked our new engineering firm what it actually costs to do a pre-inspection support through the process and a final inspection. And they came back with $1,000. And we had a discussion about, you know, is there any way to make that cheaper? What are the different options? Ultimately voted in favor of that with the caveat that we would ask the engineering firm, you know, if they have more experience, particularly in Brentwood, with the process, if there are ways to trim that, we would be grateful. And the main concern that we have is the integrity of the roadways, that things are installed properly. drainage. And that's why we felt too like having that pre-inspection was really important to see what was going in, where it was going in. We had some discussion about, it's a big jump. I don't know when they set the $300 fee, but it's obviously a big jump from 300 to 1,000. But also, we, ran into extra costs because the process wasn't working. It is what it appears to cost. And we talked a little bit about existing driveways and sort of what's the criteria for when you're actually sort of triggering this. And we talked about, you know, if you're installing a, culverts or otherwise changing things around the right-of-way, changing the way water is moving that could affect the road and the right-of-way. But that normal maintenance wouldn't count. Is that a good summary before we? OK.

53:04Speaker 4

So if they're reclaiming their driveway or putting a top coat on it, is there a permit?

53:13 – 54:02Speaker 4

I guess that would be the one thing I'd want to know. Yeah. Because I think when we had the discussion with the select board, it was like, replacing new and altering, you're going to hit for a $1,000 permit. And I think that's an unnecessarily burden on people that are reclaiming their driveway and just kind of, or putting another top on top of it, or just kind of putting back what's already there. It's already been approved. It's already been. Already there. And I think that was our I know when I redid mine, the end of my driveway, because my bell housing came separated. Wayne came out and took a look at it and was like, yeah, you can use that. OK, great. And we went ahead and did it. And we did it. And that was maybe 12 years ago.

54:03Speaker 5

Yeah. I mean there are instances around town where maybe that did happen and maybe it still wasn't right because.

54:13Speaker 4

I wanted to go with the plastic PVC.

54:17 – 55:02Speaker 5

if there are cases of that. So we're just trying to fix the process. I think maybe we can define that better, like what triggers a permit. To me, is it going to affect the road differently than it currently does? Plus, once you get beyond the right of way, if you're not changing where the water's going, on your property, but if you're messing with the Culverts the interface with the road in a new way That should trigger some kind of process And that that 300 was is relatively recent it was 50 for decades It was it was

55:11Speaker 12

It was decades. Wasn't the 300 just in the last year? Correct.

55:16Speaker 5

Yeah. So what was the old engineering firm? They weren't even getting?

55:22Speaker 11

They were never using an engineering firm. In your packet, I've provided you the actual verbiage from the ordinance book.

55:34Speaker 5

But our expectation on a development had been that they were...

55:41 – 55:53Speaker 10

I'm going to propose something, and it may fly and it may not, but I would like you to actually read what's in your book, and then we'll move from there.

55:53Speaker 11

It's in your packet. It's page 52 of our driveway.

56:01Speaker 5

When permit's required?

56:03Speaker 10

Mm-hmm. Yeah. You can read it right from the top where authority and purpose.

56:21Speaker 5

So I think, so there's two issues too, right?

56:25Speaker 5

Our authority is in subdivisions and new.

56:29 – 56:43Speaker 11

Correct. What you could do is stay within your purview, which would be subdivisions.

56:44 – 57:15Speaker 10

You could easily add $1,000 to an escrow, okay? Okay. on new subdivisions, and that $1,000 in escrow would go to our town engineer going out and doing the proper inspections on the installation of these new driveways. As far as the rest of the town goes, it's not within your authority and purpose.

57:17Speaker 5

That's why I lied.

57:20Speaker 12

I think I said that.

57:21 – 57:57Speaker 10

You could simply turn this into we've identified a problem on a new subdivision. Yeah, you have identified, and I see them all the time, improperly installed driveways on already approved subdivided land. The select board has taken the stance that they do not want You have spent months and months and months. We have talked about this, talked about this, talked about this. And you have come up.

57:57Speaker 12

And researched it.

57:58Speaker 10

And researched it.

57:59Speaker 12

Don't make it sound like it was blah, blah, blah.

58:01Speaker 10

No. It was research. You're absolutely right, Mr. Greenwood.

58:04Speaker 5

This is also.

58:05Speaker 10

And site walks and engineering.

58:07Speaker 5

This is the root cause of letting our last engineering firm go.

58:11 – 58:35Speaker 10

Yes, you have identified what I consider to be a very serious problem within the town of Brentwood. And through hard work and diligence, you have come up with a way to mitigate that. but they seem to have a different idea. So what I think you should do is use your authority to fix the things that you have authority over and let them figure it out.

58:40 – 59:06Speaker 9

Have we thought about maybe having the engineering firm on the private residence, the one lotters that you're saying you don't do anything on for the engineering company, have them do the pre- work on it, but let the building inspector be the one that does the final. So you have the regs, you have everything that goes into it. He just has to make sure that it's done. He's on site four or five times anyway for different inspections.

59:06Speaker 12

I think that's a great thing for the police to think about.

59:09Speaker 10

Exactly. You may make that suggestion to them, sir.

59:13Speaker 9

I think we have a representative here.

59:15 – 59:50Speaker 12

The clearest way for us to go forward is to just make a decision about what we're in charge of. And we require an escrow account for many things having to do with subdivision. On subdivisions, that includes roads, us saying there's $1,000 on every lot for the proper installation and inspection of driveways is expensive doing business on the roads in Brentwood.

59:52 – 1:01:11Speaker 10

And I can easily, all the driveway permits come to me anyway. The only really things that would have to be done is that the existing driveway permit would have a box that you check, is this a new subdivision? And you check it and There's no fee involved in that because you've already paid that within your escrow. When you submit your plans to me, you would have to submit a driveway plan so the engineering's already done. I send all of that right off to Tara and we'd have to put a fee line of $1,000 for the driveway. We'd have to obviously change our permits, which I I'm in the midst of changing at the moment as soon as I finish redoing the book. In that way, we as a board have established a very professional process to which there is accountability and driveways will be, we can ensure that driveways were installed and inspected to great quality. And if the select board doesn't want that, And they can come up with their own system that they are satisfied with.

1:01:11 – 1:01:48Speaker 12

Well, there are reasons why they don't think that's as important. And I think that there's legitimate concerns when you're talking about every driveway out there that already exists and how you're going to deal with corrections to those. That's different from what we're trying to accomplish. And if we do it this way, one other thing we can accomplish is that bait and switch when the developer says, oh, we're not, this is a landowner thing now. If they're charged up front a thousand bucks for a driveway, they're gonna put a driveway in. They're gonna put the culvert work in. They're not gonna say, oh, we're waiting for the property owner.

1:01:48Speaker 5

Yeah, that was the other issue, yeah.

1:01:50 – 1:02:05Speaker 10

And those one ofs that, came to light were subdivisions that we did. It was those two lot subdivisions where you get the 1L driveway. So we could already handle that within our process.

1:02:07 – 1:03:16Speaker 5

I totally get all of this. We should act within our powers. We should do this within the site plan subdivision authority. Since we have a representative from the select board here, I will give my personal opinion on this, which is that I understand when the select board says we don't want to put extra costs on individual property owners and that this is a lot of money. I just also want them to think about how it can affect other property owners and how it can affect taxpayers if the road degrades. And there are definitely examples of that around town. And I think that things have been done in the past with a handshake, you know? Sure, that's okay, you can put a second driveway in with 400 feet, or 200 feet, and no sight line. No snickering. So.

1:03:18Speaker 12

That frightens me that you said that out loud. You walked right into it.

1:03:24 – 1:03:52Speaker 5

At least we have something else to tease me about. But I just think that it, and I don't know what the full discussion is, but I think sometimes there's this, you know, we want to keep costs down for individuals. But thinking about the big picture, it could cost, when things go wrong, it costs all taxpayers. We have legal fees, or we have road repairs, and it costs everybody. So we just want to do things right.

1:03:52 – 1:04:48Speaker 4

I think what the concern was during the select board meeting, the concern is not the new construction happening and somebody putting in a new driveway. I think it was the alterations. And reclaiming the driveway. And to me, it was kind of like, I already have a driveway there. If I'm not altering anything, and I'm just reclaiming it, or putting a top coat on it, I shouldn't be charging anything. Or I should be doing minimal and looking at the surrounding communities. Like I think one town was like 10 bucks, one was 25, some are 50. I'm fine with that, charging a fee for that to have somebody, if they wanna come by and take a look at it, great, we pull a permit, they do it. I can tell you when I did my deck, no one ever came out and looked at it when I pulled the permit. They just, okay, it's Bob, he's doing his deck.

1:04:49 – 1:05:31Speaker 10

And that's why some decks were put within the wetlands buffer. And if you want professional results, you have to pay professionals. Now, if you look at some of those fees that some other towns charge, and I'll give you an example, like the state of New Hampshire, they don't charge you a dime. Any state road that you put a driveway permit in for, they don't charge you because they're paid by the state, but the state pays professional personnel to review those. Those towns may have professional staff on hand to review those and inspect them. If you wanted to, I'm just saying.

1:05:31Speaker 5

Yeah, that's another issue we have sometimes. We don't have necessarily people here.

1:05:35 – 1:06:05Speaker 12

Right, but it's a little disingenuous when DOT says they don't charge a driveway permit. What they do do is if they determine you have an impact and they want you to make an improvement, they just tell you you have to do it. And that may be $10,000. But they're saying there's no cost for the driveway permit. But if you want to access our road, there's a play fee. And that play fee can be a lot of money.

1:06:05Speaker 10

Yeah, but if you're putting a driveway into a town road, do you want the road to be secure?

1:06:14 – 1:06:38Speaker 10

And that you should be told as a homeowner the same thing. You need to put a culvert in and install a culvert and put headwalls in and do it correctly. So there's no difference between the DOT and the town of Brentwood. It's just the scale that we're talking about. The scale is much massively different. I brought it up as a point of they have paid personnel and staff that do that.

1:06:39 – 1:07:12Speaker 5

So just going back to your question, I think. So this is obviously what we have in front of us is it only applies to what the planning board has authority over. but might be a good definition for the select board. And the sort of cutoff is substantially affects the size or grade of any driveway entrance, exit, or approach within the limits of the right-of-way. So it's, you know, are you doing something in the right-of-way that changes the makeup of the driveway?

1:07:12 – 1:07:48Speaker 4

So if somebody's putting in a regular, just reclaiming their driveway, wouldn't need $1,000. And I think that was our big sticking point. The other thing, too, and not for anything, going from the bell housings that they have when they put those concrete, they have the bell housings that come separated from the frost heating up and down and moving. And I think that's what happened in Robinson and Mohawk, that whole development over there with some meadows or whatever it is off of Haig. I think you're still required to put in concrete.

1:07:49Speaker 4

Why wouldn't you guys change over to the one blank, big, huge PVC pipes?

1:07:56 – 1:08:50Speaker 10

There are disadvantages and advantages to both. We have chosen to keep reinforced concrete. I think one of the major reasons why is cover material. You need far less cover material over reinforced concrete pipe than you do plastic. Okay, and this is one of the things that we've seen on a subdivision that has become a real problem. I mean, those are brand new driveways and they're already cracked. because they used plastic pipe and they didn't use the proper amount of cover material. They were not inspected and installed correctly. And that's what kicked this whole football off of why did we go on this mission to begin with, is because someone used plastic pipe and didn't install it correctly. And if you don't have professionals review, that's what's going to happen.

1:08:51 – 1:09:14Speaker 5

I think the other thing, and maybe this has changed, but that you want something that can withstand a snowplow and that if you have metal, it can get pinched closed. I've had that happen. Plastic can get damaged easily. But I don't know. I'm open to, I know you looked at it quite a bit.

1:09:15 – 1:09:51Speaker 9

One thing that I think I look at and it concerns me, I'm all on board with what you say. If someone's having their driveway resurfaced, shouldn't trigger a $1,000 fee. But I have seen the companies dig out a culvert and then fill it back in and then pave it, which then in turn mitigates the flow going down that street. So how do you catch that? It usually happens after the fact that they discover it. So again, I'm not in favor of $1,000 for reclaiming the driveway either.

1:09:53Speaker 12

But that's what you guys should be doing.

1:09:55Speaker 9

Yeah, that's a you problem.

1:09:56 – 1:10:20Speaker 4

For me, I would say $50 permit to reclaim it. I don't know when it changed to $300, but I think if they're altering it, then I would probably say $300 would work. And then if you're putting in something completely different, then I'd be fine with $1,000. I think you need a tiered. a tiered permitting fee for that. That's what you guys should exactly do.

1:10:21Speaker 5

Yeah, I think that's the bottom line is that the planning board's just gonna stick with the subdivisions. Yes, yes. Select board and go at it.

1:10:30Speaker 4

So when they're, so like we just looked at that stuff for Route 125, he's putting it in the driveway. Do you guys charge $1,000 for that?

1:10:40Speaker 10

We don't charge anything for any state highway.

1:10:43Speaker 4

So because it's coming up to the state highway, You're out. There's no permits for you guys.

1:10:48Speaker 5

It's basically new roads. No.

1:10:51Speaker 12

We don't have any authority there.

1:10:53Speaker 12

Any access to 125. Or.

1:10:57Speaker 10

Yep. If it was onto a town road. Well, what project are we talking about? If it's.

1:11:02Speaker 4

This one. Greasy. Oh, okay. We were looking at the draw.

1:11:07 – 1:11:27Speaker 10

But he didn't change the use at all, really. So we wouldn't require that at all. It's not a change of use. There's no traffic, no increase in traffic. That's really kind of what would trigger a driveway permit or review or traffic study would be an increase in traffic.

1:11:32 – 1:11:43Speaker 7

So we're not putting on the, whatever it was, 50, 300, 1,000, we're just doing 1,000.

1:11:44Speaker 12

We'll put together language for changes to the subdivision regs.

1:11:52 – 1:12:10Speaker 10

That's a you, it's an issue, not an ish me. I will update our permitting, our permits to reflect that, and we will have a public, hearing about it, Mr. Greenwood, and we will make those changes.

1:12:11Speaker 7

Are we, so we're not touching the other? Nope.

1:12:14Speaker 10

Nope. Nope. If it's not in a subdivision.

1:12:17Speaker 7

What does someone do now? They want to read?

1:12:19Speaker 10

We don't know and we don't care.

1:12:20Speaker 12

There's a driveway permit and it's done through the Board of Selectmen.

1:12:27Speaker 12

That's the way it's always been. That's the way it'll continue to be.

1:12:29Speaker 5

We were just trying to fix something.

1:12:32 – 1:12:47Speaker 10

I will continue to process them, and they will tell me. I will know where our permits need to go to Tara, and they will tell me, or they will come up with some sort of system and let me know where their permit needs to go.

1:12:47Speaker 7

So somebody currently that's resurfacing their driveway, what does it cost them?

1:12:52Speaker 5

I don't think resurfacing.

1:12:53Speaker 10

We don't know. We don't care. Really? When you see it on the select board agenda, you may attend that meeting and make comment.

1:13:01 – 1:13:22Speaker 4

Yeah, I think right now, my understanding is they changed it to $300, but I'm not, I think, to me, it's not defined well enough. I think it's $300 for any driveway permit right now. I'm not sure if it's defined to be if I'm just reclaiming or putting a top coat on top of something. I don't think it's defined.

1:13:22 – 1:13:33Speaker 5

I mean, ours was substantially affects the size or grade at the entrance to a road. But I wouldn't think top coating wouldn't.

1:13:33Speaker 4

Mark even said if it's permit is basically for where they're cutting into the roadway, right?

1:13:40 – 1:13:55Speaker 5

Okay, we're gonna move on. Compliance and enforcement, One Smith Road. I believe we have a brief update, and we don't need to spend a lot of time on this.

1:13:55Speaker 11

Yes, so you want me to take it?

1:13:59Speaker 5

Sure. Does everybody have this? Yeah, do you have your email?

1:14:03Speaker 10

Your email, so there's a... Well, that's, I believe, a different, that's a totally different subject. So let's deal with the compliance one first that's in your packet.

1:14:14Speaker 5

Oh, this sign.

1:14:15Speaker 10

Yeah, the compliance one, the form that I filled out's in your packet. So I didn't get that till today, so I couldn't include it in your packet.

1:14:23Speaker 12

Toward the back, yes.

1:14:28Speaker 5

Well, I think to cut to the chase, he agreed to take it down.

1:14:34 – 1:15:02Speaker 10

I met with the property owner yesterday, Glenn and I did, And then I met with the renter today. That sign will be taken down off the trailer by the 24th. A new sign will be installed per our site plan, or per the site plan. By a four by eight, says it right on the site plan. I missed it in that form.

1:15:04Speaker 1

So they're resolving it.

1:15:06 – 1:15:27Speaker 10

It will be resolved. I don't think you need to sign this right now. And let's let the process be the process and the agreement that I have made with this gentleman to remove it and put up a four by eight sign within the signage block on the plan set.

1:15:27Speaker 5

Okay, so there is one. Because it said the applicant shows not to. Yes, I missed it on the site. Okay, so there is a signage block.

1:15:35Speaker 12

Yeah, it definitely shows.

1:15:37Speaker 11

Yep, that was my bad. I apologize.

1:15:41Speaker 5

So they'll install signage in conformance with the plan. Perfect.

1:15:47 – 1:16:33Speaker 1

And if I could just make one comment. Because during this whole process, I was uncharacteristically a little bit angry at the process. I don't get angry very much. I enjoyed it. I just need the Snickers. You're not you when you're hungry. That's copyrighted. Anyway. What I will say, because throughout this process with them, there were a lot of things that were frustrating and that I felt were not done appropriately. If they are able to address this in a timely manner, I think that that is a really good sign that we're turning over a new leaf of collaboration and understanding. and Kumbaya.

1:16:33Speaker 5

But the adjacent property is the same person, yes, and does not have a site plan?

1:16:43Speaker 5

And the trailers under the power lines also go with that?

1:16:51 – 1:17:18Speaker 10

I did some pretty extensive research and There's no declared use for that property. That was a residential piece of property that was used residentially. There is no laws or rules that say that you can't have a shipping container on your property. We can't mandate something that a legislation doesn't exist to say that you can't do that.

1:17:18Speaker 5

So he has to declare. Is that property being used commercially?

1:17:23Speaker 9

No, it's still a residential use. It was used commercially when he was laying the Michaels truck pack on that property.

1:17:30Speaker 1

But is that the same parcel, though? It's two different parcels. That's what I, yeah, that's what.

1:17:36Speaker 5

I only let your kumbaya hold for like five seconds.

1:17:40Speaker 1

We moved on to the other one. That was one of the things that tripped me up a little bit with this project is that there were multiple parcels, one that was very much commercial and then one that.

1:17:48Speaker 5

But it seemed like they were a little commingled when we did our site walk. Right.

1:17:54Speaker 10

Well, you can't enforce something without a declared use.

1:17:58Speaker 5

Well, is it junk? Abandoned?

1:18:02Speaker 10

Now you're reaching.

1:18:04Speaker 10

Now you're reaching.

1:18:05 – 1:18:55Speaker 4

Storage containers that are underneath the power line areas, those were, I think, left or abandoned by the prior owner, tenant, whatever it was over there. We went through, you know, building inspector and health officer me I was down there they had people living in travel trailers in there and setting mattresses on fire in the wetlands because they deprecated on them so there was a lot of issues going on out there I know that the storage containers that are still there were there before thank God they get rid of the TVs thank God they got rid of the 42 propane tanks sitting out there So there was a lot of other stuff that was out of cars. They had cars that were stored out there.

1:18:55Speaker 10

The short version of that is the containers that are there are far better than what was there.

1:19:05 – 1:19:20Speaker 4

And the culvert that goes in between that field was shattered. And I know our fire department had to replace their rim and their tire from going over that culvert to go put up. mattress that was on fire that was in the wetland.

1:19:22Speaker 4

Shredded the tire.

1:19:23Speaker 5

I have the perfect solution.

1:19:26Speaker 5

Plant bittersweet around here. You won't be able, five years, you won't be able to see them.

1:19:30Speaker 4

Yeah, but then the electric company is going to come in and mow them. Yeah.

1:19:35Speaker 10

I can't draw a direct line to a regulation that I can legitimately put on the farm.

1:19:39 – 1:20:01Speaker 4

Okay. And they, I can, I would imagine that at some point those containers will probably It was it was bad I Don't like them being a landmark of Brentwood as much as you don't like them being a landmark in Brentwood Take a left at the storage containers under the power line. I I get it I get it but

1:20:19Speaker 10

I think until a use is declared.

1:20:22 – 1:20:33Speaker 5

Okay, if we do see commercial activity there, though, we should bring that to the board. Okay, moving on.

1:20:36Speaker 10

Supplemental two pages that I put down.

1:20:40Speaker 5

I mean, this seems also resolved for the moment or not in our purview. It's also in DOT's purview.

1:20:53Speaker 1

Right, because Smith Road goes out to 125.

1:20:57 – 1:21:09Speaker 10

Well, do you want to deal with the request for a reduction in the bond, or do you want to deal with Smith Road itself first? I say we do reduction in bond.

1:21:11 – 1:21:41Speaker 10

The plantings have already been planted. I never received a bond from them. It was part of the conditions of approval, and we haven't signed the MILR yet. They're looking for us to hold on to 10% of that bond money. And I don't have it, but I know I stapled it to yours. There's the exact bond amount. And they're requesting that. Thank you.

1:21:45Speaker 5

But they're requesting it to be 10% of that?

1:21:49Speaker 10

Correct. The plantings have already been done. Mm-hmm.

1:21:56Speaker 4

So they're looking to only retain 10%?

1:21:59Speaker 10

No, they're only looking to pay us 10% of it. $2,900.

1:22:02Speaker 5

They want to do $2,900.

1:22:06Speaker 10

So just in case one of the trees dies, we can replace it. And they've done the plantings to the planting diagram.

1:22:16Speaker 5

Has anybody seen it?

1:22:18Speaker 10

Well, that was going to be my next suggestion. I'm just going to unplug this just for a second because I want to look at something. I want to look at their financial and I don't want to put it up there.

1:22:26Speaker 5

I would put this in the verify column before we... No. I skipped that word on purpose.

1:22:35Speaker 10

I just want to make sure we have proper funds within the escrow.

1:22:44Speaker 5

While he's doing that, anybody want to make a motion for the minutes?

1:22:47Speaker 1

I'll make a motion that we approve the August 20th minutes. Second.

1:22:55Speaker 5

Any changes? All in favor?

1:23:04 – 1:23:23Speaker 1

While Mark is pulling up the financials, I can... He's not. When you make motions. I'm sorry. I have an idea. While Mark is taking care of that, maybe I can do an RPC update because Mark doesn't have to make any motion.

1:23:23 – 1:23:41Speaker 10

I got it. I'm pretty well organized when it comes to such things. I am retaining $1,970 still within the escrow. So there's plenty of money to send Tara out there to inspect the plantings and the planting diagram and get a report on that.

1:23:45Speaker 5

Is that all that needs to be inspected? Would she just be going out for that?

1:23:53Speaker 12

If she's just going out for that, shouldn't we just send Chuck out for that? Ask him to take pictures?

1:23:58Speaker 10

You want me to go out and do it?

1:24:01Speaker 12

I prefer you to go out and do that to Tara. I prefer you to go up to do that to Tara. It just doesn't seem like a legitimate thing to say.

1:24:10Speaker 10

It doesn't. I was afraid, well, you have a very valid.

1:24:13Speaker 5

It's mostly are they there or not. It's not a was this installed correctly.

1:24:16Speaker 10

I mean, I certainly can do that.

1:24:18Speaker 5

Yeah, that's much better.

1:24:20Speaker 10

So you want to make a motion to reduce that bond amount to 10%? You want me to inspect it first?

1:24:30Speaker 4

So it'll be tabled till the next meeting.

1:24:33 – 1:24:52Speaker 10

Yep, okay. Yeah, we'll just go on to the next one. Now, we have a bit of an issue with Smith Road. It's a class six roadway, and I didn't know that.

1:24:53Speaker 4

Yeah, we changed that in 22? because otherwise Wayne was going to have to maintain the road and we didn't have any activity on it.

1:25:03Speaker 12

It says that it still does.

1:25:05 – 1:25:19Speaker 10

Yeah, he still plows that little bit of it. But that's a major issue because we approved a site plan on the Class 6 road. Which is subject to gates and bars. Which is illegal. Yeah.

1:25:19Speaker 4

So what we can do is, I guess, talk to Sue, put it on, and we'll just make it.

1:25:25 – 1:26:09Speaker 12

I asked you to put it on your agenda for next Tuesday. And we'll just make it. So you have to talk about it. Because it all comes from me saying I wanted DOT to sign off on the new usage. And then, because their plan set says it's a shared driveway. But it's not a shared driveway. It's Class 6 road, subject to gates and bars. If it's a Class 6 roadway, I don't give a. flying anything about what DOT thinks about needing a permit, they have no right to say anything. But the only way this works is if the Board of Selectmen open a short section of that roadway.

1:26:10Speaker 10

Now, you need to be aware of a few things.

1:26:14Speaker 4

If we do open that up to not a Class 6 road, now Wayne might have to repave that road.

1:26:19 – 1:26:31Speaker 10

It's a lot more than that. You will probably have to do a DOT permit because you're changing the classification of a roadway. You may have to apply to DOT.

1:26:32Speaker 5

What was it before?

1:26:33Speaker 4

It was a regular road, and then we made it Class 6 so that way Wayne didn't have to worry about the culvert.

1:26:38Speaker 12

Did you ever tell DOT that you made it Class 6?

1:26:42Speaker 4

Yeah, Wayne, we make it Class 6.

1:26:45Speaker 12

Would they have any way to know?

1:26:47Speaker 10

I don't know, Mr. Greenwood. This is being recorded.

1:26:51Speaker 4

It was recorded back then.

1:26:54 – 1:27:11Speaker 12

In either event, open or closed, it's still a town road. And DOT can't regulate whether or not we can access. It used to be part of 125, for goodness sakes. They don't have that power.

1:27:11Speaker 4

What's their power? Because you still have the access out to the 125. Smith Road then exits out to what is it?

1:27:20Speaker 4

The BRC, but what's the blacksmiths, whatever they're?

1:27:24Speaker 10

Yeah, yeah, the back of the parking lot, yeah.

1:27:26Speaker 4

So it comes right into the parking lot, so it's not really, there's only one exit out to the state highway.

1:27:35Speaker 10

We've already asked them for their input, Mr. What did they say?

1:27:40Speaker 4

It's an issue, not an issue?

1:27:43Speaker 12

Well, I think they're going off. Well, they may be incorrect. It's a driveway.

1:27:50Speaker 10

Oh. But wouldn't they know that that's a town road? Wouldn't that have been their response? Do you think they're going to just go away? That's my question.

1:27:58Speaker 12

I think they're only going to go away if we tell them to go away.

1:28:03Speaker 12

If it's a town road, that's like anything, any town road coming off onto...

1:28:12Speaker 12

Existing. Yeah.

1:28:13Speaker 10

Yeah. I'm just trying to figure the angles.

1:28:15Speaker 12

Oh, I know. Me too. I am dumbfounded that it's a road closed subject to bars.

1:28:24Speaker 5

What did you think it was?

1:28:26Speaker 12

I thought it was Smith Road. I thought it was a town road. Me too. Because there's always an address. People have lived in that blue house for a very long time.

1:28:35 – 1:29:13Speaker 4

Yeah. Yeah, we changed it because one of the problems that we had would be prior tenant slash owner is they were parking they were using it as like the storage area we couldn't get a plow past right and then they wanted it to be maintained well and then uh three chief police chiefs ago we started having things just towed and moved because we were giving them notice and saying here you go and then we had to look into are these vehicles stolen or what are they because there was stuff that was just showing up, just showing up.

1:29:14 – 1:29:26Speaker 12

So I don't remember ever being told that it was reclassified, but in the future when you reclassify a road, it'd really be helpful for the planning board to know that.

1:29:26Speaker 5

Well, it should be on maps.

1:29:29Speaker 4

Yeah, there should be all sorts of ways of letting folks know.

1:29:33Speaker 11

It sort of put us in a bind.

1:29:34 – 1:29:51Speaker 4

Yeah, we did it because I think the culvert, after the fire department popped their tire. And this must have been like 21, 22 timeframe after they popped their tire and then we could get the fire trucks down there. Yeah.

1:29:51Speaker 10

What are the safety requirements to having a town road? Does it need two access points? Do you need a turnaround point? Can it be just a plain dead end?

1:30:05Speaker 12

But there's a way to turn around.

1:30:08Speaker 10

Well, they have a cul-de-sac at the end of it that you can turn around. That's my point.

1:30:14Speaker 5

You've already put this on the select board's agenda. I have asked for them to...

1:30:19 – 1:30:32Speaker 5

And then, you know, if for some reason you... have an issue with DOT, we should talk about it. If the facts are not right and we just need to explain the facts to them, then we'll resolve that. Okay.

1:30:32Speaker 11

I will attend the meeting in the planning board's stead.

1:30:37Speaker 5

Okay, I mean you.

1:30:38Speaker 4

It's gonna take five seconds.

1:30:39Speaker 5

You got this.

1:30:40Speaker 4

I make a motion that we remove it from being class six. Wayne, start plowing it.

1:30:46Speaker 5

And there's a business down there now, so hopefully they'll keep an eye.

1:30:48Speaker 4

They can go through there and pop out over to the thing and cast in. Right, there can be taxes that can help pay for that service.

1:30:54Speaker 5

Well, and there should be more space.

1:30:57Speaker 4

Well, and if he goes down there with the, I think the bucket loader, he can go down there and basically grade that.

1:31:02Speaker 9

With that new plow on it.

1:31:05Speaker 4

New plows coming, but I don't want to scrape it up.

1:31:08Speaker 5

All right. Grass tracks. I don't, it sounds like they're just doing this, what they did last year. I don't really have.

1:31:15Speaker 12

They're having a preliminary meeting, right? The board's talking about.

1:31:19Speaker 9

Correct. Seen going off without a hitch last year, right? Did we see a reduction in the amount of driving under the influence arrest? That was the whole point of it, right?

1:31:28 – 1:31:47Speaker 10

I don't know. There's only one change on this map that I see. It's that it's, the area that was designated as amusements is now going to be a show and shine. Race into winter 603 diesel show and shine. And that's the only thing I see different in the plan set.

1:31:48Speaker 5

Last time the police chief commented, right?

1:31:53Speaker 9

It was about the way they were going to do the alcohol.

1:31:57 – 1:32:08Speaker 10

I mean, I'm just letting, it seemed to be a good topic. I'm letting you be aware of this is the meeting that's taking place. If you'd like to attend, you may. If you want to do a comment letter, you may.

1:32:09Speaker 4

That's completely up to you.

1:32:13 – 1:32:36Speaker 1

Yeah, if I could just say one thing about this, and I don't think we should necessarily talk about it too long. largely falls outside of our purview, but just kind of like putting my citizen hat on for a second, you know, because we did make our thoughts known last year. And I could be wrong, but I don't think Chief Doty actually, I think that he kind of abstained from commenting on this, if I recall correctly.

1:32:36Speaker 10

I think you are correct.

1:32:37 – 1:33:43Speaker 1

Yeah. My concern, my main concern about this, and I don't know if it was an issue last year, so I would want to hear more about it. My concern was that they allow people to bring, so for their alcohol policy, as long as your alcohol fits in a certain container, you can bring it in. And that is something that really concerns me, because if the standard is just, like, as long as it fits in here, it's fine. Like, somebody could put, like, a handle of Jack Daniels in there, and, you know, it's just that... So I don't, and I don't think that policy was changed last year. I don't, I could be incorrect, so I just want to preface it that I don't want to give any false information. But so just more as a citizen, not really as a playing board member, but as a citizen who's concerned about inebriated driving, drunk driving, I just wish that they had a, you know, one thing we floated to them last year, and maybe this is too expensive for them, but something like a beer garden.

1:33:43Speaker 10

There are two on the plan.

1:33:45Speaker 1

Oh, there are? Oh, wait, what? Yeah.

1:33:46Speaker 10

Yeah, I was going to interrupt you, but you're on a flow, dude. You're on a flow. I didn't want to tell you.

1:33:51Speaker 1

Well, that is really good to see because that was something.

1:33:56Speaker 10

The policies changed.

1:33:57Speaker 1

Okay, good. Because a beer garden is so much better because it's controlled. It's like beer and wine rather than liquor and stuff.

1:34:05 – 1:34:16Speaker 10

Yeah, and they also eliminated the camping thing. It's a very small camping area for racers because they travel long distances to attend this.

1:34:17Speaker 1

Oh, I see it now. Yeah, the two beer gardens.

1:34:18Speaker 5

They also have a police tent for the police.

1:34:23Speaker 1

Well, it sounds to me like they're being really conscientious.

1:34:26Speaker 9

And fire an ambulance. I think the issue was that you can bring in your little six-pack container. but then you can go back out to the parking lot and refill it.

1:34:34Speaker 1

Right, right, right.

1:34:37Speaker 10

And the supply of one-foot containers.

1:34:41Speaker 10

MVT? I'll point to it, sir.

1:34:44Speaker 4

Next is in the ear garden, it says MVT.

1:34:50Speaker 10

Motor vehicle tent? There might be motor vehicles displayed for sale? Displays? That would be my guess.

1:34:59Speaker 7

Also, do we know what a show and sign is? What's show and sign? Show and shine. Show and shine.

1:35:05Speaker 4

It's usually antique car. It's a car show.

1:35:10 – 1:35:32Speaker 4

So basically, they're trying to draw other people in. And I can tell you, I know I've touched base with some of the Jeeps. And that's one of the things that they were looking at over there. In the 30 some odd years I've been here, I've never been to this drag strip, but then again, I've been to the drag strip once, and that was to receive the free drop-off.

1:35:33Speaker 10

That's the craziest thing I've ever heard in my life. But you have to go to one. You've got to go to at least one.

1:35:40Speaker 4

I like my ears. I hear enough from my house.

1:35:43Speaker 1

I mean, shout out to Fremont. It really seems like they're taking the public opinion into account, and they're being very conscientious. So I think that's cool.

1:35:50 – 1:36:10Speaker 4

How does it work with the media? The same family that owns this, don't they own the store that's on 125? Yes. And I know they have that huge tent that's on 125 in Brentwood. Yes. Do they have, and I see that it looks like they have trails that go out to the back. Does it cross back and forth?

1:36:10Speaker 10

It does. Let's not do that.

1:36:14Speaker 9

Do they do that on a tram?

1:36:15Speaker 10

Yes, they put this on, yeah.

1:36:17Speaker 9

They bought a tram. They were going to run shadows back and forth. That's what I was thinking.

1:36:21Speaker 4

Is there something that you guys look at? Of course. How that works going back and forth.

1:36:27 – 1:36:40Speaker 5

I had a question about that. I think you were going to pull the plan up at one point to see because it seemed like there's a tractor trailer there that semi-permanently.

1:36:41Speaker 12

There's no site plan on that store.

1:36:44Speaker 5

There's no site plan?

1:36:48Speaker 12

Came through as a farm stand. That's a farm stand? Yeah. It was an agricultural endeavor.

1:36:58Speaker 4

If Applecrest did that, when they put in the new restaurant, it's a farm restaurant.

1:37:04Speaker 10

We didn't get any plans set for that.

1:37:08Speaker 4

That's a pretty big building.

1:37:11Speaker 5

Is the tractor trailer a farm use?

1:37:17Speaker 4

I guess if it was holding hay, it would be.

1:37:19Speaker 5

No, it looks like it's for events, but I guess if it's a... Looks like it's for events? It's next to the tent.

1:37:29Speaker 10

Well, they had a customer appreciation day and did a big chicken barbecue there.

1:37:33Speaker 12

Did they use the trailer at all during that? Did they use the trailer? Did they keep the tent up just for that one day?

1:37:39 – 1:38:03Speaker 10

Well, it's been up ever since that day. And I know you have, I don't know, I believe that in order to have an event with that tent, that bigger tent, that you need to have a permit from the Brentwood Fire Department. It's something about they have the purview over large tents that way.

1:38:03Speaker 4

And parking space, right? Wow. I mean, that tent is about as big as the building.

1:38:08Speaker 11

I think we're kicking a hornet's nest.

1:38:10Speaker 4

I'm just curious. I mean, I know those properties are connected, so I was curious how that works.

1:38:18Speaker 10

That is not a legitimate roadway.

1:38:20Speaker 4

No. But if they're driving through the backwoods.

1:38:28 – 1:39:20Speaker 5

OK. I did not know there was a plan there. OK. Budget for 2027. So I mean, we really picked this apart last year. I don't, I guess the only question I have is we moved legal to sort of the town's expenses. Can we do that with other things? Can we just have pooled office supplies and pooled? I know that we have our own mailing cost, postage cost. I guess we don't even have that. We just always have some of these little things that don't maintain, I don't know. But I didn't have any major changes. We need to make.

1:39:20Speaker 4

If you got rid of postage. and you move some of the other stuff over. One, two, three, four, five.

1:39:30 – 1:40:50Speaker 10

There are some accounts there that just have a dollar in them, they're just placeholders. I would suggest just leaving them. Because once you eliminate budget lines, it can be difficult to put them back on. Here on the screen, you're gonna see our budget module. This is the new budget software that I, we, are gonna be using to, control our budget, to make edits to our budget. I'm kind of just in the infancy of learning how to use this software, but it is quite good. So we'll go to engineering and surveying. You can see what we spent throughout the years on engineering and survey. Here's our budget. It was knocked down to, you know, in 2025. uh... two hundred dollars and we end up spending two sixty uh... so then we brought it up to six fifty in that line i can even click on this line oops uh... two thousand twenty six details down here i don't think there are any details to really show well it says we've spent let me show you some try to find one that it says we've spent yeah not to rip a scab off but

1:40:52Speaker 9

How much can we trust the numbers when the reconciliations haven't been done for 2025?

1:40:58 – 1:41:19Speaker 10

I can tell you I have been through our budget module. I've identified a few things. When we get to the consent agenda, there's a check to the town of Brentwood for $750 because I wanted things removed from our budget line that didn't belong there. Okay?

1:41:21 – 1:42:25Speaker 10

They were placed there because of the union leader was billing us, but those bills never got to my department. They were being paid and just put on a budget line when they shouldn't have. That needs to come out of the escrow. I have collected money for that purpose, and I've corrected these inconsistencies. What we need is good policy. We need good accounts receivable. to identify bills and direct them to the correct department. Our budget's relatively small and it's relatively easily to track it. If I'm opening this module once a month and just taking a look at it, I think that's the best course of action. It's just eyes on and it's not difficult when you have a few minutes to click a few lines and just to make sure. that things are being reported and done well.

1:42:26 – 1:43:35Speaker 4

We did find out the other day from Linda, she gave the select board kind of a review, and I wasn't aware that we had this many accounts, but you have 30 different accounts that they have and 200 things that fall within those. So, and from the audit that we had done, It was mismanaged for the 24, 25, 25, 23 to 24, 24 to 25, 25, probably coming in to 26. So there's a lot of corrections and edits. She's gone through 24 of those accounts. and straightened out those checkbooks. She still has to go through the six largest checkbooks. And just making sure everything's put where it needs to be. And I think Mark is doing a good job right now of going through and finding some of these things.

1:43:36 – 1:44:05Speaker 10

As you can see by the 2022, 23, 24, 25 and 26 budget, this is a ZBA budget of advertising and notices. There should be no red in that whatsoever. All of that should have come out of my escrows. So what I'm gonna do is I'm gonna backtrack and we're gonna fix 2026. There's a check in here that I will pay to the town of Brentwood and I will have that budget line removed down to zero.

1:44:05Speaker 9

So she says we have $83,000 on hand for the planning committee that includes our escrow accounts. That was the number she gave the other night.

1:44:21Speaker 5

Just all the fees that have been coming in?

1:44:23 – 1:44:57Speaker 10

That's what she's talking about within our budget itself. That's money left over. I mean, Glen and I haven't been completely paid for the year. That our planning board checking account is a completely separate account than what you see in any of these budgets. It is not accounted for within the budget. That is a completely separate conversation at some point that's going to come to an extreme head. And- Do you think it would match up with this? Well, no.

1:44:57 – 1:45:18Speaker 5

No, so the escrow accounts are applicants, but money- She says 83 grand on hand, it should match up with- Well, it sounds like in the past, somebody pays a fee, right? An application fee that is supposed to offset the town's costs, and it was going into our budget.

1:45:18 – 1:46:55Speaker 4

I think what they were doing is they were using it, the cliff note version, I guess, would be you have your general account, and people got a little laxed or lazy and just took things out of here, and it didn't get put where it needed to be, so you knew that, so that $83,000 that you guys see, she mentions, might be inflated or underinflated, because where did they put the bills they were supposed to? Were they dumping them to the town clerk? And they should have been putting them over there. So we found that we had, there was money that came in, for example, for the first night out, and that money was donated for body cams. But they just dumped it into the general fund. No, it had to be moved. So we spent $40,000 on body cams. We got a donation from whatever, a couple checks. But nobody moved that money over to the body cams. It was dumped into the general fund. Well, it needed to be moved to offset what we spent on the body cams. So then that gets put back. In a way, it gets dumped back into the general fund. But it made it look like we spent $40,000 Just to pay for these things. We had some grants and stuff like that that came in. So I would say it was just misentered.

1:46:56Speaker 9

And I understand that that's why I was just asking the question, because if the $83,000 is wrong, and then I didn't know if that was backfilling the data you're getting on your account history.

1:47:07 – 1:48:08Speaker 10

I don't know where she's getting that figure, whether she's including our checking account within that figure. That's something I need to sit down and talk with her about. I have identified these problems for probably about two years, and I have been bringing them to light for probably two years. And we, as a town, I completely understand the enormity of the problem here okay our end of it as far as is is small in comparison to the big picture and i and i understand why we've been pushed to the back burner it's not like i don't know these things exist it's not like i'm not keeping very careful track of all my escrow accounts. I have spreadsheets for all of them. I can prove where every dime went.

1:48:08Speaker 9

That's not what I meant, Mark.

1:48:09 – 1:49:20Speaker 10

I know, but this is an important conversation that we need to have as a board because our, I am, I am. He's fiduciary responsible. Correct, I need to provide you with the proper information, right? And you rely upon me to keep track of all this. And if I was to tell you that it was in perfect shape and great, that would be a lie, okay? We intake money, okay, from applicants for a fee and it lands in a checking account, but it's never taken out and put into the general fund. There needs to be a system in place that tracks all of this in a way does so in a manner that's transparent. And at the moment, that system doesn't exist. And I'm hoping as the new systems start to come into this building, we can build into that system something that resembles that.

1:49:23 – 1:49:59Speaker 5

So I think, you know, for our budgets, because it is pretty small, that we know for the last few years that the largest line items, you know, we had the budget and the money went out. Wages, town planner, Rockingham planning dues. So we, you know, and we have $48,000 to go for the year. So if we have $80-some thousand, it's not... It's not because this stuff was misallocated. I think it's more what Mark's saying is that we had revenue, and it was just going into the planning board account.

1:49:59Speaker 4

It was basically or being dumped into the general account.

1:50:03Speaker 11

One of the things that came up- Well, I think that's where it's- It never gets jumped into the general account.

1:50:08Speaker 4

But they were- They were dumping it into whatever, you know, oh, that works, we're gonna dump it here.

1:50:13Speaker 5

It's a planning fee, so they just threw it in our budget when it should have.

1:50:19 – 1:50:41Speaker 4

They also had envelopes, which I was horrified to find out, there was envelopes from 2024 that had never even been opened. So there's a lot of stuff that has to be, again, the auditors found mismanaged. You can't just take a bunch of envelopes, stick them in a drawer and then hope it goes away. That's like a nightmare for accounting.

1:50:42Speaker 5

So I'm gonna say this.

1:50:45Speaker 4

You name it, it's everything, bills, IRS notices.

1:50:51 – 1:51:45Speaker 5

I'm gonna put this out there. if it turns out, when all this is done, that there's revenue that's been sitting in our checking account, that's revenue from fees that we collected that hadn't really been accounted for. We do have things that we need to spend, like the, what's the thing that we need to recalculate? Master plan? No, not the master plan. Impact fee. impact fees so we're going to need to pay somebody to redo the impact fees so if there's some money there then let's talk about that so the because otherwise we're either going to have to ask for an increase in our budget or do a warrant article so if we can allocate some of that money to some expenses that we know that we're going to have before they get spirited away well i don't think right now we're not looking at spirit anything away

1:51:46Speaker 4

One of the things that we're looking at is can we just get where it needs to be so I know what I actually have.

1:51:53 – 1:52:13Speaker 4

And so now it's kind of like, okay, I see where you spent $124,000 more here than you should have. Oh, but you have to allocate it to where, did we have enough money where you're supposed to be allocating it or did we just overspend? And then it's really a matter of getting a flat line, right? Yeah. Here's where you guys are supposed to be. Now we can move on from this.

1:52:14 – 1:52:36Speaker 4

There's one of the things that we're running into right now is we found out we can't take out bonds because we're so far behind on our odds. So we can't apply for a bond. Can't get money. And I know some people are like, well, we'll just do the Warren article. I'm like, okay, so I'm going to go apply for the mortgage, but I can't get one. Why would I apply?

1:52:36Speaker 5

It's the bank.

1:52:37 – 1:52:48Speaker 10

Okay. We'll be kind and... What we kind of need to do this evening is just stay on track about our proposed budget for this year. And it just won't take long if we just stay on track.

1:52:49Speaker 10

So I don't know the wages at this time. Would you like to edit that line?

1:52:57Speaker 5

Not live. I don't want to go through all these live. I just want to know, are we missing anything? Does anybody?

1:53:05Speaker 10

Well, I'm supposed to have a budget by the 18th. Like tomorrow.

1:53:16 – 1:53:29Speaker 10

We didn't have a meeting, the last meeting. This is a mandate from the budget committee. I'll let that be what it is. If we don't have one.

1:53:29Speaker 5

So that's preliminary rough? Can you just go through and add 4% as a placeholder right now for everything?

1:53:39 – 1:54:03Speaker 10

well we can like we can forget about the wage lines for at the moment we can get rid of the the low-hanging fruit we can go you know there's five hundred dollars professional training do you want to increase or decrease decrease that line yeah what i'm saying is i don't i mean we haven't really thought about this and it's pretty early this is earlier than normal

1:54:03Speaker 11

I would say so, yes, but I didn't.

1:54:06Speaker 5

Then I would just add 4% to everything across the board, and then we'll.

1:54:10Speaker 10

Professional training right down the whole line?

1:54:14 – 1:54:33Speaker 5

Everything. There's gonna be more steps, right?

1:54:34Speaker 11

I'm sorry, could you come to a microphone, sir? I apologize. Thank you. Because this is riveting for the people at home. Nope.

1:54:41 – 1:55:20Speaker 2

Doug Finnen, alternate on the select board. One of my planning board. Thanks. The select board has not come back with a wage amount as it stands right now. Our cap is 4%. I agree with Madam Chair that if you look at every category on 4%, we address the select board that way. they can make those adjustments accordingly. The budget committee can make those adjustments accordingly. You're better off going, in this case, level funded at 4% versus each category either. Don't deal with it.

1:55:20Speaker 4

Don't say level funded, Doug. It's not level funded.

1:55:24Speaker 2

You are correct.

1:55:24 – 1:55:39Speaker 5

I stand corrected. And these are our biggest costs is we haven't gotten dues from Rockingham Planning Commission yet. Correct. So we don't know if they're staying. I mean, they took a little bit of a jump last year.

1:55:39Speaker 1

It's probably going to be like $5,500 as opposed to $5,300.

1:55:47Speaker 7

It's going to go up a little bit.

1:55:48Speaker 1

By about $200.

1:55:50Speaker 7

That seems high to me, but whatever.

1:55:52Speaker 9

I mean, on printing, we haven't expended anything, so I just take you doing all your printing in-house, and it comes out of town office funds.

1:56:01Speaker 10

I did buy some printing supplies.

1:56:07Speaker 5

It hasn't shown up.

1:56:08Speaker 10

I thought I did.

1:56:09Speaker 4

Reconciliation.

1:56:13Speaker 4

I don't care where it went.

1:56:17Speaker 11

As long as it's not here anymore. It was this line here at zero. It has been moved.

1:56:22Speaker 5

Oh, so this is not.

1:56:23Speaker 4

360? Yeah. Okay. Yes. It went to Roadman.

1:56:27Speaker 7

Which one are you talking about?

1:56:29Speaker 4

Engineering and survey.

1:56:31 – 1:56:46Speaker 5

Okay. Yeah, I guess it's kind of a question for the, well, does it make sense for the town to have separate printing and office supply budgets for every department?

1:56:47Speaker 4

Well, the problem is you only have the, well, the office supplies, you've got 225. Do you have anything specific, I guess, Mark, that's really just your supply?

1:56:57Speaker 5

I told him to buy a chair because I think it's semi.

1:57:00Speaker 10

Yeah, I did get a chair this year and a mat.

1:57:05Speaker 5

But where did that money, did it come out of the general fund?

1:57:09Speaker 4

We don't know.

1:57:10Speaker 11

I think it came out of office supplies for the office.

1:57:14Speaker 5

That's what I'm saying.

1:57:15 – 1:58:43Speaker 10

Like, I mean, this $34, like this is pretty cool. So if I go to 2025 detail, it'll tell me what that was. It was W E Mason. So when we were doing, uh, uh, the grant stuff, I wanted an extra pack of 11 by 17 paper, you know, a couple of packs of that. Um, I'm going to be reprinting all your books very soon, which that's a lot of paper. They send those out. And I want to get binders, new binders, because probably your binders are all beat up. So there's going to be stuff that I'm going to need to be purchasing. But here's the dig, right? I can't, I don't have a credit card that I can run down to Staples and buy stuff. And this is where we need a process in place where What I should do is take that receipt, like I can get the town administrator's credit card or even Daphne's and take that receipt and then write on the receipt the exact budget line that I want that receipt going to and then submit it. And that way it goes right on your budget line and that's a way of tracking it. And I don't think There just needs to be a process in place for everyone to adhere to.

1:58:43Speaker 4

So if you were doing those planning board books again, that's specific to your budget, so the 225?

1:58:50Speaker 10

It should be. It should be specific to my budget. That's what I'm saying. It should be.

1:58:54Speaker 5

Is that something you're sending out to get printed? It's not using the copier?

1:58:58Speaker 10

No, I'll use the copier. Here. Oh. It's wonderful.

1:59:02Speaker 4

But you're going to...

1:59:04 – 1:59:21Speaker 10

I could buy extra paper. I could lessen the load because Jillian sort of predicts what we're going to need for paper every week, right, of everybody's needs. But if I start printing books out for everybody, that's going to exceed the need, right?

1:59:21Speaker 5

And it's different colors, too.

1:59:24 – 2:00:09Speaker 10

It's going to be a big production when I do it. Now, the reason why I'm going to use the town printer is because the ink for that is free. It's in our contract. We have a contract for that printer where if you run out of ink, they replace it. They pay for it. So why would I go send this to a print house when I can pick away at it here at work a little bit? Print two books this week and that. You know what I mean? Sort of stagger that out a little bit. And then I think it's cheaper. And it's a really good printer, by the way. It'll... I think it might even punch holes for me. I'm not sure. We'll look into it. It'll staple. It does a lot of things, but it won't staple thick stuff like this. But any who's, I degrade.

2:00:13Speaker 5

Glenn, are you up to date on submitting your bills? Because your budget is only at 45% and it's September.

2:00:22Speaker 12

I was two months behind.

2:00:24Speaker 5

You've caught up? Okay, thank you.

2:00:28Speaker 10

You did those yesterday? You did not send them to me, sir.

2:00:33Speaker 10

Yes, I keep them in a file. If you could send them to me, I'd really appreciate it.

2:00:42Speaker 5

So one of the big discussions last year was about overtime. And is this correct, Mark, that none has been?

2:00:51Speaker 9

You've done a fantastic job. You've done a fantastic job managing your overtime. I'm serious.

2:00:58Speaker 10

No, that's a lie.

2:01:00Speaker 9

It says zero.

2:01:01Speaker 10

Yeah, I know, it's lying.

2:01:02Speaker 4

Okay. The professional training, are you planning on taking any classes?

2:01:07 – 2:01:42Speaker 10

Well, Doug, I just turned a receipt in for Doug. I might have a receipt. Well, you have to sign off on that. That's in your consent agenda. We'll just get that around. Anything that I'm putting on the budget line, you will sign off on. It'll be part of the consent agenda, and you will sign off on it. So I will be using that. We have the NHMA conference coming up. If anybody wants to go, let me know. Turn it off again.

2:01:42Speaker 4

It does that.

2:01:45 – 2:02:06Speaker 10

but it's not shutting the screen down which is a good thing because it's now running a team's meeting that i didn't join until 11 o'clock we could be here till 11 too oh please so yeah no um we'll try to do this quick so union leader

2:02:09 – 2:02:27Speaker 5

Us paying the town is reimbursing for things that should have come out of escrow accounts. That's two of these checks. Rockingham Planning Commission for books. Those are the law books. SFF engineering.

2:02:27Speaker 11

There's a bill on the back.

2:02:31Speaker 5

Is escrow covered?

2:02:35 – 2:02:59Speaker 10

Yep, that's right in the cover page. We'll tell you exactly how much money is left in it. Okay. And there might be a negative. I've had a conversation with Mr. Falzone. We are working out his escrow account. I've sent a message, an email, which I'm going to have to go down in person again to the Lambert property. and collect some money to refill their escrow.

2:03:00Speaker 5

Okay, so you're talking to him about the fact that there's a pretty significant negative balance.

2:03:04 – 2:03:22Speaker 10

That's Mr. Falzone. Yes, I had a long conversation on the phone with him. That's one of the things that we need to get straightened out, that someone needs to get into our QuickBooks, and I've been asking for a year to have someone get in there and tell me what's left in those escrow accounts.

2:03:22Speaker 4

So I don't think we use QuickBooks anymore.

2:03:24 – 2:04:36Speaker 10

Well, This has been an ongoing problem, Mr. Manigari, that I have been trying to address and have been extremely patient, which is going to come to a really ugly head. Because if it's not addressed, we're going to start accepting roadways on a development that I am not fully aware of what's going on. I have the proper accounting on my end in place. I'll be quite honest, I've been extremely patient and understanding of what has been transpiring here. But I am deeply troubled that I can't look at this group of people and tell them exactly what's going on with that. And I had to apologize to them. many times because of action that I need to take place that's just not happening.

2:04:36 – 2:05:01Speaker 5

So we have escrow account money come in. Mark's keeping track of it. He's got files with checks and receipts and everything that shows it's a $10,000 escrow. They've spent $8,200 in engineering or whatever. But the actual accounting of that, the banking part of it, he doesn't have control over and visibility into. Is that Linda?

2:05:01 – 2:05:15Speaker 10

Linda would be the one that could help straighten this all out. But I know the workload she's under, Mr. Maggiore. And I'm completely understanding of what's going on in there. But I'm getting.

2:05:15Speaker 5

But we need to fix it because it has to do with.

2:05:20 – 2:06:14Speaker 10

I'm getting to a point where I don't want to be accepting roadways with being this far behind in an escrow and not being able to clear that up with Mr. Felzon. He's completely understanding. He's sending me all the bills that he can find on the TEC end of it, but I need to know where did that leave off. I need the balance that was in that QuickBooks account so I could transfer that balance over to my, not even into my spreadsheet, where I can submit to him, this is exactly what you owe us, sir. And he will gladly cut me a check. But I want to be as transparent and as upfront with this board and him, and I just want this settled. I just want it settled. Doug?

2:06:16 – 2:06:36Speaker 1

So just in the interest of, you know, kind of action steps and moving things forward, so are we in agreement as a board that, you know, we're comfortable empowering MARC to put together, like, a preliminary budget with the 4% threshold? And that'll be kind of, you know, there'll be more work, of course, preliminary.

2:06:36Speaker 5

Yeah, I think we can describe it as a placeholder. We don't have the RPC bill.

2:06:42Speaker 1

I know it's, I need to get the exact number from Dave Walker. I know it's going to be around $5,500, so about a $200.

2:06:49Speaker 5

But until we have that specifically and Glenn's new contract and whatever the town's going to do with labor. We'll change it this year.

2:07:01Speaker 10

I will add 4% to Mr. Greenwood's contract.

2:07:04Speaker 5

I think that's the easiest thing. Well, not just the easiest thing. I think that's the best thing to do now until we have all the information we need.

2:07:11Speaker 1

I'll follow up with Dave to make sure we get the exact number, but it's going to be around 55.

2:07:14Speaker 10

And I will use 5,500 as the placeholder.

2:07:18Speaker 4

All right. Just say it's a preliminary budget.

2:07:25 – 2:07:44Speaker 5

Okay. But keep in mind, everybody, that if you go to a professional conference, one of the planning conferences, NHMA conferences, that has to do with what we do here, you can get reimbursed. Yeah. And if you want to do anything before the end of the year.

2:07:45Speaker 10

I might be going to one day of the NHMA. I like to go through the pamphlet and pick out. a program or two that I would like to see and go for one day.

2:07:53 – 2:08:16Speaker 5

Okay. And then we do have, you know, $650 for engineering that we put in there last year. I feel like we get questions all the time. It's usually big stuff, though. It's not something we can solve with $650, but... If there's anything specific that we wanted them to do for us, not for applicants, let's figure that out.

2:08:16 – 2:08:33Speaker 10

Yeah, I thought the fire department things may have to go there. It's nice to have that money just in case we run into a quandary of a site plan review regulation or you never know what's going to come down the pipe. But I will add 4% to everything.

2:08:33Speaker 5

Okay, thank you. Many minutes?

2:08:38Speaker 11

Oh, we have a motion and a second.

2:08:43 – 2:08:55Speaker 5

It's going around. It's going around. I signed the MILRs, if anybody else would like to sign, they're over there. It's 9-10, anything else?

2:08:56 – 2:09:51Speaker 1

Yes, so as the consent agenda is going around, I'll be very quick with my RPC updates. I know it's been a long evening. So just a couple quick RPC updates. We already discussed there last week that the 10-year plan, the governor's veto was overridden. So the 10-year plan is going into effect. STILL UNDERFUNDED BY AN ENORMOUS AMOUNT OF MONEY, SO WE'LL SEE HOW THAT, YOU KNOW, WE'LL JUST HAVE TO SEE HOW THAT PLAYS OUT. WE ARE BEGINNING, YOU ALL GOT A MESSAGE, OF COURSE, ABOUT THE PROJECT SOLICITATION PROCESS. AT OUR LAST MEETING, WE SET OUR PRIORITIES FOR THE UPCOMING TENURE PLAN AND WE MADE THE CUT. So the intersection between South Road and 125 is once again a top priority for the RPC for this next cycle.

2:09:53 – 2:11:26Speaker 1

Well, so that's what we need to discuss further with the community, frankly, because something that came out of the gas adhering And we talked about this at the RPC. You know the gas securing people were divided. I mean, there's no way around it and so The way that we're framing it in terms of our you know RPC priorities We want to make improvements to South Road and 125 It could be a roundabout it also could be maybe a signal to complement the turning lane that has already been put in there and So what's going to be important for us? And I know people hate when we solicit public comment because they're like stop asking us stuff But like this is something where we do need more public input in terms of what the community really wants to see In terms of improvements for that intersection, but it is going to be it's going to continue to be a top priority for the RPC Doesn't it a lot of it up to DOT? A lot of it is, but they do take community input very, very seriously, like genuinely, not fake. So that's something that we're going to continue to work on and come up with a solution that people in Brentwood can get behind. I do think that the turning light has made a huge difference. I personally think that further improvements are necessary, and we as a community can come together and hash out some of those solutions, but the RPC has our back.

2:11:26 – 2:11:38Speaker 5

Okay. Awesome. Thank you. So there was an email going around about... input from the town and you were, were you guys meeting or?

2:11:38Speaker 6

We haven't heard, I haven't heard back.

2:11:40 – 2:12:05Speaker 1

Yeah, so I had floated, so I haven't, I don't know if anybody really responded to this, but I had floated the idea of maybe doing like a work session or something to kind of hash out what we want, you know, what that public outreach would look like, what some of our preliminary thoughts might be. In that email chain, I did throw out the idea of a work session, and I'd be happy to do something like that with folks. And not just a planning board, but select board members. Yeah, yeah. Stuff like that.

2:12:05Speaker 6

Select board another town.

2:12:09Speaker 6

representatives, it shouldn't just be planning board.

2:12:11Speaker 1

Agreed, totally agreed. And members of the public, obviously it would be a public thing.

2:12:16Speaker 5

Maybe we can revive that email thread. Yeah, do you want to do that? And I just didn't want to, because I think it's the town that submits something, but I wanted to make sure that you were.

2:12:24Speaker 6

Yeah, now's our chance to just kind of think about our priorities and update them with RPC and seek more funding.

2:12:32Speaker 4

So they're looking at putting like just a flashing light, because I think they had one at our board, didn't they?

2:12:40 – 2:12:54Speaker 6

This is like a separate issue. The South Road intersections, now they're pushing that forward, but they're also soliciting other priorities in the town that we want to seek funding for in the future.

2:12:55 – 2:13:06Speaker 1

But on the South Road thing specifically, one of the ideas is like a signal light. The roundabout is another idea, but the signal will be like a more modest measure to complement the turn light.

2:13:06Speaker 4

I know that DOT, I think we had a I think we had a street light there at one point.

2:13:11Speaker 7

I don't think so.

2:13:12Speaker 4

See, I thought there was a street light and then they removed it. They saved $5,000 by removing this light. Electrical cost.

2:13:22Speaker 9

30 years I've been here, I don't recall.

2:13:25 – 2:13:46Speaker 6

Another quick RPC item. The TAC meeting is next Thursday from 12 to 2. That's the one I usually attend. I have a conflict if anyone here would be interested in You can go in person and have pizza, or it's also virtual. So think about it, let me know.

2:13:47Speaker 1

Yeah, we can connect offline. What was the time?

2:13:51Speaker 6

Next Thursday, 12 to 2.

2:13:53Speaker 1

OK. Yeah, that might conflict with my work. But we can talk offline, yeah.

2:13:58Speaker 5

OK. Any other business from the board?

2:14:04Speaker 1

I'll make a motion to adjourn.

2:14:07Speaker 4

Non-negotiable.

2:14:08Speaker 5

Aye. All in favor? Aye. I took that as a second. I guess Bob was the second. All right, hold on.