Bpda Board of Directors - Regular Meeting

Tuesday, September 8, 2026

The Zoning Board of Appeal approved numerous residential and commercial projects, including adaptive reuse of a bank for a municipal court and several multi-unit conversions. Two proposals for new residential construction were denied without prejudice due to significant community opposition and concerns about site planning and density. The meeting was also marked by persistent technical difficulties.

About this meeting

Government Body
Bpda Board of Directors
Meeting Type
Bpda Board Of Directors
Location
Boston, MA
Meeting Date
September 8, 2026

Transcript

772 sections

2:29•Speaker 3

Recording in progress.

2:37 – 5:25•Speaker 41

Good morning. The City of Boston Zoning Board of Appeal hearing for September 8, 2026 is now in session. This hearing is being conducted in accordance with the applicable provisions of the open meeting law, including the updated provisions enacted by the legislature this year. The new law allows the board to continue its practice of holding virtual hearings through June 2027. This hearing of the board is being held remotely via the Zoom webinar event platform and is also being live streamed. order to ensure this hearing of the board is open to the public members of the public may access this hearing through telephone and video conferencing the information for connecting to this hearing is listed on today's hearing agenda which is posted on the public notices page of the city's website boston.gov members of the public will enter the virtual hearing as attendees which means you will not see yourself on the screen and you will be muted throughout unless administratively unmuted when asked to comment. Board members, applicants, and their attorneys or representatives will participate in the hearing as panels, and they will appear alongside the presentation materials when speaking. Panelists are strongly encouraged to keep video on while presenting to the board. As with our in-person meetings, comments and support will be followed by comments in opposition. The order of comments is as follows. Elected officials, representatives of elected officials, and members of the public. The chair may limit the number of people called upon to offer comment and the time for commenting as time constraints require. For that reason, the board prefers to hear from members of the public who are most impacted by a project, that is those individuals who live closest to the project. If you wish to comment on appeal, please click the raise hand button along the bottom of your screen in the Zoom webinar platform. Click it again and your hand should go down. When the host sees your hand, you will receive a request to unmute yourself. Select yes and you should be able to talk. If you're connected to the hearing by telephone, please press star nine to raise and lower your hand. You must press star six to unmute yourself after you receive the request from the host. Those called upon to comment will be asked to state their name and address first and then can provide their comment. In the interest of time and to ensure that you have enough time to do so, please raise your hand as soon as Mr. Stembridge reads the address into the record. Do not raise your hand before the relevant address is called or the meeting host will not know to call on you at the appropriate time. We ask that you keep your comments brief and all public testimony will be limited to 90 seconds per speaker. Mr. Stembridge. Are you here, Mr. Stembridge? Okay, I'll keep going. Mr. Valencia.

5:26•Speaker 36

Good morning, Madam Chair, present.

5:28•Speaker 41

Good morning. Ms. Turner. Good morning, Madam Chair, present. Good morning, Ms. Barbaraza.

5:36•Speaker 7

Good morning, Madam Chair, present.

5:38•Speaker 41

Good morning, Ms. Wewell.

5:40•Speaker 7

Good morning, Madam Chair, present.

5:43•Speaker 41

Good morning, Mr. Langham.

5:45•Speaker 50

Good morning, Madam Chair, present.

5:48 – 6:21•Speaker 41

Good morning. I'm going to circle back to Mr. Stembridge because I know they're here. Are you here with technical difficulty? Okay. We have a note that says Mr. Stembridge is present. So I hope we can hear you in a second because the floor is yours. All right. Waiting on IT for sound. Okay. We have to resolve that City Hall IT issue. All right, so let's wait patiently because we need Mr. Stembridge.

6:34 – 7:02•Speaker 39

Madam Chair, just FYI, people are still returning to the intersection. So sometimes if you call them, they will be not allowed to give themselves. So once again, if you are in the attendance section, please make sure that you are in the panelist section. If not, if you are in the attendance section, and I will send you the request yourself.

7:07•Speaker 41

Okay, so thanks for everyone's patience. Again, there seems to be a technical issue at ISD that is being addressed.

7:39•Speaker 14

Yes, Madam Chair. My name is Craig Martin from Hyde Park. I thought a gentleman, I think he was a board member, just spoke something about if you call in, be sure to do this.

7:51•Speaker 41

That is Jesus.

7:54•Speaker 14

There was just a little advice that a gentleman just gave. I didn't hear who it was.

8:00•Speaker 41

I think there are some people who are trying to.

8:03 – 8:19•Speaker 39

Go ahead. Sorry, Madam Chair. Yes, no, you are allowed to unmute yourself because I think your phone, so it's not allowing me to promote. But you're all set. I'm all set, okay.

8:19•Speaker 14

I thank you for explaining that.

8:35•Speaker 41

Are you able to hear me?

8:41•Speaker 41

Okay. Sorry. I seem to have had an audio problem. Okay. This is going to be a rough day. Okay.

9:48•Speaker 42

Madam Chair, can you hear me?

9:55•Speaker 41

Yes, I can. Eureka.

10:00•Speaker 42

Bear with us. We're trying to move forward. But yes, I am present. Yes, I'm here.

10:07•Speaker 41

Okay. Well, if you want to proceed without video, the floor is yours. If you want to wait, let us know.

10:17 – 11:18•Speaker 42

uh we'll we'll uh we'll proceed without video for the moment and then i will try and get ourselves um together again once we get help from my team for sure okay that sounds good so bear bear with me please I'm still here. I'm just trying to get in the right place. All right. We will begin today's meeting with the approval of hearing minutes scheduled for 9.30 a.m. These minutes are from August 11th. And with that, I will put forth a motion of approval.

11:20•Speaker 41

Thank you. May I have a second?

11:24•Speaker 41

Mr. Stembridge?

11:28•Speaker 41

Mr. Valencia? Yes. Ms. Turner? Yes. Ms. Pettibrasa?

11:37•Speaker 41

Mr. Langham? Yes. Chair votes yes, the motion carries.

11:41 – 14:52•Speaker 42

All right, next we have Next we have the extension scheduled for 9 30 a.m. There are 12 cases scheduled. I will read through all of them and then I'll read through if there are any questions we can address those after I finish reading for sure. First, we have case BOA 1349675 with the address of 4 Deaver Street. Next, we have case BOA 1599560 with the address of 729 Park Street. Next, we have case BOA with the address of 10 Thompson Square. Next we have case BOA-115-3496 with the address of 59 Hillock Street. Next we have case BOA-162-5948 with the address of 115 to 121 Boston Street. Next, we have case VOA 667111 with the address of 151 Liverpool Street. Next, we have case VOA 136... 1369555 with the address of 2207 Norchester Avenue. Next we have case BOA 1626437 with the address of 58 Cedrus Avenue. Next we have case BOA 1348765 with the address of 155 Portland Street. Next we have case BOA 1552342 with the address of 43 Hutchings Street. Next we have case BOA 1552344 with the address of 43 R Hutchings Street. And finally, we have case VOA 1398736 with the address of 5 Warren Avenue. Madam Chair, those are the extensions scheduled for today.

14:53•Speaker 41

Thank you. Are there any questions from the board?

14:57 – 15:40•Speaker 36

Yes, Madam Chair, I have a question for Caroline, and also I wanted to ask board members if they have an opinion about this. The case for the address 151 Liverpool Street. This is the eighth request for an extension. So I understand that this case has been extended over a period of six or seven years. And for the record, I wanted to ask Caroline how many times a proponent or a project can be extended and then ask my colleague board members if they have an opinion about how many times we can just keep extending cases.

15:42•Speaker 41

Well, I think the other question for Caroline is what's the alternative?

15:46 – 16:01•Speaker 36

Yes, exactly. What is the alternative? Just for general information, I know this case, they have their motives to request extension. I read that, and that seems compelling. But just for general understanding of the process, I wanted to ask, again, clarification about this. Thank you.

16:02 – 16:42•Speaker 2

Of course. So it's at the board's discretion to grant as many extensions as you would like. In terms of the Permit Extension Act under Governor Healey, any permit acted from 23 to 25 has an additional two years automatically. Um, so this would technically be like a formality. Um, but after 2027, um, the board, if for some reason the work, they still needed an extension, the board could grant it or deny it. And then, and if that case, the board did deny the extension, um, the permit would then be abandoned and they would have to reapply.

16:47 – 17:00•Speaker 41

Okay. Any other questions? Yep. Is that a question? Okay, if there are no other questions or discussion, may I have a motion to grant the extensions as requested?

17:02•Speaker 36

Motion to grant the extensions as requested.

17:06•Speaker 41

Is there a second? Second. Mr. Sammeridge?

17:13•Speaker 41

Mr. Valencia?

17:15•Speaker 41

Ms. Turner? Yes. Ms. Barabrasa? Yes. Ms. Wewell? Yes. Mr. Langham?

17:26•Speaker 41

Chair votes yes. The motion carries.

17:31 – 19:28•Speaker 42

Thank you. Next, we'll move on to the recommendations scheduled from the subcommittee. I'll read them all in. If there are any questions, we can entertain those at that time and then go from there. We'll begin with case BOA 1822390 with the address of 278 Washington Street. And I'll hold on and please let me interject that all of these cases were approved by the subcommittee as was this one. Next, we have case BOA 1839200 with the address of 587A East Broadway, which was approved. Next, we have case BOA 1807140 with the address of 269 Silver Street, which was approved. Next, we have case BOA 182-9000 with the address of 141-113 Northchester Avenue, which was approved. Next we have case BOA 183-3903 with the address of 107 Russell Street, which was approved with, um, with planning department design view. And Madam Chair, those are the recommendations from the subcommittee.

19:30•Speaker 41

We see you guys. Nice to see you.

19:33•Speaker 43

We're getting there.

19:35•Speaker 41

Any questions from the board? May I have a motion to approve?

19:43•Speaker 42

Motion to approve. Madam Chair.

19:47•Speaker 41

May I have a second?

19:49•Speaker 42

Second. Second.

19:51•Speaker 41

Mr. Stembridge?

19:55•Speaker 41

Mr. Valencia?

19:57•Speaker 41

Ms. Turner? Yes. Ms. Betabraza?

20:06•Speaker 41

Mr. Langham? Yes. Chair votes yes, the motion carried.

20:15 – 20:41•Speaker 42

Next, we'll move on to the building, to a building case. Building code case scheduled for 9 30 a.m. This is case BOA 1877958 with the address of 4 Haynes Street. If the applicants and or the representative are present, would they please explain to the board?

20:41 – 23:23•Speaker 19

Thank you, Mr. Stembridge. Thank you. Madam chair members of the board attorney Jeff Drago Drago and Toscano here on behalf of the applicant developer for Hain Street. I also have David freed from Choi who's here who designed the. Plans pretty straightforward case we're seeking building code relief. because this project, when it was originally approved, was approved for two private exclusive rooftop decks to be accessed by Hatch. That was something Zoning Board as well as the community had supported to keep the height at a reasonable level, and they frowned upon having additional bulky penthouses on top. This project was originally approved by a different developer and architectural team. The project was then sold upon after the project had already been granted an at-risk permit to Star Construction. It was re-reviewed. A new plans examiner, the old plans examiner, had left. found additional zoning violations that we actually had to come back to this board to grant relief. However, this building code variance request was missed. It was only brought up after the full permit was actually issued. So the permit was issued contingent now upon coming back to the board to grant that relief. And so to prevent a hardship, this building is already constructed. These are gonna be sold as condos. This is something that the community had asked for as well to keep to not have the penthouse the proposed alternative, which are shown in the plans is a low profile roof hatch access rather than. Full penthouse, the roof hatches bulkheads would be limited to approximately 30 inches above the roof deck, which is consistent with zoning limitations. Proposed 3 foot by 7 foot roof hatches. would have assisted opening hold hardware and all required guard rails as well this project was proved it was a four unit building and the top units these are exclusive roof decks as i mentioned only for those top floor units normally this could have been resolved at the board prior i understand but this was only brought to our attention after the was issued and we're hoping relief could be granted. I can pause the architects on the call as well. Thank you.

23:23•Speaker 41

Thank you. Are there questions from the board?

23:27•Speaker 43

One question, Madam Chair. Can you hear me now?

23:36•Speaker 41

Sorry, what was your question?

23:38•Speaker 43

I'm sorry, my question is just to make sure we're back on track here.

23:43•Speaker 41

Oh, okay, sorry.

23:45•Speaker 43

I thought it was a question for attorney.

23:47•Speaker 41

Okay, sorry. Any other questions from the board?

23:52•Speaker 44

No, Madam Chair, I had a chance to review the plans and the request seems pretty straightforward.

23:57•Speaker 41

Thank you. Okay, if there are no other questions or comments, is there a motion?

24:05 – 24:16•Speaker 44

Madam Chair, I'd like to put forward a motion of approval to approve a building code relief to allow for the hatches as opposed to the penthouse. May I have a second? Second.

24:17•Speaker 41

Mr. Stembridge? Yes. Mr. Valencia? Yes. Ms. Turner?

24:27•Speaker 41

Ms. Barabarraza?

24:32•Speaker 40

Yes. Mr. Langham?

24:35•Speaker 41

Yes. Chair votes yes. The motion carries. Good luck. Thank you very much, members of the board.

24:42 – 24:59•Speaker 43

Next, we'll move on to the hearing scheduled for 9.30 a.m. At this time, we'll ask if there are any requests for withdrawals or deferrals from the 9.30 a.m. hearing. Mr. Currier? Yes.

25:01 – 25:21•Speaker 15

Good morning, Mr. Stembridge. Good morning, Madam Chair, members of the board. My name is Ernst Giroir. You're appearing on behalf of the applicant for 26-30 Bird Street. With the consent of the board, I'd like to ask for a brief continuance. Madam Chair, you may remember this matter. Sorry, can Mr. Stembridge read the case into the record?

25:22•Speaker 41

I'm sorry. And actually, I'm sorry, you're asking for what? 26 Bird Street? 26 Bird Street, yes.

25:29 – 26:04•Speaker 43

so you'll have to wait until mr stembridge uh asks about deferrals at the 11 30 time frame uh we're asking about the 9 30 time frame right now i believe it was scheduled for 9 30 madam chair but i don't know why that type um as mad chair said that is scheduled for the 11 o'clock here i'm sorry so So yeah, if you, if I can find it now for sure.

26:06 – 26:18•Speaker 41

Okay, so are there any deferrals or withdrawals for the 930? With that, I'll turn it back over to you, Mr. Stemberg, then I'll see you.

26:19 – 26:41•Speaker 43

Hearing none, we'll move on to the first case with the 930, which is case VOA 187. 3156 with the address of 8th Mark Street. If the applicant and or their representative present, would they please explain to the board?

26:50•Speaker 28

I'm new. Good morning. Am I coming through?

26:57 – 27:46•Speaker 28

Thank you. I just hit the panel there. thank you member madam chairman members of the board mr lemus owner of 8 lawrence street as per the refusal letter this is a restricted area for a roof deck and i'm seeking relief for a proposed roof deck on a flat pitched roof we submitted the the plans as pursuant to what we're seeing here with the survey And we, according to the analysis conducted by the architect, David Choi, we meet all the dimensional controls by way of height, setbacks in the front, and the total building. And so we're seeking relief of the restricted roof area houses located in Charlestown, Mass.

27:49•Speaker 41

Can we talk about the size and the visibility from the street? How far is it set back?

27:54 – 28:16•Speaker 28

That particular, if we can go back one slide, please. That particular picture is a good dimension. On the bottom is the abutter side. On the right side is the main street, and it has a setback. I can't read that right now, but it looks like it's about 10 plus feet from the front, which is Lawrence Street. And in the rear, it also has a setback.

28:18 – 28:56•Speaker 44

and the total square footage is 250 square feet which remains within the far about 192. thank you other questions from the board hearing none may have a public testimony actually i i do have a question um and if it might be for bpd um are roof hatches allowed or would they need a relief as well for building code This is just the last case and it was missed. Are you on, Mr. Hampton? I see you.

29:05 – 29:34•Speaker 28

It's my understanding, if I may, input from my architect, because if we look at the same slide, if you go upward, there's two air conditioning systems, the condensers, and if you stay within the height, we have the roof hatch that's already installed as a means of accessing the HVAC systems that are up in the roof. If you stay within a certain height requirements, which we are, but right.

29:34•Speaker 44

I just propose correct.

29:36•Speaker 28

It's, you know, it's, it's existing.

29:38•Speaker 41

It's existing. Okay. I don't have any further questions. Okay, with that, may I have public testimony.

29:45 – 30:00•Speaker 26

Madam Chair and board members, good morning. Siggy Johnson with the Office of Neighborhood Services. This petitioner completed the community process. Our office hosted an abutters meeting on June 22nd at which no public comments were made. With that background, ONS defers judgment to the board. Thank you.

30:02•Speaker 39

Next we have Ashley from Councillor Flynn.

30:07•Speaker 33

Thank you. My name is Ashley from Councillor Flynn's office. Councillor Flynn would like to go on record in support. Thank you. Thank you.

30:14•Speaker 39

Madam Chair, we have additional comments.

30:17•Speaker 41

Okay, with that, may I have a motion?

30:24•Speaker 44

Madam Chair, I'd like to put forward a motion of approval. Is there a second?

30:28•Speaker 41

Second. Mr. Stembridge?

30:33•Speaker 41

Mr. Valencia?

30:38•Speaker 41

Ms. Betabraza?

30:44•Speaker 41

Mr. Langham? Yes. Chair votes yes. The motion carries. Good luck.

30:49•Speaker 28

Thank you very much. Have a good afternoon, everyone.

30:57 – 31:13•Speaker 43

Next, we have case DOA 1849569 with the address of 560 to 562 Tremont Street. If the applicants and or their representatives are present, will they please explain to the court?

31:15 – 32:07•Speaker 31

Good morning. My name is Chloe. I'm the applicant. And first off, I just wanted to think there's any word of appeals members for being here today. I believe this will be brief as I received an email on Friday that my ISD permit denial, which I spent the past five months appealing, was given an error. So my permit never should have been denied. I was asked to withdraw from the hearing, but I reached out to ISD to ask to make sure that my process could be dealt with in a time sensitive manner. I haven't received any communication from their offices. So I let the zoning office know that I didn't want to withdraw until I heard anything from ISD. And so just wanted that on the record, but I don't think I'm gonna need a ruling today. because I'll be going back to ISD, but I just wanted to say thank you again for your time.

32:08 – 32:25•Speaker 41

Okay, Caroline, can you confirm for the applicant? Yes, she is correct. We do not need to issue or refuse a letter. Okay, well, then do we need any motions here today? Nope. Okay, well, thank you for your time, and I'm glad it worked out. Thank you as well.

32:29 – 32:49•Speaker 43

With that, we'll move on to case VOA. one eight six four eight zero eight with the address of 460 west brockway this is an article 80 case and if the rep is if the applicants and or the representative are present will they please explain

32:50 – 36:56•Speaker 48

Yes, thank you. Mr. Stembridge, good morning, Madam Chair and members of the board. My name is George Maranci. I'm an attorney with a business address of 350 West Broadway in South Boston. I represent the petitioner Cedarwood Development LLC and its principals, David Winnick and David Mateo, in connection with the redevelopment of 460 West Broadway. Also joining today is the project architect, Shane Losey. This project is the adaptive reuse and construction of a two-story addition to the former South Boston Savings Bank building at 460 West Broadway in South Boston. This is a 1948 classical revival structure that is listed in the state's MACRIS inventory. The renovated and expanded building will become the new home of the South Boston Division of the Boston Municipal Court, together with office and administrative space for the Suffolk County District Attorney and the Office of Community Corrections under a long-term lease with the Commonwealth. This will replace the aging and outdated South Boston Court facility currently located at 55 East Broadway, a short distance from this location. On April 26th of this year, The board approved this project under article 80 E, small project review. The board memorandum that board members have in front of them sets out the development team design and community benefits in full. So I won't repeat those here, but I do incorporate them by reference. As I said, the project architect Shane Losey is here and he'll make a brief presentation on the design directly to the board and I'll therefore limit my testimony to the zoning relief the project requires. The project sits in an MFRLS multi-family residential local service sub-district within the South Boston neighborhood under Article 68. It is on West Broadway near Perkins Square. This is the neighborhood's principal commercial corridor where ground floor commercial uses and upper floor residential uses predominate. A courthouse and the accessory office space that comes with it is a forbidden use in this neighborhood, so the project does require a use variance. Preserving and reusing the historic bank building together with the two-story addition needed to accommodate the court and the office program also requires relief from the sub-district's height limitation, floor area ratio limitation, and yard depth requirements. Specifically, variants are needed for violations attributable to insufficient side yard setback, exceeding maximum building height, and excessive floor area ratio. The side yard setbacks are zero, which is an existing condition, whereas a three-foot side setback is required. The MFRLS sub-district's maximum building height is 35 feet, which I may say is almost entirely inconsistent with existing conditions on West Broadway. The proposed building height is approximately 49 feet, which is highly consistent with surrounding conditions. Likewise, the proposed FAR 2.85 is far more representative of the surrounding density than the 1.5 FAR allowed by code. Finally, the refusal letter cites a violation under Article 9, Section 2 for increasing by more than 25% the size of a building containing a nonconforming use. Here, the proposed courthouse use is the nonconforming use. This site sits directly on West Broadway where civic and institutional uses are already compatible with the surrounding commercial and residential mix. and the project preserves rather than demolishes a historic structure the development team worked diligently with the planning department the landmarks commission staff during article 80e review to ensure that the building's dimensions and design are contextually appropriate to the block and sensitively respond to the building's architecture. Madam Chair, if the Board would like a presentation on the design, I would turn the presentation over to Shane Locey. That is obviously the call of the Chair and the Board.

36:57 – 37:08•Speaker 41

Absolutely. So let me see if there are questions from the Board. I don't hear any questions from the Board, so let's move on to public testimony.

37:11 – 38:02•Speaker 20

and chair members of the board, Connor Newman with the mayor's office of neighborhood services. This time, the mayor's office defer to the judgment, this board, some background information, the community process. Uh, this went through a lengthy, uh, community process overseen by the Boston planning board. Um, it's involved for public meetings. Uh, last year, um, there were significant changes made after community feedback regarding the designer proposal. At 1 point, there was a residential component as well as concerns related to residents want to see more parking on site. The outcome made those changes. They worked extensively with gate of heaven, which is a non opposition to this proposal as well as meeting with St Vincent's lower end neighborhood association, which was very pleased. The existing facade was incorporated into the project. Presently we are, we understand that the community is very pleased with the direction of this project without defer to the board. Thank you.

38:07•Speaker 39

Thank you. I'm sure next we have Ashley from.

38:11 – 38:50•Speaker 33

Thank you. My name is Ashley from counselor Flynn's office. Counselor would like to go on record and support not only from the critical need for maintaining a presence for the trial court of the commonwealth. In our criminal justice system in South Boston. But also a community process with neighbors in a butters that resulted in a number of good faith compromises. This included removing the entire residential element of the proposal and 22 units originally proposed, reducing the height from six stories down to four stories, changing the design of the building and attention to other key quality of life concerns in the neighborhood. Thank you. Thank you.

38:56 – 39:28•Speaker 32

good morning um board the um i'm from the office of historic preservation the proposed scope of work at 460 west broadway in south boston includes adaptive reuse of an existing historic structure the boston landmarks commission would like to state our full support for this project which preserves an important historic building while providing a much needed new space for the Boston Municipal Court system. The applicant worked very closely with the landmark staff throughout their design process, resulting in an adaptive reuse project, which will serve as an important precedent for Boston's future development.

39:30•Speaker 39

Okay. Chair, we don't have additional comments.

39:35•Speaker 41

Okay. Any other questions from the board? May I have a motion?

39:46•Speaker 36

Is there a second?

39:50•Speaker 41

Second. Mr. Stembridge?

39:55•Speaker 41

Mr. Valencia?

40:00•Speaker 41

Ms. Betabraza?

40:03•Speaker 41

Ms. Wewell? Yes. Mr. Langham? Yes. Fair votes yes. The motion carries. Good luck. Thank you.

40:14 – 40:30•Speaker 43

Next, we have case BOA 1838044 with the address of 42 Lambert Street. If the applicants and or their representative are present, will they please explain?

40:31 – 41:34•Speaker 16

Um, thank you. Mr stembridge. Good morning. Madam chair members of the board Gary J. Webster, Jr development company. I'm also joined today by Dan for Gary senior associate at stack architecture and development. The proposed project before you is to combine the existing vacant lots at 40 and 42 language street and Roxbury. And to construct a new residential building with 2 townhomes and 1 off street parking space. On a combined 3,366 square foot lot. In a 3 at 4,000 zone, the violations on the consideration include insufficient off street parking lot area and an additional lot area. the floor area the floor area ratio is excessive an insufficient usable open space front yard and one of the side yard setbacks at this time i will turn things over to dan to discuss the design elements as they relate to the zoning violations but i'm happy to answer any questions you may have related to the project or community process at the conclusion of the presentation

41:46•Speaker 41

Is your architect on?

41:50•Speaker 16

Yes, he is on.

41:53•Speaker 41

Jesus, is he a panelist?

41:57•Speaker 16

I'm sorry. He said he's in the room waiting to be elevated. What is the name?

42:02•Speaker 39

I'm sorry, again?

42:03•Speaker 16

Daniel Fuggeri.

42:12•Speaker 39

Daniel, I think I allow him to unmute himself.

42:19•Speaker 41

He's still listed as a... Hello, can you hear me?

42:21•Speaker 47

There we go.

42:21•Speaker 41

Yes, we can.

42:23 – 45:11•Speaker 47

Sorry about that. Yeah, so this is a two-family townhome on the parcel here. And there was a lot of back and forth with neighbors and... the neighborhood group before coming to this meeting on setbacks. And so we've revised the project a couple times to appease our neighborhood group and abutters. We can go to continue scrolling. So yeah, this is the site plan. We have the main entry. We can keep, if you go back one, or go to the ground floor plan, which is two slides forward. Yep, right here. So this is the ground floor plan with entries to the units in the middle here with recessed front stoops. When you get to the ground floor, we have a, bedroom office space on the towards the street with a primary shared bathroom and dead on the back the next floor up the on the right side as well as the existing curb cut which is going to remain with the parking on the right side of the park property On the second floor is the primary living space with a powder room as you come up the stairs, the dining, kitchen in the middle, living towards the back with a small deck for each unit off the back. This top floor, we have the primary bedrooms with the primary suite towards the rear of the home and a ensuite bathroom and then a secondary bedroom facing the street. with a recessed deck. The street wall elevation, although the unit itself is mirrored, the top floor is not mirrored so that to provide a little more variation along the facade and to reduce the casting shadow on the neighbor on the left-hand side. And these are the typical building sections.

45:14•Speaker 41

Okay. Are there questions from the board? Hearing none, may I have public testimony?

45:23 – 46:28•Speaker 4

Madam Chair and members of the Board, for the record, my name is Jeremy Pembery. I serve as the Roxbury Community Engagement Specialist for the Office of Enabled Services. The applicant has completed the community process, which consisted of an abutters meeting facilitated on May 11th. With no opposition, many abutters voiced concerns such as parking, The proposal does not provide parking, but is filled to contribute to the congestion they currently experience. Another concern was the shadow the building may create, filling the size and scale is out of character for the neighborhood, as well as the design. Abutters pointed out the design's location of the first and second floor porches that are adjacent to the abutting property's bedroom windows, as well as the appearance of the front of the building that looks more suitable as the rear and vice versa. becoming more out of character for the neighborhood. Lastly, in a butter question, whether fewer units would be more suitable and if two units would be more in line with the neighborhood. Next, a proposal was presented to the neighborhood council who voted in support of the proposal. To date, our office has received three letters of support, including one from High Park neighborhood council. Thank you for your time and the mayor's office of neighborhood services would like to defer to the board for their judgment.

46:30•Speaker 39

Thank you. Madam chair, I don't see any hand threats anymore.

46:36•Speaker 41

May I ask the applicant to address any of those concerns?

46:40 – 47:07•Speaker 16

Hi, Madam Chair. Those concerns articulated by Jeremy, our design was in response to that abutter's meeting. So that abutter's meeting took place prior to this revision. We were originally proposing a 3D family building with no parking, and we then adjusted the plans to be a two-town home building with one parking space as a result of that abutter's meeting, of which then the community group issued a unanimous support letter. Thank you.

47:08•Speaker 41

Any other questions from the board? May I have a motion?

47:16 – 47:27•Speaker 40

Madam Chair, I'll put forward a motion of approval which provides the plan to be submitted to the Highland Park Architectural Conservation District Commission for design review.

47:28•Speaker 41

Thank you. May I have a second?

47:33•Speaker 41

Mr. Sembridge?

47:37•Speaker 41

Mr. Valencia?

47:42•Speaker 41

Ms. Betabraza?

47:48•Speaker 41

Mr. Langham? Yes. Chair votes yes. The motion carries. Good luck.

47:58 – 48:16•Speaker 43

Next, we have case VOA-185-6279 with the address of 66 Rutland Street. if the applicant and or their representative are present. Please respond to the board.

48:16 – 50:07•Speaker 9

Yes, thank you, Mr. Stembridge. Madam Chair, members of the board, my name is Timothy Burke. I'm the architect for the project, and with me at the hearing today are the owners, Gaurav and Naya Mittal. They have purchased this single family house as their primary residence and have embarked on a wonderful restoration of the house, bringing it back to its original beauty. It had suffered some decline. As part of the work, we are seeking permission to add a projecting balcony at the kitchen level on the back of the house that would be six feet deep and supported on brackets. And then also to add a dormer and a small roof deck at the roof level that would be very similar to our next door neighbor at 68 Rutland Street. And this space would provide some much needed outdoor living space and some living space on the fourth floor due to the slope of the roof and it provides much better bedroom space. We can go through the drawings if you would like to show on the screen. These are the floor plans with the balcony on the left. And then the next page is the upper levels that shows the roof deck and dormer for the fourth floor. This is an elevation of the rear that you see on the left-hand side of the screen that shows, again, the balcony and then the proposed dormer and roof deck, which that would have to be reviewed by the South End Landmarks District Commission as well. With that, I'd be happy to answer any questions that you may have.

50:08 – 50:23•Speaker 40

Thank you. Are there questions from the Board? I do have one question. Can you please remind us What's the setback is for the roof deck railing from the building's edge?

50:24•Speaker 9

Five feet is required, yes. Great, thank you.

50:29•Speaker 41

Any other questions from the board? May we have public testimony?

50:35 – 51:16•Speaker 3

hello madam chair members of the board my name is eva jones representing the mayor's office of neighborhood services regarding 66 redland street our office differs to the board's judgment the community process was conducted including an abutter's meeting held on 6 30 26 that was well attended by south and community members and feedback from this meeting was overwhelming support by their neighbors who felt that they were happy for the applicants and felt that the project was a good fit for the neighborhood Additionally, we did receive two letters in support expressing the proposal was a good fit for the neighborhood, and the proposal was not in the catchment area of any civic associations and was not required to meet with any organizations. At this time, the Mayor's Office of Neighborhood Services defers to the Board's judgment on this matter. Thank you, everyone, for your time and consideration.

51:20•Speaker 39

Madam Chair, do I have additional comments?

51:23 – 51:36•Speaker 41

With that, may I have a motion? I put forward a motion of approval. Is there a second? Barraza, second. Mr. Stembridge?

51:40•Speaker 41

Mr. Valencia?

51:45•Speaker 41

Ms. Barraza?

51:49•Speaker 7

Yes. Mr. Langham?

51:52•Speaker 41

Yes. Chair votes yes. The motion carries. Good luck.

51:56•Speaker 9

Thank you very much.

52:00 – 52:15•Speaker 43

Next, we have case VOA 1827453 with the address of 11 Ashley Street. If the applicant and or their representative present, please explain to the board.

52:18 – 54:10•Speaker 18

good morning madam chair members of the board my name is michael chavez i'm the architect and co-founder of social impact collective uh address 26 on hill park in dorchester uh this project is uh owned by uh julia silva um it's a single family home and it's a multi-generational household so they're looking for an additional bedroom in the existing single family that's there now. I think the next slide, the second slide really kind of sums it up there. There's three variances that are being requested. Two of them are existing nonconformities, which is the lot area minimum and the front yard minimum. Our addition of the bedroom makes the FAR go up from 0.58 to 0.67 when the FAR is at 0.6. And then the bottom left corner, you can kind of see that the, where essentially what we're doing is we're infilling that little back Third floor area above the existing footprint to fill in that space for that additional bedroom as well as converting that existing small porch on the right hand side there into a little bit of a larger mud room with some balconies with existing bedrooms up above that and updating the porch and proper landing and entrance on that side. The proposal does not impact the existing driveway, existing off-street parking, or any of the other, you know, heights or net of the kind of zoning variances that would be required of the space. And then the subsequent drawings just kind of show the, you know, the floor plans that we're adding there with the first floor on the right-hand side, that mudroom space with the door. moving into that kitchen in the rear, and then the upper floors, essentially just getting a balcony on the second floor, and then a new bedroom on the third floor, up to that rear side, which is right above that existing bedroom on the second floor. And then we're just matching exterior finishes, siding, trim, everything is kind of essentially matched to existing. And I'll pause there.

54:12•Speaker 41

Thank you. Are there questions from the board? Hearing none, may I have public testimony?

54:19 – 54:47•Speaker 4

Madam Chair and members of the board, my name is Jared Pembery. I'm the Jamaica Plain Community Engagement Specialist for the Office of Neighborhood Services. The applicant has completed the community process, which consisted of an abutters meeting facilitated on April 14th with no abutters present. Next, the proposal was presented to Jamaica Plain Neighborhood Council, who voted in support of this proposal. To date, our office has received approval from the Jamaica Plain Neighborhood Council. Thank you for your time, and the Mayor's Office of Neighborhood Services would like to defer to the board for their judgment.

54:50•Speaker 39

Madam Chair, we don't have a .

54:52•Speaker 41

Okay, with that, may I have a motion?

54:56•Speaker 39

Motion to approve.

54:58•Speaker 41

May I have a second?

55:01•Speaker 41

Mr. Stembridge?

55:05•Speaker 41

Mr. Valencia?

55:10•Speaker 41

Ms. Betabraza?

55:13•Speaker 41

Ms. Wewell? Yes. Mr. Langham?

55:17 – 55:44•Speaker 43

yes yes the motion carries good luck thank you all very much have a good day next we have case boa 186 8487 with the address of 388 opera if the applicants and or their representative president will they please what

55:45 – 1:00:18•Speaker 19

Thank you, Ms. Stembridge. Thank you, Madam Chair, members of the board. Attorney Jeff Drago with Drago and Toscano with the business address of 11 Beacon Street here on behalf of the applicant petitioner, Paul Bell. And with me, we also have David O'Sullivan from O'Sullivan Architects, who was the architect on the proposal. Pretty straightforward project in Jamaica, playing at 388 Arbor Way. We're proposing to change the occupancy from its existing form, which is a two-family dwelling, to a three-family dwelling by way of legalizing and expanding the... A basement unit. It's actually a garden level because it is elevated. The back of this building is a very steep decline that goes in the rear and then add some additional space into the unfinished basement area, basically combining those spots to create habitable living space and also improving egress with some minor. interior renovations note changes are proposed to the contours of the building so building will remain the envelope and structure will remain in terms of height and the boundary lines the project also has to note off of the arborway of three off-street parking spaces that can be utilized by the residents of the building my client recently purchased this property And this particular unit was already built out on that garden level. It's 840 square feet currently. With the proposed expansion, that would go up slightly over 1,200, about 1,240 square feet. I'm sorry, 1,407 square feet, which would add two bedrooms, two bath units. to the bill for legalize that space and add some additional space. If you go to the next slide, please. These are just the layouts of existing plans or if you could go through the plans thank you you can keep sliding through and this just shows this is actually if you go back one this just shows the site plans you can see off of the side of arborway is where there's a shared easement access for parking in the back of the property for those three spaces the new legalized unit uh would have 1407 square feet that would combine the 840 existing plus 570 uh in the basement uh the unit will have seven foot eight inch a ceiling height above and seven foot six uh below in the basement it'll be sprinkler unit uh 13d fire suppression system and completely code compliant uh with two egresses as well uh the uh bpda recommendation as you know was to support this fits right in their guidelines of keeping existing buildings but also adding residential housing where available this location is 500 feet from forest hill station so it makes it ideal for for commuters there's actually a lot of existing green space and the front insides of this property as well just to quickly go over the variances needed The use, because it is a 2F district, would be required for variance for use. FAR goes up slightly. Existing as 0.92 would be proposing 1.02. And then the minimum lot size, 7,000 required, we're at 6,167. So those were hit with for violations. It also mentioned Greenbelt Protection Overlay District because it does fall next to the Arbor Way. However, when you look in the code, because we're not adding a certain number of additional square footage or a new building mass, that actually, we believe, was incorrectly cited for that one variance. but we can deal with isd on that as well um we uh did get the jamaica plain neighborhood council support at subcommittee um and with that we can answer any questions that the board may have thank you thank you questions from the board hearing nine man public testimony

1:00:19 – 1:00:47•Speaker 4

Madam Chair and members of the board, for the record, my name is Jeremy Benbury. I'm the Jamaica Plain Community Engagement Specialist for the Office Services. The application has completed the community process, which consisted of a voters' meeting facilitated on June 17th with one concern addressed and no opposition. The proposal moved forward and met with Jamaica Plain Neighborhood Council, who voted to approve the proposal. To date, our office has received one letter of approval from the Jamaica Plain Neighborhood Council. Thank you for your time, and the Mayor's Office of Neighborhoods would like to defer to the board for their judgment.

1:00:47•Speaker 39

Thank you. Madam Chair, we don't have any additional comments.

1:00:54•Speaker 41

With that, may I have a motion?

1:00:59•Speaker 36

Motion is approved.

1:00:59•Speaker 41

May I have a second?

1:01:04•Speaker 41

Mr. Stembridge?

1:01:13 – 1:01:26•Speaker 41

Ms. Barabarraza? Yes. Ms. Wewell? Yes. Mr. Langham? Yes. Chair votes yes. The motion carries. Good luck. Thank you very much.

1:01:30 – 1:01:45•Speaker 43

Next, we have case BOA-183-7050 with the address of 17 Copley Street. It's the applicant and or their representative are present. Will they please explain to the board?

1:01:47 – 1:04:30•Speaker 46

Yes, thank you, Mr. Stembridge, and good morning, Madam Chair, members of the board. For the record, my name is Matt Echol, and I'm an attorney with Fletcher Tilton here on behalf of the applicant. With me this morning, I have Jennifer Ha from Hugh Architecture. We're here this morning seeking relief to renovate the existing structure, including erecting a rear addition and new dormers, as well as to change the occupancy from the existing two-family dwelling to a three-family dwelling. The project also includes expanding the driveway for a second parking space. the zoning district is a 2f4000 and the lot size is 4 000 square feet now the property as you can see here on the on the plan is located at the corner of copley street and atherton street with the front door on copley there to kind of the top right where the street dead ends the existing structure we has many unique features and architectural details so we'll be preserving most of that and maintaining it as part of the project however the renovations will allow for a more functional interior layout and the addition will allow for the existing cantilevered second floor porch to be squared off and provide more living space for all three proposed units The proposed third floor unit will be done with very little changes to the footprint. Again, there's a cantilevered porch that extends beyond the first and third floor currently, so we'll be squaring that off and it'll look not very different than what it is today other than being squared off at the lower level and the third floor level. The project also includes a new sprinkler system to make the building and neighborhood safer as well as energy efficiency upgrades. in terms of zoning violations the majority of the violations for florida ratio side yard and parking are all pre-existing we are also seeking relief for the use as this is a 2f district and we're seeking a third unit all three of the units are proposed to be three bedroom units with two bathrooms The basement will contain common mechanical and storage area. The first floor will house unit one, which is 11,000 square feet, and again contains three bedrooms, two baths. The second floor will have unit two, which is 1,061 square feet, and the third floor will house unit three, which is 1,024 square feet. This project did go through a community process, including in the Butters meeting, as well as meeting with the JPNC, the Jamaica Plain Neighborhood Council, who voted unanimously to support the project. With that, I'll pause, and Jennifer, the project architect, and I will happily take any questions the board may have.

1:04:32 – 1:06:06•Speaker 45

Thank you. Go ahead. Good morning, Madam Chair and board members. My name is Jennifer Ha. I am the principal architect at Hugh Architecture located at 53 H Harvard Street in Dorchester. There is some technical problems on the platform this morning, so that's why I'm not a panelist. But let me know if you have trouble hearing me. So 17 Copley Street is an existing two family building built in 1900. and designed in classic Queen Anne Victorian style. The project is to convert the existing two family into three while strictly respecting the historical character to home. And so to achieve the design, we add strategic dormers and the rear addition that squares off an inefficient rear section of the building. So the priority is to preserve the signature hallmarks of the beautiful architectural style and create much needed housing. One of the best features of the property is the large, beautiful green space in the front and side yards. And so to emphasize, the project will entirely be contained within these existing setbacks and does not exceed the existing building footprint. If you go towards the floor plans, The basement level will be dedicated entirely to mechanical systems, utilities, fire sprinkler, and storage. The first floor, which is centered, is similar to the current existing condition where the residents will enter from the main front porch from Copley Street directly into a three-bedroom, two-bathroom unit. And on the second floor, which is accessed by a common stairwell, will also have a bright open concept three-bedroom, two-bathroom unit. And third floor is from the same common stairwell. And it's unique.

1:06:15 – 1:06:26•Speaker 41

I think we're losing you, Jennifer. Attorney Echol, do you want to pause here since we...

1:06:27 – 1:06:39•Speaker 46

Yes, Madam Chair. I think Ms. Sa was getting to the conclusion of her presentation. So if she comes back and wants to add more, but I think we can pause here and see if there's any questions from the board. Thank you. Any questions from the board?

1:06:42•Speaker 41

Hearing none, we have public testimony.

1:06:45 – 1:07:13•Speaker 4

Madam Chair and members of the board, for the record, my name is Jeremy Benbury. I'm the Roxbury Engagement Specialist for the Office of Neighborhood Services. The applicant has completed the community process, which consisted of an abutters meeting facilitated on May 18th. It was very well attended. A direct abutter voiced concerns for parking specifically with their driveway and maintaining accessibility during construction. The construction timeline and noise were also a concern for abutters. Lastly, the current resident with a concern for displacement stated they were not notified of the proposal.

1:07:13•Speaker 41

Are you on your phone number or something? Thank you.

1:07:19•Speaker 41

Please proceed.

1:07:20 – 1:07:44•Speaker 4

Last resident with a concern for displacement stated that they were not notified of the proposal and would not have taken the property if they were aware of the upcoming construction. The residents said they would need more time if the proposal was approved to move a second time at least one year. To date, our office has received one letter of support from Akerson Square Neighborhood Association and one letter of approval from Jamaica Plain Neighborhood Council. Thank you for your time and the Mayor's Office of Neighborhood Services would like to defer to the board for their judgment.

1:07:49 – 1:08:03•Speaker 39

Madam Chair, we don't have additional comments. Okay. I'm sorry. Go ahead. I saw somebody raising their hand. Sorry. Probably not in this case.

1:08:04•Speaker 41

Okay. Any other questions from the board? Do we have a motion?

1:08:08•Speaker 44

Madam Chair, I'd like to put forward a motion of approval.

1:08:15•Speaker 41

May I have a second? Second. Mr. Stembridge. Yes. Mr. Valencia?

1:08:30•Speaker 41

Ms. Betabrasa?

1:08:36•Speaker 41

Mr. Langham? Yes. Chair votes yes. The motion carries. Thank you very much.

1:08:45 – 1:09:02•Speaker 43

Next, we have Pace VOA. 1747507 with the address of 32 Wycombe Street. If the applicant and or the representative present, will they please explain?

1:09:03 – 1:10:49•Speaker 50

Yes, thank you, Mr. Stambridge. Good morning, Madam Chair, members of the board, Attorney Derek Small. I have a business address on 51 Dobson Road in Braintree. Madam Chair, we're here today seeking relief to change the legal occupancy of the building from seven residential units to eight residential units. actually not just to confirm the eight residential units we went to pull permits to do work on the building and there was an error at isd with regard to the occupancy of the building so we are here to square away the records at isd and legalize the basement unit if you scroll down one uh slide or maybe two you can see from the picture on the left Down one more please. On the top left, it is a walkout. The building sits on a hill and the topography is such that the rear means of egress and most of the basement units are above grade. And so we are here again to legalize the unit. With regard to the violations of the violations are pre existing non conforming again as the units do exist currently. And we are not proposing any work outside of the scope. or the mass of the building. Just to note the violations that would probably be most interested in the board would be the FAR, which the requirement is 0.8 and we are proposing 0.16. Again, it's already existing and we're just seeking to legalize that unit. I'll stop there to answer any questions that the board may have.

1:10:50•Speaker 41

Thank you. Any questions from the board? Hearing none, may I have public testimony?

1:10:57 – 1:12:06•Speaker 4

Madam Chair and members of the board, first of all, my name is . I'm the Roxbury Community Engagement Specialist for the Office of Neighborhood Services. The applicant has completed the community process, which consisted of an abutter facilitated on March 11th and was lightly attended. An abutter expressed concerns regarding the current maintenance of the property, noting that they thought the property could be better maintained. Additional concerns were raised regarding the proposed occupancy and whether eight units would be excessive for the property. Parking and traffic congestion were also concerns, particularly given the number of development projects currently taking place in the surrounding area and the potential overall impact on the neighborhood. Next, the proponent was encouraged to reach out to Roxbury Path Forward, where a few inquiries were made and addressed. To date, our office has two letters of support, one from Roxbury Path Forward and one from Roxbury adding an additional unit would exacerbate tenants living on the property, loud noises after hours, no snow trash or property maintenance complaints that go unaddressed without a known property manager. Thank you for your time and the Mayor's Office of Neighborhood Services would like, excuse me. Thank you for your time and the Mayor's Office of Neighborhood Services would like to defer to the board.

1:12:09•Speaker 39

Thank you. We'll have additional comments.

1:12:14•Speaker 41

Okay, with that, may I have a motion?

1:12:23•Speaker 40

Madam Chair, before I make a motion, I wanted to see if an applicant had anything to say around some of the concerns that Mr. Benbury just brought up.

1:12:33 – 1:13:32•Speaker 50

Sure, Madam Chair, members of the board. Most of those issues were addressed. They came up at the abutters meeting and subsequently we met with the local neighborhood group, which is Roxbury Path Forward. And I know that Lorraine Wheeler and the group had conversations. submitted a letter of support for the project as most of the issues that were brought up by Mr. Bembry were addressed later on. We met several times with Roxbury Path Forward and some of the Director Butters. addressing such issues as the trash and we removed the satellite dishes that were on the front of the building and we also did a number of repairs to the exterior of the building so work is ongoing and we will continue to work with the neighborhood group and the abutters on any outstanding issues thank you um with that i'll put forward a motion of approval thank you i have a second second mr scumbridge yeah

1:13:39 – 1:13:50•Speaker 41

Ms. Barabrasa? Yes. Ms. Wewell? Yes. Mr. Langham? Yes. There are votes yes. The motion carries.

1:13:50•Speaker 50

Thank you, Madam Chair, members of the board. Have a good day.

1:13:56 – 1:14:14•Speaker 43

Next, we have case BOA 186-31796. with the address of 772 to 778 Adams Street. If the applicant and or their representative are present, would they please explain to the board?

1:14:15 – 1:16:10•Speaker 35

Yes, thank you. Good morning. Madam chair members of the board. My name is Edward Brooks and I'm the property owner at 772 Adam street and also the owner and operator of the business. At 772 out of street landmark public house. I'm here today, respectfully requesting the board's approval to continue operating our outdoor patio at landmark located on private land at the rear of our building. I think it's important for the board to know that this patio is not new. We've been operating it approximately for five years during COVID when outdoor dining became an important part of keeping restaurants operating. We have successfully operated this patio for the past five years without any issues or problems with our neighbors. This year we went to apply, we were informed that we needed to come before the zoning board because the patio is determined to be non-conforming use. Since then, I've worked closely with the city of Boston's outdoor dining program, led by Adam Lesko, to make sure we follow the proper processes and did everything that was required to get us to this point today. We've also gone through a neighborhood process, which I'm very proud of the support we've received from our director Butters, as well as Mayor's Office of Neighborhood Services and City Councilor John Fitzgerald's office. Landmark's been a part of this neighborhood for 10 years now and a responsible neighbor, and this patio is extremely important to us. It's simply an extension of our existing restaurant and provides the customers with a great outdoor dining option when business is somewhat tough in the summertime. I believe our fire beer... track record of operating the patio while the issue is the best demonstration of um that this works well at this location and we can coexist with the surrounding neighborhood and i respectfully uh asked to be granted the relief as needed by the board um that's it i'll stop there thank you very much for your time and consideration i'd be happy to answer any questions um anyone may have thank you any questions from the board hearing none may have public testimony

1:16:11 – 1:16:45•Speaker 3

Hello Madam Chair, members of the board. My name is Eva Jones, representing the Mayor's Office of Neighborhood Services. Regarding 772 to 778 Adams Street, our office defers to the board's judgment as our office does not conduct a community process on this type of proposal and we were informed that the patio is existing and we are unaware of any concerns related to this proposal. Our office is aware of support from the local neighborhood and the Cedar Grove Civic Association, who are all eager to see the applicant continue through with the process and have the patio open. Again, at this time, the Mayor's Office of Neighborhood Services differs his board's judgment on this matter. Thank you, everyone, for your time and consideration.

1:16:48•Speaker 39

Thank you. Next, we have Leon Rimas.

1:16:52•Speaker 35

Hello, Madam Chair, members of the Board, Liam Remus from the Council of Fitzgerald's office. The Council would like to go and record strong support for this proposal as Landmark's strong community partner in the neighborhood. Thank you.

1:17:05•Speaker 39

Madam Chair, there are no additional comments.

1:17:08•Speaker 41

Okay. With that, may I have a motion?

1:17:13•Speaker 40

Madam Chair, I'll put forward a motion of approval.

1:17:15 – 1:17:46•Speaker 41

May I have a second? Second. Mr. Stembridge. yes mr valencia yes miss turner yes it's better yes is we will yes mr langham yes chair votes yes the motion carries good luck thank you next we have case boa 184 7298

1:17:51•Speaker 43

with the address of 97 Milton Street. If the applicant and or their representative are present, would they please explain to the board

1:18:01 – 1:18:31•Speaker 10

Hello, this is Christopher McEachin. I'm the owner of the property. It's a single family home. What the proposal is to do is there's existing structures on the property from the kitchen on the first floor, and it's a walkway. And on the second floor right above this walkway is a balcony attached to the bedroom. The proposal is just to enclose the structure so it will create additional living area. Okay. Questions from the Board?

1:18:34•Speaker 41

May I have public testimony?

1:18:36 – 1:19:01•Speaker 4

Madam Chair and members of the Board, for the record, my name is Jeremy Benbury. I am the DOE Justice and Community Engagement Specialist for the Office of Neighborhood Services. The applicant has completed the community process, which consisted of an abutters meeting facilitated on June 8th, with two supporting abutters present. We saw no issues with the proposal. Next, the proponent presented to greater comments for a neighborhood association, completing the community process. Thank you for your time, and the Mayor's Office of Neighborhood Services would like to defer to the Board for the job.

1:19:03•Speaker 39

Madam Chair, there are some additional comments.

1:19:07•Speaker 41

Okay. May I have a motion?

1:19:11•Speaker 50

Motion to approve.

1:19:12•Speaker 41

May I have a second?

1:19:16•Speaker 41

Mr. Stembridge?

1:19:27•Speaker 41

Ms. Pettibrasa?

1:19:33•Speaker 41

Mr. Langham? Yes. Chair votes yes. The motion carries. Goodbye.

1:19:43 – 1:19:55•Speaker 43

Madam Chair, I have a question for the applicant for what I believe are the next three companion cases that should be read together.

1:19:57•Speaker 12

Yes, that's correct, Mr. Stembridge.

1:19:59 – 1:20:31•Speaker 43

Thank you, Chair Koji. So with that, then we will go to case BOA 1834435 with the address of 72 Reedville Street. Along with that, we have case BOA 1834445 with the address of 74 Reedville Street. And along with those two, we have case BOA 183-4452 with the address of 5 Waterloo Street.

1:20:37 – 1:22:16•Speaker 12

if if the applicant and or your representative attorney pulgini uh i'll explain to the board thank you mr stembridge um uh good morning madam chair members of the board attorney john pulgini here on behalf of the uh three properties 72 and 74 reedville street as well as five waterloo street and high park the zoning in this neighborhood is two family five thousand With me this morning is Michael Bannon, who is the owner of the property. Michael is a lifelong Hyde Park resident, as well as currently a Boston fireman, and he actually lives in 5 Waterloo Street. The proposal before you is to combine the two existing lots, of 74 Readville Street and 5 Waterloo Street, and then subdivide those into three lots. Each of the new lots will be approximately 4,130 square feet. Of these new lots, the 5 Waterloo two-family home will remain as is with no work contemplated on that. On the other two new lots, both which are front Readville Street Two new single families homes will be constructed. They will be addressed as 72 and 74 Readville Street. This is a small single family house. It's a one bed, one bath currently there that will be taken down. Both of these new single families will be two and a half stories. They will include four bedrooms. They're approximately 2100 square feet. Each will have garage at the ground level. of the building. These new homes will provide home ownership opportunity to Hyde Park and will serve to improve and better utilize this lot. Happy to answer any questions. Appreciate your time.

1:22:17•Speaker 41

Thank you. Are there questions from the board? Hearing none, may I call the testimony?

1:22:24 – 1:24:04•Speaker 4

Madam Chair and members of the board, for the record, my name is Jeremy Benbury. I'm the High Park Community Engagement Specialist for the Office of Neighborhood Services. The applicant has completed the community process, which consisted of an abutters meeting facilitated on May 4th, during which the majority of attendees expressed opposition to the proposal. Primary concerns centered on the scale of the project, which many felt was too large for the lot and surrounding area. But it has also raised significant concerns regarding parking and traffic congestion, noting existing vehicles obstructing driveways, particularly near 72 and 74, making egress challenging. The street was described as already congested and further impacted by its designation as a bus route. Additional concerns were raised about the introduction of two new driveways on Tarikville Street, which Nevada believed would reduce available on-street parking and exacerbate traffic conditions. Overall, the proposal was viewed by several attendees as an over-development of a relatively small site. One attendee expressed support for the project, noting that it presents a positive opportunity to accommodate more families in the neighborhood. Next, the proponent presented to Reedville Watch and Neighborhood Association, who reached a three-way split, with a third opposed to the entire project, a third recommending a duplex as opposed to two family homes, and a third okay with two homes provided the curb cut on Reedville Street that decide would need to be reworked to have the curb cuts on Waterloo where they currently are for access to the property. to date our office has just received two letters of support thank you for your time in the mayor's office of papers just would like to defer to the board for their judgment thank you any other raised hands yes next we have a laura good morning

1:24:05 – 1:25:55•Speaker 5

Good morning, Madam Chair and members of the board. My name is Laura A. Sims. I live at 75 Readville Street in Hyde Park, directly across from the proposed new construction. I oppose this construction vehemently. I've lived here all my life, and this home construction would be Detrimental to the street area, we would lose parking on the street for the residents who do not have a driveway. The curb cuts would be directly across from my property at 75 street as well as. the property at 73 Readville Street. This new construction is in a corner lot of Readville Street and Waterloo Street. So far this summer, there have been two car accidents directly in front of 74 Readville Street and Waterloo Street. One was a car that was parked on Readville Street going the wrong way. a parking and a car rammed into his front end and another was parked on waterloo street in which a u-haul truck could not make the turn correctly reedville street is a cut through street to a state road defensive valley parkway please wrap up ma'am Yes, thank you. Two car accidents, buses and school buses use this property and this street constantly. We are opposed against it. Thank you. Thank you for your time.

1:25:57•Speaker 39

Okay, next we have the person with the number that ends on 445.

1:26:01 – 1:27:33•Speaker 14

Yes, good morning Madam Chair. This is Craig Martin of Reedville High Park. Yeah, it's just not the practice of the support to take two appropriate sized parcels, combine and subdivide it into three undersized parcels. I was suggested to the proponent of the neighborhood meeting that to get closer to allowable plot size, let's do a nice duplex on this, at the 7374 location instead of the two single family homes. You'll get the two units, And you can engineer it to have one curb cut to refill street instead of the two that are currently proposed, which would surrender parking spaces, which are very limited at this location. As the prior caller just said, this is a cut-through street to a state roadway on the Plaza Valley Parkway, and we should do the best we can to maintain the street, to make it doable. And so I suggest that we, again, send this for... a two a duplex development which will leave more open space and what and and and it's much more manageable at this location rather than subdividing this lot to three undersized lots let's do it to two smaller lots not legal but at least closer to legal and i think that's the best interest for the neighborhood and be more in harmony with the current construction thank you thank you

1:27:36•Speaker 39

Next, we have Beth.

1:27:42 – 1:28:29•Speaker 38

My name is Mary Beth Benson. I live at 73 Readville Street, directly across from the property. While we feel that tearing down the existing house and building something new would be an improvement to what is there right now, we feel that the plan to cram in as much space building on two lots and make three lots out of it is excessive and not in the best interest of the community. In addition to the driveways and the bus and the traffic patterns on our Readville Street, I just think that it doesn't do anything to add to our community of Readville to have two big houses crammed on that property. Thank you. Thank you.

1:28:31•Speaker 39

Thank you. And we have one more person, Jeremy.

1:28:33 – 1:29:00•Speaker 22

Hi, yes. My name is Jeremy. I live at 71 Readville Street. I'm actually in favor of this proposal. I'd like to say that turning this lot into two houses and tearing down the existing one is only netting the street positive one house. So I think this is a great idea. It'd be great for this neighborhood to have two new single families.

1:29:01 – 1:30:44•Speaker 12

uh thank you thank you thank you madam chair and the applicant addressed the concerns about curb cuts the loss of parking and spies etc that's true uh first of all the current single family that we're talking about is is a one bed one bath is a tiny little bungalow that is not habitable for a family or anybody more than two or three people We have two off-street parking spaces with garage parking. So when we did the community meeting, everyone was talking about how Reedville Street's a heavily traveled street. It's not a heavily traveled street. You can look it up on your tablets, you'll see that it's Basically, there's street parking everywhere in addition to that, we're providing off-street parking. If you look at the BPDA recommendation for approval, it states clearly that it's consistent, that there's several buildings on this lot, there's several houses on this street that are sub-5,000 feet. Additionally, we have a 16-unit building basically to our left if you were looking at the building. If there's any issue with respect to access off of Readville Street, I would just say that any sort of proviso to continue working with the Boston Planning Department with respect to access would be warranted. But in all, like that last gentleman stated, building two single-family houses. We're not cramming anything on the lot. If you look at what the violations are, we have a .5 FAR requirement. We are at a .52. That is certainly not cramming anything onto the lot. And again, rely back on the BPA recommendation wherein it states that this is extremely consistent and recommends approval. Happy to answer any questions the board may have.

1:30:46•Speaker 12

Questions from the board?

1:30:56 – 1:31:40•Speaker 44

just kind of an observation I do feel that with the amount of land the density seems pretty appropriate in terms of the size of the two single family residents. It's literally underneath 35 feet in height is two and a half story. The construction seems pretty conventional. So I just wanted to address, is this the appropriate type of density? I think it is. So it's just kind of some observations. Thank you. Thank you. Any other questions or comments?

1:31:42•Speaker 41

May I have a motion?

1:31:48 – 1:32:32•Speaker 44

Madam Chair, I'm going to put forward a motion of approval in that the project undergoes BPD design review to take a look at ways of enhancing um says to car in terms of the site planning i i do believe that two separate stories i mean two separate structures is the is the appropriate kind of urban use of the lot um but i do think if there's a way that the garage access and site planning can just be reviewed by bpd to minimize any um

1:32:33 – 1:33:01•Speaker 7

issues with maneuverability being close to that corner lot thank you thank you uh is there a second um i think with uh board member better barraza that the um show with the other uh dwellings in the area as well as lots i said okay mr stembridge yeah

1:33:09 – 1:33:20•Speaker 41

Ms. Barabrasa? Yes. Ms. Wewell? Yes. Mr. Langham? Yes. Chair votes yes. The motion carries. Good luck. Thank you, everybody.

1:33:26•Speaker 43

And next, we have case BOA 183.

1:33:32•Speaker 41

Sorry to interrupt, Secretary Stambridge. Do you want to ask about 11 o'clock?

1:33:39 – 1:33:52•Speaker 43

Thank you for the reminder, Madam Chair. As we have passed the 11 o'clock hour, are there any requests for withdrawals or deferrals from the 11 a.m. area?

1:33:55•Speaker 15

Yes, Mr. Stambridge.

1:34:02 – 1:34:14•Speaker 41

Well, Mr. Guerrero, yours is at 1130. It's part of the 1130 rediscussion, so you just need to wait 30 more minutes. No problem. Again, my apologies, Madam Chair. That is okay. Mr. Attorney Spitz?

1:34:15•Speaker 21

Mr. Stembridge, 350 Athens Street, please.

1:34:20 – 1:34:34•Speaker 43

So this request is for case BOA 1827083 with the address of 350 Athens Street. Would you go ahead, Attorney Spitz?

1:34:35 – 1:34:53•Speaker 21

Yes, thank you, Mr. Stembridge. Madam Chair, members of the board, Attorney Ryan Spitz with Adamson Maranci, business address of 168 8th Street, 1st Floor. We're here. We just became informed of the planning department's recommendation, so we'd like to make changes based upon their recommendation. So we're looking for a short deferral, please.

1:34:57•Speaker 34

We can do October 6th, October 27th, or November 10th.

1:35:02•Speaker 21

October 6th would work perfect, please.

1:35:06•Speaker 41

Okay, with that, may I have a motion?

1:35:09•Speaker 43

Motion to defer this case until October 6th.

1:35:12•Speaker 41

May I have a second? Second. Mr. Stembridge?

1:35:29•Speaker 41

Ms. Wewell? Yes. Mr. Langham?

1:35:34•Speaker 41

Chair votes yes. The motion carries. See you then.

1:35:41•Speaker 43

If there are no further requests, we'll withdraw.

1:35:50 – 1:36:19•Speaker 48

Good morning. Thank you, Mr. Stembridge. Thank you, Madam Chair. Madam Chair, members, George Maranci, I'm an attorney with the business address of 350 West Broadway in South Boston. I represent the petitioner on the matter of 336 E Street, which unfortunately was advertised as 336 East Street. Inspectional Services Department is aware of that. ZBA staff, I believe that a new hearing date has already been assigned of September 29th. I guess we could let Caroline speak to that.

1:36:20 – 1:36:44•Speaker 43

okay well can we read the address incorrectly as we've been for the record uh this request is for what's listed as case boa 183 3292 with the address of 336 east street so yes madam chair um

1:36:45•Speaker 2

George is correct. So we did schedule it and it is already advertised for September 22nd.

1:36:50•Speaker 41

Okay, so with that, may I have a motion?

1:36:58•Speaker 43

Motion to defer this case until September 22nd.

1:37:01•Speaker 41

May I have a second? Second. Mr. Fembridge?

1:37:13•Speaker 41

Ms. Barabarraza?

1:37:15 – 1:38:10•Speaker 43

yes as we will mr langham yes chair votes yes the motion carries thank you any further requests for withdrawal of the referrals from the 11 o'clock here and then in that case we will return to the 9 30 hearing going to case voa 183 0082 with the address of 21 couture street if the applicant and or their representative are present yes thank you mr stembridge and good morning once again madam chair members of the board for the record

1:38:10 – 1:39:59•Speaker 46

Attorney Matt Eckel with Fletcher Tilton on behalf of the applicant and I have a business address of 100 Franklin Street in Boston. We're here this morning seeking approval to erect a new single-family home at 21 Katuit Street in West Roxbury. 21 Katuit Street is currently a vacant lot which contains just under 4,000 square feet, approximately 3,800 square feet. Katuit Street itself is a small side street which intersects with Baker Street on one side and overlooks VFW Parkway as it dead ends on the other side. The street is predominantly made up of similar sized lots, all with single family homes located on them. And this is kind of the one missing tooth left in the street. We're proposing a new two-story single family home with two parking spaces. In terms of the floor plans, just to run through them briefly, We're proposing an unfinished basement for storage and mechanicals. The first floor will have a garage at grade, which will contain two parking spaces, as well as living space, which includes the kitchen, living room, dining area, a half bath, and a laundry area. The second floor will have the primary bedroom and bathroom suite located above the garage. And then towards the rear of the proposed building, there'll be three additional bedrooms, as well as a playroom. This project went through a community process which included meeting with direct abutters several times as well as a formal official abutter meeting. We also presented twice before the West Roxbury Neighborhood Council. We did implement some changes to the project, including that second parking space, as well as reducing the overall size of the structure, which increased the side and rear yard setbacks. Based on these changes, the West Roxbury Neighborhood Council did vote unanimously to support the project.

1:39:59 – 1:40:40•Speaker 44

but with that i'll pause and i'll be happy to take any questions the board may have thank you any questions from the board all right um i i'm curious as to why are elevations missing of the project um part of our job on the zoning board is to review kind of the character of the proposed structure relative to the neighboring context. And I find it, the application incomplete for me to even begin to provide feedback in regards to whether I find it to be appropriate to its neighborhood.

1:40:44•Speaker 41

Any other comments or questions? Do you want to respond to that, Attorney Echol?

1:40:54 – 1:41:19•Speaker 46

sorry apologies for any confusion or oversight um this is a proposed two-story structure the majority of the structures along katuit are similar in two stories with kind of this a similar um you know couple steps entry gradual entry into the first floor i'm not sure exactly why those elevations are not included within the set but it is a fairly standard two-story building that you know aligns with the current streetscape

1:41:22•Speaker 41

with that, may I have public testimony?

1:41:25 – 1:41:43•Speaker 26

Madam Chair and board members, Siggy Johnson with the Office of Neighborhood Services. This petitioner completed the community process. Our office hosted an abutters meeting on April 16th, at which there was some discussion, but no opposition was stated. The West Roxbury Neighborhood Council is supporting this application. With that background, ONS defers judgment to the board. Thank you.

1:41:47•Speaker 39

We don't have additional comments.

1:41:51•Speaker 41

Okay. Any other questions or feedback from the board?

1:41:56 – 1:42:15•Speaker 44

I'm sure the project has merit. I would like to put forward that the project be deferred to the next hearing until we are able to see the project in its full. Is there a second? My colleagues might disagree, but that's... No, I'll second.

1:42:17 – 1:42:29•Speaker 7

I don't think we want to unnecessarily delay anything. It's really important that we have the... they should make our decisions that are pretty important.

1:42:29 – 1:42:48•Speaker 36

I also want to make a comment about that. I'm reading the recommendations from the planning department and there is a proviso about special attention to elevations as well. I'm wondering if maybe Jeff Madam Chair, can you hear me? Yes.

1:42:48 – 1:43:01•Speaker 44

Yeah, but I think, Giovanni, I think that sets a bad precedent because then we're going to be always getting incomplete drawings in front of the board. And it's a lot of it. Sorry. Go ahead. That's fine. Love to hear from you, Mr. Hampton.

1:43:01 – 1:43:44•Speaker 23

so our recommendation was based on the fact that it was a one family right the one family in a one family district we we went back and forth here uh in the department and i would completely understand and agree with you if you want to defer this to see uh the elevations but because it was a one family that's why we put that specific proviso in there but i I will agree with you that it's rare that we never see elevations. Um, so that's, I just wanted to explain why we put it in there because it was a one family. Thank you.

1:43:44 – 1:43:56•Speaker 41

That is helpful. Okay. So there is a motion and a second, uh, I will proceed and, you know, you can decide if, uh, the recommendation from PD Stans or you want a deferral?

1:43:57•Speaker 44

I don't think there was a motion forward. I was just putting an observation.

1:44:01•Speaker 41

Oh, I'm sorry. I thought that was a motion. Okay, well, let's try again. Is there a motion?

1:44:08 – 1:44:20•Speaker 44

I would like to, Madam Chair, I'd like to put forward a motion to defer the project to the next hearing so that we can review the project as a whole. Is there a second? Second.

1:44:21•Speaker 41

Okay, Mr. Stembridge. Yes. Mr. Valencia.

1:44:36•Speaker 41

Ms. Betabraza.

1:44:47•Speaker 41

Chair votes yes, the motion carries. Caroline, is there a,

1:44:51 – 1:45:05•Speaker 2

Yeah, so would September 22nd or October 6th work best in terms of timing to get the elevations? I guess that's a question for Matt.

1:45:07 – 1:45:18•Speaker 46

I'm confident we can get them submitted by September 22nd. Obviously, that's two weeks away, so as long as Inspectional Services is okay, it's not going to be any changes to any advertisements. So let's go with September 22nd, please.

1:45:19 – 1:45:31•Speaker 23

Okay, we'll see that. If possible, could you send those directly to me as well so that we can take a look at them? Of course. Thank you. Thank you.

1:45:35 – 1:45:53•Speaker 43

Next, we have case BOA-184-8753 with the address of 24 Stimson Street, to the applicant and or their representative or president. Will they approve the complaint to the board?

1:45:53 – 1:47:39•Speaker 12

Thank you, Mr. Stembridge. Good morning, Madam Chair, members of the board, Attorney John Pagini, here on behalf of the owner of this property, Andreas Wong. Thank you for having us here this morning. 24 Simpson Street, the lot size is 20,097 square feet, zoning is name put shopping. Originally, it was a three-story condominium building with 13 residential units and a first floor with 21 off-street parking spaces and a first floor commercial space that was designated as a daycare center. As it went forward, the daycare center pulled out and the lender Was concerned because this area of Simpson streets kind of really not a business district. It's more residential. We're kind of on the. The edge of the residential, and they thought it would be make more sense as a residential unit. The plans were submitted to again to convert the 1st wall commercial into a residential space of a 2 bed to bath. uh unit um it satisfies the parking requirements however as you all know in a neighborhood shopping district uh residential on the first floor is a commercial uh excuse me conditional use uh the neighbor when we went to the community meeting as well as the west roxford neighborhood council the neighborhood was very supportive of this because you can imagine a single family or a single unit know two-bedroom uh condominium unit would be a lot less traffic in the neighborhood than you know just say 15 children in the morning 15 parents dropping off picking up whatever leaving coming back picking up and leaving and then when we presented to the west russia neighborhood council because it was just a change of use and it made sense to them we received their unanimous support happy to answer any questions thank you are there any questions from the board

1:47:43•Speaker 41

Hearing none, may I have public testimony?

1:47:45 – 1:48:01•Speaker 26

Madam Chair and Board Members, Siggy Johnson with the Office of Neighborhood Services. This petitioner completed the community process. Our office hosted an abutters meeting on June 2nd at which no public comments were made. The West Roxbury Neighborhood Council is supporting this application. With that background, ONS defers judgment to the Board. Thank you.

1:48:03•Speaker 39

Thank you. Madam Chair, we have no additional comment.

1:48:07•Speaker 41

Okay, with that, may I have a motion?

1:48:12•Speaker 40

Madam Chair, I'll put forward a motion of approval.

1:48:14•Speaker 41

Is there a second?

1:48:18•Speaker 41

Mr. Stembridge?

1:48:29•Speaker 41

Ms. Pettibrasa?

1:48:36•Speaker 41

Mr. Langham? Yes. Chair votes yes. The motion carries. Good luck.

1:48:41•Speaker 12

Thank you, everybody.

1:48:45 – 1:49:09•Speaker 43

Next, we'll move on to the hearing scheduled for 11 a.m. We'll begin with case VOA-1840166 with the address of 90-92 Elm Street. If the applicants and or their representative are present, would they please explain to the board?

1:49:22•Speaker 6

Hello, can you hear me?

1:49:24•Speaker 41

We can hear you now.

1:49:25 – 1:50:41•Speaker 6

Oh, perfect. That was muted. All right. So, hello, my name is Don Juan Campos. I'm working with the owner to present the project is what used to be an existing laundromat that the owner would like to turn into an ice cream an ice cream fro-yo, actually, to be more exact, a fro-yo shop. So as you can see here, he's gonna be using and reutilizing the existing space to create the fro-yo shop. The business hours are gonna be from, sorry, 11 to 10. The reason why we're here, Marcantile is, It's not an allowed use, so we would like to do that change of use for this project. I don't know if there's a way I can share. I also managed to get a couple, some rent ideation for this project, but this project is gonna look on the inside. I don't know if there's a way for me to share that. I can share that if you'd like as additional information.

1:50:43•Speaker 41

Were there questions from the board? Hearing none, may I have public testimony?

1:50:51 – 1:51:24•Speaker 26

Madam Chair and Board Members, Siggy Johnson with the Office of Neighborhood Services. This petitioner completed the community process. Our office hosted an abutters meeting at which comments were made supporting the concept. Some abutters raised concerns about traffic in the area caused by other food pickup businesses. concern about whether mitigation is needed due to the former use of this site as a dry cleaner, and a concern about the possibility of street tables congesting the sidewalk. The City Point Neighborhood Association voted to support this application. With that background, ONS defers judgment to the board. Thank you. Thank you.

1:51:25•Speaker 39

Next, we have Ashley from Councillor Flynn's office.

1:51:29•Speaker 33

Thank you. Councillor Flynn would like to go on record in support. Thank you. Thank you.

1:51:35 – 1:52:23•Speaker 13

next we have anyone yes good morning board uh loanne o'connor president of the city point neighborhood association this is exactly the type of business that we want in our neighborhood it's something for everybody all ages it doesn't contain alcohol the seating on the sidewalk was taken off the table so the owner committed to no outdoor seating and insofar as parking This is on the L Street corridor, and there are more businesses in this particular section because it's very close to our business district of East Broadway. So this is a perfect business for the community, and we fully support this type of establishment in our neighborhood. Thank you.

1:52:26•Speaker 39

Thank you. Chair, there are no additional comments.

1:52:31•Speaker 41

May I have a motion?

1:52:36•Speaker 40

I'll put forward a motion of approval.

1:52:37•Speaker 41

Is there a second? Second. Mr. Stembridge?

1:52:56•Speaker 41

Mr. Langham? Yes. Chair votes yes. The motion carries. Good luck. Thank you.

1:53:07 – 1:53:32•Speaker 43

The next two cases have been deferred. So that will take us to case BOA 1857851 with the address of 368 Athens Street. Excuse me. If the applicant and or their representative are present, would they please explain to the board.

1:53:33 – 1:57:28•Speaker 48

Thank you, Mr. Stembridge. Good morning, Madam Chair, members of the board. My name is George Maranci. I'm an attorney with the business address of 350 West Broadway in South Boston. I represent the petitioner David Winnick, the owner and developer of 364-368 Athens Street. This property is located one block northeast of West Broadway. It is currently used as employee parking for a local bank. My client proposes to legally combine the two parcels constituting the site into a single site of approximately 4 325 feet square feet and to replace the existing surface parking with the four-story six-unit building it would be three two-bedroom units ranging in size from 980 square feet to 1044 square feet and three three-bedroom units uh two at 1241 square feet and one at 1,660 square feet. The surrounding area is developed with a number of parking lots serving West Broadway commercial uses, as well as numerous dwelling buildings ranging from two to four stories, with a five-story mixed-use building located directly across Advent Street from the site. as to zoning the proposed project requires variances for insufficient site in rear yard setbacks insufficient lot area and insufficient parking with respect to setbacks the mfr sub-district here requires a minimum side yard of three feet and a minimum rear yard of 20 feet which is reduced to 15 feet pursuant to the provisions of the shallow lot exception on the right side of the lot a near zero first floor side setback is proposed with the upper story set back approximately two feet the left side setback is compliant because this lot is l-shaped there are effectively two rear yards and two rear yard setbacks a five foot setback along the majority of the property and a 10 foot setback to the rear of the deepest portion of the building where the setback area accommodates a patio and a small rear yard. The upper stories are also stepped back in the rear. As the planning recommendation notes, near-zero lot line conditions are prevalent in this area, and the majority of this lot is, in fact, only 45 feet deep. With respect to minimum lot size, Article 68 requires a minimum lot size of 7,000 square feet in this MFRI district for a six-unit residential building. There are not. many 7,000 square foot lots in the neighborhood, including those on which multi-families of six or more units currently sit. These combined parcels total approximately 4,325 square feet with lot sizes in the neighborhood ranging or averaging about 2,000 square feet as the planning recommendation notes. Finally, with respect to parking, there are two violations arising under Article 68, Section 22. First, the project will provide six ground floor parking spaces beneath the residential units, three fewer than required. And a second violation with respect to parking is that each space is proposed at 9 by 18 feet, which is less than the 20-foot standard depth required under Section 33, which permits up to 50% of the spaces to be built as compact. Here, the proposed design and parking count are calibrated to allow for new housing creation with adequate off-street parking, in this case set at 1 to 1 parking. which conforms with city residential parking policy and i would even suggest with the um with the desires of this board in terms of previous cases with that madam chair i'll pause and be happy to answer any questions that members may have thank you are there questions from the board

1:57:31•Speaker 41

Hearing none, may I have public testimony?

1:57:34 – 1:57:51•Speaker 26

Madam Chair and board members, Ziggy Johnson with the Office of Neighborhood Services. This petitioner completed the community process. Our office hosted an abutters meeting on June 29th, at which two abutters supported the proposal. The St. Vincent's Neighborhood Association is supporting this proposal. With that background, ONS defers judgment to the board. Thank you.

1:57:53•Speaker 39

Thank you. Next, we have Ashley from Council of Things Office.

1:57:59•Speaker 33

Thank you. Councilor Flynn supports based on a good community process. He respectfully asks that the proponent continue working closely with the community during the construction phase. Thank you.

1:58:09•Speaker 39

Thank you. Next, we have David Nagle. David.

1:58:23•Speaker 41

He's muted. Are you able to unmute him?

1:58:27•Speaker 39

Yeah, I allow him to unmute. David, if you can unmute yourself, please.

1:58:41 – 1:58:56•Speaker 29

Hello, this is David Lenhart with Coolsign Stores. I think I just heard that I should be Unmuted, is this the right David? There are more Davids in the world.

1:58:56•Speaker 39

No, it was for another person.

1:59:00 – 1:59:19•Speaker 41

This is for public comment for 368 Athens. Is there anyone else looking to speak? Okay. Any other questions or feedback from the board? Is there a motion?

1:59:21 – 1:59:46•Speaker 44

madam chair i like to put forward a motion of approval um with a proviso that the project goes through the bpd design review just paying special attention to the extra material on the first story and then the continuation to the top story so that it works with the neighboring contacts is there a second

1:59:50•Speaker 41

Mr. Stembridge? Yes. Mr. Valencia?

2:00:00•Speaker 41

Ms. Pettibrasa?

2:00:06•Speaker 41

Mr. Langham? Yes. Fair votes yes, the motion carries. Good luck.

2:00:17 – 2:00:45•Speaker 43

Next, we have case BOA, 185-5511 with the address of 555-567 east broadway if the applicants and or their representative president will they please explain to the board good afternoon madam chair members of the board my name is francis adams i'm an attorney with the business address of 350 west broadway in south boston

2:00:46 – 2:02:27•Speaker 25

I represent the owners of the property, Eric Fitzgerald and Nam O'Byrne, the current owner-archivists of the property. This property is a six-unit townhouse condominium that was approved by this board about three years ago. I represent the owner of this last particular unit here. It shows a roof deck. We are seeking relief for a variance for excessive building height, which this board has previously granted, and a conditional use permit for the roof deck. As you can see from the plans, this is an existing roof hatch. The deck is proposed here. There are no rare staircases or any other access to the roof. It's exclusive use to the unit owners, used by the two people that live there right now. It will not be shared. As I said, it's not a common deck. It will provide valuable open space to the homeowners. It's not a large deck. It's 10 feet wide by 16, not including the walkway right here. And it's set back from Broadway about five feet, as you can see from the dimensions. And on this side, it's set back a little over a foot as shown on the plans. As I said, we're seeking a variance as well as a conditional use permit for the project. We are aware of the planning department's recommendation for approval as well as to add a guardrail set back a little closer to the deck, and our project architect is committed to, if approved, submitting plans to ISD showing the guardrail in the appropriate location in accordance with Article 68 of the zoning code. With that, I will open it up to any questions the board may have.

2:02:32•Speaker 41

Are there questions from the board? Hearing none, may I have public testimony?

2:02:38 – 2:02:58•Speaker 26

Madam Chair and Board Members, Ziggy Johnson with the Office of Neighborhood Services. This petitioner completed the community process. Our office hosted an abutters meeting on June 17th, at which three direct abutters were opposed to the application due to quality of life concerns. The Gate of Heaven Neighborhood Association does not support roof decks in their catchment area. With that background, ONS defers judgment to the Board. Thank you.

2:03:02•Speaker 39

Next, we have Ashley from Consulate Friends of Oasis.

2:03:05 – 2:04:24•Speaker 33

Thank you. My name is Ashley from Councilor Flynn's office. Over the weekend, Councilor Flynn sent a letter to the CBA in the city requesting a deferral due to a no abutters meeting or community process. In recent weeks, the city informed Councilor Flynn's office that the Office of Neighbor Health Services will now decide what requires community process within an abutters meeting and what does not. Respectfully, with the presence of zoning violations, In Article 68, updated as of 2019, Councillor Flynn believes ONS should not be making subjective determinations on what deserves public process for his neighbors and taxpaying residents. Similarly, this past spring, the City disregarded the concerns of City Point residents and Councillor Flynn on having an abutters meeting. The ZBA both deferred and denied that project over the course of two hearings due to the very same issues of community process. This is not about Councillor Flynn's concerns on roof decks. It's about what's always been traditionally shared values, our respect for transparency, public process, and residents of a neighbourhood deserving a say in what takes place there. Councillor Flynn will be filing legislation to require a butters meeting for all proposals seeking zoning relief so that neighbours are able to provide feedback to the city. He believes we cannot leave the door open for human error or questions regarding whether all proposals are being held to the same standard. Thank you.

2:04:25•Speaker 39

Madam Chair, any additional comments?

2:04:30•Speaker 41

Can someone from ONS respond to the...

2:04:35 – 2:04:49•Speaker 26

Yes, Madam Chair. I'm somewhat confused by the commentary as an abutters meeting was hosted which was attended by myself and the petitioner's attorney at which the proposal was discussed with the community. I'm not sure if the testimony was intended for a different case or...

2:04:51 – 2:05:29•Speaker 25

I would also like to add, Madam Chair, we have an email and a letter from the Gate of Heaven Civic Association who declined to have a meeting on this particular project. So in accordance with the current practices of the mayor's office, we did complete all parts of the process. We had the abutters meeting, as well as a request for the Gate of Heaven Neighborhood Civic Association, and they declined to have a meeting on this project. As stated, they oppose every roof deck. in the City Point neighborhood, I mean, the Gateheaven Civic Association. So they don't believe it was important to have a meeting on this particular project. So I respectfully decline with the statement made by council of Flynn's office.

2:05:30•Speaker 41

Okay, any other public testimony?

2:05:41•Speaker 41

Okay, any other questions or comments from the board? Is there a motion?

2:05:57•Speaker 36

Motion, I make a motion. With the provision that the gut rail be set back from the roof edge in accordance with Article 68, Section 29.

2:06:10•Speaker 41

Is there a second? Second. Mr. Stembridge?

2:06:24•Speaker 41

Ms. Betabraza?

2:06:30•Speaker 41

Mr. Langham? Yes. Chair votes yes. The motion carried. Thank you very much, Floyd. Appreciate it.

2:06:45 – 2:06:58•Speaker 43

And as we have now passed the 1130 AM contract, we'll ask if there are any requests for withdrawals or referrals from the 1130 AM here.

2:07:02 – 2:07:25•Speaker 15

Good morning again, Mr. Stembridge, Madam Chair, Ernst-Guerrilla, third time would be the charm. I'm Ernst-Guerrilla with an office address of 299 Gallivan Boulevard. I represent the applicants for 2630 Birch Street. Madam Chair, if you remember the last time, you have approved a short continuance to allow us to have an opportunity to meet with the neighborhood association.

2:07:26•Speaker 41

Please let Mr. Stembridge just read the piece into the record.

2:07:30 – 2:07:42•Speaker 43

Good to talk to you again. This request is for case BOA 1749423 with the address of 26 Byrd Street. Go ahead, attorney.

2:07:49 – 2:08:28•Speaker 15

Good morning again, Madam Chair Ernst-Guerrier. With an office address of 299 Gallivan Boulevard, I appear before you on behalf of the applicant for 26 Bird Street. We'd like to ask for a short continuance to allow us to have further communication with the neighborhood association. I received a letter from the co-chair who has granted us an opportunity to meet with them this afternoon, this evening at seven o'clock. And out of respect for them, we'd like to ask for a short continuance, Madam Chair. Thank you. Do we have a date, Caroline?

2:08:28•Speaker 38

We could do October 6th or October 27th.

2:08:33•Speaker 15

October 6th would be fine.

2:08:37•Speaker 41

Okay, with that, may I have a motion?

2:08:39•Speaker 43

Motion to defer this case until October 6th.

2:08:43•Speaker 41

May I have a second? Second. Mr. Stembridge?

2:08:52•Speaker 41

Mr. Valencia? Yes. Ms. Turner?

2:08:56•Speaker 41

Ms. Betabraza? Yes. Ms. Wewell? Yes. Mr. Langham?

2:09:05•Speaker 41

Chair votes yes. The motion carries. See you then. Thank you, Madam Chair.

2:09:11•Speaker 43

Madam Chair, I believe there's also a request on 151 Lenox Street. Correct.

2:09:20 – 2:09:31•Speaker 37

Can folks hear me? Yes, sir. Excellent. Jacob Taylor, Klein Hornig, 101 Ark Street. I'd like to request a deferral for the 151 Lenox Street matter.

2:09:31•Speaker 41

Okay. Let's have Mr. Stembridge read it into the record, and then we'll hear from you.

2:09:36 – 2:09:51•Speaker 43

So this request is for a deferral for case VOA 1A5-7936 with the address of 151 Lenox Street. Would you go ahead and explain, please?

2:09:53•Speaker 18

Sure. The applicant is working with the Boston Planning Department on revising plans and revisiting some details of the project.

2:10:00•Speaker 37

We'd like to request a deferral until October 6th.

2:10:09•Speaker 41

Okay, Caroline, is that date still available? Yes, it is. Okay, with that, may I have a motion?

2:10:18•Speaker 43

Motion to defer this referred to case until October 6th.

2:10:25•Speaker 41

May I have a second?

2:10:29•Speaker 41

Mr. Spembridge?

2:10:33•Speaker 41

Mr. Valencia? Yes. Ms. Turner? Yes. Ms. Barabrasa?

2:10:44•Speaker 41

Mr. Langham? Yes. Chair votes yes, the motion carries. See you then.

2:10:52•Speaker 43

Any further requests for withdrawals or deferrals from the 1130 hearing? Hearing none, we'll return.

2:11:02 – 2:11:30•Speaker 8

There may be one, members of the board. This is Ethan Ritter's house on 44 Granger Street. I just received some communications from Ms. Hayes that they were wishing to reschedule to October 6th because of the notice that went out. I didn't know if that was going to be done on a deferral, but I'm happy to move for the deferral. Which date is that? This is BOA 18363. 44 Granger Street. 44.

2:11:30 – 2:11:42•Speaker 41

Caroline, can you confirm that? Yes, you can. Okay, so let's read that into the record.

2:11:44 – 2:12:00•Speaker 43

So this request is for case VOA 1836310 with the address of 44 Granger Street. Is there anything else you'd like to say about it? No, that does it. Thank you.

2:12:01•Speaker 41

Okay, so may I have a motion for deferral to October 6th?

2:12:06•Speaker 43

Motion to defer this case until October 6th. I'm second.

2:12:12•Speaker 41

Second. Mr. Stembridge?

2:12:18•Speaker 41

Mr. Valencia? Yes.

2:12:21•Speaker 38

Ms. Turner? Yes.

2:12:24•Speaker 41

Ms. Betabraza?

2:12:28•Speaker 41

Ms. Wewell? Yes. Mr. Langham? Yes. Chair votes yes. Motion carries. See you then.

2:12:35•Speaker 8

I appreciate it. Thank you. Y'all have a good day.

2:12:40 – 2:13:13•Speaker 43

And again, any further requests for withdrawals or deferrals from the 1130 era? Hearing none, we'll return to the 11 o'clock cases and we will go to case BOA 1850688 with the address of 442 East 5th Street. If the applicants and or their representative are present. Well, they're pleased to buy it through the board.

2:13:14 – 2:15:31•Speaker 21

Thank you. Mr stembridge. Madam chair members. Journey Ryan's fits with Adams and Moran. See business address of 168, 8th street. 1st floor. With me today on the owners, Michael Regan, Joe Santoro and Andrew. As well as the project architects, Peterson, Dorsey and Steven. This proposal seeks to convert from a three family to a four family by converting the basement into a new residential unit. No addition to the building footprint or height is proposed. The exterior envelope essentially stays the same. The fourth unit is allowed as we are within a MFR sub district, but we'll need relief for the use as a basement units are forbidden. This is essentially aligned with the by right ADU policy in the city of Boston, except that the properties that have been subjected to the condominium statute are ineligible despite that all of the units are occupied. The basement will be approximately 825 square feet, three bedrooms, a full bathroom, kitchen, living area, with a proposed recessed stairwell slash patio cut into the rear yard for egress and light. The front elevation is virtually unchanged. The notable exterior work is at the rear and the side where the proposed recessed stairwell patio is cut into the rear yard at grade level to serve the basement unit. That's what drives the rear yard setback reduction which requires relief for insufficient rear yard despite being a pre-existing nonconformity. Window wells will also be composed on the front facade at the basement level to bring in more light into the new unit. We have additional violations for FAR. The required FAR is a 2.0 and the proposal calls for a 2.71. Open space insufficiency, 800 square feet of open space would be required and the proposal calls for 429 total square feet. Additional lot area is insufficient as we would need an additional 1,000 square feet of lot size, but again, this is a pre-existing condition of the lot. Off-street parking code requires 1.5 parking spaces for any new unit of housing and the proposal doesn't have the ability to provide any parking. In concluding, we feel that the proposal would not create any adverse impacts to the neighborhood and is aligned with the planning department's recommendation of approval at this point madam chair i'm going to turn it back over to the board for any questions or comments thank you are there questions or comments from the board may have public testimony

2:15:32 – 2:15:56•Speaker 26

Madam Chair and Board Members, Ziggy Johnson with the Office of Neighborhood Services. Our office hosted an abutter's meeting on June 10th at which one abutter was concerned about a precedent in the area for basement conversions. The Gate of Heaven Neighborhood Association chose to take no position on this proposal. Our office is aware of one letter of support that has been submitted to the board from just outside the 300-foot abutter's radius. With that background, ONS defers judgment to the board. Thank you.

2:16:01•Speaker 39

Thanks. We have Ashley.

2:16:04 – 2:16:16•Speaker 33

Thank you, counselor from like to go on record and support due to a good community process. We respectfully request that the opponent continue to work closely with neighbors on any quality of life issues during the construction phase. Thank you. Thank you.

2:16:17•Speaker 39

Madam Chair, we'll have additional comments.

2:16:21•Speaker 41

May I have a motion?

2:16:26•Speaker 40

I'd like to make a motion for approval. May I have a second? Second.

2:16:32•Speaker 41

Mr. Stembridge? Yes. Valencia?

2:16:41•Speaker 41

Ms. Betabraza?

2:16:46•Speaker 41

Mr. Langham? Yes. Chair votes yes. The motion carries. Good luck.

2:16:51 – 2:17:15•Speaker 43

Thank you. Next, we have case VOA 1854862. with the address of 120 to 120 D Old Harbor Street. If the applicant and or their representative present, would they please explain to the board

2:17:16 – 2:22:34•Speaker 48

Yes, thank you. Mr stembridge. Good morning. Madam chair members of the board. My name is George Moran. See, I'm an attorney with the business address of 350 West Broadway in South Boston. I represent the petitioner David Murphy, the owner and developer of 120 dash 120 deal. Harbor street. Tim Johnson, the project architect is also present. The lot here is a 35-foot wide, 127-foot deep parcel containing approximately 4,445 square feet in the South Boston Neighborhood District's multifamily residential zoning subdistrict. It is currently improved with a two-story residential building with accessory parking off a side driveway in a large rear yard. My client purchased this building untenanted, unoccupied. The petitioner, my client, wishes to demolish the existing building and construct a four-story, five-unit residential structure with an at-grade parking garage serving each townhouse-style unit individually as well as a modest private roof deck for each townhouse unit. Each unit will be an independent four-story, three-bedroom, two-and-a-half-bath unit, each with a two-car garage, a small front balcony, and 168-square-foot private roof deck. The proposed project requires a variance for insufficient additional lot area, two variances for insufficient side yard and insufficient rear yard setbacks, and conditional use approval owing to the main entrance configuration, and also for the building's height. And both of those last two relief requirements owed to the property's presence within a restricted roof district. With respect to lot dimensions and the required additional lot area, the MFR subdistrict requires, with respect to the side yard, a three-foot minimum side yard and a 20-foot minimum rear yard. The project proposes a left side yard set back of a half foot, but it should be noted that that side of the lot in the building is boarded by a driveway serving the abutting property and that the separation distance between the two buildings will be over 14 feet. The proposed rear yard setback is approximately four feet. Here, it also should be noted that the lot backs onto a large parking lot serving a townhouse-style multifamily building that is addressed on East 8th Street. There's no residential abutter in the rear. Finally, with respect to the lot's size, it is approximately 1,555 square feet shy of the 6,000 square feet the Cove requires for five-unit development. These are dimensional constraints of what is a narrow pre-existing lot, not deficiencies of design. In fact, the design was adapted to the size and dimensions of the lot. Each unit is provided private open space through balconies and roof decks. The adjacent lots provide, as I noted, sufficient off-site setbacks from the residential uses that would otherwise be effective. uh affected excuse me the planning department reviewed these same facts and reached the same conclusion that given the scale of surrounding development the narrow lot dimension the on-site open space provided and the setback conditions on adjacent lots we believe that relief here is justified and reasonable with respect to the location of the main entrances The code requires that the main entrance of the dwelling face the front lawn line. But given the site's 35-foot width and 127-foot depth, it is proposed here to access all five units from a drive aisle with a sidewalk interior to the property within the site, with the unit entrances facing that drive aisle and private sidewalk. The front of the building will still present windows on all floors and a ground floor planter box of a street-facing frontage will remain active and inviting even without a door opening on old harvest street this configuration is not unusual for the block other nearby buildings take their access off the side of the building the same way making this design consistent with this as bill condition this is a fact also noted in the planning recommendation and finally with respect to the building's height and the provisions of the restricted roof district article 68 section 29 limits allowable building height on any lot to the height of an existing building subsequent to demolition. The existing vacant building is a 17-foot two-story outlier on a block otherwise built up to three and four stories. This proposed 40-foot building is zoning compliant with respect to the actual table requirements for the sub-district, but for the restricted roof structure provisions. Even with the additional height, the site design places the dry vial along the side closest to the adjacent building on the right. There's a dry vial that's existing on the lot to the left, and both of these conditions serve to preserve access to light and air on both sides of the building, satisfying the conditional use approval conditions under Section 29. With that, Madam Chair, I'll pause and I'd be happy to take any questions or comments from the board.

2:22:35•Speaker 41

Thank you. Are there questions from the board? Hearing none, may I have public testimony?

2:22:42 – 2:23:19•Speaker 26

Madam Chair and Board Members, Siggy Johnson with the Office of Neighborhood Services. This petitioner completed the community process. Our office hosted an abutters meeting on June 30th at which there was a mix of support and concerns from residents primarily at the 1306 Columbia Road building. Concerns were raised by two abutters residents of that building about water runoff, garage door noise, the number of decks, and the insufficient setback. Two others were supportive of the design, stating a preference for townhouses and a need for this type of housing in the area. The Dorchester Heights Neighborhood Association is in non-opposition to this application. With that background, ONS defers judgment to the board. Thank you.

2:23:25 – 2:23:46•Speaker 33

Hi, my name is Ashley from Councillor Flynn's office. Councillor Flynn would normally want to support a case like this due to two parking spaces per unit in attention to South Boston's existing parking crisis. However, he has a longstanding policy of opposing roof decks due to the quality of life issues impacting our seniors, veterans, persons with disabilities, and young families. Thank you.

2:23:50•Speaker 39

Next, we have a tuner.

2:23:58 – 2:25:14•Speaker 34

Really Turner I live at the 1306 building and we're not opposed to the the building of this townhouse is how it's being built that we have an issue with the fact that the the the garage doors are basically on the side of our building. one um basically where our bedrooms are going to be and that's something that is needs to be in concert you know like uh pointed out so the garage door the cars coming in and out um that definitely the the um the the side of you know the the side yards of three feet and the 20 feet being drastically um reduced is not okay according to how we feel about this building and i know that um You mentioned the attorney mentioned that the the the back of the building actually backs into East 8th. That's not true. It actually backs into our parking lot. So I don't know. I mean there just seems to be a lot of misinformation that's being shared here and I want to make sure that we're on record saying that we don't we don't agree with some of the proposed designs that are being presented.

2:25:19•Speaker 39

Madam Chair, there are no additional comments.

2:25:21•Speaker 41

Attorney Moran sees.

2:25:22 – 2:25:35•Speaker 48

Yes, thank you, Madam Chair. With respect to the rear of the building, it does, as I indicated, back up into a garage, a multi-space garage. I think there are 22 parking spaces.

2:25:35•Speaker 34

No, that's not true. That is not true. Please mute. Public comment.

2:25:44 – 2:26:37•Speaker 48

I believe the previous speaker said that the building backs up onto the 1306 parking lot. I believe that's what the testimony was. Regardless of whether it's a parking lot serving 1306 or the building on East 8th Street that's a townhouse-style building, I may have misidentified the building for which the parking lot is being used, but it does back up to that parking lot. With respect to garage door openers, I'm not a builder, but I believe that most garage door openers today operate at something like 40 decibel levels of sound. They're much quieter than some of the older systems that people may be used to. As I said, there is separation distance on the right side, owing to the fact that there is a drive aisle there for those garages. And I think that addresses all of the comments.

2:26:39 – 2:27:01•Speaker 41

Any other questions or comments from the board? May I have a motion? Is anyone prepared to make a motion or do you still have questions?

2:27:03•Speaker 43

Madam Chair, I'll make a motion to approve.

2:27:06•Speaker 41

Is there a second?

2:27:08•Speaker 44

Betabrasa, second.

2:27:11•Speaker 41

Mr. Stembridge? Yes. Mr. Valencia?

2:27:21•Speaker 41

Ms. Betabrasa?

2:27:24•Speaker 38

Yes. Mr. Langell?

2:27:29•Speaker 41

Yes. Chair votes yes. The motion carries.

2:27:33 – 2:28:02•Speaker 43

Thank you. Thank you, Madam Chair. Next, we have case BOA 1861457 with the address of 2073 to 2189 Washington Street. If the applicant and or their resident representative are present, would they please explain to the board?

2:28:04 – 2:28:43•Speaker 29

Good morning. chair and members of the board uh i guess good morning for another four minutes uh this is david lindhart at cool science stores one post office square uh permanent council for new england culinary arts training and thank you for the opportunity to present uh our zoning request in connection with a new location in nubian square for culinary training career readiness i'm here with several team members martin hemsley Badri Goode, Kevin Diebler. I'm going to pass it on to Martin to continue the presentation, and I'll stick around for any questions. Thank you.

2:28:54•Speaker 41

Is this, are these folks panels?

2:29:01•Speaker 41

Who needs to be elevated to panels?

2:29:05•Speaker 29

Martin Hemsley should be elevated to panelist, and he'll continue with that presentation.

2:29:11•Speaker 39

Now she's allowed to unmute herself?

2:29:15•Speaker 29

Yeah. Oh, here we go. Thank you.

2:29:17 – 2:29:33•Speaker 1

You can hear me all right? Yes. Thank you, Madam Chairman and members of the board. Martin Hemsley, I'm the founder of NECAT, New England Culinary Arts Training, and I'd like to turn over the first two or three slides to Madre Goode, who's our executive director.

2:29:50•Speaker 29

Please let us know if you're having trouble locating the names.

2:29:54•Speaker 41

Hey, Zeus, can you please elevate Madre Good?

2:30:01•Speaker 39

No, sorry. I should be... Hi.

2:30:07•Speaker 29

We see and hear you.

2:30:09•Speaker 30

All right. We can move to the next slide. My name is Madre Good. I'm the executive director here at New England Culinary Arts and Training.

2:30:21•Speaker 41

Who's advanced? Can you advance the slides, Madam Ambassador? Can the Ambassador advance the slides for him?

2:30:33 – 2:32:03•Speaker 30

Thank you. Thank you, Madam Chair. So, NCAT is a culinary training program really focused on folks when they have barriers to employment. We have four, three pillars. One is culinary arts, which is technical skills training, as well as kitchen time. Wellness is really focused and centered around the folks in our program around financial literacy, wellness and mindfulness, yoga, trauma-informed practices from staff and students. And then our career readiness is really focused on helping folks get into the culinary industry, as well as progress within that pathway to have sustainability for their families and themselves. Next slide, please. All of our programs are tuition-free. Our four programs, our flagship, which is currently at 23 Radisson Street here in the South End. We do a Spanish bilingual ESOL cohort as well, as well as the Haitian Creole cohort. And we serve folks right behind the walls here at Suffolk House of Correction. It is a 14-week program, as I stated before. And then we have a social enterprise that will provide catering and event space. typically seven weeks for our students and they have access to real life experience as well as stipend of opportunity as well. Thank you for hearing me today. I will now turn it over to Martin Hemsley.

2:32:04 – 2:33:40•Speaker 1

Thanks, Marjorie. The building that you can see here is, I'm sorry, could you go back a slide? In Nubian Square, this represents a significant move for us. We're currently on Bradston Street in an area that's not easily accessed by our students and is close to the Mass and Cass intersection. We've been looking for new space for a couple of years because lease is up next year in our current space. And we've identified this building as being perfect for our students. It's close to Nubian Square Transit Station and gives us a lot more space in which to operate. We have raised the acquisition financing, and this week we expect to get approval from Mass Development with supportive financing to cover the purchase price of $9 million. We're scheduled to close early in October. Next slide, please. We have launched a capital campaign, which has been underway for some months. We expect to invest an additional $9 million to renovate the second and third floors, in particular to put in a significantly larger kitchen than we now have to support our teaching and also our social enterprise catering. Next slide. There are three zoning reliefs requested, which I've outlined here. I can't describe them technically. Perhaps our lawyer can do that.

2:33:42 – 2:34:06•Speaker 29

Yes I can jump in although it's pretty straightforward in terms of the relief that's needed again this is moving into an existing building so the you know the request around parking has to do with the existing building for loading as well so conditional a couple conditional use permits and a variance thank you.

2:34:10•Speaker 41

Thank you. Are there questions from the Board? Hearing none, may I have public testimony?

2:34:19 – 2:34:45•Speaker 4

Madam Chair and members of the Board, for the record, my name is Jeremy Vembery. I'm the Roxbury Community Engagement Specialist for the Ottawa Services. The applicant has completed the community process, which consisted of a neighborhood services subcommittee flyer distributed to voters for awareness, which completed the community process. To date, our office has not received any further community feedback at this time. Thank you for your time, and the mayor's office of neighborhood services would like to defer to the board for their judgment.

2:34:48•Speaker 39

Next, we may, I think, is Patrick. Patrick. If you can unmute yourself now.

2:35:03•Speaker 43

Oh, hi. I was just trying to get back as a panelist.

2:35:05•Speaker 27

I'm with the city. I had to jump off and jump back on the call.

2:35:10•Speaker 39

All right. So then I'm sure I won't see additional comments.

2:35:16•Speaker 41

Thank you. With that, may I have a motion?

2:35:20•Speaker 40

I'd like to put forward a motion of approval. May I have a second?

2:35:24•Speaker 41

Second. Sorry, no. Mr. Stembridge? Yes. Mr. Valencia?

2:35:34•Speaker 41

Ms. Turner? Yes. Ms. Betamraza? Yes.

2:35:41•Speaker 41

Yes. Mr. Langham?

2:35:45•Speaker 41

Chair votes yes, the motion carries. With that, can we take a 15-minute break?

2:35:53•Speaker 44

Thank you, yes.

2:51:45•Speaker 39

Yes. Yeah, we're ready. So start recording.

2:51:54•Speaker 41

Thank you, Mr. Stembridge.

2:51:57•Speaker 3

Recording in progress.

2:51:59•Speaker 41

Present. Thank you, Mr. Valencia. Present. Miss Turner. So we're going to use the next slide.

2:52:09•Speaker 38

Thank you, Ms. Wewell.

2:52:22•Speaker 41

I see you, but you might still be having technical problems. Mr. Lang.

2:52:27•Speaker 7

Oh, I'm here, Madam Chair. Sorry, I think I got caught up. I even restarted my computer over the break, but I guess it didn't help.

2:52:36 – 2:52:47•Speaker 41

It looks to me like everybody's having some kind of issue today. I can hear lots of static, so it seems this is the issue of the day. Mr. Langham.

2:52:49•Speaker 43

Present, Madam Chair.

2:52:50•Speaker 41

All right, excellent. The floor is yours, Mr. Stembridge.

2:52:54 – 2:53:38•Speaker 43

Thank you, Madam Chair. We'll return to the 11... Sorry. We'll return to the 11 o'clock hearing. And we will go to the last two, which are companion cases. Those being case BOA 1869100. with the address of 18 R Plain Street, along with case BOA 1869799, also with the address of 18 Plain Street. If the applicant can do it, they represent the president.

2:53:38 – 2:54:25•Speaker 17

Would they please explain these cases to the board? Good afternoon Madam Chair, members of the board. My name is David Higgins with an address of 20 Plain Street in Dorchester. We are proposing to combine number 20 Plain Street and 18 Plain Street today into a single lot resulting in a total square foot lot of 13,707 square feet. uh the new house on the on the combine lot will which will now be number 18 plain street uh i'll have if tim sheen would like to uh just explain the plans of the of the house and then once he's finished i will i will uh continue thank you

2:54:26 – 2:55:44•Speaker 24

Hello everyone, I mean Tim Shannon i'm the architect, for the project i'm a nine wall street in charlestown and, yes, the david's point we'd like to build a single family. host on the site, as you see, on the site plan, it would be very similar to the last project we did in the left corner of the site where you're looking at the lot except we would have a family room. to enlarge the living space on the first floor. I'd call it family-run master bedroom because if somebody wanted that to be a master bedroom suite, it would work well for that. The base of the first floor would be kitchen, dining, living, with a half bath and a forwardly justified set of switchback stairs. The middle floor, you know, the upper floors would be identical to what we do next door, so it would be two bedrooms, a master, and two bathrooms. Top floor, what we're calling a bonus room, up in the attic on the third floor in the slope. We would have a playroom, sort of another living space in the front right corner as you came up the stairs, a bathroom sort of for everybody, and then to the left in the sloped area with the small dormer, we would have a bonus room. And basically that's the house. It would come in at total 2525 gross square footage, which would result with a net of 2345, and that's the single family we'd like to build.

2:55:46 – 2:57:30•Speaker 17

Thank you very much for presenting that, Tim. Madam Chair, members of the board, I would like to emphasise the 13,700 square feet, which is half of the lot of the total combined lot, which is 31,000 square feet, if I add all the properties together. Again, this house fits nicely on the lot. It has good space. My side yard setbacks would be 10 feet each side of the house, and I have a rear yard setback, which is insufficient, but I would have a 20-yard, 20-feet, really hard setback for the families. Again, this house works nicely on the lot. We did get approvals from the board for the number 20 R Plain Street and number 12 R Plain Street on previous I do have a number of entrances to this particular house. I have three entrances to the house. One is on the very right-hand side of the plot plan that you see right now. I have one in the middle which hasn't been... The curb cut has not been cut yet because we may have some issues with... with the fire department in regards to access, but if it's approved, we will move forward with that. With that, I'll open it to the board for questions. Thank you.

2:57:35•Speaker 41

Can you confirm, so how many units or how many houses are on the site with this proposal?

2:57:46 – 2:58:06•Speaker 17

This proposal is actually four houses on the site on this proposal with combining the two lots, number 20 and 18 Plain Street. There is three on it right now, and with this proposal, there will be four on a total of 13,700 square feet.

2:58:09•Speaker 41

Questions from the board?

2:58:11•Speaker 44

Yes, I would like to know if you have had conversations with BPD on the overall site planning of

2:58:20 – 2:58:43•Speaker 17

of your proposals um and you know what's kind of forthcoming have you had conversations with them uh well we haven't had a lot of conversations i mean you know as to get it as to get as the as the houses get approved you know we go through design review but other than that you know there's not much really that we talk about i mean i i will obviously willing to work with them anyway

2:58:46 – 2:59:33•Speaker 44

Just the only reason I'm asking is because it looks like it's been over time has been that there is a vision urbanistically. And then over time, we've been approving project by project. And so internally, where there's parking and open space, It needs to be looked at a holistic versus because all the properties are sharing a driveway. And so it's not necessarily, it's being looked at as a project per project. But if you look at the site plan, there's a lot of shared amenities between each of the houses. So that's why I was asking.

2:59:34 – 3:00:19•Speaker 17

Yeah, thank you for that. It has been an ongoing project going on since 2000, like 15 or 16. So in order for me to get these houses built, it just takes time and we go through them in phases. do share the driveways uh there is one driveway in the middle there where that car is in the middle of the of the site plan uh that is the main entrance to the property but it is like 20 feet wide and then on the right hand side i also have a driveway with access which is a 24 drivers right wide wide driveway as well other questions or comments from the board

3:00:23•Speaker 41

Now, public testimony.

3:00:25 – 3:01:54•Speaker 3

Hello, Madam Chair, members of the board. My name is Emma Jones, representing the Mayor's Office of Neighborhood Services. Regarding 18R Plain Street, our office differs to the board's judgment. A community process was conducted, including an abutters meeting held on Wednesday, January 14th, 2026, that was well attended by the Dorchester community members, where overwhelming opposition was expressed with concerns expressed regarding the quality of life, the applicant's ongoing proposals and community members' concerns about the site storage for construction, construction trash that had not been cleaned up, and what they felt to be excessive zoning violations as well as the increased stress on street parking that this property would amplify. Additionally, we received five letters in opposition, citing many of the same concerns expressed in the abutters meeting, as well as concerns that the proposed changes to rear parcel access, including the lack of a documented curb cut approval and the need for clarification regarding emergency access, combined with the number of requested variances and the cumulative impact of prior approvals on this lot and the abutting lot warrant further review. of the project's access, scale, and overall impact on the neighborhood. We have also received six letters in support from the two abutting parcels owned by the applicant and one from the parcel currently being reviewed at 18 Plain Street, where community members indicated they had no issues with the proposal. The project was also reviewed by the Popes Hill Civic Association, where no significant concerns were shared. At this time, the Mayor's Office of Neighborhood Services defer to the Board's judgment on this matter. Thank you, everyone, for your time and consideration.

3:01:57•Speaker 39

Next, we have Liam Rimas from Council of Fitzgerald.

3:02:05•Speaker 27

Hello, Madam Chair, members of the board. Liam Rimas from Council of Fitzgerald's office.

3:02:09•Speaker 20

Council would like to go on record in opposition to proposal due to concerns even for our office from Butters. Thank you.

3:02:18•Speaker 39

Okay, next we have Zach.

3:02:21 – 3:02:50•Speaker 11

Hi, how you doing? My name is Zach Yachteen. I live at 16 Plain Street in Dorchester. I'm here to express my full support for Dave's proposal to build a new single family home on Plain Street. You know, Dave's given me and my wife the opportunity to potentially have a family and remain in the city. And we would love to see another young family get the same shot. You know, with that being said, I fully support Dave's project and respectfully ask the board to approve his proposal. Thank you.

3:02:50 – 3:03:06•Speaker 39

Thank you. And we have Martin Swinney. Martin, you can unmute. MARTIN SWINNEY JR.: Here we go.

3:03:06•Speaker 37

Can you hear me?

3:03:08 – 3:04:37•Speaker 37

Hi, I'm Martin Sweeney. I'm a director directly behind the development. I'm in opposition to this. I know his tenant just came on and said he supports the project, but that's kind of self-serving. He's already there. When this project was originally started over 10 years ago, there were a proposal for three properties and green space in the back. That's currently been chipped away at. There's now a fourth building back there. There's never been any green space. And this one would be a fifth thing on the property. There is no, we've lost trees. We've lost tree cover. The fourth property was supposed to be geothermal. That never materialized. There's been a lot of issues. It's been under constant construction for more than 10 years with backhoes on piles of dirt, looking over the fence at every neighbor's house. And again, I just can't say enough. He's been chipping away at this from what the original proposal was and what everybody agreed to. And it would be a crime to allow this to continue and to get into abusing his neighbors in the abutters. I put something in the chat that's more concise and has some more issues in it, but I'm on the way to check in right now to the hospital. Thank you so much.

3:04:41•Speaker 39

Madam Chair, I don't know what's happening. I post an additional comment.

3:04:50•Speaker 41

Okay. Can the applicant respond to those concerns and feedback?

3:04:56 – 3:05:34•Speaker 17

Yes, Madam Chair. In regards to that last comment, it wouldn't matter what I built. That neighbor wouldn't have been happy. But as I said, I've been under construction here. I've built three houses here in the back, and that's why the excavator has been there and working. for a number of years now. Hopefully we can finish up with this project and move on and get this site back to original and plenty of green space, parking space, and get it finished. Thank you.

3:05:37•Speaker 41

Questions or comments from the board?

3:05:42 – 3:06:00•Speaker 44

Yes, I have 1 other question from the site plan that you showed. They should there's 7 structures. 1, 2, 3, 4, 5, 6, 7, 7 structures and. You currently are the developer for those 7 structures, correct? Or 6 and then 1 is being proposed. Correct?

3:06:00•Speaker 17

Correct. That is correct. Yes.

3:06:02 – 3:06:33•Speaker 44

Okay, and the only thing that is different from what we're seeing in the site plan. Is that the new curb cut that you're mentioning in between the properties on plain street. is not being proposed yet, correct? So the main access to 18R Plain Street is from the top right of the site plan.

3:06:33 – 3:07:11•Speaker 17

That is not correct. I just haven't pulled the permit for the curb cut yet because I'm not sure with the fire department how large they're going to want the curb cut. So the curb cut has been approved from when I originally got number 18 Plain Street, which was an as-of-right house. The houses on the front were all as-of-right, so I got a curb-cut permit. Well, no, approval. I haven't got the permit to date, but it has been approved at a public works. I haven't received it yet at the moment, but it has been approved.

3:07:13•Speaker 44

And you've had a fire department reviewed your plans for fire access trucks behind the properties.

3:07:21•Speaker 17

It is an application. I guess that they don't fully review it until it's approved by you guys.

3:07:32 – 3:07:55•Speaker 44

Um, and so when you, when you were proposing, um. Your property, you never proposed, and I think I already mentioned this, an overall site plan to be PD. You've just been doing it smaller by increments. You never had a larger vision for the property.

3:07:55•Speaker 17

That is correct.

3:07:57•Speaker 44

Okay, great. Okay, thanks. I don't have any further questions.

3:08:05•Speaker 41

Okay, any other questions or feedback from the board?

3:08:08 – 3:08:42•Speaker 40

Yes. It seems... i'm sorry it seems that there's a large impact to the community with the ongoing construction um and so i'd like to get a good sense of what if any current construction is happening and then also um like a timeline or for these projects like when Can the neighbors expect some of the current construction to be finished? And then for this new proposal, what is the timeline that you're considering? Thank you.

3:08:43 – 3:09:33•Speaker 17

Thank you. Uh, well, I'm just finishing up number 20 playing street, which is it's in the process of, uh, I just finished the landscape and plant a lot of trees out the back. Uh, so it, I'm hoping to close out the permit, that particular permit within the next month. And. Subject to this being approved, I would expect it to take six to eight months to finish out this, get the foundation dug and get the house built. you know, do the landscape. And I've done a fence around the place. Nice fence and nice tree. I've kept as many trees as I could. Some of the trees were rotten at the back, so we did have to take some of them down. But I have kept several big trees, which will get trimmed again if needed. But it's, you know, again, it works on the site, but that's all I have to say.

3:09:34•Speaker 40

Okay, thank you. And one more follow-up. Are you considering building more in this area after this?

3:09:41 – 3:10:10•Speaker 17

No, no. This is... What you see in the site plan is approximately what we're going to do. I don't plan to... I've had this property since 2017. It's been a long, drawn-out process. I had proposed different projects before through previous administration, but it... It never went anywhere, so it just takes time. And I actually just wanted, I'd like to get, try to get it finished and, you know, get my daughter moved in here and finish it up.

3:10:10•Speaker 44

Okay, thank you very much.

3:10:12•Speaker 44

I have one question. Are there six other properties, like single-family condominiums as well?

3:10:19 – 3:10:34•Speaker 17

They're single families, yeah. They're all single. Actually, there's one that was originally, it's a two-family. The one on the very right-hand side is a two-family. that I bought as a two-family, and then I got the carriage house at the rear converted to a single-family. Okay.

3:10:35•Speaker 44

But all of this is under a condominium.

3:10:38•Speaker 17

It will eventually be.

3:10:42•Speaker 44

And the improvements of the driveway, it's all shared costs. It will be among the seven.

3:10:46 – 3:10:57•Speaker 17

It will be. Yeah, yeah. Because of... Because of the way it's been developed, it got developed as single families. But once it's all going to get done, it'll all be one condo project. Right.

3:10:57 – 3:11:09•Speaker 44

And so the last one, this 18R, is the last one that... you own or do you own any of the other condominiums?

3:11:09•Speaker 17

I own them all. I still own all the houses.

3:11:15•Speaker 44

Oh, so you own all of these.

3:11:17•Speaker 44

Like the person that just came in and spoke in favor, is he a renter?

3:11:24•Speaker 17

He's a renter, but I couldn't sell these until everything gets done. Got it.

3:11:30•Speaker 44

Okay, perfect.

3:11:31•Speaker 17

So if you understand my situation.

3:11:33 – 3:11:57•Speaker 44

yeah no i understand so you're you were um building as you went along and then is your intention to sell these yeah okay okay i don't have any further questions thank you thank you okay yeah if they're not are there sounds like miss we will do your question yeah madam chair sites so i shouldn't about the relationship of the

3:11:58 – 3:12:26•Speaker 7

a proposed dwelling to the other buildings around it. You know, it looks to be three stories, which exceeds the buy rate of two and a half by half. So I'm just wondering what that relationship is like to your properties, but also the properties and it, um, I think generally when something's so internal, it's usually subordinate to its surrounding building. So could you tell us about that?

3:12:26 – 3:13:04•Speaker 17

Yeah, I mean, I'm happy to make a two-and-a-half story. It's just, there's a dormer. If you look, if you went to the plant, there's a dormer, and I think it's over eight feet. So I think it... It qualifies as a three story, three stories. But I'm happy. I mean, if it gets goes to the, you know, design review and we can go to two and a half stories, I'm OK with that. It's just it's very similar in design to the house that was just approved and that I just built at number 20. The only difference is it has a family room on the side. This new property.

3:13:06 – 3:15:18•Speaker 44

Sorry, I have one more question. No, no, it's okay. I'm not sure if they can go back to that survey plot plan. Can the ambassador go to the survey plot plan? The survey plot plan? Okay, here, this one. I just reviewed your overall site access and to the right, if you have to maintain a 20 foot width for fire trucks, it would conflict with the three parking spaces right in front of unit five. And then the only other observations I see that if you do move ahead and put a fire access in between unit three and the unit next to it it would not provide clearance because you have some structures next to it a 20-foot clearance so are the parking spaces in front of unit five flexible yeah i i actually i don't really i don't park them that way right now i park them in tandem okay so i think what this is um suggesting and i'm just having observations to my colleagues is that your project almost needs to go through a site plan review that looks at fire access that looks at overall parking that looks at open space that looks at safety sidewalk Um, pathways for the front entry or rare entries of your building. So I'm just making some observations now. Um. I don't have an issue with your proposed building, but I do have an issue with. The location of that last building, and then how everything kind of works together and you would probably need to make some modifications. to allow that. So I'm just, I don't know if others might want to comment and they agree or they don't agree, but I'm just talking out loud. Thank you.

3:15:21 – 3:16:02•Speaker 41

Thank you, Ms. Barraza. That makes sense given this is, given the all sudden properties belong to him and they should be effectively working with the neighborhood. Mr. Hampton, do you have any comments on the suggestion? especially as a potential proviso no i don't okay uh with that is there a motion yes um madam chair i would i would like to i'm sorry was there another member comment okay if not then this better awesome

3:16:03 – 3:17:08•Speaker 44

Okay, Madam Chair, I like to put forward a motion of approval with a proviso that the project undergoes urban design site planning review with BPD. and potentially BTD to review car access to the development to ensure life safety, fire department, fire truck access and maneuverability. And to review the overall final location. Of the of the proposed building and to. Promote a good balance of open and green space to that of. driveway area and also to allow for adequate vegetation to abutter the rear abutters to provide privacy due to the proximity of the proposed project.

3:17:09•Speaker 41

So Mr. Barraza, just to clarify, when you say site planning, do you mean to encompass all seven properties or just?

3:17:16•Speaker 44

Correct, to the site planning, which is to look at it as a completion of a development.

3:17:25 – 3:17:40•Speaker 41

Just wanted to be clear, we're referencing all seven properties. Is there a second? Is there a second? Mr. Stembridge.

3:17:48 – 3:18:06•Speaker 40

No, I personally like to see a better community process with the current projects and then maybe going like seeing where to go forward from there. But depending on how this vote goes, I just really would like to ask the applicant to have a better process with their neighbors. Thank you.

3:18:08•Speaker 41

Ms. Betarraza? Yes. Ms. Wuwo? Yes. Mr. Langham?

3:18:23•Speaker 41

The chair also votes no, the motion does not carry. Is there a second motion?

3:18:31 – 3:18:45•Speaker 40

I'd like to put forward a motion of denial without prejudice so that the applicant can go and talk to their neighbors and then come back to us with a better proposal. Is there a second?

3:18:46•Speaker 50

Yes, a second.

3:18:48•Speaker 41

Mr. Stembridge?

3:18:57•Speaker 41

Ms. Turner? Yes.

3:19:00•Speaker 43

I'm sorry, I keep the

3:19:02 – 3:19:34•Speaker 44

Yes, and I would encourage that the revised proposal now looks at it holistically and has conversations with BFD, the Boston Fire Department, BTD, Boston Transportation Department, and it might also be helpful to have conversations with BPD to address some of the issues that was raised in this meeting.

3:19:35•Speaker 41

Thank you. Ms. Lewell?

3:19:42•Speaker 41

Chair votes yes. The motion carries.

3:19:52 – 3:20:22•Speaker 43

Next, we go to the rediscussion cases scheduled for 11.30 a.m. we'll begin with the first case which is case boa 182 6508 with the address of 401a to 401 chelsea street if the applicants and or the representative of prison would they tell you going to the board

3:20:23 – 3:32:23•Speaker 27

Yes, thank you. This is Cambridge. Good afternoon, Madam Chair, members of the board. For the record, Richard Linz, the business address, 245 Summer Street, East Boston, here on behalf of the petitioner, which is the 348 Bennington Street, LLC. I believe we may have our architect, David Choi, with us as well, but I'll run through the presentation. And if there are any specific questions that require his response, we'll call him up. We could probably jump down to slide three to start the conversation. This is a pre-existing three-story building located in the Gay Square neighborhood in East Boston. It sits on a roughly 1,890 square foot lot. It currently is occupied by a building that's mixed use with ground level retail facing Chelsea Street with two residential units above. Our proposal would involve the renovation of the existing structure a vertical and rear addition to the building, change of occupancy from the existing occupancy of two residential units in retail to retail with a total of nine residential units. Because this would be increasing the total number of units over the Article 79 threshold, the seven units that are being proposed would be subject to the IDP requirements at 17%. would require the commitment of one IDP unit, which we will deal with with the Mayor's Office of Housing in connection with this application. We want to jump down to slide five. Next slide, please. So a good overview here, Madam Chair, members of the board showing the surrounding immediate context, this section of Day Square, is where the former Giavelli's restaurant location used to be. This property was part of that assemblage of properties that were recently sold in connection with the Giavelli's property. This is not attached to the buildings adjacent to it, but as you can see, we do have a little bit of space behind our building. Most of the buildings along this corridor do have front to back built-up conditions. You can see the relationship here, which I think is relevant to the discussion about the type of relief that we need. If we could jump down to slide, it's going to slide eight. That's probably a better view for the street. You can see the building here. It's the gray building with the ground-level retail. As you can see, the adjoining buildings are similar in height. The current condition, our building would be increasing building two stories. would point out this is in the uh i'll use the term relatively newer zoning sub-district uh notice the mixed use five district that was part of the change that was part of the planning's boston zoning changes for the neighborhood which allows for up to five stories and 65 feet in height one thing i will point out is that because this property is located in relative close proximity to runway 15 at logan airport We did a critical height evaluation of this property and the critical height limit for this area is 98 feet above mean sea level. Our building with its current site elevation of 18 feet with the total building height of 48 feet will still be below the critical height limit. We still are required. to provide notification of the FAA in connection with any approvals we receive before our building permit is issued. So I just want to point that out to the board that we are sensitive to its proximity to runway 15, especially anything in the Bay Square area. Next slide, please. Just a different view here, and you can see, again, the surrounding context. It is generally mixed use in this area, so we do have a number of ground level retail with upper level residential units. Next slide, please. It's the zoning refuse. I'll go through that in a moment. Maybe just jump down to slide 14. That will get us to probably what we need for the purpose of the site plan. Just need to zoom in a little bit on that right side there, yeah. So you can see the images here do illustrate how we propose to develop the site with the addition and what the context of the building would be, the height. I know this came up in the community process that, you know, our building certainly will be taller than the buildings that are near it. But that is, I guess, one of the outcomes of Planning Boston that areas like this were targeted for additional height and density based upon the size of the streets. These are main thoroughfares through East Boston. And the planning department, in its wisdom, decided that these areas could accommodate more height, more density, and that has been the focus of a lot of the new development that's been happening in and around the Day Square neighborhood. As you can see on the right side, if we were able to zoom in, Mr. Ambassador, we do show The area that we are filling in, and we can see the setback on the Bennington Street side is roughly about 4.25 feet, which directly addresses one of the violations that were cited that we referenced in the Planning Department's recommendation. If we go down to the next slide. We can go further down, maybe two more slides. Here's slide 14. Slide 15. Okay, yep, we can stop there. So again, just a couple of different views, images, to give an idea of what the finished product will ultimately look like, and again, what it looks like in context with the surrounding area. Next slide, please. Existing condition floor plans, just showing the existing retail and the ground level, the existing residential. Next slide. And then our proposed conditions, the ground level is at the bottom portion of the screen, Madam Chair, members of the board. We do show an ADA accessible unit. At the ground level, we are not located in a flood zone, so no issues with respect to our elevation that would affect having habitability at that level. We do provide an appropriate means of access into the unit. We can just jump back to that slide. Sorry. In the middle, we see the typical floor layout for the units that are maybe on levels two through five, and then our roof plan showing that we do incorporate the mechanicals above the roof line. Next slide, please. Just our elevations showing our overall height. I think we indicated that just over 48 feet total height. and this would be preserving the existing structure and doing these as renovations and additions to the existing building. Obviously this will include an upgrade to all of the life safety I'll turn quickly to just the relief that is cited. First would be the roof structure restrictions on Article 53, Section 25. The Boston Zoning Code requires a conditional use permit any time you're altering the roofline of the existing structure. My position is that this typically involves when you are proposing either a head house or a roof deck or some other type of structure on an existing roof. Because we are proposing a complete renovation with a vertical addition that is within the height limit, we believe that is all encompassing under the current version of Article 53 that addresses the allowable height. So even though a conditional use permit is typically required for restructuring restrictions, this is an actual renovation of the building and should be permitted without the need for even a conditional use permit. However, we have applied for that to the extent the Board deems one as necessary. we're also excited for insufficient off-street parking this comes up right early now with the mixed-use districts mixed-use districts in the east boston mayor regardless of whether or not they are subject to article 80 are exempt from the minimum parking requirements footnote 4 to table l specifically spells that out We did raise that with the examiner. It was not removed. We do not believe this is a violation based upon the plain reading of table L and therefore would ask that the board not require parking. We were also cited for the condition of a through lot because we do have frontage on both Bennington Street and Chelsea Street. The rear yard requirements are not applicable. The front yard requirements would be. We have two options to achieve compliance. One would be the setback that we're currently showing at 4.25 feet. We could also elect to do a modal study, and we're happy to deal with that in the design review component should the board approve this. So we feel that we can comply with the front yard requirement or the modal setback in either instance for the Bennington Street property. The maximum lot coverage for this area is 75%. I do believe we are in excess of the lot coverage, but as I showed the board, the surrounding context of buildings, both left and right, and anything within that sort of island within Day Square pretty much occupies most of the lot. If not in excess, while in excess of 75%, we would not be much different than any of the buildings that are in the vicinity. We therefore believe relief would be appropriate in this instance. We've also cited for the minimum permeable area not being met. It's a very low threshold. And for this site, I believe we will need about 275 square feet of permeable area. Based upon where we're set back currently, both side and front, I should say on the 19th Street side of the building. I don't think we're that far off. So if compliance is necessary, I believe that is achievable. And we can certainly, again, address that through a design review. We were cited also for insufficient side yard setback. And that, I believe, involves, if you're looking at it from the Chelsea Street side, the right side of the building, which is already in pre-existing non-conforming condition. The addition that we're proposing actually does set back on that right side line. we don't set it back on the left but again that being a pre-existing non-conforming condition we are exempt from compliance provided that we don't increase the non-conformity any more than it already is and i believe in both instances we do not do that and so therefore we wouldn't be in compliance with the exception for the institution decided setback that was cited Again, cited for insufficient front yard, which we believe we've already addressed. And then there's an additional citation for minimum ground floor ceiling height into In the MU5 district, any new constructions requires a minimum of 14 feet for the ground level ceiling height. Because we do have an existing conviction, it would be a tremendous hardship to change that floor ceiling height, especially since we are preserving the upper levels, level two and level three. And therefore, we think that a variance would be appropriate to the extent that that is applicable. With that, Madam Chair, I will pause to see if there are any questions on the board and address any comments the board may have.

3:32:25•Speaker 41

Thank you. Questions from the Board?

3:32:31 – 3:32:48•Speaker 36

Yes, Mr. Lins. Have you considered adding a step back on the top floor from the street to reduce the massing and the appearance from the street just to make it, I mean, to make the perception less, I mean, tall for the street?

3:32:50 – 3:33:19•Speaker 27

Yeah, Mr. Valencia, it's a great question. And that is actually required in certain areas in the mixed use districts. The MU5 district does require a step back to the extent that we are flooding a residential district because we are completely enveloped in the MU5 district. We would be exempt from a step back requirement, but something we can certainly review as part of any design review if that's the desire of the board.

3:33:19 – 3:34:22•Speaker 44

all right thanks thank you other questions or comments from the board um i think i think the biggest hurdle for this project is to really meet um the maximum um coverage uh the maximum coverage of 70 and the minimum permeable of 15 Because I don't really see, I think it would be great that this would be the first building that works with the new East Boston zoning to allow five stories. I don't really see that as an issue. I think you, the last story could be set back a little bit, you know, maybe three feet. But I do see, you know, I would be more than happy to approve the project if there was a proviso that you could work with BPD on the actual lot coverage and to work within the 70, even 75%.

3:34:24 – 3:35:49•Speaker 27

that that to me is the the big kind of zoning issue um that i that i see and that i've read from the bpd recommendation if i may uh i don't share ms pedrobras i i agree i think that if we could do that we certainly would have gotten there but i think in order to in order to make that lower level unit at least on the ground level a size that would be feasible, especially for persons with disabilities, especially with the access issues for the building, it is going to be difficult to get to within 75%. And I think that our total footprint in that instance would be around 1,400 square feet if we needed to comply with that. That's going to trim that addition of a rear significantly and i think it's going to create you know a condition that's going to make that you know really small so happy to work with planning on some ideas to help soften that but i don't know that we're going to get there um otherwise and i don't think it's very viable why did you say accessibility because there's no you're not changing it was noted that you're leaving steps at the front that the front entrance is not accessible that's for the that's for the retail the yeah The rear addition on the Bennington Street side does have a residential unit.

3:35:51•Speaker 44

Has a residential what?

3:35:52•Speaker 27

We're proposing a residential unit at grade.

3:35:55•Speaker 44

Oh, at grade. Okay, that is accessible.

3:35:59 – 3:37:12•Speaker 44

Yeah. Yeah, I think something has to give, right? And so then it takes you to, is your client willing to reduce it from nine units because we're asking you to comply? Yeah. with the new zoning. The other issue is do you try to strategize and go to four-story and try to get through with just one means of egress, which you can now do? Because I know there's a financial condition that you have to also review in regards to density and construction costs. So that's why I was wondering how flexible were you willing with the nine units? Because then the other way would be that the board says, does not approve it, has you to redo the request for you to revise the whole project. So I was trying to get a gauge whether your client was willing to work with BPD on that massing concern.

3:37:13 – 3:37:41•Speaker 27

always willing to work with planning. The one thing I will point out is that ISD and in practice, even though I don't disagree with you that, you know, at four stories, one means of egress would be appropriate. I think Unless there's been something that's changed as of most recently, I think we've just dealt with this in the last two weeks with ISD, is that they are requiring the two means of egress regardless.

3:37:42•Speaker 27

Okay. So I agree. I would love them to review that.

3:37:50 – 3:38:17•Speaker 36

um but we're still running into that issue depending upon who examined so even at four stories we're still going to require that to address that great thank you i don't have any questions okay any other questions from the board yes quick question how many idp idp units will you be um provided to the city and what will be the income level

3:38:19 – 3:38:59•Speaker 27

Yeah, I believe on this one, Mr. Valencia, the requirement is on the seven unit, the seven additional units we're required to address at 17%, which comes to one unit plus a buyout at 0.19 for Zone C. So I believe this is intended to be rental. Therefore, there would be a maximum AMI of 60%. Thank you. We could opt to go to a second unit and avoid bio, but it all depends on what the numbers look like. But maximum 60% AMR.

3:39:01•Speaker 41

Thank you. With that, let's have public testimony.

3:39:06 – 3:39:39•Speaker 3

Hello, Madam Chair, members of the board. My name is Eva Jones, representing the Mayor's Office of Neighborhood Services. Regarding 401 Chelsea Street, our office differs to the board's judgment. A community process was conducted, including an abutters meeting held on 4-9-26 that was not attended by any East Boston community members. The proposal was also reviewed by the Eagle Health Civic Association at their meeting on 3-25-26, and the association expressed support with a vote of nine in favor and two opposed. At this time, the Mayor's Office of Neighborhood Services differs to the Board's judgment on this matter. Thank you, everyone, for your time and consideration.

3:39:43•Speaker 39

Madam Chair, there are no additional comments.

3:39:46•Speaker 41

Okay. Any other questions or comments from the Board? Is there a motion?

3:39:57 – 3:40:28•Speaker 36

Okay, Madam Chair, I would like to put forward a motion with a proviso that... A motion of approval or... Oh, yes, sorry. Motion of approval with a proviso that the Planning Department works with this proponent to improve the project and special attention to consider a step back from the street on the top floor. And I'm open to any of my colleagues if they want to add another proviso. And if not, that is a motion.

3:40:33•Speaker 41

Okay, is there a second?

3:40:39•Speaker 41

Mr. Stembridge?

3:40:48•Speaker 41

Ms. Turner? Yes. Ms. Pettibraza?

3:40:57•Speaker 41

As we will. Yes. Mr. Langham.

3:41:05•Speaker 41

Chair votes yes. The motion carries.

3:41:08•Speaker 27

Thank you very much. Have a great day.

3:41:14 – 3:41:51•Speaker 43

The next case has been deferred. So that takes us to the following case, which is case VOA 18206. 17th the address of 722 r east 8th street if the applicant endured their representative present would they please explain the case to the court thank you mr stembridge good afternoon madam chair and the board my name is scott simon and i am the owner and reside at 722 east 8th street in south boston

3:41:52 – 3:42:25•Speaker 49

i am the fourth generation of my family to live here and i am respectfully requesting zoning relief to change the use of my existing detached carriage house to a single family under the adu guidelines for my parents to move into just a little background this would be the neighbors on each side had rear detached structures that have been converted into units 102, 103. We are requesting to change this to a one with parking underneath.

3:42:30•Speaker 41

Are there questions from the board? May I have public testimony?

3:42:38 – 3:42:56•Speaker 26

Madam Chair and Board Members, Siggy Johnson with the Office of Neighborhood Services. This petitioner completed the community process. Our office hosted an abutters meeting on June 1st at which abutters were supportive and no concerns were raised. City Point Neighborhood Association has taken no formal position on this proposal. With that background, ONS defers judgment to the Board. Thank you.

3:42:59•Speaker 39

May I have Ashley from Councillor Flynn's office?

3:43:01 – 3:43:14•Speaker 33

Thank you. Councilor Finn would like to go on record and support based on a good community process. You respectfully request that the proponent continue to work closely with neighbors during the construction phase. Thank you. Thank you.

3:43:14•Speaker 39

Madam Chair, there are no additional comments.

3:43:20•Speaker 41

Yes. I'm sorry. I'm sorry. Are you commenting on this project? Yes, I am. I'm a director of Butter, and...

3:43:29•Speaker 8

I'm at 724 East 8th Street. My name's Dan Lazarchi. My wife, Jill Shurtleff, and I have lived here for over 26 years, and we fully support the ADU proposed next door.

3:43:40 – 3:44:05•Speaker 41

Thank you. Okay, with that, may I have a motion? I'll put forward a motion of approval. May I have a second? Second. Mr. Stembridge? Yes. Mr. Valencia? Yes. Ms. Turner? Yes. Ms. Betabraza?

3:44:10•Speaker 41

Mr. Langham? Yes. Chair votes yes. The motion carries. Good luck.

3:44:16•Speaker 43

Thank you, Madam Chair. Madam Chair, that is all we have for today.

3:44:23•Speaker 41

okay well thank you everyone um thank you for everyone's patience with everyone's technical issues we will see you next time thank you thank you have a good day

This transcript was automatically generated from the official public meeting video and is presented unedited. It reflects remarks made on the public record by elected officials, staff, and public commenters. Transcript accuracy may vary; view the original recording for reference.