Wolfeboro Waters Committee - Regular Meeting
Tuesday, September 15, 2026
About this meeting
- Government Body
- Wolfeboro Waters Committee
- Meeting Type
- Wolfeboro Waters Committee
- Location
- Wolfeboro, NH
- Meeting Date
- September 15, 2026
Video will appear here as soon as Wolfeboro Wolfeboro Waters Committee posts it — usually within a day of the meeting
Tuesday, September 15, 2026
31 items on the agenda.
Sign up to highlight the topics you care about on every agenda.
Start free trialCall to order:•Item 1)
Call to order:
Minutes: Approval of Minutes-July 21, 2026 –Attached•Item 2)
Minutes: Approval of Minutes-July 21, 2026 –Attached
Election of new Chair- Co-Chairs?•Item 3)
Election of new Chair- Co-Chairs?
Develop the Budget 2027 - Attached 2026 through July•Item a.
Proposed 2027 amounts equal $21,900-
Develop the Budget 2027 - Attached 2026 through July•Item 1.
UNH 6,000.00- toxin testing
Develop the Budget 2027 - Attached 2026 through July•Item 2.
UNH- Stream Analysis 2,000.00
Develop the Budget 2027 - Attached 2026 through July•Item 3.
Toxin test Strips 1,400.00
Develop the Budget 2027 - Attached 2026 through July•Item 4.
Stream Consultant 2,500.00
Develop the Budget 2027 - Attached 2026 through July•Item ____
Beach signs
Develop the Budget 2027 - Attached 2026 through July•Item d.
Mitigation and Prevention $6, 000
Dockside Parking Lot puddle•Item a.
All water testing will be done by Stantec.
Carry Beach Petition•Item a.
Review
Carry Beach Petition•Item b.
State replied that manual removal of debris from a swimming area no wetlands permit is needed.
Hand raking of leaves and other organic debris from the shoreline or lake bed may be conducted without a wetlands permit so long as the area is exposed by drawdown or other lower water conditions, rakes does not disturb the vegetation roots, and the area being raked is no larger than 900 ft.². Hand removal of tree branches, construction material, and fish lures may be done without a state wetland permit.
Communication Committee•Item a.
Update report
Communication Committee•Item b.
Beach signs-Carry and Brewster Beach
Communication Committee•Item c.
Later Albee Beach
Communication Committee•Item d.
Boat Ramps
Assessment Committee•Item a.
Benthic mats
Assessment Committee•Item b.
Stream Testing
Assessment Committee•Item c.
Work with UNH
Rust Pond- Libby•Item a.
Update 319 grant for the watershed for the north end of Rust Pond
Rust Pond- Libby•Item b.
Update on NHDOT project for Rt 28 South below Pleasant Valley Road
Mitigation and Prevention-•Item a.
Cost-$6,000
Mitigation and Prevention-•Item 2.
Library Parking Lot-
Mitigation and Prevention-•Item 3.
Crescent Lake Dam
Mitigation and Prevention-•Item 4.
Tracking project sheet review- Set priorities for funding
Septic Systems- Update•Item a.
Next step
Wentworth Watershed Association•Item a.
Meeting with NHDOT on RT 28
Wentworth Watershed Association•Item b.
Wentworth Estates-Done
Wentworth Watershed Association•Item c.
Septic Workshop report
The Lake Winnipesaukee Alliance•Item a.