We're recording. All right. We will call the October 22nd, 2025 meeting of the planning commission to order. Our first uh item on the agenda is would you uh call the role? Miss Rambo. Uh Jade Castile here. Jim Jackson. Pete McGory here. David Miller here. Steve Pajali here. Connor Whan here. Mike Zul here. So, uh, just a question for Mr. Hastings. The the fact that Mr. Jackson isn't here and he did he call in? Not with me.

0:44 – 1:260

Okay. That that would be an unexcused absence. Correct. Unless the commission chooses to excuse it. Correct. Well, I think I'm going to stick to the the new policy as an unexcused absent. Okay. Well, unless somebody makes a motion. Hope hopefully he'll show up. Yeah, probably. Our next item is the approval of the minutes from September 24th, 2025. So, everybody had a chance to uh take a look at those. I get a motion to approve. So, moved. It's been moved. Is there a second?

1:24 – 2:080

I'll second. It's been moved and seconded. Discussion. All in favor? I. Anyone opposed? Motion passes. I'm going to abstain. I I was out of state at that meeting so I don't know what took place. Please note that Mr. McGori is abstaining. And I I will also abstain as I was not at that meeting. Okay. Plea please note that Mr. Miller has also abstained. We'll move into new business. The final planned unit development plan for Battery Park. That would be 701 East Water Street. And Miss Blair, are you going to uh kick that off?

2:070

I am. Thank you, sir. Okay.

2:08 – 4:060

So, we have received the final planned unit development documentation for the Battery Park project. Um parcels numbers as you see on the screen here. And just a reminder of the process. So first step of a PUD is the planning commission evaluates the preliminary development plan and the proposed zoning change which happened and was completed on November 22nd, 2022. And then they refer the zoning to the city commission. The city commission holds an additional public hearing and that was completed on April 23rd. So that the preliminary development plan and the zoning have been approved and we are waiting the final development plan documents which is what is before you today. So this is the final step in the zoning process. It's not the final step in the development process because they still have some legislative items to bring to city commission but this is the final step in the zoning. As a reminder of the land area we are looking at it's a number of parcels uh at the east edge of our waterfront known as Battery Park. And you can see a turned site aerial view looking east today. So there's marina land uses battery park itself and uh a lot of surface parking today. There's a few more photos of existing conditions, fencing along the waterfront, um some aging park infrastructure. This is the preliminary development plan that was approved as we mentioned in April 2023 by the city commission which was recommended by planning commission. And I'm going to flip to the final and you're going to see that it's this it's the same plan. There are no substantial changes. I'm going to flip back and forward again. It's it is uh more advanced. Obviously, we have a lot more documentation here, but this follows the preliminary plan

4:02 – 5:590

that was approved. a few takeaways from when as they move forward into design to get to this stage. Uh some little changes that have happened along the way. So first we have refined floor plans for the condo and apartment buildings. Um there's an additional 21 apartments from the preliminary plan and a reduced number minus two condos. There's 68 condos. So very slight adjustments in those numbers. Um there's 90% design for the public realm improvements. All the civil engineering that was not um started at the preliminary development plan time frame. There was an increase of number of parking garage spaces and on street parking spaces. So about 59 additional parking spaces from the preliminary just as those things start to lay out as they get more detailed and specific. Uh they maintained the 28% open space and that is 8% more than is required by our code. Our code requires 20% for PUB. So, it's an ample amount of open space. It's about 9.46 acres. The additional from the preliminary is because of all the streetscape areas where they'll have plantings. Um, that open space calculation wasn't in the first preliminary plan. And then they've also, you know, narrowed into the retail locations to complement those residential commercial land uses. There's 52,51 square foot in the final development plan. That's about 5,700 square foot less retail space than it was in the preliminary. So, roughly the same plan, the same thing. It's just more refined on on each of those numbers. There's a series of tables that shows the exact square footage calculations and comparison in the development narrative. It's also in the staff report. So, there are nine sections of the final development plan. There is an

5:57 – 7:560

illustrative table of contents in your staff report. So there's we did our best to to define each of these items that was submitted in the documents with just one or two sentences to help planning commission, the public, and future staff understand what is located in the document, where things are located in the document. The first section is the final PUD development narrative. That's the the small thumbnail image we're seeing here on the top left. There is a uh that's a like a 9 or 12 page document there. There's more descriptions of the design principles. There's more descriptions in there about what each exhibit is perta pertinent to which will also help the administration of the document in the future. Uh we chose to walk through just a few things I wanted to make sure to bring your attention to tonight and not every single exhibit, but if you have questions on the exhibits, I um please invite them from you. One item is the preliminary subdivision plat. So our subdivision, our major subdivision process requires a preliminary plat and a final plat. Um that's showing us what parcels are going to be defined in the final development. Uh the preliminary plat is part of your submission today. So that'll be part of that approval and then we'll bring the final plat in no we're expecting to bring that to you in the November meeting that will have those parcel lines um without the draft mark on them. Also there's civil engineering plans in this final PUD submission. It's about 30 or 40 pages if I recall correctly. that is the storm water, the utilities, the roadway crosssections, everything that will become public rightway. Those are at about a 90% level in the final PUD. You'll see that final drawing, those final drawings again uh when it comes back with the final subdivision plat in November.

7:56 – 9:550

There's a lot more detail in the proposed building elevations. So, I wanted to touch on uh ways that this shows up in the documentation. So we have what what I would characterize as close to like a 60% architectural drawing of the facades of the apartment building and the condo building and then details and you can see in the design options overall design principles of colors materials very specific to the articulation of these facads. So we're sure we are understanding what that outcome is. And one of the benefits I think to the advancement of technology and architectural design is the renderings that they're using, the renderings they're showing us th that is the design um technology that they are using. That's what's exporting these facade renderings and the diagrams. So the colors that we're seeing in the development renderings are what is depicted in the design principles in the document and what we can expect to see when they build the product. Here's another example of the detailed our um architectural facade. This is when you're looking from the water from the marina to the public space boardwalk area and the retail on the bottom floor with the condominiums above it and screenshots of the different design options they're showing from the types and styles of and colors of brick to the styles of the engineered wood siding that we'll see on the higher levels floor plans and different wood character surface. uh colors. There's more detail in uh for the residential unit floor plans. So in the condo building, it shows typical floor plans and arrangements of the different rooms in the for condominiums and for apartment buildings. So there's pages of these to show all the different types of units depending on where they are in the building. There are landscape plans. So there's a

9:53 – 11:530

overall landscape plan that shows the different textures that we will expect. So the hardscapes of the planning area including pavers, different types of concrete finishes, the different types of curves and planting bed edges. There's tree proposed tree species. um lots of details on the landscaping as well that is depicted in the renderings that you'll see. Overall um what is required by our code is design principles. So the the amount of architectural detail in in a lot of cases is even more detail than we require. Um, so that for those buildings that don't have a specific architectural facade in the building plan section, there are diagrams like you're looking at here which create design principles. And what that does is specify since this building that we're looking at here on the screen is not fully designed yet. It specifies that when the building is full designed, it will have brick and windows and alternating panels that look much like this, if not exactly like this. So, there's flexibility in the documentation for them to make design decisions when they get to construction documents. But staff will be able to administer the planning, the zoning code to make sure we get the outcome that we expect through the documentation they've submitted. That makes sense. Hopefully I've articulated that well, but please feel free. So, here's another example. There's six potential picnic tables on the bottom right. That's a screenshot from the landscape book. It doesn't mean that all six of those will be in the park or that any one of those will be in the park, but what they put in the park has to meet that spec of design, character, and quality in order for us to approve it when we see those final drawings when the building department will send them to us in their building for their permits. Does that make sense?

11:51 – 13:490

Thank you. They have also submitted a schedule in the final PD plan documents. Um their plan is to have this fully designed through the end of next year and see the construction through 2029. So in that schedule um they talk about starting site excavation as early as this year before the end of this year. Um, but to have that site and infrastructure marina and the standalone retail building in construction in 2026 and completing in 2027, to have the condo building, the north parking garage and the peers and breakwaters in construction from 26 to 28 and the hotel landscape south parking garage and apartments 2027 to 2029. So plan what the code asks you to review in a final PUD document is like A through H. So I highlighted some key words here. The first one is that the development can start within the next 18 months and their schedule does show that they want to start immediately. Um we know they have funding with a Brownfield grant to do site excavation specifically. Um so it they're showing that they can start within 18 months. Um the code asks us to see if the individual units of the development can stand by themselves. So if they built part of it or if they built one building or three buildings, it could stand alone and still be advantageous. And from staff's perspective, that is true, especially because it follows the principles of what we want to see from the comprehensive plan and the downtown plan and the previous Battery Park plans with the extension of the street grid and with buildings that are make making sure there's public access all around the edges to the public access to the waterfront. It asks us to evaluate whether the streets and thorough affairs are suitable and the civil engineering drawings have all been vetted and guided by our public works

13:47 – 15:460

department to make sure that they are suitable for this scale of development. Uh it asks us to look that at any proposed quasi public development is justified and I would call the quas public examples would be like the pool for the apartment building. It it is absolutely justified that the apartment building would have its own private amenity zone. So residents have a place to be outside that's not fully public. Uh and the marina guests have a pool on their second floor. So there's common space for the marina guests and marina members that's not fully public. Those are all also justified. It asks us if if there's any deviation from residential districts that it's is warranted in this. There is not deviation. So the the proposed residential PhoS are residential multif family and downtown business zoning. Um the previous zoning of this site was downtown business. So there's no need to explain um any deviation from those code requirements. It asks that the area surrounding the development may be planned and zone in coordination with this proposed development. Um staff would would say that this is also true because the area surrounding this is largely zoned downtown business and has been considered um an important development area for decades in the city. Um it asks us to evaluate whether the planned unit development is in conformance with the comprehensive plan and this has been confirmed through the uh approval during the preliminary plan process. That staff report focused greatly on the principles of the comprehensive plan and the downtown plan being fit by this development and that the existing and proposed utility services are adequate which again our public works department has uh vetted those civil engineering drawings all along the way. So with that, we would recommend approval with the following conditions. That all applicable permits are obtained through the building department, engineering department, and any other applicable agency prior to construction. And that the developer ensures that

15:45 – 16:400

during construction, to the furthest extent, practicable public access be maintained to existing public facilities. Of course, we understand that if they're building the pier, we're we're probably not going to be able to go walk our dog on the pier, but we want to make sure that they maintain public access to the extent possible uh during construction and really consider that as part of their construction phasing and construction management. Um, finally, I'll mention we do have a rendering walkthrough. So, it's actually like a a walkthrough recording of the renderings which I can key up. It's like on a loop if that is not distracting. I can start that whenever you'd like, Mr. Chairman. And also the developer is in in audience today if you have questions for them. So just let me know when you'd like me to put that video on um so you can see it. It's a couple it's like 20 minutes long. So we're not going to want to just sit and watch it. Uh but it has a good idea of like the development character and stuff. So

16:38 – 16:580

I could narrate it a little bit and then stop talking or we could just put it on. I I defer to your your How about if we we start it now. you narrated a little bit or or these gentlemen and uh maybe we stop it and come back to the table and

16:54 – 18:080

get get into some discussion. So here we're on Mag Street looking at the water north and taking a right onto what will be the new extension of Water Street. So the view that we're looking right forward is the first building that's a parking garage with a retail space as the anchor at the corner. And so the downtown's behind us street is to the right. This is the hotel building. right as the entrance to the development. So now we're into new area that's not built yet. It's parking lot today. So this would be the extension of Water Street. You can see the character of the streetscapes and the on street parking similar to other really rich public realm spaces like a Crocker Park like Columbus, right? It's got the foot traffic and interest of the type of development that the planned unit development ordinance was created to enable.

18:06 – 18:290

On the left, there's ground floor retail spaces. On the right, we're walking past or going past the hotel. Uh coming up here soon on the left, you're going to see an area where it's open air that you'll be able to walk to the left. And it would surprise me if they don't turn us that direction, but we'll see. So, be able to walk to the left here to get to the water. That's exactly what they're going to do. So

18:27 – 20:270

now you're looking through. So this is a this is a public access way through the building to get to the waterfront and we're looking at the condos above. Couple stories of condos above those retail spaces. And this is the way you would get to the parking garage. So if you park in that central parking garage, you'll be able to walk right through that building through the other building to get to the waterfront. Continuing down the water street, Battery Park is there towards the end and they have a rendering of a some kind of sculptural figure to act as kind of a breadcrumb to lead people down that direction. See a little bit more retail space there going to the left and to the right you see that new street coming up. That's where that apartment building is. And then up in the far up right you'll see the standalone retail. This is another place where there's a public access way through the building to get to the boardwalk at the waterfront. Couple retail spaces with condos above. And then there's that new street. There's that standalone restaurant building that's two two floors and the apartment building there. So, you can get an idea of the views that they'll have and how the character looks. So going forward towards the water street pier, this is where you really get to that Battery Park space. So there's the same acreage of Battery Park that there is today, but removing what's there today, which is the pool and the building, the public space, the the most valuable space of the whole land area gets dedicated to the public, which is along the waterfront. This is a turnaround area that's also acts as a plaza and then the battery park. And I don't know if they're going to take us all the way out the pier or not. We're going to

20:26 – 21:350

turn us around maybe to look at the rest of the development. So you'll see if you keep walking to the right, you can get to the boardwalk. There's the condo building. There's that restaurant building. And then the apartments behind It's about a third of the way in. Oh, they're going to fly us up like we're in a drone now. Get an idea of the character of the scale of the buildings. Looking at the marina along the waterfront, you can see that different color of that boardwalk. That's what's going to continue all the way around. They're going to show us what it looks like in different daylight sunset. There's a second story there on that restaurant building for views. I imagine potential event space depending on who ends up being there. Now we're back at Mega Street. So

21:33 – 22:110

I think loop. Okay, that's the loop. All right. Do you want me to turn it off? Um, let's say you will distract. There's no noise. You can just let it keep running if you want. We'll let it run. That concludes my comments. Thank you. Thank you, Miss Blair. You did a You did a nice job. Good job. You really did your homework on this. So, and do you as the applicant, do you gentlemen have anything you want to add? No. Um, stand up here and introduce myself. Nobody has.

22:08 – 23:190

Um, my name is John Signs. Oh, it's hot. Uh, director of development um for development group. Um, like Aaron said, the project hasn't changed much. We really dove into the details. Um, the Marina service building is the first building that's going to go. So, um the brown field, we're looking to start that before the end of the year. So, we'll start mobilizing here in the next few weeks. Um we have keyed in with um some of our boers that they could potentially be in a temporary facility next boating season for the marina services. Um we are planning to coordinate with our um boers and keep the marina mostly in phases. Um in the off season, we'll plan on doing those improvements. Um but everything else is moving forward. The condo buildings 40% construction set marina services 70% apartments moving along. Great conversations with not only some local regional end users um but some uh larger people too. So we're having some great conversations with those.

23:14 – 23:540

Okay. And uh the the hotel was that going to be 142 keys? 125 to 130 keys. Yeah. And are most of those uh buildings are they four floors? Yeah. Okay. Um the PT building, the condo building on the that's um first floor is 18 ft tall just to give you an idea for those commercial spaces and everything gives you that you want that height. So that building is four stories but it's a taller building. Yeah. Okay. and the demolition of the the restaurant down there. Will that do you know when that will take place?

23:52 – 24:300

Yeah, so that's covered as part of the brownfield remediation. So, we intend to Austin actually had the power shut off for this month, but um we're going to push that out. Um maybe use it for some meeting space as we kick off construction here, but I intend that building to come down this winter. Okay. Um in conjunction, we have to get building plan approvals, things like that. But those plans are moving pretty far along with the marina services building. Okay. And it's intent and as it always has been marina services, condo and retail, then hotel. We're going to start on the water and move inland. This just makes the most sense.

24:28 – 25:100

And then uh my only other question was, you know, there was a little heartburn about uh the the way uh the weeds and the overgrowth had occurred and I know you took care of that. We did take care of it. And um count on you to take care of that as we're moving forward. Yeah. And one of the documents um that you guys will see and commission that we're working on commissioner is the amended development agreement which is being amended to include maintenance. So all those responsibilities and everything is spelled out. So not only have the drawings and this application move forward but all those other documents construction agreements for the subdivision and the dedication of the road all those things are moving along as well.

25:07 – 25:460

Okay. Thank you. Are are there any questions or comments from around the table for my colleagues? Mr. Chair, Mr. Zulaf, so just to at the risk of repeating ourselves and but for clarification for for the record, this this PUD is already approved. It's already approved by the commission. Did Did we not extend the There was an extension. It was originally in the code. It's 18 months to bring this and there was an extension to believe it was October this month too.

25:43 – 26:240

And then this approval technically would start the clock at 18 months again, but they what we're hearing is the intent to move along immediately, right? Yeah, that starts the clock. I, you know, with we we have we have a an excellent relationship I think with the this company and so we're not too worried about you know recourse if it and this isn't the last time you're going to see me I joke with Colleen and Aaron they're going to be included in some of these decisions you know this is a public realm first and foremost so we're sensitive to that and um well to be a good neighbor

26:22 – 27:050

I had a design career so you know it doesn't You can't show me anything where I wouldn't have done it differently. But on on balance, I think this is uh very good for Sanduski and and uh and it's and it's an exciting uh development. So um but but anyway, would this this this would be the final approval then we don't have to go to city commission or anything just so everybody knows. Correct. Right. Um I I do uh yeah um we we we have a uh someone in the audience uh that I wouldn't mind hearing from the public just because

27:03 – 27:450

I I was going to give the public an opportunity. I wanted to make sure that that we had all the information we needed before we Right. Well, I'm certainly satisfied. So Okay. Okay. Through you, Mr. Chairman. I just want to make one comment. I also agree. I'm excited. I think it's a a great project. I do want to be clear though, the amenities available to the public are basically being able to walk down to the waterfront. So, there's not going to be any public pools or no public pools. There's fishing stairs, upgraded amenities like that. We call them soft amenities, but yeah. Um the public the pool now is um there are pools like the apartment pool, the uh boating members will have a pool in the condo.

27:43 – 28:280

And I just bring that up because that's a sore spot for the community there. You know, we used to have the surfs up and seeing this PUB with pools that only private the people who live there can use. I just I just was curious because I know there will be probably a response to that. Um so, but I I'm I'm excited about the project. I think it'll be good for that area and so I support it. M Mr. Chairman. Yes, Mr. McGor. I'm I'm presuming that the all the restaurants and and the cafes in the hotel would be open to the public. Oh, yeah. Yeah. So, restaurants and then the water. Yeah. Cool. Yeah. Okay. So,

28:24 – 28:530

Mr. Miller, any questions, comments? Well, I think my primary comment was uh addressed in the staff um consideration about managing the property during the construction process. I think that was uh a concern of mine and I would I see that as trying to address that concern. So, I'm I'm happy about that. Okay.

28:51 – 29:320

May I just want to add to one comment? One of the things we are proud of is the programming we're going to provide within the park. So, we'll be the HOA, the homeowners association. So, the programming, managing the concert events, we want people there every day for the success of our restaurants. So, that's what we're excited about too to offer to the public for you to draw the public. Obviously, I just was it triggered my thought when you said the pools and stuff. I'm like, events and the actual using of the park. I get it. Thank you. I'm good. That's pretty in line with what we saw the last time. All right. All right. Thank you. Thank you.

29:29 – 29:460

Uh Mr. Schwanger, I I see you sitting out there patiently. I'll give you a chance to comment. Uh Tim Schwanger, 362 Sheffield Way, chairman of Save Our Shoreline Parks. Yes.

29:43 – 31:410

Um not not anything negative. It looks real good. Just some suggestions. Um maybe it's already in the plans. Maybe it's fine in down in the in the details, but um it there are like three markers, three historical markers on site that would include for the uh um some history of the railroads and you know, Battery Park and the maritime history of Sunduski. Um hopefully that stays somewhere those markers. Um, the idea of this project, and this goes all the way back 30 years ago when we had John Iman here with the Marina District and that fell through, but this looks a lot lot better. I think the idea of this project is to make is keep what we have now, but but make it better as far as access to the waterfront and the peers, you know, hopefully the peers like right now probably forever the peers were open into the night. We do get a lot of guys fishing in the fall on on the peers. Uh so hopefully the peers will be very well lit compared to what they are now. Uh it's nice to see that uh there is going to be a commitment uh a maintenance commitment because we have had trouble the last two years with overgrowth on the peers um whether that be oversight or whatever but it's been taken care of. Um that's that's just about about it. Um, I assume that the going to the green space or the uh end of the water street extension that there's going to be uh more grassy area than what is being actually shown in this rendition. The one question I did have is that I know that there's an ordinance and I can't remember Mr. Zuluv might remember there was an ordinance passed that anything north of Water Street can only be one story high and if we're extending Water Street all the way to the bay. I'm just wondering if if this project would

31:37 – 32:200

require a variance or does that still stand true because we're seeing I don't know five, six, seven stories there along the waterfront. Mr. Chairman, I can help with that. Well, I I would uh defer to the the planning department. It's Shoreline Drive. So, this the ordinance that he's correct that there is an ordinance that north of Shoreline Drive can only two stories. Yeah, maybe it's two stories, but I remember at the very beginning making sure we understood if this was applicable to Battery Park or not. It is not. Okay. Just double checking. Thank you. I appreciate the opportunity. Well, thank you. Thank you. uh the the historical markers, will you be able to salvage those?

32:19 – 33:030

Both the historical society and the parks and wrecks. So, those are have either been removed or set to be removed. We're also on the lookout for potential time capsule, but so we will be sensitive to that. No one really knows. There's uh just water cooler talk from some of our marine operators and some people who have been around. So, and yeah, to clarify, they've been removed to be protected to put be put back when the park's complete. Thank you. Oh, yeah. Sorry. Yes. Sorry, Michael. No, we worked with your your your departments to get them scrapped and melted down in the copper. Yeah. Thank you for that clarification.

33:00 – 33:440

Okay. Other discussion from around the table. I will just say, Mr. Chairman, pretty exciting. Yes, m pretty exciting, Mr. Chairman. Yes, Mr. Zerula. Motion to approve the application subject to the condition the following conditions. All applicable permits. Approvals must be obtained through the building department, engineering department, and any other applicable agencies prior to construction and during construction access be maintained uh to all existing facilities and that all historic markers be retained and or replaced. Is there a second to Mr. There's a lost motion.

33:41 – 34:220

He's I just have the and just you have a second. Right. Just in the spirit of being 100% honest, the word all just troubles me in that because I have to stagger access. So if Migs is under construction, I'm going to make sure Water Street has access. But the word all is hard. Is I just splitting hairs maybe. Okay. Okay. The word the wording if it makes you feel any better the wording said access maintained to all existing facilities not all access points. Right. So so you you can't you right for the six time practical. It's going to be I chose the words carefully. Thank you. It's going to be

34:20 – 35:020

was your intention to read as the staff had written it or had as you had said? Well I don't have this but I have this which only has one condition. Um but no I intended to use those words. I chose those words carefully. It's fewer words. It's probably slightly broader in that it doesn't limit it to public. You know, it says public facilities. I just said all existing facilities. I did that on purpose because not everything there is arguably public, but we have existing facilities. So, I I omitted the word public on purpose, and I think it works. Chairman, question.

34:59 – 35:440

Yes, Mr. McGro. I um I was thinking while I was listening and does the motion include the specific language to the f furthest extent practicable? I didn't because if it does that would seem to resolve the issue. I I I didn't say that but I think it should be included. Well, since we had it seconded, uh, I would make the motion to amend my motion to include the to the furthest extent practicable. If if if I I could make that motion if we think it's necessary. Has it been seconded?

35:43 – 35:550

Yes. I didn't recognize the second. Miss Mr. Miller did raise his hand. So, um, well, for lack of a second, can I make a motion again? Please do.

35:53 – 36:430

All right. Uh again motion to approve the application one uh subject to one all applicable permits and approvals must be obtained through the building department, engineering department and any other applicable agency prior to construction. That would be per our packet. Number two, uh during construction, uh access uh shall be maintained to the f to the furthest extent pract practicable practicable uh to all existing facilities and three all historical markers uh shall be maintained, retained.

36:39 – 37:240

It's been moved. Is there a second? I'll second. Mr. Miller seconds. Any further discussion? This what we're seeing on the screen too that is the more or less second condition more or less more or less. Yes. Any any other discussion? Um my my question to the development team does that address your concern when it says to the furthest the practical practicable. Okay. All right. I'm good. Thank you, M. Miss Rambo, would you please call the role? Uh, Connor Whan,

37:23 – 37:590

yes. Mike Zulof, yes. Steve Pajali, yes. Jay Castile, yes. David Miller, yes. Pete McGory, yes. Motion passes. Thank you, Miss Ramble. Okay. Our next meeting is Tuesday, November 25th at 5:00 PM. Is there a motion to adjurnn? Make a motion to adjourn. M Mr. Chairman, did we have any updates? I I neglected to ask for reports from the planning department.

37:57 – 39:260

Have one u one thing to announce. So I have mentioned before we're starting a project called the housing development accelerator. We're looking to understand ways that we could bring housing to the market, housing options to the market. Um we have three areas that we're going to focus on and have community meetings surrounding. So we expect them to be about 2-hour meetings. Um and the first one is going to be um about the GNC Foundry site that's over in West Monroe. It's going to be at noon on Wednesday, November 12th, and it'll be held at the Erie County Health Department on West Monroe. The second one is that same evening. It'll be 5:30 p.m. That's discussing the Cold Creek subdivision. There's parcels that are still city-owned within the Cold Creek neighborhood. That'll be held at the Sunduski Career Center. That's 45501 Venice Heights Boulevard. And then the next day, we are going to have one um about MacArthur Park. There's a collection of city-owned parcels in Macarthur Park surrounding the Churchill Park area. That'll be held at the middle school recck room. And that will be at 11:00 a.m. on Thursday, November 13th. You will see uh we're going to have a little web page built to explain this a little bit more. We're going to have some social media outreach to advertise those meetings. We're going to put yard signs at the sites inviting folks to those meetings. But I wanted to make sure that you all knew today cuz they're going to happen before your next meeting if you'd like to attend any.

39:24 – 40:080

Thank you. And this is op these are options we're looking at for affordable housing because we have I feel like the condos and a lot of housing going up that a lot of people in the community can't afford to take advantage of and I know we were kind of talking about um options for affordable housing but that's what we're looking at here not more condos and stuff right we are looking at how to add more housing units to the city and what is develop like what is feasible what we could feasibly attract developers to come and build. And that does include market considerations for the demand for housing. So, what folks here, what types of housing options they need, affordable incomes, what they're looking at.

40:060

Uh, and that will all be part of of that process,

40:09 – 41:010

the process. Yes. I just want to stress that we really focus on homes that the, you know, majority of regular community members can actually afford to live in. as beautiful as these developments and these condos and the downtown apartments are, I certainly couldn't pay $1,800 a month or 16 or whatever it is. So, it's important to me that we definitely look at those, you know, focusing on affordable housing as a major um priority, which I know you are, but I just wanted to say that it's all part of the puzzle, too, cuz um there there is a quite a bit of research documented that new units, even luxury units, decrease the surrounding rents in the area. New options open up options in the surrounding area. It's a balancing act. I get that. will be part of this discussion.

40:59 – 41:390

I understand. I'm just very passionate about because I have to hear it all day every day. So, we can't afford to live. Yeah. Which is across the country. It's not just Sandeski obviously. But I just wanted to put that out there um publicly. Just follow up on this conversation. Um I'm on the board for Habitat for Humanity and they they build the house at with essentially well not totally free labor. Sure. I'm familiar with Habitat and and the people that buy those houses really can't afford even to pay the cost of building it, right?

41:37 – 42:070

And that's that's what's going on in the country right now. So I I guess my point is I don't know how you totally solve that. Well, yes, obviously it's not an easy answer. I just that's why I said I want to explore the options and make sure we're prioritizing homes that we can actually that people can afford given obviously we know attracting investors and all those things all contribute it's a big uh machine that all works together but it's

42:04 – 42:490

I think the solution might be to to bring in jobs that that pay the kind of wage that can afford rather than try to try to bring the cost of the of the construction down. I mean, when you're talking about the cost of lumber and the cost of materials and the cost of construction labor, um I just talked to a handyman who who built a house a year or so ago with a a big shop attached to it and he can't believe he's got $750,000 tied up in it and it's not waterfront property. So, it's just the cost is unbelievable, right? And that's the point of trying to come up with solutions for that problem. Yeah, Mr. Miller, did you have a comment?

42:46 – 43:310

I I just wondered if we could ask Miss Blair to run through those three dates and times again. Oh, yes. Thank you, Mr. Chairman. Along that line, could we also have an email? Okay, thank you. That's fine. Could you uh run through those dates, please, Miss Blair? 12 noon focus area GNC Foundry, November 12th. Wednesday, November 12th at the Erie County Health Department. 5:30 p.m. Focus area, Cold Creek. Wednesday, November 12th, Sanduski Career Center, 11:00 a.m. Thursday, November 13th, focus area, MacArthur Park Middle School, Recck Room.

43:29 – 44:100

Thank you. I I think the the key to these sessions is that uh the public comes out so that everybody's voice can be heard. And I think you should you should make sure you attend uh at least one of those sessions so you will be there to and you can get get your voice put on the record because that's the important part. Of course, we want to hear from the public. Absolutely. Any other discussion? If not, uh is there a motion to adjurnn? There may have We had a motion. No second. Second. Been moved and second. We we stand adjourn. Okay. Thank you everybody. Thank you. All righty.