City Council - Regular Meeting
The City Council held a work session to discuss the enterprise and special revenue funds, focusing on proposed water and sewer rate adjustments, staffing changes, and various projects within public works, parking, stormwater, Prescott Park, community campus, indoor pool, and community development. Key discussions included a shift in water and sewer rate structures and the financial health of the parking fund.
About this meeting
- Government Body
- City Council
- Meeting Type
- City Council
- Location
- Portsmouth, NH
- Meeting Date
- May 13, 2026
Transcript
46 sections
All right, welcome to tonight's work session for May 13, 2026 on the enterprise and special revenue funds. Um you will notice uh before I pass it over to city manager Canard uh the what uh stood the test of time in terms of uh our water pipes uh that are pulled out of Congress Street. Amazing um that those are uh those are here. Um and uh yeah, pretty impressive. But uh definitely uh puts a uh you know um a finer point on on what needs to be replaced and and wanted to make sure that we got to see that. So with that, um, look forward to the presentation, the discussion, and thanks for the work that went into this and for the work that will go, uh, into this moving forward from the council questions. City manager. Thanks, your honor. Tonight before you, we uh, we, as the mayor nicely summed up, it's enterprise and special revenue fund night. And I'm trying to make the screen. There we go. So tonight we have uh first for those who had not followed Monday night's work session, this is the budget timeline where we are in the process. Tonight is the second of two work sessions. To follow will be the opening of the public hearing on the budget in total. This coming Monday at a regular council meeting. There will be a third budget work session on Thursday, May 28th, and then a discussion about the adoption of the budget at the city council regular meeting on June the 8th. So special fund um special revenue funds and enterprise funds uh comprise the following listed on the slide and you uh will think of water and sewer and parking most notably but also of note would be under special revenue fund storm water Prescott Park community campus the indoor pool and our federal community development block grant money that we manage. We
showed this slide before. It's on page 190 in your big budget book and it outlines staffing changes overall and in the general fund it's a total of 9.06. Uh in special revenue fund it's an addition of 1.14 FTEES and in enterprise it's an addition of 1.6 FTEES for an overall citywide budget reduction of 6.32. So with that, I'm going to turn things over to the director of public works, Peter Rice, to speak more specifically to this. Uh good evening. Um Peter Rice, director of public works. Uh the previous slide can be a little challenging to follow. However, the net result of these changes is an increase in parking division uh by.5 FTE and to the water and sewer division uh of8 each. Uh as previously discussed, we did did a 3.1 reduction on the highway division having a net result for the public works of a reduction of one FTE. Uh this year's budget reflects a significant effort to improve operational effic efficiency by integrating the technical expertise we have available in our other divisions to leverage resources and complete more work in house when practicable. These changes are a continuation of an organizational review that we started when the former deputy director of public works Brian Guest left. Uh our current approach uh is that whenever a position is vacant, we require the hiring managers to justify filling that position. We review it uh to see if it is needed or if we can do work with existing staff or if we need to to define a different role for that that FTE. This exercise often results in organizational realignment uh job title changes or promotions to better meet the needs of the city. Uh these changes in this the changes reflect in this year's budget uh include uh adjustments for
succession planning, staff retention, uh change in roles, u adjustment to uh to better align the cost centers. uh and there was a significant number of them that were part of a collective bargaining uh agreement that changed the titles only. The compensation stayed the same. There was actually 15 of the 30 were zero impact in terms just a title change and that was just to to bring it in line with collective bargaining agreement uh with the supervisory management alliance. Um so that next slide um I'll briefly give you a high level view of the water and sewer. Uh Al and Al Pratt and Eric Feedler will speak to it in more depth. Uh the uh increase on the water division this year is about 4.18%. Uh the water division's budget covers day-to-day operation and and of treatment and distribution. Uh capital costs, compliance with federal and state regulations, and ongoing replacement of aging infrastructures. Uh as you recall, we're a regional water system. We provide water to Greenland, Newcastle, Newington, and portions of Durham, Madbury, and Rye in addition to Portsmith. Next slide. On the sewer side, we're seeing a 1 8 1.84% increase uh for this year over the FY26 budget. Uh similar to water um the costs uh this budget covers the cost of operations for to treat and collect uh the wastewater uh covers the capital costs uh and the compliance costs associated with federal and state regul regulations and ongoing replacement of aging infrastructure. We are also a regional system for the sewer side uh providing sewage services to Newcastle and portions of Greenland and Ry. Next slide. Unlike uh the
general fund um the water and sewer divisions have a much smaller portion of their budgets going towards uh staffing. Uh it's 32% on the water side and 21 on the sewer side. Next slide. Um just to refresh everybody's memory relative to uh enterprise funds there are self-supporting systems similar to a business um they must have fees or charges sufficient to cover the costs uh to provide uh the services that we provide. Um we use a rate model uh to u to project our our revenues. Uh and Al will speak to uh the exercise that you all participated in in updating our rate model. Uh and we'll speak to that in a little bit. Uh it's it's important to remember uh that water and sewer are not supported by general fund taxes in any way that it's independent from taxes. Uh a number of years ago, council endorsed a glide path approach uh to funding the enterprise funds. Uh this approach has resulted in predictable, stable um and predictable uh rate increases. this year's budget reflects an update to that rate model uh which Al will speak to and I will pass it over to him now. Thank you. So I'll start with the sort of core functions of water. They're quite extensive. Um everything involved from treating, pumping, monitoring, metering and maintenance of the water system are required to consistently provide the high quality water at meets water quality standards and meets pressures and flows that are expected from the from our customers. you know, and there's the day-to-day operations in that, but there's also the long-term planning aspects involved, um, which include making sure that infrastructure is maintained properly and that we proactively invest in the system to make sure that
the system and our resources are sustainable for the long run. Um, responsible u we're responsible for operating a wide range of infrastructure. The Bellamy reservoir um is our major source in Madbury. um two treatment facilities which is the surface water treatment facility um in Madbury and the PAS facility at peas. Um we have 10 um gravel pack water supply wells about 200 miles of water main four storage tanks transmission domain a lot of infrastructure that we are maintaining uh water quality um it's a critical task from all the way from source water monitoring from cyanobacteria through the treatment processes making sure we optimize our treatment um into the distribution system um ensuring that we're meeting all requirements there and through the flushing program as a part of that water quality management uh water distribution management That includes our meter replacement program where at least 800 meters are replaced every year. Uh we have a cross connection control program where over 2500 backflow devices are tested or inventoried every year. Um we have a valve exercising program where critical valves throughout the systems are operated routinely to ensure they work when they need to like when we have water main brakes. Um and we also annually uh do leak detection audits to minimize for un unaccounted for water. Um and again the flushing program is an important part for maintaining the water quality um and testing hydrants. And fun fact right now we have 1,036 hydrants on our systems and um they need to be inspected and flushed twice a year. And like last winter I was thinking of all the times with all the snow they need to be shoveled out every every storm. And there we go. Our crews were going out there and shovel them out. We do appreciate customers that take care of their hydrants in front of their house, but you know, our crews are out there cleaning around hydrants. And and a quick shout out to the fire department that they uh when they have staff available,
they do as well. That's right. And finally, all of our outreach. Um we prepare annual water quality reports. Um that's part of an EPA requirement and as of next year, that's going to be required to be put out twice a year. Um we prepare our quarterly water supply updates and all the information from those updates we talk about during their safe water advisory group meetings. Um this past year we distributed 43 uh free lead testing kits um and we answered over 100 phone calls with people concerned about their water quality specifically related to um the lead notices that we put out. Um another note on our public outreach. show. This past year, we had the administrator from the EPA, Lee Zelden, and the regional administrator, Mark Sanborn, visit our PAS treatment facility at Peas. Um, since we are sort of the pioneers of PAS treatment in New England, um, not something that we chose, but here we are. Um, next slide, I'll talk about some of the accomplishments for FY26, specifically the projects that we've been working on. Uh, we've been making repairs to the Bellamy Reservoir Dam. uh crack sealing. This is a a major asset of ours. So, this continu continued maintenance very importance to prolong the life of the dam. Um we've replaced just under two miles of pipe this year and that just about meets our goal of replacing 1% of pipe every year since pipe has a lifespan of between 70 and 100 years. If we keep up with changing them out 1% a year, um that helps us keep on track. Uh this year we replaced water manes on Little Bay Road, Pinehurst Road, portions of Maplewood, Woodbury, Congress, Von Mall, and some other areas. Uh PAS treatment. Just a few weeks ago, our operators assisted in the replacement of our ion exchange media there. And I just wanted to make a reminder that the operations of the PAS facility at PS are paid for
by the Air Force. We get about a million dollars from them a year to operate um that facility. The media alone in this change out was over a half a million dollars. So it's a very expensive facility to run. Uh Madbury treatment facility is now 15 years old. Um so work needs to be done there. This past year our operators pressure washed the inside of our 275,000galon underground clear well tank. Um they've also replaced um a number of pumps, recycle pumps and our finished water pumps. And these are tasks that our staff have the expertise and the ability to do. So, we've been able to save money by having that work done in house. Uh, Collins, Smith, and Harrison supplies wells were all cleaned and redeveloped this year. Uh, we replaced the wells, the well pumps in um, Smith well and Harrison well to to ensure their reliable reliability. So, they should be good for another 10 or 15 years. um Greenland well PAS treatment facility design is ongoing and our service line inventory was updated um and submitted to the dees in accordance with the regulations for that and we do have a contractor for painting and repairing our water storage tanks which I'll talk about again in a minute our financial um accomplishments are um so we have been very fortunate to re receive grant and loans with forgiveness from the state this past year total Toal amount awarded to us for water in loans and grants is over 14 million. Um, of that 8 million of that is through grants and forgiveness which we've been very fortunate to receive. Most of these funds or all of these funds are really associated with regulatory requirements, the PAS and the lead and copper rule requirements. Um, but I want to note that the sources of this funding are drying up. Um, we've been notified by the dees that, you know, the funds that we're receiving from ARPA, the bipartisan infrastructure law or the infrastructure investments and job act,
all those funds have gone away. All those all those monies are gone. Um, so we can't anticipate receiving any more of these supplemental funds from the state. Right now, the SRF fund program is being funded at a baseline level, um, which will help with dees programming, and some of those funds will go into congressionally directed spending earmarks. So there'll be very limited money coming down like it has been in the past five years for us unfortunately. Um and the final bullet here I'll get into more about we did conduct conduct the water and sewer rate study this year and I'll give a summary of that in a minute. Uh next slide just continuing a lot of the projects that we've been working on. Um improvements at the Madbury treatment facility Madbury one building upgrade. So there's chemical injection infrastructure there that's over 20 years old that needs some improvements. We will be continuing clearing the transmission main so we can um access that and maintain provide maintenance activities for that. So the water storage tanks are scheduled for painting. Um we have a a contractor that we're working with right now getting under contract. Uh the schedule for that will be spinny road tank will be painted this fall. There'll be a lot of outreach for that since it's going to be such a visible project. Um, next spring the New England booster tank will be painted and then the following fall of next year the the um Lafayette tank on Constitution will be painted and repaired. Um, another project, the Greenland PAS treatment facility is scheduled to go out to bid this fall for construction next uh next year, next summer, spring summer. and the Portsmith and Collinswell PAS treatment facility will be moving ahead with final design this summer. So, a lot still going on there. Um, and this is just a a previous slide. We presented this last year, too, just to to make sure people are aware of our demands versus our supply capacity. And really looking at it, this year
has been very or the 2025 data is very similar to the 2024 data as far as our water demands. It was only about 100,000 gallons a day different. um uh actually overall so u previous year was around 3.5 million gallons a day um demand for portsmith and about 700,000 gallons a day for peas so these are very similar these year to year um sometimes they're variations associated with irrigation demands like last year and the year before were both very dry summers so demands were up a little bit from previous years but overall we haven't seen any really unexpected um changes due to any of the developments. We know there's a lot of developments going on in town right now and we're not seeing any kind of increase from that. Then whenever there are developments that come forward, um we do have third party um reviews, hydraulic modeling, making sure that any impacts from those developments aren't impacting the nearby water system. And when there are in infrastructure needs required for those developments, those costs are are put on the developer to make sure that the infrastructure is is done as needed to accommodate that development. Now I would like to shift uh to the outcomes of the water rate study. Um I know we've talked about this the at the work sessions. So this is somewhat of a summary of that, but I wanted to um try to sum that up a little bit. So the recommendations were to adopt a new water and sewer rate structure um designed to provide additional revenue to the to provide make sure that there's sufficient re surplus or suff sufficient reserves in our enterprise funds while meeting the needs of our operational expenses and our debt payments. So the biggest outcome from this study is really a shift from our from so there's a greater proportion of the revenue coming from fixed service fees rather than the usage base
fees. Right now the majority vast majority of our revenue is coming from fees based on water use. But there's so much cost that has gone into the infrastructure that it's important to shift some of that to a fixed service fee. So that was a big part of the change here. And that triggered this um recommendation to split our lower tier, the tier from 0 to 10 units to two tiers, 0 to five units to cover that essential water use range and to make sure those users that are that are using that limited amount of water aren't being unfairly burdened by that new service charge, if that makes sense. Um this study also recommends adjustments to other fees um such as the capacity use search charges, wholesale rates and the sewer search charges. Um these fees were all reviewed by the rate rate comm fee committee. And finally, the study did provide us updates to the rate model and we use the rate model every year when we're looking at the performance of the funds and we're we're looking at setting fees for the following year. Um the next few slides are just really being clear of what is being recommended here. This is right from our rate study. Um as we move forward note the three tiered structure for water usage rates for the water and sewer rates and the irrigation rates. Irrigation rates have also um increased uh this year to better capture the demands that irrigation really puts on our system. Uh water and sewer service fees. Uh the next slide shows, you know, breaks down what these fixed fees will be for water and sewer customers. But just to point out for a typical customer has a 5/8 or or 3/4 inch meter. So they're at that lower tier. So they'll pay $10.94 a month instead of the previous $950 9 $4.95 per
month. Um which had been in effect for the past 24 years. So time for an an update there. Um, also note here the sewer service fee. This is a new new fee again intended to capture the cost associated with the infrastructure and our need for having that readiness and that ability to be able to serve those customers especially those customers that may not be here year round yet the infrastructure is there you know available for their for their use. Um capacity use search charges the next slide has also been revised. So these charges as you know are essentially buyin fees for new customers into the system. Uh since customers have been investing in the water and sewer system through their the payment of their water and sewer bills over time there's that value built into the system. So these search charges are really calculated so any new customers that come in are paying their fair sh for the use of that system and really you know buying into the infrastructure that others have already invested in. Um this ends up resulting in so for a average residential customer that uses five units of water. The next slide please to summarize. Um so there'll be an adjustment in that lower tier actually reduction by 91 cents per unit for that first tier of use um to help uh calibrate for the for the increased cost fixed cost. So the fixed service cost will go up $5.99 per month. So this turns out to be an overall increase of $1728 per year for an average users or user that uses five five units of water. Um that equates to one point $144 per month increase for water. And that's what I have. And with that I'll turn it over to Eric Feedler to talk about the sewer side. All right. Thanks Al. Uh council as a mayor. Um,
Eric Feedler. I'm the engineering supervisor. So, I guess we'll jump right into the punch line on the sewer side. Like Al described, um, we've added a a lower a fixed uh lower service uh tier as well as a fixed rate. Um, you know, best practice, you know, what we're seeing is that between 6 to 8% of of customers have zero or less than one unit of use throughout the year in many cases, more in certain months. um and best practices to really capture, you know, between 15 and 30% of of revenue from from fixed sources. So adding the fixed charge allows the city to you know pay for some of those baseline service infrastructure costs um that are basically always born even if there's no usage on that. Um uh the real so the average customer uses approximately five units of water and kind of like how Al was describing it um the tier one was decreased down about 54 cents but with the base sewer fee there's an aggregate increase of approximately $5.34 per month uh and $64 per year increase. So the the typical user will see approximately a $95 monthly usage uh service charge for a total annual charge of approximately $1,144. So this this is the the financial differences based on this uh the rate updated rate model. All right, we'll go to the next slide. Kind of step back into kind of the sewer core functions um is similar to the the water side. There's uh there's a lot of collection, treatment, operations, maintenance, and regulatory compliance aspects to the sewer system. We have, you know, approximately 6,700 um sewer connections, 120 miles of sewer lines, 21 pump stations, and three permitted combined sewer overflow locations. Um after we collect that waste water, it goes to two treatment facilities. One at peas and one over at Pierce Island. At those at those sites, we remove nutrients of things that would cause uh algo growth or other kind of kind of like red tide if we didn't treat it. So that would be BOD, total suspended cells and other nitrogen compounds. Um similar to AL, it's a
heavily regulated uh environment. So there's continuous sampling. There's daily, weekly, monthly sampling. um continuous lab testing, you know, there's dozens of lab tests we do on a daily basis and then monthly and annual reporting to regulatory agencies. Um you know, the really the pipes never get shut off. So there's 365 days a year we are always working. Um we're constantly doing preventative and corrective maintenance activities along with facility improvements. We do preventative inspections. Um and we're always there for customer service calls, dig safes, all these other things that make um either developers or you know repairs and other things on the private side uh work as well. And then this is uh the far uh right picture is a snapshot of our web portal for our cso monitoring. Um it's no no CSOS for almost a year now. But um that that is basically we have three permanent CSOS. You can click on it. You can get either real-time data, you can get historical data on that. Um but um you know from a regulatory per perspective we have NPDS permits. We have a Great Bay total nitrogen permit and we have a variety of uh either EPA consent decrees or long-term control plans associated with our CSO facilities. Um jump to the next slide. So there's a few accomplishments. Um we've you can kind of see front and center that there's a lot of construction downtown and a lot of our projects are um they're more of like complete streets. So they're water, sewer, there's storm water. We're trying to address all those things in one shot. You'll see in Congress there's been a lot of disruptions. But, you know, not only the city is doing the water, sewer, storm water, but there the gas company's replacing gas lines. We're undergrounding um electrical utilities for partnering with Eversource. So, there's a lot of other things that go on. So, um you know, so we finished up a bunch of sewer separations at Union Willard. We've did the new pump station on Marjgery Street, Union Street. We did the Maplewood Bridge and that covers, you know, that includes water manes and other things that go across it. We're also just kicked off the uh Peas wastewater treatment plant construction
process. That's going to be a three-year process, so it's it takes a while. And we also really um we're at that concept design phase and there'll be more public engagement um as part of Mechanic Street replacement project. Um similar to Al, we've been we've been very fortunate working with our uh funding agencies. NHDS has been very helpful. We've got approximately $37 million of grant and loans um from the within the past year from the state. Of that 8.4 million of that was grant specifically. The rest is low interest loans and things like a favorable interest rates for the city. Um and then just a couple regulatory like wins for us like um so the city because of our our great performance at our wastewater plants and our like our skilled staff, we we discharge about 50% of our permitted limits for nutrients into the Great Bay. So, we're well exceeding our permitted requirements, which is excellent. The state is very happy. And uh and also, it's just a fun fact. It was my fun fact is that we actually did we treated 1.75 million gallons per day less at Pierce Island this year than we did between 2008 and 2012. So, the plant uh saw approximately 5.2 million gallons per day on a a daily basis. We only we only treated 3.46 on an annual day this year. So it's a huge difference and that's it's the fruit of all these sewer separation projects. So this these initiatives of decreasing you know the storm water getting into the system has really this is real dramatic changes. So you know projections were showing increases to to the plants throughout the um the planning horizon and it's really not we're not seeing that these projects are making a big difference. Um and then also so we're doing a few more of our long-term control plan consent decree projects right now. you know, Fleet Street sewer separation. Um, that is, you know, that's that Congress, that's the Vaughn Mall and other things like that. We're heavy in the construction right now. We should hit some of some more Fleet Street maybe early next year. And we're still trying to work on the the Maplewood outfall, but that's uh we're still working with the the real property side of things. Our rehab contract one, you've seen us poking around throughout the city. We've been repairing pipes, leaky pipes,
and things like that. And actually, we just got a a consent decree modification from EPA two days ago. It was actually a Monday night. We got we got the email and we swapped out our next phase of sewer rehab. We identified a much better opportunity on Siri Street. We're seeing uh about 200 120 to 240,000 gallons per day of of seawater coming into the pipe there. And so the EPA agreed with us that we're we're swapping that project out and we're going to try to get it constructed in the next month. So get that before the busy season. And that should be a dramatic benefit to us. And it's actually a real cost savings because that project is targeted and focused. We can do a lining project and it's a lot cheaper than going for those other the rehab contract too. It's a probably approximately a million gallons a million dollars of savings by doing that project versus the other one and we get four to five times the benefit. So it's a it was a big win and our staff helped out. Our regulatory council helped out. It was it was a team effort to kind of get this one pushed through and and the conservation law foundation was very helpful in kind of agreeing that this was the right target for the state issue for so um and then initiative. So, I think Peter mentioned this earlier. We're continuing to implement, you know, asset management best practices. How do we preventatively maintain, inspect, and make sure we get the longest life out of our assets, preventive maintenance, we can get maybe 50% longer asset lifespan. And the cost that we're seeing from constructing new pipe, constructing new things, if you can get a contractor, is is getting dramatically more expensive than the the typical inflation rate that people see. Um, you know, to do that, we have to keep on developing our skilled staff. We have a lot of professional staff. Um, and then we emphasize in-house construction activities. So, we're seeing cost of a third or less to self-perform the work versus contracting out. These are a few examples. These are actual real pictures. Like we got pricing to replace a roof at one at one pump station for 27 to $28,000. We replaced four of the roofs roofs we had to do for the same price. Uh, we replaced the heating system at the Peas wastewater plant. We had six units that cost $30,000 a piece. We did it for
$10,000 all. So, these are real savings when you have skilled staff and you can develop your in-house staff. They can do it quickly, they can do it well, and you don't you're not kind of beholden to an expensive contractor that gets to it when they get to it. So, it's it's been a real win in trying to get our our staff to perform some of these has been it's been a great thing and and I think Peter's initiatives to kind of try to re keep on re-evaluating our organizational structures to get the most that we have out of the staff that we do have. So, um, and I think this goes back to kind of like Al mentioned this, uh, as well on the water side. So, we we have treatment capacity of over six million gallons at Pierce Island and 1.2 over at Peas. We're seeing dramatic, you know, 33% decrease in annual flow since 2008 to 2012. So, and uh, similar to what Al mentioned that anytime there's development in the city, we have a technical advisory committee and there's a tax process. So, we review these developments. We see if there's local uh capacity restrictions. So if our treatment plants and our water production facilities have capacity, if there's a if there's a a conveyance limitation in the collection system, those the developers pay or the benefiting parties pay for those improvements. So it's a big one and in many cases those pipes that have a capacity limitation for a developer are actually an old pipe anyways that would have to be paid for by the rateayers. So in many cases there are benefits for the existing rateayers as well. So, but it's an important thing to to know that it, you know, those developers are not getting subsidized through these development processes. And I think that's what I have. Um, so we'll we'll turn our attention to the special revenue funds which include uh parking and transportation uh which is uh solely uh self-supporting uh and actually spins off 2.5 million to the general fund uh storm water Prescott Park Community Campus and indoor pool
all have blended sources of funding um in part um monies from uh general fund which shows up in your um your fourth budget resolution out of those annual budget resolutions are all looked into that area and then the community development which is solely independent uh through federal funding. Uh the first one will be discussed by uh Ben Fletcher our parking director. Good evening everybody. I hate going after you guys. Ben the microphone. Thank you. Appreciate the opportunity to chat about this this evening. Uh just real quick, did you know uh 77% of the city's media collections are through the park mobile app now. So yeah, it's it's quite extensive. Uh much of that popularity comes from the fact that uh drivers are given the opportunity to know that their session's coming to an end and an opportunity to increase that session uh in real time. So uh that is the future of uh of parking meters so to speak. So just briefly uh uh the division is 100% supported by uh parking revenues, 95% of transient revenues and 73% of uh monthly revenues in the garages uh are from non-resident visitors. Uh for FY27, an estimated total of 6.86 million, 48.3% of all estimated parking revenue uh will go to support services such as uh downtown sweeping and trash collection. um uh school crossing guards, uh snow removal, and and many others. Uh this translates to a property tax savings of about $512, uh per median value home each year. And uh one uh very interesting point here uh the transportation engineering uh led by Eric Eie has secured a $345,000 grant for bridge replacement
and grade crossing uh improvements that will go towards the Kate Street railroad bridge project. Um looking ahead um we have begun the site selection process for a third parking facility. uh quarterly and annual reports uh to city council and the public uh will enhance our ability to uh use data informed decision-making going forward. Uh implementation of the resident access parking program if so approved will take place uh early this summer. So that is pretty much it. Good evening. Good evening, mayor, counselors. Uh, my name is Jamie McCarti. I'm the storm water operations manager for the city. Um, we're committed to a cleaner Portsmith and the storm water division protects our waterways and reduces flood risks through strategic planning, public education and engagement, and the effective management of our comprehensive storm water and combined sewer systems. What this looks like is um staff uh inspecting over 1500 catch basins uh in the last year uh cleaning 458 catch basins uh which removed 88 tons of material. Um, we also swept 790 mi of streets in the last year, uh, which resulted in 370 tons of material being removed by the street sweeping. That's material that otherwise would be in the catch basins causing potential flooding issues and water quality issues. So um along with um up uh maintaining the infrastructure uh we have a lot
of regulatory um items that we have to contend with. So, we have an EPA MS4 permit, a uh we are involved in the um Great Bay total nitrogen permit, um which results in quite a bit of water quality testing that we have to do. Uh over the course of the 8-year permit, uh we're currently in eight in year eight of 10. We've completed 329 wet weather quality uh water quality samples that are conducted by city staff and summer interns who go out in the rain uh to collect these samples. And 100% of these water quality samples um are done inhouse uh by city staff and the interns who we train on how to perform these uh uh sampling regimes. Um which initially was estimated to cost uh $60,000 a year and we have that cost down to below $10,000 a year because we're utilizing um the labs uh that we have at the city and staff performing the analysis. Um, next slide. Uh, so in this next year, some of the storm water initiatives that we have are, uh, like I mentioned, we're in year eight of our MS4 permit. Um, we will continue to comply with the requirements of that permit and the general and the Great Bay total nitrogen general permit. Um, we're going to continue to expand vehicle telemetry uh to help support the salt reduction plan um as required by those permits. Uh in the next year, we are going to be leveraging the open gov permitting platform to assist in the request of annual inspection and maintenance reports from commercial and industrial properties. Um ensuring the compliance of their storm water operation and
maintenance plants. Uh, and we're continuing to work uh with our new groundwater monitoring wells and hoping to have those linked with our existing CSO and rain gauge portals. So, uh, next slide. Um actually yesterday we issued a request for qualifications uh to bring a consultant on board to assist the city with the goal of establishing a more uh sustainable and equitable funding model for the storm water infrastructure. Right now the financial burdens uh split 50/50 between the general fund and sewer fees. Uh this means that the cost isn't necessarily aligned with the property's um actual impact on our system. Um so we'll be looking at uh at um methods to develop a storm water utility and enterprise. Um beyond the equity, there's also a strong regulatory driver for this. The Great Bay total nitrogen permit requires that communities investigate and evaluate dedicated funding sources. Um we were also asked by uh council a few years ago to look into this. Um but this RFQ is just the beginning of the implementation phase. Uh we know that this is going to require quite a lot of discussion with city council to fully develop the policy, define the level of service, and ensure the structure is right for the community uh before anything goes forward. That's all. Um, did you know that garden tours are are hosted every Friday during the summertime for residents and and and folks visiting? Uh, they they're great. They're led by our interns as well as our our horiculturists. So, it's really fun. Uh the Prescott Park budget goes to uh park maintenance,
uh dock operations, historic resource stewardship, uh event permitting and scheduling, tenant license uh administration, and capital planning and project uh oversight. Um, as you know, we're currently working on u project to raise uh a couple of the historic structures. Uh, and we will be working collaboratively with the uh Prescott Parks Arts Art Festival uh on their new stage uh which we're looking forward to um seeing that come to fruition. Good evening. Uh Todd Henley, recreation director. Um, did you know that we had 486 participants in our after school programs this past school year? Uh, the community campus truly is one of Portsouth uh, greatest community gathering spaces, a vibrant hub where recreation, wellness, learning, and connection come together for all ages. The campus offers welcoming spaces and inclusive opportunities that bring people together year round. It's more than just a facility. It's a place where the Portsmith community stays active, connected, and supported. One of the most important ways the campus and the recreation department supports our community is is by providing affordable quality child care. We are a leader in childare in the in the city and the bulk of which takes place at the community campus. the full-time ACE afterchool program, which was a huge success in its first year, and part-time afterchool programs, both with bus transportation from the schools, plus summer camps and vacation camps, all take place at the facility. Another part of our great community is our group of nonprofit tenants who have multi-year leases that support the important services they provide to Portsouth and Secost Area clients. We also just completed a $2.5 million renovation on the building, updating almost all office and
shared spaces, as well as an overhaul of the IT infrastructure and safety upgrades. Along with our tenant offices and our rec department offices, the building hosts many events and meetings from our community partners. Red Cross blood drives, Presca Park Arts Festival and Players Ring rehearsals, Boy Scout and Girl Scout meetings, youth sports practices, wellness expos, and adult education classes are just to name a few. The campus is truly Portsmith's community center. What we have built there over the last four years is special, and we are proud to continue to support that mission for the city. And next up, I will be speaking about the Enor. Did you know that the indoor pool held 256 swim lesson classes teaching more than 1,600 swimmers in FY26? Bringing the community together is what we do and the indoor pool is a community in itself. A leader in aquatics on the sea coast, the pool has various programs and events that bring the lovers of water together. The indoor pool programs are one of our most valuable year-round assets. They combine fitness, safety, skill building, and socializing. Something for every age and ability. Our programs create confidence and help with strength and cardio, as well as building connections. New programs that excelled this year were the Piscatico pre-team, which is helping young swimmers bridge the gap between swim lessons and competitive swim teams, senior and adult learn to swim programs, and a new arthritis foundation aquatics program. The pool also hosts community special events and swim team meets as well as committing more open swim times during school vacation weeks. So even in the cold of February during school vacation, you can bring your children to go splash around with their friends. Finally, the indoor pool is also an American Red Cross gold level instruction facility, meaning
we provide more than 1,000 plus participant swim lessons each year. And we have multiple lifeguard and water safety instructor trainings throughout the year as well. The pool also has staff that offer first aid, CPR, and B babysitter trainings for the greater sea coast area. We are proud to be a life-saving resource for our community. Thank you. Thank you, Todd. and I will uh round out the presentation for my colleagues, community development director Alisa Nuniata, who's on Zoom to answer any specific questions, but she manages our federal community development block grant funds. We've been the beneficiary of close to a half a million dollars for for years on end, and she is really creative and flexible in the way that she can figure out how to spread the dollars across so many different uh worthy causes. So, in 26, some of the highlights include an exterior lift for ADA um accessibility at Connor's Cottage right across this the driveway. Um the nicest restroom in the city at Portry Island. If you haven't been, you have to go. It's wonderful. Uh the Crossroads House energy efficiency and heating system upgrades and a PHA property, Betty's dream roof renovation. And coming up for initiatives this coming fiscal year would be support for the construction of Haven's new home on Lafayette Road. um along with public facility including and and historically has been used by Crossroads, Operation Blessing, Portsouth Housing Authority, Haven and uh even our own senior activity center. And uh lastly, we support transportation facility improvements. That is also an eligible use of CDBG funds. And Elise has identified three possible bus shelter locations that will serve PHA properties in the coming year. So thanks to Elise. So wrapping things up is a reminder of the budget schedule for folks who would like to attend and continue to hear updates and provide public input. And with that, we will close and say thank you.
Thank you again. Um council questions, councelor Taber. Um, it is really heartening to hear all the progress on the sewer side and I have to say I was reading the in the budget document we're forecasting no combined sewer overflows this year. Well, no cso events where we overflow. Uh, but the combined sewer system it still exists. There are relief points still in the system. So, right. Well, what we're doing is when we do the next long-term control plan, we kind of look at the next plan of attack to keep on limiting the the potential for CSOS. And along the lines of the big win you had switching to Siri Street from Yeah. an expensive um dig up the streets project. Um you know, we're overperforming on nitrogen by a huge amount. We're big success there. are um we're doing so well on sewer separation, our volume is down 33%. Um and so my question is, you know, could we save the taxpayers some money by really reopening the the consent agreement and saying, look at the progress we've made. Maybe there's some there aren't that many big projects left, but I think Fleet Street is still left. You know, do we need to to throw millions more at this when we've made all this progress? That's already sort of baked into the process, right? So, when with these consent decrees, there's a long-term control plan. Then there's a few other obligations that we have to look at the sewer model and other things like that. And then we go back and we we work with the regulators to see, you know, what are the needs still to kind of continue to pro protect the environment and manage the cost to the rateayers
in the community type thing. So there's there's a process of reevaluation once the long-term control plan and that's that's around is 2028 is when we're looking to kind of open those discussions back up with the regulators. And and the thing to remember, counselor, is that there are other areas of the system that aren't combined that are aging as well. So there's there's infrastructure investments that are needed throughout the city um that you know the the cso has taken the bulk of the attention uh but we you know we have to continue to make investments elsewhere. Yeah. Um but I remember I think you said once Peter we've got 95% of the separation done but that last 5% is the most expensive part. Yep. It's like in the the blowoff curve. You get to that last little bit and it gets progressively more and more expensive. But I think we the philosophy that the DPW has is these combined system these complete streets where you really have you kind of get as most value as you can out of those type of things. And I think real when that long-term control plan update happens, then there's there's more discussions where I think the city will definitely advocate for, you know, managing the costs of the rateayers while still, you know, meeting or exceeding those the environmental goals that we have, you know, as a community, as you know, as employees. Well, it's a huge turnaround from where we were when the consent decree was signed. Where would a good place to have some of that conversation in forward looking? I mean, when we look at the I think there was a a recent study that was talking about illgrass and and former counselor uh Whan had uh wrote a a pretty good op-ed around uh that in terms of the the bay yet Portsouth is producing far less than we would have expected even going back 10 years ago.
Where can we look and you know given what is said about the last you know 5% of the work on the on the combined sewers is there if we are going to continue you know that pace to continue getting the last you know little bits of this off is there going to be it's tough to I guess align that with a lack of funding uh coming from the feds around that and even you know uh from the state around that is that where would the conversation be had to prepare us for the conversation with the EPA from a policy direction on this. So, it um our regulatory support is here today. Um Suzanne Woodland could speak to it more eloquently than I can, but we have the MAM municipal alliance for adaptive management. Um that is a u we participate with the regulators and um interested parties group interested parties like conservation law foundation. And so during those uh discussions, we have the opportunity to to drill into the science really well. And it's it's clear that the investments that the communities have made has has made a difference. And we've we're now seeing um the discussion on science is turning away from from that and we're able to speak to more non-point source issues and things that are are, you know, coming from other places other than the cities that have wastewater plants. So that is something that is very, you know, we're very vocal about and we're making sure that uh we're trying to keep the regulators on that and I think the regulators are are supportive. Um Suzanne, is there anything or Jamie's anything more? No, you sounds seems like it's I guess just one last followup. how much so we've added um and would love I guess slightly more detailed because some of the positions are um it looks like uh taking
the same position and upgrading um that position but how much of the I think it was 1.6 positions that are total new in the enterprise funds how many of those are driven by kind of the regulatory exposure or the regulatory framework that we have you know positions to PAS. Um and if you don't have that answer right now, it would be helpful to know like of the added positions that there are and a lot of them are you know a point something how many are being driven by uh regulatory requirements that we have. How many are simply or yeah I guess in terms of versus operations and I know that can be somewhat of a gray line because the operation in the sewer plant that we have is driven by regulatory compliance. we built this new sewer plant. But what um that would be I guess a helpful addition to the story of you know where we are seeing you know overall you know we've reduced general fund uh positions by nine or so but our total is at six and a half because uh of the enterprise funds have grown. just want to make sure that we're we're telling the story that needs to be told and not just we're shifting some from the general fund over to uh enterprise funds and being able to point out exactly why those additions are needed. if it's you know from a we need to keep this person because it's competitive environment that would be helpful to know um in terms of uh in terms of that but then really on the regulatory front why are we what's driving some of the position growth in that small than it might be this year would still like to have that answer we can we can provide that report back councelor Cook thank you honor um I just have a stormwater question the presentation is actually very helpful tonight. Um
uh when we do uh storm water uh total nitrogen testing um for facilities, where do we publish that data so that our residents can find it? So currently it's submitted to the EPA with our annual report. Um it's an attachment which the EPA does not publish on their website where they publish the annual reports. We're working on a dashboard right now um with a map that shows all of those locations. Um it's pretty much ready to go. So, we're just looking for a place to host it on our city website. Okay. And I guess a follow on to that since we we are now moving forward with uh exploration of storm water utility um process. Will we be able to um continue to do testing and try to identify um sources um and target sources, more prominent sources of some of those pollutants that we're seeing in storm water more easily once we have um uh storm water enterprise fund in place? That sounds like a kind of a crazy question, but clearly we monitor certain storm water um spaces for for the short answer is yes over time. Okay. Um Jamie's been working really hard uh to do a an account, you know, it's an accounting of all the sources uh and he gets information from developers uh whenever they come in. But we haven't done like a it's more of a desktop exercise. It's not the actual going out and verifying um type things. It's it's expensive to do field work like that. Um and you know over time we will be doing that work. Um but the creating the enterprise fund will give us a a reliable revenue stream that's more
equitably based um than the current structure. Um, so we look forward to the opportunity to speak more uh in depth on on the whole stormwater program as well as the funding needs and and you know the benefits that we see uh going towards a enterprise based uh funding source and actually go ahead but also Jamie like his staff they they they target the outfalls to identify sources and then they chase them upstream. So that's what what those samples are for to identify there's certain indicators of either crosscontamination or other things that shouldn't be going down into that pipe and that's where Jamie and his staff they they use that as the first step and then they can they can investigate further upstream. So that's the point of that type of thing and with his mapping tools he can identify what's connected in so then they can target investigations further upstream and this is all regulated by the permit. We're required to do these catchment investigations. Like I mentioned, we're in year eight of 10. Um, we've been waiting for the last few years for the new permit, which will most likely require us to continue and in increase that that testing. So, and you all know that every year I ask about microplastics testing. I know that that is not mandated yet, but there has been some discussion around it. Um I don't expect us to see a mandate in the next several years, but um footed is a concern I have around um microplastics pollution in our um oceans that is continuing and clearly that's where we have a lot of where our storm water goes. Um so will this allow us to think about that down the road? um if we have a stormwater utility in place, think about kind of adding additional testing that maybe isn't required by EPA, but that we decide as a community is important to monitor. And I would say education is probably the first line of defense. You know, you understanding how much is going out
is really important, but you know, anybody that's walking down the street and sees a plastic bag, you know, pick it up. you know, it you know, if you you use your dog feces bags, you know, the you put them in trash cans. Don't just throw them in down storm drains. I mean, there it's really a lot that we can do as residents um to help, you know, reduce plastics pollution. So, do we have numbers on how many dog bags we pick up out of sewer drains? Is this a high number? Um, one of the pictures you saw, um, that was up there was there's more than you would like to think. Unbelievable. Um, yeah, it's amazing how much small amount of people. Council. Council, um, out of curiosity, when you were talking about flushing the hydrants, do we do as a city all of the ones that are on public roads and private roads, like if they exist on private property? if they sign up, if the privately owned systems want their hydrants flushed, they just need to sign up online. We do we do that. I asked this because my office, we have one that I drive by every day getting to my building. So, I'm like there's a Yeah, there's a liability aspect, too. So, they have to sign an agreement because it's, you know, when you operate a hydrant, there's a risk of damage to fee. No, no fee because it come it comes out of they're paying their fire service fee already. I know. We just fixed the hydrant because it had a problem. We got it fixed. Finally. Um I I've always have been curious and I think this is more of either Ben or Peter question, but we do the 2.5 million out of parking to the general fund every year. I I and that's been going on for years and years. I guess I'm wondering is there any hope or possibility or legal way that that number could ever change or increase? So, the thing to remember is that we're wanting to um build a third garage. And so,
by having a fund balance that's adequate, we can reduce, you know, the bonding required to complete that. And that will give us more flexibility when it comes to creating programs uh such as discounts or or periods of free um or microtransit and those types of things. So the you know the the the the organization or the the budget right now is is not generating the revenues necessary to cover all the expenses. The proposed rate changes uh in this year's budget will provide uh additional revenues to cover that um that shortfall. Um Ben's done a great job with his staff um in maximizing um revenues while minimizing expenses. Um but I would not encourage council at this time to be thinking about adding additional revenues until they're proven. Um and the the goal is to to really build that fund balance um so that you can one weather u you know COVID type events or downturns that so that you don't have to go in to to tax rates. But the goal that we've been thinking is that if we can raise revenues and create a fund balance that's adequate um we could offset the cost of of bonding um which would be which would give everybody a lot more flexibility um when it comes to microtransit when it comes to parking programs and those types of things. So that that would be our hope at this time. Okay. I'm just curious because it when something stays stagnant for so long you've got to ask like when you see the revenues coming in where where do we stand on the flexibility? So I appreciate that. Sure. Bennis, is there anything you want to add on to that? No, sir. So, and sorry I I I missed that question at the restroom there. Um but the
um I understand that we want that for the the the parking uh garage, but I guess it's it's difficult to understand how if you know it stayed stagnant, but also revenues have increased and we're projecting a a higher increase this year. And I'm trying to I was trying to pull up the numbers, but it's it's we're projecting now 13 million of parking revenue, correct? And when we set the the 2.4 number that we increased in 2023 to 2.5 um parking revenues were at we kept you know seven seven and a half. So how I guess it's it's difficult to to to see why there's not a greater share. That's the only thing that's kind of remained constant is so I I would encourage you to look at that um calculation that was used to generate that um $555 tax offset. Um there's a lot of monies that are being spent that benefit the city that would have been general fund types of activities. There's 100,000 that goes to downtown trash collection. There's 300,000 that goes to to snow removal. There's there's about $6.8 million total. Correct. Um so I would say the the 2.5 is is just direct cash benefit. The others are additional additional monies that have increased over the years. So the 2.4 that we started with, we had a much smaller amount going towards um other types of activities that benefit the city. Um and so it's not it hasn't really the the contribution hasn't been static. Um so it's you know I I you know so maybe another way how
much is so how much is then maybe another way to look at it would be the retention number how much has been retained in the the parking fund over the last 10 years on a yearly basis in terms of fund balance in terms of I guess like avenue annual revenue kept in the um in the in the parking. So a lot of it is as you point out in the slide it goes to um it goes to uh certainly the general fund but then there's a number of other right so all all the if if you think of the the benefiting district as the city there the the the ability to spend parking revenues is regulated um and and it needs to follow certain acceptable guidelines. So the activities that are allowable such as uh transportation related to activities, paving and striping and um things that benefit the downtown business district are all part of the the the expenditures. So the the amount that has gone towards the operational side of parking has increased over the years. But of that operational cost, there are things that are be the benefits that historically were paid for by the general fund that are now being picked up by parking because they were justified and they're allowable within the the rules associated with the parking revenues. So we are, you know, at one point we thought about um making parking a enterprise fund. So it's a standalone um thing and and then the services that that are provided would be an overhead uh expenditure directly. So that 2.5 consider that like an overhead associated with the um with the support of of the enterprise fund but it's a special revenue fund. And so, but we try to treat it as, you know, the types of things
that it does are connected uh to the activities associated with parking and they benefit um the city because they historically were paid for out of the general fund. And I understand I guess the um it would be helpful I think to maybe have a look back over the last 10 years on that number um that we see there from FY27 FY26 to go back in terms of what we've added. I guess the I just want to try to come around to the fact that we're now generating $5 million more out of that um out of that fund. Um and to see, you know, where that aligns to uh where that aligns to, you know, other spending that we have that is benefiting the parking and and allows people to park. Obviously, plowing is a as a part of that. um you know because obviously you know we are able to transfer uh to the general fund that is a that is a benefit um and to see just you know why that number it's just when all numbers are growing and this number stays static and we don't have a policy of like a CPI uh based you know approach to the the the the fund or the the amount of money that's coming out of the the general fund. It seems like a it's hard to align that based on our colas and everything else that grow that that wouldn't also be growing at a at the same rate that we are uh growing at least on the on the on the the CPI front. Sure. And and remember we're a very unique parking division. Um the fact that we're spinning off any revenue to the city is exceptional. Um and um the the challenge at this point is that you know we have large capital costs ahead of us in terms of a new garage and if you create you know the 2.4 originally um was something that the former
city manager said well we need to we need to sell the the foundry garage and make it palatable. So, we'll we'll start contributing a certain amount of money and we'll fix it. There's no magic to that number. He had that amount of money revenue uh in surplus and he said, "Well, this is how much we're going to do." And then it got baked in to the system. And so now, because we're giving 2.5 on a regular basis, the last two years we've been in in in deficit, we haven't covered our costs. So, uh but we're still spinning off that 2.5. Fortunately, we had a fund balance that was able to cover the delta. But what I would caution uh is is to to to to bake something into a cash flow that could potentially um not be there. Um and and the the what I always try to stress to staff is that, you know, we budget based on the revenues we know we get. So if we, you know, as long as we know we have a certain amount and if we have two, three years of of of surpluses that we can show, okay, this is a trend that's solid, we could look at potentially up, you know, increasing the amount of money. But so far, we've been we've been depleting our fund balance. And so to consider adding additional to the to the general fund, um, I would caution against it at this point. You know, once we have additional funds, that'd be great. But at this point, I would be cautious. Certainly appreciate that. I think the um uh whether or not it's the foundry garage or just general um you know our our appreciation of all the folks that choose to travel onto Portsouth. I think there always has to be a calculus of how do we preserve and continue to show uh the benefit of parking. There are a number of things that that we do in very small print that
my eyes can't see at the moment, but I'm aware of transfer of Presco Park um etc. I think it just would be helpful looking back over the 10 years around that what that looks like um and to be able to understand that you know we have so few options in terms of revenues in the state. We are unique in that we have uh we have this um that many other communities uh do not have. Uh but to look at this in terms of being able to align it to a um taxpayer that is uh that is squeezed, you know, I didn't get the chance to serve with Mr. Baheno. There was certainly things that I agreed with him on and and disagreed with him on as a citizen. Um, but the idea of aligning our um our city to the benefit of the of the residents and feel as though there's always a a benefit is one of the things that I do uh agree wholeheartedly that it should be at least proven that over the last 10 years this is what we've chosen to spend on and this is why it's grown um in terms of the the revenue. And if it's not then, you know, it's again another question, especially in times when we're facing a lot of um inflationary pressures that we did not face, you know, four years ago. Councelor Taber. Yeah. And I I appreciate the forward vision when you're looking at future parking garage and and it's really important that that fund balance be healthy. But if you don't look at parking revenue as just a parking infrastructure silo, if you say we're a city of 23,000 people that has 60,000 visitors and the only way we can monetize tourists is through parking. That's our only way. We can't
do a pillow tax. We've tried and tried and tried. Um and yet we have to support a huge amount of operating expense to be a tourist citizen. So I think when you look at it that way and you say what's the way that uh we can get the visitors to pay for some of the costs of this uh this enormous operating cost. you know, how many police do we have to add compared to a city our size? And that staffing of the police goes into the size of the police facility we have to build. So, and on and on all these impacts of tourism that ripple through our entire operating budget. Councelor Flynn. Um, regarding the water and sewer use rates, um, which this year will come in just under $7 combined for if you use five units. I think are we anticipating that year to year that's going to potentially grow or is that just, you know, much like the current like water rate is what 18 years it's been that way. Is this similar here or are we looking at this to it? should grow each year. You know, if the costs keep going up, it should follow that. You know, we should expect that. That's why we look at every year. We look at how the fund is doing to see how much it needs to increase to really see and see what our costs are. Um, but we we revisit it every year to to evaluate that and and those that loss of federal monies could further potentially the monies that we have now are good for all the projects that we have going on over the next four or five years. So that does help for a little while. Yeah. Okay. Thank you. And then I
just I'm sorry Jamie and I'm Forgive me because I you were you were talking and I wasn't sure if I caught this, but are you were you are you saying that potentially there would be a fee that will be associated with storm water or did I miss that? I I was quickly writing something down. Yes. So we are um looking to develop a storm water utility that would have a fee associated um what that fee would be and how it's calculated is what the process of uh you know working with our consultant and and council will will look into. Thank you. Those those costs though are paid for by general fund and sewer rates right now. So it would be it would be diff a different way of collecting them. Okay. Thank you. And it's not in this budget. Yeah. Yeah. We got that. We just council. Um so I have kind of a fun question. This wonderful log pipe that we have here in front of us. How much of this did we find um when we dug this particular sample up, it looks like it's in great condition, by the way. So um did we really have to replace it? This is a little bit extreme. So this is this wasn't in active use. So the lore is that there were in the past since Peter Rice has been here there are there were some wood pipes that were in active use but they're the stave style barrel stave pipes. They were not a wood lock. Yeah. These can't handle the pressures that we currently operate at. Um but these ones were were active pipes. You can see the tuberculations and the and the metal deposits and the mineral deposits there. And that was a lead jumper on a galvanized line. So these were active. That one is it's one it's a novelty type thing. We pull them out when we're doing our excavation just because there's so there's so much so many things in the ground. But it's a it's a good one that you know this was active. This is 1800's vintage um and we're pulling out 1890s vintage pipes as part of these projects. So we got a a good long
run out of them. But there's a need for replacing these aged infrastructure. You know that's and that that one Elvin road that's the one you with the current like rough patches right now. But that was that's where we're pulling out right now. That's and that wasn't actually connected to anything. That pipe is very much gone. That's good to hear. We're getting it done though. We're getting it done. It looks like tree bark. Are there any um vacancies currently in the uh in budgeted uh in budgeted uh positions that have been vacant for more than three months? I'd have to get back to you um on that specifically. Um we have u 164 staff members within the department and given the nature of the work uh there's a lot of turnover so vacancies occur on a regular basis um but we're constantly hiring and and bringing people on. So I'm not sure what um what what that number is off the top of my head. I'd have to I'd have to get back to you on that. Okay. And then I guess a followup uh to that um as we um as we as I've asked on the the general fund and Nathan just to make clear if that can be if it could have a report um that lists the um the additional spend that's contractual like cola's legal spending um additional spend that is uh uh net new positions. Um you know what that what that speaks to. Um and then if there's any uh vacancies uh that are longer than than three months would be helpful to see that. Um as I I know that Nathan's working on it for the general
fund. Um and if we could just shift that over to the enterprise funds that would be helpful. Okay. Any other questions? All right. Um, we will open it up to public comment. Peter Huda Portsouth. Good evening. Welcome, Petra. So, I'm gonna uh just speak about the same thing I was basically speaking on on Monday night, and uh it's just something for uh for the council to think about and it's it's in the regular salary areas. So when I look at the salaries in the water department for example, the regular salaries went up from the actual that we needed to run the departments in June almost 100%. So my question is why are we going from 408978 which we spent last year for the whole year to budgeting 827615. Now, um I know some of this is is connected to the raises and I will I will address that in a minute. Um I know I only have a a couple minutes here, so um I'd like to put out some questions of things that really jumped out at me when I I just started looking at stuff. Um especially in um what department is this?
uh treatment plant in Portsouth. Now, when you read through the materials in the budget book, it actually says that um chemicals are going up. So, just for an example, uh FY25 budget was 575, you spent 430, now we're we're budgeting 637. So I guess my my question would be and if we could get a little data on this is is are they really going up 200,000 because if you look at the trends on this they don't seem to be increasing that much. The other question that I would have and this is on Air Force reimbursement is professional services filter media. So the budget was 650,000. We only spent 38,497 and now we're budgeting 676260. Uh if there's a reason behind that, I I hope we could get an explanation on that. Um next, sewer on the salaries, same thing. We're up we're up from uh FY25 actual uh almost 50%. The question in sewer I would have is uh I know we have engineering departments in almost every uh aspect of the public works area and the professional services engineering here in addition this is in admin in addition to our regular engineering is running around uh 262,000 for for FY25 and we're budgeting another 215. So, um I guess the question would be can this be taken care of in house or is there a reason that we're going out of out of out of house for this? The other thing that I want to bring up, and I've been as I've been looking at the the salary increases year-over-year,
there was something was that was was a little disturbing that uh came out to me and the public works area and I I've seen it in a couple of cost centers and that is that the management is getting an increase of up to 11.3% and a lot of the lower positions are not. They're not getting anything. And uh to me that's concerning. I I haven't seen that before. So uh I would ask that uh we look at this because it seems to be a breakdown at the at the cost center level, at the public works level, and at the HR level that uh this shouldn't happen. So those are the things that I have now. I I will save all my fun stuff for the public hearing. Thank you. Look forward to it. Petra, Esther Kennedy, U 41 Pickering, Portsmith. I I find it kind of interesting tonight that I only see five of our nine council here. One of the most important jobs for counselors is the budget. Um and that's concerning given everything that's going on for finances in our community. So I would have recommended that if only five could show that maybe um we would had it at a different time. First I'd like to uh talk about the water plant. Um, in my 20 years experience of being involved in the council level of the city, I have um over the
years heard things like this is a 50-year fix. And that's what we heard for the water plant. So to hear someone say, "Oh, it's outdated and it's only 20 years old." Um, I know that water plant is a little less than 20 years because I was there when we voted to totally upgrade it and overhaul it. I have to ask, are we truly doing 50-year fixes? Seeing the sewage treatment plant and the amount of upgrades and the amount of needs that are coming there. Again, that was even less than 10 years and we're doing all these major things and it's just general maintenance. I get general maintenance, but the cost is going up. A long time ago when I ran I said the three issues we had as a city was water, water and water, wastewater, drinking water and storm water and yes there will be um counselor an increase in fee and storm water and that has been out there for a while um and that is not just local but that is state and federal. So, I guess, you know, I've been told for years that we couldn't divide the lowest part of the um sewage or the um wastewater amount. We had to keep it at at 10 units. And Mr. Rice has told us for years that we couldn't do it because we were going to lose revenue. And all of a sudden, we can. And yet the question is why? Why? Now, I'm glad to see it as someone who utilizes that amount, but the question I have
across the board is where's the money going? What are the finances? What are the true numbers? Now, I I get downtown has been a nightmare. We've been told for years about it being a nightmare to get it upgraded. So, I understand that expense, but it's all these little things. Um, I saw the same thing Petra as she started pointing out things about the cost of people working. Um, so I really hope that the five counselors that are here and the four that aren't sit down and look at these funds. Um, they are going up. We are one of the highest price. You can go right online and look at everyone's um prices for water and for sewer. And as we heard tonight, it's just going to go up. Councelor Taber made a good point, but we heard that we need that money. So the question is, where can we cut? And as you move forward, you're going to have to figure out where we can cut across this budget. And you might have to ask everyone to come in a little bit lower and really look and and Peter's exactly right. When you look at the budget, the amount we expect spend for chemicals last year and the amount we did not expend is quite a bit um difference between what you put in when you look at a $400,000 difference and you didn't spend 200,000 last year. So, I would encourage us to all look at this a little bit more, take a little deep, dig in the pockets and uh try to get these rates to be either constant or go down. Thank you. Thank you, Esther.
Any other speakers for public comment? Seeing none on Zoom. Um, want to Thank you again um and thanks in advance for uh the report backs. Uh we always reserve the the right to have another uh work session as we move through uh the month. Um I I want to you know I think that it's um it's Esther is uh certainly right in terms of water its importance. It's probably one of the uh the most it's the reason we have government uh clean drinking water uh you know portable water, the ability for sewer. Um I'm encouraged by uh you know when this team saw that there was uh an issue with some of the folks not really using uh you know the water in in in which we have the pipe there the sewer you know going months on end of not using that to to being able to look at the the model and saying hey we're going to capture this because whether you're you know whether you're flushing once or flushing 10 times the ability to flush is really important you know like if you can't you know that's So, that's an issue. And so, being able to to change the model to uh to be able to deal with that. Um, and then just on the, you know, there's going to be again tough questions on the budget, but we shouldn't lose sight of the fact like there's a lot of old stuff, you know, all the way out to Jitos that that needs to replace. It's not about just the downtown. um would love to think of just on the you know I saw a lot of folks on on social media this year and while I think that is usually just a a hellscape that hasn't produced you know a lot of benefit there are great things when you see um a you know a kid that's shoveling out their own um their own uh you know fire hydrants. So, if we could think of creative ways, I know that we're having tracking on the plows. If there's fun ways to get the community engaged and involved in terms
of adopting some of the the fire hydrants, um, and being able to, you know, just like we have adopt a spot to get the community, uh, involved, they're going to care and be passionate about, you know, uh, that importance. And then around the the csos, I cannot believe that we haven't had cso. We're having a lot of rain. I'm sure we'll have one tomorrow, but we have the budget meeting tonight. So you got to say, you know, for the entire year, but you know, I think there's a responsibility again for future generations of of Portsouth. It's good that we it's good that we now um are using less uh going through Pierce Island than we did, you know, in 2020, 2012 or 2013. Um but it's really important in terms of what we're putting into to that bay. a lot relies on that, you know, whether it's, you know, fishing or just just the general health and, you know, what we think about when we think about, you know, New Hampshire on the sea coast. So, want to commend uh that effort that is that has gone into that and I know all these enterprise funds work uh together um in a in an interlock fashion, but uh thank you to the work that has gone into it and look forward to the future conversations we're going to have on this budget uh before June 8th. Good night, Portsmith.