Planning Commission - Regular Meeting
About this meeting
- Government Body
- Planning Commission
- Meeting Type
- Planning Commission
- Location
- Newport Beach, CA
- Meeting Date
- September 24, 2026
Video will appear here once the meeting has been held and Newport Beach Planning Commission posts it
Thursday, September 24, 2026
13 items on the agenda.
Sign up to highlight the topics you care about on every agenda.
Start free trialCALL MEETING TO ORDER
REQUEST FOR CONTINUANCES
Approve and File
Project Summary
A coastal development permit (CDP) to demolish an existing duplex and construct a new, three-story 5,789-square-foot single-unit dwelling with a 998-square-foot attached accessory dwelling unit (ADU) and a 1,110-square-foot three-car garage. The proposed development also includes additional appurtenances such as walls, fences, hardscape, drainage devices, and landscaping. The project complies with all development standards and no deviations from the Newport Beach Municipal Code (NBMC) are requested
Conduct a public hearing;
Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment; and
Adopt Draft Zoning Administrator Resolution No. _ approving Coastal Development Permit No. PA2026-0107 (Attachment No. ZA 1).
Project Summary
A request for a coastal development permit (CDP) to extend the existing Mesa Drive trail 0.25 miles eastward to Bayview Park, creating an additional connection to the Upper Bay Trail and the Upper Newport Bay Nature Preserve beyond. The trail will be 10 feet wide and improved with a decomposed granite surface. The trail will be constructed within the public right-of-way and will be separated from the vehicular travel lanes of Mesa Drive by 4-foot, 3-inch-tall concrete railings that are designed to appear wood-like. Construction of the trail requires the removal of landscaping and other unpermitted private encroachments, relocation of utilities, construction of retaining walls ranging from 1 to 2.5 feet in height, reconstruction of six private driveway approaches, installation of roadway signage and striping, and the removal of 26 on-street parking spaces from the south side of Mesa Drive.