About this meeting
- Government Body
- Planning Commission
- Meeting Type
- Planning Commission
- Location
- Monrovia, CA
- Meeting Date
- November 12, 2025
Transcript
58 sections
Good evening everyone. Uh the time is now 7:30 p.m. on Wednesday, November 12th, 2025 and this meeting is called to order of the Monrovia Planning Commission. Uh, first up, please stand and follow Commissioner Janisk in the pledge of allegiance to the flag of America and to the stands nationy andice. Thank you, Commissioner Janisk. Moving along. Uh, next, uh, we would normally have approval of minutes, but we have none to approve for this meeting. Oh, sorry about that. I skipped something. Uh, let's do a roll call, please. Yes. Commissioner Austin, Vice Chair Rose, and Chair Brown are excused. Commissioner Stira is filling in as acting chair. Commissioner Janisk here. Sheffller here. Stira here. Bashani here. Thank you very much. So next would be approval of minutes. We have no minutes to approve in this meeting. Uh so following that in the agenda is the public input portion of tonight's meeting. Uh so at this time uh citizens with uh items to discuss that are not on the agenda tonight are welcome to uh approach the podium and speak. Um and just a reminder, we may not discuss or vote on these items. Uh, but the time for that input is now. Do I have anybody that wishes to speak on items not on the agenda? All right, seeing none, uh, let's move along to the public hearing portion of tonight's meeting. Uh, we have two public hearing items on the agenda today, PH1 and PH2.
First up is PH1, which is a request to approve two variance requests, three minor exceptions, and a neighborhood design compatibility review. The subject property is at 113 South Mountain Avenue uh uh with um uh Kadi Damlian as applicant. And these approvals would allow for the construction of a single family residence at the subject property. Um, I believe we have associate planner Gillespie with the staff report. Take it away. All right. Thank you, Chair, and uh, good evening, commissioners. Um, as you mentioned, um, there's three variances, two exceptions in a design review, all for a new twotory single family home uh, at uh, 113 South Mountain. Um, so just for some uh history about this property, um, some of you may know uh that this property had a large pine tree um, on the side and in May of 2024, this pine tree fell on the house that was previously there. It dem uh, it demolished about half of the house. Um, and currently it sits uh, vacant. The property it's located within the PD area 2. Uh so that's plan development area 2 which allows normally for multifamily development. Um and when we take a look at this uh block of uh P2, you can see the size of the property really stands out as being the smallest on the block. Um and when we take a closer look, you can see that the lot um it really has very tight uh site uh property constraints that limit development potential. Uh so the property it's 58 feet deep and only 43 feet wide and in total it's just under 2500 square ft in size. Uh when compared to other
properties in this uh zone uh most of them are closer to a little over 7,000 square ft in size. Uh so in order to build uh almost any development, you would need at least two variance requests which are uh before you tonight and as well as uh exceptions including a uh a sideyard setback uh exception, a rear yard setback uh minor exception and a backup clearance from the garage. And the variance requests are to exceed the maximum floor area as well as reduce the front yard setback. So this is a picture of the site as it currently stands. Um you can see what remains of the home is still there and it's uh on either side of the property you can see there are garage structures. Um so it really kind of sits on on its own in this block. And this is the proposed development that will replace it. Uh you can see it's a two-story uh with a minimal uh design cues um from found in the neighborhood. So uh the site meets uh most development standards. However, as mentioned before, um it does need a variance request to exceed uh the maximum floor area ratio. Uh the maximum is normally 40%, they're requesting 57%. Um it needs this variance in order to meet the minimum dwelling size for a single family home. Uh normally the maximum uh floor area allowed for this property is just under 1,000 square ft. Um also they are requesting a 9 ft uh front yard setback which is uh much smaller than the 25 ft standard. Uh and then
when we look at the exceptions, uh it's a 3-FFT setback on the north side and a 16 ft uh rear uh yard setback. And finally, a 10-ft uh backup distance from the garage door. So on this slide, you can see how that relates to the site. Um so the house, it's designed as a single structure, uh fairly centered in the property. Um, it's positioned closer to the front yard in order to allow more of a backyard space that is more usable for the resident. And they've positioned the house closer to the front in order to uh provide access on the south side to the rear of the property. And when we take a closer look at the architectural materials, uh it's more of like a modern but minimal traditional style using stucco siding, a composite horizontal siding on key, uh areas of the home, and a uh standing seam metal roof uh for the top and bottom roof elements. Overall, the building will be only 25 ft tall. Uh the maximum height allowed is 27 feet within this area. And you can see uh based on the front and side elevations, they've added uh wall articulation and modulations. Um so it's not just a stuckle box in the middle. A part of neighborhood compatibility, we look at the context um in which it's designed. And you can see this neighborhood has a mix of styles um both older and and modern or min um mid-century. Um it mostly resembles a home of multif family home across the street um using that stucco
and horizontal siding elements that are found. Another aspect is privacy impacts um and window placement. Um so they've been very careful in the window placement and size. Um they've uh try to limit larger windows to the front and the rear of the home where there's more space for landscaping that can be added and minimize the windows on the sides. Um it's also you can see it's been placed uh pretty far away uh from other residences. um the closest being about 40 feet uh 41 feet from the uh residents to the northwest. And when we look at the street frontage and how it compares to the neighboring uh structures, um you can see that the 9- foot uh setback for the front does seem very small, but when compared to the neighbor to the north, um their side setback is only actually uh 9 ft and 7 9.75 ft. Um so you can see it's relatively in the same line of that structure. And also to the south, the 10-ft setback for the garage is in line with the uh 10-ft side setback with the home to the south. Uh so part of this uh project included a review by the development review committee. Um this occurred on September 3rd. Uh with this uh review, there was public comment um from the neighbor to the south. Uh they had concerns at the time because originally there was a three-foot setback proposed on the south side. Um they had concerns about access um particularly uh utility service or utility access and fire uh emergency access. Also, there were some concerns about um privacy impacts with the second floor. Um,
but these were addressed with a redesign of the house being set 5 feet away. The development review committee also had some input on the uh layout. Um there was con some concern about the driveway depth and the parking as well as uh utility and easement access in coordination with the um the utility hookups and the uh front yard driveway setback. Um the staff worked with the applicant to try to address all of these concerns and we feel with the conditions um they've been fully uh analyzed and addressed. Also, uh, with this project, there was a, uh, public hearing notice that was sent out, including a 400 foot mailing radius, a sign posting in the front yard. And with that, we did receive two comments. One was in favor of the project from a neighbor on Wild Rose, and one a comment had concerns about potential encroachments onto their property. Um, this was from the neighbor to the north. However, with the setback of 3 ft that is taken from the property line, um not the fence that is currently there. Um they did a survey of their property and found that their fence encroached onto their property. Um but there is no new fencing proposed or required uh with this development. So that would not change. Um, we've also added uh several conditions in order to help address these concerns. Um, also the any concerns brought up through the development review committee. These include uh a survey for any future fencing that might be proposed as well as a covenant prohibiting
uh parking within the driveway area. Um this was a concern brought up during the DRC meeting that public uh parking could encroach into the public rideway. Um also landscaping is required and designed in a way to minimize uh privacy impacts. And finally a condition was added to uh secure the property with uh temporary fencing uh to keep people out. And then this was reviewed by the fire department, building division and public works. We've added uh their conditions as well um including fire sprinklers, grading and building plan check and seeing if the existing utilities can be uh utilized if possible. Uh so with that staff is recommending approval with the conditions in the staff report. I'd be happy to answer any questions as well as the applicant. Um they are they're available. Uh so this concludes my presentation. Thank you. Thank you, Vincent. Uh do we have any questions from commissioners for Vincent, the applicant? Go ahead, Commissioner Janack. Um my one question is is uh just maybe a little bit of clarity on um the uh condition for the parking covenant. Um I guess what uh is you know aside from like the covenant what is like is there uh like do people report if people have parked in those kinds of spaces or Yeah. I guess what what is the conditions associated with that? Um I can try to address that for you um Commissioner Jennis. So, the purpose of that covenant is we know that the applicant plans to reside in this home and although they've agreed not to park in that driveway, the covenant um would run with the land. So,
if the property were to be sold to a future homeowner, they would immediately know that no parking would be allowed in that. So, it's really to memorialize in perpetuity um the restriction. Commissioner Mashi, what was the depth of that driveway? Uh 10 about 10 feet. 10 ft. Okay. And 10 ft was a was an issue that was too So it was a concern brought up um at the meeting uh about having having an encroachment in the public rideway, people parking in front of the garage. Okay. And the owner was okay with this? We did talk to the owner um before adding the condition and yes they they did agree to it. Okay. Thank you. Um were there any public comments uh received about this? Yes, we received two comments for today's uh tonight's meeting. Um one was just that they were in favor of the exceptions. The other was uh concerns about encroachment of the house onto the neighboring property. Um however, as mentioned, the setback is 3 ft, but that's taken from the property line. Um so it it would not encroach into the property. Thank you. And uh one more about the fencing. Um so you you mentioned that there would be a survey required for any uh future modifications to the fencing. Can you just remind us what is the current state of the fence around the property? Yes. So to the south u because the tree fell over the those owners replaced the fencing that was damaged. Uh and to the north um there was a fence permit issued in 2005. Um however the current owner did
a survey and found that encroached onto their property a little bit. Um, so that was mainly the issue. It's really between the two property owners is the fencing. And that one is still in place where it was or where it has been. Yes. Undamaged. Anything at the rear of the property? There is a fencing to the rear. Um, we haven't heard anything about that. That hasn't changed. Great. Any other questions from commissioners before we go? All right, seeing none, uh this is the time and place for public input regarding PH1. Uh we'll accept testimony in the following order. Uh the applicant if they wish to speak, then persons in favor, then persons with concerns, and then the applicant will have a chance to respond to those concerns. Uh just a reminder if you would like to speak just please come to the podium state your name and uh we will and address your comments to me and we'll go from there. Would the applicant like to speak? Do we have the applicant? No. All right. That's a no. Um do we have any persons in favor who would wish to speak? Seeing none, uh, do we have any persons with concerns about this agenda item? All right, that makes this easy. Uh, the public testimony portion of this hearing is closed and it's time for the commission to deliberate. Um, in that brief interlude, have any more questions arisen? Nope. Okay. Don't see any questions from the commission. So, if there's no further discussion,
do I have a motion? Yeah. Uh I move to approve variance uh uh identified as ver v2025-001 variance v2025-00002 minor exception ME 2025-000010 minor exception ME 20225-000011 minor exception ME 2025-0018 and level 6 neighborhood compatibility design review DR2025-000018 with the conditions as presented in the staff report. All right. Any do we have a second? Second. We have a motion and a second. Could we please have a roll call vote? Yes. Commissioner Janisk. I. Sheffller. Yes. Vashani. Yes. Acting chair. Yes. With that, uh, the motion is approved. Uh, could someone read the appeal language? Uh, yes, Commissioner Stura. So, all decisions of the planning commission may be appealed if filed in writing within 10 days of tonight's decision, and an appeal appeal fee does apply. Thank you. Thank you, Director Burme. All right, moving right along in our agenda. Next up is PH2, uh, which is a request to approve resolutions recommending city council take several actions regarding, uh, sub a subject property, including, uh, certifying an environmental impact report, adopting a specific plan, approving a general plan amendment, approving a zoning amendment, and approving a tenative partial map, and approving a conditional use permit. Uh, the subject property is at 701 South Myrtle Avenue.
uh with uh BGB Myrtle LLC Scott Griggs as applicant. And these approvals would allow for the construction of a five-story mixeduse building at the subject property. I believe we have planning division manager John Mayer on deck to deliver the staff report. Take it away, John. Thank you very much, chair and commissioners, and thank you uh chair for covering that first slide for me. Uh that covers everything we're going to talk about. Um and and based on that, um just since we have a lot to cover tonight, I thought I'd provide a quick road map of what we'll cover tonight. I'll start with how this area um 701 South Myrtle fits in with the city's long-term vision. I'll then walk through the feasibility analysis that was done for the project. We'll cover the project design and the public realm improvements. Uh after that, we'll look at the environmental review and the development review uh committee feedback u before wrapping up with staff's recommendations. So, this area of 701 South Myrtle um has been an area of part of a Monrovia um that's had a long-term vision for a long time. Uh back in 2008, the general plan identified South Myrtle as an opportunity to extend the character of Oldtown down toward the 210 freeway. And the idea was to turn what was once an industrial corridor into a walkable mixeduse extension of Oldtown. Uh we've already seen parts of that vision come to life with projects like Avalon and Paragon. These projects have helped bring more activity, housing, and storefronts into the corridor, uh putting more feet on the street in the Oldtown district. Uh the project tonight um is considered a next step in that long-term plan. This slide shows the current site. It's a singlestory 1979 office and light industrial building with
a very large surface parking lot. It's one of the key remaining development sites in Oldtown Extension District and it's well positioned to continue Oldtown's walkable character. So, how we got here? Um, the developer approached the city with a a larger and taller mixeduse project than what the city's current standards allow. The city paused that initial idea so we could study what what was appropriate here. We looked at the design context, economic feasibility, and long-term goals for the corridor. And this led to a a very collaborative approach with with the city and the San Gabriel Valley Council of Governments working together on an independent feasibility study for this site. This graphic shows where we are today versus what the proposal could bring. The idea is to move from a low industrial I'm sorry low low inensity industrial site to a pedestrianfriendly mixeduse corridor uh corner that continues Oldtown's street experience. So, regarding this independent economic study, um EPS was the company that was uh selected to test whether the project on this site could actually be built under the current zoning. Uh they found that the old standards, the 54 units per acre and the fourstory height limit uh that's currently in place today simply didn't pencil out for a project like this. increasing the density and the height uh would make the project feasible while still maintaining strong design controls. And that analysis has guided us uh towards the creation of this PD29. PD29 is a a new land use designation created specifically just for this site. It would allow the density and height needed to make a mixeduse project feasible and requires on-site affordable
units. It also allows additional density and height to achieve the economic feasibility. It would require on-site affordable housing equal to 10% of the total units plus three at the modern income level. And it also ties the entire project to a sightspecific specific plan which gives the city strong oversight over the design. The way we can think about this PD29 is it works kind of like a puzzle. We're balancing three pieces at once. affordability, a design that is thoughtful and contextsensitive, and project feasibility. Each piece matters, and if one is missing, the picture just doesn't come together. So, what is this PD or plan development? This is a tool that the city has used for decades. It allows us to tailor the height, the density, and the design requirements to fit the neighborhood. We've used this successfully in Oldtown, for example, Colorado Commons. This was a mixeduse housing and retail development on a former parking lot. We also have a PD for the adaptive reuse of that 1950s era telecommunications building that's now u storage storage facility on the upper floors and ground flooror retail just east of Oldtown. PDS are customized zoning tools created by the city. They're not a one-sizefits-all. Instead, they they let us tailor development standards to fit the unique character and goals of a specific site. The specific plan is essentially a detailed rule book. In this case, 701 South Myrtle specific plan is the rule book that would implement what we call PD29, the plan development designation for the site. What that means, it takes the general fra framework of PD29 and spells out exactly what can be built here. Things like the design standards, the land uses that are allowed and the development regulations that apply. The purpose is to make sure that the
project moves forward in a way that's consistent with the city's general plan. And for this area, the general plan calls for a walkable mixeduse corridor that extends the vitality of Oldtown Monrovia south towards Station Square. And the specific plan is the tool that ensures this project contributes to that vision. So the role of this specific plan is put the PD28 designation into action. That means it takes the site, which was previously zoned light industrial uses, and establishes the framework for a mixeduse development with both housing and commercial space. The plan also sets detailed standards to make sure the project extends Oldtown's pedestrian environment. This includes required structured uh structured parking instead of surface lots, widening the sidewalks, creating a public plaza at Myrtle and Olive, and ensuring active ground floor uses face Myrtle Avenue. It also requires a strong street facing design elements such as the use of brick and stucco and stone so that the new building fits well with its surroundings. Finally, the plan makes sure the affordable housing is included and the design standards applied to the project are consistent with the character of Oldtown Monrovia. This slide here now focuses on the development project itself. The actual building that would be constructed under the specific plan. The project covers a 1.61 acre site and proposes a fivestory mixeduse building. The height is set at 65 ft with architectural features permitted to extend about up to 80 80 feet. Along Myrtle Avenue, the top floor steps back 15 ft to reduce the apparent scale from the street. The building total includes 204 residential units made up of 20 studios, 141, I'm sorry, 147 onebedrooms and 37 twobedrooms. Within this total, 20 units are affordable.
17 are reserved for lowincome households and three are for moderate income households in line with the PD29 requirements. Parking for the project is provided consistent with the state density bonus law which allows reduced parking ratios for the projects that include affordable housing. So instead of the city's standard 2.5 spaces per unit, this law permits one space per studio and onebedroom units and one and a half spaces for the two-bedroom or more units. And based on these ratios, the project provides 271 spaces meeting the state requirements while supporting a more efficient use of the land in a downtown setting. The project also includes a mix of public and private open spaces. These include a new public plaza at the corner of Myrtle and Olive, two landscape courtyards for the for the residents, and private balconies and a rooftop deck. Together, these features reflect how the specific plan translates into a single development project designed to add housing, incorporate affordability, and provide adequate parking under the state standards and contribute uh new public space along the corridor. This slide is an aerial photo uh showing where the project is located uh in the broader south Myrtle corridor. The site uh sits at the southwest corner of Myrtle and Olive, right at the edge of Oldtown's southern boundary. It's within what we call the Oldtown District, uh, sorry, Oldtown Extension District in the area where the city has envisioned that walkable mixeduse character. You can also see how the project is positioned between two major developments, the Paragon to the northeast and the Avalon to the southwest. And that gives this site an important role in connecting those projects and creating some continuity along Myrtle. Uh finally, the site is about threequarters of a mile from the Metro Aine station, which helps support the transit use and reduces vehicle trips. So overall, the location fits very well with the city's long-term
vision for this walkable corridor um linking Oldtown to Station Square. Here's some images of uh just a look at the surrounding context for site. You can see uh that um to the to the north we do have some shops and apartments leading into Oldtown. To the east across Myrtle is the Paragon project which is three to four stories tall. Uh to the south we still have some remnants of the some office and light industrial buildings. Uh then transitioning into that five-story Avalon uh project. Um and to the west uh the area steps down into some light industrial and residential neighborhoods uh which the project design takes into account through its massing and setbacks. Here's an overall uh site plan. I just want to walk you through this. Uh moving clockwise uh around the site at the corner of U. Myrtle uh and Olive. The plan creates a new public plaza. This plaza provides outdoor seating and serves as a main pedestrian entry uh activating the corner and linking directly to the ground floor commercial space. The main residential lobby is also located here giving residents direct access to Myrtle. reinforcing the pedestrian orientation of the building. Moving south along Myrtle Avenue, the front engine includes a brick clad arcade. This is a covered walkway uh just meant to improve the pedestrian environment and uh providing some access to the commercial storefront. The arcade also fronts the project's fitness studio uh one of the indoor amenities for the residents and u helping just to keep that activity along Myrtle Avenue. Continuing around the west side, the rear alley is designed for the service access, including deliveries and designated space for resident moveins. Locating these functions here, uh, helps keep them out of view of from Myrtle Avenue and Olive Avenue, preserving those front
edges for pedestrians. And then along the western side, uh, between the alley and Olive Avenue, the plan provides a small outdoor dog park. Uh this space is reserved for the residents and screened with landscaping and provides a private open space amenity for for the residents. And then finally at Olive, this is the vehicular entry into the structured parking garage. The garage extends one and a half levels below grade and provides a total of 329 spaces. Of those 255 are secured uh behind a gate for residents with access controlled by a call box. Another 50 spaces are set aside for guests and 10 are located in front of a gate uh for easy visitor access. So this approach keeps the resident parking secure while making guests and customer parking accessible, ensuring that it's all parked and um and accommodated on site without the need for service surface parking lots. Moving up to the second floor podium level, I just want to stress that this is the second floor, not the ground floor. This this plan introduces the project's larger amenity areas. Uh there are two landscaped courtyards designed with seating and open space intended for resident gathering and recreation. In addition to the courtyards, the club room is located at this level, providing an indoor amenity space that complements the outdoor areas. Together, these features create a mix of indoor and outdoor spaces available to the residents. Access to this podium level is restricted to residents and because it sits above the street, the courtyards have an added degree of of privacy. And finally, the structured parking beneath the podium is directly connected by elevators, so residents and their guests can move between the garage and the ground floor and the podium level without needing to exit the building. Levels two and three are what we would call the typical residential floors of this project. These levels contain a mix of studios, onebedrooms,
and two-bedroom units, consistent with the overall unit count in the specific plan. From the outside, the facades of these floors don't change much compared to the base level. Windows are aligned in a consistent pattern, maintaining a a nice rhythm that matches Oldtown's um traditional architecture. And for private open space, residents will have their balconies or Juliet railings, which provide some opportunities to look out over the street and into the courtyards. On the fourth uh residential level, the building introduces a step back along Myrtle Avenue. Uh this means that the top floor is pulled back from the street by about 15 ft, which helps soften the overall height when viewed from the sidewalk. Within the stepback, the specific plan includes a rooftop terrace that faces Myrtle Avenue and the St. Gabriel uh St. Gabriel Mountains. This terrace is designed as a shared open space for residents, functioning as a lounge and gathering area. And along Olive Avenue, the building also steps back at the upper level, creating some additional residential deck areas and further reducing the building's bulk at the street street edge. This is a cross this is a cross-section uh showing the full vertical organization of the project. Looking from the south, on the right hand side of the diagram is Myrtle Avenue and on the left hand side is the location of the resident dog park along Olive Avenue. Starting below grade, the project includes one and a half levels of subterranean parking. Uh this is where the resident guest and commercial parking is accommodated. Uh secured by a gate and connected by the building elevators. Above the parking is the podium level located on the second floor. This is uh this level contains two large courtyards for the residents and a pool and and and another outdoor seating and dining space. The next three floors, levels two through four contain the residential units. And these floors maintain a consistent um rhythm and design pattern uh as
I mentioned earlier along Myrtle. At the top, the building steps back from uh Myrtle Avenue, reducing that perceived scale when re when viewed from the street. This slide highlights the planting and heartscape approach for the project. Along Myal Avenue, three existing street trees will remain in place. Along Olive Avenue, new uh new street trees are proposed uh to provide some shade and visual interest. The public plaza at Myrtle and Olive incorporate widened sidewalks, shade trees, planters, and decorative paving, street furniture, lighting, and other elements within the public ride ofway will will need to follow city standards. Within the site, the courtyards and dog park are designed with a pallet of drought tolerant shrubs, native or adaptive tree species, and turf or ground cover where appropriate. So the design character uh this slide just gives a sense of the overall architectural character of the project. The design blends contemporary mixeduse architecture with some traditional materials, bricks, stone, stucco, and articulated bays. The ground floor is designed to be very open and transparent with large storefront windows and active street frontage. Uh this helps keep the pedestrian environment lively and connected. You'll also notice that the upper floors step back as the building goes up. Those stepbacks help reduce the massing and soften the overall appearance from the street. All of these elements, the materials, the transparency, the stepbacks, and the proportions are all intentional. They're designed to make the project feel compatible with the Oldtown Extension District and to continue to the visual rhythm of the corridor. And this particular elevation, this is one that faces toward Oldtown Monrovia. So, this is a view that you would see going south on Myrtle. Uh so the next few slides I just want to focus specifically on that connection and explain
why the project is not expected to create any adverse impacts on the Oldtown historic district. Just want to walk through the historic resources analysis that was completed for the environmental impact report. Even though Oldtown is not a formal designated historic district at the local, state or federal level, it was identified in the city's um historic survey as an eligible historic district. And so under SQA, when an area is considered eligible, uh we must treat it as a historic resource and evaluate whether a project could impact it. So, uh, the city's team, um, uh, historic consultant Debbie How Ardella, um, prepared the full technical report on this, and she evaluated the potential Oldtown commercial historic district using the SQA criteria of integrity. Things like, uh, setting and feeling and design and association are all attributes of historic preservation. And because the site is several blocks away, separated by a major intersection, and because there are non-historic buildings in between, the study found that the project would not change the district's character or impact its potential eligibility. The building also incorporates a lot of design um a lot of design elements such as stepbacks and traditional materials and a strong pedestrian orientation. All of this helps it fit within the Oldtown uh extension cont context. So in short, the analysis concluded that the project would not create or direct or direct a direct or indirect uh significant impact uh to the potential Oldtown historic district under SQUA. And this this uh slide simply explains why SQUA requires us to complete this kind of study. SQUA doesn't just look at uh designated landmarks. It also requires the city to evaluate these resources uh that have been identified as potentially eligible.
So because Oldtown has been identified um as eligible, SQA treats it as a historic resource. So the next series of slides um will be uh to show the architectural images of the project. This is a view from the southwest quarter of South Myrtle and West Olive Avenues facing that corner plaza I discussed earlier. The design incorporates a brick clad arcade at the ground level with commercial storefronts and this treatment is consistent with Oldtown's pedestrian environment and helps activate the street. This is a view looking south on South Myrtle showing the corner plaza and scale relative to the Paragon development across across Myrtle. Uh the public plaza at Myrtle and Olive incorporates widened sidewalks, shade trees, planters, and decorative paving, street furniture, lighting, and other elements uh within the public ride ofway uh will all need to follow uh city standards. This is another view. This one is um across the street of Myrtle Avenue showing how the storefronts are framed with the canopies uh providing shade along that ground floor um area. This is the view looking northwest on South Myrtle Avenue on the south alley elevation. This is the side of the building where the service functions are located, including the the loading entry. This is um there's a loading entry for deliveries and resident moveins. Uh this is also the out uh the location where um the trash pickup will will occur as well. Uh this is a sort of a massing model uh in a view looking northeast from the rear alley. The design is more simplified in this um this view uh compared to the Myrtle Avenue. But the plan does call for lighter materials
and some visual breaks uh in the design like changes in the materials to avoid that flat wall uh appearance and keep the facade in rhythm with the old town's character. And finally, this is a rendering looking southeast towards the project from across West Olive Avenue. The ground floor uh on this side incorporates residential entries directly at the sidewalk, creating a more residential scale and reinforcing a neighborhood feel along the this edge of the specific plan. The length of this West olive facade, as you can see, is broken into some distinct building blocks uh separated by two podium level courtyards uh which all help reduce the apparent mass of the building and provide some visual balance. So before a project like this can move forward, the city is required by the California Environmental Quality Act or SQA to study whether it can have any significant effects on the environment. For 701 South Myrtle, the city prepared a draft environmental impact report or an EIR and that was available for public review from July 3rd through August 18th, 2025. During that time, residents, agencies, and organizations have the opportunity to comment on the analysis. We've also prepared the final EIR, which includes responses to those comments and identifies the mitigation measures or the specific steps that the developer must take to avoid or lessen any potential impacts that were identified. So the ER looked at a wide range of environmental topics. Everything from air quality and traffic to cultural resources, noise, utilities, and public services. Each topic was analyzed
to determine whether the project could create any significant impacts, and if so, whether those impacts could be reduced through mitigation. Across all 15 environmental areas, every potential impact has been reduced to a less than significant level. So that means there are no unavoidable or unmititigated environmental impacts associated with the project. Some topics like aesthetics or quality, transportation, energy use were already below uh significance thresholds. Others like cultural resources, noise during construction, geology and soils, hazardous materials needed some mitigation measures in this case, and we'll cover those next. Just to give you a sense of the city's due diligence, these are the main mitigation measures that will be conditions of approval for the project for the cultural and tribal resources issue area uh before any demolition or excavation begins. Construction workers will receive training on how to recognize artifacts or tribal materials. If anything is uncovered, work must stop immediately and a qualified archaeologist and tribal monitor must evaluate and handle the find appropriately. With respect to the geology and soils issue area, the project must follow detailed recommendations from a licensed geotechnical engineer, including engineered shoring for the underground parking levels, proper soil compaction, and foundation design standards. all to ensure safety and prevent settlement or instability. For the hazards materials uh environmental issue, uh because the site once had a gas station, there's a chance an old underground storage tank could still be buried. The contractor will need to investigate and if found, remove and dispose of it safe safely under the uh state and local oversight, including soil testing and cleanup if contamination is detected. Regarding construction noise, the project must prepare a
construction noise management plan to limit noise for neighbors. This includes maintaining mufflers, limiting loud activities to daytime hours, uh posting contact information for on-site uh uh posting contact information on site for any complaints uh noise complaints and installing temporary sound barriers if needed. Regarding utilities and waste, the project must comply with all city and state recycling and waste diversion programs, confirm that the utility systems have capacity, and include electrical vehicle charging infrastructure. Regarding transportation, the project qualifies as a low vehicle miles traveled area, meaning residents are expected uh to drive a lot less because of its location near downtown, near shops and jobs and transit, which aligns well with the state environmental goals for reducing car dependence. So together these mitigation measures um are um are there to ensure that the project is environmentally responsible and consistent with SQA's intent to avoid or reduce impacts wherever feasible. And at this time I want to just want to acknowledge some of the comments that we receive that fall outside the SQA um review but are still very important to the community and to the city. Uh the three main themes we heard were the height and scale with residents concerned that the five-story building near Oldtown might feel too tall or out of character. Uh people also talked about the architecture. They wanted the design to feel like Monrovia, not something generic. Uh the loss of the tall pine trees came up frequently. Uh they've been part of the landscape here for decades. Parking and traffic were also mentioned, especially fears about congestion or overflow into into public areas. Some residents expressed concerns about uh construction noise or dust. And
there's a general feeling of what might we might call uh development fatigue in the community. Uh the sense that several new apartment buildings were have already gone up nearby. And of course, these are understandable concerns and staff and the applicant have worked carefully to to address these through the project design and and enforceable conditions. We also received a letter uh yesterday from an organization called safer. Uh this stands for the supporters alliance for environmental responsibility. And their letter focuses on two specific SQA topics, air quality and noise. on air quality. They argue that the EIR underestimated certain uh construction emissions and should have included a health risk assessment related to diesel particulate matter. On noise, they argue that more detail should have been provided on the modeling assumptions and that the construction and operational noise levels may may be understated. So, Safer's position is that the ER doesn't fully analyze or disclose these issues and that the document should be revised or recirculated. Uh for tonight, uh we do have the applicant SQA consultant here, Tracy Zinn, and she will respond to these uh safer um technical assertions uh during the public comment portion of of the meeting. And staff will include both the letter and the consultants responses in the final EIR record that goes to the city council. Uh this slide just summarizes the development review committee meeting that took place on October 15th. At that meeting, staff presented the project, walks through the design and circulation and summarized the key SQA findings. The applicant team also described how the um the um how the project supports the city's long-term vision and to extend Oldtown South along Myrtle. Um the his our historic consultant Debbie Howardillo was there uh also presenting her findings of
the historic resources analysis including the conclusion that the project would not impact the potential Oldtown historic district. After the main presentation, the city's departments each reviewed their areas of concerns. The fire department had originally raised some questions about the fire engine movement in the alley. Uh that issue was resolved after the meeting through the addition of a a center pullout area uh within the six-stall alley segment. So there's six parking spaces along that alley and the fire department had some concerns about maneuvering some of their trucks. Um the applicants architect was able to to provide a little more space for those for those fire trucks to maneuver back there. The police department also asked for some improved emergency access to the building uh which was addressed by just adding two designated parking spaces um one on Myrtle and one on Olive so that they have easy access into that main lobby. Uh that's something they requested both and also the public works department uh reviewed these updated plans and agreed with that circulation layout and the revised striping that's needed for those for those concerns. So in the end the all the departments uh concurred with the changes and the DRC supported the project moving forward. And before I conclude this presentation tonight, I just want to briefly highlight a couple of cleanup items that staff um updated to make sure everything is fully aligned uh with the environmental impact report and the conditions of approval. The first one is condition number 28. Uh this deals with the open space and parkland dedication fees. The earlier draft of the of the condition used an older population estimate 1.5 persons per bedroom which understated the total number of future residents. We've now updated that condition to match the population assumptions used in the environmental impact report which estimates 556 future residents. This update doesn't change the project at all. Just simply
ensures the condition is consistent with the environmental impact report and their population and housing analysis. Uh the second cleanup item is uh condition number 37. The original draft of this condition only referenced the mitigation measures from the environmental impact report. Uh but we've now updated that condition so that it clearly requires compliance with all the SQA commitments in the IR just not just the mitigation measures uh but also the design features and the um applicant that the applicant committed to as part of the project and all the regulatory requirements. And the purpose of this update was just to simply consolidate everything all in one comprehensive SQA compliance conditions so that there's no confusion uh later during plan check or during construction monitoring. Again, this doesn't um add any new obligations to the project. These items were just already part of the EIR and makes the condition clear and more enforceable. And before we move into the formal recommendations, I just want to make take a moment to clarify um what it means to certify an an environmental impact report and what that actually means under SQA and just as importantly what it doesn't mean. Uh certifying an EIR means that the environmental document was prepared in accordance with SQA law. It provides a full disclosure of the project's potential impacts and that the city has exercised its own independent judgment in reviewing and relying on that analysis. So this means that the associated the associated mitigation monitoring and reporting program will be implemented ensuring that all the mitigation measures design features and regulatory requirements identified in the ER are carried out through construction operation. Uh certification does not mean that the planning commission is approving the project. uh certification is really a procedural step under SQA. The commission is simply recommending the council find that the EIR is adequate under SQA's legal standards. Uh
it also does not require the commission to agree with every detail or conclusion in the EIR. Uh the focus is really on whether the document as a whole uh meets SQA's requirements for analysis and disclosure. final project approval itself, including the specific plan, the zoning actions, and the parcel map will all occur at the city council hearing. So, with that cl uh clarification, staff is recommending the following actions tonight. Um, environmental impact report. staff recommends that the planning commission adopt a resolution PCR 2025-00004 recommending that the city council certify the EIR adopt SE SQA findings effect and approve the mitigation monitoring program the general plan amendment staff recommends adoption of resolution PCR 2025-00005 recommending the city council approve the general plan amendment which would establish that plan development area 29 the 701 South myrtle specific plans Staff recommends adoption of resolution PCR 2025-006 recommending that the city council approve the 701 South Myrtle specific plan. The zone change in zoning map amendment, the adoption of resolution PCR 2025-00007 would recommend that the city council approve the zoning ordinance amendment and map amendment to reclassify the site from ODLM to SP specific plan. And then finally, the tenative partial map and conditional use permit. Uh staff recommends that the planning commission recommend approval of those to the city council and uh subject to the conditions uh in the staff report in data sheet one. So with that, uh, staff is recommending that the planning commission recommend approval to the city council and, uh, myself, city attorney, community development director,
and the applicant's entire team is here to answer, uh, any questions you have on this project. Thank you, John, for excuse me, uh, for that thorough report. Uh, and thanks all for all the work that went into creating all of these materials and taking this project to where it is today. Um, do we have any questions from the commission for John or uh other members of the team? Yeah, go ahead, Commissioner Jan. Yeah. Hi. Um, one of the questions I do have is um, particularly uh, it's it's in alignment with one of the concerns or some of the concerns mentioned uh, in the report um, about uh, the trees um, and the the pine trees that are on that corridor. Um, and while it might not necessarily be completely in alignment with this project in particular, um, the city of Monrovia has a two for one replacement tree replacement policy. Is that or do we have any standards for that? Well, um the only real protected trees um in the city are are oak trees and those are under an oak tree preservation plan. Generally speaking, when a project moves forward and a oak tree is being um recommended for removal, then we will bring in either a suggested replacement plan or we there's no standard really. We look at the how big the tree is and sorry start from there. But but two for one has been somewhat of a of a standard, but it's not it's there's nothing official about it. There's a lot of things we think
about before we recommend that. Gotcha. Good to know. Thank you. So, let's talk more about trees. Um Monrovia is a considered a tree city USA. So, say the signs as we come into the city limits. Um and uh the benefits of a mature urban healthy tree canopy uh are are well known and well well researched. Um and our general plan and I believe the specific plan also um contain goals um and and policies that promote and support a healthy tree canopy. Um so uh given that can you talk a little bit more um about uh you know the thinking behind uh the number and the size of trees um that are part of this plan and the measures that we have um to ensure that this project uh I is um uh achieving those goals uh in the general plan and and the specific Man, certainly um staff did um discuss this issue with the developer and uh those those tall pines are have been in in place for quite a while. And um the the fact is is that those um the roots of those trees would have a conflict with the subterranean parking that would um be constructed right on the site there. Um very difficult situation to make that work. Um the uh the applicant is uh understands that concern and uh is proposing to plant some substantial trees along that elevation uh to brought to provide that shade. Probably a better shading than what the pine trees currently provide at this time. Um that would help shade the sidewalk
and create an even more comfortable uh pedestrian experience along West Olive there. Um, some would say also the building also creates amount a good amount of shading along the sidewalk too, but also the trees really help soften the appearance of that as well. In terms of environmental impact, the trees were analyzed on whether these trees would have an impact to the environment. Um since they are uh considered um parking lot trees, basically it's really um their trees were really to decorate the parking lot to make it look a little more um you know aesthetically pleasing. Um those were not considered environmental impacts um for their removal. Okay. Um, I was just going to also add that the specific plan has a dedicated section that actually provides the standards for the sub submission of a landscape plan. Um, that requires the approval of the director and it gives um outlines the requirements for both irrigation and plant selection and planting notes to make sure that what is planted is sustainable. in a long-term manner and that the the plantings um are a sufficient size um in compar to to what can be supported upon initial initial planting. Uh follow-up question on the size um particularly for the trees. Um one of the conditions in the cup says it talks about a landscape management plan and it says minimum 24 in or 36 in uh box trees um should be used. Um how is that uh is that complimentary to what's in the specific
plan? And is that consistent with uh the size guidelines? Yes. Okay. Um is there anything uh is there anything that could be done um to encourage larger tree uh integration into the project? larger than a 20 larger than a 36 inch box tree. Um not really. I don't we haven't really discussed anything larger. Um some of the things that I can tell you that our team does as a project goes through development a development um phase into building plan checked is our planning team actually works closely with our public works team to look at what's uh comparable within public rightways and adjacent to public rightaways. And that's something we do through our development services team where we have all uh actually hands on deck folks who actually um are h are our work within the line of landscaping. We we actually coordinate with the applicant as well. And that's something we've done um consistently on all these larger projects, but have also been taken care care to do on these on new new developments since some of these other projects in the past have moved forward since like for example the In-N-Out project, Chick-fil-A for example. At at what stage in the in the uh design and construction process does that type of review and interaction happen upon their initial submitt of a landscape plan. Okay. So, everything right now is concept. Um, but once they start proposing something for us to look at and they have approval, then that's when we start looking at it more carefully. And does that
typically happen after things like most of the hardcape are finalized? And it actually happens during the plan check of the entire project. So, the entire project. Yeah. Before any permits are issued. Uhhuh. Um, one of the other continuing with trees. Um, one of the other things that, um, I believe you mentioned, John, and and I know, uh, the staff report mentions is, uh, preservation of, I think the three trees on that, uh, are right along South Myrtle Avenue. Um, I see language in the cup that says, you know, preserve those trees where feasible. Um, is there a commitment to preserve those trees? Would that also be part of the landscape plan? Could we remove the language where feasible there? Yes, absolutely. I I don't know if those trees have been assessed lately to to determine their health, but I I think that will take place and and if they are uh viable and healthy trees, then of course, yes, they will they'll remain as part of the landscape plan. Yeah. And that might be another question you want to explore with the applicant. Sure. Um and one more here on uh on trees. Um when I look AC uh across the across Myrtle to the east at the Paragon property um I see along Olive Avenue um there are quite a few street trees in that sidewalk. Um I think I counted something like 15. Um I can't quite remember. Uh I know that this is uh the renderings that we've seen here like the uh one that has the amenity deck um and the uh and the conceptual greenery plan is not final uh but I see something like eight trees along that street um have there been any discussions or could there be to increase that number?
We could certainly do. We could certainly have those discussions with the applicant and the city. Yeah. Okay. Uh and is that something that could be uh added to conditions of approval of the landscape? Um, I I think at this point what we should probably do is um there's always that possibility, but might be good to open the public hearing and start hearing from the applicant, getting public testimony before we start committing to conditions. Great. In this phase. Cool. Okay, I've been on the stage for a while. Any other questions uh from No, I got Vashani. Go. This is definitely a small project. This is a definitely a nice project and there's a lot going on here. I think some of the uh discussions about concerns about building height and scale and the density is definitely can be seen in comparison to say the Avalon project next door from a height perspective, a density perspective and how you compare the two projects together. Can you give me some kind of comparison between the two? Is this more? Is it less? Is it in line with the Avalon project? Because a lot of the concerns that I saw after Avalon was done was that the scale was too big and people had a lot of concerns about that. I heard that from the public. I heard that when there's rock in the streets that didn't fit the mold of of the downtown. I like that we set back some parts near Myrtle and Olive going further back so we don't have that same impact. But if you can answer some of those questions that'd be great. Yes, actually Sherry can answer that. This I know Avalon was constructed with a density bonus um as a density project. I'm sure you can fill in with that. Um yes, thank you John. So the Avalon project will likely be is probably comparable in size to this particular project. So it it measured 65 ft in height. That's what this
project is proposing. Um the difference between the two projects is Avalon was developed with an above grade five-story parking structure. So the units are wrapped around it. The other thing is um it it also uh um they also applied for a density bonus and through that phase there wasn't as much articulation as proposed on this project. So, this project's actually developing their parking garage below grade, which allows for a lot more openings and articulations, especially on floors 2 through five, where across all of you can actually see into the project. Um, and the design of the Avalon project was pretty much a box. Yeah. Um, so comparable in height, but I would say this project was definitely more articulated, a lot more um colors and materials incorporated into um the the architecture and and that and that's what I see from the pictures. There's definitely a different view to the whole thing in terms of the architecture, in terms of the the the designs, the curvature. Um that's I do like that all um from the parking perspective is there ability I know we're doing I think two levels you said two two and a half levels three levels is there have we looked at that the thought of and I know this is probably nothing more for the city to look at but u adding more parking that relates back to public use in there because we do have a a parking issue in the city which is the biggest complaint from all of the uh commercial users in the city of the of the of the stores here and so is there a way to add more public parking here? It didn't seem like we had a lot of public parking here. It's all private parking and that's that's a little bit of a concern for me. Yeah. So, the project is actually parked um based on for the residential
units based on the state's density bonus law. The city cannot require any additional parking beyond that. for anything else that's proposed. This project actually parks the leasing area, the uh commercial area, and is there anything else that all the the non-residential? Yeah. And and with some surplus if I'm not mistaken. Is the guest parking for visitors only? Is he they said 50 guest spots? 50 spaces for the uh guests of the residents. Residents only. Okay. Okay. Well, that's something that if there's a way to incorporate that more, I don't know. That's more with the city is seeing if there's other ways to add that to the city. That could be a good time to do it because I think we miss a lot when we don't do that when we build the projects when we need more parking as it is. And then the next thing is I noticed that the uh the commercial space is like I think 2,800 ft² or something like that as I remember. Um but a big portion of the area that's on Myrtle is the fitness center that faces Myrtle. Did we look at that space as being, you know, to incorporate it more into the city along with the commercial and the walk walking through this the down Myrtle Street? Did we look at that being all commercial and then having the the fitness off the main street so you're not seeing that from the street? This way we see more of the stores to go align with the rest of Oldtown. The development standards in in our existing general plan, they do call out for a commercial space at the corner, right, which they fulfill. Um what's very different when the standards um there's been a lot of changes right for re non-residential development right most housing developers mixeduse developers um do not like to incorporate any particular I think um our team worked with the Scott Griggs team for over a year on convincing them to incorporate this particular ground floor commercial space in and I think the
idea of putting all the active uses along the ground floor achieves the pedestrian feel and activity. Um, and we've that was consistently done with the Avalon project and I did see that with most with Avalon with Paragon with all of them. They they kind of do that. I'm just thinking about that that this is a kind of the entry point to the uh the town is you know before before Avalon came and I want to make sure that we don't I wouldn't say have any mistakes but the same kind of feeling you have around Avalon that's now we're getting closer to the to the downtown that was some of the things I had there um let's see what else they have the there is there there are I think I saw one of the drawing there was a loading zone in front on Myrtle Is that Did I see that in there? The um the myrtle access is is for for the residents and guests and and the commercial space. Uh the loading area is in the alley in the back. Okay. I thought I saw in the drawing it said loading there in the front too. Maybe I'm wrong on that emergency vehicle. That's emergency vehicle maybe. Okay. I just I have so many notes here. So Okay, I'll stop right now. Um thank thanks Commissioner Vashani. Um just going back to one of the points Commissioner Vashani made um we were discussing the articulation that was made possible by this particular design on the north side of the building uh fronting Olive Avenue. Um I don't see uh much of that articulation on the south side. Um can you talk about the reasons for that and um if any of that was explored? I think the the back the backside the alley side is is um probably the simplest design feature of the building and um there are some design tricks that the architect included to to make it look like the make it not look like a flat appearance design tricks with paint and things like that.
And I think that's really where the bulk of the the building really needs to occur along that alley portion right there. And everything else was articulated. Um it was designed to slope down and um towards Oldtown Myrtles so that doesn't create a very um dramatic um bulky mass in the corner. So um the the design tricks were intended to soften the appearance on that on that south elevation. So just an observation uh you do get that sloping on the the old town side. Um but when you pass through the the art the gate the entrance to Oldtown that's at the corner um of uh Chestnut and and Myrtle. One of the first things you see is the southside bulk of this particular project. One thing that staff appreciated with this project is that brick facade does wrap around the alley side so that when you're driving north on on um Myrtle that um you do have a portion that's that's brick um for the visible part that you see. Um but yes, the rest of it is is flat. Yeah, it does make that corner slightly more attractive. um question about the uh is there any uh vision or development vision or thinking about the parcels that are immediately south of this property between this property and Avalon? Um right now you said there are some residual industrial and commercial uses. Um are there is there interest in changing that use to a mixed use like this? Um can you just talk about that a little bit? We u we don't have anything proposed at this time or we haven't had any um expressed interest in that but um I believe that whatever is proposed would
have to respond in context uh to the 701 South Myrtle project and everything around it. Yeah. So, and I just to reiterate that, you know, um the general plan sets the vision for this area between Olive and Maple as this Oldtown Extension Oldtown Extension District. So, the the base zoning is office research and development. The general plan has that designation. Um and then um this overlay was added um I want to say in two maybe 2008 to encourage right the redevelopment of these areas into mixeduse projects. Yeah. So it's likely that a future use of that area would be consistent with that. Abs. Absolutely. And we could potentially get more projects within this area because that's we're really seeing these higher density projects where this general plan allows for them in this Oldtown Extension District and Station Square. Yeah. Uh just I mean this is speculating, but we could end up with another project similar in scale uh and scope to this one uh on that property. And then we would have an alley of two backsides of mixed use projects meeting each other at that alley um for whatever that's um and just a reminder to the commission, now's the time for questions. We should save all opinions and observations until after the public hearing. Thank you. Um all right. Uh getting back to a a question uh on the specific plan. Um I I know you said John that um you know this is really the specific plan is a tool to um allow us to you know customize the
the development um for this particular area. Um is there any concern of uh of this being a slippery slope here uh of the city you know losing some discretionary review authority um in you know approving the additional density height and and floor area ratio um for this project um I I would I believe the specific specific plan is the city's con uh planning tool to control and enforce the design that's in this plan. Um, one thing that we lost during the project with the Avalon was um, yes, they had a specific plan, but they came out of the ground with um, the density bonus. So really, um, there wasn't a lot of specific design review that that the city could conduct on that project. We did. Um, but I think for this particular project, the city um staff really worked hard to get a design that um, you know, reacted to the comments that the community heard um, during the initial community meeting phase, respond um, to all the general plan design criteria and guidelines that were outlined in the Oldtown Extension District. I think it was really important that the specific plan didn't lose those but built those into the entire plan. Okay. Um, more questions from anybody? No. Just going back to the now to the density bonus and looking back at the affordable housing and just can you kind of just recap some of the affordable housing numbers and and you know
moderate and just tell me kind of where the numbers are at towards going back to our plans. Do you mean the housing movement? Yes. As in our arena. Yes. Thanks. Kind of where this this fits into that. Absolutely. So, the city's uh six cycle housing element has a a goal for the city to attain um about 1600 units, 1,670 units. Um every project we that incorporates affordable housing. um any housing contributes to the overall uh goal of those total housing units that um we have a a standard for each of the very low low moderate and above moderate. So all of these units would contribute to the city's attainment within the six cycle and these were mostly all moderate right? Um these were 17 low income and three moderate. Okay. Okay. Thank you. And just one last question actually. I know we were trying to do the setback of the heights to not be so big when you come back from Myrtle looking at the site and right right in the center we have the the the front part is five stories high in the corner there. Did is there a reason why they chose to go five stories right right at the entrance of the of Myrtle and uh Murder and Olive. I think this is just a design feature to help um substantiate that corner presence design. Okay. Just thinking about the the setback and why we did the setback of the four the four levels and then over here you have this big one right in front that I get the design part of it. No. Yeah, I understand. And the general plan actually calls for a sitback along Myrtle Avenue um between the third and fourth floors. So what this project did is it did that sit back at the fourth floor. Okay. Thanks. Okay. Thank you.
I'm good. It's okay. Uh any other questions that folks have thought of? Um I just have I think two more topics uh that I wanted to cover. Um can you talk a little little bit about the like water capacity um uh and like the studies that were done and if this is more appropriate for the applicant you can let me know um but just summarize uh things about the like total water demand. Yeah, I'd be happy to defer that to the um applicants consultant. I'll direct those to the applicant. Um and then uh oh could you talk a little bit how the um uh the the parkland uh dedication or inloo fee how that works and the situation for this project? Yes. actually the um the project uh applicant is required to either pay an parkland impact fee or uh um join a community facilities district that would actually fund that. Uh it's based on a formula based on the number of residents and that's collected uh before uh the certificate of occupancy is is is um issued. Okay. And um that requirement is memorialized in the um mitigation measures from our housing element. That's the root of that requirement and and the previous general plan amendment. Very good. Okay, that exhausts my questions for for this part of the uh for this part of the meeting. Um so let's move along to the public testimony portion. And chair, before you move along, I just wanted to provide a few brief remarks. Yeah. Um, so as staff mentioned,
the city did receive a comment letter from Safer yesterday and the developers consultant will dive more deeply into the comment letter and the substance of that. Um, but before doing so, I just wanted to let the commission know that the letter was received significantly after um, the period of time for public comments on or for comment letters on the EIR. Um and if safer safer had a significant period of time to provide this comment letter and did not do so. Um and if they wanted an actual substantive response they could have provided this comment letter dur during the comment letter period. Um second preliminarily based on what we're able to evaluate at this late date this letter is not new information and would not re would not require any recirculation of the EIR. Um, and then finally, as staff mentioned, the letter that was received from SAFER will become part of the record and will be submitted to the city council prior to the public hearing at the city council meeting on this project um and will be evaluated fully between now and then. Very good. Thank you. Uh, should we hear the summary of the response from the consultant before or after opening the public testimony portion? Yeah, great question. you should open the public testimony portion and then we will hear as part of the applicant's presentation. Very good. Um a summary of the letter and the response. All right. Uh now that we've cleared up that, let's move on to the public testimony portion uh of this public hearing. Uh so again, as a reminder for folks, uh this is the time and place for public input regarding PH2. Uh we'll accept testimony from the applicant first. uh then any persons in favor then persons with concerns uh and then the applicant will have a chance to respond. Uh so if you would like to speak uh when you come to the podium please just state your name and direct your testimony
to me. Um so with that uh I would welcome the applicant to come forward and get us started. Good evening. Um, there is one item that I would like to clarify on the agenda. Um, that it is BGP Myrtle LLC and it's written out BGB. Um, but sorry. Um, good evening staff and commissioners. My name is Scott Griggs. I'm a development manager with Blake Griggs Properties. We're located in Danville, California. Um, we're a Californiabased company with a proven track record in infill multifamily development. Uh, we have an affiliated company, Opportunity Housing Group, that works in providing moderate income housing. Um, one of these is actually Moda located over in Station Square. Um, I also want to take this time to thank John Mayor for such an indepth and thoughtful presentation. This really makes my job a lot easier. Um, uh, his presentation reflected the history, collaboration, attention to detail, and all the thought that have really gone into to shaping this community. Um, some of you may be aware, uh, I started my career playing professional baseball for for eight years. I actually spent some time in Rancho Cukamonga. Uh, if there's one thing I've learned over that time, it's it's really uh, you're only as good as the team that supports you. Um, and I believe we we've assembled one of the best teams in the industry. Uh with us here tonight we have Kenneth Walpa and Tobin Semac from
AO Architects. Uh Debbie Hell Ardia, our historic preservation consultant with Chattel. Tracy Zen, our SQL consultant with TMBB Planning. Um there's two groups that couldn't be here tonight. Kieran Wright, our civil engineer, and MJS, our landscape architect. Uh, I would also like to thank the Feder family, Blaine, Linda, and Nick, who have lived and conducted business here in Monrovia for many, many years. Um, this all started when they approached us back in 2022, uh, with a shared vision to create a community that helps bridge Oldtown and Station Square by creating a pedestrian friendly and activated frontage uh, between the districts. Uh, the Feders will remain actively involved with the project and its vision throughout the process as the land owners. Uh since the inception of this project, we've worked very closely with the city and the community to refine this vision. We've hosted community outreach meetings. The first of that being in November 2023. Uh that really helped us understand the rich history of the Oldtown's character. Uh the second meeting uh was held with the Monro Monrovia Historic Preservation Group. That was in February of 2024. That's really where we refine the architecture to better match the historical content and context, the compat compatibility of the surrounding area. Um, following those conversations, uh, you know, we wanted to make sure that we were crossing our tees and dotting our eyes. So we had Debbie uh complete the historic resource
analysis which concluded that there would result in no adverse impacts to the surrounding areas abil ability to gain historic designation in the future. Um, with that input from the community, um, you know, we incorporated that into our design, as John noted, uh, through steps in the massing, traditional brick and awning features, the small plazas, courtyards, walkability along the sidewalks, landmark building forms, and distinct bulkheads on the storefronts. We're extremely proud of this proposed project. We've worked on it for three years. Uh, you know, I've run the day-to-day on this for three years. Um, you know, I think it's a a beautiful addition to Monrovia, to the community. Um, it's going to provide 204 new homes, um, helping meet the city's Rena goals. 17 of those will be low income, three of those moderate, activating the ground floor with the commercial and uh residential fitness center, bringing both life and energy to this emerging Oldtown Extension District. I want to thank the commission for your time as well as the community who shared their input and ideas over the past few years. We believe this project honors Monrovia's rich history while looking towards the future. We fully support the staff's recommendations here tonight. Um, and with that, I would like to invite Tracy Zenup, who is going to respond to Safer's letter. Thank you. Thank you. Good evening. Tracy Zinn with the consulting firm TMBB Planning and I was the
primary author of the environmental impact report. Um, as mentioned, Safer submitted a comment letter on the EIR which I think the city received actually we received this morning. Um, I'm going to respond to it here um, verbally at the podium. So, some of this information is for your benefit. Other of the information is a little bit technical, but I need to state it into the record so it's in the public record. As staff mentioned, we will be preparing a written response um to the letter that we will provide in advance of the city council meeting. Um Safer's concern were over two technical areas, the air quality analysis and the noise analysis. Um first, Safer claimed that the ER should have included a construction health risk assessment. Um, the EIR did include a localized significance threshold methodology and relied on the guidance of the South Coast Air Quality Management District and the modeling that the district recommends. Um, the um the district does not recommend that a construction health risk assessment be done for projects of this size. Health risk assessments are typically done considering an exposure of the surrounding community of 70 years. 70 years. Um this project will only be excuse me under construction for approximately 3 years. Um so the state guidance does not require us to complete a health risk assessment. Um attached to the safer letter they did perform a screening level health risk assessment using a software program called um airc screen. That software program is commonly known to overstate impacts. It does not take into consideration things like meteorological data, temporal data like climate, wind direction, summer, winter,
etc. Um so it it does exaggerate um health impacts um when that model is run. We do not believe that it's credible evidence that this project would cause a significant health risk to the community and we stand by the conclusions of the ER that the impacts would be less than significant. They also questioned input into the air uh quality model. air qual the air qual quality modeling was done using Caliod. Um that is a software program developed by the California Air Pollution Control Officers Association and it's the model most often used to calculate air quality impacts under SQUA across most of California. Um Kelly uses defaults of data based on surveys of actual projects throughout the state of California. um those defaults can be overridden when project specific information is available and we did that. Uh we contacted the applicant, asked them a lot of questions about their construction process, how many construction employees are they going to have on the site? Um what type of equipment are they going to have on the site? What's their construction schedule going to be? So we overrode the defaults for everything where the information was actually available. Um, Safer complained that all of the defaults were not overridden, but it wasn't possible to do that. Things like the distance that dirt would be hauled um during the um export operation. The applicant won't know that until they actually get to construction and know where their dirt's going. Um, so we did continue to rely on the default, which was 20 miles, which is very conservative. And in fact, the earth calling will probably not be um that long. The second topic was noise. So in the safer letter in general, they nitpick the noise analysis. It
was prepared by a professional noise modeler and peer reviewed by a technical expert hired by the city. impacts will be less than significant and in compliance with the city's noise ordinance which sets hours for construction. As was mentioned in the staff presentation, there will be a construction noise management plan that will be implemented during construction. So if the noise on the ground exceeds what the standards are, the applicants are required to pause construction, erect a sound attenuation barrier and continue monitoring to make sure that the noise levels stay beyond um the level of significance. So we are strongly confident that the analysis presented in the ER and the supporting technical reports is sound and that um the comments submitted by safer do not contain um merited information that would um give us any pause um for the planning commission to not recommend certification of the EIR. Um, again, we intend to respond to all the comments in writing before the city council meeting. Do you have any other questions for me while I'm up here? Do we have any further questions from the commission? Okay, thank you. Thank you very much, Miss Sin. Uh, do we have anyone else from the applicant team who would wish to speak? All right. Uh do we have uh questions for the applicant while while we're here? Um Mr. Griggs, uh if you don't mind, um could I ask you about the water capacity study that was done uh and to talk a little bit more about that part of the project? Um yes,
I'm actually gonna default back to Tracy. Okay. Sorry. Of course, after we said we had no more for you, we make you get back up. Yeah, that's okay. And as mentioned, the civil engineer isn't here, but I think I could probably answer the question. So, um, as part of the final EIR, um, a water demand assessment was done. Um, it is attached to the final IR as attachment one, the water capacity study. Um, so that study looked at all of the potential water use opportunities on the site, including the residential units, the commercial units, down to like how much water is it going to take to refill the swimming pool. Um, and based on the capacity or the water demand, it was calculated that the project's estimated water demand will be approximately 39.2 acre feet per year. um that was compared against the available supply and it was determined that there is enough supply in the city system. Um there are not any upgrades needed even to like the pipe sizes. Um and the project's going to just connect to the l the uh lines that are uh adjacent to the property and the streets. Uh thank you. And then I think maybe for city staff um for projects of this size uh that are tapping into utilities like that. Is there a fee that uh that these projects also pay uh to support that use of the infrastructure? There is a higher water rate for multifamily housing that was passed several years ago. Okay. Thank you for the reminder on that. Any more questions before Miss Simpson's down again? Okay. All right. Um, do we have any
other questions for the applicants? All right. Thank you again uh for speaking with us. Um, let's move on to any persons in favor in the audience. Please, uh, just state your name. Good evening. My name is Blaine Federer. Um, I was the developer along with George Boon of this project in 1979. Um, this was the first project that our firm did in the city of Monrovia and I would call it a first date. Um, we had a great track record in other places in Los Angeles County and Monrovia was in trouble. It was in trouble. This is not a simple place to imagine coming and building a development in. Um, but I'd grown up in Arcadia. My wife grew up Linda Boon in San Marino. So, we knew the area. We knew the area west of which was barely the new 605210 junction. Um, and decided to do this again as a first date. Um it was an improvement over and I'll be honest with you what Jean's Grinder's project had been a few years before and the city was very disappointed in that outcome. So we brought this in as sort of a hybrid project in terms of the use. It can be office, it could be industrial. Uh we made it architecturally more attractive than what have been developed in the area. Um over the years that building has incubated or spawned some major companies here in the city of Monrovia. One of the best was a company called Se Beyond which you some of you might recall but they went from 180 square foot office space to 250,000 square feet here in the city. Um we had the good fortune to develop all of the projects
for them. So our history here in the city is storied. We've been very successful as has the city of Monroia and we've been very proud of the relationship we've had for the last 10 years. I've been looking at the Myrtle Business Park going this it's got to go. But what are we going to do with it? It's got to be special. Every time we've done a project in this city, we've attempted to make it better than the one that we've done before. I've known Mr. Griggs, Brad Griggs for 20 years and knew of I know all of his history and he is a nearly gifted uh multif family developer. So we handpicked him. I mean thinking about picking somebody from the Bay Area to come down here, but we knew and had such a high degree of confidence in him that we wanted him. The interesting part of the this property is it's familyowned and it's now into the second and third generations of the family and it's a little bit of an important piece in their their life, their portfolio. They need to get that check every month. So the idea of selling this would never replace what they were getting. So what we're going to be doing is participating in the ownership of this project. So, it's very important to the Boone Federer family. Um, and final comment I want to make is I planted those trees. We tried multiple trees. These trees are not worth saving. I would love to take you on some tours of our projects because our landscape is fantastic and these are not indigenous trees. I I'm going to be honest with you. I think out of frustration, we got a deal and we stuck those in there after the uh um sycamore trees that we had planted. There's just they we could never get them to survive. So anyway,
um happy to meet with any of you at some point in time and we'll take you on a tree walk. Thank you. Thank you very much for your for your testimony. Uh any other persons wishing to speak in favor? All right. Uh, any persons who with concerns? Seeing zero people with concerns. No need for the applicant to respond. Uh, so let's move forward. Uh, the public testimony portion of the hearing is closed now. Uh we can deliberate and discuss. Sorry back to you. Further questions. Go ahead. I see something brewing. We're good. We're good. It's I mean it was more I mean I think Chelsea would agree now is the time where we can have those kind of discussions. So you're welcome to express those things. Yeah, I know that there is concern about uh parking and you know parking shortage um you know where my fellow commissioner was wanting more. I was sitting here looking like we have a surplus according to the requirement and so I was like you know what is the purpose of that but and then I think one of the things I I just want to have a comment on is while parking is important to consider and I think we have secured the at least requirement based on the density bonus um I think to to my fellow commissioner's comment is this I I do believe they're uh the parking that's currently on site and then the parking that's going to be
there. It's it's not technically like a city on public parking lot. And so I my my only comment was like while I think that we could use more parking, I think that like we can't we can't force them to do the parking that like is not taking away public parking. So that was just like a a thought process, but I just put that out there. So excellent point. I'm not question comment. No. Okay. Hold hold hold that for a moment. Um I'd just like to revisit um uh do we have anything else from staff? Okay. Um I just want to revisit uh some of the earlier things um that I had mentioned about trees. Um just looking at in the conditional use permit um at condition 15 I think it is that's the one that's about the landscape plan uh or landscaping um uh is it possible I would like to strike the where feasible um for the existing street trees along Myrtle Avenue. Um, I feel like where feasible is implied um in the uh in the generation of a of a landscape and irrigation plan. Um, am I wrong there? Um, would it be reasonable to strike that? Um, I guess my my my initial concern is that we haven't evaluated it yet. So when we say where's where feasible is we do our greatest effort to make sure um a project you know can preserve but we balance that with the reality of trying to get the project off the ground. Um, we could add a condition that requires
that the the landscape plan go to the development review committee for oversight. Um, and final kind of review to make sure we've covered all of our basis on on that. Um that's not something we normally do, but given maybe the scope of this project, that's something the applicant um would would be willing to to do given the the sensitivity regarding tree removal. Yeah, I would say thank you for that suggestion. Uh I resonate with that. Uh and given that this is uh so central uh to this area um and you know the the the landscaping and the design features of this particular project will be here for a long time to come. Uh I would be in favor of adding that condition and seeing some thoughts. And I think what um the city staff would also bring forward with that review to the to the development review committee is not just um the planning staff review, but maybe a coordinated review with the with the arborist working on the project to also make their presentation to the DRC. And I'm assuming it would also talk about how it's consistent with the general plan. Oh, absolutely. The specific plan. Great. Uh okay, I like that. Um, I think that addresses uh one of my concerns. Um, any other questions or comments? Go ahead. I'm good. Okay. Far away. Move to adopt planning commission resolution number PCR 2025- 004 recommending approval of city council of environmental impact report
00 excuse me for 701 South Merurl specific plan and development project including certification adoption of adoption of findings of facts approval of reporting program planning commission resolution ution number PCR2025-00005 recommending approval to city council of the general plan amendment GPA 2025-002 to establish planning development area 29 PD29 for 1.61 61 acre project site. Adopt planning commission resolution PCR 2025- Z006 recommending approval to city council of 70701 South Merrl specific plan SP2025-002 adopt planning commission resolution PCR 2025-007 recommending approval to city council of the zoning ordinance ordinance number 2025-12 and map amended amendment ZA 2025- 001 to reclassify the property from or RDLM to specific plan. Remove recommend approval of city council of tenative parcel map number 085041 and conditional use permit CU 2025-000010 subject to conditions and recommendations in the staff report. again uh with condition number 15 modified to with condition number 15 modified to include uh review of the landscape plan to include DRC to review the landscape. There we go. All right, we have a motion. Do we have a second?
I'll second that. We have a motion and a second. Uh Commissioner Sheffller deserves some water. Uh, could we get a roll call vote, please? Yes. Commissioner Janisk, yes. Sheffller, yes. Pashani, yes. Acting Chair Stahhira, yes. All right. With that, motion is approved. Um, uh, would you like to read read the appeal language? Oh, no appeal. No, no appeal because this is these are resolutions going to the city council. Thank you. And our our anticipated is, uh, council hearing is December 5th. Oh, second. Like I said, December 2nd. Um, and I just want to say uh I want to thank uh the applicant and the city staff for all the work uh that they put into this. Um, both the project and itself and uh itself and the presentation. Um, it made our job uh easier for sure. Um, and looking forward to seeing this uh go forward. Okay. Thank you. Okay, with that we can move along in the agenda for tonight's meeting. Uh I see we have no administrative reports on the docket. However, uh I think we do have development update from the community development director, director Berillo. All right, take it away. Thank you very much. Um, just wanted to let the commission know that our building division is currently working on the uh uh new building code update that's will go into effect on January 1st. So, he will be taking um the introduction of the 2025 building code to the meeting on December 2nd. Um, and we will be kind of reaching out to see if anyone's interested in looking at it ahead of time. But again,
these are really state standards that will be adopted. Um, it's very exciting. Something that the building official gets to do every 3 years. Just wanted to share about that. Cool. Any other development updates from you. No, I think this 701 South Myrtle Avenue project has taken up a lot of uh John's time and our city attorney's time. A lot of team teamwork makes the dream work effort was involved in this. Yeah. How long have you been working on it again? Two and a half years. Two and a half years. That is a that is a substantial chunk of time. All right. Um I did want to mention uh next week the thankful and grateful celebration is happening on Thursday. So, hope to see many of you there. Um, any other reports or announcements from my fellow commissioners? Yeah, staff, everybody involved in this project. It's awesome. It's It's no questions. Did a lot of reading. You guys did a great job. Yeah. Thank you very much. Okay. Uh with that I believe we can adjourn the meeting at 9:22. It says 10:22. I know. Uh we we can adjourn to our next meeting on December 10th, 2025. Thank you very much. Thank you for leading tonight's meeting. Happy to do it.
This transcript was automatically generated from the official public meeting video and is presented unedited. It reflects remarks made on the public record by elected officials, staff, and public commenters. Transcript accuracy may vary; view the original recording for reference.