About this meeting
- Government Body
- Plan Commission
- Meeting Type
- Plan Commission
- Location
- Waukesha, WI
- Meeting Date
- February 25, 2026
Video will appear here as soon as Waukesha Plan Commission posts it — usually within a day of the meeting
Wednesday, February 25, 2026
10 items on the agenda.
Minutes of January 28, 2026
Attachments: PC Minutes - Draft 1-28-2026 Sign In Sheet - 1-28-2026
Minutes of February 11, 2026
Attachments: PC Minutes - Draft 2-11-2026 Sign In Sheet - 2-11-2026
Certified Survey Map - Prairie Song Dr (WAKC098835 & 0988136)
A request to approve a One Lot CSM on 4.0295 acres of land proposed for residential development at the southwest corner of summit Avenue and Prairie Song Drive in the Rm-2 PUD Multi-Family Residential Planned Unit Development District. Attachments: City of Waukesha Cover Sheet - Prairie Song Courtyards CSM Draft Certified Survey Map, Prairie Song Courtyards. 2-25-26 Prairie Song Courtyards-CSM-020326 MSA Review 2-12-2026 FLAT Project Staff Reviews - CSM26-00001 2-17-26 Charlie Griffith
Consultation - 222 W. St. Paul Avenue
A request to discuss potential plans business model for a proposed improvements to the currently vacant portion of the building located at 222 W St Paul Avenue under the B-3 General Business District. This item is an opportunity for discussion between the developer and the Plan Commission; no formal action will be taken on the plans at this meeting. Attachments: City of Waukesha Cover Sheet- Consultation, 222 W St Paul Ave Cover Letter Elevations and Architectural Plans - St Paul Place, 222 W St Paul Ave, Waukes Renderings - Current Exterior of Building-compressed Renderings - Current Interior of Building-compressed Warehouse-Suite-Layouts Robin Grams
Final Site Plan & Architectural Review, 2600 Summit Avenue, Montessori School of Waukesha
A request to approve final plans for a 14,000 sq.ft. building addition and new parking lot to the west side of the Montessori School along University Drive in the I-1 Institutional District. Attachments: City of Waukesha Cover Sheet-Final SPAR 2600 Summit Avenue Montessori ad City Department Review Comments - Montessori SPAR 2026-01-26-230187600-Sealed Civil Plans 2026-01-26-230187600-Sealed SWM Report 20260210 Montessori School Addition MSA Review 230187600 - Sheet - A1.0 - OVERALL & LIFE SAFETY PLANS 230187600 - Sheet - A1.1 - ENLARGED LOWER LEVEL PLAN 230187600 - Sheet - A1.2 - ENLARGED UPPER LEVEL SOUTH WING PLAN 230187600 - Sheet - A1.3 - ENLARGED UPPER LEVEL WEST WING PLAN 230187600 - Sheet - A1.4 - DUMPSTER ENCLOSURE 230187600 - Sheet - A1.4A - STORAGE & DUMPSTER ALTERNATE 230187600 - Sheet - A2-1 - EXTERIOR ELEVATIONS Stormwater Easement Exhibit MSOW renderings Project Narrative Doug Koehler
Final Site Plan & Architectural Review, 1808 Silvernail Road, UW Credit Union
A request to approve final plans for a new 5,200 sq.ft. credit union building to be constructed at the northwest corner of Silvernail Road and N Grandview Blvd. in the B-5 Community Business District. Attachments: City of Waukesha Cover Sheet - UW Credit Union Applicant Cover Ltr - UWCU Branch 1808 Silvernail Rd. - 260126 20260210 SPAR25-00066-UW Credit Union, 1808 Silvernail Road MSA Revie Storm Sewer Calcs - UWCU Branch 1808 Silvernail Rd. - 260126 Final SPAR Drawings - UWCU Branch 1808 Silvernail Rd - 260126 Light Fixture Cut Sheets - UWCU Branch 1808 Silvernail Rd. - 260126 Project Staff Reviews - SPAR26-00002 2-17-26 Charlie Griffith
Final Site Plan & Architectural Review, 400 Wilmont Drive, Superior Crane Corporation
A request to approve final plans for a new 31,234 sq. ft. industrial building to replace the current building at 400 Wilmont Drive, a 122 foot wide driveway opening is also proposed to safely accommodate the oversized product moving in and out of the facility located in the M-2 General Manufacturing District. Attachments: City of Waukesha Cover Sheet- Final SPAR, 400 Wilmont Drive Superior Crane Civil Plan Set 02-12-26 Photometrics -Superior Crane- 400 Wilmont- 012626 Plan App Cover LetterSuperior Crane- 400 Wilmont- 012626 Plans-Superior Crane - 400 Wilmont dr - 012626 Project Reviews- Superior Crane, 400 Wilmont Drive SPAR26-00003 400 Wilmont Dr Superior Crane MSA Review Comments Robin Grams
Final Site Plan & Architectural Review - 1101 West St. Paul, INNIO
A request to approve final plans for a 3-story 1,904 sq.ft. building addition to the west end of the building along St. Paul Avenue in the M-2 General Manufacturing District. Attachments: City of Waukesha Cover Sheet-Final SPAR 1101 W St Paul Ave INNIO additon City Department Review Comments - INNIO nw entrance 20260212 1101 W. St Paul Ave, Innio MSA Review Comments Arch Plan Set INNIO Welcome Center Addition 1101 W St Paul Ave 012626 Civil Plan Set INNIO Welcome Center Addition 1101 W St Paul Ave 013026 Doug Koehler
Sign Appeal - 3011 Saylesville Road, Momentum Daycare
A request to approve the location of a proposed sign at less than the 10-foot minimum set back from the right-of-way along Saylesville Road in the B-3 General Business District. Attachments: City of Waukesha Cover Sheet- Sign Appeals, 3011 Saylesville Road Momentum-Monument Sign-Proof 9 momentum_sign_placement Robin Grams
Review and possible action on a request from Mandel Group to extend the Plan Commission approval deadline for pulling building permits and commencing construction for the approved 219 unit multi-family development located at 130 Delafield Street, Tax Key WAKC1305459.
Attachments: City of Waukesha Cover Sheet - Mandel Extension Request 130 Delafield St - Extension of Approvals Request 20260210 Doug Koehler