Drainage Board - Regular Meeting
About this meeting
- Government Body
- Drainage Board
- Meeting Type
- Drainage Board
- Location
- Lake County, IN
- Meeting Date
- October 21, 2026
Video will appear here once the meeting has been held and Lake County Drainage Board posts it
Wednesday, October 21, 2026
28 items on the agenda.
Meeting Called to Order – Pledge of Allegiance
Roll Call
Additions, Deletions and/or Corrections
Permission to Open Bids/Proposals
Other
HANOVER DITCH (TILE) RECONSTRUCTION (continued)
- Hanover Ditch Reconstruction Report and Exhibits - Responses from Property Owners to Hanover Ditch Reconstruction Report - Surveyor Responses
Minutes
July 15, 2026; August 19, 2026; September 16, 2026 (Recorded on Granicus to be transcribed)
Advisory Committee by Township
Little Calumet River Basin Development Commission October 21, 2026 Meeting Notice (link for agenda) https://www.littlecalumetriverbasin.org/
2026-09-24 Indiana Department of Natural Resources – Certificate of Approval – Indiana Harbor Canal
St John Ditch, St John, St John Twp. DB App 445-04-24-I-III extension request
Report from Assistant Drainage Admn. Chris Brown to County Surveyor Bill Emerson Jr., PE regarding monthly Clearing & Snagging Crew activity.
Other
KRBYRBDC State Line Bridge Removal Ceremony – Wednesday October 28, 2026
Bull Run Ditch – 9765 Rosewood Dr., St John, IN 46373 (Obstruction of Waterway)
Letter from Drainage Administrator Dan Gossman to property owner regarding an obstruction in Bull Run Ditch.
Other
2021 Main Beaver Dam Ditch Maintenance–Ross, Center & St John Twps. (Clay St to W of Blaine St)
2025 Hart Ditch Stabilization – North of Fran Lin, Munster, North Twp.
2026 Spring Street Ditch Culvert Replacement – Highland, North Twp. (Spring St near Industrial Dr)
• 2026-10-13 CBBEL Review for COR for Ellas Const estimate $15,000 - $17,500 • 2026-10-13 CBBEL Review for Payment for Ellas Const Invoice #351-01 - $221,524.02
2025 Schoon Ditch Maintenance – Calumet Ave to Hart Dt, Munster, North Twp.
• 2026-09-29 CBBEL Review for Final Payment for Gariup Invoice #18048 - $67,187.90
Dyer Ditch Stabilization - Phase 1
• 2026-10-13 CBBEL Review for Final Payment for Dyer Const Invoice #2602-2 - $19,292.70
Other
2023 Singleton Ditch Maintenance – Phase II, 173rd Ave to SR 2, Eagle Creek Twp.
2026 Foss Ditch 2-Stage Ditch Project, Cedar Lake, Cedar Creek Twp. (153rd Ave near Colfax St)
Other
493-11-25-I-III Turkey Creek Lateral #5, New Elliott, St John Twp. (141 71st Ave, New Elliott)
Applicant: David Kubik Agent: I-Work Within; III-Temporary/Permanent Structure; Engineering plans, as well as other related documentation, to install a temporary pathway to remove junk and debris from property. • 2026-09-15 Report
501-03-26-I-III Spring Run Ditch, Lowell, Cedar Creek Twp. (2535 Belshaw Rd, Lowell)
Applicant: Brooker Family Agent: I-Work Within; III-Temporary/Permanent Structure; To install a culvert pipe, cost permitting, to gain access to both sides of Spring Run Ditch. Plan to do work on both sides of the creek with heavy equipment. A culvert maybe the better option then the bridge we original requested. • 2026-05-18 ASI Review #1