Cultural Development Board - Regular Meeting
The Cultural Development Board discussed and recommended approval for a donation proposal of the Daniel Marosi, Bernard Wolfson Bench at The Underline. The board also received updates on cultural grants and ongoing Art in Public Places projects, including delays and modifications to the Morality Set piece.
About this meeting
- Government Body
- Cultural Development Board
- Meeting Type
- Cultural Development Board
- Location
- Coral Gables, FL
- Meeting Date
- August 12, 2026
Transcript
74 sections
Absolutely.
Okay. We have established that we have a second one. I'd like to call the meeting to order. First item is an approval of an issue. Second item, new business. Kathleen?
Good morning. So the second is a donation proposal for Daniel Marmosy and our Wilson bench at the underline. So our main person at the underline that made their presentation to the arts advisory panel at their meeting unfortunately had a fat injury. So I'll go ahead and run through it. I know a little bit about it. And if you have any questions, you can always bring it back. However, we would like to hopefully move it forward. So let me share the screen to share the presentation and why this is coming before. Can you make it? Okay, so now I'm... Okay. So I think I'll probably just talk more about it as you see it. This is just the sketch on the left and the description of it, which you all have received already and hopefully you've had a chance to look through. But basically, this is a large-scale sculptural bench. And this is within the underline, but on the coral anvil's right of way. It's not made of? It is a... a powder-coated aluminum. It is going to be a matte Danish. And you can see it's sort of inspired by two major things, Art Deco architecture and then also South Florida. So you'll see certain elements in here that are referring to our community and the flamingos and the plants, some fish. That's a good thing. And with the overall Design of it was meant to have a more deco feel to it. So this is the dimensions of it. Yes, it's 59 feet long, and it has a slight curve to it to follow the path for its intended installation. So 29 feet long? Yes, 29 feet long.
So this is 18 feet, right?
Let's see if we can count. If there's a lot of people on a table, And it's about eight feet tall, even a little higher at those middle points. See some scale drawings. And then this is the location. So Granada, it's just north of Granada. And then the pathway, the borderline for Coral Gables cuts about here. So you'll see it's a curved path and the bench is bent. date to also curve along that pathway. In addition, in addition, this central area is also being designed to accept another soldier right now we are looking at a gosh, I'm sorry, I'm blanking on the name of the artist, but they do have a proposed artist for that location or proposed permission. No, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no, no. Maybe even the whole map and I have a look at a little three miles. There's a section that's on the world. It was right away.
Right?
Yeah. So we are also all talk about that later. But I mean, So you'll see here, you see where the line is this dashed line up here. That's the line. So this is county. This is city.
So should I have a question? So yes, I'm your presentation there.
Yeah, if you don't mind, but I don't have a whole lot more to say about it. It was presented to the Earth's advisory panel at their last meeting, and they are recommending approval of it. This would be a donation to the city, so it would become part of the city's collection, our whole place's collection, and we would be responsible for the maintenance of it. Can you start with the last slide? Okay, so yes.
Okay, so yeah, so just to reconfirm this is a donation. So it's not like we need to allocate any funds to purchase it. It's just part of the annual maintenance fees are going to be.
Correct. So we would work it into our regular maintenance program and add it on to it.
And including installation.
So the underlying would take care of all the permitting and installation. foundation and everything.
I personally think it's beautiful. My only question would be the compatibility of Art Deco with Coral Gables Aesthetic.
I'm glad that it's If it were made out of iron, it would come out really top-top.
Yeah, it's going to be powder-coated, and then it won't come out. So I think that's how it should be.
Well, the problem with iron is it's going to rust immediately. Excuse me. And then when it rots, you need to say, Well, a little bit of them doesn't get it out there. And a little bit of them also, you know, paint it, you know, as regularly as you should.
Yeah, when they were originally speaking with you, the artist had proposed some options for other colors. And in my opinion, I'm glad that they went with the Russian one. I just kept it.
Is there any correlation between what was the name
Yes. So they are the family that basically funded the piece. So it was their donation that the production of the bench and part of what part of that connection to the art deco was because of Bernadette Wilson. So when they were when the underlying was originally went out looking for different artists, one of their criteria was that you have an art deco.
the building beach. And I like the dividers on the sea. Because it will discourage the escape words.
And just so I like my skateboarders at the edge of the kingdom.
entertain a motion. So, that's all.
So, that's fantastic.
Yeah, this is a discussion, but it's fantastic. 29 feet. It's the answer. It's 100 feet. Yeah, 100. All in favor? Aye. Any opposed? Catherine? All in business?
HAB-Masyn Moyer- Okay, so all those kind of connected to. HAB-Masyn Moyer- But. HAB-Masyn Moyer- Just to let you know that so we'll we'll present this at the next city permission meeting in August and at that same time, we will also be. HAB-Masyn Moyer- Modifying the previous resolution that we have for the installation of the gene wars also have the same issue where they are on the city right away so originally is going to be alone to the underlying. The underlying taking care of it now since it that those anymore pieces will be sitting properly. We're kind of pulling back on what we alone will still be ours will still maintain them. And then it will be a partnership within the restoration, which needed to be done anyway, but they are going to handle the foundations infrastructure installation. So those two pieces
that I think if we are placing any sculptures on the underlying, I think they should be owned by us and they should be maintained by us and not have to rely on county funds or any other funds to maintain them. I think if they are, it's great.
Yeah, it just feels the easiest and the best solution.
Yes.
And right now, you know, they've been able to facilitate the commissioning a lot of work. And even temporary work where it's like up to two years in programming. So they're doing a great job with that. However, they actually don't have a maintenance for themselves. They've been the county because the ones that are On the highway way they've been falling under the risk of county accounts. So if I'm taking care of those.
Great. Any other business.
No, no, we're all of this.
Also read the updates.
Just a couple of just very brief updates. A couple of the grantees again just sort of change the day. A little bit of a venue. So our JCC They always do book events, and typically, like the film festivals, they don't always know who their authors are, so they did send that to us, along with their finalizing dates, and where they would be, real significant changes in their programming. Miso, my own symphony orchestra, had a change of dates, because they were going to be at
museum here and then we've got some date changes so thank you i'm just gonna but we are still working on the consideration of yeah extra breaking out those educational grants for it yes i'm still making a choice on record i know part of public places i'll finish
of, as I mentioned, these two pieces. And then we're also going to commission with slight modification to the morality set piece. So originally he had proposed doing a sculptural concrete base that would have a wave texture. So when we were talking about the installation of the piece itself and how that was going to look and the concrete, He approached him and said, well, maybe we could consider doing a bronze plate instead of the sculptural concrete. But we are going back to commission it also in August for additional funding for that top plate to be bronze instead of concrete, about $50,000. So it'll look nicer. It'll have like a weight texture. Yeah, yeah. Um, yeah. And then we are also moving forward with putting it on a farther triangle from the Merritt Park. So there's Merritt Park and then there is a churn lane and then there's a triangle. So we are proposing to put it in that triangle.
Will there be less, um, foliage around it? Because I think one of the discussion earlier on was also that there's foliage on the base of the churn lane. What's my favorite topic in yours?
The melon. Yeah, not a lot has changed in the last month because it's already in process. So we have a timeline, everything. So it's just moving forward with the design team. It shared with me for the last meeting. We have a design team. They're doing the rentaries. It's not scheduled. So it is continuing to move forward.
It's not scheduled. It's the last month. Yeah. That's good.
Yep.
You know, this has been going on for three years.
It's very close.
It's very close. Three years. And this is a gift.
Mm-hmm.
And, you know, again, you know, I was involved. I remember this. a lot of the details. The artist is mainly responsible for the play. Let me try to give you two minutes for one minute. First, the artist donated the work, but we donated his fee and the work and all that, but we paid the construction cost. And that's the fabrication. Okay, for the fabrication. Which was, for his brother-in-law, $400,000 and we were paying $100,000. So those might not be the right numbers. So he suggested that we use a fabrication. And the fabricator is Ron Hart Foundry of Hardenburg Developments. And it was a disaster. Foundry was a disaster. Foundry delayed and delayed and delayed. And that took, you know, two years. So finally the work is done. But now comes the part of the installation of the work. So Then we got caught into the fabricator wanting to know what kind of screws were going to go into the face. And then the plants were done, and then the plants were done, and back and forth, back and forth, back and forth, to the point that we finally, I think, got to the plant's face.
Correct? We're doing engineering for the plants.
We're doing engineering. so that base can be set up so that it's more comfortable.
Yeah, it's complicated. It's a complicated installation, just the design of how the base is going to be set. And then the location that we're putting it in is a little complicated because it's a patterned concrete plaza. So we have to cut that out and just have it. It's just some technical stuff. Base, I thought.
Based on the schedule, what are the plans that are supposed to be installed?
We should, I'd have to look at the latest that they gave us, but we should be breaking ground late summer, early fall for the foundation work. And then it'll move very quickly once that happens. But the drawings are being finalized and then the construction has to be completed. And then they, so the piece itself is finished except for the painting. However, both the artist and the fabricator agree that painting needs to wait until basically a couple of weeks before it's ready to be installed.
Is there any way this is, I mean, If we can, I don't know if we can, but if we, if the person that, or I'm sorry, the party that has caused a delay can step up and put this at a higher priority on, you know,
and be accountable for the delay.
Accountability being defined as doing whatever is reasonably necessary, make sure it gets done as quickly as possible. If we could do something like that, and then maybe say, hey, by the way, I'm scheduled to be taken to my vaccinate.
Under the circumstances,
The circumstances being that these delays, these even more inwardly unreasonable delays have occurred. We think it's imminently reasonable to ask you to go to the stretch, go the extra mile, and do whatever's necessary, because this is before this development. And maybe we'll get it done by the next time. You know, I mean, I don't know if it's possible, because I don't know any of the specifics usually. But I'm just throwing that out there. It is And my, without even thinking of the figures, I just can't imagine a reasonable explanation for a two or three year delay.
It just doesn't make any sense. Well, I, let me answer that.
Yes.
The fabricator would probably, two years away, would push in visitor monthly, you know, on and on and on. The fabricator was not looking. the base. But the major delay was the fabricator when we got into the bureaucracy of the base and the permitting of the base and the funds through the base into the city of Charlotte.
Yeah, and I do want to give a shout out to Mr. Dulles-Fowley who who really also helped by going out to the foundation with us to speak. There was more than that that had nothing to do with the actual fabrication of the s'more.
If Mr. Bob's following facilitated this and made this quicker than it otherwise would have been, it would have been unimaginable. Thank you.
The donation was made to me.
So I am in the middle. You know, my mind is not necessarily about this project. If it isn't my time on this board and pieces like the Doucette piece and some other pieces that have been in front of us for a significant amount of time. station. one rule fits all but i think it would be nice to know because you know i came in with no expectation i know we've approved some really great pieces and unless it's been a piece that was completely done and donated i you know we're all maybe but that info that actually that i feel like i sat on and saw a presentation that was installed particularly those that are not tied to the
to do it they're gonna fly you know it's not ours yeah yeah so a fast the fastest which would be really really fast which would be a year year and a half but that's very very fast So, you know, our developer projects are often two, three years, depending on what the piece is. And sometimes that's when they already have a piece. And like you said, they haven't commissioned it. It's not being fabricated with fabrication. So a lot of times, just like with a building, a lot of times the majority of the time spent is even in design. So finalizing the design, the engineering drawings, which take time. in modifications need to be made. So, so with morale, to set a space, you know, it's taking longer than we were hoping, because I think for him, it's his very first permanent public art piece. So he had never done anything like this before his design. And then he ran into issues with some of the people that were the computer part of his, and then he had to start again. So it's not uncommon, for good or worse, it's not uncommon to have different situations come up that make it longer than black. But yeah, two, three years is not unreasonable.
It's not unreasonable to approve something and then you're not on the board anymore by the time it gets installed. Right. Right. Okay. I mean, again, I'm not trying to cut you off, but it just, you know.
Yeah. It was very naive. Everybody's part of the owners of that a that mountain was one of our world or. One of them was owned by Gary later it was lent in the sea, but so i'll sit down and put here and it was put on a base.
Yeah, and this particular one, this is the first, he had worked with other factories that were overseas, previous ones, so this was the first, it's like starting from scratch, you know, new molds, everything, it was, yeah. from the beginning. It's a five. It's a five out of five, but it's the only one that's been done by this foundry. And even the artist has said that this is like the best one. It's his favorite one. It's the best one. It's more intricate. He's actually gone in and did a lot of the sculpting on it. I imagine he'll have some of his hand on the painting process as well. So I feel it's a very special, special piece.
So your message is the, listen,
Okay. Catherine, can we go on? Any more?
Not that I can think of. We're moving forward with the intervals. We're focusing for a while, finalizing locations with property owners. We have the galleries on board and a couple of artists already And we're going to so that project is moving ahead and I'll be taking it very swiftly says, you know, it's five artists by spaces by galleries for me. If I was Any commission I don't know when you just when you mentioned earlier.
No, that's great. That's great. And then they I think there's going to be
It was approved. I updated on the last meeting. Nothing's changed from that.
Okay. Further on the agenda, any discussion items?
That's not a discussion item. I didn't get over to Actors Playhouse and saw the production. The show was brilliant. Very enjoyable. Really well done. It's great. Saw a lot of attendance. It was a good production, of course.
Okay. If we don't have any other items, can we have a motion to move to adjourn? Second. Thank you.