City Council - workshop

Monday, September 14, 2026

The Apache Junction City Council discussed potential procurement code updates, the potential transfer of State Route 88 jurisdiction from ADOT, a conditional use permit for a residential project, and regulations for police surveillance technology.

About this meeting

Government Body
City Council
Meeting Type
City Council
Location
Apache Junction, AZ
Meeting Date
September 14, 2026

Transcript

177 sections

10:47Speaker 3

The City of Apache Junction work session of September 14th, 2026 to order and ask everyone to put their cell phones on silent. Roll call.

10:57Speaker 1

Mayor Wilson.

10:59Speaker 1

Vice Mayor Schroeder. Present. Council Member Cross. Here. Council Member Heck.

11:04Speaker 1

Council Member Johnson.

11:05Speaker 1

Council Member Nesser. Present. And Council Member Seller.

11:09Speaker 1

You have a quorum, Your Honor.

11:11Speaker 3

Thank you. Presentation discussion on city code procurement.

11:16 – 11:54Speaker 5

Procedure Joel Thank You mr. Mayor Mayor City Council I Provided you some background information on this already and so for tonight. It's just a Status of where we're at we've Staff has been wanting to do this for a while the code was Adopted in 2018 before that and There was a change also in the late 2000s.

11:55Speaker 6

So basically the city's growing, and there's a lot more projects, and they're more sophisticated projects.

12:02 – 13:57Speaker 5

Therefore, you need more sophisticated rules, especially when there's bidding, where bidding is coming from all over the state. And so what you have before you is just a summary of what we're going to be looking at to bring you at a different time. And we'd be asking for a direction to staff to have a procurement change. And we'll be asking to do that probably in October. And so basically, I just went through the table of contents. We're going to change some things on the purpose Refine the definitions because there's gonna be more definitions There's gonna be some procurement levels that we'd like to change because they are outdated that other cities definitely have other communities There will be more specifics as to the in the invitation for bids request for procurement requests for qualifications And there's other things also in the list. Exemptions, the emergency procurements, clarify bid protests and appeals, adjust ethical standards, penalize more clearly unauthorized purchases, update cooperative purchase and job order contracting agreements, clarify debarments. So I know that's a lot of information to understand. And it's just the current code that we're gonna go through and provide changes to so at the city managers Help with his help we're gonna have probably staff Come up with some changes, but we'd like to get that going so we can do do our projects Right you want to say I just would add and I don't know if Angela or Matt want to add it's been eight years and

13:58 – 14:15Speaker 4

When we do this, it's time to review best practices. This is just the kickstart for you all to start diving into this. We do need to get council direction of staff a couple weeks or even in a month to get some thoughts and ideas on some of these numbers, some of these changes. Matt, anything else you want to add?

14:15 – 14:26Speaker 14

No, you covered the reason why we want to do it, and we'll bring forward, if the council directs, a draft ordinance for them to consider and ask questions about and all that.

14:29 – 14:49Speaker 6

Yes, yes, so you'll have a question on this one on the procurement limit the one from 15,000 to less than hundred thousand you could do that without Requiring three formal written quotes so you could get a ninety five thousand dollar project you could get one quote and we have and good to go No, I apologize.

14:49Speaker 5

That's that was a clerical error.

14:50Speaker 6

That's not the intent at all.

14:52Speaker 5

No you you do we will do to be doing procurements and up to that amount, so no. Because I thought we would do that.

15:00Speaker 4

No, that was a mistake. That was never in the ordinance nor our thought to propose. It should say would require. Yeah, would require.

15:07 – 15:33Speaker 6

Oh, okay. Yeah. Because I thought, man, that's putting a lot of trust in me. No, no, no, no. Change the word without to will. yes yeah and i apologize for that okay i just want to make sure you like what that seems out of the way the rest of it's set up that seems a little out of it yeah you are correct to point that out and i apologize for that mistake thank you um yes are you going to be bringing us a redline version of this

15:33Speaker 4

Absolutely. 100%.

15:35 – 15:48Speaker 5

We will be doing that. Yes, I've started one, even though I don't have direction yet, but I know what you want, and I know you want it in an easy way to handle so that you can understand exactly what we're taking out and what we're putting in.

15:48 – 16:28Speaker 8

One other question. Under 3-7-6, a little further down, it says allow city managers to approve amended contracts value at $1 million but less than $5 million with 10% of contract value. If we already have a contract that has a, maybe it's a 5% contingency, I can understand, or a 10% contingency, I can understand. But if it's a contract that doesn't already have that contingency, if you had a million dollar contract, you're talking about $100,000 just on a signature without council being aware.

16:28Speaker 12

But wouldn't that also be You know, that's what the contingency is for.

16:34Speaker 8

No, I said if it doesn't have a contingency.

16:37 – 16:52Speaker 12

Everything they provide us seems like it always has a contingency. Much to my dismay on a lot of the contracts, I sit there and say, well, put that in the bid. There shouldn't be a contingency on something that you have the solid numbers for.

16:53Speaker 8

So I don't know if we need it, if they're all with contingency, or if If we're doing things that don't have contingency, maybe that should have a different override.

17:03Speaker 6

We will take that definitely back to the group, and we will be back in touch with you on that.

17:11 – 17:34Speaker 3

Anyone else? Thank you. Okay. Presentation, discussion, and update on transfer of jurisdiction, a portion of the state route jurisdiction. Excuse me. Mike.

17:37Speaker 14

Mayor Wilson and members of the council.

17:39 – 25:40Speaker 9

Just a quick update here on where we're at on this. I want to explain to you some different options and who I've talked to and kind of give you an update of what's going on. So as you guys are aware, here's an overall picture of 88 and Idaho Road. It goes through the middle of town here and all the way up to Canyon Lake. I'll We have at least five different traffic signals along this route and around about as part of that. This road has been here since the 60 was installed. Construction was done on the 60 and took over for Apache Trail. So as part of this, the ADOT went out and did a listen to the public. Some of your council members were at that. They heard you guys loud and clear that, Apache Junction was ready, willing, and able to take over this roadway. But what does that entail? How much of roadway do we want to take over? How much is it going to cost the citizens of Apache Junction to take this over? How much did it cost to originally be built? And then go through that process of do we want to take it over without any improvements? Do we want to take it over with improvements? So we'll go through some of those ideas tonight as part of this presentation. So the first part of it is leg one, I'm calling it. This leg is actually from the 60 all the way up to the stoplight here at Apache Trail. So roughly about four miles of five lanes, basically, as we come up through here. We have also five signals. They have sidewalk curb and gutter as part of that. And then also some storm drain as part of that. So we had to go through, did a quick analysis of what current day costs would be for this new road if it was 11 lane miles. So again, it's not just five lanes in certain areas and next down to some different things. So it's 11 lane miles, four miles of sidewalk curb and gutter, two miles of storm drain, five traffic signals, and 17 streetlights along this section. If they were to build that today, it would be roughly about $31 million to build that in today's funds. They're willing to give that to us if we want to take over that portion of the land. But with that comes the maintenance of those areas. Obviously, they did a little bog seal this past year, made it look a little bit better. But eventually, that road is going to be mill and overlaid to make it last another 20 to 30 years as we go through that. As part of that, over the next 10 to 20 years, it'd roughly be about $9.1 million of our expenditures that we'd have to bring that road to keep it up to existing conditions or better it so that it'll last another 20 years for the city of Apache Junction. That would be with no improvements. Those were the costs that the city would have to take on as part of that. The next phase is from that stoplight at Idaho in 88 all the way up to the roundabout or just past the roundabout. That's roughly about 1.75 lane miles. The roundabout, which is fairly new here, 0.5 miles of sidewalk curb and gutter and about eight streetlights that surround that. Total cost to build that, roughly about $2.6 million. It's fairly new. Over the next 10 to 20 years, it'll be about a million dollars to maintain that, keep everything back up to grade. If we have to do a fog seal or slurry seal, something that's not a mill and overlay, it would be a little bit less money to do that as part of that process. Those would be some of the maintenance costs we'd have on that section. So this would be that section we were just talking about there. And then the final section is leg three. This is from the roundabout all the way to the city limits to the north. This is roughly about 6.5 lane miles. There's only one street light, not much out in that area. To build that new, $9.75 million. They just recently did a mill and overlay roughly about three to five years ago on that section of a roadway. Again, the rehabilitation cost for that over the next 20 years, probably more than 15 to 20 years, would be roughly about $3.75 million for us to maintain. So as you can see, there's cost. Even though they would provide that to us, we wouldn't have to pay the overall cost for the infrastructure they built, but we would have to maintain that forever once they turn that over to the city of Apache Junction. So in total, if we took over an entire route of 88 through the city, total new cost would be roughly about $43 million if we had to build that on our own. This is what they're willing to turn over to us. Over the next 10 to 20 years, we'd roughly have about $14 million in expenditures to maintain that road. So what does that really mean to us? The additional lane miles that we're adding here is roughly about 10% of what the city currently has, maybe just a little slightly less than 10%. Our budget on year-to-year is about $7 to $8 million for roadways today, so roughly about $7,000 to $800,000. So we're slightly short of those numbers as we maintained it if we added this on, but obviously we'd have to have additional tax revenue because there's more maintenance as we went through these to maintain all these roads out there. So this is the overall picture. I'm not sure how council feels yet, if they want to take over the first leg, second leg, or all legs at the same time. A couple different options. After talking to ADOT, they reached out to us after they heard from staff or from council when they were at some of the meetings. And they said, well, there's several different options that we can do. One of the options was, hey, we can immediately turn over ownership in the next two to four months with an agreement. The city of Apache Junction can have whatever portion they want. and maintain it forever after that. It's no improvements, so we get it as is, but we're going to have to maintain that from here on out. Some of the benefits is we can control the flow of traffic on this section of land. It helps PD where they don't have to call Highway Patrol out to maintain accidents. We show up to them and typically turn those over to them. It helps utilities out. because currently, even though it's in the city limits, water district, sewer district, our ITS, we have to get permits through ADOT, and typically an ADOT permit is six to eight months to get that permit from ADOT. So take a long time period compared to the city's permitting process, which is about a month. So there are some benefits to that. Explained on legs one and two, some minor maintenance done, but we'll need additional maintenance over the next five to 15 years, and then leg three, which I talked about earlier, It was recently redone with the mill and overlay, so we're looking at more 10 to 20 years before we have to mess with Lake 3. Option two is request ADOT make improvements before they transfer ownership to us. We've talked to ADOT. It's not on their five-year improvement plan at this point in time, so this would be a long-range plan with them of saying, hey, if you mill and overlay it, you put a slurry seal on it, you bring it up to better conditions than it is currently today and put it in agreement, and they will do those, but we wouldn't be able to take over that road or ownership of it for possibly the next five or seven years or longer so we get to that agreement so they could do those improvements before they turned it over to the city. So again, all maintenance costs after that would be taken over by the city at that point in time. And then the last one is your options if you want to take over leg one, which is 60 to the traffic signal at 88 in Idaho. Do you want to take over all the way to the roundabout? or all the way to the city limits. This street, as you guys are aware, it really goes through the heart of the city. So this is a main corridor. As we have our downtown improvements happening currently throughout here, it's becoming a major corridor, and working with ADOT has been difficult to do with traffic signals, different improvements that development needs. They typically require, as you get north on 88, turn lanes, different requirements as part of that. These are some of those decisions that

25:41 – 26:07Speaker 10

council will have rather than have to deal with eight out of that point in time so at that do you guys have any questions for me on this yes yes i have a question so the maintenance for leg one yes that's does that include does those monies include the stop lights the street lights or just the road work that is everything that's everything

26:08 – 26:33Speaker 9

So that'll be, and I have it broken down in an Excel spreadsheet that goes through all these, but the traffic signals are roughly about a million dollars themselves because we have to bring them up to what we're currently using, how we can tie them on to our system with our fiber, getting on the network with cameras, with everything that we apply to that. Don't say cameras. Not for license plate readers. We're talking about cameras for traffic signals that we can make sure we can control the flow of traffic through town.

26:33 – 27:12Speaker 10

It also helps us synchronize as part of that so we can keep that flow going through. And if we decide to go either leg one, leg two, or all three, now this kind of throws in the roundabout artwork into play. So as it sits right now, any artwork we decide to put on that roundabout has got to go through ADOT. That is correct. But if we're like, okay, let's go through one, two, three, all three legs, two to four months you're saying would take for this to happen, if we decide, hey, let's go for it and do it. So as far as they're concerned, they're just waiting on us to see what we want to do. Correct. So they're like, fine, if you guys want it, you can have it kind of thing. But the process takes a few months.

27:13 – 27:27Speaker 10

So we can realistically, if we make a decision about the legs today, we can start designing this artwork in a way how we wouldn't necessarily want it instead of in a way how we think ADOT would approve it. That is correct. Okay.

27:27Speaker 13

Mayor? Yes. Leg one. Have we looked at that? And how soon do you think it's going to need to be fixed?

27:36 – 28:18Speaker 9

So this year they did a fog seal over it. There is some portions in distress that we're going to be working with them on. We're doing an improvement on Old West Highway from basically Idaho to Tomahawk. That intersection they did not touch, but if you go through there, it's very alligatored or has a bunch of holes or cracks through it. We'd probably do a disservice if we don't do something with that intersection currently because we already improved the pavement west of Idaho. So we leave this bad intersection. If we took it over, we could definitely get in there and repair that. That's the only immediate need that I could see out there currently. Some of the other needs would come probably more that 10-year mark when we'd have to do some more. And leg two is okay?

28:19 – 28:31Speaker 13

Leg two is okay? Yes. And leg three is good because they just did it? Correct. So all we're talking about really is fixing the one intersection area immediately. That is correct, yes. Okay. Yes.

28:32Speaker 12

Yes. Mike, you said the annual increase to our budget, $700,000?

28:41Speaker 9

So it would be roughly that. We do roughly about $7 to $8 million in road preservation each year.

28:47Speaker 12

So adding this, the entire 1, 2, and 3, would be roughly an extra $700 to?

28:56 – 29:14Speaker 9

$700 to $1 million annually. Annually to our budget. Those big improvements as we move forward, maybe at that 10-year mark or later. So we'd slowly start building those up. Obviously, we move projects forward and backwards as part of that. And we'll see how things develop here in the city with developments and additional tax revenue as we went through them.

29:16 – 29:47Speaker 8

Bambi? Well, my question is, you know, I've heard an awful lot over the people trying to push to put something in like a roundabout out at 88 and Las Dutchman. I mean, is this something that ADOT is looking at? Because that's a very expensive proposition. And maybe I don't want to look at Section 3 until that actually occurs, because how much is a roundabout put in? How much by state land?

29:47 – 30:29Speaker 9

I'm going to assume ADOT is not looking at putting in any roundabouts in the near future. If we had issues out there, if there were safety issues or something like that, that would be something the city would have to go after. I think that was part of how ADOT did the roundabout here was went after safety money because the intersection was a little dangerous at that point in time. We had enough traffic and incidents there that they were able to go get some grants and help us fund a portion of that also. So that'd be something that we'd have to look at as we grew as a city and we've seen additional accidents or additional issues out happen further to the north and east of town here. And then we'd have to address those issues when they came about. But right now, I don't think there's We wouldn't have any plans to do that, and I'm sure ADOT currently does not. They have not mentioned anything like that.

30:29Speaker 8

And you feel pretty confident that that whole stretch of 88 going out there probably won't need anything major for about 10 years? Correct.

30:38Speaker 9

We may have to do a fog seal or a slurry seal here in the next 7 to 10 years. Those are roughly very minimal costs compared to a road or a mill and overlay.

30:48Speaker 8

So you're looking at $700 to $1 million a year increase in budget, but we get to actually control our downtown. That is correct.

30:59 – 31:18Speaker 6

Yes. Mike, would I be correct to say that we could agree to transfer just leg one, but at any point in time if we wanted to transfer legs two and three, we could do that. ADOT is not a one-shot deal. That is correct. Yeah, you could take it down all at one time.

31:18Speaker 9

You could do it one leg at a time or even change the legs if you guys don't like how I laid them out tonight. Okay. They are open to anything that we're willing to work with them on and work through.

31:29 – 31:50Speaker 6

Then one other question, and maybe this might be for Joel. While ADOT owns the 88, if there were any issues with, you know, deficiencies with the roadway or something, they'd be liable. Once the transfer goes through, we assume that liability, I would expect.

31:50 – 33:20Speaker 5

Yes and no. And I have to say it that way because there's some case law out there. That basically says if your police department or a sheriff is patrolling a state route, this happened up in Prescott, I think it's Sanchez versus Prescott, a license plate, sorry, council member, a license plate frame had fallen off a motorcycle. And what happened was someone hit that and it became a paraplegic. So Prescott got sued, so did the state, and so did the county. Prescott ended up having to pay for that. And it was not their road. It was because the court said that road is something that the police department of Prescott was patrolling. Because of that, they should have seen the live, they should have seen that, and they should have done something about, and it was a four-hour gap in the time that the plate was seen and then there was an accident. So to answer your question, there's some liability now, because I think when an accident occurs on 88, the police show up, otherwise you have to wait a long time for ADOT, and I believe they do pass it to ADOT once they get there, if they show up. So there is liability in that sense. But once it's totally transferred to us, yes, the city will be liable for any liability

33:21 – 33:42Speaker 8

accidents or any Defects in the roadway Could you tell me the pros and cons of only taking it from Broadway past the roundabout Since that is our downtown corridor

33:45Speaker 9

For the downtown corridor, I think it would be great.

33:47Speaker 8

But we do have potential for development along Idaho just south to southern as that's state land currently today.

33:54 – 34:54Speaker 9

So I think that's an opportunity for the city to control the flow of traffic. Hopefully someday there will be a large commercial user that comes into that that adds tax revenue. But as of right now, they'd have to go through the ADOT process to approve that. You can look at that. We have at 16th Avenue, we have the fire department that's there roughly too. helping move them along through this process so we can get them in and out of there but it's truly up up to the council on what legs we want to take there's some benefits there are some cons to it also you know obviously we're maintaining more more roadway more traffic signals as we go through this the biggest thing is part of it why we looked at some of the the pieces was if we take over the five traffic signals we can synchronize those so that as we get flow of traffic through town we can make sure that you have green lights all the way through rather than stopping every mile or every half a mile as you go through that, or when you're going east and west, it again creates those synchronizations all the way through the city, so it makes it flow a little bit better, controlling some of the traffic movements that we have here. Thank you.

34:54 – 35:36Speaker 5

Mr. Mayor, if I could ask one more thing. There's also a political issue here, too. Right now, you have a very friendly ADOT staff, I believe. That changes, and that has changed over time, where we've tried to do certain things on the roadway 10 years ago, 5 years ago, And you had a different staff that said, don't touch our right-of-way. And they get very angry about it. Right now, it sounds like they want to hand this off. That could change. So keep that in mind, too. When you said, oh, any time we can go for leg two or three, if you do leg one, maybe not. But that's speculative. I don't know. I just know what Mike is saying right now. They'd love for you to take it, because this is going to cost them a lot of money to maintain.

35:37 – 36:05Speaker 13

Mayor? If we're going to do it, we just should take the whole thing throughout our whole city because there's going to be growth out in the north, too, eventually. And if we own the road, we can make changes. If we don't own it, and that road, that big portion of the road's just been done. So that's good to go. If we're going to do this, let's just do it. The whole thing. That's my opinion. Daryl.

36:09Speaker 12

The leg one and leg two, they overlap, right?

36:13Speaker 9

Just slightly, yes. We're right there at that intersection, but then...

36:17 – 36:33Speaker 12

So if we were to incorporate just taking over legs one and two, there's a little bit of a cost savings in the formula, I suppose, is the way to say it. Correct. What would that cost us on an annual?

36:33Speaker 9

So that's roughly... We're looking at 9.1 for that first leg, which is all the way up to the intersection here.

36:43 – 37:01Speaker 9

And then also leg two, which would be from the intersection just north of the roundabout here. Right. And that was roughly 3.75. I'm sorry. Okay. $1.1 million. It's fairly new in condition.

37:01Speaker 7

As I say, legs two and three don't add that much liability if you want to look at it that way.

37:07 – 37:19Speaker 9

It's going to be further out for those maintenance costs because they've done that mill and overlay recently. So we wouldn't have those immediate expenditures on that for maintenance of those roads. That's correct.

37:21 – 37:35Speaker 7

Mike, I have kind of a crazy question. On that map where ADOT goes out there, I forget what you want to call it up here in this section of land right here, are they going to expect us to pave that for them?

37:36 – 37:57Speaker 9

So that is a county island currently today, but there are some commercial venues out there. Obviously, we'd probably be reaching out to them if you guys wanted to take over that section and say, hey, we're going to maintain this road. It's now kind of a county island. The city owns it. prefer that you would come into the city limits so we can manage some of that and have to work with some of those commercial developers and some private residential ones at that point in time.

37:57Speaker 7

So that's included in if we take it over, that would be part of it even though it's not in our city?

38:02Speaker 12

That's correct.

38:07 – 38:18Speaker 12

Yes. Brian, where do we sit financially with this? I mean, is this something that we could absorb into our budget and start maintaining it, or is it something that's going to hurt us?

38:19 – 39:36Speaker 4

We'll definitely have to be prioritizing. I think it's something we can manage. Matt and I are just looking at that. One of the issues is if you were to tell me the economy continues like it's going right now, that's a full, strong recommendation because we want to be able to control this. This is a big statement. But we never know what headwinds are coming around the corner, what could happen in terms of the economy changing. But we've been strong in terms of our revenues to expenditures. Mike and I, I think, feel like we need to take it. The only thing that I have on the, I was just going to add for Council Member Johnson, if we do take the first leg, I strongly recommend we get that area between Southern and the freeway. That's just a huge economic corridor. So I would say definitely go all the way up to the roundabout. Leg two makes sense. It could get us some control on the roundabout in that area. The last leg feels a little bit like it's still rural to me, a little bit less, more like a state highway. We could come back, but like Joel said, there could be some reasons we'd want to start now. Mike, I think, leans a little bit more like now is the time. That's the best leg. What's that? That's the best leg. It's the cheapest, right? 20 years, probably. So we would absorb that. It would be a prioritization, Matt House, would we describe that in terms of our street budget?

39:36 – 40:04Speaker 14

So I think an important thing, although our general fund revenues have been pretty good over the years, HEERF hasn't changed. And you all know the story of HEERF. It's the same story that the state has. So it really becomes, the hope becomes we get more efficient and better technology that helps us do projects and maintenance cheaper over time because the HEERF fund is not growing. But but we've managed very well over the years, and we're pretty confident we could manage this.

40:04 – 40:15Speaker 4

Financial, I think we could, and there have been many times over the years working here that I just wish we already owned it in terms of the ability to take control of our own destiny.

40:15 – 40:31Speaker 10

Your Honor. Yes. Mr. Micah, leg one, if we, if Apache Junction owned this road for the past two years or a year, whatever, it's ours. on your priority maintenance scale, what section, this road, where would that fall?

40:32Speaker 9

It would not fall high on our priority list throughout the entire city. We have other roadways that are in worse condition.

40:38Speaker 10

So as it sits right now, it sure is going to need some attention soon enough, but if it was ours right now, that wouldn't be a focus of priority.

40:46 – 41:09Speaker 9

Probably a low priority at this point in time. Like I said, they just did a fog seal on it. That would be something, a preservation project that we put on it to start with. Like I said the one intersection is the only one we noticed We went out there and traveled it quite a bit to make sure it made sense with the dollars we were putting in there But we're probably looking at low priority now probably next five to seven years higher priority for our Preservation as part of that.

41:09Speaker 10

So you're saying this first leg we're looking at five to seven years before we have to start That's correct invest reinvesting into the road.

41:17Speaker 3

Yes about the light time.

41:20Speaker 3

The lights, the timing of the lights and everything.

41:23 – 41:54Speaker 9

Some of that would, I guess some of those initial costs would be some of the lights to get them onto our system rather than an ADOT system currently. We'd have to add some different features to those, but we could slowly ramp that up over time as we went through that. They obviously have devices on them currently today with our program that we just tied in with MESA, with the RCN. We actually can see those traffic cameras now as part of that, and we'll keep continuing to move forward with that. But obviously, we want to get them on our system so that we can synchronize those so that we make a better flow. Currently, we can just see them. We can't change anything on them today.

41:58 – 42:31Speaker 6

I think one thing to keep in mind is city council kind of got this ball rolling because we're the ones that talked about having more control over Idaho Road when we wanted to do some development here. And I think we're the ones that said, can we gain control from ADOT? So that's part of it. And also correct me too on the portion of Idaho from southern up to 60. We already have half road improvements, don't we, from U-Haul? South. Yeah. I mean, if you have south from. Those are ours. We currently already own that. We already have half the road.

42:31Speaker 9

We own that entire road south of 60. We own that entire road south of 60 today.

42:37Speaker 6

Oh, I thought so. We didn't. No, everything south of 60 on Idaho is us. Already. Oh, I thought that was a big issue. I thought of trying to get from southern up to the 60.

42:47 – 43:03Speaker 4

From the 60 to southern. That half mile is key economic development for you all as we move forward. There's a street called Juanita and Mesa that's like the half mile mark where that's where you're going to get into that state land section at some point.

43:07 – 43:27Speaker 8

I personally would like to see a stake at all. Just because that's a good point that Mr. Stern brought up. We've all been to ADOT for different reasons and it's mood of the day and clerk of the moment and you just never know when the tide of cooperation can change.

43:30Speaker 12

I concur with Bambi and Brian both. I think we should go for the whole thing.

43:39Speaker 3

Okay, we'll bring this back when?

43:42 – 44:00Speaker 9

I'll bring it back probably in the next couple of months. I'll get with ADOT now, kind of give them an idea of what we're looking for, see what kind of agreements we can agree on, and then I'll bring those agreements back to you guys with a recommendation on moving forward. I think I got direction from you guys enough that I can start putting some of those things together, and then we can bring back some recommendations to you for your approval in the end.

44:03Speaker 4

We'll do it. Thank you. Thank you, Mayor. Thank you, Mike.

44:08Speaker 3

presentation discussion of case P-25-46-CUP. Nick.

44:18 – 46:47Speaker 11

Thank you, Your Honor. Good evening, City Council. Nick Lefto to the Development Services Department of the City of Apache Junction. I'll be presenting the case information for Bella Norte, P-25-46-CUP. This is a proposal by Bella Floor to develop the northeast corner of Idaho and Junction. The proposal is to have a 210-unit, three-story multifamily residential rental community. It is 9.31 net acres. The property is currently zoned B3 city center, and because of that, it requires a conditional use permit to be approved by the city council in order to authorize that land use, which is what this proposal is for. They are surrounded by other B3 properties to the northwest and south. then to the east is a another bella floor property that was previously zoned rm2pd high density multiple family residential for their skyline towns project this is its position within the general plan land use map located firmly within the heart of the downtown area the downtown mixed use which is a as we've reviewed previously a land use designation meant for higher density residential commercial uses, mixed use uses. And so this is something that fits within that matrix of allowable uses. And the idea being that it would be more rooftops downtown that would be able to support the local businesses. So we find that the general plan ultimately supports having some sort of residential within this area at a higher density. Shown here is the site plan going over it. The primary access with the deceleration lane is along Idaho Road. As is currently planned, the idea would be that there would be, they prepared the site plan with some kind of future coordination with the property to the north, so there would be a shared entrance along Idaho Road, and then there is a secondary access at Junction Street to the south. There are 10 three-story buildings With that, there's 408 parking spaces. Shown here is the landscape plan that also highlights the amenities a little bit better. They have a pool and clubhouse, pickleball courts, a dog park, playground, bocce ball, and cornhole areas. And those are some amenities that they provided along with some community space, green space.

46:49Speaker 9

Something to note also is that there, as part of the downtown development proposal,

46:55 – 48:42Speaker 11

We have worked with the applicant to make sure that there is a trail system along the street fronts, along both Idaho and Junction, designated as a 10-foot trail system adjacent to the sidewalk, which is kind of shown here in the brown. And as part of that, I will note part of their request has asked for a deviation regarding the arterial street sections, which normally require a meandering sidewalk. And they have asked that in order to fit this with this trail, at this section that they would not have to detach the sidewalk. Now, notably, they are going to be tearing out and putting in new sidewalk as they build this deceleration lane. So not everything is existing exactly as is, but that is just a noted request as they implement that trail system. So here are the elevations. They've worked with staff and have previously submitted elevations to council members for review, and they've settled on this more Pueblo-inspired style, as they've noted. Now, the applicant has complied with all the necessary public notification requirements. They've been working on this project for a bit. So their neighborhood meeting was actually last year, Tuesday, June 24th, 2025. At that time, we had six members of our community. At least some of them are council members. And there were questions regarding site planning, parking, the crime-free housing policy, the funding mechanisms, construction timelines, the development of the adjacent properties, and so forth.

48:42Speaker 4

And since then, staff have received 23 letters of support

48:45 – 49:41Speaker 11

11 were provided in the staff report, and 12 more were received just in the last few days and were sent out as an email package. And those were from local businesses in the Apache Junction Chamber of Commerce. Now, this case was heard with the Planning and Zoning Commission on August 25th, just a couple weeks ago. At that time, there were six council members, one of whom was absent, and ultimately they voted 3-3. The motion to recommend approval did not pass because of that. and no further motion was made. And so with that tie vote and no alternative recommendation, this application has been forwarded to the City Council without any kind of recommendation from the Planning and Zoning Commission. And we have our public hearing on Tuesday, October 6th, at which point the applicant will also be here with the presentation to address some of the more operational questions, but happy to help as I can.

49:43 – 50:01Speaker 10

Your Honor. Yes. Well, I would think one of the first things you should do is contact them and tell them to pull out of it, because if this is an ADA road situation, I personally don't think we should do anything until the road is ours. And if that's four months down the road, what's the point of hearing it?

50:07Speaker 11

It makes sense.

50:08Speaker 12

Nick, what was the... The commissioners that voted, three yes, three no. What were the yeses and what were the noes? Why?

50:22 – 51:26Speaker 11

Sorry, let me recount. Thank you. So some of the concerns that have been noted during the Planning and Zoning Commission meeting We're about any kind of deviations to the standard and also the appropriateness of having the apartments downtown. Like there still has been some concerns regarding what develops and where and what other potential land uses could be. Those who were in support believed that it was a good high quality project that with the inclusion of amenities and features, it's on the higher end of some of the proposals that we've been seeing in terms of quality of life features. And of course, there's the general plan motives to have more of that development downtown, more rooftops. And so those who voted in favor cited those motivations and those who voted against

51:27 – 52:34Speaker 6

just questions about how this would fit here and and if If everything would fit, right Yes There was also they were requesting a variation on or variance on the parking Seemed like we're getting that more and more these days that they're wanting less parking and And it seemed like when they factor in ADA parking and all, they're only like 20-some parking spaces short. And of course, they're trying to give evidence that Apache Junction has much more stringent parking standards than other cities and such. That would be an area where, if we're talking about 88, we're not gonna have on-street parking or anything. So tell me what the thoughts on whether or not we're supposed to give consideration to allowing a reduction in their parking requirement.

52:36 – 54:18Speaker 11

When it comes to that specific item, it is not strictly part of the conditional use permit request as the parking code has administrative relief within the percentage that they're asking for a deviation. However, it is still something that ultimate decision comes down to council. So with the parking situation there, they are permitted to request this administrative relief deviation as long as they provide these parking studies and are able to show that they address the demand. They provided the study. Ultimately, it comes down to the applicability of that information. And as you noted, on-street parking is not something that is certainly, there's certainly no available on-street parking on Idaho. It's a busy corridor, not even a possibility. And so we have worked with the applicant in order to try to get the parking where we can. But they have noted that they plan to ask for the as part of the request, the deviation in order to fit and to provide the amenities. And we find that in terms of the trade-off of the amenities that they're providing and in terms of how the site layout is formatted and whether or not it's gonna cause any kind of spillover problems and all that context combined, that is why we have come to this point with the potential of that deviation. Okay, so the administrator can,

54:19Speaker 6

after evaluating all the information, can say, you know, we recommend, yes, that they be given that approval for fewer parking spaces?

54:29Speaker 11

Yes, that's correct.

54:30Speaker 6

Now, that hasn't happened yet or that?

54:33 – 55:01Speaker 11

Nothing formally happens until the case itself is approved. It's like, you know, we don't have any kind of administrative authority to promise anything when there's no actual entitlement. And the entitlement will come upon approval. Council's vote, should they vote to approve it. But should the council approve the conditional use permit for the land use itself, then as part of the administrative relief process site plan review, we would be able to approve that.

55:03 – 55:58Speaker 12

Yes. It kind of seems like they're assuming that they'll never have 100% occupancy. And based on the rent, $2,300 a month, It's a two-person income to support that in most cases. That's more than a lot of people's mortgage. I guess in a way. So I mean, to me reducing the amount of parking that we as a body up here voted to make those stricter parking regulations in place. We went through months of going through that. the audacity for somebody to come in and say, well, we can't meet that. Well, change your plans. Change your settings. Instead of 210 units, make it 200. I don't know. Just a thought.

55:59 – 56:26Speaker 6

Thank you. Go ahead. Another question. So this may be a question for Joel. And I saw somewhere, I think it was in the town hall meeting, there was a discussion about the giblet. Is that I mean that seemed like that was a factor in this development or could have been Are we looking at this project? Completely independent of that.

56:27Speaker 5

Yes. There's no chiplet involved in this. Okay

56:31Speaker 6

So we are not to engage with them because they may be coming back looking for that. We're just saying this will be evaluated.

56:39 – 56:50Speaker 5

And that's a council discretionary thing if you want to talk about, but we've talked about that in the past with other items. It wasn't just giblets, but that is not what this CUP is all about at all.

56:51Speaker 4

And that is good that we clarify that for the record because it was at one point, but that is not on the table. Who are they asking at this point?

57:00 – 57:57Speaker 8

Yes. I am more concerned over the fact that when we've talked about this several times that you know the shared driveway and another development which hasn't even been brought to us when so we're sharing with something it doesn't exist and we had talked about the traffic patterns on Idaho. I am not convinced that this should be before us until we know for a fact of whether we have control of that road because we've talked about turning lanes, we've talked about this is a bad intersection to put any kind of commercial into because we don't own the road. If so much of what we wanna do is depending on do we own the road, I think we need to settle that question so that everybody's on the same page and knows who has rights to do what when this development comes before us. My opinion. Your Honor.

57:58 – 58:24Speaker 7

Yes. Joel, question. Based on what Bambi's saying, it's not the developer's problem or issue that we don't own Idaho. Could we find ourselves into any kind of legal trouble by not approving something based on us not owning a road that's not, they don't care whether we own it or who owns it.

58:25 – 58:38Speaker 5

Mr. Mayor, Mayor of City Council, Council Member. Yes, sir. Under a conditional use permit, the City Council can put in conditions that are reasonable.

58:39Speaker 6

And that's based on the factors and the tests that you are familiar with seeing.

58:43 – 59:56Speaker 5

One of those is the traffic flow. And if you don't agree with the traffic flow, you can vote no. This applicant has a right to bring it forward to Council. They've paid their money for the application. and they are before you, and now whether they get scheduled near in time, or if they agree to some kind of continuance, you just have to be careful with the continuance. I mean, there's some cases out there that talk about if you continue it too far out, you now deprive them of their right to come to council and essentially try to develop their property. So you have to be careful with that. But I think the discussion tonight is they're probably sensitive to that issue of the roadway ownership and they may be willing to continue it to a certain time period after the ownership has been dealt with. But I would caution a little bit that They have a right to bring this forward, and they take the chance. They roll the dice on how you vote, and it's up to you on how you want to vote in whatever the circumstances are brought to you in the moment. Yes.

59:57 – 1:00:34Speaker 10

So, Joel, one thing about what you just said kind of stuck out of me. So you're saying that the continuance were maybe infringing on their rights to be able to develop. Well, they purchased land that was not zoned for what they want to develop. And the reason why they're even coming to us is because it's not zoned for what they want to develop. So how is it at all on the heads of this body if we decide not to approve the CUP? How is that taking away their rights to develop their land when they purchased the land knowing that it was a zone for what they want to build.

1:00:35 – 1:01:41Speaker 5

All I'm saying is they have a right to come forward with ACUP, and they roll the dice on how you vote, and however you vote, you vote. So it's really, it's their... The risk, I mean, council has a right to vote. It's discretionary. You have a right based on the factors, the findings, and one of those findings, of course, is the traffic flow. And if you feel that is a problem, then you could vote accordingly. So when you said it's on your head, it's not. When I say if you try to continue it many times, there's some case law out there, and they're extreme cases out of California, but they're Ninth Circuit, and they went to the Supreme Court. Monterey Dunes is one of the cases where the counsel continued an applicant 22 times over a two-year period. I'm not saying you would do that. I'm just saying there are cases that you should be aware of that You don't like the road, and we don't feel like voting right now, so we're going to continue it again. I'd just be cautious with that. And there is no continue. When is the next time, when is the schedule to come back for a public hearing?

1:01:43 – 1:01:59Speaker 5

Okay. So has it been advertised already? Yes. Okay. So we'll come back on October 6th. You can talk to them about that. how they feel about it, and whether they're willing to wait a certain amount of time to see if the roadway issue would be dealt with.

1:01:59Speaker 10

So what if they decide to continue it?

1:02:02Speaker 5

They can continue it. They can make a motion to continue. And they may want to look at it.

1:02:05Speaker 10

And you can grant that. So if we convey the message that, hey, look, until we have complete control of Highway 88, we have no desire to start talking about developments here, then it would be up to them to continue it.

1:02:17Speaker 5

Yes, that's all they want or you could vote in the moment say vote accordingly how you feel they could vote no.

1:02:24 – 1:03:06Speaker 8

Yes So they could take their chance and show up here on October 6th after reviewing this meeting Well, they are coming talking to them and it's already advertised. Yes, but I'm saying that I believe they're going to hear that we have can do we have still have issues probably regarding the traffic pattern that we do not, as of this day, have control of. I'm sure that will be reiterated to them through the development team. And then it is up to them whether they still want us to vote on that before, while we still have those concerns.

1:03:06 – 1:03:28Speaker 5

And Mr. Mayor, that's why the findings, I always try to get you to do the findings, and you do. That's why they're so important. Because if there's ever a challenge to your decision, it's on the record. And if it ever goes to a superior court, the judge basically looks at the record. And was it discussed? Were the findings discussed? That's critical.

1:03:31 – 1:04:06Speaker 3

OK. So I'm going to make a comment concerning the parking and the aspect of it. And I know we've had to deal with it with other places. And they've carried forward outside and around the unit. There's no room for them to be able to do outside at all, whether we own the road or ADOT still owns the road. So I'm definitely very concerned about the parking in the aspect on it as well. Your Honor?

1:04:06 – 1:04:17Speaker 7

Yes. Can you park on the junction? No. Yes, no? No, I don't remember. I don't know if there's signs up there or not.

1:04:18Speaker 6

Dirt shoulder. I don't think there's a shoulder. Dirt shoulder right now.

1:04:23Speaker 7

Okay, but I mean, that's what I'm saying. Can people, are they, would they get a ticket or something if they park there? I mean, does the developer know that people can't park out there?

1:04:34 – 1:04:48Speaker 11

Yes, we've made sure that they're aware that Junction is not for parking. It would be, Junction would be categorized as a collector, like one tier below arterial.

1:04:48Speaker 6

I've seen abandoned RVs over there a few times.

1:04:50Speaker 7

Yeah, that's what I'm saying, you know.

1:04:52 – 1:05:36Speaker 13

What's up with that, Chief? Mayor? Yes. I think I made it pretty clear way back when about the traffic. Junction Street is not a good street to come off. It's horrible. 88 people are gonna do dumb things and get creamed doing u-turns and stuff because it was supposed to be a ramp going straight north Until we can get control of that Portion of 88 I Really don't like having a lot of people in an area dumping into Areas that are gonna cause a lot of problems for our police department and a lot of pain and injury to our citizens Thank you

1:05:41Speaker 3

I think we all said our piece.

1:05:46Speaker 3

Thank you. Discussion on crime detection prevention technology employed by the police department. Chief Pulley.

1:05:56 – 1:06:27Speaker 4

Actually, Joel, we actually, this is a discussion with council at this point, Your Honor. We've done our presentation from staff. Chief, we could find it from last time, but that wasn't the intent tonight. I WAS ASKED TO PUT THIS ON THE AGENDA SO THAT COUNCIL COULD HAVE ITS DISCUSSION BECAUSE WE HAD OUR PUBLIC HEARING. OKAY. AND WE CERTAINLY CAN HAVE CHIEF COME UP AND ASK QUESTIONS AT THIS POINT. BUT JOEL IS READY ALSO TO WALK THROUGH SOME OF THE ITEMS WE'VE SENT. IF YOU WANTED TO CHAT, TOO, THAT'S FOR YOU. YES.

1:06:27 – 1:09:51Speaker 5

MR. MAYOR, MAYOR OF CITY COUNCIL. Well, we had that public hearing, and it was interesting, and you heard from the public, and I noted a whole bunch of items that some individuals were very strong about, and Queen Creek recently adopted a code, and they actually amended their code. They also have a police policy on it, as we do. We have a police policy. Now, a policy is not a law. That's true. But the policy does include a lot of this. But if you want to make that part of the law, you can certainly do that through an ordinance. And there's certain things that you can address that are already in the policy, but that can be the law. And the first one would be access shall be limited to internal law enforcement, representatives only. Data collection and record retention will include time limits on the information storage. Right now it's 30 days. Some cities have made it seven across the country. Restrictions on selling information and types of information collected. That was a big issue. And so it would be restricted to vehicle type, color, location, date, and time. Or whatever else you wanted to do on that. Agency sharing will require supervisor authorization. Query access will require the incident number and supervisor approval. Audits will be required. They are now. But you can more define how often you want to do audits and what the audits are supposed to show. And that would be publicly available also. Use of information for law enforcement only. Personal searches will be strictly prohibited. Approval uses will be investigations and hot list alerts. Penalties for unauthorized access or use include termination of employment. And that could certainly be in the policy. It isn't right now. Also, and more importantly, make this a crime. If there's any unauthorized use intentionally done, you can make it a crime. And the city council can't say, oh, it's a felony. You can't do that. But you can say it's a class one misdemeanor. And the class one misdemeanor penalties are up to 180 days jail, $2,500 fine, There's also penalties and interest that can be added to that. I think it's 78% or 82%, so it could be a $4,200 bill that they get at the criminal court on extreme cases per violation. You could also have a three-year probation period where they're on probation. Also, you can make them do community service. Now, that part, you can't say out of all those penalties, we want to have those the most maximum. You can't do that under the law. but you could say it's a class one misdemeanor. Then it's up to a judge to basically sentence someone or a prosecutor to do some kind of plea agreement. So those are the main items. If you want to create a code, you can do that with those items. You could also stay the course, do nothing. That's another option. You could also terminate the flock agreement. You could do that too. So you have options. And Mr. Soler was very available about this, so I think he's looking at me like he has something to say, so I will be quiet at this time.

1:09:54 – 1:12:50Speaker 13

Again, Queen Creek said it right. You don't throw the baby out with the bathwater. Let's just admit what happened. New technology got out there. We didn't have all the guardrails, and we didn't have it a crime to use it. And unfortunately, our city had one employee that misused it We need to put the guardrails on. The chief's done a good job with that, with the supervision. You've got to get a supervisor's approval, second set of eyes on it. I think if we incorporate these bullet points, and I absolutely believe, I know the chiefs of police are going to run a bill to make it a felony when the legislation opens up after January, but I think just as a city council now, we should make it a misdemeanor one. It has to have some teeth to it, and they should be arrested. I think you did a good job with the bullet points. If we put that in, there's a lot of safeguards in there. As for the 30 days, I can tell you I work with Mesa. We've been working with this for decades. And it's good to be able to go back in time. If you have a homicide and you find out a week later, hey, somebody was killed here, we can try to track back and find out who was in that area and build a case. So I like the 30 days. I know everybody's upset that they think their stuff's getting run and everybody's looking at it. The only things that get looked at are when we have a government purpose to look at it. Everything else falls off in 30 days. That's a fact. If you don't believe it, anybody out in TV land, ask the police to come and take a look at the flock system. But I also want to go a step farther with this. I'd like to see these bullet points. I'd like to see the misdemeanor crime. And I would like to see it incorporated all AJ government surveillance. That is flock, that is real-time, that is axon, and that is drone. If any of our employees, Apache Junction employees, violate any of those systems for personal use, they should be charged with a misdemeanor crime. They should be fired. There has to be teeth and strict adherence to the policies because, yes, It could be abused, and we need to stop that from happening. So I would like to see it incorporate all of our surveillance technology for any employee that misuses it. They should be charged and fired. So I'm good with what you wrote. I thought you did a good job, Joel, on getting the bullet points out there. I'd just like to incorporate the rest of it in with the real-time drone and axons. And if any other new technology comes out that we're using for surveillance, it would be incorporated into that crime. Automatically. Automatically.

1:12:50Speaker 6

All current in the future.

1:12:53Speaker 6

I have a question.

1:12:56Speaker 5

Joel, I have a question.

1:12:58 – 1:13:43Speaker 6

It's about an issue I don't, I'm not sure I've ever heard it answered or addressed. But it might take the chief doing this. One of the concerns I've heard is, with this collection of data, it's not so much the police department that's doing it, but once How does FLOC factor into this? Do they collect this information? We may have zero control over what FLOC does with that. And I've had people say, you know, since they're a private entity, not a government entity, we can't get a Freedom of Information Act to them. Do we have assurances that they won't use the data inappropriately? I guess that's my concern with this.

1:13:43Speaker 5

Yeah, I asked the chief to come up to address that because he has been asked that many times and he knows the answers to those administrative questions.

1:13:52 – 1:14:57Speaker 2

Good evening mayor, members of council. On September 11th, a new law went into place here in the state of Arizona. It is against the law for any of these tech companies to sell that data. It is our data. We own it. We have it. And yeah, is it housed in a cloud? It is. It's housed in Amazon Government Cloud, just like thousands and thousands of other pieces of data from all over the place. It's a very secure thing. It's our data. And like I said, on September, it was actually September 12th, right, is when that new law went into place. That was one part of legislation we were able to get through this year. Again, I support everything Councilman Soler said. We are, as Arizona Chiefs, trying to push the legislation to make it a felony. We know that with this great amount of data and it comes a lot of responsibility and we want to make sure we assure you as well as the residents that it's being used appropriately.

1:14:58Speaker 6

Do you feel comfortable that FLOC understands with this new law that They do not and cannot be putting that data out there.

1:15:08 – 1:16:13Speaker 2

Absolutely. It's in our contract as well. We could sue them as a city if they were to breach that contract. These tech companies, they know better than that. We've been using body-worn camera video for over a decade. That is housed in a cloud as well. And that has a lot more sensitive information than license plates that are out there. It is body-worn camera is the exact same thing housed in the exact same place. And we don't want to get rid of body-worn cameras either. A lot of our video cameras, they're housed in a cloud. A lot of our different databases are housed in clouds. Our CAD RMS, which is our computer-aided dispatch, our records management system, All of these things, we have to have some trust in these tech companies. It is their business, and it is their business model. It's in our contract, and it's state law now.

1:16:16 – 1:16:59Speaker 12

There is an email that went out regarding the upgrading of individual flock cameras and individual cameras capabilities as they are right now and that they can just hit a couple buttons and reprogram that camera from a remote source. Is that possible, one? And two, are you comfortable with any changes that you wish to make in the abilities of any of the cameras have to come to the council for approval?

1:17:01Speaker 2

As far as the technology, the cameras we have do not have that capability. Right now.

1:17:07Speaker 12

And they cannot be reprogrammed to do that. It would have to be a complete change out of the camera.

1:17:12 – 1:17:25Speaker 2

Correct. Yes, that's what we've been told. I believe them. It's a license plate reader. It takes a picture of the back of a vehicle. And that's what it does. As far as your other question, can you explain that a little bit better to me?

1:17:26 – 1:17:59Speaker 12

So if a flock came to the department and said, hey, we have these new cameras that can do this, now takes not just the back of the vehicle but also the entire side of the camera or the vehicle and it can take if you you know put this one in it can also shoot the vehicle coming and going I don't ever want to see that I mean because we don't want that facial recognition you know that's what everybody's so concerned about but

1:18:03Speaker 13

That's called photo radar.

1:18:05 – 1:18:31Speaker 12

Well, there's a lot of different things, right? You know, Johnny, in the one email reply was, we have not paid for, nor do we currently have FLOC free form in our contract with FLOC. If this department ever decided that they wanted to go with free form, what I'm asking is, I would like to see that come to the council for approval.

1:18:32 – 1:18:54Speaker 2

Versus yeah sure we'll go yeah any type of upgrade or anything. We would come to the council for sure right now. We have no Anticipation of changing anything new with flock just using continuing to use the cameras that we have now Yes chief we still looking into removing them from the rural areas and

1:18:56Speaker 6

They've been removed.

1:18:57 – 1:19:17Speaker 10

Been removed? Yes. Are we looking at more along the lines of maybe the freeway entrances and exits and then maybe some of the main thoroughways through the city? So we're 20, 25 right now? We're at 30 cameras. 30 cameras and as far as we're concerned, that's it?

1:19:18Speaker 10

And now with those 30 cameras, did we just relocate the ones in rural areas or now we're looking at 27 or 26 or 25 we less than 30.

1:19:29 – 1:19:55Speaker 2

Yeah, we are less than 30 now we had we've had 15 cameras damaged over the last several months. Several of those cameras we have not replaced so we're using some of the cameras that we've moved to replace those cameras in different areas and and some of the cameras are going to be put more on the the entrance exits to the freeways and in the main thoroughfares like you said.

1:19:55 – 1:20:55Speaker 13

Mayor? Yes. On that note, I want to tell everybody on TV land, that's government property. There's no room for vigilantism. You're not a hero. If you damage these things, we are going to investigate. We are going to try our best to find you. And when we do, we are going to charge you. And you're going to pay substantial fines, possibly due jail time. It is not a game. It's not a joke. It's a felony crime, and if you want that on your record and you get caught doing this, it will be on your record. I know some people want to think that this is like a hero that goes out and runs over government property, but there's no room in America for vigilantism, and that's exactly what this is. You're not a hero. You're a criminal, and you'll be treated as such if we find you. I just want you to understand that. And that's coming from a 37-year police officer.

1:21:04Speaker 2

Thank you. Okay.

1:21:08Speaker 3

I will now adjourn this meeting. Thank you.

This transcript was automatically generated from the official public meeting video and is presented unedited. It reflects remarks made on the public record by elected officials, staff, and public commenters. Transcript accuracy may vary; view the original recording for reference.