City Council - Regular Meeting
The Beaumont Commission for Historical Signs approved three applications for residential alterations and heard a monthly code compliance report.
About this meeting
- Government Body
- City Council
- Meeting Type
- City Council
- Location
- Beaumont, TX
- Meeting Date
- September 14, 2026
Transcript
124 sections
Okay, it's 3.30 p.m., so we'll call our regular session of the Commission for Historical Signs and ask for a unanimous call. Susan. Yes. Yes. Yes. Yes. Yes.
Okay, everyone has received the agenda of the session and the protocol of our last session by email.
At this point I ask for corrections. Changes or approval of the protocol.
Approval of approval of the protocol that we have received.
In order, we have an application and a second vote for approval of the protocol of the session of August 10, 2026. Everyone who is for it, please signal with yes. Everyone who is against it, sign with yes. In order, the application is approved. We now move on to our regular session. Our first point is PZ 2026-204. It is a request for a certificate on the right for a construction on the back of a house. The applicant is Jimmy Dixon and the location is 2311 Pecan Street. In order, employee report.
Jimmy Dixon, on behalf of Lisa Borchardt, applied for a permit for a construction on the back of the house on Pecos Street 2000 Street to be visible. The construction will be visible from the truss of 7th Street. The proposed construction is the construction of an ADA-compliant bedroom and bathroom with a connected covered veranda with a wheelchair-friendly terrace and a ramp on the back of the house. The outer walls of the new construction receive traditional plaster and are painted to match the existing structure. Das Dach des Anbaus erhält ein niedriges Profil mit einer Neigung von 4,12 m, um das Gewicht der spanischen Fassziegel aufzunehmen. Das Haus ist nicht im Bumundsberg-Survey aufgeführt. Das Planungsteam empfiehlt die Genehmigung des Antrags unter folgenden Bedingungen. Alle einzubauenden Fenster müssen zur bestehenden Struktur passen und alle erforderlichen Genehmigungen und Inspektionen werden von der Bauaufsichtsbehörde eingeholt. Auf Ihrem Bildschirm sehen Sie die Vorderseite des Hauptgebäudes. Dies ist der allgemeine Bereich, in dem der Anbau erfolgen soll. Dies ist eine Ansicht des geplanten Anbaus und eine Gesamtansicht der Adresse. Hier ist der Antragsteller.
Danke. Gibt es Fragen an die Mitarbeiter? If not, Mr. Dixon, if you are here, please come forward and give us your name and address for our documents and tell us what you plan to do. My name is Jimmy Dixon. This is my private address. Whatever, it's a business address, whatever. 5095 Richard Drive, Beaumont, Texas. And we're planning an ADR-compliant construction on the building. 4.2 times 7.7 meters wide for the lady. die das Haus mehr oder weniger bewohnt, damit ihr Mann einen rollstuhlgerechten Bereich hat, denn das Haus ist derzeit nicht rollstuhlgerecht.
Also machen wir genau das.
Okay. Gibt es Fragen an Herrn Dixon?
Herr Dixon, stimmen Sie allen Empfehlungen zu den beiden?
Ja, ma.
Und Sie sind der Bauunternehmer?
Danke. Fragen? Danke, Herr Dixon. Okay. Ich eröffne die Diskussion. Oder den Antrag.
Ich stelle den Antrag, dass wir die Datei PC 2026-204 mit den beiden Bedingungen genehmigen.
Unterstützt.
Okay, wir haben einen Antrag und eine zweite Stimme. Und Susan, würden Sie bitte eine namentliche Abstimmung durchführen?
4 4 4 4 4 4 I mean, I was late, but I read the information, so I'm in for it. 4
In Ordnung, Frau Dixon, Sie können loslegen. Vielen Dank.
Darf ich etwas sagen?
Könnten Sie den Eigentümern bitte mitteilen, dass Sie es so weiterführen wollen? So oft sehen wir, dass ein Haus in einem bestimmten Stil gebaut wurde und dann soll ein Anbau hinzugefügt werden, der dann überhaupt nicht zum … eigentlich nur auspasst. Die Tatsache, dass Sie die spanischen Fliesen und den Stuck und alles, was Sie sich in Ihrem Plan überlegt haben, verwenden, ist uns sehr wichtig. Thank you.
Actually, I was the architect, but I have to pay him the fee for the recognition. He has already made a few different drawings for you. So he knew what was waiting for him. And so he killed him. Thank you, thank you. Thank you. Okay, our next point is PZ-1226-40-42. This is an application for a certificate of compliance with the roofing of a carport. The application is Sean's Homes LSC and the location is 2095 Beach Street. We are asking for the employee report. Report.
Sean's.
Homes LSC is applying for a certificate of compliance to obtain the external changes in the house in 2095 Beach Street. The carpet on the back of the house was covered without a approved certificate of compliance or a building permit. The roofing of the carport is intended to create additional air-conditioned living space. The layout consists of 21.8 cm thick winter-hard tiles and an 18 cm wide visible overlap and is painted in the color Sherwin-Williams 2008 Rockwood in dark brown. A window is added on the right side and two windows on the back of the house. The house is not on the spare boom lot survey. The planning team recommends the approval of the application under the following conditions. Das vorgeschlagene Fenster muss so groß sein, dass es zu den vorhandenen Fenstern passt und alle erforderlichen Genehmigungen und Inspektionen werden durch die Bauaufsichtsbehörde eingeholt. Auf Ihrem Bildschirm sehen Sie einen Überblick über das Grundstück. So sah der Carport aus, bevor er überdacht wurde. So sieht er derzeit aus. Die vorgeschlagene Ansicht mit sichtbarem Fenster. and an overview of the location of the property. The application form is available.
Okay, one more thing with the staff, that's the bedroom. The existing windows in the house are too small for bedrooms because you need a certain opening size so that the fire brigade people can get the people out there in case of fire. I think the drawing shows the right window size. The smallest window you can install is usually 3.05. I just wanted to say that briefly. If it was another room, I would agree. But the bedrooms need bigger windows.
Can you bring the suggestion to our screen again?
Gibt es noch weitere Fragen von den Mitarbeitern?
Also, die untere Zeichnung, die Rückansicht, das sind die 3x5, von denen du sprichst. Das ist auf dem Carport, also ist das in Ordnung?
Das sind Schlafzimmer. Wenn du dir den Plan ansiehst, könnten wir dann zum Blatt mit dem Plan gehen?
Ich habe den Plan nicht beigefügt, aber er sollte in der Paketzeitung sein.
Okay, Plan ist im Paket.
Ich habe ihn hier.
Do you see that both rooms are marked as bedrooms? Correct.
And it looks like that's what I'm asking. Are these three, 53, 5, on this second drawing, the right sizes and these two back here? Yes, that's right. So you meet the prerequisites.
Apparently, the administration forces you to build a larger window.
Gibt es noch weitere Fragen an die Mitarbeiter? Falls nicht, melden Sie sich bitte als Antragsteller und geben Sie für unsere Unterlagen Ihren Namen und Ihre Adresse an. Ich glaube, Sie waren schon einmal hier. Wir kennen uns also einigermaßen.
Ja, guten Abend. Mein Name ist Shannon von Shannon's Home LLC. Und ich renoviere das Anwesen in der... Adresse 25.
Oh, Entschuldigung.
Ihre Adresse. 1888 in Oakland, Manor Lane, Richmond, Texas, 77707407.
Danke.
Ich renoviere das Anwesen, um es ansprechender zu gestalten und den Carport zu überdachen. Aha. Ich hatte bereits vor dem Kauf des Anwesens nachgefragt und sie sagten, es sei in Ordnung, vorausgesetzt es passt zum historischen Erscheinungsbild des Hauses. Als ich das letzte Mal hier war, haben sie nach der Ansicht gefragt, also habe ich meinen Architekten beauftragt, das zu tun.
Könnten Sie bitte das Mikrofon weit nach vorne ziehen und hineinsprechen, damit wir Sie richtig gut hören können? Okay, Entschuldigung.
Ja, als ich das letzte Mal hier war, wurde mir gesagt, dass die Ansicht fehlt. Das habe ich dann von meinem Architekten machen lassen. Ich habe es vor der Sitzung geschickt.
Gibt es Fragen an den Antragsteller? Danke. Ich eröffne die Frage zur Diskussion oder Abstimmung.
Ich habe eine Frage an Sie.
Müssen wir dann streichen, dass sie so dimensioniert werden müssen, dass sie dem Bestehenden entsprechen, wie es im Rahmen der Durchsetzung der Vorschriften vorgesehen ist, oder?
Denke ich, dass es richtiger wäre, sie so zu dimensionieren, wie es die Vorschriften vorschreiben And that then determines what size it is.
I approve the application PZ 2026 to be approved under the condition that the windows have the prescribed size and that all permits and inspections are received by the construction inspection authority. I agree.
We have one application and one second. Is there any further discussion? If not, I ask Susan for a unanimous vote.
You can continue with your renovations.
Last point on our last request. SPZ 2026-54, application for approval for the reconstruction of the veranda. The applicant is Salvador Cisneros and the location is 2030 Laurel Street, Laurel Street. Personnel report.
Salvador Cisneros has applied for a permit for the reconstruction of the veranda of the house in Laurel Street 2030 due to the deteriorating condition of the veranda, the applicant wants to remove the cement posts from the front and replace them with four 8x8 cedar posts. The staircase on the front side is to be rebuilt with an extended hand and a staircase is added to the right side of the veranda from the entrance. The veranda facade and the gratings are removed and replaced by an open cedar wood railing. The house was introduced in the Beaumont Report of 1990 and was built before 1920 and classified as a traditional craftsman's house. The meaning of the building material was introduced because the house was typically built for houses of the middle and middle classes after the turn of the century in Beaumont. The proposed changes are to adapt the house to the American traditional houses from the 1930s. The planning staff recommends the approval of the application under the following conditions. The cedar column should be shrunk upwards and covered at the bottom to better correspond to the traditional craftsman style. A detailed drawing should be presented to the planning office, which shows the veranda with the revised columns and additional stairs. All necessary approvals and inspections are received by the construction inspection authority. On your screens you can see the front of the building and the position of the current Randa aus Zementseen. Dies ist nur ein Bild eines vorgeschlagenen Entwurfs, wie sie sich das Ganze vorstellen. Und ich habe ein Grundstück eingefügt, das sich östlich dieses Grundstücks befindet. Es zeigt nur die Bedingung Nummer 1. Nur eins. Wie ihre Pfosten umwickelt und dann oben etwas verjüngt sind. Und dies ist ein weiteres Beispiel im Südwesten. And then a general air intake of the location. We have the applicant.
Okay, are there any questions for the employees?
An additional staircase is also mentioned there, which is not visible in this picture. Is that right? Yes, it would be on the right side, so to speak, in the direction of the entrance. Okay, thanks.
Should you be painted with cedar wood or will you have this natural color?
I think it will be the natural color, but the applicant can tell you better.
These are not rejuvenated like the other example you showed. Right? What do you mean? Like the previous example you showed the craftsman. No, no, no. This one. I mean, that's what we mean when we talk about rejuvenation, right? Yes, yes. Thank you.
Gibt es Fragen an die Mitarbeiter? Falls nicht, bitte ich den Antragsteller, sich zu melden. Bitte geben Sie für unsere Unterlagen Ihren Namen und Ihre Adresse an.
Hallo, mein Name ist Salvador Cisneros und ich wohne in der Laurel Street 2033 in Roman, Texas.
Okay, would you like to tell us what you plan to do and why you want to change the front of the house?
So, Mr. Cisneros wants to change the house and make repairs, since termite damage is on the veranda. He said that the posts sink a little down and then please in the middle.
oben oder ziehen Sie am Mikrofon? Ziehen Sie einfach daran. Ziehen Sie es weiter nach unten, dann wird es näher an Sie herangeführt.
Ja, er sagt, die Pfosten sinken ein und die Decke beginnt einzustürzen. Deshalb möchte er es reparieren.
Wie lange besitzt er das Haus schon? Er sagte 30 Jahre. 30? Okay. Waren die Gitter immer oben oder wurden die hinzugefügt?
He said when he bought the property, everything had been there since he bought the property. Thank you. He also says that there are also termite damage behind the house. I'm not sure if it's included in the CA, but he also wants to have it repaired.
Do you have any objections to the conical and covered columns, including those in your plan to modernize the appearance? Aber fordern wir die Ziegel unten oder nur das Holz an der Basis? Es befindet sich oben auf dem Boden der Veranda. Hier steht konisch und ummantelt.
Aber dann steht nicht. Aus welchem Material? Denn diese Ziegel beginnen mit der Basis auf dem Boden und berühren den Rasen. Und diese Pfosten beginnen dann auf dem Boden der Veranda. Wo würden sie also beginnen? Wo würden... Seine Pfosten auf dem Boden der Veranda beginnen. Es wäre nur Holz, nicht die Ziegelbasis.
Können wir bitte die Version mit der Veranda aus Holz sehen?
Seine geht also nicht bis ganz zum Boden. Wenn er also Holzsäulen verwendet, möchte ich nicht, dass er denkt, wir fordern, dass er...
Is that right, John?
I mean, these are not columns in the Craftsman style. Right.
We know that you have to use them in the Craftsman style, but I didn't want to show him the picture of the brick columns that start on the floor and make him think that we demand that.
If someone wants 569 in our book, there are some variations of posts and types of the long end.
The same.
Yes, I agree with that.
You just have to look here.
Would you like to start on the veranda?
Yes, that would be possible.
So it shouldn't have a zygomatic change, but it would simply rejuvenate to the phantabone, in contrast to this pillar.
Herr Kommissar, könnten Sie mir bitte sagen, dass ich zum Podium kommen soll, damit wir es auf der Aufnahme mitverfolgen können?
Ja, können Sie. Danke. Er möchte wissen, bei welcher Breite er unten anfangen und nach oben weitermachen soll. Ich glaube, der Kommissar macht gerade schnell ein paar Zeichnungen. Danke.
He draws it. People want a lot.
Also versuche ich es so zu gestalten, dass es für ihn nützlich ist und das würde genehmigt werden. Okay. So I think if you make it about 30 inches wide and make it quite angular to the top of the terrain. And then from there upwards to about 14 inches wide. Maybe you should mark that. And just cut it like I showed you here.
Also, für diesen unteren Teil brauchen Sie Zement oder Ziegel oder irgendetwas anderes. Kann es Holz sein?
Nein, wir sagen, er wird es auf dem Belag des Bodens bauen.
Ich glaube, normalerweise ziehe ich nicht vom 77er.
It will come in and have a little more depth. It won't be that wide. It has to be right-angled at the bottom.
Er sagt, er stimmt zu.
Eine Frage. Wird er die Arbeit selbst machen oder wird er einen Bauunternehmer beauftragen?
Er sagt, er wird einen Bauunternehmer beauftragen.
Okay.
Er muss jetzt noch eine Skizze mitbringen, wie er es tatsächlich bauen wird mit den Maßen, und zwar zurück ins Büro, um eine endgültige Genehmigung zu erhalten. Okay. Aber das ist nur ein Leitfaden, um Ihnen zu zeigen, wie wir darüber denken.
Wäre das der Zeitpunkt, an dem wir darüber sprechen, dass es auch gestrichen werden soll, nicht in diesem natürlichen Look? Denn das sieht ganz anders aus. Eher nach Bauernhaus-Look, als es der Handwerker braucht, um stimmig zu sein. Richtig? Also soll ich das als Vorschlag machen?
Ja. Das kann eine Bedingung sein. Der Kommissar möchte, dass alles gestrichen wird. Nichts gebeizt. Nichts gebeizt.
Nicht dieser natürliche Brown. Passt nicht zum handwerklichen Look. Also keine Beize, nur Farbe.
Farbe.
Gebeizt.
Wir haben eine Anforderung an die Farben, okay? Und die Damen haben die. Es muss also von hier sein. Muss nicht von hier sein, aber wenn es etwas ist, das nicht hier ist, muss es genehmigt werden.
Haben Sie die gleiche Farbe wie das Haus? Genau die gleiche Farbe wie das Haus.
Ist das in Ordnung?
Ich bitte um Beschluss.
Ich stelle den Antrag. Die Genehmigung von PZ... That the column from the veranda to the top should be narrowed down to better correspond to the traditional craftsman style. That they are painted in a previously approved color or match the existing color. That a detailed drawing should be presented to the planning office, which shows the veranda with the revised columns and additional stairs, and that all permits and inspections will be received by the department.
I agree. You did that very well. I have a request and a second. Susan, please call me by name.
Commissar Labide.
Commissar Branton.
Commissar Crawford.
Commissar Hembright. 4. Commissar McCann. 4. Commissar Prova. 4. Commissar Rabin.
Commissar Siegfried. 4. Commissar Thomas.
Thank you.
Thank you very much, Ms. Cisneros.
Commissarin. When it has been delivered, first of all, thank you very much for coming. But we too, Christine and I, represent the Oaks Historic District and we offer small but fine benefits for exactly the kind of project that you carry out. And I would like to show you our website. It does not require much information. It is oakshistoricdistrict.org. I would like to write it down for you. The application is very simple and it is up to $500 and we finance half as soon as your plans are approved and the other half when you have completed the project, if you are interested in it. So that's $500 for...
I need a business card. That's free money. It's not a loan.
I can't write. But that's what we do. And we're always looking for people. No, thank you. And I'll give my phone number.
Excuse me.
Nice to have a few flyers with this information.
I just want to. Yes. Thank you. Thank you. This is our new program. We have just changed it so that the charges were eased. Because the people hesitated to apply. We said we want the girl in the name of her grandmother. And all the people say they want to bring the old town or the historic quarter to Vordermann. Here is your money. And we are always looking for additional funds so that we can expand it.
Okay, our last point is the report on the implementation of the building regulations for the historical district.
In August, a total of 298 inspections were carried out. A reference to monument maintenance was sent, six post-controles to monument maintenance, a post-control to garbage truck control, six post-controles to littered areas, 16 references to weeds, 47 weed control, 85 references to zone divisions, 330 references to zone divisions, 83 post-controles to zone divisions, A general note on the problems and seven basic controls to be left out. Are there any further questions for the staff?
If not, we will adjourn the meeting.
Thank you very much.
This transcript was automatically generated from the official public meeting video and is presented unedited. It reflects remarks made on the public record by elected officials, staff, and public commenters. Transcript accuracy may vary; view the original recording for reference.