The Village Board of Trustees addressed multiple infrastructure and administrative items, including pickleball court feedback, trail resolutions, and a software agreement.
About this meeting
- Government Body
- Village Board of Trustees
- Meeting Type
- Village Board Of Trustees
- Location
- Egg Harbor, WI
- Meeting Date
- September 9, 2026
Transcript
1066 sections
I mean, it's our Madam Secretary, we please have a roll call.
Here, here, Scott Rasmussen here, Joe Megan here, Mike Johnson here.
Next is a pledge of allegiance. I pledge allegiance to the flag of the United States of America, and to the republic for which it stands, one nation under God, indivisible, with liberty and justice for all. I'll make the motion to approve the agenda. Second. We'll take a vote on favor. Aye. Motion carries. Any corrections on the August 12, 2026 Billings Board meeting minutes?
None. So I make a motion to accept the minutes. Second.
We have a motion. We have a second. We'll take the vote. All in favor? Aye. Motion carries. Next is open session. Anything from any of the trustees?
Observation and maybe for consideration next year. I live at the Hill of Ames Farms on that ridge area. So we're kind of western mode in the community. We're looking at cherry orchards. And we have the benefit of being able to hear concerts without going to the concerts when they're at big even. And have noticed this past summer that the volume of the Rhythm and Roots concerts is significantly higher than the Sunday evening concerts. And we found it a little bit distracting. And I'm just wondering if And so just wondering if that could maybe be modulated in future summers. Okay.
It is earlier. Yeah.
Five to seven. Yeah. It's not like it's disturbing bedtime. Bedtime though, right?
Yes. Did you think the Sunday concerts were quieter than normal?
Okay. Because I heard that from a couple of people.
I actually, Karen, I think that was their sound system, the band.
So we can tell our own sound when needed? Yes.
We have Mark Beebe who does the sound unless the artist specifically requests to do their own. So I think the majority of them are done in-house.
Yeah, by far the majority. I measured it last year and it was well within our
For Rhythm and Roots today, do those bands go through our, they use our sound system?
No, I think they all use their independent system. So that could be something that they inquire about, you know, hiring a sound consultant to kind of monitor it. But I can bring that back to the HBA for sure.
Okay. Okay. Anything else? All right. Anyone in attendance?
Hi, I'm Kathy McElligott. Could you stand up and talk? Sure. So that all can hear you and we can take proper minutes. This thing. I'm not used to doing this. Thank you. If you just state who you are. You're talking to this.
Sorry. Hi, I'm Kathy McElligott. I live in Apple Ridge. And I am here to discuss the pickleball courts. First of all, I want to say that I've heard a lot of rumors about it. Where is it really going to be? I've heard it's going to be at the dog park. I heard it's going to be behind baseball diamond. I heard it's going to be just on the other back of the fired house. So my neighbors and I would like to know really where this is going to be.
Can anybody tell me that right now? I mentioned when we spoke on the phone that it's adjacent to the dog park parking lot. So it is near the dog park. Correct. Down. Correct. Well, it's at the backside of the parking lot. Is it?
The parking lot on Church Street.
But that's not just the dog park. That's for boats and a whole bunch of stuff, right? So adjacent to that, but down. Well, just right next to it. Right next to it. Okay, well, that clarifies something. The only other thing that I would say is that there's a lot of concern about noise up even where I am because I can hear one barrel's music and I'm way up high. So I'm thinking I can hear the pickleball from way up high. And I know you've done, somebody said that you did some studies on the sound. And I'm wondering if I could get that study. We didn't do any studies. We just referenced studies. We just referenced. Okay. Yeah. Well, I know that there's an ordinance for sound hearing in big Harbor and I believe has to be like 90 decibel decibels. It can't be over that the line of your property. So I don't know how that's been figured out or who figures that out. But I think there's a concern, not just with the people at Apple Ridge, the people on the hill, the people at Harbor Vista, and then this other, I don't really know the name of the other condo association. No, Ridgewood. Ridgewood. So, I mean, we're all kind of concerned. And it seems like, like I said, there's a lot of rumors. We never were really, maybe our HOAs aren't on top of this because we really haven't heard a lot. And summer is a busy time. We're all scattered about. So my only thing would be that we're all concerned about the sound. And I'd like, when is this going to be voted up?
Today?
It already has been.
Well, we're talking about it today, but yeah. It has been voted up. Yep. Like I mentioned, when we spoke on the phone, they approved the use of that property for the pickleball courts.
Okay. So then it's just, we, I guess we already have. a little bit late on this.
Yeah, the other thing was, you know, the actual design of the pickleball court is yet to be determined. That was my other question. That was, you know, if they're screening, if they're firm, or that type of thing is yet to be, but the use has been approved. But not the actual implementation design.
Right, as I mentioned, the Pickleball Club is... going through their capital campaign to raise the funds. And, you know, the design work was part of that in terms of the final construction package. So natural construction hasn't been approved yet, but the use of the property has been.
And then who monitors the summit? I mean, I heard this might be wrong too. I heard six courts. Maybe that's just rumor too. Six courts is correct. So six courts is a lot of courts and a lot of noise. Who monitors? Who monitors that? Is there someone in the city that says, oh, you're over the decibels? I mean, I don't know how that works. Anybody?
Well, do we even know if there's a cumulative effect by having six parts? I mean, you'd have to have two people or a number of people hitting the ball at the same time to have, I would think, an amplified. And we don't even know if it would be amplified.
So that's what I'm here for.
I don't know.
It could be percussive hits and or at a certain frequency and decibel level to actually impact your hearing. And in my opinion, you wouldn't get that from pickleball, but you will hear it.
Well, I'm not really saying that we're going to go deaf from this.
No, we don't know. We don't, correct. And that's why there's going to be discussion about the design of sound deadening and so forth and where that will play out and how that works with the funding being asked for right now from pickleball players.
And that discussion will happen under agenda item 3D today.
Okay. Well, you know, I guess it's like I say, we're all too late, but the consensus is not general that this is a good idea. I know some people feel that way. They might not be living above it. I have nothing against pickleball. It's fun. It's great to be outside, but it's just that this is an, these are basically a neighborhood that you're putting this in our quality of life. This is why we bought up here. Quiet, peaceful. We're not in sister Bay. That's why we're in egg Harbor. And I think that's going to pierce that a little bit. I really do. So that's just my 10 cents. I hope someone is monitoring. Once they put this in, the sound votes. That's all I'm asking. Thank you.
Thank you. Thank you. Anyone else? Is there anyone online?
Okay.
So we're going to close open session and move on to the administrator. And first item is a certified survey map approval.
Yes. So today we're talking about a certified survey map submitted for the reconfiguration of tax parcel one one eight zero one two five three zero two six three two C one. That certified survey map that was submitted was attached in your packet on page 11. The lot is being reconfigured and reduced so that the existing cart path is all in the Alpine Golf Course parcel. The lot was originally created via CSM that was reviewed and approved by the Planning Commission and Bill of Board back in 2023. The original lot line that was approved via that CSM back in 2023 is highlighted in red. The new lot lines are folded. The lot is zoned R1 residential. and the proposed lot reconfiguration is in alignment with all the zoning requirements for the district. Planning Commission reviewed and recommended approval at their meeting on the 25th of August. Any questions? Surveyor is here for this audience. If you have any questions.
Can you just ground me in this a little bit in terms of sharing where this is as the hillside trail?
Page 13 is the overview map from the county GIS site.
Okay.
That going better perspective.
This is that golf hole that tees off from the block, Joe. Okay. Right next to that. The golf hole is right here.
If you kept going, you'd run into the amber. Okay. And this is the landmark. Do you look on page 14?
Yep.
So that's the curve right before you go into the parking lot of the landmark restaurant in the landmark. I know when you look at the all by itself.
I think you can kind of see where the trail did run right through that lot.
It's the last lot that's for sale. Does that make sense?
That makes sense. So what was once a bigger parcel is now being subdivided?
It should be bigger to be made smaller.
Gotcha. Okay. And it's still an acre and a half.
So do you just need a motion to approve this? Yes, please. Okay. I make a motion to approve one. Go back to whatever it was. If you look at, yeah, go ahead. Certified surveying that reconfiguration of tax parcel number 1180125302632C1. I'll second that.
We have a motion and we have a second. We'll take a vote. All in favor? Aye. Motion carries.
All right, thank you. Thank you very much, everybody. I had intended to bring the map up, but as of this morning, I don't know if the lender has to sign off on the CSR or not. So as soon as I find that out, I'll bring it up for your signature.
Awesome. Thanks so much. Have a good day. Thank you. Pickleball court location and correspondence.
I don't think anybody cares about this.
I'm sorry.
Yes, I'll ask him a question over there.
So last meeting, there were some concerns raised by members of the public during open session regarding the pitfall courts. At that time, we did not have the item appropriately agenda. So we discussed putting it on this agenda, which is what brought us here today. Some correspondence that was received in advance of last meeting and after last meeting was attached in the packet.
So I have a comment slash suggestion. So I think there's been a lot of fears, as expressed by Katten, that could be put to rest just based on what Bob says in his letter in our packet on page 16. I'll just read it. Many communities are now locating new courts 500 to 800 plus feet from homes whenever possible. And then parenthetically, studies continue to show that distance HAB-Jacques Juilland, Is the more effective is more effective than in almost any barrier. HAB-Jacques Juilland, So wondering if a do we know the distance between the proposed site, we could set as close to the parking lot right now that we were there. HAB-Jacques Juilland, And the edge of these communities, the Western most entities communities, and if we don't. Can we walk that off or measure that with Kathy walking alongside or Bob Bottle, whoever wants to participate in that to get a comfort level of the actual distance between the proposed court site and these communities? Because I think that could, maybe I'm thinking overly optimistically here, but maybe that sets aside some of the concerns.
HAB-Masyn Moyer- yeah so the personal works committee did visit the site, we had it staked off the dimensions, so they visited that doing an aerial analysis of measuring the distance of the ports to the closest residential home, which is the furthest. HAB-Masyn Moyer- South would be West. HAB-Masyn Moyer- yeah yeah. of the Ridgewood Bluff condominium, that was just under 500 square feet. So it was 470 or 480 square feet away.
So Kathy's would be even further. Yes, the measurement on that was about well over 800, 1,000 feet.
It was over 1,000 feet, yeah.
Over 1,000.
Yep.
And it's 500 to 800 is the range here.
It was further also. Harbor-Griston was further than 500, yes. So they're on Church Street. It was just up the road, was over 500. The home on the corner of Carver School and Church Street was just over 500 feet away.
And this is as the full-fledged measurements?
Right, right, right.
Yeah, okay.
Aerial measurement from the GIS site.
Okay.
And I don't remember, Karin, if you can remember, but I don't know if you could visually see that condominium building. You cannot, so you cannot see Ridgewood condominiums at all from the site.
You can't even see them. They're very, it's very wooded up to them. You can see Harbor Vista. There's an orchard in the way. And then Harbor Vista is up on the hill and it is, I thought that was like 700 square, 700. It's very far away. Yeah. So we are, we are there. And then where you live, Kathy, is even further away too. And you're like, you've got lots of barriers in between where you are and where those courts will be.
So just to reiterate the statement here, and I don't know if anybody has any information on the contrary, studies continue to show that distance is more effective than almost any barrier.
So Joe, in conversation with Megan, I suggested you're a pickleball player. Yes. Scattered. Well, you can know how to hold a panel.
I don't know how to hold a tennis, but that's fine.
you, two of you, stand down where the pickleball courts are going to be. I will go up to the various spots that are in discussion here. You hit the ball, and I'll see if I can hear it. So I think that's a...
Okay.
One way of testing?
Yeah.
I mean, you know, we're talking about, you know, 500 feet, 700 feet, 800 feet, I think, and distance being, so let's put it to the test.
Okay. Okay, we want to make some residents aware of the timing of this so they can stand on their porches.
You know, I think the other thing that our committee has talked about a lot is just that this is a public piece of land. And it has been a public piece of land for a very, very long time. And there are any number of things that could be on that property that would be far more onerous potentially than a pickleball court. And I think the pickleball just has a reputation. And so is therefore getting all this.
Well, there will be a playground.
Publicity. There's going to be a playground there. Right. And the pickleball club has been very, very proactive talking to people and they have courts in this whole County. And a lot of them are in. the middle of villages or the middle of residential. This one is very far apart from any residential. So I think they're kind of surprised, honestly.
But I think- But at the same time, they and we want to be good neighbors. Right.
They also need it to be realistic because these are public courts. This does not belong to the pickleball. So a lot of the things people are asking for very unrealistic because it's not private. They're not private courts. You know, no one is really monitoring. There won't be lights, which is a big deal not to have lights. But.
Well, I think if we conduct this experiment and I can barely hear it or can't hear it, I think that kind of shoots down the noise issue.
And what if we can't hear it? And what if we can't hear it?
Well, then we talk about other strategies. I mean, it's not like there's no time here to do it. It's three cents. You get acoustic panels. You get these, the mallets or the paddles that are low impact, a little noise.
Is that real, John? Paddles?
I'm not familiar with them, but I don't think we can expect everybody that wants to come and play there from wherever they're coming from. Because there are going to be a lot of visitors using this to walk in. So the estimated cost is up to $500,000, hopefully less than that. But I think that's kind of the aspirational fundraising goal. So I think we have to be a little mindful of How much of that can be spent on putting in a huge burn? So I think we want to understand what's needed as a first step based upon a simple noise test. I like that idea.
When's that? 10.
Well, if we need to agenda it or something, if we have three of you, then we're going to have to agenda it.
Well, why don't you and somebody who's not a different ball player? I just, it just needs three people to, to hit the ball back and forth.
We could get Susie Cummings who was there. Susie was there. Yeah. Susie was at our meeting. She knows exactly where it is. She was there. She was part of the meeting. Yeah. On site. So Susie knows exactly.
So Kathy, you're in Apple Ridge.
I am.
That's behind us. Right, John? Further away than us. Yeah.
Yeah.
Yeah. So I know Susie. I know Susie. Yeah. I can reach out to her. Keep her out of the kitchen. Oh, okay. Excellent. Excellent.
Possibly tomorrow morning, Joe. Tomorrow, Friday, or even next week. It's not that great.
Well, I got a meeting at 10.
I got a meeting at 10.
A budget development meeting.
So whenever. Whatever. Works for you. Maybe 930? Yeah, there you go.
OK. Good luck.
OK. I have to say, it's a very innovative way of trying to figure this out.
Yeah.
I appreciate that.
You get some comfort from that?
I do. Good. Thank you. Appreciate that.
I'm sure.
And I get back home knows about all these concerns and everything else that he's taking. Oh, yeah. Letters addressed. Yep.
Yep. Yeah.
And then, of course, we talked about it at the parking lot, which is sensitive to these issues, regardless of where the courts are located. Yeah, good guy.
Right. And he knows about them all over the country.
Yes. Yeah.
I think he's president of the pickleball.
Well, let me reiterate, I am not against pickleball. I think it's a wonderful thing for people to be out and about. It's just that, I mean, yes, we have selfish reasons for being a poster.
I think if I miss a shot, and what I might say afterwards is maybe the greater concern.
Well, I understand. Being a home brush, I get that. All right, so then you'll contact Susie Brown?
Yeah, I'll be in touch with her.
Otherwise, I'm next door to her, and I can be around her at night.
Yeah, and if you want to provide me your contact information, Kathy, I'll just send out a note to both of you.
Okay, I signed in.
I got it in there.
Okay, very good. Thank you. Thank you very, very much. You're welcome. You're welcome.
Thank you. We aim to please. Okay. Next is Door County Trails strategic plan following. All right.
Is it possible for me to hook my computer up?
Otherwise, we can just, are you just going to the presentation you sent me? We are, but I have two other pages that I want to show.
Okay.
But I can also just speak to them. They're in your packet. Yeah.
I did print out a big copy of the maps in case you want to post it somewhere.
That's a, I think that's a great idea in terms of giving supporters rather than specifics. So I think I like, Oh yeah. We're going to talk about all that. Yeah.
Yeah. Nice way to show it. Yeah.
Okay.
So you want to hear the owl? Yes. Yes. Thank you. Perfect.
Hi everyone, I'm Sophie Parr and I was here many months ago presenting and we said that we were going to be back in March and things took a lot longer than we anticipated but we are now back to present with an update to the Door County Strategic Trails Plan that is being organized and funded by the Door County Trails Group, which I know you guys are very familiar with. Obviously, it's been spearheaded out of Ann Arbor. So I'm going to let you also introduce yourself because you're going to be a very familiar face.
Yeah, I'm Natalie Dorler-Hyde with Stantec Consulting based out of Suriname Bay. I work mostly from home in Fish Creek, so I'm right down the road. And I've met a few of you over the past couple of years. I think it was almost exactly three years ago, we were all at the Crest Center talking about this trail when it was still like Harper Trails and hadn't grown yet to Door County Trails. So good to see you.
So I presented last time on what we were trying to accomplish with this plan. Essentially, we are a group that's been, and Natalie and I are both consultants on the project, but we've been assisting Door County Trails with developing a county-wide strategic trails plan, a very high level plan. that identifies different areas and corridors that people want to be able to utilize to get to different places. So the things that we did were we launched a survey, we got over 1200 responses, and I'm actually gonna go, I think, yeah, let's just kind of jump to that.
So, I think go ahead and move forward two slides. Yeah, you can go.
is giving you a page. Here's a page.
We'll go to the strategic planning process page. Page 31. So this plan is really meant to highlight things that are already going on in the county. Planning initiatives that have been completed, planning initiatives that are sort of in the process, and then any future ideas for connectivity using trails. The purpose of Dewar County Trails is to build a pedestrian and bicycle network. So that is the focus of this system. It's not necessarily expanded towards other uses, but it doesn't mean that the organization... Are they all multi-use trails in that regard? So I'm going to kind of get into a little bit of that. Yeah. So Dork Honey Trails is an advocate for the pedestrian and bike system. That does not necessarily mean that the organization doesn't support the idea of multi-use for like horse and obviously different winter uses. That's kind of a different element. However, this plan is really meant, and we kind of get into this at the end, is really meant to be a tool to help municipalities do what they need to do and work within their communities to build a trail system that works for their community. We did launch a countywide survey. We got over 1200 responses. And if you want to go down to like the survey page, I think it's two more. Yeah. And so these are the overarching themes that we pulled from the survey. So there is overwhelming support for a connected system. There is a strong behavior change potential. So we asked the question of like, would you drive less if there are more trails? Would you walk or bike more? And there is definitely an opportunity to change behavior. People did say if there were trails, I would drive less. If there were trails, I might walk and bike more. Trails are seen as a community investment and not a niche amenity. And connectivity is kind of the dominant priority. So people want to be able to get to the places that they want to spend time, whether that's to schools, whether that's to parks, the water, or whether it's between communities, people want to be able to get where they want to go. Safety is a concern. We did ask, and I'm gonna get into this with your specific survey results. We did ask about funding and whether people would support tax dollars going towards trail. So we have that specific question. We were able to pull out for just the Village by Harbor, which we thought was helpful information in future decision-making. And then lastly, trails are viewed as supporting local economies. So in Ag Harbor, we received 186 responses. from people that, whether they were seasonal or full-time, at least they represent Village of Egg Harbor. The top places, and this is where, like, I would show you, but... Yeah, this is an appendix A of the plan. It's page 44 of the plan, but I don't know what page it is. It's 34.
This one?
No. No.
They have a response.
Oh, yeah. Like the full plan. So the top places that people... Sorry. Yeah.
Yes, it is.
I noticed that. That's my reading. A lot of it is the appendix. The appendix is like almost out of it. So the top places that people from the village of the harbor noted that they want to be able to get to, City of Surgeon Bay, Village of Ephraim, Village of Sister Bay, and Town of Gibraltar.
And I think in our I'm like an 83 83 83. Oh, yeah. Yeah. 83 of the packet. Yeah. And then
So 59% stated that they would support tax dollars going to trail development. 30% said tax dollars going to trail development depending on what the project is, so kind of having that information. And then 11% said no. So that's just good information that we felt could help communities kind of figure out priorities funding as you guys are pursuing projects in the future.
Can I ask a question? Yes. Which type of tax will you foresee?
We did not ask specifically. We wanted to just get an understanding of the support. So I kind of, at this point, I will kind of maybe talk a little bit about the purpose of this plan. So this is really meant to be a tool to help you guys get money for future trail planning. The planning is actually done at your level. So you are already pursuing a lot of trail development here. You have been pursuing a lot of trail development here. This is really meant to be a tool for you when you're going after grants. Your funding mechanisms that you're using, in addition to grants, completely up to you. This plan is not a mandate. It's not a prescriptive plan for you. It's really a strategy. The ultimate goal is to get, and we'll come to this at the end, is to get resolutions of support for the plan from all 19 municipalities, which will help everyone as they're going after grant money, to know that it's a very supported project and these corridors are supported by all the municipalities in the county. So that's our ultimate goal with this. So this is a very, very high level plan. It's not going to dive into the specific funding mechanisms. It's not going to dive into the specific parcels that should be used for trail development. That all happens at the municipal level. It also is not going to be specific to what the uses are. The plan supports pedestrian and bike, but if you have an opportunity to go after a grant that's going to allow pedestrian and bike, but maybe there's a horse element and you want to develop part of it as a horse trail because you'll get more money, this would still support that. But that's a decision that gets made at the municipal level, not at this plan level. So I hope that helps with some clarification. And then some of the open-ended responses that we got from the Egg Harbor survey, Um, just like safety, making sure that the trails as much as possible are separated from streets. I know church has the nice bike bike paths, which is also a great addition. Um, but I think people want to see that separated trail as well. Um, you guys are obviously kind of moving forward with a lot. So this is, this might be just kind of redundant information, but it's all good information. And then in the plan, we have our goals and objectives. So we've developed these corridors. So all of the highlighted areas are connections based on what we heard in the survey of where people within the communities want to be able to go. And for the most part, they make sense. It's not, the county's not like rocket science. It is pretty straightforward where people want to go. They want to be able to get to the different communities. They want to be able to get to the water. They want to be able to get sort of in the middle of the peninsula as well. So we developed these areas as more of a strategic direction, as opposed to this is where a specific trail has to go, because a lot of that's going to come down to land use, land ownership. That's not at this planned level. So part of the plan was to develop goals and objectives. We have some very high level goals, things like strengthen the local economy as a goal, support health, well-being, and quality of life, improve safety and accessibility. We also have specific goals for each community. And that's where today we want to make sure that you are aligned with what we have in this plan. Because each community, all 19, have their own specific goal. So we would love for you, I'm going to read out the goal, and we'd love for you to, today, if you want to approve a resolution of support for it, if you want to take a month to review it, give us any feedback, we can still make changes. So this meeting is really that opportunity to ask us questions and make sure that your goals as a village are aligned with what we have written in here. So the goal for, and this is on page, this is on page 21 of the plan. I don't know what page of your packet, go ahead.
It's on... 60.
Perfect. So I'll let you flip, but I'll read it. So the goal that we have set for the village of egg Harbor is enhanced trail connections between downtown egg Harbor, the waterfront and surrounding local and County parks, as well as pursue development of a trail that connects into the town of egg Harbor town of Gibraltar and the town of Bailey's Harbor with access to local destination destinations and residential areas. Again, it's a very high level. But we welcome any feedback. We welcome wordsmithing. We welcome changes. We want to make sure that what we have written aligns with the vision that you as a community have.
Can I just ask a question here, Sophie? So town of Gibraltar, I read is Fish Creek.
Yeah.
Is that fair? Okay. Town of Egg Harbor. I don't know where I'm going. Where would I be going from the village? Because the town's kind of a amorphous place.
Yes, so the what is it out on our bridge the heritage lakes that's a big community that wants access in. So that's in the town, so it doesn't really need to specify where it's going it's more like go into the town and then, if a harbor. Is that what it's called, Heritage Lakes? If Heritage Lakes wants to pursue trail development, this is actually a tool that they could use because that's identified. And then the town of Egg Harbor has a goal of pursue opportunities to connect into the village of Egg Harbor, Sevastopol, and Bailey's Harbor. So it's really just meant to help you get money.
Yeah. We've been talking forever, Joe, about Dr. Murphy Park. Yes. That's why we added that first sentence. That's kind of like a logical avenue.
yeah yeah it is kind of interesting that i look at all the responses from the various towns and they all want to seem to come to a harvard the building well you can see i mean it's crazy like you can see the progress that you have made like on here because we have all this is all potential trail you guys have so much potential trail that you have already started planning for whether it's built as one thing but You know, there's not there's some blue and Bailey's there's a potential trail extending the anarchy. But really, like you guys are a hub, for sure. So a lot of a lot of this has come out of what you have done here, which is great.
Wait for the pickleball course.
And then yeah, you're gonna have to have a trail directly to the pickleball cards.
Well, just wanted to comment with respect to the covers village statements here. and town of Bailey's Harbor. So that's just cutting across the peninsula. That'd be awesome. I mean, my wife and I get on our bikes and we come out onto E and go east. And we typically go over then on Heritage Lakes and into their little community there. It's kind of fun to ride around the little homes that are back in there. But there's traffic down all the time. And you're going over this hill and you don't know cars that are kind of coming up. So if you're going east, you're going up the hill on E, and there's a car that's kind of coming up alongside you, they don't know if there's somebody coming across. They've got to, you know, really tamp the brakes, wait to see. It's just, I mean, the comments that you captured and mentioned about the trip, the people's feedback on the concept of trails in general kind of sums it up in terms of It's a safety issue and it's a quality of life issue. I think everyone would be much more relaxed, happy to, if they're biking, to be on a bike-specific trail and not worry about who's coming up alongside you. You know, you're coming over blind areas and it's just, there's traffic on these county roads and there's little shoulder, if any. So it's just, it's awesome. You've got to go for it.
Um, and I do want to kind of note like the multi-use right to how this plan helps. So, um, if you from the constructed that new pedestrian pedestrian only trail, we probably know bikes will go on it, but it's technically a pedestrian only trail just north of downtown. This plan would still support that because it supports pedestrian access. Sometimes there are limitations they couldn't, they could not build. They didn't have the room to be able to build the 10 foot a width that they needed for bikes. this plan will still support as long as it's a pedestrian or bike trail. And, you know, there's going to be limitations on where it can go based on land ownership and, you know, who supports it and all of that. So this plan was really meant to act as a tool for you as you continue to do your own municipal planning within your community.
So I gather, Gina, the two individuals from each town, village, then you...
Yeah. Do you want to jump on that? We'll talk about the kind of what the next steps are.
And then you've got, then you've got support enough for grants.
Right.
Is that kind of where this whole thing is at? Yeah.
Now that the planning portion is coming to a conclusion, we'll be then able to work kind of across the county. The goal is to have this working group of all municipalities having two liaisons be assigned to that working group, as well as potentially other land holding entities, like public land holding entities, the county, the state, maybe land trust, agency, things like that. And then just get all the people together quarterly. The idea is that kind of within each region do quarterly, and then once a year get together across the whole county to just share where progress has been made, where lessons have been learned, planning that is occurring, capital projects coming up that might be able to be leveraged for planning and design. So that's where I'll come in as the community liaison moving forward and help facilitate those quarterly conversations with each of the municipalities across the county. What do you think about that?
Oh, it's fantastic. I think you need a cohesive everybody on board. These people are signed up representing their communities and to write a brand, then you've got scale of commitment.
Yes.
And then, you know, then see what comes back.
And we're really hoping that for the Dork Night Trail group, you know, can provide this support to everybody.
Because I'm like, you need a big room.
That's a good point.
Everybody needs to Yeah. Being good grants, I heard an announcement that there was a million dollar or maybe multi-million dollar grant that was just a change. Can you tell us a little bit more about that?
Yeah, the town of Gibraltar was just awarded multi-million, almost five million from a conduction mitigation air quality grant program. That's through the Wisconsin Department of Transportation. And that will complete basically four and a half miles of trails through Peninsula State Park. to connect the existing kind of Fish Creek Park Trail into EFRO.
Awesome.
Over the next four to five years.
Are you in communications with all of the municipalities on this list?
Yeah, yeah. So I was back, I was here, what, in like April, I think I came, to kind of give an overview of what we were doing. So at that time, we met with all 19 at that same time. So we went to every meeting. We said we were coming back in March, but obviously things got pushed. So you're actually our first meeting. We're going to Gardner and Union tonight. We're sort of starting our follow-up to present this information, present the goal that is associated with each municipality, get their feedback. We anticipate some people might say we can adopt the resolution today, and we anticipate some people might say we need a month, we need a little bit. So we're expecting this whole process of getting the resolution support to take about two months, from like honestly today is our first day.
It's kind of fitting that we're starting with the village of Egg Harbor. Yes.
Which is kind of the case, the one, the county of Door is, I don't see them on, you know, on here, and that really kind of irritates me.
They are... Well, so we are, we will be meeting with them once we meet. Okay.
And they'll be involved.
They had a bit of a turnover in staff there, which left us a little disconnected from them. But yes, we anticipate meeting with them once we've connected with all the communities.
Okay.
Yeah.
Good. Yeah. They should be.
Yes. Yep.
Integral part of this.
So that resolution, is that somewhere? Yeah. Page 38.
Do you help and or write grants for communities?
Yes, that's one of the services.
So if we reached out, we would, okay.
So Natalie is actually the grant that we approved for Hillside Trail. She's the point person on that. Yeah, closing the loop on that.
I just wanted to put two and two. Since you brought that up, what's the status of that? Where are we at in the cycle?
We're waiting on Friday. Hanging off on Friday, yep.
To do what?
The grant was announced and just started talking about the requirements and getting the documents. I see. Yeah. Could we get the grants due November 1st? We haven't applied yet. Just to kick off to get the application started. Yeah.
So the grant that the Fish Creek group, $5 million, is that something that we could do? Do you see that being applicable to our village?
Yeah. So that funding source is specific to coastal counties in Wisconsin. So with the idea being that, I mean, it's not just the idea, the fact that As coastal counties, we have the lowest air quality because we get Chicago and Gary, Indiana smog coming off the lake. So it's actually a really great opportunity because it's a limited few places that are eligible for those funds. It's a good pot of money.
Yeah. Congestion mitigation and air quality funding for the Highway 42 project.
OK. Yeah. And Sister Bay received funding to buy a bus through it for their little trolley, their little bus route.
What stuff you could buy to would there be a companion grant under that program.
To serve as a match. Yeah, there's always a way.
That's what I do. And that's honestly why we wrote the plan, the way that we did so that there's a lot of flexibility for the different types of grants that you might go after.
Yeah, and like to your question about the specific locations within the town of Egg Harbor, you could follow specific locations if you want, or it can just be broad and then it's applicable to any opportunities that might arise.
As long as any trail works within these corridors, and these corridors are so vague that even if they weren't, it would be okay. As long as they align with what the goal is ultimately saying, which is connect us into this town, you really can do a lot. And I think this group is hoping to help HAB-Masyn Moyer- coordinate the different communities that are especially adjacent to each other, so that as you're building and as maybe Bailey's is building or. HAB-Masyn Moyer- Or the town of egg harbors building you connect so that this group is really meant to help you guys connect as you're building out.
HAB-Terry Palmos- And I think we can presume tourists will also take big advantage of the trail system.
HAB-Masyn Moyer- yeah I mean this, the trail system is going to definitely support the local economy and the local economy is a tourism economy. HAB-Masyn Moyer- So.
Have there been any examples of the tourism zone, the entity that makes grants based upon tourism taxes that are being collected to travel?
Destination Door County.
Have there been any examples of Destination Door County funding in these trail segments? Yes. Okay.
So today, Andy, I think you brought it. Yeah. HAB-Masyn Moyer- We're kind of community.
HAB-Masyn Moyer- Yes, good that's another. HAB-Masyn Moyer- big Harvard be the first one.
HAB-Masyn Moyer- Oh, no.
HAB-Masyn Moyer- We want them to have a good successful. HAB-Masyn Moyer- Further just yeah just just one kind of yeah.
HAB-Masyn Moyer- Joe maybe stumbling block question here so i'm looking at a map and it's got. HAB-Masyn Moyer- For the trustees page. HAB-Masyn Moyer- And there's a tannish man and white sort of alternating segment. HAB-Masyn Moyer- And i'm not seeing. HAB-Masyn Moyer- i'm not seeing that. HAB-Masyn Moyer- In the index.
HAB-Masyn Moyer- highway quarter oh that's funny that is actually just a Center line of the highway that little yellow line. HAB-Masyn Moyer- Okay, that looks like it's connecting to green to blue lines it's just the underlying road layer so yeah.
HAB-Masyn Moyer- you're doing a great job burning cats.
HAB-Masyn Moyer- she's good at. HAB-Masyn Moyer- This.
HAB-Masyn Moyer- motion.
HAB-Masyn Moyer- uh.
We approve resolution number 2026-12 in support of the Door County Trails Strategic Trails Plan.
Second. We have a motion. We have a second. We'll take the vote. All in favor? Aye. Motion carries. Thank you very much. Congratulations.
Thank you. Good work.
Thank you. I thought it was how many people mentioned horses?
The horse came out loud. Yeah. Yep. They are. They are very organized. Yeah. Up in like Allison Bay area. Right.
By the Allison Bay Park.
Yeah. But I'm sure there's very specific grants for most. So just before we move on, we do have to then determine who our two representatives are.
Do we have to do that now?
No, no, we can do that at a future meeting, but I just.
Unless we have volunteers ready to step forward at this time.
It can't be, can it be two of us from here? Yeah.
Yeah, as long as we have numbers. We're hoping that half of you two are going to do that. Representative, don't read all the quorum. Yeah, right. Let's think about that.
And I also thought maybe it'd be a good idea to open it up to some other, you know, outdoor enthusiasts within the village. So I think maybe...
A trustee. Yeah.
Do we do that? I mean, we're all kind of busy.
Yeah, I just wanted to put that feeler out there.
Yeah, we're anticipating this resolution process to take two months. So you don't need to do anything.
Except sign it. Yes.
To be determined. Hopefully by the end of the calendar year, but I know we're getting into the holidays, so that seems unlikely. Yeah.
All right. Thank you.
Thank you.
I can't think of... Actually, I do need... I'll ask... I have a couple of friends in the orchards. Biker friends? Biker friends, yeah. Pardon me. I hardly know. Yeah, okay, I'll ask you one of those. Okay next is.
Tourism zone.
Yes, I am a consideration and press election request for approval of the dark any tourism don't mention violence amendment. I actually the correspondence that we received from the door pictures and don't get the record Julia Juliana Holly and They are, if you took a look at that correspondence, there are two amendments that have been proposed and recommended for approval by the Fullville County Tourism Zone Commission. They're related to term limits for the executive committee member positions and actions to be taken in regards to attendance. Those changes were included in red, the first on page 94 of your packet and the second on page 95 and 96 of your packet. So as a member of the tourism zone commission and executive committee, you know, I have no issue with the proposed amendments as proposed. That was an interesting sentence. Anyway, meeting attendance, basically, Ultimately, we have bodies that are approving our commission members. I'm one and Mary Zeller is our other commission member. I think either one of us is in attendance. We try to communicate if one or the other can't be there. So we have representation. It's not the case in every municipality. So they just kind of want to have some teeth to if there's lack of attendance to go to those boards and be able to point to something within the bylaws in terms of making a change. And in terms of office, I think with the tourism zone, what they have seen occur is that they end up seeing the same representatives in the executive committee position, and they just like to have that turnover to get some new ideas more frequently. So it's a two-year term limit. That doesn't mean you can't ever rejoin, but you're on for two years and then off, and then you could potentially be reappointed to the executive committee.
So, those are the changes. So, Megan, what's the breakdown of Southern, what, two representatives from every municipality?
I think it's dependent on your collections, but we have two. I think, like, City of Sturgeon Bay may have more than two. Okay. I'm sure that's in here somewhere.
And then how big is the executive committee?
I should know that answer too. It's less, it's maybe 10, 12 people.
Okay. And you're a member of that?
I am, yes.
Are you president?
No. Actually, I'm secretary of the tourism zone now. Thank you very much.
So you're just looking, so do we need to make a motion to approve? Yeah. Okay. So I make a motion to approve. HAB-Masyn Moyer- They're trying tourism zone Commission mission by loss either two commissions and word. HAB-Masyn Moyer- doesn't make sense. HAB-Masyn Moyer- We'll just go with the. HAB-Masyn Moyer- Door county tourism zone Commission Commission bibles.
HAB-Masyn Moyer- yeah.
HAB-Masyn Moyer- Anyway, I make a motion to approve.
HAB-Terry Palmos- Second, we have a motion, we have a second any other questions. Okay, hearing none, we'll take a vote. All in favor? Aye. Motion carries.
Megan, a question. You mentioned Mary Zeller?
Yes.
Is she related to Paul and Cedar? Is there some requirement that Zeller be on every committee? Yeah.
I don't think so.
I think it's just the three.
They're all spoken for. Yeah, I'm all for her. All right, next item is three either repair chief report for August and it's actually the new fire engine so justin is here, if you have any questions regarding his report is on page for one on four sorry and one on five and the new fire truck new fire engine is outside someone.
Pretty obvious.
I haven't been outside since 7.55 this morning. Just a reminder, Justin, how much did that cost? $1.2 million. Oh, wow. Thanks.
Well, any questions on the chief's report?
Nothing alarming? Well,
There's several there. We've been going to the landmark pretty good. Unfortunately, they did have a real fire watching late one night. I credit the guys to doing a great attack. I was late at the hospital that night. Unfortunately, we've been going there more and more. I don't want to go there because of the big loss of life, big dollar value there.
So there's nothing preventative.
No, unfortunately not. It's just stuff that we can't see. It's the age of the building is what it's coming down to. But as I did note on there, August was the busiest month we've ever had.
And I'm sure you're talking to Cambria and trying to figure all this out.
August was the busiest month we've ever had on record, ever. Every one of those calls went answered. There wasn't an unanswered call there, which shows the dedication of the personnel that we employed.
Justin, I've got a couple of questions. Nancy and I heard all kinds of silence about Two weeks ago, maybe three weeks ago, it would have been right in front of your house. Was this, and it was for an extended period, I want to say maybe a half hour, an hour. Was this going to the landmark for a fire call?
It very well could be.
There were just a lot of vehicles involved.
It very well could be, depending on what time of day it was.
Was it done by the marina?
We do send a truck to the marina right away to establish our water supply. Anytime we have a fire, one of our auto aid departments, we send a truck there to establish a water supply if we need it.
Okay. The other question is on page 104, the mutual aid calls. So there were, let's see, two, four, five of them. You recorded for August. And one, two, three, four were canceled.
Yep, that happens.
Is that the norm?
So the way it works is any time somebody calls in, whether there's smoke or fire in a building, we have an auto aid policy across the county. So it could be you see smoke in your building, and we're going to garner a response from another six departments. And this is how we work. So sometimes it could be as easily as, You know, one of the calls of the landmark was a burnt-out motor. It caused smoke in the building or flames. So we can call that off relatively fast. That's why some of them are canceled.
So do you try and do that before they're deployed?
Not always, because we want to make sure we know what it is before we call anybody off.
Three of those four had to do with missing people. Yep. So there was missing kayakers, paddleboarders, and then just missing people.
Yeah, so we've had, so again, we are the only department in the northern part of the county that carries a drone that is available 24-7. So some of those, like the missing paddle boarders, we were a dual response with an agency with a boat, so they want to get our drone up in the air and be able to find that. The same with the missing people at our sister base. We're readily available to respond with our drone, that's why. And it shows they're canceled because the Luckily, we can resolve some of those problems fairly quickly. But they want to get us on the road because, you know, the panel of orders was, it was 10 after 9 at night. And the missing people were getting to that point of it's the dusk hour. We want to try to get eyes on these people relatively fast. So we can go, hey, we know where you're at. We're coming to get you. Unfortunately, at night, our signatures also pick up gear. and every other living creature that's giving out heat in the earth. So sometimes we have to get fairly close and zoom in to make sure we're looking at what we're looking at.
Do you foresee other departments getting drones?
No, that's up to them. That was one of our fundraising goals that we wanted to do at one point, and that's what we undertook, is to become one of the operator of a drone team. I tell you what, it's great when we don't use it. I mean, you know, a lot of it goes back and forth to what every department has. So we don't own a boat. You know, so we kind of, you know, it's a lot of sharing resources back and forth.
Well, which is a good idea.
Yeah.
The drone alone that we own is $30,000. So.
Where is Three Springs?
It's a nature preserve.
Okay.
Any other questions? So should we go out and look at the truck?
Yeah.
Yeah. Let's see what our million dollars. Yep. One point we haven't got reset.
Did you sell one or is this four? Reconvene at 10 after? Is that enough time? Quarter after?
10 after.
10 after. That's fine.
Well, jumping right to the final open session.
Oh, no. Yeah. Run to the restroom? Yeah. OK.
Any other comments on that before we move on?
Oh, nice drawing. Good.
We'll have it here.
Okay, I guess we can move ahead, right? Yeah. Okay, the Hague River Business Association request.
Yes, so this is consideration of possible action on the EHB requested road closures for 2026. There are two One is the portion of County Highway G from the State Highway 42 intersection to the north end of Dock Road, County G intersection. There are no private driveways on that section of the road closure area. Dock Road will remain accessible and the HBA is proposing to have the road closure to create a festival food court, which will allow additional space, well, additional food vendors to attend the festival and then provide additional food offerings. HAB-Masyn Moyer- Given patrons and then also allow more part of the park to remain open for those enjoying the event festivities. HAB-Masyn Moyer- Over the years. HAB-Masyn Moyer- We know there's just a lot of activity in the park, a lot of vendors and such so everything's kind of crammed in the park so looking at kind of expanding that. Um, that would be proposed. Well, okay, let's, I think I have it all in here. Uh, the second is a returning request to close orchard road when you say highway 42 intersection to the west side of the Virginia center parking lot entrance to allow for additional space for craft vendors on orchard road itself. Uh, both road closure areas are outlined in the dark green on the attached maps and both are proposed from Friday evening, October 9th through the evening of Sunday. HAB-Masyn Moyer- October 11 event barricades are going to be provided from the county of door and will be used for the road closures, those are barricades and cannot thrive here or around. HAB-Masyn Moyer- And in other areas throughout the festival grounds as well, I did reach out to the door kind of highway Commissioner to determine if there's any approvals needed from the highway department there's no specific approvals required, but we have some information. HAB-Masyn Moyer- We obviously need to provide them with. in the event that we choose to move forward with the state or the County G closure as discussed. We did have a pumpkin patch safety meeting on August 31st with our staff, each VA staff, Justin was there, emergency manager, management director was there as well as a Door County Sheriff's Department representative and all in attendance were in support of closing that section of County Highway G. I didn't see any issue with it. So with that, do you have any questions or concerns for me?
It's a pretty small segment there. So looking at what you highlighted in green. Yes. Outlined in green on page 107. So a nice idea.
So this is different from closing the highway at both ends.
Okay. So this is just different because it's for three days. Friday night through Sunday, and the others are just considered temporary?
Yes. So the highway is only closed on Saturday, and then that approval runs through DOT for the highway. Okay. Yeah. I mean, if we were to change that from year to year, we would obviously propose that to the village board as well, but there's no change to the highway closure itself on, say, Highway 42. That remains closed on Saturday. I think it starts at 10 a.m. and runs through 5 p.m.
Why just Saturday on 9-14?
It has been just Saturday for a number of years. The EHBA pulled their membership back two or three years ago to see if there would be an interest in Sunday as well. And just their membership, there was opposition to closing both days. So I think this is a nice alternative to be able to allow more vendors to stay foot outside of the highway so that they service the event both days, because last year they had some vendors in the highway on Saturday, food trucks and things, but then they weren't able to also be there Sunday because that road was back open. So this would kind of be the food court area, like I mentioned, and then Orchard Road would be an extension of the craft vendors, which they've done for at least the last three years. Yeah. Yeah.
I remember that.
Yeah.
Is this, you mentioned the closure is going to start Friday evening. Is that just a setup period or is that the festival itself?
That is the setup period. So some of these vendors that they would place here that have historically been in the park, they're the caramel apple vendor, caramel corn. Stop, don't get me hungry here. Yeah, their main food vendor outside of the food trucks, I think they would put kind of on the side of the mezzanine building in the park itself just to kind of separate some lines of people. Um, but then it would allow them to have the tents go up. Alyssa did say, you know, an earlier morning, Saturday morning closure could work. They, they could make that work. We have concerns with the length of time. Um, their original request was that we go, um, Friday evening through Sunday evening for both areas. Um, you know, I think, I don't think orchard road is really an issue Friday. Um, County G probably more concerned there.
And we, we put signage up down at, uh, five corners to direct traffic down.
Yes. Um, I did talk to the door County highway commissioner or my follow up to the door County highway commissioner. He actually just got back to me this morning. I had asked him, um, you know, if there was any specific requirements in terms of determining a detour route, he said that there's not. Um, but yes, I think we would put, um, and I can talk to Cody about that. some detour signs up where we would send them, whether it be down South Trail. Yeah, South Trail. Yeah. And then we would also provide a copy of that to the Highway Department and the Sheriff's Department as well and the Fire Department also.
Okay. I'd like to make a motion then to approve proposed road closures for 2026 Pumpkin Patch Festival.
Second. We have a motion. We have a second. We'll take a vote. All in favor? Aye. Motion carries.
Thank you.
Okay.
All right. Uh, next item is work schedule. Yep. For the, for the treatment plant employees. Talked a little bit about this in previous discussions about the employees living to a four, 10 hour workweek schedule. Um, BERT put together the proposal for us and gives us a little bit more information. Um, so cover pages on 109 and then BERT's information is on page 110 of the packet. So that kind of discussed the proposed schedule, how it would work in terms of who would work when, the overtime and holiday pay.
Yep, and then this wouldn't impact any emergency coverage or anything like that, right?
No, whoever's on call would work a 5-8 hour day. They'd still be on call the same Monday morning from 6 until Monday morning.
So it's all call primarily, you can do the 4-10s? Yep. Okay. I don't see you having one here, though.
No, I'm planning on staying at 5-8s.
Are you, do you also serve on call?
Okay. So when you're on call, both of them could work.
Four-tenths.
Four-tenths. Okay.
Do you have like a time in your head when you're going to make sure that it works and perhaps reevaluate?
If you don't feel it works, go back to the... Well, I think that the biggest thing that we have to do is just change when we do some of the line work. And I think that, you know, right now, the biggest thing that Mike and Velvet are doing is all these locates for the fiber going in. I mean, the amount of paint that they've used in the village in the last year is staggering. And if they can stay You know, like on a day like today until four o'clock, they can get a lot more done that way.
That will be done at some point though.
What's that?
That particular project will be done at some point.
I don't know. It's been like five years now, Church Street, and then it was the highway. We have the same amount of stuff that has to get done, like the maintenance items. And if something, if the oil doesn't get changed today, it can get changed tomorrow. And I think as far as like me being doing most of the paperwork and answering questions, I should be there five days a week. But as far as Mike and Velvet, they can rearrange the stuff that needs to be done as far as making it work.
And this could potentially help employer retention? I hope so.
And do you think they'll both have the same schedule? Or could one work Monday through Thursday and one Tuesday through Friday? Or does that make any difference?
Well, you know, as life goes, I told them when I proposed this that if they show up on Monday morning and say, hey, this week I'm working five eights, they're working five eights. But if they want to work four tens, they can.
Okay. And they choose the days?
No, no. It would be Monday through Thursday.
Oh, Monday through Thursday. Yeah. And not Tuesday through Friday. No. Okay.
Are they both going to jump into this right away, do you think?
I know Velvet said she would immediately. And, excuse me, Mike, I think it depends on the time of year because he's a deer hunter and he likes to be done at 2 o'clock in the fall. So I think it all depends on, and their family schedules, you know, if that.
And that's fine with you if on Monday someone tells you they're going to do one or the other.
Yeah.
But the default is the 10 hours or not even necessarily?
No, no, it's just whatever they want to do. You know, I think that with, especially Mike having daughters that he wants to travel out of town to visit them. So if he can leave on a Thursday night to go visit his daughters in Minnesota, it's a big benefit to him.
Yep. Yeah. Well, and really the only time this occurs is when the two of them will be, would be when, you know, when Bert's on, on call.
You know, and that happens sometimes now anyway, if they will take vacation on the same day. So yeah.
Okay, well, no problem with me. All right. I'll make a motion to approve alternate work schedule proposal for wastewater treatment plant department.
Second. We have a motion. We have a second. We'll take a vote on favor. Aye. Motion carries.
Thank you. Thanks, Bert. Yes.
All right. Next item is item 3H, Consideration of Impossible Act on Ordinance 202609, an ordinance creating chapter 40 ethics code of, oh my gosh, Big Harbor Code of Ordinance and adopting the code of conduct for elected officials. So we have looked at this document in the past. Last week we talked about incorporating a conflict of interest disclosure, which has been incorporated appropriately. So the ordinance itself, is on page 112 and 113, followed by the full chapter 40 of the code, and then the conflict of interest policy.
Any comments?
One comment, it's on page 122, Megan, and paragraph D, references 40-13, but I believe it should be 40-12 because there is no 13. Yes, correct. Can we still move forward with the motion on that?
Yep, just as discussed. Okay.
I've got one item minor on page 125, letter D. It begins, do not solicit political supports from staff, council members, I think that should be village board members. Yep. Anybody else? No. With that, I'll make a motion to approve ordinance 2026-09 as amended as an ordinance creating chapter 40 ethics code of For the Village of Egg Harbor, code of ordinances and adopting a code of conduct for elected officials as presented.
As discussed.
We have a motion and a second. Can we please have a... Joe. Joe. Can we please have a roll call vote?
John Heller.
Karen Northrup. Aye. Joe Megan. Aye. Scott Rasmussen. Aye. Mike Johnson. Aye.
Okay, motion carries. Thank you.
Thank you.
Thank you.
All right. Consideration of possible action on riprap placement at the beach break wall. So construction has begun down at the beach break wall in terms of the repair. Parks and Public Works visited the beach at their meeting last Wednesday to observe the progress of construction. And at that meeting... There was some discussion on a possible change to the project plans. We do need to make the decision in the next couple of weeks based on the schedule. So we threw it on today's agenda to see what everybody's thoughts were. The change relates to restacking the riprap material on the water side of the wall's dog leg. The committee discussed the possibility of eliminating the riprap material from this area to allow beach visitors to jump off of the pier. There are removable stairs incorporated on the project plans that you may have seen. The project engineer does not have concerns with the removal of the riprap interior with the installation of the new steel sheeting, which will protect the integrity of the structure. We did talk to him about in the event of high water, we could then place riprap there. We could even put it on top of the wall in that event if we had concerns about the integrity of the structure in the future. In terms of the liability concerns, we were allowing people to jump off of the pier in other areas where there wasn't riprap. So there's really no change in those liability concerns.
And our attorney agrees, I think.
Well, there's recreational immunity in terms of when you're using some of these facilities. So we'll have the no diving signs to discourage those from diving in and things like that. But because we were already kind of allowing people to jump off of the structure in some capacity, there's really no additional concerns there.
I'm going to ask Karin. I don't know if anyone can see this, but Is it the entire wraparound, that riprap, or just?
So there was, the riprap was not going to be replaced here, but it was replaced here. So there will be no riprap, is what we're proposing, no riprap. And they suggested that we keep it, store it, because we may need it at some point, we need it somewhere, and riprap is valuable.
So we said he's got a place to store it.
Well, we had talked about maybe even just placing it somewhere at that property. I mean, stacking it somewhere.
But, I mean, this came out partly because Sister Bay does not have RIPRAP, so they have a dock that we'll jump off of.
Wrapped up like ours will be.
Right. And actually the contractor is the one who suggested it to Skylar, which Allison is the Stamp Act guy.
And there's potential to save some money, too, or is it just like, don't hold your breath?
Well, he's already removed, he's already pushed it back, so he would have to move it somewhere. But I think, you know, for the, the other thing is, so Skylar also said right now on the backside of that dock, the water is five to seven feet deep. And we're kind of at the average right now for the water level. On the inside, where people already are jumping, it's two to four feet.
That's not much. Right.
So there's probably more likelihood of getting damaged or jumping into shallower water than other water. And there's also just the general feeling that people are going to walk onto it. Janet Callahan- If it's there. Yeah, try to jump off. Anyway, so I feel like it would actually be safer to remove it. Yeah, entirely.
Yeah, then they're not Janet Callahan- Tiptoeing around the rocks.
Right, right. Plus, we just think it'll be well yeah it'll be safer, actually, and it'll be a more general, it'll be a better experience for people who are at the beach.
A better amenity. And maybe we could, you know, if you look at this, we could maybe, here's the pumping, the lift station, we could maybe put those rocks up in this area. So, yeah, but we can...
Right. Would the raft that you're contemplating be situated just off the end of this or where?
I don't think it'd be right off the end. It would be down a little further. Probably over the beach. More in the middle of the beach. Kind of in the middle.
Yeah.
So you've got ladders around for safety aspect. I think there's just one ladder.
Yes. There's one ladder. One ladder to inside of the dog leg. One ladder to allow yourself.
It'd be like maybe a formal life ring or something down there.
Oh yeah, we can definitely put that out there.
Well, maybe the trade-off for not replacing the riff-raff would be another, even two ladders. So whatever. Yeah. I think you might. On the other side?
On the base side. Well, I think those would be easy enough to have it out there and then see what makes sense. And we can always add ladders in.
I really think having a ladder on the other side makes sense if we're not going to do it. Yeah.
Yeah.
So there'd be no boat tie-up story, like, you know, what about, like, kayakers?
Hey, if I bring my kayak out, right, tie it off on one side, like, one side dedicated for jump off, and the other?
No, no. Pull that kayak up on its own.
Okay. No more. Is there a need for a motion, or is it just...
We can make a motion.
Let's make a motion so that we can give them a go ahead to do this. Where are we?
I don't have a motion. Make a motion for consideration and possible action on riprap replacement at Beach Breakwall to remove and or not replace riprap but store it instead. Second.
We have a motion. We have a second. Any other questions? Hearing none, we'll take a vote. All in favor? Aye. Aye. Aye. Motion carries. Thank you.
All right. Next item is consideration of possible action on lawn renovation proposal for Peggy and Performing Arts Center and Village Beach Lawns. There was some attachments in the packet, but we do have some updated proposals that were printed out at your spots today. HAB-Masyn Moyer- And she will get swapped out for the final packet to go on the website. HAB-Masyn Moyer- carn that before landscape regarding the existing condition of the grass on areas of both Peggy again in the village beach door landscape provided the proposal in response to the meeting. HAB-Masyn Moyer- For the grass on area both venues and they can both do some renovation. Parks and Public Works Committee did review the lawn at the beach at their meeting when they were down there and they support the project for both properties. This was not included in the 2020 budget, therefore they didn't take any formal action on the proposal. And the other thing, the other component of this for the beach property that we're working on in terms of the budget development for the fiscal year 2027 budget is an underground irrigation system for down at the Village Beach property. We don't have those proposals yet. Cody was meeting with the vendor this week. So we don't, that's kind of a piece of the puzzle on that property that we're not aware of. We'll go through the updated proposals here in a minute. Staff does recommend that the general fund fund balance allocation be made to cover the cost of this project in the event we want to move forward. The fiscal year 2027 budget development process would allow us to discuss making a transfer to reimburse the general fund. As you saw, if you had a chance to review the financial reports later in the meeting, the room tax fund is currently at a negative fund because of timing due to room tax collections. So we don't have any available fund balance funding from the room tax at this very moment in time. So the total fund balance allocation in the event we wanna move forward for both phases of the project in terms of both properties, is $32,841.42. So Karin, why don't you walk us, if you don't mind, walk us through.
So John and I did a little driving tour of the village a few weeks ago, and we started at the Peg Egan. And just for background, all of that land back there was just a field. All of this.
Initially.
Yeah. I mean, like where the store is, where Newport is, everything back there. This was just a big, huge field. So when the people at Ames Farm donated that land for the Peg Egan, there was never grass planted there. It was just mold, whatever was there. So there is not, there's never been grass planted on that property, which is very obvious when you really take a good look at it with people who know what they're talking about. So there they looked at it and basically that Peg Egan is pretty much all weeds. There is really no grass there at all. So their suggestion for actually for both of them is to apply a herbicide, which they would like to do by the end of September is the ideal time to do that. They can reseed two weeks At least they need at least two weeks in between before they can receive any anything so and they would like to have the receiving done by the end of October so we're kind of in a really short period of time here when this could be done this year. So. The Peg Egan is relatively easy because there's water there and it's a very specific area. It's the grass in front and the grass behind.
So they would put sprinklers out.
Yes, and they will work with village staff to do that. These Dural Landscape actually did this in Bailey's Harbor when they tore down Nelson's store. So they did this exact same thing there. taught their public works department how to take care of it, and he said the grass is absolutely beautiful there. Did they have irrigation? I don't know if they have underground or not. Okay. I don't know.
And just one further comment, and talking to Cody, The area in front of the stage at the Peg Egan, probably approximately 20 yards back, he said the topsoil there is about a half an inch or an inch.
Right.
And so it's a weed bed at best, and it's, you know, nothing is happening there. So if you go back a little further, I think it's, you know, it looks like there's more sod, still a lot of weeds, though. And so that's, you know, one of the reasons I think the cost at the peg, they have to import a fair amount of soil. Right.
So it's also just going to the, if you're standing at the Peg Egan and look, there's a kind of like a ridge where there's rocks.
There's like two of them.
Well, this would go up to the one closest to the Egan and then they would stop. And then there's a second one, like a second tier kind of wouldn't go all the way. So it wouldn't go all the way to the fence, the fence line. It was just up to that, that section.
That's still pretty deep. Yeah.
Oh yeah. That's really deep.
So we've been attending concerts there ever since we moved here five years ago. And this prescriptive concert season is the worst I've ever seen it. It seems to be getting worse.
Well, it's not going to get better unless you do something.
Right. Yeah. I'm just saying it's bad. I'm agreeing with what your assessment. Right. And I think the absence of water really hurt. add it to the cat.
Well, it added to it. Right. But unless you actually do something, it's just going to always look the way it looks, you know, unless you absolutely do something. And, you know, I think you all remember the plan that there was for the Egan to put that bench out in front and do a bunch of landscaping. Well, that's dead. We're not doing that. That's not anything. our committee is advocating for at all.
I'm in full agreement with that.
And that would have cost twice, three times as much as that.
It was like 60 or 60 or 50 or 60,000.
Right, right, right. And we just feel like this is something that really needs to be done. It's the center of our village. Theoretically, it would get used more if it actually looked nicer, but there's time to do it now. So the Eagan, you know, we really feel like there's time to do it now. The beach property is another animal simply because the irrigation and the watering is much more difficult there. And Cody's been trying to reach a company just to find out what the pressure is on the water that exists there because we don't even know what the pressure is. It's in the bathrooms. The beach property is There's actually grass there and there's actually dirt there, but there's so many weeds there. And it's also really bad. The landscape people said they would not feel comfortable herbiciding the beach and reseeding it unless they knew there was going to be a good water source because they feel like we would just be wasting our money and it wouldn't be done. So unless we have a water source for the beach project, he is saying we should wait until spring.
Did we ever have a water source? Or is this a new issue?
No. Well, there is a water at the bathrooms.
There's a spigot outside, too. Yeah, there's a well hidden.
Well, that's the other thing that seems kind of strange is because that property was a house which had a well. And Cody can't seem to find it. He's looking for it, the well. I mean, there's got to be a well.
How long was that?
When we did that portion of the beach reconstruction, how long ago was that? Ryan Heiss was still here. Megan, do you remember how long ago that was?
I think that property was purchased maybe in 2007, almost 20 years.
So we're trying, Cody's trying to, and Megan are looking at in old survey plots, there's got to be, the well has to be somewhere. It has to be a well in that property.
So the bathrooms don't have water.
The bathroom is the only thing that has water. But you have to run, it's a significant distance from the bathroom. Right. Right. In one area. So you'd have to run a lot of hoses.
And that's kind of unrealistic.
When we did read the that section of the beach, and they put in, well, they didn't put in sod, they put in grass. Cody had hoses strung all over the place, but trying to, you know, water the sod and then have beach activities go was a nightmare. So it was always, you know, it didn't work well. Okay. So maybe another material.
at some point, besides grass or whatever.
So if a well was abandoned, is there any way to ? It's too big to say. Is it abandoned or is it going to have to be capped?
The fillet, the abandoned concrete is gone. But it's a lot cheaper to keep it open, to keep it . Yeah, there is a well right there.
They could have kept it and buried it, maybe, you think?
I don't think the DNR or something. I understand you can't just happen. That's why we're trying to get water people. You have to fill it there. Oh, do you? We'll ban it. Yeah. Right. The banning rock?
So that might be why they banned it.
I think the thing that we're thinking is, so we've put all this money into the beach. And once you step off the beach, it looks pretty ratty. It looks pretty awful. You know, the grass is terrible. I mean, even now, after it rained, it's greener, but the weeds are growing more.
Is this on any of our capital project lists? No. This is something new?
Yes. Okay. But it's also not full-time money to be on the capital list.
Oh, okay. I mean, well, for me to drill a well or something.
That we don't know yet.
Where's the water coming out for the restrooms? Well, there's an obvious answer. For the restrooms, you mean?
Well, there has to be a well. But there could be another well. Could be two wells. But if you have a well, right. So that's why we need the water people to...
Maybe it's just a bigger pump.
I was going to say, if we do have a car, maybe that's a solution. If we do have a well, maybe it's a matter of putting a bigger capacity pump in that well. And I can't imagine, I would think there'd be enough water source. That should never be an issue.
Well, and it's not like it's a house or a kitchen or where you're running a lot of water. There's the
So we'll have a company like Cater come in and take a look or...
I don't know who he is. He's got somebody from Green Bay, I think.
Okay.
Oh, that's for the irrigation.
I think Cater might be coming for the pressure tank.
Okay. That should be in the utility room there anyway.
But the utility or the irrigation people should be doing that also.
Yeah.
I think it's like a connection of... finding out what is actually down there, what is the pressure, what is actually needed to maintain. If you're going to actually go through a seating, what's going to maintain it? What do you need to maintain that? And what do you need to do it?
Because we're probably drifting a little bit off agenda, but I think I'd make a motion then.
Well, so, okay. So there's really two parts. Yes. Okay. Thank you.
Thank you.
Okay. And then there is also There was another page. Oh, yeah. There's also something about doing some landscape work at the Peg Egan, which is...
I didn't include that because it was agended specifically for the... Oh, okay.
Sorry. Okay. So we'll just drop that one. Okay. So go ahead, Scott.
So I'm going to shorten it, though, because we're only talking about Peg Egan for now until we get more feedback, right? So I'll make a motion to approve lawn renovations proposed... for Peg Egan Performing Arts Center and holding off on the Village Beach lawns as presented until more information is gathered with regard to the beach.
I have a question. I know we're trying to move fast here. But it's a decent chunk of money. Were there any other companies that were considered for the work that we heard from?
Mostly because of the timing. And these people can do it. I mean, we've tried to hire a landscaper lately.
Isn't that easy? Just to note, irrigation and pressure and all that stuff. The idea to get irrigation perhaps for a summer. Is it true to get it up and seeded and watered? And after that, God willing, nature just takes care of itself. Are you talking about the Egan or the beach? The beach. Why can't you just buy a pump? and a big enough for capacity because it's kind of a one-time thing it'd be ran for a summer go down turn it on it would irrigate and then turn it off and just suck it out of yeah they've had the pickup out off the beach i don't i don't have the i have no okay qualification to answer that either you know to go through all the work you're putting new well you know and all that stuff it's like much costlier than just buying them. Right.
Well, I think that's why we asked him to separate out the two because it seems like there are very, there's some pretty big unknowns about the beach. There are not really any unknowns about the Peggy Egan. So by separating them out, we make it two separate things.
One other question before we finalize the motion here. Does your committee have any concerns about the maintenance of this investment at the pay median over time?
No, Cody, that's fine. Partly because this is the last year they have to water the trees continuously. And he said they spend 60 hours a week watering trees. Joe they cut the grass at the beginning or the grass and the weeds that's what they do again yeah now they'll be cutting the grass it's more the irrigation watering I was concerned about because we go through these periods increasingly where we've got a month of no rain right and he said this fall is they're good because it wouldn't be seeded until late September early or no October yeah it wouldn't be seeded until sometime in October.
Yeah. I was just talking about on an annual basis. Right.
No, I mean, really it's the, you know, how much time the watering is taking up is just sort of crazy.
Okay.
And so when you give your crew back 60 plus hours a week, that's huge.
I was wondering how long that's going to go on. I'm like, maybe this is just a, this is the last week. 27 is last year or 26 is?
Two years.
I'll second the motion.
But we have all that so we have a motion we have a second. We'll talk to take a vote all in favor. Any opposed or abstaining. Motion carries.
There will be 21,000. Well dollars 44 cents and the motion probably should have included a dedication from by mail and so somebody want to.
I make a motion that if you find it from one balance in China. Thank you. Do we need to second and re-vote on that?
This is just a secondary motion to what was approved. So yes, a second and a vote, please. I'll second.
OK. But we don't have to vote.
Yeah.
Yes, please.
If we have a motion, we have a second. We'll take a vote. All in favor? Aye. Motion carries.
Thank you. Well, we've got pockets here and there.
Okay, next item is 3K approval of the land use by Dorff Central snow goers. So we see this request from them each year. It's essentially use of the snowmobile trail, which comes off of Bradley School Road through the, kind of around the fire station out past the parking lot on Church Street. And in the past, we have not allowed them to use the Church Street sidewalk. So then they would go in the roadway itself. Honestly, the past few years have not been great for snowmobile traffic. So I don't even know if it's been used at all. Maybe one weekend out of the full winter. Yeah, I don't think you ever know what can happen. But that's been our contingency previously is that they can't use the the sidewalk, that they would have to use the roadway itself.
And $20 gift certificate to someone.
There's like participating businesses that you can use it at. Oh, okay.
HAB-Terry Palmos- All right, we can get them.
HAB-Terry Palmos- It shows on the back of which we don't have a. HAB-Terry Palmos- Motion.
HAB-Terry Palmos- Door central snow doors second motion, we have a second we'll think about all in favor aye. HAB-Terry Palmos- No.
Winnie the Pooh.
Yes. All right. So this is I'll make a motion. Please, Joe. You go ahead. Yeah. Proclamation celebrating the 100th anniversary of the publication of Winnie the Pooh October 14, 2026 as presented. Well, and we rename Peg Harburg.
What are we going to rename it?
I picked Bee-Friendly Village and not to our pollinator-friendly landscaping.
I thought it was John that brought that up. No, mine were not. Mine were not.
Well, so one of my little kitties' favorite Winnie the Pooh stories is about the bees, the honeybees, and so I'm good with that.
Big lit point. motion.
I'm going to second.
Thank you. All right.
That's wonderful. We have a motion that we have in second. All in favor.
Aye. Good work.
That wasn't a roll call, was it?
No. Number 14. We have money for that. Thank you. Thank you. Okay, on to the village clerk.
Hit us with some important stuff here, Lynn. Workhorse.
Yes, workforce. So at the last village board meeting, you all sort of had a consensus that you were good with moving forward with switching software, financial software programs to workforce. So this is the actual contract in front of you for I don't know if you call modules, but items that we need, products that we need to function the same way we are currently functioning. I asked about the discount. They said they don't do that.
So I'm just reminding you.
I did ask. So I would ask that you approve so I can get some more information to try to move forward.
And we're looking at January.
To begin using and or Yes. I can't get any more information from him until he knows that he has an approved contract in front of them and look at what we have.
Do you have any indication that January is doable for them.
I don't know. I've asked him, like I said, until he gets an approved contract, he can't Tell me anything. Yes. Okay.
I've got a quick question though. Some of them have annual support. So will that be a reoccurring expense? I was a little confused there.
Yeah.
So all the annual supports will be, well, what's our total then?
This is actually lower than our current support with Cassell, our current software.
What is that number? At the bottom of 149, John. Annual subtotal and a one-time subtotal.
Right in line.
Well, I know. Okay. So the annual is a compilation of, well, accounts receivable, annual support. It's 8,000. Oh, it's 800. I'm sorry. Okay. Municipal. And then municipal accounts is 1,450. And then, okay. And then there's 720. Okay, good. So it's going to cost us.
So the support is just on the actual... modules. If you notice, there's two lines for accounts receivable, one that says training, one that says annual support. Yeah. So it's basically support on each module or each category.
So every category has... We have four annual supports. Okay. And the support should include help desk when needed? Yes.
That's what that is. That's what that is. And then also training.
You're excited about this?
Yes, I am. Fantastic.
Okay. Anybody else? I've got two questions.
So... Well, when the second line item in the quotas for the chart of accounts, admin COA accounting setup, they talk about that and the following page as something that's not not necessarily needed. So wondering about your level of interest in that.
Yes, I have great interest in that. Okay, fine.
That's okay. Second question has to do with the training options. So this is centered on online training 100%. They also have an option if it's more expensive, of course, or a hybrid of online and on site training. Are you good with the with what's quoted here, which is the 100% online training approach?
Okay.
Yes, I do better one on one. Um, And the online, I would be able to do it when I'm able to, like if I'm in the middle of payroll, I can't, you know, I also, it's just me looking at the screen. No interruption. So I think, you know, if somebody comes here, you've got distractions, you've got lots of people in the room. I can't necessarily see what there's up and I see, well, I have to get right up close, you know? So I feel like this is a better option.
Okay. Well, if you think you need somebody, you know, you can, you can do that.
All right. I look pretty good online.
That's actually your preferred mode.
Yeah. Got it.
I'll make a motion to approve the workhorse agreement for the starting date of January 1st, 2027. Second.
Wait a minute. But what if it's not January 1st?
That's true. Yeah, I think we just want that. Or the date that is agreed upon between workhorse and
Office. Well, if your possibility could happen sooner.
My guess is they'll start from December. Some of the prep maybe ahead of time.
You want to start the financial calendar?
We will not be 100% workforce by January 1st. I think the process will be starting on Monday. I think, honestly, the process to get fully in will take three, four months. So from what I understood of the book treasurers that I talked to about the transition, it takes months to transition. They get you one module at a time. And then, like I said, we're going to have to have PASEL support probably for at least a year because we have to get through the audit where it's all PASEL yet. So there'll be an overlap of paying support for two softwares. hopefully be a read-only with Cassell. Well, hopefully that'll be cheaper. I have not inquired because I don't have enough info to give Cassell as far as how long do we need to support.
Okay. Yeah, but you'll have to know where to go for data entry and where to go for read-only and transition.
So until I can get this in front of you, of course, as an approved contract, I can't get more info for you. So maybe just approving the contract. Yeah. Starting sometime and, you know,
27 mutually agreeable yeah so. So we have we have a motion, and we have a second that will take about all in favor. Motion carries. Yes, yeah good. room test.
It's a bigger number.
Yeah, it's good.
So can I just ask a question about the room tax? So the DDC gave this one time $7,900 for the 4th of July. Where did that money go? Well, where did that money go? My question. Fireworks. I know, but did it go to the fireworks company or did it go to EHBA to pay for the fireworks?
It came to us and then we're going to remit payment to the EHBA and then pay the final fireworks bill. Okay, so he has to be a paper fireworks bill. Yes. So the private donation that we get for virus comes to the village and then we remit that over to each be in a final bill.
Yeah, the daughter doesn't want to donate to the HPA. They prefer to donate to the village. Okay, for transparency. Well, no one set out there. Okay, I just was curious. I didn't know. Great fireworks to Yeah. Any other questions on that? Revenues and expenses? I have a question. On revenues and expenses or the room tax? No, revenues and expenses. Okay.
So on page 152, there was a fee in lieu of parking paid for $750. Who paid that?
That is in response to some short-term rental licenses. So I think Village View Condos and maybe Meadow Ridge have some licenses that are paying into that.
So that'll be an annual? Correct. Good catch.
I've got a question on that. Licenses for short-term rental? So year to date, we're at 23,215. We have a budget of 25, so that's pretty close. Just wondering if we took anything in more in August.
I have a handful of checks that were awaiting license approval, so we don't pass a check until the license has been approved. And then we sent out three cease and desist letters, and we're hopefully going to get... licenses from them as well.
Gotcha. It'll get pretty close to budget. That's good.
There, I have a question on that page. Maybe for you financial goers. Interest on investments looks like it's markedly more than we budgeted, and that's always a good thing.
Yeah, but there's a caveat to that, Scott, which is There is some utility fund money that's earning interest on investments. It gets all booked to the general fund. And there's kind of an adjusting entry that's done at the end of the year. So we look at the combination of our budget, the general fund budget, and utility budget. Utility budget has 90 grand. So there's a total of 140 budgeted for interest. And I think year to date between the two funds, we've booked 130 grand roughly. Okay. So we're going to be positive overall, but you have to look at not as positive as this would indicate. There's a big budget number in utility.
Okay. Is there any desire to segregate down there? Did we talk about that?
Well, we do segregate. Lynn segregates via an adjusting entry at the end of the year. Can we do it? Yeah, with helping accountants. Yeah. Can we do that on a monthly basis? I don't know.
They laughed at me when I asked them. They said it was way waste of time.
Okay, that's fine.
That's fine.
So we're looking at a report today in the draft of a scorecard. Okay. And in the scorecard, we've got our interest income looking at the combination of both. One thing that came up with the AT&T dollars that are sitting on one of the LMS funds that generates probably about $40,000 right now in interest. That's fantastic. Yeah, but that's going to be going. No, I know. Being paid out to AT&T once they complete their project, which should be early 2027. So there's 40 that will be coming next year. Well, yeah. 27 will be a lighter budget year. Yeah, yeah. So, you know, it's there, but there will be, if we scale back a bit, 40 off of one. Have we only made one payment to 18K?
Okay. When's the next one due? Should be, you know, probably past.
It may be completion of the project.
Uh, there's a couple more dude. No, I thought there were a couple of jokes.
I think we have some more questions on page 1 56 unless someone's got questions before those pages. No. Okay. Um, okay. So these have to do with revenues of the peg again. And the Winter Concert and the Crest Winter Concert. So I just was sort of confused about Winter Concert and Crest Winter Concert. Isn't that all the same thing?
Yeah.
So that should just one or the other of those should be missing?
Well, so Winter Concert donations, those are like donations that come in This is the start of the season. Oh, sorry.
It's ticket revenue. So there's a ticket revenue and then concert revenue.
So is the concert revenue if they take in donations during the concerts?
I don't think it's donations. I'll have to check. It might be a duplicate account that I created.
Well, it would only be if somebody made a separate donation.
Well, it's not a necessary.
There's also a donation.
Yeah.
That's a sponsor. Maybe they should be merged.
Yeah. I'll check and make sure it's not the same thing. It's the same thing. And I could just still want to transfer.
Okay. And then under the expenses. Okay. So the winter concert. Well, first of all, there were winter concert management, performances, marketing, and then there's assistant and venue rental that have no entries at all. So are those things that they don't normally have?
They happen in November for the assistants. The venue usually happens December, I think. So we haven't happened upon those yet for this year.
Okay. And I'm just wondering... What body determines whether these are viable or not or to do? Is there? This body. This body? The area budgeting that's coming up. OK. Yep. OK. OK. All right.
That's a lot of expense compared to .
Yes. Yeah.
Without duration.
OK. That was one of the questions. And we have any other revenues expenses. Or should we Move on to the joint. Anybody have any questions on the joints. Think there's the profit and loss for the lie and other status, the fire. Well, then summit to me. He's ham for all the time for the pairs of dogs. Well, soon it will be here.
When do you know when the third party accountants going to take over?
That was January 1st, January 1st of 2027.
Why would the so this I'm on page one of three here. the first couple of line items there for income, bills, operations, receipts, and time. So why would the annual budget be so much smaller than the January through July actual?
Probably I'm not going to be able to. This is all QuickBooks, and I don't use that software. And I have no way to look at it. So I'm probably going to have to just refer the question to Pam and then get back to you for the next one.
Because we... We've been down this road multiple years with the town. We know what we're, you know, through our budget process, what we each plan to contribute toward both services. It just seems like a weird.
It could be a wrong way she entered it. I, you know, until I inquire with her, I'm not going to necessarily not answer. I don't have a way to look at it or.
What are you talking about, Joe? The joint operations?
Yeah. So the village and the town both contribute an equal amount. Hopefully that'll change in the future. But for now, that's the way it is.
Actually, there are pennies.
So three quarters of a million dollars. But there's a budget there.
I know it doesn't make sense to me, but I don't... $22,000. Is that the money, Rob?
I don't think so.
Well, that's right. The truck wasn't paid this year. That's got to be...
I thought we...
It was budgeted a couple years ago. Yeah. But it was paid. It was paid. So we did an amendment. We did an amendment, but I don't know. And she probably might not have adjusted the budget in the system after the amendment to the budget. We want the account. So I can.
Yeah, we definitely. And then it's reason number 32. We touched on it. Where is the discussion with regard to a fair balance of the fire department funding on that?
We're hoping to meet next week.
Next week. OK. So it's coming along, at least. There's more.
Well, I think we need a higher sense of urgency from our standpoint, because this will.
That's what I'm trying to figure out, how we can help or whom we can help. Yeah, right. Further or faster by budgeting?
Probably more upon the next meeting, Scott, because we'll have a meeting with them. Are you aware of that? OK.
What's going on?
Yes. Yes, I think I can always ask the next meeting that would help you better to wait until we actually have a comment. Well, I mean, just so you get your questions answered this year, I can always ask the plan for the attend our meeting, you know, by zoom just to be there to answer questions. Because I don't have access to the software. I don't
Yeah, we got it.
And I think we should know. We should know the answers. Well, why don't you just ask her the specific questions you have.
It's probably easier for her to do than attend a meeting. I mean, if you just have a very specific question about a specific line item.
I think where the rubber meets the road on this is have our contributions toward the joint expenses for fire and emergency management services Are they adequate for your experience as we move through the year? And I think my sense on that and from looking at this is yes, but I'm not quite sure to be honest. I don't know how this current balance of 300, I'm looking at the bottom of this, where this current balance of $374 is coming in. I'm assuming that's just your for checking account balance. So yes, it's a little challenging. I don't feel a need to drag Pam into a meeting. Maybe Mark can help me understand when we get to a meeting.
And maybe at our upcoming October joint meeting, you should maybe kind of, because we'll have some, hopefully, Some financials that we put in. Over. So can we move on then to consideration and possible action? Opening a commercial Platinum Plus money market account and a three-month CD for Egg Harbor Marina accounts through Founders 3 F3.
Did we just, I had none. No, this doesn't have a cover page, so that's why.
Okay, it's on the agenda.
So where is it? Where is it held now?
It's not in a business account because they're business. We're a municipality as a government. So a business account won't put the same interest advantage as a government.
So we get better.
We get better. We have schools, municipalities, currently to Nicolet, we have special accounts that get the sweep of the money markets to get a higher interest, which is something we work towards. Quite a few other municipalities do the same thing, and school districts in our county.
Oh, good.
So Joe inquired with the founder's three people to inquire with Nicolet Bank. Joe, do you want to take it over? Sure.
So the idea here is, how can we put our money to better use? Because it's a lot of money, $410,000.
Is that what would sit in these accounts or this account? So we talk about well.
What we're what we're proposing is that he put 200,003 months. And then the remainder would work much like what differently, but similar concept to our villages general fund account. For daily needs and then how it's swept. Nightly savings account. Right. Okay. And three and a half percent. Okay. So we want to do the combinations kind of a CDS foundation. Yeah. And then any money we have above that, that can be invested nightly in an interest earning account would do so.
I see.
So we're, we're comfortable. We're only comfortable at this point in going out three months because we just want to make sure. that we get through that amount of time. And then we can maybe look at some laddering of CDs or, you know, it kind of depends upon the interest advantage of a CD versus whatever this interest-bearing checking account is offering. So.
Okay.
Longer term is usually higher. Right. Right. But I don't know that we'd go beyond six months. So I don't know if there's a huge difference. What is that? What's the current rate? I believe, John, it's in between three and a quarter and three and a half. Okay. Somewhere in that range. I made a note on that.
As opposed to...
Zero.
Well, no, as opposed to three and a half and the...
Which they can't get because they're not a municipality.
Ehlers is about 3.6. Nicolet is like 3.6. And the LGIP account is about 3.7. or 365. They're all right neck and neck for the municipality dollars. And then we go in private. I have them look like three-month CDs.
It's really close.
Maybe you get 3%. It's like $1,500 a quarter. It's money that...
It's better than none now.
Laying on the floor, you might as well pick it up.
So Founders 3 was fine with this? Yeah. Because you're basically taking it from them.
Well, no. They are...
Village money, but it's because it's their house, right?
They would be giving the ultimate instructions to the gas.
Okay.
And they presently are making a any interest on that money? No. Okay.
And it would be our interest. So yeah, okay.
Yeah.
So it's all been Nicola now. It's just a matter of reallocation.
Yeah. So with this body's approval, we'd like to invest in a short term, specifically three months CD $200,000 and then to start that sweep account arrangement so we can earn money on the other $200,000 or so that we think is going to float generally in that account.
Why can't you just take the CD money and put it in that sweep account if they pay the same?
Well, they don't pay the same. I think the CD pays a little bit more.
Do you need the Platinum Plus money market too?
Um, yeah, the Platinum Plus Money Market is that account.
Okay, I got you. Okay, I'll make a motion then. Okay, to make a motion to direct both staff and F3 Marina staff to move forward with opening a commercial Platinum Plus Money Market account and three-month CB for Egg Harbor Marina accounts.
Second. We have a motion, we have a second. We'll take a vote. All in favor? Aye. Motion carries.
Thank you. Okay. That's good.
Yeah. We're just not leaving $1. We're cautious. Not making us money.
Joe, do you want to follow up with that three or would you like us to?
I'm happy. Maybe together. I mean, I...
I'm happy to participate, but I think that would be more comfortable with one of you guys involved. It doesn't have to be both.
Okay. We can definitely do it. You don't have to.
Everybody's okay. I'm okay to be on it.
I'm confident. We'll just give him the go ahead. I think whatever that gentleman's name was, no one can remember. We'll just email and say we got the village board approval and he can go ahead and move it forward.
Okay. Sounds good.
Okay. Determination of additional $50,000 debt payment.
Remember the Marina committee approved paying $50,000 more towards the debt for this year than what was budgeted. I just need a little direction on what the village board would like me to do. If they would like me to this year, make an additional debt payment of 50,000. to that particular bond. Or if you want me to leave it in as a fund balance and levy less next year.
Nope.
Okay.
Agreed. I like to pay down the debt. Let's pay down the debt and it will also lower the levy for next year. Right. But I also want to ask why not more than $50,000?
It was more than $50,000 total for this year. It was just an additional $50,000. Beyond the normal amount. No, no.
I meant why not go beyond $50,000 for the additional is what I'm asking.
Um, I think we thought that it was aggressive. Um, so when we, we didn't, we didn't want to push it too far. Yeah. The first time we had made an extra payment at all the first time. Yes.
The Marina always contribute some. So that was positive. And this is beyond that budgeted amount. I understand. So that's the only thing I need to know what to do, how to proceed previously approved a budget amendment.
to do this at one of your previous meetings. I don't know if it was last month or the month before. And 50,000 we landed on because for last year, I think it was 2025, we had, I think it was only a $40,000. It was less then. So the 50,000 got us back into that range that we typically like to see on a regular budget year. After we had the dock damage from the storm and the chain replacement and all of that, HAB-Juliette Boone, The marinas fund balance wasn't in a great spot.
HAB-Jacques Juilland, Okay, so I saw a safety net and everything yeah yeah with regard to. HAB-Jacques Juilland, yeah yeah then we're on track to pay off by end of 29 or. HAB-Jacques Juilland, correct and end up there. HAB-Jacques Juilland, Okay, perhaps sooner, maybe next year we're sitting here well that's. HAB-Jacques Juilland, Another 50 grand. HAB-Juliette Boone, Like.
Post-COVID, 2020 or 2021, the marina had like a really exceptional year, and I think they did an additional, maybe in the budgeting process for next year. But yeah, I mean, there's always, you know, the opportunity to have this conversation and contribute more, but this was just kind of to make up for that reduced debt allocation by the marina, specifically last year.
You can't read that?
What does that say, by the way?
In the finance meeting, it came up that the marina, it's going to be paid off in the 29.
Well, 29, we have right off the cliff in terms of our- I think in 27, there's another downstroke. Right. Little one.
No, not that little. $300,000? No. It's a little light and low. Do we need a motion? Yes. I'll make a motion that we direct staff to use the $50,000 in the debt fund to pay off the marina loan in 2026. at your earliest convenience.
Yeah, the extra $50,000. Yeah, the extra $50,000. Do you have a second?
Do you have a second? I second. OK, so we have a motion. We have a second. We'll take a vote. All in favor? Aye. Motion carries.
So we've got pages from 173 to 178 that are unintelligible.
It's just detail on that loan, I'm assuming.
Yeah.
On the marina loan.
Yeah.
Okay. So nothing to see here.
Well, I mean, it's basically an encapsulation of that page you can read, which is 173. Okay. There's just more detail in what we got there. Right. Okay. So, I mean, if you're looking at a laptop, you can blow it up and obviously read it, but printed. I got you. So that, 173 was an Excel sheet and I'm guessing it just got formatted funny. The Marina, when the Marina Committee looked at this, they just saw page 173. Not all those other, so I'm guessing just how it got attached it was.
Okay, so nothing interesting. review. We made the motion, we approved it, and we're good to go.
Okay, so we're on to the Finance Committee.
Unless Village President has anything to say. She doesn't. She doesn't know anything. Then Finance Committee. So they meet, obviously, prior to your meeting. So this is their meeting when it's been last month. They met this morning at 10. Joe or Mike? Sure. Any comments?
Yeah, we spent probably a decent chunk of time on a version of a financial scorecard. So what we're trying to do there is pull together some key financial metrics to share with this body, as well as headlights for ourselves on things like how our fund balance is coming along our cash position are interesting when compared to plan and debt. So our policies last that we approved a time or two ago with respect to your debt management policy and the fund balance management policy, you know, created certain thresholds we want to operate in. So where are we with respect to those thresholds, things like that. So our review could be quicker because you'd have everything housed within the scorecard and That's right. Easy to move forward. Lynn's going to help us with some fabulous charts and graphs.
Visuals, you know.
Yeah, through a workhorse.
No, not a workhorse.
Chat, keep, or something. Yeah, that's it. So this would be a... So it would be like a slide, basically, that you'd see. Right. The Financial Scorecard Incorporation and how everything's looking.
Right. Okay. How we are with those metrics and debt. Yeah. Okay. It's, Not a calendar, but it's, we talk about starting, you know, having that scope on a quarterly basis. And it would begin after, well, except next month, is the equalized value.
So fourth quarter, we'll see the card?
Probably December. Yeah, we're still, I'd still be fidgeting with it for a few months. And then we have a December, March, jimmy bacao, jimmy bacao, jimmy bacao, jimmy bacao, jimmy bacao, jimmy bacao, that they had been put together with went up with your taxes, your property taxes. The backside is a breakout with the debt that the village has, and it's got some charts and graphs on it. And Paul really thought highly of that. And that would be kind of encapsulate the debt. Cause you can see what the debt initiated and the carry forward, what it was paid, why the debt was taken and then eventually So let me just take that one step further in terms of Paul's attitude. So there was a pie chart and three quarters of the pie chart or $2.1 million is debt service. One quarter of the pie chart, $700,000 is our operating budget. And he was drawing a contrast to, was it Langley County? Yeah. That operates entirely without debt. And so they just, they just did it one year. I think that was a great year for whatever you want to say. Great. It was a year for Langley, but he's not looking for zero, but he's looking for something much less than 77. And he made that 50. Right. Did he get it down to something?
I'm guessing that's not Applestone, just Langley County.
No, I mean, every municipality has their unique scenario. Yeah, you know, and there's some ways, you know, not trying to paint the bright side, but what he was saying is that we are on one end of the spectrum. They were on another. He would like to see us move toward less debt. So we have more operational expense. Yeah. So we just. Well, you don't though.
What do you mean you have more operational expense capacity at all? Our operating revenue is controlled. Well, it is John.
But if our operating revenue is $2.8 million and we're spending 2.1 for debt service, that leaves 700,000 for general fund and other fund expenses, right? if next year our operating revenue is $2.9 million, but our debt service, we start to move that down, say it's $2 million. Now we've got 900,000 for operational needs versus 700,000 the year before, just kind of shifting No, but proportion.
It's not quite that way. Yeah, it's not quite that way, which I don't believe. There's a levy limit on your general operations. That has no levy limit.
You can levy up to your percentage. So we can't increase our levy limit after debt's retired. So we can increase the levy limit to cover the debt payments. Only the debt portion, yeah. Only the debt portion. So it's not like if you retire, that's That $700,000 of debt that we talked about, that doesn't automatically. So that wasn't really made clear. We talked about doubling your operation. Yeah, yeah, yeah. Okay, I didn't understand. Yeah, yeah, yeah.
Sorry, I didn't catch that. So we don't take that, Paul. So we don't cancel the capital project.
Paul's getting a little overexcited there with that.
Yeah, because we're going to take on more debt.
Yeah, I'll do that for Sister Bay. All right. Well, we talked about that.
An exercise?
Well, I mean, I think you want to be in context with people that you're actually in context with.
He was actually going to look it up for some of our meetings. It's just, are we high, low, in between?
Well, I think Sister May was, you know, they were at their max. Really? Yeah. Well, they were.
I think they were 80%. Yeah, they were up to 80%. Oh, yeah.
Yeah. So, okay.
A lot of ways is the only way to.
I mean, I don't think. Right.
Yeah.
I mean, we aren't as low as the town of Big Harbor.
Well, they don't have infrastructure. Yeah, exactly. They don't have parks.
Projects that, you know. So we're all learning together on this finance committee. It's good. Yeah, me in particular, both been helpful in educating.
Okay, particular book. So next fire commission next meeting, the 21st of January. I've got press billion committee. They meet on Friday, Friday, parks and public works committee.
Okay, we had a meeting last week, Wednesday at the beach. Um, and so we talked already talked about the rip rap. Um, thank you very much for that. Um, the project is on schedule. Skylar Taliesin was at our meeting. He said he had brought my car in as kind of a observer, just to kind of overlook what Mike Cole is doing from ironworks and everything looks good to my car. Um, and it has looked good to Skylar too. So he is, um, very. Feels like the project's right on schedule and it's being done well. We looked at the grass areas. We looked at the playground. We talked about the playground has bark underneath it. And it was very, very, very weedy and very bad. And they had weeded, but so we're going to look into potentially changing out that bark and putting in the same kind of surface that we were talking about putting at the new playground. which Megan got a bid for, and it's $30,000. So we'll see about that. But that will potentially go in for our budget.
The playground is being used, even though it's shabby.
Yeah, I think it does get used, yes. The equipment is fine. The base is terrible. Actually, the whole base of everything at the beach, except for the sand and the water, is terrible. We also talked about the biofilters because they are pretty awful and they are very, very, very weedy. And Cody has done some work on them in the fall. And so he is actually going to start looking into what they can potentially do to make the biofilters just the grasses instead of all the weeds that are specifically along the parking area. They have the same effect?
Essentially.
I don't know. But weeds tend to take over what is already there. So if the biofilters are the important, the grasses are the important thing, the weeds are taking over those grasses. So you need to kind of look at that study.
Just for reference, a biofilter is weed or grass or is that just tone that you have?
It was what was planted there to control the runoff. HAB-Masyn Moyer- But a bio filters. HAB-Masyn Moyer- Right. HAB-Masyn Moyer- Originally, when this. HAB-Masyn Moyer- project was undertaken and you know it's. HAB-Masyn Moyer- A lot of the landscape, what we would consider attractive landscape in the village has just kind of been on the back burner because of all the other projects. Cody said the new guy he hired is very specifically knowledgeable about that. So he's hoping to work him into that capacity a little bit more to be able to actually do some work on our landscape projects instead of just cutting grass, which is kind of what they do right now. So we're looking at that. We're also looking at the gardens at the top of the lawn underneath the sculpture. The master gardeners spent a lot of time and energy putting perennials in there and now that's all weeds too. So no, it's basically the, a lot of the landscape needs to be freshened up and taken care of a little bit better. So that's what we talked about there. Okay, we talked about the beach and the water and not doing the herbicide and planting at the beach unless we have water source, which we do not know that we have right now. We came back here. We talked about the walking path that you all have talked about. We've talked about on E. We got a bid from Mike Simon for a cost estimate for just the engineering, which we all kind of gasped at because it was very, very high. It was $121,000 just for the engineering portion. So we talked about a couple of different things, potentially shortening it, some other things. He is going to come to our meeting in October and give us some more information about that.
Did we apply for a grant?
Is that because we just know there's no grants out there for this kind of stuff?
Not necessarily, but we're not... Anticipating it being, we will have many more requirements if we take greater funding. My original conversation with Mike was we wanted the simplest approach to getting a walking path there. And if you apply for grant funding, there's just more, oops, you got to jump in, compliance with different things. And we probably would end up costing more.
Okay, question on the quote and how it might change with change in size, length. So just to confirm, the 120 covers from Church Street to Apple Ridge? Correct. If it went from Church Street to Ames Farm slash Orchards?
I would say that's only the third of the total.
Well, I would say distance-wise, not whether that relates to... Do you have any sense if that would cut the quote by a commensurate amount?
Potentially.
Yeah, probably. So here was our discussion about shortening it and just potentially doing the path from County E to the service road at Ames Farm. Right. The service road is what we're talking.
So that's a second entry. Yeah. The second entrance. Right.
So, so our discussion was about how Apple Ridge has a, an interior path that goes from somewhere in Apple Ridge through Apple Ridge down to the service road somewhere in Ames Farm. And whether or not it was good enough it would be good enough to just put the walking path along e to that service road because a either people going up the hill or people going down the hill would know that they could go on that path um to get up or down right and so that is a big question mark because it is a private path and it's really not super well marked and if only the people in those two areas know about it, then is that really enough for the village to be putting in a walking path? That would actually be what we want is a safe way to get up the hill.
I would think so. I mean, if Apple Ridge folks know about it, they're the ones that would be coming from.
But other people might be using it too. So then there's the whole question of if I decide to do it, I don't know where those paths are. I don't know where they start. I don't know where they end. I don't know whose property they go through. So there's that question too. And actually I was going to try to do that, but I didn't have time this week. I'm going to do that before our next meeting, go up one or the other and figure out where those paths are, because that's kind of important too, if it's very visible and very easy. And if everyone thinks that's enough, then that would cut the cost down really drastically. And it also, Megan is very concerned about the water and the drainage kinds of deals along key and feels like that's part of the reason why the engineering costs would be high. Just to make sure that we are taking care of that storm water and things. So if it's shorter, then it should be less.
And this wouldn't be part of the trails initiative then?
This would be separate? Well, so in light of what Joe said, but that's really a lot longer term. He said connectivity to Bailey's Harbor. And so if this trail ran up to the top of the hill, it would be, I think it would be You know, maybe the obvious route would be just going right down, you know, all the way to Dallas Harbor. Right. So, but that, I mean, do we have to, should we be connecting the two at this point or.
Where does the village end? Up there it ends. No, it ends Sequest. Basically at the end of, uh, the Apple Ridge development.
Yeah, the sequence property. No. Okay. All right.
So if the town did it, if we went to Apple Ridge, the village would be kind of at the end of the limit on E. Correct.
And so, I mean, that would be something to think about in terms of how far we extend that trail. But do we want to do that now or do we want to do something that's more financially feasible and then just develop a trail from wherever we stopped to, you know.
As an aside, Steve played golf with Matt Meachum last night, who has a hotel in Ephraim right in front of where they just put their walking path. And I asked Steve, I said, just ask him if he knows what their engineering costs were. It's on his property. He thought that seems really, really high. HAB-Masyn Moyer- 121, however, you know it's probably different circumstances that. HAB-Masyn Moyer- Yes, and private property and don't know you know what kind of stormwater yeah problems there were with that, but their entire project was for 5470 or something so. HAB-Masyn Moyer- You know I don't know who knows so next week next month Mike Simon will be at our meeting, we will ask him more questions.
HAB-Masyn Moyer- No um. One of the things I raised last time, Megan, was whether or not Jack Johnson would be willing to make a contribution toward such a path on behalf of all the folks in the orchards.
That would definitely be something that we could approach the orchards board about, which I don't know if Jack serves on that or not. Obviously, it could be the connector point, but I think they would potentially have an interest if we had some plans. I think the complicated thing is when you ask somebody to contribute to something and they don't know what you're talking about or what it looks like. For actual construction, I think they'd likely be willing to make some sort of contribution. They have expressed that in the past.
However, they also wanted it on their side of the road.
Didn't they? Well, not necessarily. Okay. I thought that was his original, that it would be on the orchard side of the road, which makes no sense. I don't think, I don't know if we ever got that far in discussions, honestly.
Okay. You know, for them to cross the road and have a safe walking path, I don't know. Oh, I know.
But I thought in the beginning, he was going to donate land for us to do that on the orchard side of the road. I thought that was... Well, but he doesn't have that.
No, you know, there isn't that much land. I mean...
Well, I mean, it never made sense. Right. I mean, to connect from there from Gulf Village Drive. I mean, yeah, there's hardly any property there in terms of what we need for the path overall. Crosswalk or something.
Yeah.
Yeah. So I don't know if we ever got that far in conversation in terms of, you know, what it would actually look like besides him just mentioning that that was a possibility. So.
So we'll get more information after October's meeting and move forward from there. Our next thing we talked about was reviewing the memorandum of understanding with the Door County Pickleball Club. And we all agreed that the memorandum of understanding was appropriate and we'll proceed with that to the proper committees, to the committee members of the Pickleball Club.
So you'll see that all of this body wants the pickleball or sees it and gets the thumbs up.
And we also just agreed as a committee that this project has been approved for a six court pickleball court in the very specific place where it is and we want to proceed as it's been approved.
Any word on the playground?
Uh, not exactly. Well, well, yeah, we have some updated plans, but we're still working on. Yeah. The committee didn't talk about that. Yeah.
Um, state highway 42. So as you sure remember the tap section feed and weed, weed and feed has never been, has not been done as it was supposed to be done by that advance. Um, and, uh, the village and really wants to close out this project, which they cannot do because there was $5,000 withheld from advances contract until they actually did that. So Megan told them that they were done with closing out the project. You did not come, you're not going to get your $5,000. And then they said, well, wait a minute.
Yeah, John actually told them and then they submitted of pay certificate to get paid $5,000. So we're still working through that. Yeah.
Yes. So, I mean, it looks better with grass, but there are still some very specific areas where on the North for sure. Anyway, where it is bad. Yeah. So, um, okay. Then there was no green tier. Then in opening session, a couple of things that we had talked about. One is Mark Bradley who lives in, um, point beach area has multiple homes there. It contacted me about the utility poles, how when WPS installs a new utility pole, the existing utility pole is actually like this there and just wondering why they were left and if there was anything that we could do about them. So I contacted Megan. She's said that the old poles typically have the utilities on them, not WPS. So cable frontier. T or telephone and until they would move their wires on to the new polls, the old polls will stay and apparently we have no poll with anybody to actually get them to pace in that progress process. So we're just sort of apparently stuck with Polls that are kind of redundant throughout but He was not very happy about all the excess poles in their neighborhood. We also talked also something that's important about the curb and the crosswalk painting, which should happen hopefully soon. Cody didn't have a date yet, but they were going to wait till after Labor Day. He found somebody who's going to do it. So hopefully you will see some enhanced crosswalk painting and perhaps some curb painting also. And the brush pile is still there. Delivered equipment this afternoon should be starting tomorrow. Let's not change it. Okay. But we are still going to look at potentially putting some chipping equipment in the budget for 2027. So that we do not have this problem.
Like that would be sizable chipping equipment then?
Enough that we could actually not have a brush pile. Okay. that they could do it themselves. I mean, they wouldn't be able to do everything, but the majority of it they could do.
Okay. Can I just back up to the 18-teen poll situation? WPS. WPS, oh, okay.
WPS is who's replacing all the polls. And they've been doing this throughout the whole entire county. No, WPS.
Okay, okay.
So they've done this everywhere. This has been a three, at least three-year project.
So this is unrelated to fiber install.
OK. No, it's nothing to do with fiber install. But actually, now that you ask that, so is AT&T putting their fiber on the new WPS post?
Yes. Well, probably, yes.
OK. Which would make a lot of sense. Yeah.
And if any of that area has frontier, you should be able to come down, right? What do you have, Scott? I have spectrum, which is basically frontier. And that's all hung off the poles, right? Yeah. So, yeah, they'll be utilizing those poles.
We had ours replaced.
And they took the old one down? Yeah.
So sometimes it's just a timing issue that we talked about.
They eventually come down, it's just we don't know when. I mean, there are at least... 20 new poles laying in Point Beach right now, waiting to be, you know, pointed upwards.
They're laying in like the throat too.
Yeah.
And that was our report.
Okay, moving on to utility. We spent most of the meeting approving expenditures for equipment. So, How are the flows these days? The flows are good. They're down a little bit, but they're fine. That's good.
I feel like I could give Bert's report verbatim at this time.
Plant's running really clean.
It wasn't. And four, there's a bullet that says the plant was upset at the end of the month. What does that mean? Was he crying or was there an actual issue? Where is the report? The plant was upset.
No, it was upset.
Was it upset?
Yeah. What does that mean? Where there was four.
Something about oxygen. Dissolved oxygen.
Oh, the plant was upset at the end of the month specifically. The last week of July, dissolved oxygen was too low.
Yeah. So I guess they corrected it.
Yeah.
But just turning a bell.
Yeah, everybody breathed into it.
Yeah.
Okay, so they sold the sludge truck. He thought he'd get 4,000. He got 15. Oh, score the goal. Yeah, I know. Exactly.
That came with a load of sludge, though.
He's your only. Oh, yeah. So, yeah. Okay, and then that's pretty much it. The Don Lane thing, though,
It's about $6,000 on Don Lane where that new sewer was put in, the main line. That's for repair of asphalt repair. Is that out of their pocket, not ours, right?
Yeah. The contractor was a little reluctant to, the asphalt contractor was a little reluctant to come back and do it or didn't want to come back and do it. We said, well, it's the responsibility of the prime contractor, so get it done. Excellent. And another thing, right, that won't be paid off.
Well, yeah. And my correspondence at this point has been like, this project should be closed out now. We're waiting on finalizing special assessments, which needs to be done.
Yeah, that's very important.
So, yeah.
Work done. Talking about the Darlene sewer extension.
Yeah.
Okay. So back charge of the, you know, the recipients of the Yeah, and that those ones haven't been received yet.
Right.
The bill seven nine process or the final assessments have not been concluded, right? Because the contract is still open.
So something else that we have to focus, because I know it's something diligence.
Spence, but not a revenue for that. Correct.
Moving on. Okay, Black Commission, Black Commission, Black Commission. Try to make it fast. So we are working on addressing the requirements of State of Wisconsin Act 173, which basically is an update that states within your zones, you have to have a declaration of density, essentially. So we're trying to get ahead of the game and do an update the master plan and or to add a corridor plan to a certain area too. In addition to help work through what is Murphy Park all the way to the beach entrance into that five road area. And that is an ongoing discussion right now in terms of how to exactly approach that. We're taking a look at actually mapping the new ordinance 152 and laying out where the six zones are going to go. Right now we have four and I get pummeled, but questioned about where does my house reside? Where does my business reside? And so I can't answer that until we start mapping things. And I'm looking forward to that exercise. And I don't know how easy that will be because I've never been through it, but I look forward to having a marker and a map on that wall and making, you know, color changes. HAB-Jacques Juilland, Great honestly, so we know, and I think we're going to have help from Gerbaker and and or the other. HAB-Jacques Juilland, Really.
HAB-Jacques Juilland, Like the people.
HAB-Jacques Juilland, yeah yeah.
HAB-Jacques Juilland, Okay, so they're both putting together proposals. HAB-Jacques Juilland, For all three of the projects that Scott just mentioned one quick correction, the quarter plan would be from the county have a G 42 intersection all the way to murphy park. HAB-Masyn Moyer- Yes, i'm from the village limit all the way.
HAB-Masyn Moyer- It'll be a transition zone as well. HAB-Masyn Moyer- In terms of defining what happens, where, when and what we can do within that corridor to include a golfers or whatever else is deemed necessary.
HAB-Masyn Moyer- But that's not all village property.
HAB-Masyn Moyer- It's not all village. No. So we're going to end at village.
HAB-Masyn Moyer- Well, so we have extraterritorial journey. zoning jurisdiction as a village over a certain area within the town. So that comes up occasionally with proposals for property division, close to the village limits. So it actually gives us a little bit of flexibility to do some planning outside of the village limit because of that extraterritorial zoning jurisdiction. So I just had a meeting yesterday morning with Brandon Robinson, who was here last month with Bay Lake, to talk about a little bit more detail about some of those components. So he...
HAB-Masyn Moyer- refresh my memory on that, and you know knew we had that jurisdiction, but it will come up as well, but it's that miles of overlap or hundreds of acres of overlap it's just.
HAB-Masyn Moyer- A mile and a half yeah to I forget what the three maybe up to three miles I forget the threshold is so it's not a great deal of overlap, but it does give you some flexibility in order to plan areas that could potentially.
HAB-Masyn Moyer- be annexed in the future, and then the other update is we're working on chapter 153 which is shoreland. J. What wetlands zoning updates essentially we were talking about setbacks from wetlands what should that number be we haven't coalesced on a particular number yet. J. There were there was talk of 10 feet 35 feet in an aggressive 50 feet so we're trying to figure out what's most appropriate and then would impact areas such as point each. Those places that would likely sell a lot and be close to a wetland and how you would situate a house on said lot.
So are the wetlands in the village very clearly delineated?
If you go into the GIS site, Megan, that you go on and you can overlay the wetland map, that's what we have to work with.
So it is very clear.
I mean, it does change, though. But we asked our surveyor Last meeting, I asked him if he could indicate a wetland demarcation on a survey map. And he said, no, he has to have somebody probably stake it out. And then he put it on his map.
So there's the wetland maps that are determined by the Wisconsin DNR. Those are what is the layer on the GIS that you can see. But that's not necessarily reflective of the actual wetland boundary. You would have to have a wetland delineation done to determine that boundary. So that would be the private property owner hiring a wetland delineator. There's a list of those that are certified with the DNR. And then you would go through that process. And once the delineation is done, then Brian could take that documentation and map that as part of a survey. But he just as a land surveyor doesn't have that certification to make a wetland delineation. But you have, you know, the wetland map via the DNR that's on the GIS site is mapping where wetlands are likely. So it's a pretty good indication. That doesn't mean that there's not changes once the delineation is actually done.
Right. So your committee is trying to determine the setbacks, which is pretty important.
What are they now?
No, there is no.
Wait, that was our initial number in the draft.
Then we had comments. Oh, yeah, 35. And then we got to push back on that. And the comment was made, I think, that we discussed like 10. It was from a realtor. And then there was this discussion, well, what if somebody has grass and they're fertilizing the grass and the fertilizer is going to run up into the wetlands? Yeah. But, and so it was discussed, but 35. Well, so what if people have 35 feet of grass and they, they fertilize all of that. Yes. And that all washes off into the wetland. So I think, I think having a more restrictive is actually.
We also talked about infill too. Well, yeah. And that's the other. How much. Okay.
Janet Callahan- Jason. Okay.
Janet Callahan- And isn't that all my favorite.
Well, no.
My beach like this manner.
Janet Callahan- All on the shore.
There's but lens for that whole bird trail that will go if you get there's lots of there that
you know, half of the lot could be a wetland.
Absolutely. Well, a third might be.
Well, I think some of it's even more than that, Mike. You know, when you look at it, there's probably very little buildable space. Right. So if you have setbacks, 35 feet, you're in the road building your house.
Is there any particular landowner that owns a lot of those lots?
Yes. Yeah.
I think I know the answer.
I think I know that. A, it's not a B. Yeah. Mm-hmm. Well, my gosh, I mean, I mean, what is it going to build there?
It's not worth anything here. Well, I think if it's wetland, you can't build on it. What do you do with it? Right. I mean, your postage marks.
Yeah.
Bird sanctuary.
Scott, I have a question on the plant conditions. Unwilling efforts, this predates you joining. or taken over that as fair, the whole effort to come up with rezoning. And I know you had some public input sessions and stuff.
We've got feedback coming in and I think that's set for us as the plan commission review in the September meeting. Feedback was due the 8th, yesterday. So we'll see. Apparently there are a good dozen or so feedbacks and we'll take a look at what the public is saying.
A lot of them are the same. Where is my property?
That's a good theme.
Yeah.
Okay. Is that it, Scott? That's it. Okay. All right.
Kind of at the end of the season, technically it's October 15th, but we had a little discussion about, you know, how'd the staff do this year? And Allie said, it's okay. Little inconsistency. And then there were some issues with tardiness and motivation with some of the folks. But they had a star in the group. And I forget the fellow's name. Larry. Larry? OK, because reading the minutes here reminded me of an admin item I took. So I'm going to write him a letter saying, hey, we heard a lot of good things about your performance. We'd love to have you back. Are most of them students? Yeah, high school and college.
Does Allie hire them? Yes.
They're F3 employees, technically.
And there was a major, they didn't have any, I don't know if they had any returnees this year, cons or the home staff. But anyway, this Larry Stanton stood out. So I'm going to send him a letter encouraging him to, letting him know what a great job he did and also encourage him to come back next summer. We had to replace a mechanism at the top of the flagpole that was broken, so we couldn't raise and lower the flag and found out something very interesting, which was that it got fixed, but in order to get to it, a guy had to actually climb up the flagpole. I think he had a head start from a bucket, but didn't go all the way up. So I wish I could have been down there to see this.
Oh, so he, like, shamed it.
You'll see guys go up in the heli and they're sailing boats.
OK. OK. Anyway, but we've got the flag flying and raising lower in the bow. No problem. Thanks to this guy's efforts. We are still figuring out the best way to landscape these. beds, flower beds that were put on the break wall that just can't keep any vegetation in it because there's too much water that comes over. Still in progress with that. Reaching out to some other landscape companies. We looked at that, but it was uber expensive. 40 grand.
What about rocks? Those get washed out, but we talked about a larger stone. Maybe the rip raft. Right. Yeah. Well, that's kind of smaller pieces.
Yeah. Right. They're not all huge.
Yeah. Yeah. That's a possibility. We had some electrical issue that actually, this was a couple months ago now, a month or so, that's lighting an area of bringing some lighting for boaters to help them navigate into the harbor. And we've reached out to our normal electrician company to get an estimate for fixing it. It's very expensive, and they are not sure what even fixed the issue. Because of just the length of the conduit and how it got destroyed, it's just hard to tell what's the right. So we're looking into a solar option. to replace it. That would be hopefully not there.
Just leave the existing kind of injunction boxes in place.
Yeah. Okay. We talked about we had an initial conversation about the slip fee increase for 2027. Don't hear 10%. But we landed at 5%. We did 5% last year. It's a discretionary It is. Why can't we do that? There was a strong voice for that.
You can have a budget workshop. This is just what the committee decided. Don't beat you up too bad. You can overrule. I'm not saying that.
I'm just the most curious. So we had one member that was pushing hard for something higher who's a voter. So he would have- So there you go.
That gives you the sentiment of the voters.
Well, we had two other voters on the committee that didn't mind.
Okay. Okay.
So- Whoever he is. Those are the highlights I would say. Okay.
Go ahead.
Well, I was just going to ask about, so you had your boat trailer parking discussion. Yes. You know, this is going to be a big deal next year when we have this. Pickleball. Well, on the playground and everything. And so is this something new? $150 seasonal parking?
Okay. So we just have a seasonal boat launch. We don't have a seasonal parking. Correct. Okay.
So what, so is this for at that parking lot?
And what does this, is this for a vehicle and a trailer or just a trailer or what is that? I mean, I think it could be either or. Well, a trailer and a vehicle takes up two spaces. Trailer takes up one space.
I think they generally keep it attached. So, you know, when you're pulling a trailer, you back into a spot in your car would be, you know, those are,
Right, but I mean, if we're worried and trying to figure out how we're going to redo this parking area to facilitate all these things that are going on, the marina is a big deal about that.
I think it's more trailer-centric because I don't think people are leaving their vehicles there for months at a time.
No, people have been leaving boats and boat trailers there for months at a time. That's where it would apply to.
So is that for the full season?
Yeah. And what we're doing here is we're mimicking what Fish Creek does. Is that what they charge you? Are you going to be certain about the slots you're going to set? No, I think we- Are we going to be up a little bit?
Yeah.
Okay. We're a little high. Yeah. So we went up.
But so is this, so, I mean, this is great, but I think going, when we get more into spring, there's gotta be some enforcement mechanism. How is that going to happen? Janet Callahan- Who is going to monitor whether or not you have this parking permit right and you're also going to talk about doing short term parking Janet Callahan- Not for the whole season. We have talked about that.
Janet Callahan- Well, short term, they already have a pass. If you're like using transit launch ramp or transient, then you can pass.
The marina already monitors that just gets tricky when stuff's left there. Right. So I mean, monitoring it and actually enforcing it are two different things.
Yeah. So let's talk about that. Yeah. So I think, I think what we talked about, correct me if I'm wrong, Megan, is having some new signage there that creates an enforcement mechanism.
Well, the advantage of the sign is that if we tow it, we can tow it. Yeah. Right.
Do we expect that we'll have a big hit in people taking this up that are local residents and they don't want to pay to have it stored at a... Well, that was a concern of the committee in the past when this was discussed.
Okay. We also talked about there being, you know, a certain number. I think where we landed on this is that I was going to pull the latest rendition of the parking area to figure out how many trailer spaces we had and how many car spaces we had. And we can definitely reconfigure that. I mean, being up at that site many times in the last few months, it could easily be re-striped. I mean, it's.
Yeah, you can't even see this.
But it should be delineated also. And then we also talked at the Harbor Committee about having maybe a limit on the number of these passes we're selling each year. So whether that be 10 or eight or whatever, so that it doesn't get inundated with people. So we have control. Yeah.
So the Sturgeon Bay, they'll actually sell you a pass which you apply to the side of your trailer.
seasonal 2026 you know pass and that's how you i like that yeah right you know we have that for the launch yeah give them a sticker for the trailer for the launch too but i could see where you know some of those spaces might have to actually have like marina one marina two marina three or something somehow so that people know where so their past car corresponds with where they're trucking the vehicle or their trailer or whatever just to make sure that I mean, I just think there's gonna have to be some coordination between the harbor committee and parks, make sure that that parking lot is the best use of the space for everybody.
Well, yeah, because certainly to be publishing a lot of paid for space. Yeah, I think step one, let's, let's get, let's get a view to what, what we've got there from volume of parking spaces. And then let's decide on a cap for trailers.
Well, right. And then also see if it needs to be re-striped in a different manner.
I think it will.
I think, yeah. You want pickleball. And where to do that, how to do that. Pickleball players parking next to the pickleball courts and the trailers. And then you have a pickleball player with a trailer. He could park anywhere.
And a dog. And kids.
And you know, good thing we have the outhouse multiple. Oh, right. Okay. Joe, what's the situation on the quay wall investigation?
It's happening early October. And we asked Ali to make sure you can be contacting them this month to make sure it was on their schedule to come out. Is it after October 15 thing?
So that's what the 16th is. Yeah, the investigative work. Okay. Okay. And then they're going to take out the asphalt and dig down to see what the situation is?
Yeah. I'm not sure how much asphalt they have to take out to do that. That should have been part of the business.
Yeah. Yep. It was in there. The square footage. I don't know what was in there.
And what was the cost of that?
I don't remember.
Yeah.
I know we have 25,000 in the budget.
I think it was like, yeah, that's what I was thinking.
We, you know, we borrowed a hundred thousand and hopefully we won't need any of that, but we'll see.
Right. Yeah. So I'm anxious to see here, the results of this. Yeah. Okay.
Um, plan commission, architect review and story preservation board.
Yeah, so they had kind of an interesting meeting. They started with a public hearing. They reviewed three properties, Chief Oshkosh, Calvary United Methodist Church, and If Ever Lifestyles. Chief Oshkosh had representatives there as well as the church. There's some legal concerns that were raised by the church in terms of designation with some different protections for religious properties. So their attorney provided some correspondence. We shared that with our legal counsel and we'll be meeting with them this week to talk about that before anything moves forward on that property. They also had the public hearing for Egg Harbor Lifestyles, which is where that old stone building next to the new condos downtown. There's some retail shops in there. So they approved, yeah, approved designation for Chief Oshkosh. and worked through that. The church was tabled, like I mentioned, and then we're waiting to see if the property owner for 7792 at Cover Lifestyles will attend the next meeting. Seems to me people don't get a whole packet of information in the mail, but I don't know if they open it or not. So we'll see. They also reviewed a site plan modification for Sand and Sun LLC, which is the escarpment condos on the north end of town. And that was their meeting. So I had a question.
Yeah. So let me see. Right at the very end, somewhere they talk about potential new properties. Yep. So the Alpine was out there.
So this is why you just talked about getting a report for that property, given that it is back up for sale. So we have that available if we would want to move forward with that.
Yes. Well, it's not a new owner.
Same one.
Price went up, by the way, in case you're interested.
Well, it includes all the cottages.
That's an argument I think that's being played out between.
I think it was played out, and that's why the price went up. Because the first listing.
I just heard that part of it. I just heard that.
The first listing did not include the cottages. The second listing includes, it very prominently says, includes 29.
Probably not wise to talk about. I'm not sure that I didn't.
Yeah, I mean, I'll put it down there just because they would like the consultant to have the report available to them and whether we move forward with consideration of designation is yet to remain a question, but we'd just like to have the report on file so we have it available if and when.
And then can I ask what the Browning property is?
That is the property at the corner of County Highway E and State Highway 42.
Oh, those cottages? Yes.
Is that one property?
Yes. They're derelict. Yes. Yes. So.
Yeah.
So they have to be preserved in that condition. Yeah.
Right.
I'm not hearing by somebody else or so I have to be careful, but they're derelict. That's all.
There's things growing in them. Yeah. Yeah.
Okay.
They were whitewashed.
So why would they be concerned about that?
Well, it's just probably that. Is it just the house?
I would assume it's the entire property, whether all of it is historically significant or not. I guess we'll find out once we get Tracy's report. But it was on the Woodstones. I can't speak for them, so. Okay. I don't know. Yeah, it's not an interesting scenario, I have to say. We kind of tailored this process, the ARHP board did, based on our consultant's opinion of what was likely to meet the requirements. but also those that we thought would be in favor of moving forward with designation. And I have to say there has been some resistance where I didn't expect it. So be that as it may, that's my observation.
So the end result is a plaque? Is that if there is an approval?
Well, yes, but also the expectation that the integrity of the historical significant components of the architecture be maintained. By owner. Correct.
OK. Current and future.
Correct. So is there a point where this whole thing is assessed of this body?
Well, yes. And also, the other thing to keep in mind is if the Architecture Review and Historic Preservation Board were to make a local designation, the property owner can't appeal that decision to this body. So ultimately, in the event someone is handed a designation that didn't want it, they can appeal it to you all. And then you can decide. HAB-Masyn Moyer- Previously, I don't remember exactly why we entertain this ordinance change, but our ordinance did require that the property owner be on board and that was eliminated earlier this year. HAB-Masyn Moyer- So, but that was the understanding that they still have the opportunity to be able to this body and you're the ultimate decision line with you all in the event of property owner appeals so.
HAB-Jacques Juilland- They need the property owners been informed that. Their properties have been deemed significant and they have accepted the designation as such?
Yes. So there's a tiered process in terms of correspondence that they receive. So all of them on the listing, there was like just under 30 properties that were included on the listing that was submitted to the consultant, received the letter saying, hey, the village hire consultants go through this process and your property is included on the listing.
Yeah.
No designation has been made yet. Once we get more information, we'll keep you informed. So when she decides that she, when she produces a report and then they get a secondary letter saying, Hey, your property met enough qualifications that report was produced. Then they get a notification that there's been an application file and a public hearing scheduled there have the opportunity to attend that public hearing. So it's a tiered process in terms of keeping people informed. So we had Less than a handful of people reach out when they received that initial letter kind of asking, hey, I got this letter and I need to know more about what it means for my property. Yeah, it was just a few which I have asked that an Architecture Review and Historic Preservation Board member join me for those meetings because they're ultimately the ones that are interpreting the information we're receiving and deciding whether that meets the criteria. But yeah, it hasn't been too many. Like I said, and then some that are further along in the process, Um, more than I expected. I've been a bit hesitant to move forward, honestly. So that's just my personal observation. I don't know if that means anything.
I'm just saying, um, but yeah, that was the meeting.
Okay. Uh, green tier.
Yeah. That's included in the acronym page one 99.
HAB-Masyn Moyer- Thanks for anyone. HAB-Masyn Moyer- For respondents and that is HAB-Masyn Moyer- Yeah, it looks like it was just, yep.
Do you see the letter.
HAB-Masyn Moyer- Oh, and the door kind of environmental HAB-Masyn Moyer- Correspondence HAB-Masyn Moyer- Okay, then, you know,
Can we do closed session? Yes, please. Okay. I make a motion to move into closed session for state statute 19.85, parentheses 1, parentheses C, considering employment, promotion, compensation, or performance evaluation relating to day of coordinator compensation and then to return to open session to take further action or to adjourn the meeting.
Second.
We have a motion. We have a second. Could we have a roll call vote, please?
John Heller?
Carter Norfolk? Aye. Scott Rasmussen?
Joe Megan? Aye. Mike Johnson?
Aye. Everybody?
I'll make a motion.
I'll make a motion to move back into open session, too. Second. We have a motion. We have a second. All in favor? Aye. Aye. We're in open session, and we're in open session. Anything permitting that an open session?
All right. We can just take it. HAB-Juliette Boone, And we can just so motion, can I just ask. HAB-Juliette Boone, The order of agenda items, so it made no sense to me to have Burke Sawyer and Justin mcdonald's sitting there waiting for their turn on the agenda. HAB-Juliette Boone, To go through an hour's worth of stuff. HAB-Juliette Boone, And so, is there a way to look at the agenda and. HAB-Juliette Boone, Especially down. that's working that is sitting here. Yeah. Okay.
That's what are we doing? Do we anticipate what's going to be in attendance and then, you know, schedule recording, right?
Right. You know, we have, you know, like HAB-Masyn Moyer- Different presentations or whatever we try to get those blame or like members of the public, like I knew they were coming to discuss the pickleball. HAB-Masyn Moyer- Why, I don't know who was going to show up with that as a so we try to get those people out of here, but we can. HAB-Masyn Moyer- Yeah yeah. HAB-Masyn Moyer- Yeah. HAB-Masyn Moyer- So.
HAB-Masyn Moyer- I would like you to pick a couple days for the village board budget. Workshops. The weekend looking at it is October 26th through the 30th. If we could pick two days that everyone can attend any time of the day. They tend to be four to six hours each time. Monday. 26th through the 30th.
I can do any of those days. I just have a plan commission on the 27th. That's all.
Megan, I didn't get the public second. No, I didn't get the meeting. It's the planning session.
OK. How is everybody else doing?
They don't have to be together. They can be like one day, like Monday and then Friday or Monday, Thursday. They don't have to be.
So they're two four-hour sessions?
They can drag a little longer, too.
We have to go through the budget.
So I am really not available on the 20th and Monday mornings ever. Okay. Or Monday afternoon or Wednesday mornings. We could do what Monday, Wednesday afternoon. So four hours. Yeah. It's not fun. Can we do a map? One o'clock or is that too late or is it 12 o'clock?
We could do Wednesday, Thursday. I don't know what your Thursday looks like, Karin. The 29th. We wanted to keep them together.
Is it better to have a day in between? No. I kind of like the continuity.
You can build momentum from the day before. I like the idea of consecutive days. I thought it worked well last year.
So I would say for me, it would be easier, I guess, 28th, 29th in the afternoon. Okay. And I Wednesday, Thursday.
Start at 12 is okay with everyone. So we have enough time so we don't feel pushed.
Yeah. Yeah. Yeah. Earlier, the better. Okay. Mantra, bud.
So 28, 29, if you can put that in your schedule, I'll send out invites to make sure. Noon, noon, noon. Noon.
Doan Nguyen- October 26 six o'clock. Doan Nguyen- Oh what's that.
Doan Nguyen- Another request from a particular alcohol license folder wanting to submit an application for premise a temporary premise expansion for pumpkin patch to be able to sell alcohol outside their premise shipwrecked. So they want to know that they would pay the $250 to have a special village board meeting because they just asked me yesterday. And obviously the next meeting that we have is after Pumpkin Patch. So the weeks I'm looking at for that would be September 21st or September 28th. All we kind of need is... We can do that virtually. It should be like a 10-minute meeting virtually. Whatever day you want to pick.
People come out of woodwork and they say, get everybody together.
Was there a time when they were supposed to do that?
They should have done it before... Friday before the meeting.
They just asked me yesterday in an email. How about if we just say no? You can say no. Or you should have done this before. Or they can pay the $250.
Well, if we have a... No, I know. But if we have a form, you know, we don't all have to be here either.
Yeah. Well, can you tell them next year, get it in on time? Or you might not get it? Yeah.
I think that's more powerful than saying, well, it's going to be $500. And don't think the money is...
But... You know, I just think...
They just get... Respective.
Respectful of
Yeah, I get it.
So what we Yeah, if you could click, I can tell you where we have openings in the meetings around here. And when we don't have other meetings, you have a week there that you would prefer me to
Or we could even be in September. We're done.
Yeah, because it's gonna happen before pumpkin patch here.
I mean, we can actually connect with your next little thing to try to be the ones fine. They've been proven at all. Monday, the 21st and Monday, the 28th of September.
I don't think so.
I may be on some I may be at its panel and may not have self-exception. I'm sorry.
Well, sometimes three of you that perform. The other two are okay with not paying $250. I can come to them and say this is the only date they have if they can't get ready by then.
What did we decide then?
Which week is better for the three of you, the 21st or the 28th?
Which of the three doesn't matter to 20.
Well, all you're doing at this meeting is approving it.
Yeah, sure. You could just come on to the line.
What are we doing? 21st? Yeah, I would not be available until 1030. Okay. 30 to 21st.
And 3021st.
And I may not be here because I have a doctor's appointment.
What about the day?
Oh, actually, no, I'm looking at the 28th.
Okay.
No, the 21st. Okay. Okay. The trustees are irritated. Well, I'm pretty sure they probably know.
I'll make a motion to approve the action in closed session.
I'll make a motion to approve the action in closed session. Second. We have a motion, we have a second.
We'll take a vote. All in favor? Aye. Motion carries.
Are we at adjournment?
Yeah.
I'll make a motion to adjourn. Second. All in favor? Aye. We are adjourned.
Megan, do I contact AJ or do you contact AJ?
It's up to you. Yep, 10.30, we never have each other. Okay, all right. Well, and I was going to say too, I don't even remember.