The City Council discussed several TxDOT transportation projects in Nueces County and received an update on the Hart Library. The council also addressed public comments on various issues, including AI data centers, water rates, and city governance.

About this meeting

Government Body
City Council
Meeting Type
City Council
Location
Corpus Christi, TX
Meeting Date
July 21, 2026

Transcript

632 sections

0:11Speaker 59

I'm losing my mind.

10:44 – 10:58Speaker 60

Okay, good morning, everyone. I'd like to call this meeting to order. Welcome to City Hall and Council Chambers. This morning, our invocation will be led by Pastor Jordan Shimon from Rock City Church. Shimon.

11:02Speaker 11

Good morning, Mayor, Council Members. Thank you so much for having me here to pray.

11:08 – 12:47Speaker 11

Lord, thank you so much for Corpus Christi, your sparkling city by the sea. And we come to you humbly asking for guidance and wisdom and strategies from heaven. We thank you for what you've done for our city so far by sending the rain to help fill up our reservoirs so that we can begin to at least lighten the load to what the water crisis is here in Corpus. We thank you for our leaders and our governing authorities that are here to make laws and make decisions on our behalf that are for justice here in this place that you love so much. I thank you, Lord, that your scriptures tell us that the coastlands by the sea will wait for your instructions. And Lord, we ask that today that the spirit of God would come and rest on us and give us a sense of patience that we might not move in our own will or in our own desires, but we would move in accordance with what your instructions are here for us. We thank you, Lord, for protecting this place. We thank you, Lord, that you are showing this place off to the country and to the world in a way. But Lord, we ask that you would protect it the way that we desire to see it protected, that it might harbor life and exuberance and fellowship and excitement and family. And we just thank you for all that you're doing here today. We ask, Lord, that you would come and move before us. and that you would make a way for all things to rest in your peace the way you see it, and not that we do. In Jesus' name I pray, amen. Amen.

12:48 – 13:07Speaker 60

Thank you, Pastor. And our Pledge of Allegiance to the flag of the United States and to the Texas state flag will be led by Rebecca Orozco. She is a Mary Carroll High School senior, graduated cum laude, and she is a Del Mar dual credit program certified phlebotomist and registered medical assistant.

13:10 – 13:37Speaker 31

Please join me in the Pledge of Allegiance. I pledge allegiance to the flag of the United States of America and to the republic for which it stands, one nation under God, indivisible, with liberty and justice for all. Please join me in honoring the Texas flag. Honor the Texas flag.

13:38Speaker 25

I pledge allegiance to thee, Texas, one state under God, one and indivisible.

13:46Speaker 60

Thank you so much, Rebecca, and good luck in your studies.

13:48Speaker 25

Go Tigers. That's right.

13:53 – 14:13Speaker 61

Ms. Huerta, would you please call the roll? Mayor Paulette Guajardo. Present. Council Members Roland Barrera. Here. Sylvia Campos. Here. Eric Cantu. Not here yet. Gil Hernandez. Here. Kaylin Paxson. Here. Everett Roy. Here. Mark Scott. Here. Carolyn Vaughn. Here. City Manager Peter Zanoni.

14:14Speaker 61

City Attorney Miles Risley. Here. Mayor and Council, a quorum of the Council and the required charter officers are present to conduct the meeting. Thank you, Ms. Winston.

14:22Speaker 60

We'll go to Section E, and that is our City Manager's comments and update on city operations. Mr. Zanoni, you have two items.

14:28 – 15:15Speaker 20

Yes, ma'am, thank you. Mayor and members of the council, we do have two items on the city manager's report this morning. And the first is an update on several TxDOT projects that are happening in Nueces County. And we know TxDOT's an important partner of the city in developing our transportation network. So several projects are either underway or in the case of Northwest Boulevard have just been initiated. And so we wanted TxDOT to share with the council and the community the importance of these projects. So with us here today is Eric Martinez. He's the TxDOT area engineer, and he's going to provide this update of about five to six major TxDOT-funded and constructed road projects in our region, or in our county, I should say. Eric?

15:20 – 19:59Speaker 27

Morning. Thank you guys for having me. Eric Martinez. I am the Corpus Christi area engineer with TxDOT. just a few project updates. I was going to start with the largest construction cost project and work our way down, which is our State Highway 286 Crosstown Extension. That's the Crosstown Extension from FM 43 to FM 2444, which is Weber to Staples out on the south side. That is a new roadway and bridge construction. We got retaining walls going up. We have pictures going in. Currently, we are working on all of those things. You might see a lot of work happening in that area. We have bridges and retaining walls happening at the same time we're working on that southbound frontage road with earthwork and lime. Current contract cost was $79 million. That's what it's been at for 805 contract days of work. We're about 54% complete. So we've got about halfway done with that job from a dollar standpoint. We still expect our completion date on that project to be June of 2028. So we hopefully plan to hit that goal. Second project we're going to discuss is the state highway to get ramp reconfiguration project that's when you're seeing out there on S P I D between staples and Nile reconfiguration the ramps on that area right now at this time we're working on widening of our frontage roads through that section once we get those frontage roads widening drainage structures in place and we'll look to work on that main lane. The main lane work the main widening and reconfiguration of those ramps in that area. That's a $58 million contract. As it was led, we had 844 contract days in that one as well. We're currently about 25% complete. We're spending about $14 million into that job so far. So we still got a ways to go, but we expect to be completed on that project in August of 2029. FM 624, as was referenced, is the project that just started out there in the Catalan area. That's an extension of the Boulevard section from Wildcat Rd all the way out to County Rd 73. So we're adding a lane of capacity in both directions. Past Wildcat is three lanes up to that point. We're going to continue those three lanes through there. We've got raised medians in that area. We've got curb and gutter and drainage going in there as well as sidewalks and shared youth paths for pedestrians all the way to the end of the project limits. Currently, we are working on the County Road 69 widening portion of that project. That's the end of the drainage, the closed-loop drainage that will be going through that project. So we're trying to get the County Road 69 widening done before school starts here in August out there. That's a $31 million contract, and it's got 780 contract days, and we're about 7% complete. We started last month, so we're just at the beginning of that project. It's installing drainage and widening that County Road 69 road so that way traffic can get through there. We expect to complete that project in January 2029 as well. Park Road 22 Bridge Preventative Maintenance Project. That was a bridge preventative maintenance project we started back in November. Currently it is on a time suspension. We put on a 90-day time suspension at the beginning of July. We won't see them back out here until October to finish up the remaining work. The remaining work is under the bridge at the West Laguna Madre structure that we were working on in the end of June. All the other work on the other three structures, which is the Humboldt Channel, the East Relief Channel, and the West Laguna Madre Channel, we finished that work back between November to February. That's a $1.8 million contract for bridge preventive maintenance through there. It was 106 contract days, and we're about 81% complete. Like I said, we've got about a month worth of work left underneath the bridge when that picks back up in October. A few other notable projects. You might be seeing the sidewalk happening over here on State Highway 286 between Horn and Baldwin. On the frontage road there, we have an ADA remediation project where we're just upgrading the sidewalk over there to ADA standards for pedestrians through that area. A $900,000 project that's about 10% complete, but I think we're moving faster than that. It's got 92 days in the project, but we still expect to be completed by the end of the year on that one. Two of interest, I think, Yorktown Boulevard over the bridge replacement over at Calle de loso and then the Ocean Drive bridge replacement over at Calle de loso. Those are under contract right now, but we have not started work on those. We're currently waiting on material procurement. Give us a little time to get the materials in. We expect Yorktown to start sometime near the end of August and then maybe October on the Ocean Drive bridge. Those are the projects I brought. Other than that, we've got minor sign projects here and there. We've got other smaller projects going on, safety projects happening, signal projects. But those are the big ones. If you guys have any questions, I'm happy to answer.

19:59Speaker 60

Great. Well, Mr. Martinez, thank you for that information. How long do you think the Yorktown Bridge will take?

20:06 – 20:17Speaker 27

I've got May of 2029. It has 537 contract days in it. It's a $21.2 million bridge reconstruction is what it ended up as.

20:17Speaker 60

Can you give us a little bit more info on that one? You're widening it?

20:22 – 20:38Speaker 27

It's a bridge replacement and widened to four lanes. So it's matching what the city is constructing right now through that bridge structure and the other side. And it begins in August? It'll begin planning on August. We're waiting on material procurement, so it's manufacturers sending materials to our contractors until we can get going.

20:38Speaker 60

This is really good information, so thank you. I'm not sure if we asked you to To come give this update or if that was on your side, but this is very helpful to us.

20:48Speaker 37

Councilwoman Vaughn. So the Cal Allen 624. So we have two lanes now with the turning lane. So tell me what you're going to do. You're going to do three lanes or tell me.

20:58 – 21:13Speaker 27

Yeah. So there'll be three lanes and then there'll be a median, a raised median in the middle there. So there'll be access points much like the section from 77 to Wildcat is. Okay. They'll just continue median through there with different access points, but there'll be also be a third lane of travel.

21:13Speaker 37

all the way to 73.

21:15Speaker 37

All the way to County Road 73?

21:16Speaker 27

All the way to County Road 73, yes. Okay, thank you. Three lanes on both sides all the way through.

21:20Speaker 37

Got it, thanks. Councilman Scott.

21:23Speaker 34

The Crosstown extension, when's that complete? I'm sorry? The Crosstown extension out over... Oh, I think I had January of 28 or 29.

21:35Speaker 27

June of 28, so.

21:36Speaker 34

June of 28. You guys are doing a great job. I just didn't know the timing. Thank you.

21:40Speaker 27

That's our goal right now. I think they were progressing the job pretty quickly, so I think.

21:43Speaker 34

We appreciate you being here. We appreciate you bringing your pocketbook, and we appreciate the construction work you're doing. Yes, sir. Go ahead and get some more. Go get some more. Working on it.

21:51Speaker 60

Thank you, Mr. Martinez. We appreciate your time and presentation. Thank you, guys.

21:55 – 22:56Speaker 20

Yeah, thank you, Eric. And just for Eric and Ernie's business here, we On Northwest Boulevard when we had the public engagement meetings, one thing that became apparent was nighttime street lighting and Texas just replaces like for like with the city wanted more lighting, especially with the pedestrian use path will be. So we were to enter into some interlocal agreement to add more. So we'll just follow up on that as well as something that the community expressed interest in. Yeah, but with that nice shared use path and especially by the school. At night, it can be pretty dark. So we're going to improve lighting as well. Great. Thank you, Peter. Okay, good. Thank you again, Eric. And thank you, colleagues and Mike Walsh at TxDOT because we do appreciate the partnership that we have with TxDOT. The city is in the road business. Others provide transportation services. network improvements here as well, including TxDOT and the county as well, Nueces County. So we thank them all for improving our community.

22:56Speaker 60

Yes, we do. We have one more comment, Peter.

22:58 – 23:09Speaker 44

Just one quick comment. On this report, you know, it's not visible to our audience. Where can we see the complete report that you just presented? Can you send that to us, maybe?

23:10 – 23:22Speaker 27

Is that something that we need to look up somewhere on what? I mean, I just wrote down some notes on things. I mean, this is a presentation that I just put some information on really quick. It's not really, I can get y'all something. If y'all want information, I can put a report together.

23:22Speaker 44

Okay, that'd be great.

23:23Speaker 27

Send it to Ernie, if that works. Just a summary of what you... Yeah, I can summarize.

23:27Speaker 44

We'd appreciate that. Thank you.

23:28 – 26:26Speaker 20

Great, and that sidewalk, Councilman Campos, would be nice over there. I see the construction of it. Yeah, that's real nice. Okay, great. So we have one other city manager report update, and that is on the Hart Library. And so we know this has had a lot of community engagement and councilwoman Paxson and myself and Many members of the council have been to several community meetings about a year ago. I think or more than that, but Just for background context and I'll turn over to Laura This library is one of two that we have in the system that is a shared use library And so we part we partnered up and some time ago with two schools two school districts, CCISD and Flower Bluff ISD, to have a library that has two customer groups, the school and then the general public. It's an old model. I think many cities in Texas, and maybe the country did this before, We had issues with gun violence and other issues on school with states like Texas have put stricter rules on who can go in the library if it's on a school campus. So that's caused a little bit of an issue in the business model that used to work back in the 80s and 90s, so it's different today. So we've tried to react to that while still having the city operated library, the school operated library. The Hart Library is a little different than the CCISD one because it's co-used still, meaning the school comes in and the general public comes in. The CCISD one is only the city. CCISD moved their library into the school building, but the Hart Library and Flower Bluff doesn't have that option. There's no room in the school facility, so we co-locate in there. So Laura is here to provide an update. We know Marilena Garza, the board chair for the library board is here. She and I spoke last week. We've promised her to continue to do a better job in communicating with her and the library board. If there's no update, even telling them that, that there's no update this month. So we appreciate Ms. Garza's passion for the library. I see a bunch of folks signed up as well on the budget. One of the things that has come up in our community meetings is more resources for the library. And so it's fitting that Laura can speak today. The budget will be submitted to council next Tuesday. And I don't want to give out the information now, but the library is going to do a little better in that budget. And so we'll see that next week. I'm just proud to announce that because we know in the past eight years, we've worked pretty closely with Laura and the library board to reinstate a lot of the, a lot of the services that were cut prior to me being here. So we're glad we've been able to fund the library in just about every budget, and you'll see next Tuesday that continues. So with that, Laura's going to give us an update on the Hart Library, and we'll go from there.

26:27 – 31:00Speaker 4

Good morning, council members and mayor. This is, like the manager said, an update on the Janet F. Hart Public Library. In October of 1998, the City of Corpus Christi and the Flower Bluff Independent School District entered into an intergovernmental agreement to establish and jointly operate a branch library on school district property. The Janet F. Hart Public Library, located on the campus of Flower Bluff High School, in Council District 4 opened in August of 2000 as a joint use facility serving both the public and the school district. So the intergovernmental agreement is actually a 13-page document. So these are just a few of the points that are on that document. The lease agreement is for 99 years. The city owns the public library building. Florida Boulevard ISD owns the land and the parking lot, and they provide us with 50 parking spaces When there's no school in session, we're allowed to use any part of that parking lot. So in cost sharing, the city pays 75% and Floribla pays 25% of utilities, cleaning services, alarm, monitoring, and inspections. The city pays for the library maintenance expenses for all repairs. City establishes hours of library operation and opening and closing procedures with recommendations from Floribla FISD. Also, so the city council knows that legal has reviewed this document on several locations. In the spring of 2025, Florida Boulevard ISD notified the city of the requirements outlined in Texas Education Code Section 61.1031. This section mandates that school districts secure building entry points and limit public access during instructional hours. To enhance student safety and comply with these safety and security requirements, Flowerville of ISD and the city mutually agreed to temporarily adjust the Hart Library and operating hours to align with the start of the school year and went into effect August the 11th. At that time, we were going to be opening for 28 hours. And after receiving feedback from residents and at the request of Councilwoman Caitlin Paxson, the city and Flowerville of ISD held a joint town hall meeting at the Hart Library to gather input from the community. The city manager was there, the superintendent was there, and Councilwoman Paxton, and I believe a few of you others were there, perhaps, I think, Councilwoman Campos. So residents primarily expressed a need for increased weekday operating hours, curbside service accessibility, and access for homeschool instruction. So in response to the feedback, the city and Florida Village ISD worked to address those concerns. So on September 15, 2025, the hours were increased up to 40 hours. And what we added was Thursday morning hours from 9 a.m. to 12.30. We also, instead of opening at 5, like we were going to do on August 11, we were going to open from 4 to 8 p.m., Monday through Friday. And we added Sunday hours from 2 to 6 and curbside hours from 10 a.m. to 2 p.m. on Mondays and Wednesdays. So after that the city in Florida ISD initially we considered installing a temporary partition while to separate the public from Florida ISD and Florida ISD actually received approval from the Texas agency. education agency to move forward with that plan. However, then we found out that building code constraints and fire egress requirements deemed it unfeasible for us to implement. So then in January of 2026, the city hired an architecture firm to conduct a pre-designed engineering assessment. The assessment was intended to evaluate the construction of an eight-foot partition wall, analyze system impacts, develop as-built and schematic plans, and provide cost estimates. As of June 2026, late June of 2026, the pre-design assessment is at 90% complete. The Engineering Services Department is currently working with the architecture firm to finalize the pre-design assessment and provide cost estimates. I stand by for any questions.

31:05Speaker 60

Okay. Thank you for the presentation, Laura. Councilwoman Paxson.

31:11 – 33:14Speaker 58

Thank you, Laura. And thank you, Peter. Uh, this was something that we really dove into last year and I appreciate that we were able to in such short notice and the constraints that we were facing. Um, it would have been great if we could just provide the needs to the school and also turn the library right back over at a hundred percent to the community. But we didn't have that option at the time. However, you guys were very helpful in trying to make as many changes or concessions to what the needs were as possible for that. I do understand that there's been some issues trying to communicate with our library board as per board members, but I appreciate that we're trying to bridge that gap now. I see that we're still moving forward because without a long-term solution, we still have to address the needs before us, which is this safety component. And I know we're putting in something that's a little more robust than a temporary wall, but I would still challenge us to look at the future of this. We received this well-thought-out, well-studied letter from the library board with very valid points And I think that those definitely need to be taken into serious consideration for the future of that location. Um, and so that being said, you know, we're weeks now away from a semester starting. I realized that we want the kids to be safe. I realized that, but I'm challenging us not to stop here. Um, the hearts really wanted to make this a facility that the community could always come to. And I, and I know that flower bluff ISD is growing and, My heart is close to them. You know, we're Hornet Nation out in District 4, but there's got to be a way to do both. And I think from what I've seen in the community, of course everyone supports our students and their safety, but everyone also dearly cherishes their library. So I don't think this is the closing point of this decision.

33:14 – 34:01Speaker 20

Right. We would agree, Councilwoman. So the ultimate solution is a new library, standalone, and that would take, you know, some dollars. So We had looked at some property as well. So there's some options that we know about of where we could cite a new library. But that cost would be probably 10 plus millions. So it's something we can look at for the next bond, which would be bond 2028. But in the meantime, the solution would be, it's not the ultimate, solution, but it's a good once the wall, we call it a temporary partition, but it's built to be a permanent. And what it will do is put some square footage only for the school district that the general public can't get into and vice versa. And then the rest of the library, probably, what is it, 85, 90% of the building?

34:01 – 34:24Speaker 4

Yes, and just for clarification, I've always considered that there's always been an invisible wall between what we do and the students, when they come in, they knew that there's always been an area for them. And so that's what we're looking at the wall. After hours when there's no school, we will still be using that area for our own programming as well as perhaps if somebody wants to have a meeting in that area.

34:24Speaker 20

Right, but how much library would be open to the general public once the permanent wall?

34:29Speaker 4

Once we would be open, 90% majority of it.

34:32 – 34:44Speaker 20

The majority of the building. So the goal with the wall is so that we can open normal business hours like the other libraries. That way the general public can't mix with the school children. So that's the biggest goal.

34:45Speaker 58

At what point before we approve 100% on this design, at what point do we get to see those renderings and release that to the library board?

34:55Speaker 20

Well, we'll work with the library board to get their input. And Sonia or Laura will have to answer that question. What percent are we in the design?

35:03Speaker 4

We're at 90% pre-assessment, so we're still not really into the design yet until this other decision. Yes, so this is just a pre-assessment.

35:11 – 35:25Speaker 58

Okay, just like the trestle bridge, just like the seawall, just like any of the other major designs, it's very important that the stakeholders are in that conversation, especially with something that is so vital to District 4.

35:25Speaker 20

Right, we agree on that.

35:26 – 35:57Speaker 58

And retaining that. I don't know what the future looks like. I don't know if this is going to be a sole responsibility of the city. I don't know if this is an area for the school district to have an input on how can we take those career-ready resources and things much like CCISD did. I don't know what the ultimate decision is going to look like. But the commitment that our goal is to try to get heart back to the community, that's what I think we need to continue to focus on. So I appreciate all of the help here. Thank you.

35:59Speaker 4

Laura, remind me who owns what?

36:03Speaker 4

We own the building. The city owns the building, and the land is owned by Flowerville of ISD and the parking.

36:09Speaker 60

So we own the building.

36:10Speaker 4

How many square feet is that building? The building is 14,800 square feet. Okay.

36:17 – 37:16Speaker 60

A couple of things. I think that one of the points of contention, Peter, was that there was no communication to our library board. This is what I'm being told directly. in having the information, some of the partition wall and for the idea or whatever it is, whatever it was, and that is not acceptable. Because when we have committees, when we have committees and boards, people are volunteering their time. And this is not the first time it's happened. I don't know why, and I want to know why. Why was that not communicated? This is not for you, Laura, please, I'm not directing this to you, probably to Soni or to Peter. Why was that not communicated to the library board who meets to make this better, to be part of the solution? Why was that not communicated to them? And the first time they heard it was when you all said it here.

37:16 – 38:07Speaker 23

No, I'm going to, and I understand. That's what I'm told. I understand, and I understand the, passion of the advisory board and we enjoy working with them. There have been updates on the situation at Hart Library since August of last year. It's even in the minutes of each meeting. There was one month I believe in May, it was either April or May, that we didn't meet in May, and so they weren't provided an update then. And then June, at the most recent advisory board meeting, they were working on a letter to the city council, and from there there was still any, there was no, progress or updates from the last update that they received in April. So pretty much where we are is the same information that we have been communicating to the library board that we are in the pre-assessment process and working with Flower Bluff.

38:07 – 38:32Speaker 20

Right. Yeah, so the issue, and that's what Ms. Garza and I talked about, even if there's no board meeting and if 30 days lapse, people want to generally know is where we ended in April still the condition in early June? And so that was the issue. So they have communicated. to the library board is just when there was no meeting, they didn't provide an update via email or at least advise the chair, so.

38:32Speaker 60

Well, I would just, you know, I think communication is obviously key and if one side or the other doesn't feel like they've been communicated with, then we need to improve that, which is what you just mentioned.

38:42Speaker 20

And that's what we've done. I've personally called Ms. Garza and I, excuse me. So I'm not saying there's no merit.

38:49Speaker 60

That's fine. What was the study that was done? You mentioned a study? Sorry, you mentioned a study?

38:53Speaker 23

Yeah, for the partition wall, the construction of a permanent partition wall. It's a pre-designed study.

38:59Speaker 60

And what was that cost? What was the cost?

39:02 – 39:14Speaker 23

Yes, so the early estimates right now, all in cost would be $180,000. No, but for the pre-designed work? Oh, the pre-designed, sorry. The cost for the pre-designed, $15,000.

39:14Speaker 60

Okay, but all this is going to be cost shared?

39:17Speaker 23

With? Not the pre-design. We talk on the cost of the pre-design. But the actual, for the wall moving forward, everything is cost share 50-50.

39:26Speaker 60

Okay, all right. Councilman Hernandez.

39:32 – 41:10Speaker 28

Okay, thank you, Mayor. You know, we kind of knew this was coming, right? And I understand the partition wall is somewhat of a band-aid. But, I mean, we saw this with CCISD at the Garcia Library. We went through the process of designing a new facility new library combination with the rec center and I understand it's you know we're not gonna be able to do a bond packages this election that this probably get pushed back to 2028 but ultimately we're gonna have to vacate that spot at some point this is just a band-aid right So I would say take that design that we're utilizing for what was going to be to replace the Garcia Library and do the same thing for the Hart Library. And then we should be negotiating with Flower Bluff as to what that would cost to have them buy that building. Now, I understand the idea of location, but this is just – What's the term? Lipstick on a pig kind of thing, right? I just want to make sure that we're having a long-term solution that fits the needs for both the community and the school district. And I don't know if you've ever tried to get to the library at 3 o'clock, but it's almost impossible. Same thing with Garcia. So I think ultimately it should be two separate facilities. I appreciate what they tried to do in the past by combining these things and trying to have some synergies, but times change and here we are. So if we can take that design and maybe utilize it for both libraries. Thank you.

41:12Speaker 60

Councilman Scott.

41:13 – 41:27Speaker 34

Wait, wait, wait, wait. So we own the building. We have a 99-year lease. We can't allow the school, the students to come and go at the same time or commingle. But we have a building.

41:27Speaker 20

We own the building.

41:28 – 42:23Speaker 34

And we have a 99-year lease. I don't know why we have to leave. I get that they can't commingle, but I guess the simple answer would be, close it off. And then we have a library with 50 parking places that we can use at our leisure, our leisure at the hours we decide, I guess maybe there ought to be a car and you're going to, I guess I talk a little bit about an alternative to the, but I wouldn't be so quick to abandon, um, the building and the, the, the lease agreement that we have, um, I knew the hearts. I knew them well. I was at the opening. I was very young when I went to the grand opening, but I think that was their vision. I think we can continue with that and keep the building, close off the... I get the temporary answer is the partition or the wall, but I think the permanent answer is just remove access from the school into our library.

42:23Speaker 20

Yeah, the agreement allows them access, though. Got it.

42:27 – 43:00Speaker 34

Well, they can have access. I mean, I don't know that... I just don't... I don't know that... Let me back up. This is an interesting experience for me. I get educated, and then months go by, and I get educated, and months go by. So I'm not up to speed. And I wrote a note last week to try to sit down with you and get educated, but then I saw you put it on the agenda. So thank you for doing that. But my basic assumption would be we ought to figure out a way to keep the building as it is. provide them access to what their needs are, and move on down the road. Right.

43:00Speaker 20

There's actually a little room for an expansion as well. So if we give up 10%, you can almost build 10% more. Yeah.

43:06 – 44:01Speaker 34

Well, I just wouldn't be quick to just say, hey, we need to go build a new building and move somewhere else. Unless they want to pay, you know, $12 million for a building, then golden, you know. Yeah, right. And I love the school district. I just think that we have made a commitment. And I get the world's changed. Nobody's bad here. But if there was a way to keep our building, keep our hours, and still provide some library access somewhere, somehow to the school, that's my preference. Thank you. Thank you for being here. Please keep in touch with your library board members, because if you don't, we will. You know what I'm saying? Yeah. If you're not talking to them, they're talking to us. That's not good for anybody. Right. We prefer our conversations with library board members to be casual, positive, and supportive. We're not getting answers, so thanks. Yes, sir.

44:03Speaker 60

Councilwoman Paxson. Thank you.

44:07 – 46:24Speaker 58

I understand Councilman Hernandez's thought process, but I would have to maintain that it is the building, the library building, that building, That is what we need to, I think, continue to work towards. That's what is so valuable. That is what the hearts envisioned. That's what they gave. It's not the same to just put another spot. And I'd almost, I think you mentioned it briefly, is add-on, a 10% add-on. I mean, if we look at what the school is utilizing, there's some library resource training, some homework hours, some career readiness, those types of things. And again, I don't know, if that's something we could evaluate our time, you know, if they do that before the 10 a.m. opening, things like that. I still think there's some creative use ability there for $180,000. I don't know about putting that towards adding on another room or something, but I think it's astronomical. That's a big price for a temporary wall. I did receive calls from the library board. I won't belabor it. but I will put it on the record, like I will say, because this is fair is fair, I did receive calls before May. I was being told that the updates were few and far between and they were very limited if they existed. And basically, you know, they weren't even in favor of the $15,000 study, whether they agreed or didn't. My point is these individuals were appointed to serve this purpose. We call on them, they call on us, like that's their role. And I think that that needs to continue to be very much at the forefront. And if there is a discrepancy, like I would like to know, be like, hey, our board doesn't want us to do this, but we really need to do this. then I'm not getting a phone call. They're taking this, what do you mean they're taking $15,000? I'm in the dark here. So I will say that before May, this was an issue before the meeting was skipped. And so I just, in their defense, because they tried their due diligence to reach out and that's where I started calling people. I appreciate that we're talking about it so we can do better going forward, and that's, I think, all of our expectation. So thank you, guys.

46:24Speaker 60

Thank you, Sony, and thank you, Laura. We appreciate the presentation and the information.

46:28Speaker 23

Thank you for the feedback.

46:29Speaker 60

All right. So that's going to conclude our public comment. I'm sorry, Peter, your report.

46:35Speaker 20

That concludes the city manager's report.

46:36 – 48:46Speaker 60

Thank you. So we're going to go into public comment. It's 1210 this afternoon. We have... 40 in person and about four either on phone or WebEx. So before we begin public comment, I want to remind everyone that the City Council has adopted rules of decorum to help ensure our meetings remain orderly, respectful, and productive. Copies of the rules of decorum are available at the City Secretary's office across the hall here and are also available on the city's website. and I just ask everyone to please conduct themselves accordingly. We're here to do the people's work and we would like to proceed in that spirit. So, also I want to make this announcement, beginning with our next regularly scheduled council meeting, if you would like to speak on a specific consent agenda item, public comment period at noon will be the opportunity to do that. So public comment on consent agenda items will no longer be taken at the consent agenda posting part of the agenda, or when that item is considered. The change doesn't reduce anyone's opportunity to be heard it simply moves those comments to one designated time so which would be the noon hour so that we conduct our meeting in more efficient orderly and consistent manner while we ensure that everyone has the same opportunity to address the council so we're moving it from one place to another not today that would start on our at our next meeting so if you have any questions regarding that change please see our city secretary at the break When you come forward, please state your name and city in which you reside before beginning your comments. In-person speakers will have up to three minutes. For callers and Webex participants, Corpus Christi residents will have up to three minutes, and non-residents will have up to one minute. The timer located at the city secretary's desk will help and keep everyone within their allotted time. And if you have a petition or any other materials that you'd like to give to the council, please provide them to the city secretary before speaking as normal. So, our first speaker. Yes, ma'am. Councilwoman.

48:47 – 49:25Speaker 58

Thank you. Mayor, with all due respect... I disagree with this policy change, allowing individuals to exercise their public comment opportunity at noon gives them the opportunity to speak on a variety of issues. extending a second, which is, I think, an appropriate interpretation of how we're supposed to extend that at our action, which is the consent agenda, then allows them to speak on the consent agenda. If those two are consolidated, they have to choose which topic. They're reduced a little. So I disagree with this policy change. Thank you.

49:27Speaker 60

Colonel Oberon Sexton.

49:40Speaker 49

I don't know, over in J. Sexton, U.S. Army. E-5, play my video.

49:49 – 52:37Speaker 8

All right, folks, E-3 here, and look at this. Look at this. Paulette's campaign finance, Adrian Garza, $1,500, starting 3-9. That's March 9th, and there is his address, supposedly. But look at this. Old Adrian Garza was arrested 328 for terroristic threats and still was getting paid by the mayor. And look at that one. His address don't even exist. Now, you ain't falsifying those reports, are you, Paulette? Remember this? June 19th when you went on Larry Alessandro and called me out by name. By name. Then what happened? Your boy come on my page pointing a gun at me saying he's going to make me famous. Well, I'm your huckleberry because I went on his and I certainly told him, you know, that it was about your 91K trip with Roland to D.C. Then your boy starts attacking my friends. And then your friend's Tito piles on. And who's Tito? Oh, look, he's going after my friends again. Oh, and me again. Oh, look, and Robin now. Oh, and look, but Hood News done got the truth on you, boy. Look at all these charges. Paulette, or should I say, Wallet. What are you doing, Wallet? Look at this. You hiring this guy, Wallet? Look at all them charges. Lord have mercy. Oh, Lord have mercy. Those are a lot of charges, Paulette. Are you just surrounding yourself with criminals or what? Ooh, Lord, 13 plus arrests. Now, here's an interesting bit. I got contacted by somebody who said they want you and your pals to go after me, specifically through Kronika. And see that? Yeah. Yeah. Look what else. Oh, look. Yeah, I had a nice chat with this individual two times, as a matter of fact. And see that there? Oh, yeah, Paulette. I recorded both of them phone calls. Got them. Recorded. And look at this. Doug Allison put it out there that you are paying two chairs, Kronika, Garza, and Tito, and also Wayne Docefino. So you're paying all these people, Paulette, to come after your opponents. And guess what that means there, Paulette? I hope you are familiar with Texas Penal Code 3902 and 3903, because guess what? You violated the law, baby doll. Woo! And today is judgment day.

52:37 – 53:19Speaker 60

All right, next. And I will say statement of fact. Not true. Thank you, sir. Goodbye. Bradley Bartleson. We're not going to have applause and we're not going to break decorum. Okay. So please, I'm asking y'all, we have two hours of public comment. Let's respect one another's time and the rules of decorum here, please. Thank you. Mr. Bartleson. Mr. Bartleson. Yes, sir.

53:23 – 56:26Speaker 29

Brad Bartelsen, Corpus Christi. Going forward, our city leadership needs not to merely react, but to understand AI and develop a winning strategy. The explosion is not in the future. It's here now in our local forms of HUD-8 and Bootstrap Energy. The governor is pushing a six-month AI moratorium. Our Amanda Short is heading up Texas Infrastructure Stewardship Initiative. It occurred to me that we are incurring the impacts and yet the use and benefit is going elsewhere. Imagine if our Hut 8 is used by the Chinese military. The idea I'm proposing here is to control data flow, requiring it to be tagged and filtered for safety and location and giving local use priority. Tax on labor is government's primary funding mechanism. Google, DeepMind, and others recently determined that tax base erosion due to AI displacement is a certainty. This target diagram displays the current AI workforce by industry in the red center area and the anticipated in blue. While better news for manual workers, white collar jobs pay more and have been generating more tax revenue Once most secure, computer programming is most exposed. Media hosts are being replaced by AI. We don't know when and what an AI workforce will look like. A harmful lag is anticipated with deep unemployment. A multi-year tax chasm would occur in which the government hasn't the funds to meet its obligations. As of 2025, 65% of federal tax revenue came from labor. Proposals to replace that revenue include boosting wealth and consumption taxes, hiking corporate taxes, or a new tax on AI. All of these will object, fight, or will flee. Replacing this revenue, for example, would require a 33% consumption tax. It's been highly problematic to tax multinationals. I like the idea of AI token taxes as this is a growing revenue and profit pot to take from. Seek control of AI data centers and the data be on the forefront of educating our kids The new jobs attract businesses that employ these workers, find a new way to tax AI data centers do like Sweden and Singapore save up tax money, cut back spending, say no, no to new 30 year debt obligations. Bootstrap energy is example how we need to do better. And I'll say quickly on our ways to lose our lover in new ACS Bay. We have seven steps of ruining this already. We don't need another one. The far field modeling is incomplete. I can talk to you in more detail. Thank you.

56:27Speaker 60

Thank you, Mr. Bartleson. Vidal Conde.

56:39 – 56:54Speaker 6

Good morning, City Council. Thank you. Good afternoon, should I say. My name is Vidal Conde, and I'm running for Corpus Christi City Council District One. And the reason I decided to run is because I have experience in the maritime business. I have experience.

56:54Speaker 60

Yeah, Mr., Mr., what if I could you please advise on this?

56:59 – 57:16Speaker 61

We're not currently a polling location, so there's no prohibition to the gentleman speaking regarding his candidacy that I know of. The city attorney can chime in if needed, but at this point he is allowed to speak on that.

57:16Speaker 60

I thought y'all had mentioned recently that candidates were not. I think there was a question on that. I'm not sure who answered it.

57:23Speaker 6

I haven't been asked the question. Is this a part of my introduction to get to know me better on the agenda that I'm leading to, if I may say so?

57:33Speaker 60

So a candidate can come up and talk about his candidacy and running? Who needs to answer that?

57:40Speaker 61

I mean, to my knowledge. Yeah, I'm not aware of any such prohibition.

57:45Speaker 23

I mean, somebody would need to point that out in the rules.

57:48Speaker 60

All right, that's good. We established it then. Go ahead, sir.

57:50 – 1:00:46Speaker 6

Okay, no problem. Well, you know, I have experience in the maritime business and dealing with the Corps of Engineers, TCEQ, environmental agencies, EPA, in maritime projects. And that's one of the reasons I decided to be a candidate. But the point that I'm trying to get to is that I'm no and opposing to Inner Harbor, okay? Inner Harbor, just for starters, it doesn't have the footprint for us to grow. It's in a limited space. It has approximately 13 to 20 acres, okay? So we're gonna invest $1.2 billion or a billion dollars into a project that has no real room for growth. Now if we were to expand it, the only thing we're gonna expand is the amount of brine that we're going to expel into the marinas. So right now in those waters, and it's been stated and it's been there since day one, there's microplastics in the waters, there's hormones in the waters, there's estrogens in the waters, And there's forever chemicals in those waters in the Inner Harbor, okay? Now, if we were to move forward with something like this, for every 30 million gallons of water that we produce, hypothetically, at that location, it's a 1 to 1.5% ratio. So for every 30 million gallons of water that we produce, we're going to be expelling 30 million to 45 million gallons of brine out into the intercoastal waters. And that would be Corpus Christi Bay, Nueces Bay, and all the way up into Oso Bay. So what I propose that we do is find a way to eliminate that idea. Let's invest our money in flower bluff at the Barney M. Davis plant. let's put that money into that location because right now Barney M. Davis footprint is almost 2,000 acres, okay? So what we do is we go to Barney M. Davis, obviously it's a municipal owned by CPS, and we propose to them, hey, we would like to purchase at least 100 to 200 acres of your land so that we, because we cannot have Barney Davis, we cannot have CPS as our landlord. As them being our landlord and us being their tenant, we're never going to get anywhere. That's a prime location because it's right next to the Gulf, it has the footprint for growth, and the water is a lot cleaner out in the Gulf than in the Indian Harbor. Now, let's say we sit down and we have a friendly meeting with CPS and they say, you know what, we don't want to sell you 200 acres. Well, what do we do? We do eminent domain. where we are able to, based on Texas Local Government Code Section 251.001. Study that.

1:00:46Speaker 60

Thank you, Mr. Conde.

1:00:47Speaker 6

You're welcome. Appreciate y'all.

1:01:03 – 1:04:14Speaker 50

All right, start that timer. I'm Julie Rogers. I live in District 1. I want to take this back to the libraries, please. Also has a layer of data center to it. Y'all might have seen the meme that's going around all over social media. I love it. It says, libraries, they're data centers. So we can be against corporate data centers and be for libraries and real data centers. I do want to address that the library board, the advisory board, they did not skip a meeting in May. They did not hold a meeting in May. because we lost a dear librarian, Dorothea Castignon. She's dedicated over 30 years to this city and that community morning. And so were the staff. They've all worked together for over 30 years. Congratulations to our library director for dedicating her life to libraries. She's worked for over 40 years for the city of Corpus Christi. These are the reasons that we love libraries and they are big parts of our life. And when I went to the town hall in Flower Bluff, that community loves that library. And Council Member Paxson's right. You can't just put another building. That building's part of their life. You know what, too? The Padre Island uses that library, and that community's growing. Yeah, we're going to need another library, and that one needs to stay there because there's not enough libraries. We need the one that up in district five and you know what else we need? We need flower bluff, independent school district to take responsibility for their part in this. The city is not responsible for it. We own the library and that wall. I'm sorry if my child was in school, I would not be comfortable thinking that a wall is going to protect them because they are in danger and this is about public safety. And you do have to carry it forward and think of a different way. And it just blows my mind that it's $180,000 for a temporary solution. Invest that in a library. Or make Flower Bluff do what CCISD did. What did they do? They got out of the library. I don't hear that discussion whatsoever. All I'm hearing is the city needs to do this, the city needs to do this. What does Flower Bluff need to do? And one more thing, there has not been community engagement on this. There was the town hall meeting, and that was it. That's all there's been. So I suggest that you reach out again to the Flower Bluff residents and the parents and grandparents and find out what they want. You know what? That's not my library. my library is labratama because people go to the libraries where they live and each library is dedicated to that community what they have in the building has to do with what that community wants at flower bluff it's all about water the hearts intended that so do the right thing thank you miss rogers uh tom tagliabue

1:04:25 – 1:06:45Speaker 10

Good afternoon, I'm Tom Tagliabue, District 2. I'm also here about the Library Advisory Board. They've asked for answers, and the staff has deliberately ignored those requests. They've withheld information, and they've intentionally denied the briefings to the people that you appointed to oversee those libraries. 28 years ago, the City Council implemented the agreement with the Flower Bluff ISD to ensure the city's authority to protect taxpayer investment in the libraries and guarantee the library patrons would be served for generations. It's an agreement your current staff has chosen to disregard and allow the Flower Bluff ISD to bully and manipulate the city into restricting access. I don't believe the education code or the administration code referenced by the school district applies as this building is not defined as an instructional facility for curriculum. The 1988 agreement specifically states the city is not responsible for enforcement of school district policies. We've taken the word of the Flower Bluff ISD. Flower Bluff ISD isn't paying a dime towards resolving this issue. They should either build their own facility or let us buy that land from them. For months, the library board has pleaded for updates. We finally got one today. It took, for three months, the library board debated the language that was going in the letter to you. And only after that came to y'all last week did staff decide it was the appropriate time to brief you on this subject. The lack of transparency is an indication of a greater problem. It's not the first time staff has demonstrated a disregard for its residents and your appointees. I'm a retired city employee. I've been appointed to three boards by city council, and it disgusts me that there's a lack of respect given to those volunteers who serve on those boards. If you can't be honest about small things, how can we trust you on the major issues? The public trust, I think, is irrevocably broken. We've become a laughingstock statewide, and it's time to clean house.

1:06:46Speaker 60

Thank you. Thank you, Mr. Tagliabue. Sandra Meyer.

1:06:49 – 1:08:54Speaker 42

Hello, Sandra Meyer, District 4. Thank you all for all being willing to serve. I know in my heart that none of you have put yourself through this, through campaigns to serve. aggravate the city. You all wanted to be here to try to help. Our employees and staff are the city's best resource and y'all are their leaders. And so I've spent the last nine months almost since the audit was done in September trying to understand what has gone wrong with this Homewood Suites thing that we are at the point of having a hearings over the next couple of days. It really makes me sad. And I realize that Corpus Christi is kind of like a little mini snapshot of what's happening nationwide. And my newest conclusion and my word of the week is, oh my gosh, what's the word when you say something but you mean something else? Like, oh my gosh, I just totally forgot. So that's good. That means I don't get to call y'all a bad name. But in the Bible, it talks about accusing people of things when you've got a plank in your own eye. And as a city, as a state, even as a nation, we are doing that. And we talk about, as citizens, we want trust, we want transparency, we want ethical behavior, but we have to have that from everybody. We cannot be demanding that we get it and then not expect it from everybody else. It can't be, okay, I want y'all to be ethical, but I'm going to be wrong. And so I apologize for forgetting the mean word that I had. But I really wish that this thing over the next couple of days would go away because it just seems very cruel. Thank you.

1:08:55Speaker 60

Thank you. Mr. Falwell?

1:08:57 – 1:12:13Speaker 49

I have the floor. Thank you. Well, I have a speech to tell, but I'm going to have to cut it short because you blew my mind again with your idiocracy. Texas Upmeeting Act. For everybody behind me, you're allowed to speak on the agenda item before or during. There's nothing this bitch can do about it. Don't listen to her. Weasley, help her. She's failing miserably again. All right, just like she did last week or week before last one, she let the chief get up here and dictate that he could talk no matter what. You tried to help him. That's the first time I ever listened to you and knew what you're talking about, and she just Let him control the whole room. Who controls the room? Her. Yeah, Texas Old Union back violation. You were right. Chief did it. She didn't care. Or maybe she's an idiot. Or both. All right. What I came to talk to you about is many citizens, including myself, believe there's two parts to the justice system. One for us and one for the servants, in which y'all aren't held accountable for shit, and we are. Okay. The 14th Amendment. Guarantees equal protection under law. That means the law should be applied fairly consistently regardless of person, title, or position. This is out to Chief Markle. You've got three questions. And remember, sir, only cowards lie, so I'm going to hold you to this. First, was Officer Maria Sanchez, who was at the scene of the crime where Officer Martinez beat that woman, she watched the whole thing? Is she being investigated, and is she on paid leave? I'd like to know. Second, The Corpus Christi police officers trained to intervene with witnesses when they witness another officer using excessive force, or are they permitted to stand by and turn cheek? I'd like to know. What's your policy on that, sir? Third, this is a loaded gun because of what you told me. If a union electrician working under contract with the city, same as the union officer sitting behind me, if a union electrician walks into somebody's house and beat the shit out of a woman, Does he get to sit at home on paid leave like these guys do? You're telling me it's because of union contracts, so we better be doing the same as you said and holding everybody equally accountable, right, sir? I'd like to know that one. Let's see if you lie about it. If an ordinary citizen was accused of the same conduct, we go to jail, we have to be bonded out or sit there for 180 days. Not the police department was blatantly corrupt, and we can tell, right? Not y'all in particular. You, for sure. Not y'all, too. All right. I am not asking for you to do anything out of the ordinary. Just continue a due process the right way. I'm asking whether the law is applied equally to everyone. And, of course, you already showed us that it is not, Chief. The public deserves accountability, transparency, and confidence that no one is above the law. Please do what you're told and serve us. You don't serve this council. You serve us. You took an oath to the people. If one of your officers beats a woman, he should be held accountable. The hearsay on the streets is Officer Martinez was fired after almost three and a half months of us paying. If that happened, good. But the other thing in the public talking about right now is that he won't go to jail. He won't even be fucking prosecuted.

1:12:15 – 1:12:46Speaker 60

Samuel Andre Fryer. Thanks, guys. Councilman Cantu.

1:12:46 – 1:13:33Speaker 26

I want to apologize for him calling me that. I don't think that was right, saying the V word towards you. But I do want to say something, and I have 100% faith in our police department. I think you guys did the right choice of doing what you did to that officer. That officer is not working with the city of Corpus Christi no more. And the DA's office declined to file charges against him. So it's not on PD. It was on the DA's office. So I just want to throw that out there. I understand he has his rights to speak, whatever the case is, but I just couldn't sit here and not apologize for him, what he called you. Thanks.

1:13:38 – 1:16:46Speaker 1

Good afternoon, council. My name is Samuel Andre Friar. I live in District 4. First of all, I just wanted to say it's admirable what you all do on a regular basis as a city council. I know Councilman Gil Hernandez said at one point that he said that what the city council does affects decades. And so I keep that in mind when I think about various things. With that said, Um, that's the reason why I feel that our, our students are very, very important because things that take place on the school districts, as far as the, the, um, board of trustees affects generations. And that's very, very important. And that's one reason I'm running for the Corpus Christi independent school district, district four position. And I filed my papers yesterday and that's the reason why I'm doing it because I think it's very, very important. And I want to stand with parents who. desire the best education for their children, which is our future. Families first, financial trust, and informed citizens. Now, with that in mind, I wanted to bring up a few things dealing with the budget. I have a pleasure for the last couple of years to serve on the Crime Control and Prevention District. So you have a choice today to approve the budget that was presented for you for the police department. I believe the police department is doing an exceptional job. Appreciate everything they do. Without them, we could not be as safe as we are. The next thing is I want to look at the proposed amendments to the charter that were presented. Now, if they are going to actually be individual items, then I 100% support that being a choice for the people to vote on. However, two of them have to be in tandem, and that is to increase the term limits to four years has to work in tandem with the actual point when you stagger the council terms. It has to work together. The other thing is the at-large positions, making them position one, two, and three. I believe that's also important. Some people will argue, well, it's no longer an at-large position, but actually it is. It just means that you put in for one position, the second position, or the third, and you still have to get a majority vote. So I do agree with that as well. And then the increasing the requirements vote for removal of a city council members from two two-thirds, I believe that is a good call. And so without any other things, that's just my opinion about the whole thing. And the last thing I wanted to do is all the things that are going on now, as far as all the things going back and forth, city council, the audience, the citizens being as disruptive as possible and being very insulting. I just wanted to make this one thing. In conclusion, brothers, focus your thoughts on what is true, noble, righteous, pure, lovable, admirable, and whatsoever virtue and something praiseworthy. Keep that in mind as you go forward from this day forward. Thank you.

1:16:47Speaker 60

Thank you. John Dugan.

1:17:14 – 1:20:44Speaker 19

I have some handouts. How are y'all doing? Good? I am too. But I'm worried. I've been worried about this water situation for I can't remember how long. Finally, I decided to look into it. And I looked into the desal plants. That's what I'm really interested in. I'm worried. We used to have a water shortage problem, but it looks like at least we're getting some help on that. I think that one of the main things that I was worried about was the fact that a lot of the areas around here get their water from the from the aquifers, and I thought it would be a really good idea for us to stop producing water out of the aquifer once we get the situation under control. That was my first observation. Also, I'm concerned about the Inner Harbor desal plant. I don't think it's a good idea. Not that it wouldn't work. but we're taking it from sort of polluted area, okay? We know there's PFAS in it, which is continuous and doesn't dissolve. When you take the water in, the reverse osmosis takes the salt and the PFAS out, and we get to drink water that's clear and pure, but we send the salt and the PFAS back into the harbor. So... I don't think that's too good of an idea. It stays contaminated. As we increase the amount of water we're producing out of the plant, the situation only becomes worse and can get much worse over time. I think the plant is too small to cover our problem in the long run. We need more water available, especially when we get into a situation where there's a lot of no rain, so to speak. I think we need to worry about the money, too, because it seems like we're spending a lot of money and we haven't gotten anything out of it. Of course, that's pre-planning and preparation. I think a better choice would be Barney Davis plant. It's larger. You can use it to expand on. The plant can be built in sections, and you can have an increasing amount of capability as time passes. I think that the idea that, I don't think we should throw the baby out with the bathwater, so to speak. I think all the work that's been done with the Inner Harbor plant should be used in working with the Barney Davis plant. God bless all of you.

1:20:44Speaker 60

Thank you, Mr. Dugan. Hope Malkin.

1:21:08 – 1:23:51Speaker 39

Hi, good afternoon, Hope Malkin, District One. Nice to see you all again, and thank you for your service. I'm speaking on agenda item 18. We recognize that this agenda item is not an immediate stop work order. Its value is in preserving what remaining authority exists at the city level, determining what is and isn't vested at this point in protecting residents from cost shifting and preventing future data centers from being approved by default. Monday, July 20th, HUD-8 announced that it signed a second 15-year lease for an additional 352 megawatts of IT capacity at Beacon Point, doubling their contracted IT capacity to 704 megawatts. HUD-8 now describes this 1,000 megawatt campus quote, fully commercialized with a reported base term contract valued at 19.6 billion. Fully commercialized means commercially committed. However, it does not establish that every local permit for phase two has been filed, approved, or vested. The question we pose is whether this new lease term of an additional 15 years that we're calling phase two is already included in the same qualifying permit series, PLAT, site plan, or project scope, or whether it requires new or materially different approvals. We aim to determine exactly what HUD-8 has already secured, preserve every remaining city decision, seek a voluntary pause on unvested work, and establish permanent protections regarding beacon point expansions and all future data centers. To that end, we request that the council add a project-specific directive requiring city manager and city attorney to publish, within five business days, information that would address questions that while unanswered, prohibit us from understanding what has and has not been vested in this overall Beacon Point project. A handout has been provided that details the necessary information that we're requesting. We understand this is a time-consuming process added to an already heavy and pressing load on the part of city staff and city government. So I specifically want to thank you for the time and effort required to fulfill this request. Thank you.

1:23:51Speaker 60

Thank you, Ms. Malcolm. Hope, I'm sorry, Susan Elwood.

1:24:11 – 1:27:13Speaker 54

Good afternoon, Mayor and Council. My name is Amanda Short, founder of the Texas Infrastructure Stewardship Initiative, resident of District 4, and I am presenting comment on behalf of myself and Sue Elwood, who wasn't able to make it today. What is the most valuable infrastructure in Corpus Christi? It is in our roads, it is in our electric grid, and it is in our water. It's the people sitting in this room and the hundreds of thousands who call this city home. Every budget you approve, every permit you issue, and every development you authorize ultimately is a decision about people. What is the purpose of local government? I believe it's to create conditions in which people and future generations can flourish. Infrastructure doesn't raise children. People do. Infrastructure doesn't teach, heal, invent, innovate, volunteer, mentor, or love a neighbor. People do. Psychologist Eric Erickson described one of life's defining challenges as generativity versus stagnation, whether we invest in future generations or simply consume what we have inherited. I believe that cities face that same choice. People are not here to serve infrastructure. Infrastructure is here to serve people. The greatest asset any community possesses is not its roads, utilities, or buildings. It's the people, the teachers who educate our children, the nurses who care for our families, the contractors who build our homes, the entrepreneurs, 78 years family run business. It's the people who make up our communities that is our biggest asset. Every infrastructure decision, should be measured by one simple question. Will this decision help our people flourish? The United Nations widely uses the brunt principle of sustainable development, which calls for meeting present needs without compromising future generations' ability to meet their own needs. Responsible development must meet today's needs without taking away the ability of future generations to meet theirs. Our nation was founded with a responsibility not only to ourselves but to our posterity. Our laws likewise recognize that each generation serves as a trustee for the generations that come after it. Trustees do not exhaust their inheritance. They preserve it, strengthen it, and pass it forward. I look forward to speaking with you on Agenda 18 also. Thank you.

1:27:14Speaker 60

Thank you. Marilena Garza?

1:27:31 – 1:30:38Speaker 59

Marilena Garza, District 1. Good afternoon. I appreciate that after nearly two years of waiting, the public is finally receiving an update on Hart and But let's be honest, this update should have happened months ago. This information was available weeks ago prior to our July meeting, yet it was withheld from the very board appointed by this council to advise on library matters. Heck, we're hearing new numbers today with staff blurting out new numbers in the presentation just now. That is the first time I have ever heard that 108, 180,000 number. But I kind of already knew that's about how much a partition costs. It's great that the staff has that kind of confidence in the board that you have to say it here. But our library board meetings are not recorded. So this is recorded. So everybody can see staff is withholding information in real time. I would venture to guess that staff knows more, and they're not sharing information still. The board requested updates, we were ignored. The public requested updates, they were ignored. So I have to ask, what is the purpose of an advisory board if staff chooses when or if to involve us? Is our role to provide meaningful oversight, or is it simply here to dress up and waste my time? Today's presentation raises more questions than it answers. We're being asked to accept that a permanent partition wall is the solution. Yet the engineering consultant Dykema isn't here. Where is their report? Why are we relying on a summary memo instead of hearing directly from the professionals who conducted the assessment? If this recommendation is sound, let the public see the evidence. And let's remember who is being impacted. Hart is the only public library serving Flower Bluff and Padre Island. District 4 residents pay taxes just like every other district, yet for nearly two years they have had reduced library services while continuing to fund a system they cannot fully access. That is unacceptable. I also want a clear answer about funding. Who is paying for this project? I do not support shifting the burden onto taxpayers if there are other responsible parties. The public deserves complete transparency before another single dollar is spent. We've already spent $15,000. I'm asking council for three things. Release Dicama's complete report when it's done. Have Dicama present its findings publicly and in a way that the community can ask questions and provide a long-term restoration plan, not just a partition wall, but a real commitment to returning Hart Library to full service to the city. Trust is built through transparency, not backdoor deals. Right now, that trust has been damaged, not because of the engineering challenges, but because of the lack of communication and the decision to leave the public and your own advisory board in the dark. District 4 has waited long enough. It's time for complete transparency and real solutions, not another memo and not another sweetheart deal to somebody else.

1:30:40Speaker 60

Thank you, Ms. Garza. Chair Suarez?

1:31:18 – 1:33:41Speaker 14

Jairus, what is District 2? Mayor, after watching your interview on Inside Texas Politics, I was sick to my stomach. If every lie were a gallon of water, that would overflow a 30 MGD capacity Gucci bag. Anyways, the city is $3.1 billion in debt. I don't think the people truly understand the gravity of what exactly $3.1 billion is. This graph will be available on my Facebook page, Jairus Wattis for Corpus Christi. It is estimated that 150,000 citizens work in Corpus. If we all get $20 taken out of our monthly income, each month would amount to $3 million, to which in a year it will equal $36 million. Now, how long will it be if we all pay $20 a month to settle this debt? Take note, this graph does not show any other sources of revenue except that $20. It will take about 86 years and some change to come clean. This does not take into consideration any future debt and loans to pay back along with this interest. So how did we get so far in debt? Allegedly, allegedly, the city manager wants to be city manager in Austin. Austin told him that he needs to be able to manage a bigger budget and control major debt to be considered. If this If true, is this why this city is drowning in debt and why he takes on expensive projects? Is he trying to prove himself to the big dogs? Debt increases our taxes and makes more loans to manage a bigger budget. With so many hidden taxes from the city, it makes you wonder if there is money laundry going on, and if so, who are all involved? Does the city auditor and chair every penny is accounted for? Is the money funneled by companies who play ball and possibly charities too? The city manager is getting paid $409,000 annually, and yet money is missing, debt is growing exponentially, and in speculation with this salary, That high is it should be able to hide money from the books to pay people off to do what he demands. Wasn't it a crooked council that signed off on such a salary for him? I wonder what their kickback was. Jesus, meek and humble heart, make our hearts like unto thine.

1:33:44Speaker 60

Thank you, Mr. Suarez. Maria Rosa Suarez.

1:34:00 – 1:35:49Speaker 31

Maria Suarez, District 2. When my parents take me somewhere around the city, it feels like a bad carnival ride. I don't understand why fixing roads are not being handled faster. Is it because we don't have enough workers? Do we not pay well? I got to thinking, maybe we use cheap materials and not the good stuff. Apparently, with constant potholes everywhere, we definitely do not order high quality materials. Many foreign countries and different states use a machine that's a 4-in-1. A power air blows the area clean, sprays asphalt, then blows a crushed stone mixed with asphalt. and finally sprays a top coat sealant. This machine is called spray injection pothole patcher or spraying patching machine. It can also repair about 100 to 150 potholes in one day. It is expensive to buy, but it will pay for itself less than three years and save us tens of thousands of dollars. So if we can't hire people, it can at least take one person to operate. The people will have smooth streets and will not feel like a bad carnival ride. The people will not have to constantly repair their cars. Don't you want people to save money and keep their cars in good working condition? If you are really for the people, fix our roads so people will be driving safe, Motorcyclists don't have to worry about crashing and possibly dying. And keep the disabled and elderly from feeling pain from all the jolting. Keep Corpus Christi smooth. Thank you.

1:35:50Speaker 60

Thank you, Maria. Susie Saldana.

1:36:04 – 1:38:46Speaker 51

Susie Saldana, Corpus Christi. I'd like for you to pay close attention to what I have to say. You have to do away with your decorum because you're not following it. I stood here and listened to Robin Knox insult each and every one of you and compliment some of you, okay, by name, which is a violation of your decorum. She was never stopped. I've heard people come on and dressed as clowns and come up here and insult, and he wasn't stopped. So why do you have decorum if decorum is not enforced? Why are you paying an attorney if he doesn't object? Why is it that you have these people and you talk about decorum and they come over here and they're allowed to talk about anything they want? and they're not stopped. So what is the quorum for? I can tell you honestly that it is selective. The person that came up here to insult and said, oh, Arian Garza and Tito have been out there and they've said lies and the mayor's doing this, she's paying that, everybody hires people for their elections. You don't know if he was hired to put up signs or he was hired to put up other things up there. And some of them are paid under the table and some of them threaten and try to put young ladies like me around. Those are things that are happening, and that's a break of decorum. I think if you're going to have decorum, you need to enforce it. If you're not going to enforce it, then you don't belong in those sits. And according to your attorney, when I ask about it, any single one of you can stop it. When people come out here and spew insults, any single one of you can stop it, but you have chosen not to. The people of Corpus Christi deserve better. The people that I listen to say that it is a fiasco, that this is a circus. And I'm beginning to think it's more than a circus. It's more than the people can take. It's time to stop the shenanigans. It's time to stop the way that this council is being run. And you can't blame one person because each and every one of you is guilty if you're not putting a stop to it. You need to come to fruition. You need to come to a place where you can understand what it is that you are there for. And then I see you want to increase your salary. For what?

1:38:50Speaker 60

Captain Dave Heasley. Captain Dave Heasley. Henry Williams.

1:39:12 – 1:40:37Speaker 7

You know, to the Mayor Henry Williams District 1 and the Hillcrest neighborhood. You know, first, I would like to speak to our vision of who we are as a people. Whether you're there as city council members, officers, or here in the audience. We must understand that we are the body of Christ in our city, and we must conduct ourselves as such. Secondly, our police department. I conduct a prayer meeting at the police department. I've done it for the past 30 years. Assistant Chief David Blackman and I have been friends for many years. Chief Markle, the assistant chiefs of police, our police department of this city are commendable. They're commendable. There are cities in our nation that have problems, police departments, communities, and so forth. We work very, very well together. Thirdly, item 20 on the agenda.

1:40:39Speaker 29

I would ask that you vote no to this item.

1:40:43 – 1:41:22Speaker 7

I request that those who have voted no in the month of December Regarding the Inner Harbor Desalination Project, we vote no to the funding, funding the preparation and submission of the City of Corpus Christi U.S. Bureau of Reclamation Water Smart Desalination Grant application for the Inner Harbor Desalination Project. I ask that you not approve the funding of an item that has not been approved by the council and that you would say no to item 20. And may God bless you all and may God bless our community. Thank you.

1:41:23Speaker 60

Thank you, Reverend. Shannon Ross.

1:41:41 – 1:44:46Speaker 13

Good afternoon. I'm Shannon Ross with District 2, and I'm speaking with volunteers for Nueces County Defending Freedom. I'm following up on Hope Malkins. We wish to read these broad questions. Oh, first of all, I do want to say, y'all have the hardest job in the whole city. I just think it's so hard. And just want to encourage you that there's a scripture that says all elected officials are appointed by God. So I hope that encourage you. But we wish to read these broad questions into the record for public information and educational purposes. What exactly is vested thus far in AI at Beacon Point? What permits and approvals already exist? What work is occurring today? What authority does each governmental jurisdiction retain? What agreements were made directly with the city? What city decisions remain? And what can be done before a moratorium takes effect? How do you envision this agenda item helping to safeguard the residents of Robstown, Corpus Christi, and Nueces County from the adverse impacts of Beacon Point Project? When will answers be made public? And because these questions cannot be fully addressed within the format of city council meetings and public comment periods, we respectfully request that the city establish a working group of citizens and city representatives. This group would coordinate the collection and verification of accurate information so that the community and its leaders can make well-informed decisions about these critical issues facing us now and into the future. We respectfully request that Citizens Defending Freedom volunteers be included as active members of this working group. Our volunteers have vested substantial time in reviewing project documents, identifying unanswered questions, and communicating community concerns. Their participation would provide continuity, strengthen public trust, and ensure that residents' questions remains central throughout the fact-finding process. We hope that each and every council member recognizes that this is exactly the desired function of local bodies of governance, both to include the public in a meaningful process in which they have genuine influence and to enhance the quality of outcomes through citizen participation. The challenges posed by HUD-8 projects specifically and AI hyperscale data centers in general offer a unique opportunity for us to rally public opinion and forge a cooperative relationship with the city. Thank you.

1:44:47Speaker 60

Thank you. Melissa Zamora. Melissa Zamora, Jennifer Espino.

1:45:12 – 1:48:21Speaker 30

Hi, Jennifer Espino, D4. As usual, I'm starting my comment by noting that I am a working class Corpus Christian, which means that I had to take the day off of work to prioritize being here. Some of you may actually not know who the Corpus Christi DSA or Democratic Socialists of America are. And some of you may be pretending not to. Our city manager has referred to us as Mark Minster's team, a label that I wear proudly. Some have just preferred to call us the socialists, a label I also accept. And some have accused us of being paid agitators or outside agitators. So I will once again remind folks that I am not paid by the DSA. but rather pay dues to the DSA to be a member, and also that you can see my birth certificate if you doubt my corpus cred. There's much to be said about the recent wave of electoral wins we've made across the country, from Zoran Mamdani in New York City, to the more recent NYC sweep, to Philly, to Denver, to D.C., and even our own socialist in office on the Diasylvia. While our commitment to electoral struggle is unwavering, it's the work that happens between elections of building trust in our communities and meeting people where they're at and committing to making our lives and city better that truly advances our mission some of you may know and some may have not checked your inbox but we unveiled our people's budget prior to this meeting other dsa comrades are signed up to speak to that so i will not belabor going through the tenets of our people's budget proposals On one hand, I'm relieved and grateful that I'm not up here talking about the water for once. And on the other hand, our budget is just as much of a manifestation and reflection of the mismanagement of our resources as our water crisis is. Since our mayor so shamelessly likes to invoke her religion or reference the pope in comparison to, of all things, the unholy and inappropriately named Environmental Protection Agency, I will just, A, encourage her and everyone else to read the pope's encyclical. And because I know she won't, I will, B, share a couple of key takeaways from that encyclical. On solidarity, he writes, solidarity is expressed when each person, both individually and collectively, takes part in the life of the community by staying informed, engaging with others, making their voice heard, and contributing to public decisions and choices, while also assuming real responsibility so that the common good is achieved through shared decision making. We are not sharing that decision-making in our budget development, are we? On social justice, he writes, the idea of social justice helps us recognize that injustices do not arise solely from the wrong choices of individuals, but also from structures, mechanisms, and economic and cultural systems that produce inequality almost automatically. Justice is not merely about the fair distribution of resources or the correction of current injustices, but also assumes a restorative dimension. It aims to mend broken bonds and reintegrate those who have been excluded, taking into account the wounds caused by injustices. So I would just encourage you to go to confession. Do your penance.

1:48:23Speaker 60

Pam Matlock. Pam, oh, there you go, sorry.

1:48:35 – 1:51:00Speaker 52

Good afternoon. I'm Pam Matlock. I'm from District 1. And I've lived here in that area all my life. And I want to know why we were not told that this data center was being built right next to an elementary school with kindergarten, first graders, second graders. You've all seen reels on all these AI data centers, how much noise there is, how much light's going to be put on. Is this what you want to do with the children in our area or even in any area? We know these are bad. And now we've got phase two coming on. And they want to build something out in the violet area. I know a couple of farmers that aren't going to sell, so we won't probably get that. But still, why were we not even given the chance to vote on this? This is our area. This is where we live. I don't know where you live, Everett. I voted for you, but I was hoping that you would be for us. I don't know what's happening, but... I just don't understand this. I'm a citizen. Like I said, I've been here. I'm 72. I mean, I've never had this problem before. Of course, we have some things that come up. But this is a big thing. This is going to hurt people in this area. I'll invite y'all out there once it gets started so y'all can sit out there with me in my backyard and listen to the commotion that this is going to cause. I sit out there all day long, you know, in the afternoons, listen to the birds and the kids playing, and now I'm going to have to listen to 24 hours a day. So next time you think about something like this, let us make the decision, not y'all. I don't know if it's y'all. I'm sorry. I'm not mad at y'all. I'm not upset with y'all. I'm just that this got done. without asking the residents in that area their comments. I mean, give us a chance. So thank you very much, and I appreciate your service.

1:51:01Speaker 60

Thank you, Ms. Matlock. Councilman Boyd.

1:51:04 – 1:51:40Speaker 18

I just wanted to give a statement of fact. Unfortunately, where they're building that data center, it's actually in the county. If you know where the... What do you call those? The storage? Yeah, the tankers. That was also an issue that's in the county. And so everybody that has called me, and I've had a lot of phone calls on this, I've just asked them to contact Mike Pusley and talk to him because he is the county commissioner in that area, and hopefully maybe they can address that issue.

1:51:40Speaker 52

Yeah, I've had a meeting with Commissioner Pusley and County Judge Scott, too. Okay.

1:51:47Speaker 18

Yeah, we have the same concerns as you do. Unfortunately, there's just not anything that I can do because it's outside of our jurisdiction.

1:51:55Speaker 52

Can we get something to tell people what's going on out there? Because there are a lot of people that don't know what's going on. Yeah, we can't have that.

1:52:02 – 1:52:16Speaker 60

Ms. Matlock, I'm sorry. The councilman's making a statement of fact just to let you know that This is completely outside for the majority of the part of that facility of the city limits. So it is a county issue.

1:52:16 – 1:52:27Speaker 52

But you can certainly call him and discuss. But I know they've asked the city if they can have like 10,000 gallons a month for toilets. Thank you. Thank you.

1:52:28Speaker 60

Yes, ma'am. Amanda Guerra. Amanda Guerra. Carrie Meyer.

1:52:42 – 1:55:43Speaker 45

Carrie Meyer, District 1. Good afternoon, City Council. Thank you for your service to our city. I'm here to talk about a few things. Number 20 on your agenda, please say no to the Inner Harbor and to the Voices for Coastal Bend Energy grant. And set your sights on desalination at Barney Davis or Harbor Island. or somewhere where you can intake and discharge into the Gulf. And thank you for what you've already done for our water supply through the Mary Roads improvements, the groundwater improvements, and the aquifer improvements. And also, thank you for the rain. Number 21, as a businessman, businesswoman, I'm a kayak guide. My business relies on bay water quality and a healthy marine ecosystem. for its survival, my business says. So I served on the far-field committee, and I feel that the update that you're receiving on the agenda item 21 is overly optimistic, when the reality is that the most important scientific analysis really hasn't been done. and that's from the marine science experts. So we've got the data and the modeling, but really what it means, that's still yet to come. Finally, as a neighborhood advocate, I would like to recognize four different city employees who have really helped me. And they are Assistant Chief David Blackman. I talk to him on a regular basis and update him about things that are going on in my neighborhood that are police issues. And Ross Patchen, who's with Peter Zanoni's office, and he's a liaison for our neighborhood, and he has really helped us. and continues to. Joseph Johnson with engineering services. He's the assistant director and he's got so many projects on his desk at any given time and he takes the time to stop and focus on the street that's near my house and some questions I might have. The eco park project that we're all real excited about and some of the details on that. and the little canal that we're getting over there. And, you know, they're just working really hard to make all that happen, which is real difficult because it's infill development in an historic old part of town with all kinds of hidden things, infrastructure problems that, you know, you don't know about until you start to dig up the ground. So I really appreciate all the work that Peter Zanoni and his staff have been doing over there. The final city employee I'd like to recognize is Tracy Cantu with Code Enforcement. And she is a very personable person and listens and sends out her field workers when needed. And I just think she's probably my favorite of all. Thank you.

1:55:44Speaker 60

Thank you, Ms. Meyer. Mark Munster.

1:55:57 – 1:58:23Speaker 35

Mark Minster, Corpus Christi. I'm here today with a bunch of people from Corpus Christi DSA, and we're here because we want to take collective action. We want to speak together and speak up. For residents, a lot of people that are not able to attend these meetings, you're lucky. There's a lot more people that are going to be impacted by the water rates and property tax increases, things that have to do with the budget. We're here talking about the budget because you'll be releasing the one for this next year at the next meeting. And I've been going to the budget input sessions and been watching the process for the past three years and how there isn't really clear avenues for resident input to be seriously implemented into the actual city budget. And when you look at the budget numbers and you look at the revenue that the city collects from residents and large volume users, I just think it clearly shows the inequities of how residents will face significant rate increases because of large volume demand and large volume usage that we don't get a say in how our resources get allocated. And I feel like when you look at the city revenues, we never see those numbers. We never see the total numbers of how much revenue the city collects from each customer class. It's really untransparent. And instead, we get numbers like, oh, residents are only paying 13% for the desal plant. But rates are going up. They're going to be impacted. And that's just financially, not environmentally. And so it all goes back to the budget. And the budget just shows clearly on paper these inequities. And just in talks of, I just think the city council is out of touch when we hear that these are low-interest loans. How much is that interest? It's hundreds of millions that will stack onto the principal payments, the maintenance costs, and the environmental impacts. So I get really mad when I hear that it's low-interest loans. The city already has a significant amount of debt and these projects would just add more. And debt isn't a bad thing. We've talked about the libraries and how ten million dollars would build a whole new library and that's deemed as too much but we talk about billions being spent for corporations. They're not the ones that elect you. They're not the ones on regular fixed incomes that are paying water rates and that are going to save the increases that you present to us. And Let's see. I'll take my time. And then there's all these concerns about data centers. Residents are already concerned about our water projects, and data centers are just going to be on top of that. So I think you should expect to see more residents and just know that so many people are busy, are working, and they're the ones that are producing the surpluses, the profits for these companies, and they're getting screwed over, and people over profits.

1:58:26Speaker 60

Thank you, Mr. Munster. Amanda Breland.

1:58:45 – 2:01:43Speaker 53

Okay. Amanda Breeland, Corpus Christi, honored member of the Munster team, as well as the DSA. I'm also a current co-chair for our People's Budget, People's Platform working group. I'm just going to read some from the press conference earlier. So... One thing that I focus on, come up here multiple times, is the parks, our trees. So as a mom of two who frequents the local parks and libraries on almost a weekly basis, it's clear to see that our public facilities need work. The city needs to prioritize spending in ways that benefit the community as a whole. Currently, our city spends over 50% of its budget on public safety, while parks and rec department accounts for barely 7%. Numerous studies show that cities that invest heavily in their green spaces and public libraries create stronger community relationships and social ties among other things. I'd also like to point out that our libraries only receive about 1.8% of our current city budget. So a small step that the city can take towards improving our green spaces. by adding trees as a line item in the parks and rec budget adding more trees to our parks and rec our parks and other areas of the city will not only improve our urban canopy but will also provide shade help with storm water management improve air quality and so much more i've personally spoken with city staff before and they will state that we're not planting new trees due to the water CURRENT DROP RESTRICTIONS. I CHALLENGE THAT AND I ARGUE THAT THE FACT THAT WE ARE IN STAGE THREE DROP RESTRICTIONS SHOULDN'T MATTER AS THE CITY CURRENTLY WATERS ALL TREES WITH RECLAIMED WATER IN THE FIRST PLACE. SO WE'RE NOT LOSING OUT ON ANY DRINKING WATER. I'd also like to mention, as someone who attended two in-person public input sessions and one virtual, those sessions could use a lot of work. There was only five departments there. There needs to be more work done. Attendance was so low. I know the city has a advertising budget. It's clear. Y'all use it to push desal a lot. So take a chunk of that. Use it to push these budget input sessions. These are important. They need to be accessible to working class people. We need to have our voices heard. Free Palestine, fuck ICE.

2:01:44Speaker 60

Thank you. Hannah Leach.

2:01:59 – 2:04:59Speaker 55

Good afternoon. I'm Hannah Leach from District 2, and I'm here representing as a corporate DSA member, and I want to encourage you guys to support our people's budget. So I moved here with my family in 2022, and it was quite a change for me to go from endless prairies to a vast coast, the Gulf Coast. It wasn't until I volunteered at the Oso Bay Wetlands Preserve that I really started to love the city, that I really started to enjoy it. Volunteering there really showed me, I'd say, the most precious part of our city, which is our children and our children's education. Because people would come there, they would bring their kids on school days as well as off days. to show them our beautiful park and our beautiful place. And I was able to show them the beauty of our preserve and hear about their curiosity and about our flora and fauna. And I'm here for you guys to ask that please don't forget about our wetlands and to remember our public parks when you consider our budget, to remember our trees and our birds, and to remember that if we abandon the preserve, we are also... abandoning our children's education. Because children's education is not just within the classroom, it is also as they go out into the world. I know I'm not from here, but I do really want to stay here. I want to make this place my home. The Corpus is the body of Christ, and as a believer, I want to tell you from the bottom of my heart that I believe if we spent maybe just as half as much money on our parks and our libraries as we do on the unnecessary infrastructure for the benefit of profit-driven corporations and giving huge tax breaks to same million and billion dollar companies, We could, more people would want to stay. More people would want to stay in Corpus if we put more money and effort and funding into people in places like the Oso Bay Wetlands Preserve. Like why don't, I hear a lot that we don't have enough funding for these places. But why do we have enough funding for AI data centers? That's something that always bugs me. Politics makes people uncomfortable, I understand that. I think it's important for us to get out of our comfort zone and be there for each other. I do not intend to attack anyone, but rather to critique and to push for change because I want for everyone to care for their fellow humans and to care for the land that we live on. That's why I wanted to volunteer there in the first place. I hope that you will hear us today in the same humble spirit that it takes to care for one another. Thank you.

2:05:01 – 2:05:15Speaker 60

Thank you, Ms. Leach. Autumn Hensick? Autumn Hensick? Okay. Chloe Torres? Yeah.

2:05:38 – 2:08:40Speaker 36

Chloe Torres, District 2. I'm speaking today as a member of the Corpus Christi chapter of the Democratic Socialists of America and to advocate for our people's budget platform. As you've heard, it's our way of increasing public participation and one of the most critical aspects of local politics as it literally determines how wealth is distributed throughout our city. I typically keep my comments and personal, so I don't lose composure, but I'm going to take a risk and speak from a very sensitive place today. I want to talk about my friend, Renee Davila, who was murdered from the organized abandonment he experienced at the hand of many government agencies, but in particular our city, I met Renee in the homeless and Corpus Christi Facebook community page in late 2024. He made a post about needing help with groceries. And while that's initially what made me reach out, It wasn't what gave me my first impression of Rene. It was the fact that he commented on many other posts offering guidance to those who were similarly struggling with homelessness and financial instability. As we spoke more and eventually became friends, I always took note that his compassion and willingness to help others never wavered. Many people in the best of circumstances don't rise to the level of compassion that Rene did, and I think he was remarkable for this. Rene was evicted a couple of months after we connected, and he had nowhere to go but to the streets. The very few public programs and services that are funded by the city were his main lifeline, and that line was profoundly weak. As library hours are abysmal, and shrinking and publicly run shelters are non-existent. Rene was already struggling with health before he was evicted. And once he was out on the streets with very few reprieves from the harshest heat and cold, he deteriorated quickly. He survived until December of 2025 when his heart finally gave out from the constant stress, lack of rest from constantly being forced to move by the police department and lack of access to healthcare. I grieve for Rene's family and all the friends who depended on him for their mutual survival. And I just miss my friend so much and regret not spending more time talking to him about our favorite animes or exchanging more silly memes. I grieve for the city that we could be, for all of the lives that have been wasted, lives that could have been fulfilled. And that's my why. That's my why for this people's budget. That's my why for engaging In the DSA, it's my why of why I've been organizing for the past decade in the city. I do it because I know we can do better. I know that we deserve better. And I want your partnership in this. It doesn't have to be an adversarial relationship. So I call upon the spirit of collaborative energy, of intention and care. And I hope that you will set meetings with us or accept our invitations to meetings when we ask to meet about the people's budget. Thank you.

2:08:41Speaker 60

Thank you, Ms. Torres. Maggie Peacock.

2:08:59 – 2:12:20Speaker 46

Thank you, Chloe, for sharing that. Yeah, Maggie Peacock, District 2. If you're not moved by stories like that, I... Maggie Peacock, District 2. I'm a very proud member of the Corpus Christi chapter of the Democratic Socialists of America. Because of the repeated failures of the city in regards to establishing democratic processes for creating a city budget, We at the Corpus Christi DSA have initiated our own community engagement processes and are actively developing our own budget priorities and demands through data based on countless years of organizing within our community and also just talking to our neighbors and fellow community members, like what Chloe was just talking about with Renee. Through this, we have developed three tenets of a people's budget. That includes democracy and transparency, quality of life programs, and people-centered infrastructure. Today I would like to focus on quality of life programs. We are demanding robust funding for programs and services that will improve our collective quality of life and produce equitable health outcomes. Mental health services that promote safety and reduce crime play a vital role in meeting these demands. Examples of these demands include de-escalation training for city staff and behavioral crisis response programs for community members, counseling services, restorative accountability processes and recovery programs, investment in evidence-based youth prevention programs such as functional family therapy and targeted diversion programs, and to dissolve the industrial district agreements, annex heavy polluting industries, and reallocate that extra tax revenue into community-owned funds for quality of life programs. Thank you for being committed to investing more in our libraries. Libraries are really among the last public spaces where people can simply be without having to purchase a good or service or spend any money at all. As Miriam Kaba says, the library is the last of public goods that exist. that we don't have to ask people to dream about making. It exists, it is here, and if we lose it, we will not get it back for a very, very, very long time. These are the political institutions, and all of them are sites of contention. We know that spaces like these are real forms of crime prevention, by the way, and we need more. We know that another world is possible, and that starts with the moral document of a city budget. We believe that our city should not be controlled by market forces or by capitalists, but by the people who inhabit them. Capitalists do not have a vested interest in things like parks and libraries because these things do not generate profit for them. We ask the question, why are we investing in things that solely generate profit for the capitalist class instead of investing in quality of life things for the people? But yeah, we're actively working on collectively uncapping our political imaginations to build this better world that we know is possible. I just have one more sentence. We think of things like we want strip malls or farmers markets. Do we want eight lane highways or a robust, equitable, accessible public transit system? Do we want urban sprawl or a walkable city? So I ask you to uncap your political imaginations with us. Thank you.

2:12:34 – 2:15:35Speaker 9

Good afternoon, Mayor, council members. My name is Armand Alex. I'm speaking today as the newly elected co-chair of the Corpus Christi chapter of the Democratic Socialists of America in support of the people's budget. I was born and raised here in Corpus Christi. I graduated from Moody High School and attended A&M Corpus Christi, and I love this city. And that's why I'm here and alongside many other folks in the audience today, organized to better our city. Budgets are often presented as technical documents. We're told about balancing numbers and having to make difficult choices and living within our means. It makes sense, but budgets are also never neutral. Every budget answers a simple question. Who are we willing to invest in? And year after year, working people, hardworking people are told that there isn't enough for them. Not enough for our parks, not enough for our libraries, not enough for our neighborhood infrastructure, not enough for the public spaces and the services that make a city healthy, connected, and dignified. Yet somehow, There is always enough when industrial expansion is on the table. Our city continues to devote resources, public resources that we pay for, infrastructure, planning, and political urgency to accommodate industries that already generate enormous amount of their own private wealth for them. At the same time, residents are asked to conserve more water to prepare for higher utility costs and accept that investments in our neighborhoods just got to wait. Those aren't separate decisions, these two things. They are the same budget as it is designed to operate. As a scholar and activist Ruth Wilson Gilmore reminds us, where life is precious, life is precious. A city budget should reflect that principle as well. The people's budget says if life is precious, then our children deserve libraries before corporations receive another accommodation. The people's budget says our neighborhoods deserve trees, sidewalks, and parks before polluters receive another public investment. The people's budget says our families deserve affordable public services before private profit is treated as a public priority. This is why so many residents over the years have supported a people's budget. It begins with a different understanding of what public money is for. Public dollars should strengthen the public. They should improve the everyday lives of people who wake up every single morning, go to work, labor, raise families, care for neighbors, and make the city possible. I urge you all as a council to adopt principles of the people's budget and build a budget that reflects the dignity, needs, and future of the people you were all elected to serve. Thank you.

2:15:40 – 2:15:52Speaker 60

Miriam Gara Rashidi. And then Fatima, if she wants to come down with you. Okay.

2:16:15 – 2:19:20Speaker 3

Good afternoon. Miriam Gara Rashidi, District 1. I'd like, again, to thank all of you for all of the hard work you do. It's not easy, and I do not envy you in any way, shape, or form. So God bless you. I want to start with thanking the city for the beautiful 4th of July celebration that we had recently. I hadn't gone in a long time, and I happened to be sitting at the water's edge with the live music and the food trucks right by the little park with the trees shading everyone. It was just so beautiful, and I was truly grateful. So thank you. whoever was involved and I know it takes a lot of people to put it together and I know that there are a lot of issues and problems that the city may have and that our country may have but I am so very proud to be a resident of Corpus Christi and a citizen of the United States so We have the right to speak and the right to fight. And that is the beauty of our country that a lot of people don't have. So I'm ever so grateful to be able to give my opinions and my thoughts. So thank you. That being said, I've already brought up the issue of the concrete and gas stations and quick quacks all over the city. And I just want to say that I know that in Austin... They have strict regulations that are upheld, not just to maintain, but to enhance the city's natural environment, living in harmony with the residents of the city. And that is completely opposite of what we do here in Corpus Christi. We have a chance, like I said, to create more jobs. As many people have said today, there aren't enough trees, there aren't enough parks. I'd rather have water go to trees and beauty than to big industry any day. So if we can all work together, if we could find some programs to help communities to have different, even if it's volunteer community parks. I know that Melissa Salmato was giving some compost classes for people. These are just such great ways for us to be in harmony with the earth. So these are, like I said, great ways great job opportunities for people. So let's fight for the beauty of our city and stand up for the people and the environment. And I still stand firmly against Inner Harbor desalination It is not a solution for us. We all know where the water would go to. We want, we're praying, we exhort you to serve the people. Thank you.

2:19:21Speaker 60

Thank you, Ms. Kedar Rashidi. Fatima? Oh, yeah.

2:19:32 – 2:20:42Speaker 57

Fatima Rashidi, District 1. It seems that while we are focusing on and still are focusing on desalination in the Inner Harbor, another major problem has been rising all over the area. AI data centers are coming everywhere unless we fight. Recently, the governor of New York signed an executive order to create the nation's first moratorium on new hyperscale data centers throughout the state. San Marcos became the first Texas city to ban AI data centers. New York and San Marcos banned AI data centers for a reason. They are looking out for the people and the environment. I was pleasantly surprised to see Governor Abbott call a ban on AI data centers in rural neighborhoods throughout Texas. I just want to say the city's inability to control what happens to communities with our county is disgusting. I'm still strongly against Inner Harbor desal, but AI data centers, Inner Harbor desal, and industrial plants are all connected. So put the people and the environment over profit. Thank you, and God bless you and your families.

2:20:43Speaker 60

Thank you, Fatima. Jessica Villarreal?

2:20:54 – 2:23:37Speaker 40

Jessica Villarreal, District 2. So much to discuss, I have to pick and choose on what to read about. It's pretty depressing. I'm here to voice my absolute opposition to the self-serving, short-sighted agenda currently playing out in this chamber. Let's look at what's really happening this week in the realm of the wicked. While everyday citizens are enduring strict drought restrictions and everybody's watching our reservoirs, UNETHICAL DECISIONS ARE BEING MENTIONED. I JUST DON'T UNDERSTAND THE NERVE. NOT TO MENTION OFFICIALS ASKING FOR RAISES, WANTING TO EXTEND THE YEARS IN OFFICE. THIS IS A PRIVILEGE FOR YOU GUYS. IT'S NOT SOMETHING THAT YOU TAKE. YOU HAVE TO PROVE TO THE PEOPLE THAT YOU'RE FOR THEM. You can't just try to bury the public in all the decisions that you guys are making for us. It's time to stop. We need change. We need transparency. We need honesty. That obviously isn't coming from a lot of people. The mayor, it's disgusting to see you on the television over there in Dallas, on the news, lying. You are lying. Everybody knows that you're lying. Also, I'm trying to change the amendment so that you guys are basically just trying, you're reaching for more power. It's gonna change. The election is close. Everybody is watching the decisions that you guys are making. Yeah, you too, Roland. You'll be gone. People are tired of this. It really burns my heart to see the elder up here worried. I've seen a video of you speaking about your parents in one hand, literally worried about the rates and the water and everything else. What happened to your worry? Where did you change? Why are you not for the people? It's very obvious where y'all's hearts are at. It's disgusting. It's overwhelming. We're tired of it. I hope to see some type of change and stop asking for money because it's not going to happen.

2:23:39Speaker 60

Thank you, Ms. Fierro. Jasmine Evans? Jasmine Evans? Oh, okay. Sorry.

2:24:02 – 2:26:19Speaker 41

Jasmine Evans, District 5. I'm here to talk about the Hillcrest desal plant and asking y'all to say no to approving the application. Council has not approved it and we the people absolutely do not. Our community has come out to speak out against Inner Harbor for years now. We're coming out today as well to ask y'all to say no. We're tired of wasting time, money, and resources on a project that nobody wants, except for those who directly make money off of exploiting our community. You have marine and agricultural workers, local workforce business owners, scientists, environmental experts, families, organizers coming out time and time again to suggest alternative water projects, insisting upon protective testing and regulatory guidelines, new locations, and it just falls upon deaf ears. Regardless if you want to say we're a democracy, a constitutional republic, whatever, the community you represent doesn't seem to move you. Money talks and you listen. Where was this initiative for communal funding and collaboration when it comes to saving our libraries? You put air conditioning in hell if you were paid to before addressing the needs of your people. Our children need safe spaces to grow and learn, clean air and water, jobs and educational opportunities that benefit us rather than bleed us dry. Our community deserves transparency and collaboration, not just very limited chances to be heard or rather ignored. We're hearing this issue come up across the board. DSAL, data centers, the budget. Y'all don't know everything, and that is okay. Lean on the expertise and perspectives of your Coastal Bend community. Let's actually work together to protect our Corpus Christi, not just from financially and environmentally ludicrous DSAL projects, but the incoming threat of data centers in our already fragile coastal community. Corpus, Robstown, Gregory Portland, Taft, we must work together. You have orgs out here like TCE, DSA, Sierra Club, For the Greater Good, Ignition, so many other people coming out here that are very qualified members, volunteers that want to work with y'all to meet our common goals. Thank you for your time.

2:26:20Speaker 60

Thank you, Ms. Evans. Melinda De Los Santos.

2:26:38 – 2:29:44Speaker 65

Good afternoon, Melinda De Los Santos, District 2. I'm going to speak a little bit on the interview with the mayor and Inside Texas Poly, but in a lighthearted manner, if I were mayor. Okay, the question was, have you thought at all that after a decade of trying to get this through, millions of dollars spent, if there's not an appetite for this now, is it time to walk away from the Inner Harbor desal plant? Your response was no, it took five years to get the permit. We have invested way too much time and millions of dollars. Me? Hindsight is 20-20. It's been a long, expensive road. So if it were up to me, I would say, let's cut our losses and walk away. What's the next step? Majority of council says we are not interested. Mayor, they are saying we are not interested. They aren't saying we aren't interested. If you are saying you are not interested, you need to walk the walk. our mayor majority council are not saying they aren't interested in desal they are just not interested in the inner harbor desal plant because of cost minimal ngd and a few have concerns about the environmental impacts you see delay after delay the farfield study is it going to be resolved once this comes back or do you think they're going to ask for something else I'm optimistic because we all know as a council, our city manager knows, this is the only shovel-ready project. Everything is lined up for this project. Me? I believe the farm field study may give us answers we didn't have prior. And if there is concern about the environment, that's okay. We have many shovels on the ground with diversified projects that will bring ample water supplies. And remember, we had all this rain, which, thank God, buys us some more time to assess the other desal projects. I was reading about the Inner Harbor plant. It could produce up to 30 MGD, which is a fraction of what you said the city uses. Is this the right project if it does not produce enough? It is. 30 MGD is a good number. We don't want to overproduce. Me, it isn't enough. To tell you the truth, It's mainly going to be used by industry, so we need to end exemption programs for industry and require them to pay drought surcharges. This way we can allocate more money for a desal plant. What point should the city move on from Inner Harbor and look at these other ones that produce a ton more water? Here is the problem. The Inner Harbor is the only shovel-ready project that we can consider. Me, there has been a lot of pressure from the governor and industry regarding the Inner Harbor. In fact, I've heard cases of retaliation and threats occurring. So I hope this far-field study will bring to light the impact it will have on our dear Hillcrest neighbors and environment. After September 1, when far-field study comes back, what makes you think the majority might finally say yes to this? Because you can only kick the can down the road so long. A decision needs to be made one way or the other. I have more of an appreciation of just make a decision and let's move on. Me, I think the far-field study, if done correctly and honestly, will finally put a halt to the Inner Harbor desal plant.

2:29:45Speaker 60

We can stop kicking the road. Julian Hernandez. Julian Hernandez. David Varga.

2:30:08 – 2:33:11Speaker 24

David Varga, District 4. There's two reasons why up to this point, let's go back three weeks before we got all the rain, that we were having to put more restrictions on our water. Because of this, the situation we're in. Okay, two reasons why we're in this worry. First of all, Mother Nature can't control what she does or what she doesn't do. Simple as that. The second one, you can take a proactive response or a reactive response to what situation you're in. Three years ago on my daily run, I passed a house by Kentner in Ponish. The guy watered his grass every single day. Didn't matter. Didn't matter if we had rain coming. Didn't matter if it was raining. Every single day. And so I saw that gentleman one day. I said, sir, why do you water your grass every day? He said, because I can. That is taking a proactive, that's taking a reactive approach with the water we had. If we would have had a proactive approach to our water crisis three years ago, we would not be in the situation we're in now. And it's very simple. For instance, I don't know if Mr. Rizzoni I hope I have the attention, and the council put the 8,000 gallon limit on households if we're going to go on the next water restrictions. That means because I use 2,000 gallons a month, I could put an extra 6,000 gallons of water that I can use Or in my backyard, nobody would know it. Take 10-minute showers, blah, blah, blah. That's 72,000 gallons a year just from one residence. And the formula is very simple. We did this back in 1980. 1,000 gallons of water per person, per household. Simple as that. And because of that, first time you do it, they give you a little warning. Second time, you cut the water off. That's taken a proactive approach. And that being said, that wasn't to be done. We need to start drought one restrictions at 50%, drought two at 40%. And that way, we wouldn't have to be reactive. We could still be proactive and still have water. And that's very important to all. We need to take our second most important resource to more of an exception and to more to dealing with. It's a lot that we have. People think we have a lot, but we don't. We live in a drought-prone area. Irritification has already come out. Our area that we get our water, especially in Cho Canyon, is going to be drier for the next 30 or 40 years, if not more. That's the predictions I've already read. So I would say to this council, we need to redo. if we go on to more restrictions, that we do 1,000 gallons of water per person, per household, and follow my regrets in that way, follow my suggestions in that way, maybe, maybe we're going to have more water than we need. And that's what we need to do. Thank you for your time. I appreciate it.

2:33:11Speaker 60

Thank you, Mr. Varga. Rachel Caballero?

2:33:25 – 2:36:18Speaker 62

Rachel Caballero, D1. It's really hard to come up here because it feels like we're attacking everyone, but I'm saying this is not for the five. This is for the four. If you're not paying attention, you need to wake up because the political environment that has been occurring over the last couple of years is changing. And the community is demanding to be involved. The community is demanding to be heard. And we're done with the tyrants. We're done with the tyrants. Ask Judge Canales. And it's so crazy that somebody who despised that individual so much is acting exactly like her now. It is crazy. This is craziness. Anybody that changes our ability to... utilize our constitutional First Amendment rights will not get reelected. Period. End of story. No matter how many losers you pay to defend you and bash Good citizens who are using their time and they're not getting paid to come here to air their grievances and fight for their community. We're going to continue fighting. This isn't the end here. So you can be on your phone. You can yawn. You can hem and haw. You can get up and go to the back. We're going to be here. We're not going away. This is our community. Oh, dang. I need my phone. all right the frustration levels are so huge because we are not being heard we're not how many different sessions have we told you people we do not want the inner harbor plant how many sessions we wanted to fund the far field modeling the community wanted to fund it you all said no But now you got the rich guys, David Loeb, promising $20,000 saying, oh, if they don't take this money, you didn't take our money when we wanted to do the Farfield study. So I'm seeing a theme here where people keep throwing bad money at bad mistakes. They keep throwing money at bad projects. For example, United States Court of Appeals for the Fifth Circuit Before Stuart Richmond Haynes Circuit judges per curiam, it is ordered that appellant's motion for an injunction staying the impeachment proceedings in the city of Corpus Christi pending appeal is denied in capital letters. Denied. So when you're throwing money at appeals and you have broken the law, guess what's going to happen? We will see you in the next two days.

2:36:27 – 2:39:36Speaker 63

Hi, I'm Robin Cox district three. And when I was here a few weeks ago, some ladies in front of me turned around and said, wow, this is like a circus. Well, you know why it's like a circus because the residents are fed up. They're mad. They're angry because they've been overlooked. They've been overlooked and pushed aside by industry. I'd come before to council, but I really started coming with the whole inner Harbor deal. I wanted to stand up for the residents of Hillcrest and also for my own health and my own safety. And what happened to me? I got totally attacked. Guess I must be making a difference when, like we said, we're getting people that the mayor has on her payroll attacking me, verbally attacking me and getting other pictures, using the Internet, cyberbullying. I thought cyberbullying was something middle schoolers had to deal with, but we're officially in middle school. Going after what I wear, my clothes. I called one guy that I personally knew, and he let me know, well, I'm getting paid. I need the money. Really? They're admitting it now. They're getting paid. Will you come up and say it? No, I'm afraid. I'm afraid of the backlash. When I've asked other people to come up here, you have all these things. Did you want to come up here and talk about it? No, I don't want to go through what you're going through. We're even going so far now as to attack the homeless, the lowest people that are at the bottom of the bucket in life. I had someone get on the internet or get on one of their little shows and say that my boyfriend, my fiance, was homeless. He never was homeless, but what if he was? This is what we do to society? Who did I have call me? Some of these nice kids, they called me and said, I'm so sorry. And you know what I would do? I would help. I would help the homeless. I wouldn't snub my nose at them. They're members of society. You talk about taking pictures with the bishop, the priest. Where is God in your life now when you do that? Where is God now? Don't go to confession anymore. You can't go to confession and keep doing the same bad things. And when they come up here and say I get paid, I've never taken a dime. I do this because I want to help my community. They want to find out some personal things about me. I can clear them right now. What race are you? I'll tell you what race I am. I'm of the human race. That's the race I belong to because I feel like we're all the same. Why am I doing this? I told you all why. You know, guilt hides in darkness. Truth comes to the light. So go on with the trial. I would want it to come out what I have to say if I'm guilty. You're going as far as releasing sealed records on somebody. Had paid someone to put up that my boyfriend had a drug charge 22 years ago. Boy, I can look into some of y'all's past. I know some drug usage going on up here that y'all probably don't want people to know about. One lady was taking pictures of me at the grocery store. Shocker. I buy beer. Yeah, I'm close to 60 years old. That's a shock. So when you do these things, think about it. You don't like them done to you. And I am a private citizen. Every day, one of them said, I'm bringing all kinds of homeless people. Do I help the homeless? Yes, I do. It's called being a good person.

2:39:36Speaker 60

Yes, thank you. Jim Klein?

2:39:40Speaker 60

Mr. Klein? Yes.

2:39:40Speaker 23

We have a 2 p.m. time certain executive session.

2:39:47Speaker 28

With our out-of-town attorney.

2:39:49Speaker 60

Right, okay, so we still have one, two, three, four, five, is that correct?

2:39:56Speaker 61

Two, no, I know, but this is for you. The only person online right now is Eli McKay, and Mr. Zertuch is here.

2:40:06Speaker 60

Okay, Mr. Klein, go ahead and come on up. And this is from your item, isn't it, Rebecca? The item in the 2 p.m. time certain?

2:40:17Speaker 61

Yes, ma'am, it's an executive session, the one on charter.

2:40:22Speaker 60

Right, right, right. That would be your item. Yeah, go ahead, Mr. Cline.

2:40:26 – 2:43:32Speaker 5

Good afternoon. My name is Jim Cline. I live in District 2 here in Corpus Christi. I'd like to talk to you today about data centers. Last week at the City Council meeting, there was some discussion about the Bootstrap Energy Project. I'm not sure what it's called now, but that was the original name of it. And members of the council and staff highlighted some of the problems with that Bootstrap Energy issue. that there was money that had been promised to the city of Corpus Christi that was not paid until the staff did not even catch this problem. It was a member of the public that had to catch this problem and bring it to the staff to get it corrected. I think what that does is it highlights the problems with IDAs. And what I would ask is that you seriously consider an audit of all 80-plus IDAs in the city to see if any of these other partners are reneging on the terms of their agreement. With regard to Bootstrap or whatever they're called now, I would argue that they are in violation of their IDA because they failed to pay when they were supposed to. That IDA should be null and void, that land should be annexed, and they should be paying 100% of their property taxes and be bound by all regulations in the city. There's another data center being proposed. being under construction very close to Cal Allen, just outside of Cal Allen, within less than a mile from East Cal Allen Elementary School. This is the HUD-8 data center that you heard about a few minutes ago as well. I have real concerns about this as well, about the water usage for all these data centers. And you heard this talk about a closed-loop system. At least 75, if not 85 percent of the water usage from data centers comes from their energy production. If they have a closed loop system, their energy production goes up. That means their water usage in the front side is going to be that much higher than it yet as well. So I have real concerns about that. I have concerns about the electrical draw. I'm not convinced that our shaky grid is over the problems we had just five years ago. And I think worry as well that this additional draw from electricity is going to raise electrical rates. There are temperature issues involving this as well. What I'm seeing now, studies indicate that in the immediate vicinity of these data centers, temperatures will rise 20 degrees above the atmospheric temperature. And within a mile, this is again where East Elementary, Catalan Elementary School is going to be located, temperatures will rise 10 degrees more above atmospheric temperatures. On a day when it's 98 degrees outside, that's pretty alarming. I have concerns about the noise as well. There's a low hum that comes from these things. Some of the noise is inaudible to the human ear, but seems to be having a negative health consequence nonetheless. People are unable to concentrate. People are unable to sleep. The location for this HUD-8 center is the last place we should be doing this. It's right, as I said, next to this elementary school. I know this is technically outside the city limits. It is gonna affect people in the city limits. And I think that we need to be doing something about this. I also, from what I understand, looking at the maps, I think 25% of HUD-8's property is within city limits. Most of it is outside, but 25% within city limits. I ask you to consider that as well. Thank you.

2:43:33Speaker 60

Thank you, Mr. Klein. Mr. Zanoni, is the briefing gonna include the details of all of this, the HUD-8?

2:43:40 – 2:43:54Speaker 20

Yes, so Ryan is going to present a briefing, and he's been tracking the comments and questions, and I've asked him about half an hour ago to answer as many as he can during his presentation today. I just wanted to be certain.

2:43:54Speaker 60

And we're going to go ahead, Mr. Zaduce, since you're here, you want to go ahead and do your public comment, and then we'll break.

2:44:11 – 2:47:17Speaker 47

Albert Sartucci, D3, Hard Life Spade and Tackle owner, Team Hard Life YouTube channel as well. Why is it almost two years now we still haven't gotten any answers from the questions I asked about the experimental Inner Harbor desal plant scam? No updates. Maybe I've got to get on the bandwagon to get paid to spread false information and learn the behind-the-scenes payments. Also, there should be an update on those who sign up to speak. online but cannot speak because they're at work there so there should be some kind of amendment set up to where somebody comes out and verbalizes what they have posted because they're taking the time out of their day to get on there with the chance of being able to speak it's obvious y'all are trying to deny it because y'all are trying to go into executive session now which means they got to further put their their day off to come and speak to y'all y'all are making it impossible and this is wrong Back to the experimental Inner Harbor desal plant. Is it in the best interest of the taxpayers when we're not going to be getting that water? No, it's not. But you're going to make us pay the brunt of the force on that. The facts are large industry users continue and historically account for a significant use of the municipal water, yet they refuse to pay their fair share while they continue to sue our city for reduced rates on taxes. which the taxpayer citizens end up having to carry that burden. Example, my house jumped $18,000 in taxes for one year. That is ridiculous. They refuse to pay their fair share in natural resources, yet the taxpayers are having to pay top dollar for increased costs per year. Look at our water bills. Facts again. We, the taxpayers, need to see the real total of the cost for the 30-year terms, including taxes, which will include about $2 billion alone in repayment for that $1 billion diesel plant. We, the people, demand the truth for the far-field model. The scientists and marine biologists have still been denied the information so they can continue doing what they need to do to show. What are those totals in the billions of lost revenue needs to be shown to get us an understanding how the taxpayers actually carry this city, not industry? That's a fact. We carry the city. We pay the taxes. We pay for everything. Industry is not carrying us. That's a false information right there. And you can Google the facts. It's all in there. It's all in your actually it's all in your city documents showing that we pay more for everything. We have seen the numbers. The total of the Texas industry is paying millions less than the whole city. We have seen the numbers from natural resources. They drain hundreds of millions of gallons of water and pay less than taxpayers do. I run several small businesses in our city. I can see how numbers work and don't work. I move accordingly. The city council needs to remove corruption and industry lobbyists sitting in conflict of interest no different than insider trading.

2:47:19Speaker 60

Thank you, Mr. Sertice. Who is online?

2:47:24Speaker 60

The other two are not?

2:47:26Speaker 60

Okay. Let's go in now.

2:47:27Speaker 61

Okay. Ms. McKay? Hello?

2:47:32 – 2:48:23Speaker 43

Hi, Eli. Hi. Hello. My name is Eli McKay, and I live in the historic north side, District 1. Some might call it Refinery Row, but I much prefer to call it the historic north side. There's a lot of items on today's agenda that I wanted to chime in on. But unfortunately, I had to watch virtually today. So I'll do the best that I can with this time. Let's start with item 17. No one cares what the outgoing governor has to say. His words are always a political stunt and never for the people. Item 18. An IDA for the tech bro losers of Hut 8 who lost $250 million last year.

2:48:23Speaker 42

No, thank you.

2:48:25 – 2:50:12Speaker 43

They are already beginning to pillage part of our community that has retained its small town feel. But Beacon Point will change Cal Allen, Anneville, and Robstown forever. The council that fell for the Ponzi scheme of the bootstrap debacle made our city a target. and now those tech bros see a bunch of dum-dums to take advantage of. And here we are. I don't think y'all are dum-dums. Let's not do this. We do not need another IDA. We need an audit of all existing IDAs so that people can understand how much we're sacrificing to these corporate sweetheart deals. No new IDAs. Okay, item 20. Finally, how pathetic How how laughable to see the ignorance of the rich pawns to fork over cash for a grant that could produce a tiny portion of funds for a zombie project that no one wants. David Loeb donating $20,000 and boasting about it on Facebook to stroke his ego only proves the points that many of us have been making for decades. Maybe He should invest that money into filling his properties in uptown and stop blighting uptown. There's so much more I could say, but I know y'all have an executive session to get to, and so I'll give any of the remaining time that I have for a moment of silence to those who are killed by poor planning and the bad decisions of rich people.

2:50:41Speaker 61

Thank you, Ms. McKay. Mayor, that concludes the public comment period.

2:50:45 – 2:51:29Speaker 60

Okay. So we're going to go, the council's going to go into executive session on items 23 through 25 per Texas Government Code sections 551.071, 551.072, and 551.074. And we will return. Okay, we're gonna go ahead and reconvene our meeting. We have no action, so we're gonna go to our consent agenda items. That is section I, items three through nine. Council members, do we have any requests to pull any items three through nine? Nope.

2:51:31Speaker 25

I move for approval.

2:51:33Speaker 60

Well, I'm gonna ask the public, is there anyone in the public that would like to pull any items three through nine?

2:51:39 – 2:51:51Speaker 20

And they are we're going to number 9 we're going to just defer to next week a delay him to pull it and delay it till next year pulling number 9 yeah we have to do a little more work on number 9 so pull that one okay we'll see you next week.

2:51:52 – 2:53:00Speaker 60

Consent agenda agenda items 3 through 8. We have a motion in a second. Please submit your vote. Oh, I just saw that. Okay, the motion carries. Let's see, Section K, that is our public hearing. Item number 10 is an ordinance approving the Corpus Christi Crime Control and Prevention District Budget for fiscal year 2027. Okay, well, we can move on to the next one, come back to it if you'd like us to, Pat. Okay, we'll come back to number 10. We'll go to number 11 is zoning case number ZN9255, House Finder TX, or I'm sorry, Texas LLC. This is in District 1. It's a rezoning property at or near 556 Virginia Avenue.

2:53:05 – 2:55:16Speaker 21

Good afternoon, Mayor, Council, Yvette Wallace, Interim Director, Development Services. The subject property is in District 1 with a request to rezone the subject property from the CG2 General Commercial District to the RS6 Single Family 6 District. The subject property is plotted and is .017 acres. The owner has requested a building permit for a 1,200 square foot single family home. The purpose of this request is to allow aforementioned construction of a single family home The property is part of the West Side Area Development Plan, adopted on January 10, 2023. And the subject parceled is Zone CG2 General Commercial District, with the north being Medium Density Residential, RS6, the south being Medium Density Residential, Zone CG2, and then the east is Commercial Zone CG2, and to the west is Public Semi-Public Zone RS6. Regarding the required public notification, 21 notices were mailed inside the 200-foot buffer. Seven notices were mailed outside the 200-foot buffer. Zero notices were received in opposition. Zero notices were received in favor. The proposed rezoning is generally consistent with the elements and goals of the City of Corpus Christi Comp Plan. However, it is inconsistent with the future land use designation of mixed use. The requested amendment is compatible with the present zoning and conforming uses of nearby property and the character of surrounding neighborhood. The abutting property to the north is zoned RS-6 Single Family 6 District, and much of the block continuing the north maintains residential land use up to Baldwin Boulevard. Additionally, the abutting property to the south is zoned CG-2 General Commercial District and has been utilized as a single family residential structure since 1955. If approved, this rezoning will allow for the continuity of single-family residential uses. It should go unnoticed that the shortage of attainable and affordable housing creates a need for additional infill housing opportunities, such as the proposed zoning case. The property is suitable for the uses permitted by the zoning district that would be applied by the proposed amendment if approved. A Planning Commission and staff recommend approval from the CG2 General Commercial District to the RS6 Single-Family 6 District. And I'll stand by for any questions.

2:55:18 – 2:56:03Speaker 60

Okay, we have a motion and a second. I'm gonna open public hearing. Is there anyone in the audience that would like to speak on item number 11? Okay, there being no one, we'll close public hearing. Please submit your vote. Okay, the motion carries. We'll go back to item number 10, and this is an ordinance approving the Corpus Christi Crime Control and Prevention District Budget for fiscal year 2027. Okay, we have a motion and a second. Councilwoman Gumpels.

2:56:03 – 2:56:48Speaker 44

Thank you, Mayor. I think every year that we pass this budget, I always, I mean, I try to... to ask, make sure that we are using these dollars for crime prevention. I think I've asked this before, is to show proof. I mean, what is it that the police department is doing to actually prevent crime? I did share something that another city was doing just this morning. For example, just leaving the lights on at the basketball court down by Water's Edge. As a matter of fact, it helps to reduce crime. But again, this is just one example, but I wanted to hear what it is that the city is doing to actually reduce crime.

2:56:49 – 2:57:27Speaker 32

Yes, Councilman Campos. Assistant Chief Blackman, Police Department. You know, that's a great question. And let me start by saying, you know, we're not against crime prevention programs and all these, but everybody knows that we're funding seven to eight officers out of this budget, right? So as far as what are we doing, I stand before you 38 years as a police officer. And through the years, crime control, I've been part of a bunch of this. So I was one of the first bike officers when the creation of the bike team, one of the first direct patrol officers, all of those things were covered. by the crime control. And I know we've already heard that, but let me kind of tell you what we do with those programs.

2:57:28 – 2:57:49Speaker 44

Well, I wanted to see statistics is what I've been wanting to get from the police department. Show me that your programs are actually reducing crime. I've not seen it. I've not heard of it. Again, this is going to be my third year that I've been here. And that has not been brought to the right.

2:57:49 – 2:58:19Speaker 32

And preventing crime. Sometimes it's a, it's hard to show what crime you prevented deterrence. And then like chief Markle said, one of the, one of the biggest crime prevention deterrence is a, as a Mark police car in the neighborhood, bike officers in a neighborhood, your direct patrol officers, working with code enforcement, eliminating blight, those things. So they're reducing crime by doing these things. Sometimes those are hard to measure because the crime hasn't happened yet, right?

2:58:19 – 2:58:36Speaker 44

Well, I'm just looking at nationally when your cities are proud of the reduction of crime. It's in the news. You hear of cities... actually reducing crime. So I'm like, okay, well, what is it that that city is doing that where we could be doing?

2:58:36 – 2:59:07Speaker 32

And our numbers, our numbers, uh, have come down and some, and some they're staying, staying flat. Uh, we always say we, you know, we, you know, we're hesitant about taking credit. There's a lot of, they take credit for, for big crime reductions, but at the same time, you have to be willing to take the hickey when crime goes up. Cause sometimes there's national trends that you look at throughout the country, you'll see crime rises and falls throughout the nation. It's the weirdest thing, but you look at it and throughout the nation, crime rises and falls throughout cities.

2:59:07 – 2:59:36Speaker 44

Okay, so let me just say it this way. Could you bring us statistics? from let's say the last, I don't know, 10 years or something that shows that what you're doing with the $11 million that we budget for this, that crime is being reduced. Could you provide that? And if it's not, then maybe that's what we need to know. What is it that we could do that we're not doing? Could you provide those statistics to us?

2:59:36 – 2:59:54Speaker 32

We can provide statistics showing what our crime numbers are for the past years. You're funding seven, eight officers that are out there working the streets, right? I can't, you know, I can't, nobody can provide numbers for what you've prevented, what you may have stopped from happening.

2:59:55 – 3:00:22Speaker 44

If you prevented that crime just by having that officer in a neighborhood and... Well, I think you could because I think if you're saying that the reason that why we need to increase police enforcement or police into the city, you know, having... it's actually helping because now we don't have as many robberies or maybe we don't have as many killings or, you know, whatever. Right? And we can show you where those time reduction numbers are.

3:00:22 – 3:00:41Speaker 32

Right. What I'm getting at is, and you alluded to a very good point about leaving lights on it, at the basketball court. some of those things are deterrent and they're hard to measure. Others, others are, we can, we can provide numbers and show you what, what the crime reduction numbers are. And I think, I think we have over the years, especially during the summer.

3:00:41 – 3:01:40Speaker 44

I, I, I just sent that article to the chief and Peter and, to see something that we could discuss. But, you know, I remembered that you were coming here, so again, just wanted to see what, if we could bring that into our conversations. You know, let's see what we can do, you know, in addition to, I know that y'all, at least for me, you know, throughout the years, at least a rapport that the police department, at least personally, has had with the community, myself, has gotten better. I mean, way better than when I was growing up in the 70s. And so I appreciate that. And that, I think, is attributed to training. because, you know, it does. And so I do feel that, you know, the police department has come a long way, but I also feel that, you know, you can show us the numbers to show that this money is being used wisely. So again, you know, I will support this, but I still want to hear those stats.

3:01:40 – 3:01:57Speaker 32

And Councilwoman, not to belabor your point, but I will say that so every time we had a crime prevention district meeting, we provide them with stats, crime stats, what the stats are for the month or We can for the six months. By all means, we can provide you with crime stats.

3:01:57 – 3:02:08Speaker 44

Okay. Well, this is an important agenda item, and it would be helpful to have that. Okay. Well, I think already somebody seconded, so.

3:02:09Speaker 60

We have a motion to second. We have a couple more comments. Councilman Scott.

3:02:14 – 3:03:56Speaker 34

Thank you, Mayor. I had the honor of block walking for this effort in the late 90s. I've supported it ever since then. I thought it was a fantastic effort. endeavor for the city. I had a really interesting evening last night. I had the opportunity to be with some of our finest at a neighborhood meeting talking about some neighborhood problems. And the Director of Patrol officer was there. And it was an extraordinary experience for me just watching you all and your knowledge and the way you interacted with people. personally, I think you make acronyms up just on the fly. I wasn't sure half the stuff you were talking about, but you were, your folks were impressive. Um, and I think the neighbors felt it. So I'm a huge fan. I, I do get the math. You eliminate what? 78 police officers. That'd be bad. You know? So, uh, I think I appreciate that they're there and appreciate what they're doing. Um, I do get a chance to talk to my appointee regularly, and he's very supportive of the Crime Control and Prevention District, thinks you guys are doing great work. And then I'll close by saying I thought part of the most interesting part of my evening last night was the sidebar conversations with our police force, what the chief was here. and to learn how innovative you all are, and it's outside of our world. And the examples they used about how you see these other communities that get themselves in trouble, and they go, well, we're not going to do that anymore. The chief's saying, well, golly, Chief Garrett stopped us doing that back in the, you know, the 90s, you know. And so my sense is you guys are innovative. You're doing all you can. I'm very supportive and just want to say thank you. Thank you, sir.

3:03:56Speaker 60

Councilman Cantu.

3:03:57 – 3:05:17Speaker 26

Thank you, Mayor. First of all, I support this 110%. Can you imagine not approving this and then having 78 officers off the streets? I mean, that's crazy. In my own opinion, I think crime has gone down, what I see. Of course, on the news and briefings that we get and stuff like that, I think crime has been has been down. I mean, there's always going to be crime no matter what, no matter how many programs you have out there, no matter how many officers you have out there, you're going to have crime. Um, a lot of people on social media, you know, don't support the cops. I wish I could say what I want to say, but, um, you know, there's, there's a saying, um, If you don't want to call 911, then call a zip, you know. Call them a clown. Call a clown except to call 911, you know. I'm going to call 911 because I need you guys, you know. So I support you guys, and I support this. And how much money was it, Peter, on this?

3:05:19Speaker 20

$11.2 million a year.

3:05:21 – 3:05:33Speaker 20

Yes, sir. That's a 1.8 cent sales tax, and so it generates about that much revenue each year. And you said about 78 existing police officers are funded out of this fund. Yes, sir.

3:05:33Speaker 26

How long has the crime control budget been around?

3:05:38Speaker 32

It was initially in 97. 97?

3:05:42Speaker 20

Got it. 20 years, right? Yes. The first term was 10 years, and it was renewed once already, so this will be the third renewal. Got it. Okay.

3:05:50Speaker 26

All right. Awesome. Thank you.

3:05:53 – 3:06:16Speaker 60

Chief Blackham, thank you. Thanks for the presentation. And I want to thank the board members of the Crime Control Board for all that they do. And this is, again, as everyone has said, an incredibly important board. And, of course, their budget is critical. Seventy-eight officers is a lot. That does include, does it include their, yeah, their equipment as well?

3:06:16Speaker 32

Yes, equipment, cars.

3:06:18Speaker 60

Right, right. So I know we're very dependent on that. So, yeah, thank you for that. We appreciate that. Councilman Vaughn.

3:06:26Speaker 37

Well, I support this. The most of your budget is the 78 officers, over $10 million.

3:06:31Speaker 32

That's correct.

3:06:32Speaker 37

Clear. So what is the $100,000 for election cost?

3:06:35Speaker 32

So that is actually to hold the crime control vote in November. Okay. Because it has to be renewed through the vote.

3:06:44Speaker 37

You all have to pay for that? Yes. Okay. And the professional services? Yes.

3:06:48Speaker 32

It's, that is going to be, that's for the MDR, right? So that is for the advertising and stuff to get out to the public.

3:06:56Speaker 37

Okay. And then what do you have to contribute over to the police academy?

3:07:00Speaker 32

We're not contributing anything. That's zero this year. So we had some residuals from before, but this year it's going to be zero.

3:07:07 – 3:07:23Speaker 37

But next year you're going to? No. It says 26383? It says 2627, yes. Hmm. Okay, on expenditures, police academy cost 26, adopted budget, amended budget 383.

3:07:24Speaker 32

Yes, that was the residual from the academy from last year when we built it. So for this budget coming up, it will be zero.

3:07:30 – 3:08:14Speaker 60

Okay, thank you. Yes. Okay, we have a motion and a second. I'm going to open public hearing. Is there anyone in the audience that would like to make a comment on item number 10? Okay, there being no one, we're closing public comment. Please submit your vote. The motion carries. Item number 12 is a zoning case number ZN9250, Moorhead Dots, Ryback, located in District 2. This is an ordinance rezoning a property at or near 301 Indiana Avenue, 305 Indiana, and 2767 Santa Fe, and 2771 Santa Fe.

3:08:17 – 3:10:33Speaker 21

Mayor council you've got Wallace interim director development services The subject properties are in district 2 with a request to rezone from the o n Neighborhood office district and from the CN 1 neighborhood commercial 1 district The subject property is point 4 6 acres an area all for the lots are plotted with a 50 50 foot width widths and each roughly 5,000 square feet in lot area and The purpose of this request is to allow a vintage retail store at 2767 Santa Fe Street. Article 5 of the UDC stipulates that the retail uses must serve as an accessory to an office use. In this context, a small boutique currently occupies only half of the total area of the structure. Upon approval of the rezoning, the boutique store will be permitted to occupy the entire structure. The applicant proposes to utilize the two vacant lots that are on the northernmost part of this parcel as open space for community-friendly events. The properties are part of the Bayside Area Development Plan, which was adopted on December 10, 2024. The subject parcel is zoned currently ON Neighborhood Office District. The north, south, and west is medium density residential zone RS6, single family with the exception of two properties to the north and four properties to the east zone RM1 multifamily and RSTF2 family, where townhomes duplexes reside. To the east is commercial zone CN1, neighborhood commercial, Sugar Baker's Restaurant, Baba Furniture Store, Fork and Vines Restaurant, and Mia Mia Pizzeria. Regarding the required public notification, 36 notices were mailed inside the 200-foot buffer. Five notices were mailed outside the 200-foot buffer. Zero were received in opposition. Three were received in favor. The proposed rezoning is consistent with the Bayside ADP. Of the four lots to be rezoned, two of them are inconsistent with the future land use designation of medium-density residential. While the other two lots located at the southeast half of the property will maintain the commercial flume designation. The requested amendment is compatible with the present zoning and conforming uses of nearby property and to the character of the surrounding neighborhood. The property is suitable for the uses permitted by the zoning district that would be applied by the proposed amendment if approved. Planning Commission and staff recommend approval from the O.N. Neighborhood Office District to the C.N. 1 Neighborhood Commercial 1 District. And I stand by for any questions.

3:10:34 – 3:11:55Speaker 44

Councilwoman Campos. Thank you, Mayor. Well, I really wanted to bring wanted to hear it only because I love that neighborhood. I love the pizzeria, the sugar bakers, Baba's and what is actually happening happening right there. It reminds me of when I ended up going, visiting New Orleans, I think, New Orleans, yeah, where it has that kind of mixture where the residents and the businesses are coexisting. It's just a really cool, nice feeling, and there's just not a lot of these kind of niches in our city, and I just wanted to congratulate the owner. I actually met her I don't know, a couple of months ago I was on my way to the beach and they were having a flea market. There was a lot of parking. I'm a little concerned about that, but hopefully the residents will be good neighbors and be able to navigate that because I don't think it happens all the time where they have these flea markets, but yes, I wholeheartedly support this, and I'm glad that the, I guess the owner is here, and hopefully that people will go and visit this vintage shop. I'm like, oh, it's exciting. So with that, I move for approval. Second.

3:11:55 – 3:12:09Speaker 60

Are you the owner? Oh, raise your hand, okay. Yeah. I think you emailed? Yes, okay, great, great. So we have a motion and a second. I'm gonna open public hearing. Is there anyone in the audience that would like to make public hearing on item number 12?

3:12:15 – 3:12:46Speaker 38

My name is Yvette Richards and I am the owner of the Vintage Pearl. We have been so welcomed by the community. When Ms. Campos came in, it was just, it was amazing because it happened at the perfect time. The store was loaded with customers waiting in line. We were having our market, our open market, which I had 20 vendors. The community came out in full support. Most of the vendors sold out of all of their items So it's been fantastic. I can't thank you enough for being there.

3:12:46Speaker 44

And I was one of those that bought a couple of vintage items. So, yes, good deals.

3:12:51 – 3:13:04Speaker 38

Yes. Thank you. Like I said before, the community, all the neighbors, they walk over. All of our morning people who have breakfast or brunch at Sugar Baker's walk the street over. It's been fantastic.

3:13:04Speaker 60

That's wonderful. Thank you, Mr. Richard.

3:13:05Speaker 38

Thank you so much.

3:13:06 – 3:13:41Speaker 60

Yes. Anyone else? Okay, we'll close public comment. I think we have a motion and a second, so please submit your vote. Okay, the motion carries. Item number 13 is a zoning case number ZN9194. This is Miller Street Holdings, LLC, located in District 1. It is an ordinance rezoning a property at or near 3641 Mueller Street.

3:13:41 – 3:16:50Speaker 21

Mayor, Councilman Yvette Wallace, Interim Director, Development Services, this is the last zoning case today, I promise. So the subject property is in District 1 with the request to rezone from the CN1 neighborhood commercial district to the CN1 with a special permit. The subject property is 0.23 acres in area and unplotted. The purpose of this request is to allow a wireless telecommunications facility to be erected. The property is part of the West Side Area Development Plan adopted on January 10, 2023. The subject parcel is Zone CN1 Neighborhood Commercial. North is public, semi-public, and medium-density residential, Zoned RS6 and RM1. To the east is vacant and medium-density residential, Zone RM1. To the south is commercial and vacant zone CN1 and CG2. And to the west is public, semi-public, and commercial zone CN1 and RS6. Regarding the required public notification, 14 notices were mailed inside the 200-foot buffer and three notices were mailed outside the 200-foot buffer. Zero notices were received in opposition and zero were received in favor. Within a one-mile radius, there appears to be four towers. The proposed tower will shrink a gap in coverage. To note, the nearby tower is a small rooftop, a small telecom tower on the old value bank building, so it's not a large telecommunication system. The proposed rezoning is consistent with the City of Corpus Christi Comprehensive Plan. However, it is inconsistent with the land use designation of commercial. The applicant's request is compatible with the existing zoning and conforming uses of nearby properties as general necessity and a use with very limited on-site activities. And additionally, the sleek, space-efficient monopole tower with co-location will have limited visual impact on the surrounding area, and the proposed infrastructure generally expected to be part of the landscape is deemed a necessity and will augment critical infrastructure. To accommodate the growing demand for telecommunication services, The Unified Development Code regulates the development of telecommunication towers and facilities in a manner that addresses location needs while also balancing compatibility factors such as aesthetics, distractions, and public safety. Telecommunication towers have the ability of polluting the landscape if not properly regulated, which can result in adverse impacts on the overall aesthetic and causing damage if designed on a site that's poor for this type of development. The proposed tower adheres to all of our standards. The property to be rezoned is suitable for the use to be permitted by the special permit to be applied. And staff determined that the requested zoning map amendment will not have a negative impact upon the surrounding neighborhood. Planning Commission and staff recommend approval of the special permit. So the special permit is going to limit the telecommunication tower by height. So this one specifically will be limited to 115 feet. And it has to be designed to meet the maximum wind speed of the area, which today is 143. Access and placement will be off of Mueller Street. And, of course, like any special permit, it has a 12-month limitation. So if work is not started in that 12 months or if they cease to use the property as telecommunication, they'll revert back to the base zoning. And I stand by for any questions.

3:16:50Speaker 18

Make a motion to approve.

3:16:53 – 3:17:47Speaker 60

We have a motion and a second. I'm going to open public hearing. Is there anyone in the audience that would like to make comment on item number 13? There being no one but close public comment, please submit your vote. Okay, the motion carries. Section L, individual consideration items, item 14 through 20. Item number 14 is an ordinance reappointing Jacqueline Deliano-Chapa as presiding judge for a two-year term of office beginning August 1st of 2026 and ending August 1st of 2028, appointing Carlos Omar Reyna as part-time judge, number three, for an unexpired term of June 24, 2025 through June 24, 2027. I'll make a motion to approve.

3:17:50 – 3:18:03Speaker 60

Okay, we have a motion and a second. I'm going to ask for any public comment. Would anyone like to make comment on item number 14? Okay, we'll close public comment. Please submit your vote.

3:18:19Speaker 61

Mr. Gunther, do you want to vote?

3:18:29 – 3:18:41Speaker 60

Okay, the motion carries. Item number 15 is an ordinance amending Corpus Christi Code section 55-50 regarding water rates for all customer classes effective January 1 of 2027.

3:18:47 – 3:29:39Speaker 15

Good afternoon, Mayor and Council, Nick Winkelmann, Corpus Christi Water, Chief Operating Officer. I would like to go over first the adjusted water rates, but nothing, just to remind everyone, nothing has changed since our last two workshops, so this will purely be a review of the previous information. Reminder of the goals. So this is a continuance of our 3 year phase in legacy stormwater water debt plan. And we we've outlined the approach over the previous years for 2025 so in 2025 0% of the water rates went to the legacy stormwater debt. Where the remaining went to was paid by wastewater 2026 14% of the rates The legacy stormwater debt was paid by water and in 2027 the proposal is 36%. 2028 in future years we're proposing 50% water and 50% wastewater to cover this stormwater legacy that service. Also this year the debt service coverage is 1.25% in accordance with city policy. Couple of things to note. The minimum charges for the outside city limit customers will be slightly lower than the inside city water customers, primarily because of the stormwater debt. The outside city limit customers do not see benefit from the stormwater improvements. Monthly minimum charges were improved to be progressive for meter sizes up to 30 inches in diameter. The water and wastewater funds will continue to meet cash reserve and debt service coverage requirements. When you look at the rate adjustment drivers for water. 21% of the adjustment is required for operating expenses. Another 21% is required for prior approved CIP project debt issuance. 36% of the adjustment is associated with our new water supply projects, and 22% is associated with debt service coverage. The next slide shows more specific details of the projected debt associated with our new water supply projects. Again, this is the same slide that we've shown in our workshop. But you can see we have different projects listed, including the Nueces groundwater program, the brackish RO treatment of the Nueces groundwater, the reclaimed water or the wastewater reuse project. We also have the Evangeline project as well, also known as the San Patricio groundwater project. We've detailed the monthly minimum charges. On the left of this page is the inside city retail water charges. On the right is the outside city retail water charges. You'll note that the inside city is a little bit higher than the outside. Again, that's associated with the legacy stormwater debt. Slide 9 is a detail of the different rates and their adjustments for fiscal year 27. And I would like to go to some examples. We will go through some examples of residential users in the forthcoming slides. But I do want to cover first our wholesale customers. So the public agency wholesale raw water rate For San Pat, Municipal Water District, South Texas Water, Port Aransas and Violet is $1.43 per thousand for the proposed fiscal year 27. Wholesale treated water for San Pat Municipal Water District and South Texas Water Authority is $1.74 per thousand gallons of water. Wholesale treated water utilizing our distribution network is $2.33 per thousand gallons. Those costs are largely determined just per the requirements of the contract. Wholesale water taken from the river. We have a number of customers who actually take water directly from the Oasis River. They are the San Pat Municipal Water District, Celanese, and Flint Hills. The current rate is $1.36 per thousand. The new rate proposed for fiscal year 27 is $1.45. Now I'd like to go through some examples of our typical customers. Again, this is not new information. It's identical to what we've shown previously in the workshops. Typical residential customer, and we always use 6,000 gallons of water when we're talking about rates. The 2027 adjustment is an additional $2.48 a month. Again, that's for a household using an estimated 6,000 gallons of water per month. In 2026, the adjustment was $4.78. So the adjustment last year was more than two times greater than the requested adjustment this year. Commercial... Customers, a 20,000 gallon commercial customer, which is a typical restaurant in the city of Corpus Christi, they would have a monthly adjustment, an increase of $15.70 a month. So that is a commercial customer within the city limits that's using 20,000 gallons of water per month. When you look at large volume customers, we have three separate examples for you. The first is a high-end large volume user. That's 260 million gallons per month. That customer will be paying an additional $67,629 per month in 2027. A middle large volume customer would pay an estimated $23,429 per month. And then what we would call a small, large volume customer would essentially be paying $3,149 additional per month. The wholesale customer receiving treated water would pay an additional, on average, $4,129 per month. That's a customer using 50 million gallons of wholesale treated water per month. Then one thing that we talked about is rate impacts over a period of time. So NewGen, our rate modeler, along with the CCW finance team, developed this chart to show the projected rate impact until 2036. And you can see the increase for the different sizes of meters and customer classes. This is meant to show, again, this is just a projection. Things change over time. And that's one reason why we recalculate the rates on an annual basis. But this is a projection showing potentially what the rates could be over the next 10 years. Rate comparison, where do we fall along other cities within Texas? So the bottom yellowish line is our current rates. This is for an average residential customer. So in 2026, Corpus Christi is $42.07 a month for an average residential customer. Projected in 2027 is $44.55. You can see with the adjustments, we are a little bit below middle of the pack here. But I do want to call to everyone's attention that these rates with the other municipalities are 2026 rates. I'm fairly confident everyone's water rates will be raising this year. This slide is a historical view of water rates since fiscal year 2020. You can see over the years where water was increased and held at zero and actually decreased throughout this time frame. There's a lot of detail on this slide. We've shown both residential, commercial, and large volume. One thing to note is in this table, and this item is solely on water rates, but on this table we have shown both water and wastewater rates, showing the history for that. The same thing goes for our commercial customers. And then, of course, our large volume users do not use our wastewater services. Before I stand by for questions, I do want to acknowledge Andy McCartney with NewGen Solutions. Him and his team has helped us again in putting these rates together. Wes Nevgan, our director, is here as well. Camille Terrace, our assistant director of finance for CCW and Esteban Ramos and assistant director of water supply management is here as well. With that, the team mayor stands by for questions.

3:29:41Speaker 60

Thank you, Nick.

3:29:42 – 3:29:56Speaker 37

Councilman Vaughn. Okay, just a couple. On the new water supply project debt schedule, on the new ACES water wells, eastern and western, you've got $30 million. Is that the $30 million that Denise Villalobos got the city?

3:30:00Speaker 33

Okay. Council on communal tires. No, this is the, the wells are 60 million. This is just the extra. Yes. This is removing the 30 million that was received from the state.

3:30:10Speaker 37

Okay. And so the previous, um, the prior approved CIP project debt was from the previous council. That's 21% are the ones that have been ongoing for years.

3:30:20Speaker 33

Ongoing for years. So this is prior projects that were, we don't issue that until we spend the money. So it could have been two or three years.

3:30:29Speaker 37

Okay. I'm just clarifying. I just want to make a statement. When we all voted for the CIP projects up here, we had like six, I think, projects, water that we voted on that I remember.

3:30:39Speaker 33

That's the new water supply project? Yes.

3:30:42 – 3:31:26Speaker 37

We voted on them knowing that we were going to have to raise rates because that's the only way you can pay for them. So it's very difficult up here because if anyone's up here running for council, they're thinking, oh, I'm going to be in trouble. But this is our job. We don't like it. I don't like raising rates. But we have to pay for what we approve because we had to have the water projects in order to have water. So I want the public to understand that. And Nick, if you can address the fact that we know there are some that cannot pay for their water. So you had talked about doing a fundraiser, and I know the mayor has talked to industry. So there will be a pile of money that are going to have residents like single moms, veterans, elderly that cannot pay for their water, correct?

3:31:27 – 3:32:20Speaker 15

Yes, Councilwoman, and thank you for bringing that up because that's very near and dear to all of us as well. So one of the enhancements for next fiscal year is to bring in the utility assistance program in-house to CCW. That way we can administer it on a more efficient, proactive basis. I like the fact that people can call in and talk to someone to move forward in the process instead of CCW referring it to an outside agency. The other thing, and you touched on it, is previously we did a One Water Summit to raise money to put a little kickstart into that program. We're committed to doing it again. We didn't do it this year. We were dealing with a lot of things. But we are committed to doing it, and we're working on the schedule to get that done.

3:32:21Speaker 37

So we're probably going to do that maybe in the spring?

3:32:23Speaker 15

I think a spring is a great goal. I've got staff working on it right now, but I think that's a great goal because that will give us that kickstart to that program.

3:32:32 – 3:32:45Speaker 37

Okay, well, my point is I don't want to raise water rates, but I know that we have to pay for the CIP projects that we did, and we have to have water. And we've got some really good projects coming online within a year. Thank you.

3:32:46Speaker 60

Councilwoman Paxton.

3:32:48 – 3:34:06Speaker 58

Thank you. I don't want to belabor the point, but Councilman Vaughn's absolutely correct. A year ago, we were talking about being just weeks from possibly declaring a level one emergency. In reality, but we have really quickly. The team, the council, the community, everybody's worked together to prevent that. And yes, we've had beneficial rains, but we have really invested in a good portfolio for our water supply. That is why nobody wants to do this vote, but we have to, because if we committed to protect that water system, then we have to commit to supply for it. And I do think that the team has done a great job being able to space... those commitments out. So it's not that hard of a hit at the beginning. But Peter, I would like to just reiterate and request that we be able to publicly demonstrate our active efforts to try to offset some of these really big costs that we've agreed to. Going and looking at grants and things like that for this specifically. Because as much as we can get that offset, the future of those rate changes changes. Thank you.

3:34:06Speaker 20

Councilman. Yes, and I think Nick is at some point, we have a compilation of all the grants we're looking at and have applied for. Is that in your water briefing?

3:34:13Speaker 15

It's in the water supply update today. There'll be a one-page slide.

3:34:17 – 3:34:44Speaker 26

today we'll go over that what we're yeah councilman kentum nick um so the residential rates are going up the commercial rates for like a tropical typical restaurants going up but what i'm seeing is wholesale treated water wholesale treated water network the rates are going down in 2027 why is that why can't it be all across the board

3:34:45 – 3:35:38Speaker 15

Because of the contracts, Councilman. So the wholesale contracts utilize actuals for the year to develop their rate, and it's actually formulaic in the contract, so we have to utilize that process to determine their rates. How long are those contracts for? Well, they're for different lengths of time, but they're for different... periods, for instance, this council approved a three-year extension to South Texas Water Authority. So that was maybe 10 months or so ago. But one thing that, because of how it's determined, their rates next year will go up significantly. It's just because of how the contract's written, we have to use actuals, and then those costs will catch up. And we've informed them of that. We met with them just last week. Mm-hmm.

3:35:40Speaker 26

Do you have the contracts yet for the refineries? How's that working?

3:35:45Speaker 20

Yeah, Nick, go through the list. So we've been focused on this, and most of them are in the works, so we have some nearly done.

3:35:52 – 3:36:38Speaker 15

Yeah, we've got a lot going on. So one thing that we've been talking with is Flint Hills Resources. We've had conversations with Phillips 66. Just a discussion was held Monday afternoon with Phillips 66. Lyondell, the attorneys are working on the contract. Of course, Citgo, we're reviewing potable water contract, effluent water from Greenwood, effluent water from Broadway. So there's actually three contracts with Citgo we're working on. There are some large volume users that are inside the city limits. That's STX Beef and Howard Energy. So we're focusing, of course, on the outside city limits, large volume users. There's a lot going on and a lot of contracts.

3:36:38 – 3:38:20Speaker 26

I appreciate your work in this. I really do. And, you know, I got mixed emotions about this. I mean, yes, we did, as this council approved, a lot of projects for water supply. But we did this because of one group of people, industry, the refineries. Um, we didn't do it for the residents because the residents never ran out of water. Um, it wasn't, it wasn't for us. It was for the refineries. We did all these projects for the refineries and I'm okay with that. And I always been okay with that. But what's just, what's, what was disturbing to me is this, for example, and, and I don't know, you could tell me there should not Nick. Um, but, um, You talked about Broadway. So my understanding is Sitco was going to use the wastewater from Broadway station. They're gonna get three million gallons a day and they were going to find somebody to do the work and do whatever it is to get that three million gallons per day. And I was told that they backed off now because we have water in our lakes. And they're not very concerned right now. And I don't understand if they want to be a good partner, they should not back off on that deal and continue doing that and getting that 3 million gallons a day from Broadway. Can you talk about that?

3:38:21 – 3:38:45Speaker 15

What I can tell you is what I know, Councilman, is they have never told us officially that they're not interested in anything. Their legal team is reviewing those three contracts that we talked about. And the last time that we met in person, I informed them myself that we wanted to bring all three of those contracts to Council at the same time.

3:38:45 – 3:40:26Speaker 26

I just don't understand how... I don't understand why the refineries are taking their time on these contracts if they need water and they want us to approve an Inner Harbor project for them. desal plan i mean it's for them like you would think you know what show good faith i'm gonna get these contracts to you guys so the council that you know we're we're we're a team together and and we don't want to screw nobody so we're gonna get these contracts um lined up i mean you know um i just i just i just don't understand like you know where's where's where's the urgency at you know, and we're bending backwards for them. We're trying to find other water sources for them, you know, and I just, I don't feel like they're helping, but they're putting a lot of pressure on us to get this Inner Harbor project done. Like today, they want us to do the grant, but where's the contracts at? You want this body to approve the Inner Harbor project, but with no contracts, right? And then once we get that approved, if it gets approved, the water rates don't go up again. I just don't understand, you know. I get it. We approved them. I agree with Carolyn Vaughn. We, as a council, approved water projects. But, you know, it wasn't for the residents. It was for the refineries. So, okay. Thank you.

3:40:26Speaker 60

Councilman Hernandez.

3:40:30 – 3:40:46Speaker 28

Thank you. I want to make a correction here. The money that this increase is going for is for existing projects, not for the new water projects. We haven't paid for them yet, right?

3:40:46Speaker 33

36% of the increase is for the new water projects.

3:40:49 – 3:41:52Speaker 28

No, no, no. What I'm saying is that I'm going back to the CIP, right, and how much money we have spent on projects. The Lake Texana dam repairs, 15 million. Mary Road's pipeline phase one assessment improvements, 16 million. Mary Road pipeline phase one improvements, 16 million. Mary Road phase two improvements, 14 million. Wesley Seal Dam gate rehabilitation, 18 million. Raw water pump station upgrades, 16 million. The chlorine system improvements that we've spent, 58 million. Clear well number three at Owen Stevens, 39 million. Filtration system hydraulic improvements, 23 million. Raw water influent and chemical facilities improvements, 66 million. Sediment basin improvements, 31 million. So we're not just paying for new water supplies. A lot of this debt is from stuff that we've already been doing.

3:41:53Speaker 28

Yeah, and a lot of that is coming up for purposes. We haven't spent all the money for Evangeline yet, right?

3:42:02 – 3:42:13Speaker 28

Okay. So I just mentioned a whole bunch of things that were way more than that. The improvements for the wastewater, reclaimed wastewater units, how much have we spent there?

3:42:15Speaker 33

We have encumbrance. I don't remember from the memo exactly the amounts.

3:42:20 – 3:43:03Speaker 28

Okay. What I'm trying to get across here is it's not, don't just put this on new water. It's not. This, a lot of our debt service is for projects that we did because of all the crap that happened in the past, and TCEQ came down on us pretty hard. Remember the water boils from 10 years ago? We're still paying for that now. Yes. With these projects. So I don't want this to be, oh, this is new water sources. Don't go down that road because a lot of this is old debt that we've spent money on, that we've maxed out the credit card on. He coined a phrase, right, that I know Councilman Barrera doesn't like because we have an asset, right?

3:43:04 – 3:43:29Speaker 33

So you're correct. So referring back to the pie chart, 21% is those projects that you mentioned, the CIP projects like the ones, that's the additional debt that we issued because, of course, we issue over time. And 36% is the new water supply projects. 22% is the debt service associated with all of that debt. and then 21% is operating.

3:43:29Speaker 28

So are you talking about you have new water supply project debt issuance? Yes. That's not coverage, right?

3:43:38Speaker 33

No, no, no. That's the debt issuance. And then of that, you have to also have coverage.

3:43:42Speaker 28

This pie chart is deceiving because that's not what we're actually paying, right? The issuance is different from the coverage.

3:43:51 – 3:44:15Speaker 33

The debt coverage is a separate pie chart. the 36% is the debt issuance. As part of the debt issuance, you have to have a 1.25 debt service coverage. So there's a little bit more. We could have made that 36 bigger and just broken out the debt service coverage over you know, to the 21 and to the 36, but we wanted to show what the debt issuances are and the debt service coverage for state policy.

3:44:16Speaker 28

So our debt, what was our debt? The percentage of our budget last year was how much was debt service for the Water Department?

3:44:26Speaker 33

33... 34%, right?

3:44:29Speaker 28

And what is it now?

3:44:30Speaker 33

It's going to be $68 million out of a $200 million budget.

3:44:45 – 3:45:23Speaker 33

40 to 36 yeah 36 so our debt service is going from 33 6% right of the grand total budget so that's why I'm saying this this way that you have this chart is not is not reflective of what we're actually paying in debt service well that is correct this is the the chart only shows out of the increase that sure that that the two dollars and 48 cents 36% is related to this 21% is related to The CAP approved 22% is the debt service coverage, not the total utility bill, not the total water bill.

3:45:24Speaker 28

Okay. Do you see how that can be construed as deceptive?

3:45:31Speaker 33

I don't know. It says fiscal year additional. Okay. So I don't know how.

3:45:36 – 3:46:21Speaker 28

You're assigning the increase to the amount. But what I'm saying is that the overall debt service is not just new water projects. Oh, absolutely not. No, no, no. Okay. So going through this, I want to make sure you understand that this is, you know, not only for future water projects that you're signing issuance for, but what we're actually paying on. So, you know, I just... Don't think this is indicative of how much it were actually paying for everything This is only what you kind of shifted everything into just what the $2 was for.

3:46:21 – 3:46:41Speaker 15

Yeah, it's in the slides titled Rate Drivers, and it's really the incremental change for the rates, what's causing that adjustment. We titled the slide Rate Drivers. And you're right, Councilman, there's tremendous infrastructure improvements. You listed everything that's going on at Owen Stevens.

3:46:41Speaker 28

Oh, I only listed about a third.

3:46:44Speaker 15

Yeah, no, you're absolutely right, and it is something that's going to benefit this...

3:46:48 – 3:48:18Speaker 28

community the region for years to come in terms of resiliency and reliability okay so i want to make sure that we understand that there's a lot that we're paying on right now and i'm pretty sure our bond rating agencies are listening to us right now making sure that we're going to be uh increasing our rates so we can cover our bond probably and that's the reason why we're you know our bond ratings are going down is because we have an excessive amount of debt you Now, we don't have a policy on our debt management policy to reflect how much debt we can have. I think that was intentional so we can manage what we have without having to go back to the policy. But I still think that let's not paint this in a frame that it's just the new water supplies that is causing this. The majority of it is not. And I want to say that 36%, we had an increase of 3%, so now 36% of every dollar that we receive goes to pay to debt service. Now, our hands are tied. Once you borrow that money, you've got to pay it back. There's no choice in that matter. So unfortunately, we're put in this position because we have had our foot on the gas and maxed out the credit card. And some of it is well justified. But I think we need to really make sure that we're understanding what's causing these increases.

3:48:22Speaker 60

Council Member Roy.

3:48:26 – 3:53:06Speaker 18

Thank you for your presentation. Appreciate the work that you guys have done. A couple things I want to mention. Number one, and I go back to this chart that shows the CCW water rate adjustment, well, the consumption for the proposed rates. And it has all the different cities. If you want to take a look at the bottom, I guess Laredo, which is sitting there in terms of the lowest cost. And then we're about right in the middle. And so when I look at this, One of the things I wonder about, like, for example, in Dallas and Arlington and that, how do they basically manage their system and maintain their cost at such a low level per month for their consumers? But I had a conversation with a lady that was from Houston a couple weeks ago, and she said that her water bill She moved here to Corpus Christi. Her water bill in Houston was $22 a month. And I'm just looking at Houston here, and it's $62.79 on average. So I don't know where that came from. It makes me wonder sometimes, does the average person really know what their water bill is? I know that, like us, we bill a couple of things related to that one bill. So we're sitting really in the middle. And I look at some of our partners, our neighbors, because really what struck me here is that I feel for Ingleside and Taft and Portland and Rockport and Port Lavaca and Aransas Pass. I mean, they're paying a lot more in terms of for their use in water. And so I feel we're kind of fortunate to be in the middle. But the other thing is, is that... asset management i mean really at the end of the day because we're having this conversation about what percentage of our debt is attributed to old debt what percentage is new debt you know what's current debt but the bottom line is is that the biggest thing that we have to take care of is our assets because they are assets you know we've learned a lesson and we're in the situation that we're in, and I'm not going to blame a particular council member group or whatever the case is, but when you take a look at different things, not only with water, but earlier today with TxDOT, and we were talking about the improvements out in Kyle Allen, where we're going to a three-lane road. They're putting sidewalks in. They've enhanced the sewage system. They've done a lot to be able to do that because for a long period of time, they didn't do anything. You know, we didn't do anything. That's kind of the same thing with the water. When I go past Owen Stevens and I see the work that's being done right there and I think about this asset that we have, we can't neglect our assets. And so you guys juggle a fine line in terms of making sure that you get the most out our biggest bang for our buck because at the end of the day, we're not just throwing money out of a window. When we invest in our city and our assets, it pays us back threefold. and so i i just want the people to understand that but yeah we got that and i don't necessarily agree with my other the other council member that we've um... what's expression something about the credit card next time we've maxed out the credit card because when i'm looking at his debt service i'm looking at what is that what is our debt service coverage ratio as far as this where we're at as a city and what our assets and that that's the balancing act and i think you guys do a good job with that we could be up there At the top, we could be sitting at $78 or $80, and we're not. We're right in the middle. And so, again, that's just my thoughts. I wanted to just address that and let the people know that we got to take care of it. I think we've learned an important lesson. If we don't invest in the Mary Roads pipeline, you know, and we've done that, and we don't talk about the things that we did in order to take it from 42 MGD up to 72 MGD, we would be doing this city a disservice. But you had to go in and you had to update the pumps, right? You had to go in there and reinforce things. You had to put the pig in there. Isn't that what they call it?

3:53:06Speaker 15

Right? Yeah, we actually put an ultrasonic device in there. Sometimes it's referred to as a pig. This isn't exactly a pig, but yeah.

3:53:15Speaker 18

But you had to understand that so that you knew exactly where you're at and where your vulnerability is because you're protecting your asset. So I just think that's important. I thank you guys.

3:53:26Speaker 60

Councilman Scott.

3:53:28 – 3:54:26Speaker 34

Yeah, so what I get out of this, God, you guys spent a lot of money over the last six to eight years. God dang it. And I thank you for it. So I guess my sense is what I told somebody today is I got good news and bad news. The bad news is the rates are going up. But the good news is we're spending that money to protect our assets. All the money you're spending on Owen Stevens would be an example, I think. And we're spending it trying to go find new water supplies, which is, I think, what you expect from us. I have a different opinion. Some of my fellow council members, I think their water supply projects are water for all. I don't designate it for one segment of our customer base or another. I think it's like somebody said, somebody asked me this morning, hey, can I just water my yard? I said, hey, hold out, hold out. I think our water supply job projects for all is the reason why. So you're some of the wholesale customer stuff. I guess we overcharged them last year. And so there's an adjustment this year.

3:54:27Speaker 15

I'm going to let Andy McCartney come up and he can talk through some of the contractual aspects of the, of our wholesale.

3:54:34Speaker 34

If you overcharge them and just want to blink, I'll just move on. So, cause it goes to the bottom line.

3:54:39 – 3:56:06Speaker 17

No, sir. Mayor counsel. Andy McCartney, principal with NewGen Strategies and Solutions. So, no, when we first worked on the rates over four years ago, going back to 2022 and got the contracts, we had to analyze those. And they do have true-up mechanisms, as well as the raw water for the San Patricio, Salonese, Flint, Coke Hills that take it directly out of the Nueces River. So what happens is we have to use, you know, the proposed budget for 27% So then we go and look back, what was the proposed budget we built in the rates for 2025? And then we look at the actual expenditures for 2025 and calculate what that delta or true-up is. And so it happened to be an addition, I mean, a credit to the 2027 budget. We don't like those kind of true-ups. That's like a true-down, and we don't like that. Yeah. So a true-up would add to their rate. Unfortunately, they had a true-down to where – The department was really good in that they underspent their budget. It was probably because chemical prices, which are very volatile and are variable costs when it comes to water treatment. There's not much going on with raw water diversion, just to note that raw water diversion is when you take it out of the Nueces River and pump it to Owen Stevens. So it's a very small fractional cost.

3:56:06Speaker 34

And then why do we think the rates are going to go up significantly next year?

3:56:11 – 3:56:27Speaker 17

Right? Isn't that what you said? Like, hey, get ready. It could be. Yeah, it could be. Because of the projects. Yeah, because of the projects. And we'll be looking back at the 26 proposed budget that we worked with last year, and then we'll be truing those up next year.

3:56:27Speaker 34

Got it. So the message to our HOSO customers is give it a year. Just give it a year because you're telling me there's a big true-up coming in 2007.

3:56:37 – 3:59:08Speaker 17

Yes, sir. And I see this working on the full-worth water rates. As a former staff person, as a consultant that helped out on that project this past summer, I mean, their rates for both water and wastewater going up, they weren't used to that and it was shock for the wholesale customers. And so usually there was one going up and while one went down because they'd have wet versus dry years. And so it was just a process. Kind of like the weather here, it's kind of been a prolonged dry season. Got it. So it added that double whammy for them. And you asked about the bill comparison. Councilman Roy, like Dallas, they're a little bit different. Working on Dallas 15 years ago, they were built out, as well as their wholesale customer cities. Now to the north, those communities are served by North Texas Municipal Water District. Those are growing. But really, Dallas hasn't been growing. They're landlocked. And so they don't issue much. They do have impact fees, and they're not issuing a lot of new meters collecting impact fees. Just like I mentioned at one of the budget workshops, saws, they're a totally different animal because they're totally 100% on groundwater. I know when I worked for them 25 years ago, they had a water resource fee that they added to the customer's bills for water supplies. And at one point, they had spent over $100 million looking for new water. And I think that they do have a project for Caldwell County for additional water supply. But basically, because the Edwards Aquifer had so much water, they facilitate a lot of growth. And so with that aquifer, they installed vertical pumps. They pumped it up. They injected chlorine and then pumped it out into the distribution system to the customers. So they didn't have an Owen Stevens water treatment plant or a series of water treatment plants like the city of Fort Worth has. So it's you can't really say it's apples to apples. It's more like apples to oranges. But still, everybody wants to see how are they doing? Like like here, how's Corpus doing to the rest of the big cities in the state, as well as some neighboring communities that you. unfortunately compete for in economic development because everybody wants businesses to come there because that's a benefit for the residents. So you want to see how do our utility rates, both water, wastewater, I'm sure the natural gas department does it too, how do we compare to other communities? And so that's the benefit of what we call a regional bill comparison.

3:59:09 – 4:01:09Speaker 34

Just for record, Mayor, that wasn't my question. That was Council Member Roy's question, right? So I want my time back. I have one last thought, and I'm supportive of them. I'm going to take another swing at the windmill. It's my understanding the San Patricio IDA payments are going to go up significantly in 2032, 33, to the extent of $33 to $40 million a year. So those of you in the audience have been who have been talking about IDA payments and council members, I would like us to have a conversation about the possibility of allocating a large portion of those payments to offset water rates. And that's not for any particular project. That's just to offset water rates. And if it's system-wide, so be it. And if you shame on me if you tell me it can only be used to offset Corpus Christi ratepayers, hey, I'm good to go with that also. But We have, just by a freak of maps, whatever, 50 years ago, we have several large industrial projects that are inside our city limits. And as he's mentioned, we've incentivized them, but those incentives go away in 2033, and then we're going to get 33, I think it starts out at like 54 million, then it comes down to 33, but we ought to have a conversation about let's just say it's 30, do we take 20 of it? Do we take 15 of it? Is there a possibility to offset our Corpus Christi ratepayers' water payments? And I think that deserves a conversation. I'd be even willing, I don't think they are, but to have a conversation about net present value of those payments and see if you couldn't implement them sooner. Because what an interesting concept to say, hey, those refineries that we're all mad at over there, by the way, they're offsetting your your water rate increases. And I just think that's worth a conversation, and I'd appreciate you guys following up on that. Thank you. Thank you, Mayor.

4:01:10Speaker 60

Councilman Hernandez.

4:01:12Speaker 28

Sorry, Nick. I just wanted to be very clear on the new water cost. It does not include Inner Harbor Desal, correct?

4:01:19Speaker 15

That's correct. There's just the cost for the amount that's been expended to date, right, that we have to continue to pay back.

4:01:27 – 4:02:30Speaker 28

Okay, and I wanted to clear up what I was saying, that you looked at it as a whole for the entire budget not just the increase of the two dollars the amounts you would be looking at for the for those particular items would be much smaller as opposed to the overall uh debt service and operating cost right that's what i was trying to get at yeah councilman i think we're on definitely on the same page uh you know we we phrased it as drivers to the adjustment but okay yes sir you know the thing about it is we've got to see the the full picture right not just one small section of it uh also last thing i just want to mention that the ida payments go to the general fund not to the enterprise funds so it might not be something you can offset your i'm just saying the way it's structured right now the way the way it's structured right now it's it's a it's a pilot A payment in lieu of taxes. So that goes to the general fund. So I just want to clear that up. Thank you.

4:02:30 – 4:02:48Speaker 34

Yeah, let's let's let's spend a minute on that. I appreciate your interest in that. What would be some ideas you've you've we've had conversations about how you could allocate funds from the general fund to the water fund to help offset payments. Right. And you'd have to get clearance, certainly.

4:02:48Speaker 33

But well, general fund, the general fund, the general fund can send money to anybody who pleases.

4:02:53Speaker 34

Well that's good enough for me. Thank you so much.

4:03:01 – 4:04:33Speaker 60

uh okay so i think that's all of our comments so i'm going to disagree with all my colleagues i'm not going to be supporting this i think we're in a time where families and businesses have carried a tremendous financial burden and and that seems like it's typical and i think i don't i'm not condemning anyone because we all have our reasons um and i'm not voting against water infrastructure because i understand that but i think that We have had opportunity. We talk a lot about grants. And we've turned down some of that opportunity. And that's turning down the pressure on the rate payer. And it doesn't matter what project it's for. In the end, just like was described, 22% is debt service, 36% is new water. I think 36% was new water, is that right, Camille? 36%? Regardless, 21% operations, somewhere in there. Um, and I think, you know, all of it has a play into Councilman Roy made some great points in terms of the debt service. Um, but for me right now I think that, um, we could demonstrate better in terms of pursuing all available, you know, and I know you're going to have a slide on this later, funding sources and, you know, to offset that additional cost to the ratepayer, but that's just where I stand. Councilwoman Vaughn.

4:04:34 – 4:05:10Speaker 37

Well, thank you for clarifying that, because if the city mayor is not going to vote for it, knowing that she voted for projects on there and past projects to pay for this, why would any of us want to hear? Why would we want to vote for that? So here you have the mayor, the face of this city, saying she's not going to vote for that. You've got the credit rating people looking at us. You don't do that. You do not do that so that you can get votes. It's about election, and it is about Inner Harbor because we don't support the grant. You have to separate yourself. You cannot do that. So thank you for clarifying it.

4:05:10Speaker 42

We appreciate it.

4:05:11Speaker 37

Are you all hearing this? Thank you.

4:05:14Speaker 60

It's been recorded. Councilwoman Paxson.

4:05:16 – 4:06:18Speaker 58

Well, I mean, yeah, if unfortunately if the head of this body feels like this is a bad direction for us to move in and if the actual direction we should be moving is to not fund our water rates when we've worked this entire year and a half to try to signal to our bond rating agencies that we can go through a catastrophe and still be stable and invest in our future and commit to what's necessary, then maybe it is a bad decision and maybe we should all vote this down. If it's going to be that black and white, I mean, I really felt like, Nick, you and your team had done a great job. You've laid it all out. It all makes sense. And I think that it's prudent as leaders to accept that this is what secures a healthy environment for our water system. So I appreciate that you presented that. And you asked me this week, could you rely on my vote to support this? And I said, yes, but... Now our leader is saying that this is a bad idea, so now I'm going to have to think about it again. Thank you.

4:06:19 – 4:07:11Speaker 60

You should, because the bond rating agents have made it clear that we failed. with votes that the majority of this council took. So let's not point the finger at me because it's not, well, I'm pointing it right back at you. Your no vote on 100, so have you, ma'am. So have you. Your no vote on foregoing grants. So you can't attack one person when your no vote have caused the credit ratings. Councilwoman, you've already attacked. You've already attacked, so just enough. I mean, that's Councilman Roy. So I cannot state how I feel, but you can. Councilman Roy and Councilman Kentu after that, take the vote.

4:07:12 – 4:08:44Speaker 18

I'm going to say one thing. That's why we're a council form of government. Every vote here is equal. We don't have the ability, I mean, and I'm gonna use, Gil, I hope you don't mind, I'm gonna use this in a positive way, but one of the things that Gil says in the past, you know, because he's always looking at the budget, but when we look at different projects, especially within his district or my district or whatever the case is, When you go forward with a project and you start the pre-engineering and the engineering and the design phase and that, hopefully to get to the end of the project, one of the things I always say to Gil is that, hey, those are great projects, but at some point in time, we're going to have to pay for those projects, right? Because you really don't want to go into a situation where you start putting projects out there and then you either yank the ability to pay or you don't intend in paying for those projects. That's a little disturbing to me. I'm a little disturbed by that. But at the same time, we just have to remember that we all do have opinions, and that's why we're not a city manager form of government, that we're a council form of government, you know, council management form of government, because we're set up here where my vote is just as important as the mayor's vote. So thank you.

4:08:45Speaker 60

Councilman Cantu.

4:08:49 – 4:10:28Speaker 26

This changed a lot of stuff around here, that's for sure. You know, if our leader is not going to vote for this, I mean, why should we vote for it, right? I mean, I want to correct something when she says that we turned down grants. It's only been one grant that we turned down for the Inner Harbor project that's not been approved by this council. That's the only grant that we have turned down. We haven't turned down any other grant for any water projects. We welcome all the grants. And the only reason why we turned down the Inner Harbor Project grant is because if we accept that grant, we will have to buy everything American made. So that $1 billion project will end up being $2 billion. I mean, I would love to buy everything in the U.S., but it's expensive. And there's never really... There's not that many desal plants in the United States that has parts. Like, parts supply. You know? And why do we want to buy everything American-made if you're trying to cut back on cost? I just... You know, I don't know what to do anymore, to be honest with you. It just is... I don't know. And I hate to put you guys in this position. So let's see what my colleagues have to say after this.

4:10:29 – 4:11:06Speaker 15

If I could just comment on your reply, Councilman. What CCW has done is presented a plan in rates to diversify our water supply by adding groundwater, wastewater reuse, to significantly upgrade our infrastructure, not just in one year, but that's over the last three, four, five years. And all of that, we are benefiting from all of that. The region is, the community, the citizens of Corpus Christi. And they'll continue to do so because we're building a system that's resilient and reliable.

4:11:10 – 4:11:59Speaker 58

Thank you, Nick. Well, I said what I said a moment ago and I still believe it because if I may use my final minute that I didn't use as my last, I'm requesting to speak once. I appreciate that and thank you. I stand by what I said a moment ago because I think that it's important that anyone that can hear this because it's going to be taken, recorded, snipped, copied, and shared everywhere. It's important to recognize Words versus actions. So where we go from here, what I believe we should do is protect this city like we committed to do and approve these rates. It's not the easy thing to do, but it's the right thing to do. That's what our city needs.

4:12:00Speaker 60

Council Member Barrera.

4:12:01 – 4:13:54Speaker 25

Well, thank you. Hold on, I'm looking for this. Here, I'm looking for the slide that had the rates, the rate history. Here it is. Okay, so, hey, I'm ready to vote yes. I mean, regardless of what anybody says, I've been getting a lot of work done here while you guys have been pontificating. So I want to thank you for that. Hey, great job. Great job. I know you guys did a lot of work. I know Nugent a couple years ago, I didn't get along with you guys because I was the, and I say this with pride because I was the sole person that voted against doubling industry's rates. I still say that with pride. And I've said it ad nauseum to many, to many periodicals, you know, the Texas Tribune, Inside Climate News, and I said that industry always felt there needed to be adjustment. I just felt that it was wrong that The individuals that use 60% of our water aren't communicated, and that way we have a process. Considering, I think, their water rates are going to go up, what do we say? Our largest volume is going to go up $67,000 a month on this particular one, and they kind of knew it was coming. So I just think, I've said, all that industry is looking for or the community is looking for, mostly those if you want to bring in developers, is a predictable regulatory environment. And I think that's what our bond companies are looking at as a predictable regulatory environment. So I told you the other day when I talked to you on the phone and we had our meeting, I thank you for all the work we do. Sometimes it's a bitter pill to swallow. What is it? But we suffer from the same inflation that the community does. And I'm not here to judge anybody else's vote, but I just wanted to make it clear I'm voting yes.

4:13:55 – 4:15:14Speaker 44

Councilman Campos. Thank you, Mayor. It is shocking. I can't believe that we're here. I can't believe that, of course, you have every right to vote the way you want to, Mayor. But when we started on this path, this looking over the rates every year, this is the reason why. It's because you have to have the courage to do what we have to do in order to move the projects in order to have water in order to have the banks you know financing all this is is clear uh and i was not going to say anything only because i had already made up my mind that of course i was going to support this and i i told you this that i was so there was really not much to add but this cannot what the mayor just stated does not make sense. How is it that you cannot support what we have been working on as far as making it fair and equitable? This is the path. These are the hard choices and the hard votes that we have to do. This is why we get voted. That's why we're here. So yes, I am ready to vote and let's just get this over with.

4:15:16Speaker 25

I move for approval.

4:15:18 – 4:17:41Speaker 60

Okay, and I'm really glad. I'm really glad that y'all are voting for it. I think there needs to be a respect for, yeah, there will be. I think there needs to be a respect for what my reasons are. I'm flattered that your vote depends so much on me, Councilman Cantu. It shouldn't. I can, well, I'm sorry. So if my reasons are my reasons, And my reasons, I mean, there shouldn't be pointing fingers. If y'all don't vote for desal, you don't vote for desal. And if I feel like the majority of the leadership on this council regarding water is not one I agree with, Because of what has been done, we have rejected up to $120 million. Whether y'all believe in the project or not, $120 million in grants. You've got an opportunity here in a second. Then you vote no. But there's no need for badgering. You vote no just like you have. Just like you have. Sylvia, you've always been a no from day one. That's respectable. That's respectable. But when people are campaigning and they're for DeSalle, and then they come on council, and then all of a sudden DeSalle looks, it's the worst thing in the world. And we're not talking, DeSalle's not on this item, so I'm not gonna veer from it. But I am gonna say, every vote here should be respected. And that wasn't respectful, Councilwoman. That wasn't respectful. Not you, her. No, not you. And thank you, Councilman Gompels, for even saying I apologize. Because you don't have to. We have every right to do that. And I have every right to speak my mind. If you don't agree with it, you don't agree with it, you vote no. So I am voting no because I don't believe that this is the time for that, regardless of what anybody thinks. I respect y'all's votes. I'm glad you're voting for it. I really am. But thank you. So we have, yeah, anyone, who would like to make public comment on item number 15? Just come on up.

4:17:43 – 4:18:56Speaker 54

Hi, I'm Amanda Short, Texas Infrastructure Stewardship Initiative. Councilman Hernandez, Councilman Paxson, and Councilman Vaughn, we have a later agenda item where you said that you desire to prevent the cost shifting to taxpayers and residences. So I'm going to break this down real quick. The percentages that you discussed, Councilman Hernandez, that were from his slide, 21% of this is old debt. That's easy to see. I've got bills to pay, right? 21% is operating expenses. That's, you know, imagine we were roommates. No. Anyway, and there were four roommates, right? And we had these shared bills. But me, by myself, am responsible for half of them. And as Corpus Christi taxpayers and residents, that's what we're doing. We're shifting the industry water use and infrastructure cost to the taxpayers. So if you support this today, then you're also saying it's okay to share the rates with the taxpayers, okay? Thank you.

4:19:05 – 4:21:59Speaker 29

Sometimes I think I come from a different world. As a entrepreneur, corporate person, opinions matter a whole lot less. I look for analysis of options. You know, we did what we had to do, we spent the money, we have to pay our bills. But going forward, I think we need to be a lot more strategic about what debt situation we're putting ourselves in. So, you know, things like Let's just give it back to the taxpayers now. I think you should be preparing a kitty. I think we should be getting into a lesser debt situation, getting ourselves in a lower risk position. So, you know, like I said earlier today, they found that taxing people more to get yourself out of a situation is very difficult. I think we do have an economy with some jobs that are kind of resilient against AI depletion. right? We got some new opportunities I heard about. We're really lucky, but let's not be hasty at getting elected again by giving back money and claiming victory when what I don't see and I still frustrate is where are we going to be five years out? What do we want our debt situation to be five years out? So unless, well, I think this is good and I think that's bad. I'd like to hear a whole lot less about that than talking about Debt ratios, years going out. I'd like to see a capacity plan on water. I'd like to see a lot more discussion about that than I would, are we going to pay our bill that we just did? We just did what we did as a group. We decided we were in a difficult situation. And you went and spent this money and you did what you had to do. Thank God. I'm okay with that. I would like to see a little bit more appreciation for things that have better return ratios, though. You know, putting the coverage on Lake Corpus Christi doesn't cost you anything and you get water. It's passive. You always do those things first. I don't see any interest in that. I see it's been, it has appeared to be quite a focus on one project over here, and that looks to be a big problem, so. I would encourage us to look at, as I've asked before, what is the cost-benefit ratio of the things that we're about to do? And what does it look like five years from now? So that we're not just trying to run for office every couple years and have short victories. We need to get ourselves in a lower debt situation. And Acts H. Joe, if somebody came to the table and said, I'll take that on. I'll take the risk off your plate. And if we don't deliver, we don't deliver. I don't see, this is another one like the evaporation. Where's the loss?

4:22:00Speaker 7

Where's the loss?

4:22:01Speaker 29

It's only if you want control, right? But I think we gotta be looking at numbers, less opinions. Thank you.

4:22:16 – 4:23:45Speaker 62

Rachel Caballero, D1. Well, we have now opened the season for reelection campaigning. And for the watching public, that's what this looks like, political theater. I will never understand. This is why the community does not trust some of the leadership. Because you shove projects down our throats, you got to pay for them. And then during election season, oh, I'm just kidding. This is an extreme concern for our community and why people are so disappointed in leadership. And I refer to the four, not the five. We have to trust that you guys are making good decisions. And the four fail at every pass, every single pass, including bringing A community, community, which we all know is industry supported and driven. They're coalitions and they're using the money that the community made them to go against the community. This is complete insanity. If you're going to promote projects, support projects, and vote in favor of projects, have a backbone. Thank you.

4:23:50 – 4:24:56Speaker 35

Mark Minster, Corpus Christi. I think it would be helpful to have the numbers of the city's revenue from the different customer classes, bringing to the last couple meetings in my presentations the residential and have this for the next year's budget and have how much you're collecting from residents revenue-wise how much you're collecting from commercial inside city limits and large volume outside city limits because last year residential inside city limits paid 41 million and the large volume paid 37 million and then you look at the IDAs the IDAs around 30 million so when we're talking about how you've done all these projects these CIP projects to find water, water for who? And then it just seems unfair. Residential rates have increased 17% the last two years, and then the chart of how much they're gonna increase over 10 years. And then considering other projects, I think it would just be helpful to just be very clear with the numbers of how much the city revenue is now from each of those classes. Because whenever I looked at the budget, I had never seen those numbers before. And I've seen a lot of CC water presentations. So I think those would be helpful to show how much revenue we're collecting from each class. and if it's equitable or not. Yeah.

4:25:04 – 4:26:19Speaker 51

Susy Saldana, Corpus Christi. The water rates that you're talking about, my concerns are this. Thank you, staff, for all the work you've done to try to bring everything down, because somehow we've got to have water. But let's take a look at what you could have done or should have done. When I first started this, I told you that the refineries were the large water users, and the best thing you could do was annex them. So they pay the same rate we do. They're an X, and I was told no because the infrastructure would cost too much. Well, right now, the way that it's set up, this particular project, with the amount that's gonna go up on industry, will they not be suing us again? Because it's going to go up higher, and then they want their money back, and we can't beat them because they've got a ton of lawyers. Are they gonna be suing us? Is district going to be suing us because their rates are going to go up? Not as much as the others, not as much as the taxpayers, but they're going to go up. I still say your easiest defense is to annex them. Bring them into the city. Let them pay the rates we pay. Thank you.

4:26:26 – 4:29:06Speaker 16

Michael Miller, District 2. Our water rates are already extremely high. we should have some of the lowest rates in the state of Texas. Our rates are extremely high because we're delivering three times what the average citizen, you know, the GPCD per day compared to San Antonio and Houston. We're delivering three times the amount in Corpus Christi. So we have to do these very expensive water projects. In 2016, the Harbor Bridge project was started, and that was a $1.3 billion project. In 2017, the deepening and widening of the port was begun. That was a $700 million project. Combined, that's about $2 billion worth of investment. What was the City of Corpus Christi's contribution for all those projects? $6 million. That's because, yeah, it's nice to have a new bridge. It's nice to have a deeper ship channel. But the citizens don't need that. My 24-foot boat does not need to draft 54 feet of water. My car does not need to go 500 foot in the air or however tall that bridge is to get over the ship channel. But the federal, state, and the Port of Corpus Christi funded all of those projects. The citizens don't need to be delivered 110 million gallons per day. Industry needs that. Where is the state and federal funding? And Mayor, I appreciate you going and asking for a contribution, but it's tiny in comparison. We need to be thinking about this different because we're getting hoodwinked. The benefits are going to the state, the feds, and the global economy. But they're all looking at us, the poor citizens of Corpus Christi, to pay for all of this. So the time has come for us to put our foot down and say no. So, Mayor, I appreciate your vote. And what I would suggest to the rest of the council is call for a roll call vote, let the mayor vote first, and then follow her lead on this thing. Because there is waste going on in CCW. I drove around putting out some signs over the weekend, and I saw the wall that's being built around Owen Stevens. And it was described as a security fence. That thing costs about $400 a linear foot. I'm like, what are we trying to secure ourselves from? The dinosaurs from Jurassic Park? I mean, this is a very serious piece of infrastructure. And I'd like an explanation of why we need that. Because all of our expenses keep rising and rising and rising, as do our rates. And something's got to give. So I'd appreciate you all doing something about it. Appreciate it. Thanks.

4:29:06 – 4:29:40Speaker 60

Thank you. I don't see Peter. Is Peter back there? Well, just Miles, if you'll make a note, or Revae, if you'll make a note for him to get, or staff to get with Mr. Miller regarding the fence. Oh, yeah. I'd rather you send him the information because it's a lot of information, especially the reasoning. All right. Anyone else? Okay. We're going to close public comment and submit our vote. Item number 15.

4:29:40Speaker 20

The motion carries.

4:29:58 – 4:30:09Speaker 60

Okay, we're gonna go to item number 16, and that is an ordinance amending Corpus Christi Code section 55-100 regarding wastewater rates for all customer classes effective January 1, 2027.

4:30:12 – 4:35:53Speaker 15

Thank you, Mayor and Council. This is a similar presentation to the water rates. I do want to just comment on the two workshops we had. I am thankful, and so is staff, to having those two workshops because the last workshop we had, we got to go in a little more detail on the consent decree, and that was a welcomed opportunity to go through those details. So I am thankful specifically in presenting this information today that we've had a chance to review in detail previously. So the rate study goals, again, this is for the wastewater rates. This is the identical slide to what you saw with the water rates in our plan to bring the stormwater legacy debt to a point where it's eventually 50% water rates and 50% wastewater rates. Just as in water, the wastewater rates, the debt service coverage, is calculated at 1.25 times coverage. Again, the minimum charges for the outside city limits will be a little bit lower due to that stormwater legacy debt. And I'll go through it, but there's very few outside city limits wastewater customers. The volumetric rates are still equal for ICL and OCL. That's inside city limits and outside city limits wastewater customers. And the water and wastewater funds will both continue to meet the cash reserve requirements. If you look at the drivers, this would be for the incremental increase in the wastewater rates. 52% of the increase associated with debt service coverage and 48% is attributed to the prior approved capital projects. There is no increase in the rates associated with operational expenses. The changes that you can see, again, I mentioned it earlier, the outside city limit residential customers, there's only 14 of them. The inside city limit residential wastewater users, the meter charge went from 38.29 to 39.95, and then the volumetric rates increased seven cents from 8.41 to 8.48. Commercial customers inside city limit The base or the meter charge went from $38.29 to an adjusted $39.95 and then of course the volumetric rates remain the same across all customer classes. The outside city limits, there are only 22 commercial customers using wastewater services outside the city limits. Their meter charge $33.12 to $35.15 and again the volumetric rates are the same across all customer classes. Wastewater charges, this is your typical residential bill. It's an average of 5,000 gallon usage. The increase is approximately $1.87. That's the adjustment. It's $1.87 more per month for your typical residential customer. The monthly bill went from $63.52 to the projected $65.39. The commercial class utilizing the same reference point, 20,000 gallons of water per month. The monthly adjustment is an additional $2.92 per month. This chart, like in the previous, shows the 10-year projection for wastewater rates and the potential impact on our ratepayers. One thing that I do want to point out that both water and wastewater service is determined on a cost of service method that we've instilled since bringing NUGEN onto the team to develop the rates. So a true cost of service is what's charged. In a similar chart, if you compare the City of Corpus Christi wastewater rates to other areas. You can see in the yellow, that's our 2026 rates. And then in the orange is the 2027 rates. These are for your average residential customer. Again, all of the other cities are 2026 rates. We've heard from many municipalities that their wastewater rates are also increasing. So we're comparing our 2027 to their 2026 rates. And then the last slide I have for you on the wastewater rates is the historical rates for all of our customer classes. So FY20 compared to fiscal year 27, you can see the rate impacts each year and also combined water and wastewater. The chart is the exact same as what I showed in the previous presentation. With that, Mayor and Council, I'll stand by for questions as I also have staff here as well. I move for approval. Second.

4:35:54 – 4:36:05Speaker 60

We have a motion and a second. Would anyone in the audience like to make comment on item number 16? Okay, there being no one, we'll close public comment. Councilman Hernandez.

4:36:08 – 4:40:11Speaker 28

Okay, I want to clear up a few things here. We are on the backside of a lot of stuff. And maybe a lot of you don't know that how much costs are associated with the, and I always refer to as sins of the past or neglect in the past, of where we didn't do preventative maintenance and the EPA came down on us pretty hard. We agreed, we paid a million dollar fine and we agreed to pay seven or expend up to $750 million over a 15 year period as part of that consent decree. You know, the wastewater budget is half the size of the water budget. It is nowhere, and so the per capita costs, and it only applies to people within the city limits pretty much completely. So there's a lot of debt cost. There's a lot of projects that we approved, including a $3 million, 5,000 square foot building this year, which still rubs me the wrong way. But all these things were put out forward over the last several years with regards to the capital improvement plan. And if you know me, I've rarely, I think maybe I voted for one of them, voted to approve the capital improvement plan because I thought we had too much, we were doing too much too quickly. So this is what happens. We spend a lot of money, over 30% of our operating budget is now debt service, and so what do you do? You have to pay your debt. We're in a situation where our hands are tied, and like I said, we have these rating agencies that if we don't pay for our debt or have the funding to pay for it, then they reduce our bond rating. It's not because we didn't approve desal, it's because we have a lot of debt and we have to pay for it. So all those CIP projects that we approved, and I can go through them again, for wastewater. Right? Broadway wastewater rehabilitation, $15 million. Greenwood process upgrades, $75 million. Wastewater process and BPC facility decommissioning, $57 million. Citywide wastewater IDIQ program, $60 million. Lift station, forced main repairs, $13 million. I mean, These are monies that we've already spent. And unfortunately, we have, you know, anytime, just like when you borrow money for your mortgage for your house, you gotta pay it back. Or you get kicked out. Or in this case, our bonds would go to junk status if we didn't pay for our debt. Or we would go back in the same place where we weren't doing preventative maintenance because we got a cut somewhere. It's not, you know, the money just doesn't appear out of, Now, I don't want to raise these rates, and I was waving the red flag for a long time with these projects. And I know we needed to do a lot of these projects, but we have to live within our means. But now we're in this situation where we have a lot of debt because we had a lot of repairs because of all the neglect from 20, 30 years ago. I hate being in this position. I absolutely hate it because I'm going to be accountable for it. I don't want to raise rates. I don't. But I know we've got to pay our bills. We've got to pay our bills. So I will be supporting this begrudgingly because we have to pay. We can't have our bonds go down because we still have a lot of improvements to make. But I can tell you this, Nick, you need to reduce that CIP significantly, because I'm not gonna vote for it. Thank you.

4:40:12Speaker 37

Councilman Fon. I agree with Gil on this right here, too. We've gotta quit spending. How much of this is current debt for the current council?

4:40:22 – 4:41:00Speaker 15

Estimate. Right, so I'll defer to Camille, but I do wanna say that in a lot of the projects, some of them that Councilman Hernandez has named, They're long-term improvement projects associated with our six wastewater treatment plants. So a couple of them were approved a couple of years ago. Some were approved this year. Some were approved previous years. And those are typically those large wastewater treatment plant improvements are two to three years at a minimum. And so we incur debt and expend cash every single year. That's how it's budgeted.

4:41:00 – 4:41:37Speaker 37

Okay, and I think the citizens need to understand we were so far behind on infrastructure, the roads, all of these things that we've had to catch up since you've been here, Mr. Sinoni. Because of decades of neglect. And you can't do that. We have to continue to improve them. I will always put this city first. I will. I will always put it first. That's what I got elected to do. And everybody in here, you can say it's for industry all you want to. Every project that we have done, every citizen benefits from it. Every citizen does. And we do need industry. And you know, I get tired of hearing industry bashed all the time. We still need them. We have got to work together.

4:41:37 – 4:42:11Speaker 60

but these projects for everybody thank you i'm going to go ahead and open public comment would anyone like to make comment on item number 16. okay we'll close public comment and let's please submit our votes The motion carries.

4:42:13 – 4:42:28Speaker 60

Item number 17 is a briefing on data centers, including an overview of Governor Abbott's recent guidelines. And Peter, you said this was going to include the HUD-8, some information on it?

4:42:28 – 4:42:52Speaker 20

Right, Ryan's been listening, and I've been texting him through the meeting. So he had some initial information on HUD-8, and he's going to try to answer some more as well. Ryan, you're laughing. And then let me, for the mayor, the secretary may have told you this, but this is a briefing, so no citizen comment on this one, but on 18, citizen comment. We moved the briefing up ahead of the three signature memos, just to give it some context. Right. Ryan? Yes, sir? Good.

4:42:53 – 5:02:19Speaker 12

Yes, Mayor, Council, Ryan Skobarczyk, Director of Intergovernmental Relations. We've got a presentation. So this is going to be a very broad overview of data centers just because they are essentially the third rail of American politics at the moment. So we're going to give counsel and start from kind of a conceptual basis before we talk specifics with DSD and the three signature memo. So first and foremost, what is a data center and how do you define it? because I think that's the nuance that council and not just city councils but state and federal government are dealing with when it comes to potential policy recommendations on data centers. And essentially they are large facilities that hold the equipment inside of them that are used for the compute power that needs to be generated. So things like server racks, power generators. You've seen these conceptually probably in images. But really what we're seeing a lot more of are what are called hyperscale facilities. So briefly, to give you a general history of data centers, obviously they go way back as we started talking initially about enterprise data centers, which are facilities that a single entity might own. It's where we house our IT infrastructure. We have one for the city of Corpus Christi. And it's where we put all of that. We keep those servers and that data and that information and that equipment, and we keep it under certain conditions, secure conditions, cooled conditions because of the heat it generates. And so, however, what you've seen is the development of data centers reflects the changing use of technology, where we've gone from a company owning their own data to cloud computing to now the advent of artificial intelligence and the use of that in everyday life. And so importantly over the last 20 years you've seen the onset of these hyperscale facilities and then they are increasing dramatically in the proposed number of facilities across the country and in particular in the state of Texas. And you can see there from the information the amount of capital outlay that will have to happen just to facilitate the rollout of AI. So generally speaking in When we talk about how intentionally we want to be when it comes to the regulation, we want to define the types of data centers that are out there. As I mentioned, enterprise or maybe on-premise data centers that a company or an entity might own to control its own IT infrastructure, its own server racks. Think things like school districts, the city, for example, commercial entities with credit card data or other things that they need to keep secure and they want direct access to those servers. The other kind of more conventional category is the colocation data centers where you have the ability of cost sharing between entities that don't want to solely own that infrastructure. The more trending data centers that we see kind of in the early 2000s was again cloud data centers when those large scale data centers needed compute power in order to be able to basically virtually house everything that you needed access through the cloud. The other is very small data centers, and we have several in the city of Corpus Christi called edge data centers. They handle latency issues where you need that compute power close to wherever that function is going to take place. And they're small facilities. There's one several blocks away. If you go just north of the post office in uptown, you can kind of see what I'm talking about think like a connex box with like an AC unit outside, just to conceptually give you an image of what that looks like. But the one that is captured a lot of discourse in public policy, of course, is the hyperscale data center, which are the very large facilities. And so I just wanted to run through those definitions so that way council, as a policymaking body, in addition to the conversations that are happening at the state level and the federal level, can be very intentional about what we DO OR DON'T ALLOW AND HOW WE REGULATE IT. SO IN THE COURSE OF DATA CENTER DEVELOPMENT, LET'S TALK BRIEFLY ABOUT THE LANDSCAPE IN THE STATE OF TEXAS. SO VIRGINIA FOR A LONG TIME HAS BEEN THE LEADING STATE FOR DATA CENTER DEVELOPMENT. BUT TEXAS IS GOING TO BE RIGHT BEHIND IT. IT IS DIFFICULT TO GET EXACT FIGURES AND I'M NOT SURE THAT THEY'RE EXACTLY KNOWABLE BECAUSE SO MANY OF THE DATA CENTERS WITH the rapid progression of technology and the use of artificial intelligence are happening maybe through the use of certain investor groups that are coming in and proposing a data center that may never come to fruition. And so knowing the exact number of where they are and how many of them are actually gonna be constructed It's not something easily done. However, you can look at certain sources that will show you from an investor standpoint, we have an immense amount of growth in the announced category of data centers looking at the state of Texas. So as the information there on the slide says, many data centers are proposed in unincorporated areas where there's limited regulation on site development. So when we talk about new data centers for our purposes, you know, folks want to discuss the new data centers in the coastal bin. The one that's been announced and has seen a lot of, well, it's actually commercialized and is underway is HUD-8's Beacon Point Project, which is a hyperscale, could be classified as a hyperscale data center. There are several others that are proposed in that kind of large scale or hyperscale category. Of course, there has been rumored to be one in Senton or in the San Patricio area. There were two different groups that have approached Corpus Christi International Airport in seeking a letter of intent so that they could put together a proposal for a data center out there on open land that's available at CCIA. Um, those conversations are in the early format. And of course, anything that, uh, happened with property at CCI, a, uh, the lease agreement would have to come to city council for approval. But as, as again, as I stressed, many new data centers are constructed outside of municipalities. So there is a limited ability for us to know exactly how many there are even within our region, as they're not required to file with any permitting or zoning authority. So some of the resource demands of data centers, first and foremost, we want to focus on is power. So the state of Texas has recognized how tremendous this growth is in the demand for what is called large load to the ERCOT network. These large-scale requests have gone up from 24 in the year before to 519. To give you some perspective on how rapidly within a 12-month period or within a two-year period, we're seeing the request for that. And so the majority of those are projected or are claiming they want to start in the near term. Because of the public policy issues there, whether it is the vulnerability of the Texas grid and the ERCOT market, the capacity to be able to actually provide that power, The state of Texas is looking at changing certain regulations, and I will get into that here shortly. But as a result, and some of the conversations that are happening on a statewide and national policy level about data centers bringing their own power, many of them are contemplating that and what it would look like. And so it is a growing trend. It is not an absolute that they would generate their own power. And they may have power purchase agreements But I think as what you'll see on water, there's not a uniform characteristic that would define how data centers and data center developers are approaching the power situation. If they can find a spot that has capacity, where they have access to the electric load that they need, they may locate there and have a power purchase agreement. If there's not, they may anticipate bringing their own power generation. They may anticipate bringing their own power storage through battery storage. And one thing to note when it comes to power, when there is a conversation about requiring data centers to pay quote unquote for their power, there's a difference between the transmission cost and the generation cost. And so I think that's something to keep in mind. An entity could pay for the line to connect to its physical facility, but their generation, unless it's co-located with them and they bring it, it may be somewhere else in the state, it may be a larger part of the grid, and that certainly is a policy conversation that's happening with the larger Texas market and ERCOT and what the state is looking at. So, of course, an issue that is very important to our region, but the water use varies by proposal, frankly. Some data centers, seeing the recent policy trends, are planning to, quote, unquote, bring their own water, whether that's purchasing enough property in order to obtain access to a sufficient amount of groundwater. They would drill wells or something of that nature. They may be trying to access brackish water in certain parts of the state of Texas. But what is a growing trend is the push to have all data centers go to closed loop cooling systems. So instead of the more traditional cooling towers where they use evaporative cooling and they don't capture that, these closed loop cooling systems will essentially be charged at a low frequency meaning you know the hud aides proposal is once every seven years so they will fill that cooling system for their server areas with a water glycol mixture and that will be trucked in from somewhere else where they manufacture that specific chemical mixture they will put it in their closed loop cooling system and then the only need to refill it or flush it and change out the fluid every seven years according to the company's proposal But the thought there is that they're not taking constant demand for their total cooling needs off of whatever the regional water provider is. Like I said with power, it is important to note there's not a mandate right now, although there is a proposal to do so at the state level to require hyperscale data centers to use closed loop systems. And so it's a conversation that each individual community is confronted with right now when they're talking about a data center moving into their community. There can be a trade-off between what type of water conservation technologies employed at the facility versus its power consumption. And this was made clear on the June 23rd at the House Natural Resources Committee where the industry testified to the fact that if you require us to go to more energy intensive air cooled systems with closed loop cooling systems or other things, there will be a trade-off between the amount of energy then we have to consume. And so whether they have access to sufficient power or access to sufficient water does enter into the decision matrix of the developer when they're putting together that data center proposal. And so the last resource demand I want to touch on is obviously land. When we're talking specifically about hyperscale facilities, they're very large, require amount of land, means they're going to put them where that land is largely available. And so they are going to be typically out, or a lot of the newer ones that have been proposed are outside of cities in order to have a freer regulatory environment in order to develop their specific proposal. And cities, obviously, as this council is aware, are limited in our annexation powers due to the last several years of annexation reform. And so the ability to reach out and capture a facility within our regulatory environment is limited by the current state law. I do want to talk on, as it comes to land, some of the questions around specifically the beacon point project. You know, we were asked to talk about phases one and two. Are they vested? The answer to that would be yes. Vestment is a legal protection in Chapter 212 of the local government code. to ensure that once a project starts, its rules can't change. And so the plats are done for phase one and two of the HUD 8 Beacon Point project. Thus far, they've got permits and approval of a OCL water contract and a site work permit where they're doing clearing and grading. And so assumably right now, what they're doing out on that location is site work preparation. Um, as far as what government entities have regulatory authorities there, you know, the county has no zoning, the sitting, the city has platting in our ETJ. Um, and, uh, we have permitting by the way of an outside city limit contract, a water contract. And so in terms of future permits, there'll be necessary for that specific project. It'll be permits for the vertical construction of that facility. And regarding setting up a moratorium, we've had this conversation when it came up in the context of water shortages. A moratorium has been very expressly limited by the state legislature and what municipalities are allowed to do. It takes you about 100 days to get to your first period of moratorium. A moratorium is limited to a 90-day period, and then it can be renewed for one additional 90-day period, but then can't be reimposed for another two years. So it's a very narrow window. So in terms of the public policy considerations around data center it's not dissimilar from other major development or construction projects. Obviously land use and zoning including what a large facility does to what is probably a greenfield site in the way of stormwater management is a consideration. We've touched on water supply and obviously wastewater use depending on how an individual facility might partner with a community to utilize those utilities. Electric power generation, storage, and delivery are all separate areas that you would want to consider in the fact that they may have co-location of power generation, lots of different proposals. Obviously, renewables are available. Gas turbines are available in terms of commercially available right now. There is a lot of investment going on in this area towards small modular nuclear reactors, but they're not. commercially available at present and we're probably several years away from that. And there is such a thing as large battery storage projects where they may have those on site in order to balance out their power demand or their power costs associated with their demand. And then obviously delivery of how far away they are from a substation if they require a high intensity line to get there or if they're going to pay for the infrastructure to connect themselves to the electric grid. Like any large facility, particularly one that requires cooling, you're going to look at potential noise and light pollution abatement. Although several facilities that are being proposed right now in the state of Texas in regards to light, are proposed in dark sky areas and so they've had to incorporate certain design aspects that would cause them to shield their outdoor lighting at night as to limit the amount of light pollution that is there. Heat dissipation, just specifically talking about the servers that are there and how the heat dissipation from the cooling might cause a near term, what do they call it? Heat zone, what's it called? Heat Island, thank you, Heat Island. Nobody out there help me. That's okay. Construction impacts and operational traffic impacts, obviously, during that period of construction. And then there are property tax implications depending on where the property is located. Obviously, if it's in an area that captures both real property and business personal property, it's gonna, it could, it has the potential to generate a large amount of property tax. It's, In the context of what the council wants to talk about, obviously there is policy activity all the way from the White House and President Trump's recent statement on data centers to what folks like the state of New York have done to what Governor Abbott has done. It's really touching every end of the political spectrum. And so specifically in the state of Texas regarding the regulation of the development of data centers, and a memo to this effect was already sent to council But back in June, Governor Abbott put out a letter to the PUC and to ERCOT with a list of recommendations about how to limit the impacts of new data centers on ratepayers. And so, specifically, the instructions that were included in that were to include, were to require those two agencies to ensure that data centers paid for their own infrastructure. to connect to the grid and limit that immediate rate payer impact on the rest of us. There were a list of legislative initiatives that he included as well. Of course, the legislature doesn't go into session until January of 27. And even a bill with immediate effect, the earliest it could have an impact is likely sometime in the May, maybe not likely April, but probably May. June timeframe. And so all of these items are being considered. The legislature right now has a litany of at least five committees that have interim charges where they're conducting studies on proposing legislation for the next session on this issue. Some of them have already had their meetings. Several of them haven't yet, but they are scheduled in the upcoming months. And so there'll be a lot of development on what the state and what the legislature wants to do, whether that's enacting exactly what Governor Abbott has put out in his proclamation, or if there are recommendations beyond that. The PUC and ERCOT were asked by Governor Abbott to put forward several recommendations, and I believe as of the 17th, they did come up with some additional recommendations, just trying to encourage the legislature to put into state law that they, as regulatory agencies over the energy market, have the authority to communicate directly to and potentially curtail these large load facilities on the overall electric market. And with that, Mayor, I'll be available for any questions.

5:02:19Speaker 60

Thank you, Ryan. Thank you for the presentation. Councilwoman Paxson. Thank you.

5:02:25 – 5:02:42Speaker 58

Two thank yous. First, thank you for having a supplemental presentation to the upcoming discussion and action item, possibly. And second, thank you for taking the questions that we received this morning from that group and answering those. I know you did that pretty quickly.

5:02:42Speaker 12

It wasn't me, but I will pass along the credit to the rest of the team that did all the research.

5:02:46 – 5:04:30Speaker 58

Thank you to the entire team. Whoever is the team liaison, please email me with those answers. And then next, so the reason this is coming up is a couple months back I approached Mr. Zanoni and I had a couple council members with me that this was an impending concern because we were seeing the HUD 8 information coming out there. And our first priority is protect this city. And I'm not against AI, I'm not against data, I'm not against technology. I don't think anyone up here is. But the reality is, just as all the organizations and governmental agencies that you just listed have recognized, we're not at the point where we can handle this from an infrastructure perspective. Between the electricity, certainly the water, the drawn water right now, we're not at the point where I believe that we can responsibly take on this much load. We're just now getting closed looped data centers in these mass scales. This isn't something that will benefit us inside city limits, absolutely. I understand that our jurisdiction, our powers in the ETJ are a little bit limited, But I think we're trending that way in the state to have some good controls put over any projects regardless of where they come. So that's the very first thing is protecting us inside city limits. With that being said, the one that's coming into Cal Allen, which I think is the one you've been referencing, my understanding is there's a big portion of its facility that's actually in city limits.

5:04:31 – 5:04:48Speaker 12

Not the facility. There's a portion of the property that they own. So what they've listed online is 525 acres, I believe, is on their website. About 100 acres is within inside the city, but neither phase one nor phase two of this proposed facility is inside city limits.

5:04:49 – 5:05:13Speaker 58

So with it being outside of city limits and now they have an OCL outside city limit water contract with us. And he said, our next step is going to be our role in the permitting as they begin construction. Right. What is the relationship look like between us and our partners in the County? If that's where this project's going to be able to contact them about what can be done, it's less than a mile from a school.

5:05:14 – 5:06:26Speaker 12

Yeah. Well, I think it is important to note that the site was probably selected intentionally with the reality that they were going to always develop in the area outside of the city of Corpus Christi. And so with that, the Nueces County has very limited, I don't think they have any at all zoning authority. And so it's not like Nueces County has much in the way of determining how the site or the project specifically is developed. I think it is important to talk about the fact, and I don't want to get in front of the presentation that's going to happen as a result of the three signature memo, but it is important that the permitting will still take place for the vertical construction of that facility as a result of their meter being inside our CCN, our water utility CCN, which requires us to provide service. the fact that we have that permitting ability does allow DSD to implement certain standards. And I know that there's been consultation with what those requirements would be on that facility, but I'll have to let them speak further to that.

5:06:27 – 5:06:39Speaker 58

Okay. And I trust that by standards, we were talking as much as we can possibly put the foresight into protecting those neighboring areas. So maybe you can elaborate on our provisions.

5:06:39 – 5:07:29Speaker 21

So Councilwoman Paxson, to add to what Ryan said, they strategically left a lot of open space between the proposed Phase 1 and Phase 2 and the residential structures as to act as a natural buffer between that and the development, which far exceeds any buffering requirements that we have in our Unified Development Code today. In regards to vertical construction permitting, it is being looked at by DSD and FIRE and has to meet all IBC and IFC requirements. prescriptive guidelines that we have in place, all of our local amendments. So any setbacks that we have to roadways, any distance requirements that we have for fire, making sure that they have a fire lane around the building, making sure we have adequate access to combat a fire if we need to, and then also just the vertical construction itself. We're in a windstorm area. They have to meet all of those intents. They have to meet the code standards that any other commercial structure would have to meet today.

5:07:29 – 5:08:16Speaker 58

So would we be able to? I appreciate that they're going to have to be held to the same standard of anyone else. However, this is a little bit different. If I was going to put, I like to use the example that Councilman Hernandez used a few years back where there was a car wash put very close to a residential area. And even though it may or may not have been specifically required with consideration to what it was abutting, we requested that much more of a dampening wall. So is there something along those lines for protection of sound and potentially even time zones of this decimal that could be impacting these neighboring areas?

5:08:16 – 5:09:00Speaker 21

Yes, that's a great question, and we did talk to one of their designers last week, and that is one thing that they are really putting into the design. So specifically for the neighbors that are right across the street, they've already had those discussions with those neighbors that are also OCL and putting in that sound buffering wall. And that's something they'd be looking to do on the other side as well, where it goes into Cal Allen or near the school or those areas that they have there. I don't know what the messaging has been to the neighborhood. I know they have talked to the ISD out there and they've been working with the ISD for this project, but they will have sound buffering noise buffering, they will have to do any light emissions, right? It's a flight path. Airplanes fly above that quite regularly throughout the night, throughout the day. So they'll have to meet all of those lighting requirements as well.

5:09:01 – 5:09:49Speaker 58

Okay. Is there potentially, Mr. Zanoni, like we would, any other special case? Is there a town hall, something that we can do to engage these stakeholders? Because as you see this morning, even though they're talking to the ISD and they're talking to the immediate properties, you've got to... address the concerns of all participants in that school district which may or may not be immediately abutting that everyone that's going to be impacted by this because Until today, there's not been a whole lot of communication from the city as to what to expect, what's our parameters, what are we doing? This is the key point here is what are we doing to be proactive where a lot of the measures we would like to utilize, we cannot because it's not in city limits, if that makes sense.

5:09:49 – 5:10:07Speaker 21

So I think a good path forward, and we can definitely talk to HUD-8, is having that joint meeting with HUD-8. And I don't think that they're opposed to that. It's just figuring out what that location looks like and doing that, they will speak to anyone if they're wanting to talk to them. I mean, maybe they just haven't made themselves as readily available, but they have told us that they would definitely do that.

5:10:07 – 5:10:19Speaker 58

They will. Okay. I have other things to say that would explain and go into detail on the three signature, but being that this is a separate item, I will hold on those. But thank you for the presentation.

5:10:19 – 5:10:44Speaker 21

And if I can, Councilwoman Paxson, really quick to the water question that you had outside of the closed loop system that Ryan alluded to. is the amount that they've modeled for. So the amount that they've modeled for is about 3,800 gallon per day, max 5,800 gallon per day for phase one, and that would be mirrored in phase two. So it'd be about 11,000 gallon per day, which is very small. It's like a restaurant. It's not like a heavy industrial usage.

5:10:44 – 5:11:27Speaker 58

And Mr. Zanoni, while we're still in a stage three, potentially stage two, and I pray that in the next seven, 14 days, we go back into a stage two. If we do, I don't know how long or what that will look like because we're still growing that water back up. We're still replenishing that. So what I'm getting at is right now they're coming to us like a standard commercial use outfit. Should that change given the sensitive nature of our water supply point in time? What mechanisms and are we prepared to engage those so that we're not signing up another large volume user right now?

5:11:28 – 5:11:45Speaker 20

Yeah, so Nick's not here, but they will not be using water for any of the cooling processes that we've heard a lot about AI data centers. The water will be used for things like restrooms, break rooms, regular office type water use.

5:11:45Speaker 58

They're not going to go buy it from one of our other customers?

5:11:48 – 5:12:25Speaker 20

No. Yeah, from what they've told us, and Aaron's here, Aaron Farmer from the Regional Economic Development Corporation. Aaron, can you raise your hand? Yeah. So he was dealing with them before the city was even aware that they were coming here, but they're using water from out of the state and some type of a closed-loop system. So their water from us, and I'm glad it came up. I was going to raise the issue myself just so there's no misperception. The water that they'll get as an outside city limit customer is merely for office use and about equivalent to what is used in a restaurant per day. So they're not considered a large volume user.

5:12:26Speaker 60

Thank you. Councilwoman Vaughn.

5:12:31 – 5:13:09Speaker 37

Everett, I was going to suggest to you because that's in your district, although it's in the county. I know where the school's at. I've been out there a couple of times. There is a buffer. But maybe you could get with Commissioner Pusley. And y'all can have some kind of town hall so that they can get information. Because I think what happens is people operate on fear when they don't know what it is and not facts. So I'll be glad to help you with that as well. But I think that that might just be an idea for you, you know, and get the county involved because it's their area. I was told that the parking lot is in our area. Is that not true? The 500-something acres, is that where a parking lot's going to be? Mm-hmm.

5:13:12Speaker 12

Let's turn it on.

5:13:14 – 5:13:34Speaker 21

So, Councilman, we'll just go back and forth. Councilman Vaughn, out of all of the proposed layouts that we've seen, we have not seen any parking in that area. We've seen it around the Huddy building. In a recent meeting that they said that outside of construction, They anticipate about 150 employees. And, of course, that's on a 24-hour rotation, so not all 150 will be there.

5:13:34Speaker 37

You know how rumors swirl. You don't know what's true and what's not.

5:13:37Speaker 21

Understood. And until we actually saw something, we also didn't know what it was until we saw it.

5:13:42 – 5:14:22Speaker 37

Thank you. And I think what's happened, they're going to the farmers and they're buying the land. And, you know, you cannot fault the farmers because they will not make that kind of money in their lifetime farming. So they're probably going to other areas as we speak because there's talk of others that they're talking to now. My question is this, because they're right down the road from AEP, because they need electricity. They're very smart to do that. And I will give them this. They were smart to go to the other side of the road where Epic is. And it is going to be humongous, no doubt. So can we not talk to AEP and see if there have been any other data centers that have come to them and said, We are talking about getting in the area. Can we not do that? So we can do that.

5:14:22 – 5:14:53Speaker 21

For this specific project, they talked with AEP exclusively. So this project is going to have their own substation and their own battery energy storage system, which is kind of mirroring what Calicoat already has because AEP did that at their substation. So they're providing their infrastructure. They're also providing a water line for the city, even though they don't really need it. They've offered to put that in to help with the water pressures in that area and just the overall circulation. So that is a benefit because right now there's some pressure issues for like Epic and down Calico.

5:14:53 – 5:15:17Speaker 37

Okay, I have a couple for you. So I've been reading up on this. So I saw a documentary the other day and what they said was, and I'm not for or against the data centers. I don't know enough about them, but I do know it's new technology and we don't need to keep being behind. We need to move forward like everybody else does. Is it a matter of national security, some of these data centers?

5:15:17 – 5:15:34Speaker 12

Well, the president has said it's a matter of national security. So I'd have to say that, yes, there are experts that have testified at the federal and state level that have said that there is a global race towards being able to have enough compute power to develop artificial intelligence faster than particularly China.

5:15:34 – 5:15:55Speaker 37

And it says, and I don't know if this is true, laugh if you want, but it says that, and by the way, I don't just watch Fox News, I watch CNN, I just kind of flip the channel, so I didn't just get this from them. They said that China is spreading propaganda about the data center so that America will not want them, and they rise up and they protest against them, and that's really what's going on right now.

5:15:55 – 5:16:23Speaker 12

There was, yeah, there was an institute that testified in Austin specifically to that effect, Councilman. that talked about there are legitimate policy considerations that any local body might make when it comes to the development of property, but that according to their information, China is involved in trying to influence public opinion on data centers on both the left and the right because they know that that could be one of the ways that they could stall the United States' ability to develop the technology.

5:16:24 – 5:16:35Speaker 37

And I would just challenge us not to jump to conclusions. Let's get the facts before we go and do something. Let's just don't jump on the bandwagon and say we don't want them. Let's don't do that. Let's look and try and find the facts. And thank you for what you did today.

5:16:35 – 5:17:12Speaker 12

And I'll just say from at least what appears to be the legitimate kind of industry standard is they are all encouraging their members to have more town halls, to be conducting more community engagement because they recognize that public sentiment is not with them. And whether it's a company that is developing a hyperscale system facility or it's a group of investors that are trying to make one to then sell the lease to one of those companies, probably the best approach could be over-communicating the details of their project to the public.

5:17:12 – 5:17:28Speaker 37

Yeah, because whenever you don't know what's going on, your mind tends to go somewhere else and you imagine things and you think all kinds of things because you're hearing all the worst-case scenario, and we really don't know what it is. Data centers, like you said, they've been around for a long time, just not to this scale.

5:17:29Speaker 37

Okay, thank you.

5:17:30 – 5:17:42Speaker 12

And I think that's what's concerning people is how rapid the development is, right? They're such large-scale facilities and how rapidly we've gone to not really hearing or knowing about them to their major topic.

5:17:42Speaker 37

Well, and you named a number the other day. When I heard the number, it was 464, and that's the ones that have been done and the ones that are proposed for Texas and that we were behind. Was it West Virginia?

5:17:53Speaker 12

Virginia. Virginia.

5:17:54Speaker 37

Yeah, Virginia.

5:17:55Speaker 12

Yeah, there's, yeah.

5:17:57Speaker 37

Yeah, thank you. Thank you, Mayor.

5:18:01Speaker 25

Thank you for the presentation. I guess at some point we're going to discuss what's on the agenda, but... The signature memo?

5:18:07Speaker 12

Yeah, there'll be a separate presentation.

5:18:10 – 5:18:31Speaker 25

I guess then, okay, so this is just for you. So... So nothing, obviously the one on the table in particular, there's nothing, even though we have the benefit of having development services have to oversee the permits. Right. What is it? But we have no regular authority to withhold it or to prohibit them from moving forward. Right.

5:18:32 – 5:19:04Speaker 12

Okay. If they didn't have an OCL contract, we wouldn't have any... they had gone to another water provider oh well that i guess that's good uh what is it for you know eventually 10 11 000 gallons a day um i think their their projected demand is a little bit less than that that's what they're expecting that's what's out there publicly but in terms of on their website but i think when you look at just purely the number of employees that they would have on site in the facility size that they're proposing for the administrative offices that maybe end up being slightly less than that.

5:19:04Speaker 25

I'm just curious then, what are the permitting fees? What kind of revenue does that bring in? Not IGR. It's going to be a lot.

5:19:13Speaker 21

Ryan ducked out of that one. It's all going to depend on the value of the project, and we have not received that to date. So to date, we've only done a site work and grading permit, so that is an unknown at this time.

5:19:22Speaker 25

But how big is the project?

5:19:23Speaker 21

I believe the Phase 2 that they just announced said $9.8 billion, and the Phase 1 I don't think ever announced the dollar amount, but it is a relatively high dollar.

5:19:32Speaker 25

So that would be significant.

5:19:35Speaker 25

Okay. That being said, then, I guess I wonder what the revenue to the county would be, and it's in Cal Allen ISD. Ryan, that's probably a question for you. You can give me an estimated guess.

5:19:46 – 5:20:06Speaker 12

I don't know. I'm not going to hazard an estimated guess because Unless the EDC has any kind of updated information on the phase two commercialization that they've successfully concluded. But it's a multi-billion dollar project. So it would all go on to the county and school district roles. So in terms of the revenue generated.

5:20:06 – 5:21:07Speaker 25

The county can demolish their own courthouse. Oh, did I say that? I'm sorry. Okay. Okay, so I guess that's the whole thing. I said there's nothing from a regulatory authority that will allow us to prohibit them from moving forward. It seems like they've got the question on water answered, and then obviously we know. I think in Mark or Carolyn's issue stepped out, wasn't it about a decade ago that Google was looking at us specifically for a data center? I don't know. It was. So that's another thing. So it's just now, obviously, that it's just come out. I think it's just very interesting. And, you know, here, I still can't look for the last. So I guess Amazon, Google, and all these other search engine and AI, I guess it's for their purpose. It just fascinates me how they can invest so much money to have that kind of speed.

5:21:08 – 5:22:08Speaker 12

Well, I mean, I think it's really about the artificial intelligence technologies that they're still in the process of either refining or developing. And it's not just the names that we're probably familiar with, like Amazon Web Services or Google. There are a lot of entrants that are particularly well-funded in this in order to try to meet what they see as the demand. HUD-8's particular model is they're essentially the owner of the warehouse and then the leasee owns the equipment that's inside and so yeah it's it's going to be either one or a couple of tenants that have enormous investment inside that facility so the taxes are going to be i mean dare i say it i get criticized all the time now is is on the personal property a good portion of it will be on the computers inside is where a lot of the valuation comes from okay all right thank you very much um yeah i know that i i hear a

5:22:09 – 5:22:35Speaker 18

I get stopped all the time and people are talking about it. And one of the questions, and I know we'll probably cover this later on in your presentation, but 500 acres. 500 acres is pretty large space. And I heard also that the parking lot was on the city side. But from the elementary school to where this actual building is going to be, how close is it?

5:22:35 – 5:23:04Speaker 21

I wish I would have remembered to have that measurement for you. I don't have it. Andrew, does anybody even, it's a, it's a pretty, uh, large distance, right? It it's, it's about, I would say three quarter. Yeah. Three quarters. Not, not quite yet a mile up until the city limit line. So probably about three quarters to two point from the school, three quarters of a mile. Well, from the school boundary line from the school boundary line, because remember this, the school has like the playground in the back. So you'd want to, you'd want to take the property line.

5:23:04 – 5:23:42Speaker 18

It just, I don't know, maybe somebody out here knows if 500 acres, to cross 500 acres, what is that in equivalence to like miles? I guess my point is, it just fascinates me, and there's been several projects like this, and I had this experience myself. I lived on a place that had 10 acres, the people next door bought 10 acres, and they put their house right basically in my backyard. I'm like, what are you gonna do with the other nine acres? But I do have a concern about that, and I would like to have more information because if anything, they haven't, have they broke ground yet?

5:23:43Speaker 21

So they started site work and grading, so clearing and grading.

5:23:45Speaker 18

So they have, but they haven't because, I mean, if anything, if we have any influence, maybe we can get them to move it further away from the school.

5:23:53 – 5:24:11Speaker 21

They're putting it right along the boundary with EPIC. The phase one is right along the boundary with EPIC. It leaves just enough room for the buffering between them and EPIC and then for the required parking and fire lanes. that's required around it, but it is very close to EPIC. So they're putting it as close to industry as possible.

5:24:11Speaker 18

As they can. Okay. Yeah, it would be great in the future to have some type of aerial view or whatever, if you can, to see what the proposal is.

5:24:20Speaker 21

We can provide that. We'll provide the distance measurements and also the acreage that's the buffer.

5:24:24 – 5:24:48Speaker 18

Yeah. The other thing I had a question on is somebody said that just by design and the way that these – centers work is that they're not meant for long term. So in other words, is there like a particular life shelf on these centers that, again, everybody's just talking. Somebody said, oh, well, you know, they really aren't any good after six years or seven years.

5:24:49Speaker 21

It's not the center itself. It's the equipment, right? It's the servers. It's the chillers. It's the generators. So those have a longevity, right? And then they have to be replaced.

5:24:57 – 5:25:09Speaker 18

They'll just replace them there. They're not going to sit there. What I don't want to see is a bunch of abandoned buildings and them hopping across the street and doing the same thing. Okay. All right. Thank you. That's all I had.

5:25:10Speaker 60

Councilman Scott.

5:25:11 – 5:25:57Speaker 34

Yep, yep. I'd like to see a map, too. I mean, I'm looking at what's been provided. Interesting to me. It does look like it's right up next to Epic, but it's also, I guess, across the street from some residents, and that's just an artistic rendering. Yeah, it's just an artistic rendering. A couple thoughts. One, our CCN, right? CCN? We can't say we don't like you, so we're not going to sell you water. Do we have the ability to tell one particular industry that we just don't like you and so we're not going to sell you water? My sense is we can. I fought this years ago, and I didn't like the project, but we were told that if we don't give them an agreement, they'll sue us and get the agreement anyhow.

5:25:57Speaker 20

I'd like to talk through that. Right. You can't do that as a short answer.

5:26:01Speaker 34

All right. Well, I think it's important to note because there's going to be a lot of, well, you don't like them, just don't sell them in the water. Now, I guess you could do a moratorium if you're doing a moratorium on everybody for 90 days.

5:26:11Speaker 20

Challenge like what Ryan said with the state moratorium on prohibiting new taps, that type of thing.

5:26:18Speaker 12

Right. I mean, it falls under the same category. process that's been mandated by the state in terms.

5:26:23Speaker 34

And if you did a moratorium, it'd be for all projects, anything, any new taps for none. No, not necessarily.

5:26:30 – 5:26:46Speaker 12

You can, you would target it, but like I said, you could target it towards new construction. You could target towards type of, of a facility. But again, what's limited is how long it takes you to get there to begin the moratorium. And then, you know, it's 90 days already under total of 180 days.

5:26:46 – 5:27:18Speaker 34

Yeah. Can't take the tap back. Right. We're here to take our meter back. Right. It seems to me that the issue is really, you know, not how much, I mean, it's how much water somebody says they're going to use, but the relationship between, was it the meter and how much water? So if somebody says, hey, I'm only going to use 10 gallons a day, but they get a massive meter or tap, help me with the language. How do we determine how much water someone can really use? Is it by the meter or the tap?

5:27:20 – 5:27:40Speaker 15

It was both, actually. So the different size meters allow for the amount of water, the volume of water to be transmitted to that customer. The tap size to the main tap corresponds to the meter size. So typical, if you have a two-inch meter, the tap is going to be two inches as well.

5:27:41 – 5:27:59Speaker 34

Okay, so I guess that's my point. If somebody says, hey, we're going to use 10 gallons, but we don't trust you, but if they file for a two-inch tap and a two-inch meter, there's a capacity in that. You can't get a million gallons a day out of a two-inch tap, can you?

5:27:59 – 5:28:10Speaker 21

So no, you cannot. So if a For commercial projects, they do what we call a water meter sizing form that looks at the fixture count within the facility, and that determines the meter size that's going to be needed for that location.

5:28:10Speaker 34

Okay, and do we have, we don't have that from them yet?

5:28:13 – 5:28:32Speaker 21

We don't have a full set of plans, and one of their renderings, I was counting every urinal and every commode, and it looks to be, and every faucet, it looks to be about 13, but again, we haven't received a full set of plans, so I couldn't give that number, but they have done their own water meter sizing form, which is our form, And they've said that they need a two-inch meter, which is a relatively small meter for commercial.

5:28:32Speaker 34

By the way, is that a normal thing? Everybody counts toilets as they're putting up?

5:28:36Speaker 21

If you're going to get a water meter in a commercial business, yes.

5:28:39 – 5:29:03Speaker 34

Well, I guess my point was if they're asking for a two-inch meter, then that should tell us that they're not going to use a million gallons a day. We don't trust anybody, and that's okay. But I think we all want to focus on that meter size because if it ends up being two inches, I think we're good to go. That's all I have now, Mayor. Thanks. We'd like to see a map at some point.

5:29:04Speaker 60

Councilman Hernandez.

5:29:06Speaker 28

Yes, thank you. We don't have zoning for what would be considered a data center, right? No.

5:29:17 – 5:29:31Speaker 21

Good question, Councilman. That's going to be in the next presentation. But no, we currently do not. And as it's rapidly growing in Texas, that is something that we were already working with our development services technical advisory group as we're looking at the UDC right now to incorporate.

5:29:32Speaker 28

Yeah, I kind of have the UDC up right now.

5:29:34Speaker 21

It's not in there.

5:29:35 – 5:29:52Speaker 28

Right. There's nothing that states what it is. Correct. Do we have some idea from the state as to what they classify a data center as in terms of the amount of servers, what the size of the facility? I mean, do we have some aspect of what the definition would be?

5:29:52 – 5:30:15Speaker 21

So we do. We've been looking at best practices in Texas, and there's a lot of cities that have recently underwent UDC rewrites or zoning rewrites, whatever applies to there. their area. And we do have some common definitions that we'd be looking at, whether it's hyperscale or the small scale or cloud. And it basically is pretty much by size, under 10,000, over 10,000.

5:30:15 – 5:30:46Speaker 28

So we would have a square footage facility. Correct. Okay. So, and thus is a lot of, you know, reason why that three signature memo came out was because we need to have some form of regulation within the city so we can have some aspect of it. We can't do it once they're here, right? I mean, HUD-AID is already in the process. It's not like you can go back and say, we're gonna go back and regulate them now that you're already here, right?

5:30:47 – 5:31:03Speaker 21

So HUD-AID is still OCL, so the zoning restrictions that we have inside stadiums wouldn't apply. But we have seen an increase in people looking to our area, asking our staff questions for data centers, So we had already seen the need to put in some definitions and some parameters. Right.

5:31:03 – 5:31:32Speaker 28

So let me step back. I didn't mean it in terms of just zoning, right? I mean, we have no regulations. And obviously, the HUD-8 is going to be in our ETJ, correct? Correct. And so there are aspects of that as well that we have some things that we can do within our ETJ. But like I said, we want to get in front of it, not be behind it, right? So... How many data centers do we have in the city now?

5:31:33 – 5:31:50Speaker 21

So at our count earlier today, it was two small ones. And then Beacon Hill, of course, would be under construction. But there's two small. There's one uptown and downtown. Very small. They support the one uptown we know for certainty supports the education services or the ISD. So it's a very small one. And I believe the downtown is similar.

5:31:51Speaker 28

Okay, so, I mean, I know we have certain stuff that's in this building. Would that be considered a data center?

5:31:57 – 5:32:11Speaker 21

We would have to come up with a definition in the Unified Development Code that allows these small-scale server rooms within your building, right, which is not, it's not literally, it's not the data centers that are all over the news right now. That is just your server room, if you will.

5:32:11 – 5:34:22Speaker 28

Okay, so I want to make sure that we're looking at regulation, not necessarily prevention or, you know, demonization or anything like that. We just want to make sure that we have some tools so we can have the aspect of at least not putting them next to people's houses or next to a school or whatever that means, whatever we consider or what the data suggests that we should not place them next to, right? Sound requirements, any kind of, I don't even know if we have electromagnetic concerns with these data centers. But the main concern I have, especially with some of these things that are going to be outside the city limits, is that since they're outside the city limits, we don't receive any fund recovery from property taxes or ad valorem taxes. However, we do end up having mutual aid agreements with other fire services where our firefighters can be put in a situation where they have to go out there, right? And so my biggest concern is that, okay, we're talking about massive amounts of computing equipment, electricity, a lot of electricity requirements. Are they gonna have lithium ion batteries on site? What's gonna be their backup generation? There's a lot of questions associated with that that make it concerning. And honestly, from a perspective of me as a city, what liability do we have with regards to firefighting, right? Ultimately, you gotta think worst case scenario. I give the same discussion with battery-powered vehicles. What if a battery-powered vehicle gets on fire on top of the Harbor Bridge? How do we address that? So it's something that we also have to consider, and policy-wise, make sure that we're covered not only for the sake of our firefighters, but also for the cost associated with that. So I want to make sure that we have full coverage of what we're trying to accomplish here. It's not, you know, we're not trying to demonize these facilities, but we want to make sure we have good regulation. Is that understood? Okay, thank you.

5:34:24 – 5:35:22Speaker 44

Councilwoman Gumpels. Thank you, Mayor. I was just catching up with the latest that our governor was stating. Even though the title of the Texas Tribune says, Governor Greg Abbott calls for a ban on data center development in rural Texas neighborhoods, it really is deceiving because it still appears that he's still following the June 10th like you just pointed out to us. So Even though he's saying that, you know, he's banning, it's not. Can you clarify just making sure? Because it is confusing. Here you are thinking this is what he's telling the rural communities, and here all of us, I mean, we're getting, it's an onslaught. Like, you know, we can't keep up with, we don't even know how many have called on our area. So, again, can you just,

5:35:24 – 5:36:25Speaker 12

reiterate what it is that good question because i think there's there is as fast as the information is coming towards y'all and as it is out in the media it's happening at every level of the policy world and so um the it is important that the clarification that came out from the governor's office was it is in line with his june 10th letter a ban on something being put somewhere would wouldn't be able to take effect until the legislature took an action like that And so he's not instituting, there was a public comment earlier about the governor instituting a six-month moratorium. He's not announcing a moratorium or doing that. He is working with the legislature to develop a concept like that in particular around what he calls rural neighborhoods, which I assume, but it is an assumption that he's talking about co-locating a facility within close proximity to a residence. It's not about banning it everywhere.

5:36:25 – 5:38:09Speaker 44

Yeah, okay. So really, it basically comes down to, I mean, I don't know where the candidates stand, the ones that we're going to be electing in November, but I think that would be a very important question to ask them where they stand so that we know, you know, and the audience and the constituents know where you know, they're coming from, because right now it's not a left or right issue, it's, you know, what is it that is best for our communities? And it doesn't look like data centers are wanting anywhere, not in their front yard, not in their back yard, not in their site, nowhere. And so, yes, it is about communication, but again, I think just based on what I was just seeing about the applications how we have had like an onslaught of applications because they know that it's a matter of time where whoever we elect, it's going to matter. And hopefully we'll elect the right person, the right people that will hear what the constituents are saying, which is we do not want any more data centers. I think you can hear from all over the United States how it has affected their lives And like you said, there's different types. Yes, I understand that. But I think people realize when you buy like 500 acres or when you get 500 acres, you get 1,000 acres. That's a lot of data center. That's a lot of industry there. So anyway, I'm glad that we are having this discussion. How much time did you have, though, to prepare for this? Because you did a pretty good job in getting all this information, Ryan.

5:38:10Speaker 12

I had as much time as we... talked about it. I don't know.

5:38:15Speaker 44

There was a last week.

5:38:16Speaker 20

So see, y'all were, he's, he's been doing work on it since, you know, just in general, we've been tracking it.

5:38:23 – 5:38:39Speaker 12

So like the memo said, one of the things we wanted to do was get through the house hearing where they had an opportunity to hear from all sides at a state policy level experts. So at least since you know, June 23rd, kind of looking at where the conversation about from the industry perspective.

5:38:39Speaker 44

Okay, but you had already been tracking it and like the three-member agenda.

5:38:44Speaker 12

What's the most talked about policy issue at every level?

5:38:47 – 5:39:01Speaker 44

Yeah, it's everywhere. So I congratulate you. I thank you for having a presentation, giving us at least some more information so that we can, you know, delve into it. So again, thank you for the presentation.

5:39:01 – 5:40:06Speaker 12

Yep. I would say, Councilman, just to expand on your thought about the number, I think the number is so telling in terms of the amount of what they refer to as electric large load facilities and their request to ERCOT and PUC market that they are actually looking at requiring projects to put up some kind of financial feasibility before they expend a bunch of staff time Advancing advancing a lot of work and preparation for what that demand on the grid might look like because there is some belief that You know a number of these projects will never come to fruition because they're because the onset of the technology is so Rapid and the amount of investment very clearly is so rapid that you know their prop there are not every project will be real candidly and It is and so it makes it challenging from a from a policy standpoint on every level about a city council trying to be very intentional about how they want to regulate it and every level beyond that.

5:40:07 – 5:42:38Speaker 58

I wanted to state just reiterate again because I heard questions and concerns. As the one I mean very involved in kind of leading this 3 signature none of that was against Data centers or technology or being at the forefront or a good position as a leader It was not about that. So it's all about setting expectations, you know and setting our boundaries for our city You know, this is what we will accept as beneficial This is what we won't and I mean if we think about it think about how technology has already advanced and I know this is a little different but it's not because When you set a parameter for something, if it's going to thrive, it's going to learn to live in that parameter, it's going to go away. We came from a point where to use one computer, it took an entire office space to set that up. And now we have astronomically increased output in the palm of our hand. Things continue to grow and change. And what... is important for us at this place is even though again we're not calling data centers bad we're saying that we acknowledge that they have a huge demand on water electricity and they're they're noisy neighbors they're hard to live next to and while that's not a pronouncement that they're they're bad objectively it's saying we don't want you in these zones and so that's That was kind of that impetus behind point one on the upcoming three signature. It's setting those expectations and those boundaries, and they'll learn to live with them. They will. Technology will update. Making parameters that ensure that we're not putting additional costs on the rate or the taxpayer. Something we talk about at Nauseam is that we need to massively increase our water supply right now And we all have to unilaterally pay for that increase because of the condition we're in. So we don't want to set ourselves up for that again, being proactive on how do we plan for something that could be taking a huge amount of these resources. So that's the thought process. I wanted to just put that out there. I know we're going into the next item. If I could ask you real quick, you said it takes X amount of time between initiating and a moratorium going into effect. And then, of course, you get the 90 days plus 90 days, so six months. What was that first?

5:42:40Speaker 12

Okay. The law is very prescriptive in so many days between certain hearings and issuance of announcement of hearings, so it's about 100 days.

5:42:48Speaker 58

So, in effect, it could take us to May, which is when we could see this stuff enacted.

5:42:54Speaker 58

Roundabouts. Yeah. Okay. Thank you, Ryan. I know we're going into the next one. Yes, ma'am.

5:42:59Speaker 60

Councilwoman Vaughn.

5:43:00 – 5:43:27Speaker 37

Ryan, we don't want to reinvent the wheel here. This is new to this area, the data centers, but you know there are other cities around here that have been dealing with them for a while. So if we could contact some of those and maybe get the pros and cons, because I'm not going to say I'm against data centers. I don't know if I am or not. I think we need to give them a chance before we start doing certain things and make sure we have all the facts. But I just thought maybe if we contacted some of the cities that already have them and have already experienced them, it might help.

5:43:27 – 5:45:49Speaker 12

Yeah, I don't know. Yeah, I think that's a good idea, Councilman. You know, we know from an approach looking at moratoriums or something like that, you know, Hood County was one of the first ones to jump out of the gate because I think there's a proposal for maybe eight in that county. And almost immediately that was stopped because counties don't have the ability to do that. And so the company threatened a $100 million lawsuit and State laws doesn't allow a county to institute that type of moratorium. The city of San Marcos was one of the first cities to try to ban them within their city limits. And I think that's going to be challenged as well. There's at least one state senator who's come out and said it violates House Bill 2127. which was the super preemption bill of municipalities. And so it's a challenging topic for local governments to be able to confront because in some ways the law is really restrictive on how we institute a moratorium or even what our regulatory authorities are, even more so for counties that are only able to enact regulations that they're expressly granted by state law. So it is a challenging concept and one that, every local government is frankly probably looking at. If we're talking about in our immediate area, I think there's a limited amount, but I'm happy to work with any council member if you're aware of proposed or potential sites and we need to talk to some neighboring entities, we can certainly conduct that outreach. But I do think that the state, regardless of what individual cities and counties try to do in the interim, the state, at least for their part, from a power, approach because they control the ERCOT market. And from a land use and zoning perspective, they're going to come in over the top and create some type of statewide regulatory scheme that everyone will live under. And so that'll be an active conversation that we have to have with our delegation and with the entire legislature with how Corpus Christi feels about that and what what common sense regulations seem to be put in place in order to protect communities from unwanted nuisance or impact.

5:45:49 – 5:47:40Speaker 60

Thank you. All right. Okay. Ryan, thank you very much. We're going to move on to the same subject, but different item number 18, and that is a motion to direct staff regarding data center classification and parameters as requested by council members, Kalen Paxson, Gil Hernandez, and Carolyn Vaughn. So number one is initiate a unified development code amendment to define data centers as a distinct principle land use and amend the city's zoning and permitted use tables to prohibit data centers in all zoning districts rather than allowing them to be approved by default under existing office, data processing, utility, warehouse, industrial, or similar land use categories. Number two, an ETJ utility infrastructure and public facilities protection policy requiring data centers and similar high intensity digital infrastructure projects to enter into an IDA and to fully fund their own infrastructure needs, prevent costs shifting to residents and rate payers, provide verified water and wastewater planning, address electric and backup power impacts, mitigate community impacts, and receive separate city council approval before receiving city utility service, infrastructure participation, development agreement approval, or economic development incentives. Number three, the statutory notice hearings findings and ordinance preparation process necessary for city council consideration of a temporary development moratorium related to data centers and similar high-intensity digital infrastructure use okay do you want to speak first councilman paxton thank you i just kind of wanted to explain um at baseline because i know that your presentation is going to

5:47:41 – 5:50:21Speaker 58

feed into it. With the first item, what I did was of course looked at how San Marcos handled theirs and they kind of crafted in their development code a definition for that data center and so that way we could carve that out of each zone that we have, each zoning area. I understand fully item one and item two has long processes associated and it sounds like you're already ahead of the game on that. I'm glad y'all are already looking at it and I look forward to hearing your presentation. But those were understood that they were gonna take some time to implement between working through the channels of that definition, going through the planning committee, coming back to city council to adopt those, that could be six months, realistically. And so with the second item, kind of like what we discussed previously on the last topic where we were talking about as they seek their permits to go vertical, like we say there's certain setbacks they have to have and things like that, being able, while we're updating definitions in the development codes, setting parameters there And these two items give that kind of guide guiding post there. They weren't meant to be taken as like this is ballot language. But basically, like this is the thought process we would like to arrive at potentially is to set. those types of parameters. And then again, knowing that those are gonna take a while to work on those definitions, go through the different organizations of approval before they come to council, while those are in taking shape, I know that the state, and we're thankful to our state delegation, we're very thankful to them, but that's going to start to come into play as well. And again, I'm speaking hypothetically if these items do move forward today and pass, and I know you're already working on a lot of those in the background, but that's where that third pillar kind of comes in is while these take six months to kind of pause them. Because again, thankful for the state, I hope that that policy goes into effect as quickly as possible. Not that these are bad centers, but just to protect residents. But before it goes into effect so we don't see things creeping in. And I did of course try to write this in a way that distinguished large hyperscale facilities. None of this was meant to apply to onsite information technology needs, and small scale operations that regular commercial and even shared commercial outfits would use.

5:50:22 – 5:56:06Speaker 21

Thank you Yvette. I will go through the presentation. As we kind of mentioned earlier, we have what we call, and I'll get to the presentation in a minute, but we have what we call the Development Services Technical Advisory Group, and that group is tasked with looking at UDC rewrites, Unified Development Code. We started that process up again. We had our first meeting I believe last week, and it was a very lengthy meeting. couple of long-standing residents of the city of Corpus Christi are winded but it was a great meeting a productive meeting and it takes us time to go through that some of these definitions and some of these use classifications were already on our schedule to look at because we were already revisiting revisiting the entire zoning matrix so it wasn't just specifically for this but we were looking at the zoning matrix overall specifically for residential and some of the state law changes that just happened the last legislative session with the extreme small lots, the 3,000 square foot lots. So we are looking at that, but I do just want to say that we took some time last week to kind of push this a little bit quicker and look at other Texas cities to see what those best practices were. So we have found that many Texas cities are finding that their existing codes classify these massive high impact facilities under standard categories like general offices, light warehouses, or utility uses. Currently, our UDC does not classify these types of uses as such. We'd look to bring forward a UDC text amendment that adopts the best practices already being used successfully in other Texas municipalities. So one of the first things we would want to do is establish the clear, distinct land use definitions in our code, specifically for data centers, crypto mining, and battery energy storage systems, which also align with some of the changes from the International Code Council, who's currently adding those definitions to our code. vertical construction, as you call it, our regulatory framework for building and for fire. This would allow us to differentiate between a small-scale server room and a massive hyperscale facility with heavy cooling towers and backup generators. Secondly, we'd look at removing default by-right approvals. Instead of allowing these projects to pop up automatically under office or warehouse zoning, requiring that every proposed facility be required to go through a discretionary conditional use permit or special use permit may be one of those things that we move forward with. Again, that's all subject to the discussions that come out and the ordinance proposal that comes to council. We'd also look at restricting where the facilities can be located. Reviewing them, limiting strictly to heavy industrial districts is one option or another specifically designated zone that maybe we create that could require that it be in that zone. We could also still end up requiring that a conditional use permit or CUP or SUP, special use permit, be required even if you're within that zone to make sure that you meet those regulatory frameworks. Lastly, we look to adopt larger setbacks from residential neighborhoods along with enforceable limits on 24-7 mechanical noise, power draw, and HVAC cooling systems. Again, this is something that we're seeing across the state of Texas when they're doing some of their amendments. So we'd be looking at that as part of the process. As you mentioned, Councilwoman, it is a very lengthy process, and even if we wanted to rush this process and try to get it in three months, which I highly doubt we can, it requires a lot of public notice, a lot of public outreach. So we do need to route the proposed ordinance through the vetting process, which is DSTag. And then after that, we typically have public meetings, right, when we do this, and we meet with all of our stakeholders. After that, then we would go to Planning Commission, and of course it would end up at City Council for final decision and approval. I also wanted to speak to the IDA, which was the second request. So industrial agreements are non-regulatory. Our IDAs are contractual agreements not to annex property located in extra ETJ. It's easier for me to say tonight. Within a designated industrial district, they are contractual and not regulatory. We have limited city authority in the ETJ. Cities already possess very restricted regulatory power over land situated outside their formal city limits within the ETJ, as we mentioned earlier. But within the ETJ, we do have platting authority. And if they do get an OCL water contract, that gives us the permitting jurisdiction. So there's also for the IDEA is the impact of House Bill 2127 that Ryan kind of talked to earlier, which is also known as the Death Star Law. HB 2127 prevents municipalities from enacting new regulatory requirements unless expressly authorized by Texas state statute. Any special data center regulation not authorized by state law could be preempted by the Death Star Law. So what that means is any attempt by a city to create a special regulations targeting data centers in the ETJ, if not explicitly permitted by state law, could be vulnerable to preemption under the Death Star Law. So in our mind, the best approach would be changing the Unified Development Code, which we do have oversight for within our zoning code, especially inside city limits. And in discussion for the moratorium, so in Texas, imposing a moratorium on property development is strictly governed by Chapter 212 of the Local Government Code. Cities have extensive public notices and multiple hearings over roughly a 100-day lead-up, which Ryan kind of spoke to earlier. And then once approved by required three-quarters supermajority vote, a moratorium lasts a maximum of 90 days with one option 90-day extension, and then it's capped at 180 days for a period of two years before you can bring another moratorium, similar moratorium back up again. It is important to note that in doing our research, we found that Fort Worth is currently considering a temporary moratorium, not to ban the development, but to require that all of the facilities use closed-loop systems, which which is a good thing, right? Because that kind of goes along with the governor's attempt to change the state law to require them use those closed loop system as a way to preserve water. And so with that, I stand by for any questions.

5:56:09Speaker 60

Okay, Councilman Hernandez.

5:56:12Speaker 58

Could I? I'm so sorry.

5:56:13Speaker 60

Can I finish my three minutes? Yes. I didn't realize you were done.

5:56:17 – 5:56:36Speaker 58

Sorry, Councilman. No, thank you. Thank you so much, Yvette. On page one, bullet point two, you have it so that they wouldn't buy right under a variety of different zoning. Again, the proposal would be that they don't have buy right under any of the zonings.

5:56:36Speaker 21

Right. So if we were to change today, right now, they could. It's not a definition that we currently have. So what we'd want to do is change the UDC so they're not allowed just by right within any zoning district.

5:56:47 – 5:57:05Speaker 58

Any of them. Correct. Correct. I think it said maybe in point three, and I'm sorry, perhaps you can email this slide. Sure. I was trying to make as much notes as I could as they were up there. One, you said basically that they would be considered under light or industrial, those types of zones.

5:57:05 – 5:57:26Speaker 21

So in other Texas cities, that's what they're doing. They're limited, limiting to light industrial or heavy industrial uses. So again, we look at best practices across Texas as we're going through the vetting process. And that is just what we've seen is that most jurisdictions are limiting to light or heavy industrial. and they're also adding a CUP or an SUP on top of that that has to come before the regulatory body for approval.

5:57:27 – 5:59:19Speaker 58

I know a lot of places are doing that, I agree. I would still say that the thought process behind this is still additionally excluding them from even those zones. So it would be very, very much like San Marcos who did exclude them from all zoning criteria, all zones. And the thing here is in city limits. And yes, you gave that slide where we're very restricted on ETJ, and I agree. And you addressed a lot of that with how even though we can't enforce a lot of this in ETJ, we can still employ standards. So that would kind of address a bulk of that second provision. That's mainly on just having those policies in place, like I said. And so if I call them 0.1 and 0.2, 0.3, under 0.3, again, I'm sorry, under bullet 3.1, all, that would be my note there. And then under your 0.4, that's sub 0.2. the thought process with that, and I think you've hit most of that on there, is to have that very long stretched viewpoint is that we're not gonna get several popping up and before we know it, now we do have the equivalent of large volume users drawing on our water supplies and things like that. So having that foresight so that they're responsible for connections, they're responsible for all costs and potentially future supply if demand were to get to that point. kind of like we would for a large volume. If they came to us and we can't supply water, we could transfer that cost onto them to increase our supply, something like that. Okay, I think that's probably, that's about the end of my three minutes. Thank you so much for that presentation.

5:59:20Speaker 60

Councilman Hernandez.

5:59:24 – 6:02:14Speaker 28

Okay. You know, when we talked about having zoning, right, The moratorium can be for when you're in the process of creating the zoning, right? Correct. I mean, we're just talking a temporary moratorium. I don't think, like I said, from my perspective, it was not to ban something outright, but you want to make sure it's in the correct thing. I want to go back to Municipal Code Chapter 48 might have some reference to it. Anybody, everybody know chapter 48? It has to do with sexually explicit, or sexually oriented businesses that are only allowed in heavy industry. And it's an ordinance that was set up back in 1996 that kind of outlined a lot more than just the requirement for the UDC. What I'm specifically, this might be a more comprehensive thing that we need to address as for the city to look at it also from the perspective you'd mentioned from IDAs, requiring from IDAs. Well, the biggest issue I have concern with is from our fire department and the risk and the liability associated with that. Well, if they don't want to join an IDA, then we put a specific requirement that our fire department can't go out to service that regardless of the mutual assistance agreements. I mean, there's got to be some recovery of risk and cost associated with that because we've got to maintain the fire department in that aspect. Now, we've been struggling to make sure that we fully support our fire department, and we're talking about four-man units for the fire trucks, right? How do we get there? Well, if we need the preparedness for... these data centers, specifically with the high heat and fire hazard associated with it, we need preparation for it, and how do you pay for that? So I don't know if there can be certain things associated with that, but I want to make sure that if we're going to have our people at risk, that we have some form to pay for it. And so if that's a possibility, we need to make sure it's more encompassing than just the zoning that it also talks about what requirements are for fire prevention, what requirements are for the actual facility. I wanna make sure we're very specific on this because it goes beyond just where these things are located. Is that?

6:02:15Speaker 21

I understand and we'll have to meet internally. So just so I have clarification, we're talking about those that are inside city limits and even those that have an IDA that might be in an industrial area.

6:02:25 – 6:03:33Speaker 28

Right. I mean, you know, not all IDAs are the same, right? So these things can be tailored to these things to be specific. And I just, you know, if they're going to be outside the city limits and we have very, you know, we have a lot of constraints on annexation, but there's still risk associated with it. That's why we created the requirement for compensation if we go out to an area not covered by an ESD and still, and then so we can recover some cost associated with it. This is a preparedness issue. I know I've had several conversations with Chief Wade about not only this, but also electric vehicles and some other things. The preparedness for it costs money. it's not like you just automatically accept them to be able to do whatever's needed without being able to fund that preparedness. So I want to make sure that that preparedness is there available for them and not put them on a spot where they're going to something that they're not prepared for. And I'm not saying they're not. I'm just saying that you've got to make sure that we can fund what they need.

6:03:34Speaker 28

Okay. Thank you.

6:03:35Speaker 60

Councilman Barrera.

6:03:37 – 6:05:41Speaker 25

Here, I just want to, Peter... I just kind of want to caution, you know, sometimes we have a tendency to, you know, I tease my colleague, who actually I've learned to love over the last eight years, but he was hard. But, you know, I just say he's a solution in search of a problem. And the thing is, is that, and I say that tongue in cheek, I don't mean it to be facetious, it's just, You know, right now, we're directing you to do the items when this is already, I mean, what was it, probably four committees are going to address at the legislature, you know? You know, a very wise man told me, if he's listening, the Fed has all the money, the state makes the rules, and the local people have to solve all the problems. And right now, we're not sure what the rules are yet. And I just caution Peter that we get, you know, we've said sometimes we throw it around like a football. The staff has no time. You know, we've got all this other stuff going on. And I think before we start these projects, which I think are important, you bring some valid points, I think. You know, this group will probably join CBIA, and then maybe they'd be part of the RTFC, and it would be something that we're trying to address, and I think we need to be engaged, but I think we just need to proceed cautiously before we're creating another level of bureaucracy of something that we don't know all the rules about. You know, I understand the nature of trying to get ahead of the game, but we're not, the rules are gonna be made, You know, and I think perhaps we contact, you know, our lobbyists and or our legislative team and particularly, you know, particularly the state rep that this is going to be in this that this particular site is. It's also the state rep for the airport. You know, I mean, the airport, we probably need to be cognizant of and proceed very cautiously because that's in the city limits. So.

6:05:42Speaker 20

Right. And it's our property too. So we're not, I don't think we're, I don't think we want to sell.

6:05:47Speaker 25

Okay. Okay. So there you go. So it's not, it's not a likely, we need that for future runways and. Okay. Okay. So then it's not a likely project. It's not.

6:05:56Speaker 20

So not likely.

6:05:57 – 6:07:26Speaker 25

So I just, and I'm, I'm not trying to, I want to take a different approach. You know, I want to be more of a gentleman, you know, you know, and, I want to take a different approach. What's our mission? What's our vision? What are we trying to accomplish? And I see here that we feel there's a lot of pressure from the public on, you know, there's a lot of information that's out there that we don't know about, and we're trying to solve a problem that we don't know exactly what the problem is. So I'm just trying to encourage you, Peter, because you're the one in charge, is to be cognizant of that because, like I said, the rules haven't been written yet, and we just need to be cognizant because we may spend all this time and energy putting you to work. And I want to say it publicly. You're one of the hardest-working people I've ever met. And I want to say thanks to you. I'm really, to know where I was eight years ago and to see what you're doing now, I don't want to say I'm proud of you because I think it sounds condescending. It's a pleasure to be working alongside you, you know, and you have this tendency to try and solve the problems that we put in front of you. And I'm just saying, I don't know that this is a real, this is a problem that we have the ability to solve. So that talk, Peter, was intended mostly for you, you know, when you delegate your team what they do. And so I just wanted to make those comments. Okay, thank you. All right, thank you.

6:07:26 – 6:07:59Speaker 37

Councilwoman Vaughn. I actually agree with Roland. I tried to reiterate that at the very beginning. I think we need to proceed with caution, not fear, get the facts, because we don't know them. And then I think we need to leave it to you guys to come up with what we need, listening to some of the comments that were made by Ms. Paxson and McGill. But I think that we need to put it in your hands And because we don't know, we really don't know enough about the data centers to just jump all in. And we need to see what the state, that's just my two cents. Thank you. Councilman Scott.

6:08:00 – 6:08:32Speaker 34

I agree with Councilmember Vaughn. Big love in here. I would ask you to move expeditiously, but it sounds like you have a mechanism going. So I would ask for two things, an expeditious movement and try to get a lot of eyes on it. You know, I think there were a number of people that came today and There's a public interest in this, and I don't want to have a conversation like we had on the library, like, hey, you're not including this, and we're passionate about this. So if there's ways to increase public input, that would be awesome. Thanks.

6:08:33 – 6:08:57Speaker 21

So I'm listening. I understand our UDC text amendment process is a lengthy process for that reason, and what we try to do is align with legislative sessions. So we're always watching a legislative session, and if the state makes a move, if the state implements something, we can pivot our amendments before we bring them to council. So that would be our plan, is do our research now. And then anything that is brought down from the state level, of course, we would incorporate.

6:08:58Speaker 60

Yeah. Councilwoman Paxson. Thank you.

6:09:02 – 6:09:55Speaker 58

So again, sounds like you guys are already in this process that we knew was going to be a long one. I really did feel like being able to present this helps put that perspective, like this is the feedback ahead of the game while you're building that. Like this is a direction that I think is beneficial for the whole city. And if whatever that needs to be crafted in the background the expert and that's why i didn't write it in a way that was kind of nitpicking it was like this is the this is the goal if you will like we're shooting towards this um so i don't know peter do do we need to take action then on one and two because it sounds like they're already pretty much doing that i don't think we need to yeah i think they've already begun the process and this committee's established and procedure established established already

6:09:56Speaker 20

So we'll develop timeline, a more holistic calendar, and work with the council to see if we want to bring policy back for council consideration.

6:10:06 – 6:10:31Speaker 58

Do you know, Ms. Yvette, about when would that look like? I think there's two parts there. One, to begin to really be able to tell that story that we're already doing this, because it's a huge concern. It's a huge concern. And then the second is... before it goes back into the background where work is happening, when would we expect to have that next dialogue on it?

6:10:31 – 6:11:00Speaker 21

So ideally, we'd like a year for UDC text amendments to process. And there's a lot of amendments we're working on. It's not just this. But what we could do is shuffle around our prioritization on our amendments. And I would say that we could probably get something here and around the six-month mark. However, that's all going to depend on legislative session, right? So if we see that whatever we're recommending doesn't align with the discussions, We may have to pause so that way we're not bringing something forward to you that we're having to amend soon after.

6:11:00 – 6:11:16Speaker 58

But I think of most of that, I think with the legislative session, the items they're talking about is kind of like who fronts the bill for some of this big construction based on that presentation. I don't think it really addresses whether or not we can put into our ordinances. I don't think it forbids that.

6:11:16 – 6:11:27Speaker 21

I'll let Ryan speak to that. But there are also discussions for those additional buffers, the type of things that we were kind of looking at. Not so much just the infrastructure, but how do we allow it to develop? What does that look like? How do we protect?

6:11:28 – 6:12:07Speaker 58

Thank you for clarifying. But more to that first point, as far as defining it in UDC and being able to apply zone preferences, that was more kind of what I was going along. I know... Bullet Point 2 was pretty much based off of what sounded like it was being discussed at the state level. I was hoping to get ahead of it because, yes, the state's going to do that work. And like Council Member Barrera said, let them pay for it, let them do it. However, our charge here is to protect our citizens. So while they're doing that work, being able to do that locally is still, in my mind, very valuable because we do have some additional layers that they're not going to go right out for us.

6:12:09 – 6:13:14Speaker 12

Councilman, I just want to add that you probably will see a comprehensive rewrite of zoning authorities, maybe as it specifically relates to data centers. I just want to level set expectations about kind of where the conversation is at the state level. And if they do so, it'll of course impact what we have or what we have done to that point. So whether it's the types of regulations we set for setbacks or noise abatement or whatever the case may be, there is a likelihood, I would say almost a certainty that at least legislation will be filed to create some kind of statewide framework for that. So just to be prepared, I'm not discouraging any kind of conversation or decision making happening here locally. but just to be prepared for that. So I think that what's said is we're just going to look at that, monitor it through the process, try to play as active a role as possible in advocating for the council-adopted policies that we have on the books, as we always do, but just recognize that that relationship exists there.

6:13:16 – 6:14:20Speaker 58

I appreciate that input, and I think that while there's a lot of unknowns, we see the direction, and I don't think, again... if there's areas that we revise, that's an if, having our own best practices I still think is a great responsibility of ours to be able to do. So you said about six months, so hopefully we'll be able to address some of this publicly. Then on the item three, The moratorium, again, the intention is city limits. That is something that we could potentially still take action on tonight. My question is, realistically, what's coming down the pipeline? Are we looking, other than the airport one that we've discussed, and perhaps our CCRADC may have some insight here, Are we looking at projects potentially moving into the city limit space? Do we need to enact this? Because I would really hate to not take action tonight on bullet point three and then in 30 days see a headline that says data center moves into city of Corpus.

6:14:23 – 6:14:34Speaker 20

Well, so the only two that we know would be coming, that have asked to come to the city are the ones at the airport. But I was talking, I need some help here on, can you call a moratorium?

6:14:35 – 6:14:50Speaker 48

Because I thought there was... You can call a moratorium, but the state sets out a specific procedure, and you've got to provide 30 days' notice, publish a paper, do two public hearings, 30-day notice in between. So it's not an immediate snap your fingers.

6:14:51 – 6:15:13Speaker 58

Understood. There's a process. My interest is... what is our risk level of someone moving into the space before the state legislation takes an act for the city of Corpus Christi? Because what, again, what I'd hate to do so far, sorry, so far, almost all of the data centers in our area, we've all discovered through media.

6:15:14 – 6:15:37Speaker 48

I would say as far as risk, even though our zoning code doesn't specifically identify data centers, I think we can legally defend classifying them as warehouse uses because they're just giant warehouses with computers in them. And I'm talking about the mega sites. And those are, warehouses are really limited to industrial light and industrial heavy, and I think there's some special permit uses in the heavy commercials,

6:15:38 – 6:16:31Speaker 58

but by right i think believe that warehouses are just industrial uses so as as a date we can limit them to our industrial districts um industrial zoning districts so there's really no protection in city limits so the only way to prevent them from taking up shop between now and next may when potentially is the first point we could have legislation in effect would be a moratorium and and that doesn't mean forever it means to some concerns around the diocese there's unanswered questions there's we don't know what they're going to look like we don't want to ban them forever those types of questions but until we have those answers that's the only solution is that is that reality or you deny uh... you know like in the case where they've come to us to buy property

6:16:34Speaker 20

at the airport, I don't think we're interested in selling prime airport space for data centers.

6:16:40 – 6:17:19Speaker 21

So, and Councilwoman, outside of the ones at the airport and outside of the one outside of the city limits, the only other one that we have seen in recent years is the one at Tawankawa, and that was a relocation that used to be in the Wilson Plaza basement, and when the Wilson Plaza shut down, they had to find another location to move that. It's basically an oversized server room. They're very small connex boxes on Tawankawa, but that is the only one that we've seen. We have had some phone calls for battery energy storage systems, which are pretty much right off a substation, which is also included in this because they're used for data centers. But outside of that, we haven't seen any other requests for an actual data center outside of the Beacon Hill or the ones at the airport that expressed interest.

6:17:22Speaker 58

And do we feel that would hold between now and May?

6:17:26 – 6:18:00Speaker 21

I mean, you'd have to find the available platforms. property number one so they have to find one that has a substation nearby and if you've seen our substation layout in the city there's not a lot of substations that have available land nearby they need to be kind of close to a substation the data center just doesn't make sense if they have to put it you know miles away from a substation they'd have to pay more in infrastructure so they it wouldn't be a feasible property for them um there's calico is one of the calico is one of the substations it really doesn't have any area development in the ocl nearby but inner city Most of our substations are fully surrounded by development today.

6:18:00 – 6:18:21Speaker 58

All right. Again, I'm trying to boil down to the reality of the situation. Are we protected from city limits while we sort out legislation or not? And it sounds like we're not technically. Land could be an issue, but if they could make what's available work, then no, we're not fully protected.

6:18:22 – 6:18:35Speaker 48

Yeah, so... We're not completely protected from data centers being established within city limits. What I'm saying is the zoning code does provide some protection. They would be limited to just industrial areas, industrial zoning areas.

6:18:36Speaker 58

And at that point, would we be able to set some?

6:18:42Speaker 21

So they would have development requirements, whether it be buffer requirements, noise requirements, lighting requirements. That's already built into our zoning districts, whether it's commercial, industrial, et cetera.

6:18:52Speaker 58

So that's still problematic. I see there's a comment. I'll wait. Thank you.

6:18:57Speaker 60

Council Member Boyd.

6:19:01 – 6:22:34Speaker 18

Thank you. I know this is an ongoing issue. I know it builds itself. But one of the things I want to talk about is the fact that, and I want to use the ammonia plant because I have a concern out in District 1. you know when you look at this facility first of all the hard work that public works did in that particular area so now all of a sudden you know we just redid some streets over there there's a lot of work that's been going into improving that area now all of a sudden we're getting ready to have a facility that's going to have to have heavy trucks as they build this facility come through the area and we're going to our infrastructure is going to suffer you know what i mean in terms of just having to build a structure like this and all the components of construction and all the different things that come into play, right? So it's going to put wear and tear on our streets. It's going to put wear and tear on other things. It's going to cause congestion in terms of what's already congested in Kyle Allen. I want to make sure that we are communicating with the county because right now it seems like you know we're worried about the city part but. What the track record shows is that a lot of these companies that are looking at moving in and they're buying land and farmland and that are doing it right and butting themselves right up against Kyle Allen, for example, right? Because had that ammonia plant been successful, they would have had ammonia plant right there, right on the other side. If this, I asked you if they've already broken ground, they've broken ground already. So they've already started. So I want to make sure, Ryan, number one, that we are communicating. When Council Member Barreto was talking, he said the federal, state, and then the local level, but he left out the counties. And so I want to make sure that we are communicating with the county because we need to be able to work together with them and have a plan in terms of how we're going to go through and protect our neighborhood and protect the city while these things are going through and benefiting the county. And I think that's really important because what happens is, and you see it here in public comment, most of the people will sit there and they'll talk about the city. Well, you know, Councilman Roy, are you aware of this and what the damage is going to be? Nobody's sitting there saying, hey, how about the county? Did you know the damage it's going to do here and the damage it's going to do there? They're already asking us to fix their streets, which is a county street right outside. What is that, County Road 52? Yeah. Yeah. And so we're having to bear that and take on that responsibility. So I don't know if you guys go to the meetings, but it's like anything else. Just like when we talk about the water and the release of the water. We all need to work on those things, not just the city's responsibility. It just seems like at certain times... We have a tendency, especially to look the other way until it benefits him. And we need to know what the counties take on this. We shouldn't be blindsided. We should have just as much information on this when they're developing this. But nobody's come forward and said anything to us about this project until it's well on its way. Does that make sense?

6:22:34Speaker 21

Councilman Roy, we can have that conversation with the county and also TxDOT because Calakuta is a TxDOT right away.

6:22:39 – 6:23:13Speaker 18

Yeah, and I think that's how we're going to learn in advance because I really don't think we're going to see a lot of, I might be wrong, but we're not going to see a lot of this development within the inner city part. I think what we're going to continue to see is areas out there right on the edge. Cal Allen is landlocked on one side, but it's wide open on the other side. And Robstown, they're looking for money. They're looking for ways to generate revenue. And so we just need to be able to work together with them and know, because I think communication goes both ways. They always want us to communicate up, but they can communicate down too. Thank you.

6:23:15Speaker 60

Councilman Hernandez.

6:23:17 – 6:25:29Speaker 28

Okay, I just want to make sure we're very clear on this, right? Regardless of what the state does or what things they put in place, we still have a uniform development code where we have zoning and requirements for that zoning. I don't think that's really going to change much. I'm sure the state will come in and say, okay, you have to have 10 feet away from such and such. They've done it before. It wouldn't be surprising. However, like I said, I want to be out in front of this, not behind it, right? If we have to change our zoning for state laws, that's fine, but we should be out in front of this and creating that ordinance which requires what zoning it goes into, what the setbacks are, all that stuff, and it should be prioritized. I understand we're making updates to our UDC, but this can be done separately and moved forward. If you need a moratorium on this for the development of this, then we should move on that. We should ask for that based on what... Mr. Bryce had said about what the requirements are. We'll give you the opportunity to make that decision to say, hey, we need to do this. This is our timeline. This is what we need. What do you need? Is a moratorium for the 90 days or the 180 days, whichever you think is necessary, in order to develop this this ordinance in legislation or however you want to discuss it to make these things possible. Look, we're trying to make sure that we're addressing the concerns of the citizens of the thoughts behind these data centers and them coming in and where they're going to be. And so I want to make sure that whether it's within the city limits or in our ETJ, that we're looking forward and planning on it, not reacting to something. We need to make sure we're out in front and developing these things First and we want we're not telling you how to do it We're just at telling you you need to move forward and do it So you've got the support of several council members to do this Peter is that I mean, what is it that you want to see?

6:25:30 – 6:26:11Speaker 20

I think we just summed it up councilman. So as Yvette said we're working on I am one and two right now with with the UDC Clarification setbacks everything you just said the only thing we're not sure of is putting a moratorium on moratorium on data centers until that work is done. And Ryan's tracking the legislature, and so we've been working on this. That's why the Councilwoman Campos's point, it was easier in this case to have a PowerPoint presentation today. So item number one and two is already in the works and makes good sense to do. We're not ready to talk about a moratorium right now.

6:26:13Speaker 28

Okay. What do you need from us?

6:26:19Speaker 28

We don't, we got, we, I think we, I'd like to say some, I mean, we, we, we should do something to give you something behind you, right?

6:26:26 – 6:26:39Speaker 20

Uh, we have the record. I mean, this is on tape, so you can make a, you can make a motion if you want. It does say motion to direct staff to, um, to develop these classification parameters. You can do it. Okay.

6:26:39 – 6:26:56Speaker 28

So motion to, uh, to make the classification parameters around, data centers and all associated aspects of it for zoning as well as anything that can be done within the ETJ. IDA options. And IDA options. Yeah. Would that work?

6:26:58Speaker 28

Okay. And if you need a moratorium, let us know. I'll make that motion. Okay.

6:27:04Speaker 60

Okay. Can you repeat the motion?

6:27:07 – 6:27:19Speaker 20

Yeah, Peter. It's a motion to direct staff to develop policy on land use, setbacks, development standards for data centers.

6:27:21Speaker 20

Zoning, infrastructure necessary, potential IDA.

6:27:25Speaker 28

Within the ETJ.

6:27:27Speaker 20

Yeah. Within the city limits in the ETJ. Second.

6:27:31Speaker 60

We have a second. We have a second. Okay. Councilman Barreta, did you have a comment?

6:27:41 – 6:28:45Speaker 25

Go ahead. Here, I just want to say, once again, I think now I am going to say this is a solution in search of a problem. I mean, we still don't know the rules, and we're going to put an overburdened staff to give them something to do when it's not likely that any, it's highly unlikely that any data center is going to come in with the city limits of Corpus Christi. And, you know, we're developing regulation without any true path. You know, I mean, once again, we already have the ability to ensure that their buildings are safe or whatever. I just think it's creating more regulation at a time with an overburdened staff, and it's not necessary because it's not really going to regulate anything. Yeah, I think, yeah. I mean, so that's what I'm saying. I can't support this because I think it just creates more bureaucracy, you know. And especially right now, I don't think we need that. We've got a lot of problems to solve.

6:28:45 – 6:29:16Speaker 20

Okay. Just to add to that, so we do appreciate that from Councilman Barrera. This is an emerging national trend, and there's nothing wrong with being ready to react to things like this. So I think we're ahead of the game if we do some minor adjustments to the UDC and just look at the issue. To not look at it, we know it's a, like Ryan said, it's a top of mind, top of government issue. I don't think it's really time intensive to do this. This is part of the work we do.

6:29:16Speaker 60

But this is, y'all have been looking at it.

6:29:18 – 6:29:30Speaker 20

Yeah, we've been looking at it. Ryan's been going to the legislature. So it makes sense to be ready and have our policies ready If a data center wants to come here, another one. In the city limits, right?

6:29:31Speaker 60

Okay. So we have a motion and a second. Public comment. Who would like to make comment on item number 18? Go on up.

6:29:54 – 6:32:41Speaker 54

Good evening. What a long day. Thank you all for sticking to what the people are concerned about in this evening. I know it's been a lot of back and forth. I want to again thank Councilwoman Paxson and Vaughn and Hernandez for opening up this dialogue because it is something that is very important to the people. What you are receiving It's a municipal model based on the Texas Infrastructure Stewardship Initiative that I am presenting at the Senate hearing. So in a lot of ways, everything that you have just spoke to, everything from decommissioning, which you said was a $57 million BP project, that's a big debt. Everything that I could possibly think of, as well as other experts in their field, has went over this legislature. It is sitting in your email. The entire bill is, the proposal. So if you have more questions to reference it. And what it does is it does create a new level of industry above the heavy industrial. They're called extraordinary infrastructure industrial facilities. So you're talking about water usage from another type of facility that's not a data center. What are you going to do whenever they build on one of those heavy industrial sites? We're going to be asking the same questions. So it's not about AI data centers. They're as big as 500 acres today, and we're on our wrist in 30 years. It's about the impacts that it has on our infrastructure, who's going to pay for them, how we manage them. They are a valuable resource. And I feel like... Healthy boundaries make good relationships. And if we lay out the expectations, the businesses will rise to those expectations. And I want to point out a Chevron-Microsoft partnership that is proposed just west of Odessa Midland. They are completely off grid, zero net water usage. They have heat capturing technology that reuses that heat as energy. It's not about data centers. It's about responsible business practices. And that's what we need to establish in this new industrial code. And who says that Corpus Christi shouldn't be the first one to do it? I think we should be ahead of the game. Don't wait for the crisis. Prepare for it. Do you have any questions for me?

6:32:53 – 6:34:17Speaker 56

I just wanted to set the record straight. Y'all could have stopped this data center sprawl, and you should stand firm on a ban. You approved the removal of a section of the drought contingency plan last year that would have banned new water meters under Stage 3. You did this mid-water crisis. You call it a water crisis only when it's politically viable. You exposed us all with this thirst for exponential growth and economic development. The state wasn't ready for these. The PUC is having to approve them in bulk. The Water Development Board's planning is way behind. It hasn't accounted for the growth. We're being overwhelmed and now residents are gonna see crazy electricity rates because Texas is so business friendly. You have some power here as a regional water provider, you tout that. Anyone wanting to keep developing while industry drains the lakes is to blame for data centers. If you're gonna codify a definition for data centers and crypto mines, amend the drought contingency plan and put the section back in to disallow new meters. You have a tool at your disposal that you refuse to use to benefit residents. Use it. Nobody likes data centers, and I know you know that. Also, don't give them an IDA. You showed us how badly it can go with Bootstrap, that crypto mine. How many owners has that crypto mine had by now? They're going to go bankrupt and leave us with the bill.

6:34:25 – 6:35:46Speaker 53

Amanda Breeland, Corpus Christi, Texas. I don't really have anything prepared, but I'd like to say it's kind of embarrassing how many of y'all are like, oh, I have no idea. I don't know anything about data centers. I don't know what they do. Google it. What are you talking about? How do you not know anything about data centers at this point? It's embarrassing. And for me, it is about data centers. It is about, like, my children go to East Elementary. That's where they went to school. My children, their playground is right up against a refinery where they can see the flares. They can't play outside at certain times. So you're going to put a data center right there? Like, make it make sense. Make it make sense. Yeah. I don't know. I appreciate the fact that y'all are trying to get ahead of this, and I think it's great, and I think it would be stupid to not explore boundaries for these types of data centers. So yeah, keep our kids in mind, because they're already butted up against refineries. Adding this to it, it's not good yet.

6:35:52 – 6:38:58Speaker 62

RACHEL CAVALLERO, D1. WELCOME TO THE PARTY, COUNCILMAN ROY. AS FAR AS YOU ARE CONCERNED, THE COMMUNITY IS WORKING. WE'RE TRYING TO HAVE CONVERSATIONS WITH COUNTY COMMISSIONER MIKE PUSLEY, WHICH HAS GONE NOWHERE, CALILON ISD, WHICH HAS GONE NOWHERE. AND NOW WE'RE HERE, AND IT SEEMS TO BE GOING NOWHERE. THE TOTAL ACRES IS 525 ACRES, COUNCILMAN. in your district, less than a mile from an elementary school, and it's a five to seven mile radius, the building, five to seven miles, okay? Put that in the bank. A third of that does belong to the city of Corpus Christi. So be aware of that. These things do emit electromagnetic fields. So there's no ifs, there is. And we have a city manager that likes to fly places to go look at projects. Why don't you just take a drive to a location that already has a data center of this size and stay there through the day and through the night to understand the sound levels and the light that it emits. These things are at 70 decibels. You have to wear protective gear per OSHA at 85 decibels. That's how loud these things are. So I'm going to make a suggestion here. We have no water still. And use the whole... It's going to be intertwined with this other stuff. They're going to truck it in. Yeah, sure. And the revenue, Councilman Barrera, is going to be the same as bootstrap since we have an incompetent legal department who writes really horrible contracts in favor of corporations instead of in favor of this community. One of my suggestions will be is every city council member and city staff be forced to live within half a mile of these data centers if they support it. and vote in favor of it, period, end of story. That's my suggestion. Also, this is for the community. On Monday, July 27th, AEP and Centerpoint will be having a dialogue with our community. I'm surprised our own district representative doesn't know this. It's at 530 at the Richard Borchardt Fairgrounds, and they're going to be talking about the 765 lines that are going to be required to be put in to provide the power for these data centers. 765, just so you guys know, takes a 200-yard easement. And those things also emit loud buzzing sounds.

6:39:02 – 6:39:36Speaker 35

Mark Minster, Corpus Christi. In terms of potential property taxes and revenue that is being talked about these data centers can bring, I just think that there's serious concerns with how much these places will cost to construct and operate and how much they'll cost to maintain over time if they will actually be profitable. I think there's serious concerns And that's not just coming from me. There's a lot of input from data centers, from residents all over the country, and people are really upset about it. And there's concerns of if it's even going to be profitable because it's something new. So just keep that in mind.

6:39:42 – 6:40:38Speaker 51

This is Saldaña, Corpus Christi. In San Antonio, I live a block away from Microsoft data plant. One block. And it's a huge one. right around Wiseman. And it's a huge, huge data center. Is there a lot of noise? Nah. But the electricity is horrendous, you know, that's taken out of there. And I can guarantee you one thing, we don't lose power. When the whole city of San Antonio loses power, we're close by and it doesn't lose power. But I think you're doing the right thing by taking the time to check it out. But I wish that you would take a look at it. The one next to my house over there is Microsoft. It's right off of Wiseman. Thank you.

6:40:43 – 6:41:52Speaker 64

John Lee, Corpus Christi native. Ma'am, you said yourself that we had to find out over media about the data centers. You mentioned that they're not considered data centers because they're in a warehouse. There's no difference. It's still a data center. Earlier, someone else mentioned about the refineries and their kids and now having to be worried about a data center on top of that. Another person mentioned the EMFs. That's not a joke. During 2019, our government decided to build 5G towers everywhere around the city without anybody knowing. Everybody's quarantined. What do they have? EMF. And during that same quarantine, the Trump administration had to go back and build extra protective panels because of how much radiation that was coming off of those towers. So not only do we have 5G towers, but we also want to have 5G and whatever other data center, EMFs, are built. And if you ask me personally, it's like we're going to live in a giant microwave. And I mean, microwavable food is not safe for you. So thank you.

6:41:54 – 6:43:57Speaker 60

Anyone else? OK, we'll close public comment. We have a motion and a second. Please submit your vote. Okay, the motion carries. Our next item is discussion and possible action on an ordinance placing city charter amendments on the ballot for the November 3rd, 2026, as requested by council members Carolyn Vaughn, Kaylin Paxson, and Gil Hernandez. election to increase city Council terms to 4 years staggering Council terms increase term limits creating Council members at large places one 2 and 3 requiring at large Council members are Council member elections to be decided by majority vote requiring elections for an expired terms more than 12 months. Increased City Council members' salary to the equivalent of federal minimum wage for full-time employees and the mayor's salary to 25% above City Council members' salary. Increased the number of registered voters required for a petition to initiate the removal process. Increased the required vote for removal of City Council members to two-thirds of the City Council members holding office. and authorizing a $0.02 property tax for streets and roadway infrastructure.

6:43:57Speaker 26

Can I make a motion to vote line by line?

6:44:05Speaker 60

Vote. To see which of these go on?

6:44:06Speaker 26

Number one, increase the time for term four years to two votes.

6:44:12Speaker 60

Right. You don't need that, but we can do it. That's fine. We can do like that at the end.

6:44:17 – 6:44:41Speaker 20

Yeah, and can I just add one thing? So some of these are kind of connected, so we'll guide you. Like, you know, the at-large, the sum that you have to do together. So we'll just help you. Yeah, right. Some of them are paired up is the point, but we'll help you as we go through it. Buck Bryce, the deputy city attorney, is going to go through a presentation that we have, Mayor and Councilman Buck.

6:44:41 – 6:46:17Speaker 48

Yeah. Buck Bryce, deputy city attorney. So I'll start with in 2020, the city council commissioned a charter committee and some of the recommendations in the three signature memo are same or similar to the ones made by the 2020 charter committee. So one of the same recommendations is increasing the city council terms to four years. They also recommended staggered council terms. They also recommended an increased term limits. Theirs were eight years as mayor or member or a 12-year combination. The three-signature memo deviates from that. Require a majority vote. The difference between the three-signature memo and the charter committee, is the charter committee was recommending eight single member districts and a mayor where the three signature memo is recommending keeping the three at large with the five member districts and a mayor. They also recommended requiring elections for unexpired terms more than 12 months. And that's a Texas constitutional requirement when you go to four year terms. The charter can be recommended resigned to run that also that is a Texas constitutional requirement that if you announce for a journey for an office other than your position with it within 13 minutes of the expiration of your term You're automatically resigned Yeah, but can you try to go to the next slide?

6:46:18Speaker 20

Can you advance the site?

6:46:19 – 6:50:27Speaker 48

Yeah, there you go So we resigned to run They also recommended doubling city council members and the mayor's salaries. The only deviation, I guess, the difference between the Charter Committee and the current recommendation is the Charter Committee recommended indexing the salary to consumer price index, where the current recommendation is for the federal minimum wage. And then they also recommended increasing the required vote for removal of a city council member to six council members. Then I'll get into the details of each proposition. So proposed Proposition 1 is staggered four-year council terms. And so really a lot of these are intertwined. Once you go to four years, you're required to do the resigned vote to run. You're required to do the majority vote. So we'll just go through those individually. So obviously the proposal is to increase the city council terms for four years. The current proposal is to stagger the terms with at-large and mayor beginning their first four-year terms in 2028, and then subsequently the single-member districts will begin their first four-year terms in 2030. The proposed increase in term limits is 12 years. unless completing less than a half of an uninspired four-year term, then it'd be 14 years term limit. The proposal creates council members at large places one, two, and three, and that's required in order so you can have the required state constitution majority vote. Requires at large members elections to be decided by majority vote. Again, that's a constitutional requirement. Requires elections for unexpired terms More than 12 months. That's required by the Constitution and resigned to run again required with Constitution So proposed to is to increase the city council members salary to the equivalent of federal minimum wage and the mayor salary to 125 percent of that council member number and based on terms Federal minimum wage that would constitute salary change from six thousand to fifteen thousand dollars and 80 for council members, and then for the mayor, it would go from 9,000 to 8,850. Again, that would be indexed to the federal minimum wage. Proposition 3, this one really is probably two propositions. The first one is to amend the removal process to increase the number of registered voters required for a petition to initiate the removal process. Currently, it's at five registered voters. The proposed is half of 1% of voters in the previous election for the position being removed to file a petition to initiate the removal process. And then the second proposition related to the removal process is to increase the required vote for removal of a city council member to two-thirds of the council member's holding office. THE CURRENT TERM IS FIVE VOTES. PROPOSITION FOUR IS AUTHORIZING A TWO CENT PROPERTY TAX FOR STREETS AND ROADWAY INFRASTRUCTURE. SO FOR TAX YEAR 2027, IF THIS PROPOSAL WERE PASSED, CITY COUNCIL WOULD BE AUTHORIZED TO INCREASE PROPERTY TAXES BY TWO CENTS PER $100 VALUE FOR STREETS AND ROADWAY INFRASTRUCTURE. potential next steps, any city council recommended charter amendments can be included in the special election ordinance, potentially for first reading on July 28th and second reading on August 11th, or potentially just a one-reading ordinance on August 11th. And to Councilman Cantu's request, I would say Proposition 1 is all intertwined and would need to be approved together, but Proposition 3 could be split into Two different items.

6:50:29Speaker 20

We have their paper copies of that PowerPoint book.

6:50:33Speaker 48

I do not have.

6:50:34 – 6:50:51Speaker 20

OK, we're going to be able to help us make some, but I think that would be helpful for the council as we go through this. The councilman can't use because we'll make some copies of the council so you can have it pretty. That concludes the presentation. Yes. OK, Mayor, that concludes the staff presentation.

6:50:52Speaker 60

OK. Thank you, but Councilman Hernandez.

6:50:57 – 6:56:24Speaker 28

Okay, so we had this charter committee done in 2020, and they made some recommendations, and I want to kind of go through some of the issues. They did make the recommendation for staggered terms, and however, they did want to change it to all single-member districts. Now, the challenge behind that was that in our current system, you can vote for five council members. If you went to all single member districts, you would only vote for two, your single member district and the mayor. So by keeping the existing system, every person can vote for five council members in their election process. So it's to give more voting to the actual individual voter as opposed to what they would have if it was all single member districts. So it was a good idea in the sense that they wanted to, you know, you know, make it more specific to individual districts, but I think the way we have it structured has, you know, we're used to it. Now, because of the four-year requirement, we cannot do a plurality vote. That, I believe, is through state constitution that if you have a four-year election, you need to have a majority vote. Majority vote means is that for every position you're in, you need to have 50% plus one. So... that necessitated splitting up the at-large from just being one of the top three people to have individual places that you would file for individually, similar to the single-member districts, and then have to win by 50%. There was always some questions about, with a plurality vote, you could win an election with 12% of the city's vote, which is, well, this would address that issue. So with that for Proposition 1, you could do the staggered terms. The proposed version of it was to do the mayor and all the at-large in 2028 and all the single-member districts in 2030. So in 2030, all the single-member districts would run for a two-year term. I don't know if there's anybody who wants to discuss or have questions on Prop, or that would be Proposition 1 with regards to that. Proposition two, and I'll just go through all of them. Proposition two, we'd been talking about the cost, the pay associated with city council. Back in the early 80s, minimum wage was around $2.35 per hour. which equated to about $5,000 a year when you multiplied it out by 2,080 hours. So instead of having the static number that was set back in 1980s, just set it to a specific item, federal minimum wage, no one's gonna get rich off of getting paid minimum wage. It's just in order to compensate a lot of the time and hours that council members spend for we're not only here but traveling to Austin to participating in lots of town hall meetings and whatever associated with it. Charter proposition number three associated with The removal process the the Charter Committee actually recommended removing that portion of the five five voters But I think you we didn't want to eliminate that completely So we made it equivalent to what it would take to get on the ballot if you had a petition to get on the ballot Which is 0.5 percent of the actual voters that took that voted in the previous election so for a single-member district that could depending on how many people voted in that district could be anywhere from 60 to 100 voters and for an at-large or mayor would be somewhere in the neighborhood of 400 to 500, depending on which election you were referring to, whether it's the presidential year or the gubernatorial year. But you would still have that in place and still have a minimal threshold in order to be able to do that. The other part of it, what they did recommend is putting that in place for removal of having two-thirds of the council members, which was six versus five, And the last one was not something that the Charter Commission did not have, but it was something that ties back to the two plus two plus two tax that was done in back, I want to say, 2018, where we took four cents out of that six cents. But because of COVID, we didn't take that last two cents. And then the law changed. with regards to only being able to do 3.5% above the no new revenue tax rate. So this is a first opportunity to do it, but we thought it would be important for us to vote on it as opposed to just take it as a council. So this is something that we discussed with staff and they brought it forward. And those are the discussions we had. Thank you.

6:56:35 – 6:57:31Speaker 26

I would like to make a motion with all the items 19, 20, 21, and 22 to put on the agenda for next week, Tuesday. It's going to be 8 o'clock. About time we go through all these items. We're going to leave here at midnight. Item number 19, it's a lot to discuss. I talked to Peter, and Peter said that we could There's enough time to put this on the ballot if we do it next week and do one reading I just feel like you know, we have to be here tomorrow 9 a.m. We're gonna be a City Hall week I just feel like it's it's too late. How are we gonna concentrate and make decisions at 8 o'clock at night? Till midnight. I mean, it's just you're making a motion. I'm making a motion. Yes. I

6:57:32 – 6:57:48Speaker 60

Okay, so we have a motion and a second to take items 19 through 22. 22. 19 through 22 and move those to the next meeting in light of the evening, the time. And Mr. Zoni is saying that's... Yeah, we can do that.

6:57:48 – 6:58:01Speaker 20

So this item next week, it could be on for discussion and a vote. And if there's no vote and it's just discussion, then we could do a one reading ordinance in the first meeting in August. Okay. Okay.

6:58:01Speaker 60

Yeah. That's good. Yes, Councilman.

6:58:07 – 6:58:36Speaker 28

Okay, if that's the case, Peter, I don't have a problem with that, but you would need to have to write up the ordinance because, you know, if we do one reading, I'm a little concerned about that, but if we have two readings, we have two more meetings between now and when this has to be in to put on the ballot, so. if you could write up the ballot, I mean, you have the ballot language, but you can write up the ordinance associated with it, so we can have that, review that as well for next week. Okay, that's good. We can do that. Okay, thank you.

6:58:37Speaker 60

Okay, so we're gonna table these two items. Motion and a second, please submit your vote.

6:58:42Speaker 26

Table two items.

6:58:42Speaker 60

I'm sorry, not two items. Yeah, four items.

6:58:49Speaker 58

We're tabling.

6:58:49Speaker 60

We're tabling. Items 19, 20, 21, and 22.

6:58:53Speaker 61

Mayor, did you even ask for public comment on our nephew? Pardon? Public comment prior to the voting.

6:59:04Speaker 61

We usually ask for it before you take any action.

6:59:06Speaker 26

I did it for you, Mark.

6:59:08Speaker 60

Okay, does anyone have public comment on the fact that we're tabling? Not the items, just that we're tabling. I know that's weird, but.

6:59:17 – 6:59:45Speaker 22

Yeah, it is a little weird. Hey, Joshua Frederick, I hope you guys know that. City of Corpus Christi. Yeah, very against this. Been here all day for a reason. We all tuned in, and we definitely want to talk about this. I'm sorry if you're tired. We're also, you ran for this job. It's part of it. We've been here much later than this. It's 8. I was kind of expecting to be here for another six hours if necessary. This is very frustrating, but I'm very against this. Please don't table this. Let's duke it out. Let's talk about it.

6:59:48Speaker 60

Okay, anyone else?

6:59:52 – 7:02:55Speaker 2

Isaiah Dallas, Alba Dulce. As he said, we've been here all day. I've been here since 2.30. I've seen many other people here since 2.30, three since y'all reconvened. We've been waiting here all day as y'all fight against an issue that affects not Republicans, not Democrats, but all of us. Y'all have been making this issue an extremely partisan issue. Y'all have been making this an issue about cost when, I know I'm not supposed to mention this bill yet until tomorrow, but when this bill increases cost. If cost is the big issue, then why are you asking voters to raise your wages, doubling them? We've been waiting all day. Y'all ran for this job, as he said. Y'all knew what y'all were getting yourselves into when y'all signed up. Y'all knew what y'all were getting yourselves into when you took an oath to serve the people of Corpus Christi. You knew that you would be here for countless hours, be it 30 minutes to 12 hours. About a month ago, y'all were here until 2 a.m. because y'all kept having screaming matches at each other. Y'all have proved that y'all do not prioritize the people of Corpus Christi. Y'all prioritize y'all's egos. Y'all prioritize what you can do for yourself. You prioritize being louder than the other person. Okay? Now I have about a minute left, and I don't know what to say. But I do know what to say. I do know that I am disappointed. I'm not disappointed in each of you specifically. I'm disappointed in the city. I'm disappointed in what our government has come to. When I was little, I was taught that the government was supposed to serve the people. I was taught that the government was supposed to listen to the people. I was taught that the government was supposed to explain difficult things to the people. I have been involved in politics since I was 11. I have been attending city council meetings in Alice. I've worked on numerous campaigns. I volunteer for the Justice of the Peace in Precinct 3 in Nueces County. I have seen what government can be. I have seen that people have waited hours have gone into long nights. A couple weeks ago, I was volunteering at the Justice of the Peace, and this man, the defendant, didn't show up for two hours. And do you want to know what the judge did? He sat up there on his bench for two hours, waiting for the defendant to get there. He kept the jury there for two hours, waiting for the defendant to get there. He kept the jury, who got paid $6 to travel from all over the region, all over the county, to a little small town in the middle of nowhere, surrounded by fields. They got paid $6 and they waited two hours there. Y'all are getting paid much more than $6. So I say, I say that y'all wait and y'all discuss this one. Thank you.

7:02:57 – 7:03:19Speaker 60

Thank you. Anyone else? Okay, we'll close that public comment. We do have a motion and a second on the table. Please submit your vote. You need a voice vote, please. What's that? Voice vote, please. Oh, oh, okay. Councilwoman?

7:03:20Speaker 61

I'm going to postpone.

7:03:22 – 7:04:16Speaker 60

Amend to table? You're amending the tabled vote? You're wanting to amend the tabled vote? okay well you have a motion all right i know all right well there's not a second so the motion fails and we're gonna oh you said a roll call councilman vaughn voice i'm okay Oh, okay. All in favor say aye.

7:04:18Speaker 60

Any opposed say no.

7:04:22 – 7:04:37Speaker 60

Paxson and... All right, the motion carries. Okay, so the items will be tabled, and this meeting is now adjourned at 7.54.