Zoning Board of Appeals - Regular Meeting

Thursday, June 25, 2026

The Carver Zoning Board of Appeals addressed two public hearings. The first case, involving Bill X, LLC, was withdrawn without prejudice. The second case, concerning John and Camille Spinetto's request for a dimensional variance to construct an accessory dwelling unit, was continued to allow for communication with Eversource regarding an easement.

About this meeting

Government Body
Zoning Board of Appeals
Meeting Type
Zoning Board Of Appeals
Location
Carver, MA
Meeting Date
June 25, 2026

Transcript

626 sections

0:08 – 0:59Speaker 13

All right. Good evening, everybody. This is the Carver Zoning Board of Appeals. We are meeting in room one this evening. It is June 25th, 2026, and it's about 635 p.m. As is our custom, the first thing that we do is handle some administrative matters before we get into the actual cases that are before us this evening. FIRST ORDER OF BUSINESS WILL BE TO APPROVE THE MEETING MINUTES OF MAY 27, 2026, WHICH WAS OUR PREVIOUS MEETING. DOES EVERYBODY HAVE A COPY OF THE DRAFT MINUTES WHICH I CIRCULATED IN ADVANCE OF TONIGHT'S MEETING? YES. DOES ANYONE HAVE ANY CHANGES, AMENDMENTS, OR MODIFICATIONS THEY'D LIKE TO MAKE?

1:00Speaker 13

ALL RIGHT. SO DO I HEAR A MOTION?

1:02Speaker 6

MOTION TO ACCEPT THE MINUTES. AS WRITTEN. AS WRITTEN. SECOND. FOR APRIL 9th. SECOND.

1:12 – 2:59Speaker 13

May 27th. May 27th. And Mr. Poirier seconds. All in favor? Aye. Okay, so those meeting minutes are adopted and become part of the official record. Next, we have one public hearing which had appeared on our agenda for this evening. That was public hearing case number 60-6-0R, the petitioner being billed X, LLC. Now, as I recall, the vice chair recused himself from this particular case. Is that true? That's correct. All right. So whatever action we take tonight, you're not going to be voting. However... We have received communication from the petitioner in this case that it wishes to withdraw its request for relief because they have changed their building plan. And as a result of changing their building plan, they no longer require any relief from this board. But for the fact that they are now asking to withdraw without prejudice, meaning that should they decide that they want to refile, they would be allowed to do that. I'm not quite sure why they want that. I'm just speaking for myself now. If they're going to go ahead and build and not need any relief from this board, I'm not sure why we should keep this open, but I throw that open for discussion to you folks. What do you want to do? Withdraw with prejudice or without? Without. without just in case something happens? Yeah. Yeah.

3:00Speaker 13

Anybody else want to say anything?

3:04 – 3:19Speaker 13

All right. So do I hear a motion to allow the withdrawal on this case number 60-6-0R, the petitioner being billed X, LLC? Do I hear a motion to allow withdrawal without prejudice?

3:20Speaker 12

I'll make that motion.

3:21 – 3:46Speaker 13

Do I hear a second? Second. All in favor? Aye. Okay. So we're done with that. Now we have two other matters, one of which is a new one, and I'm gonna get to that one straight away. That one is public hearing case number 117-11-KR, and I ask the vice chair of the board to read that notice into the record, please.

3:47 – 4:49Speaker 6

Okay, for case 117-11-KR, Petitioner John Spinetto, A petition was filed seeking a dimensional variance pursuant to Article 290-2-3.2 and 290-5-2.2 of the Carver Zoning Bylaw for property located at 10 Bisbee Drive in Carver Carver Mass Assessor's Map 117, lot 11-K-R. So as the construct of 30 by 30 accessory dwelling unit in the residential agricultural district, a variance of approximately 8.4 feet is needed due to the fact that the east side of the subject property has a setback of only 21.6 feet, 30 feet is required. Very good.

4:50Speaker 13

Now Ms. Dahl, do you have anything you want to say for the record?

4:54 – 5:06Speaker 5

I guess just for the record, I should say that I do know the Spinettos. Our children grew up together, but I don't see any reason why I can't make a fair vote on what they're looking for.

5:06Speaker 13

So you don't feel as if you have a partiality one way or the other?

5:10Speaker 5

Yeah, no, absolutely not.

5:11 – 5:57Speaker 13

I have to say, again, for the record, that we live in a small town, and we frequently encounter people in our personal lives that sometimes then we encounter in our lives. semi-professional lives up here. And if we were to recuse ourselves every time we happen to just know someone, hello, how are you, seeing them in the post office of the grocery store, it would be difficult to attain a quorum. So I understand what you're saying, and if you feel as if you are able to render a fair and impartial decision, then the chair is fine with that. Does anyone have any concerns about the disclosure that Ms. Dahl just made? Mr. Poore, you have any concerns?

5:57Speaker 12

I have known Ms. Dahl to be impartial in all situations, Chair.

6:05Speaker 13

Thank you. The gentleman to my right? No concerns.

6:08Speaker 8

No, no issues.

6:09Speaker 13

Okay. So let's proceed. Is Mr. Spinetto here?

6:14Speaker 13

Could you approach the microphone? And I see that you are sitting with a nice young lady. Are you with Mr. Spinetto?

6:25 – 6:37Speaker 13

Would you like to come and accompany him? Thank you. So you are John Spinetto. I am. And you are?

6:37Speaker 4

Camille Spinetto.

6:39Speaker 13

Camille Spinetto. And Mr. Spinetto, can you tell the board, please, a little bit about what it is that you'd like to do?

6:48 – 7:28Speaker 9

Requesting relief for the zoning laws to construct approximately 900 square foot ADU attached to my existing home. my wife and i plan to move into that and my son and his growing family will move into our existing home this will ensure that my wife and i can live out the rest of our lives on the property that we've brought our children up for the last 27 years and we've raised our children there and my son is excited about bringing his soon-to-be three children and and bringing them up in the town that he grew up in and the house that he grew up in.

7:29Speaker 13

Are you excited about that, too?

7:30 – 8:36Speaker 9

Yes. Because we'll have three of our grandchildren directly right next door to us. That would be pretty cool. Okay. The location on our property is essentially the only place on our property that we can do this. Why do you say that? Due to the fact that there's an Eversource easement in the back of the house with the power lines. And on the left side of the house... There's a chimney to deal with, and quite frankly, we'll run into the same 30-foot setback on that side. So basically, it's the only place I can go. This project will be great for my family. My son will get a lodge at home for his family. He travels quite a bit for his job, so we'll be able to help his wife out. We'll have our kid grandchildren right next door. And then later on in life, when my wife and I get a little on in years, we have help right next door. So we plan that we'd be able to spend the rest of our life in our house.

8:43Speaker 13

Mrs. Spinetto, would you like to say anything?

8:47Speaker 4

I'm shaking like a leaf. He does a really good job. But I'm very, very excited.

9:00 – 10:48Speaker 13

OK. We review all of these cases in advance of the evening that we have our hearing. Don't shake like a leaf. You're fine. So we come to these hearings with a familiarity, a certain familiarity with regard to the case. We don't speak to each other in advance of the case. We don't make preliminary decisions behind your back, but we review all the paperwork individually. And then we get together collectively and we render a judgment. So let me tell you what I gleaned from the records, and you tell me if I have this right, okay? Your property is at 10 Bisbee Drive, yes? Yes. And this is going to be an attached accessory dwelling. Yes. We had one recently that was detached. This is an attached. Yes. And you've lived in this home since roughly 1998. Is that true? And you've already explained eloquently that you want to have your son and his family move in. to the primary residence, and you're going to move into the ADU, which is going to be constructed. Now, the side set back to the east of the property is just that 21.6 feet, as you heard the vice chair read into the record. So you know that 30 feet is required. You're short, what's that, 8? 8.4. 8.4. See, he's going to mine like a steel trap. 8.4. And you have trees on the east side of the lot?

10:49Speaker 13

Down the lot line?

10:50Speaker 13

Which separates your property from the neighbor. Is that true?

10:56 – 11:09Speaker 13

I don't want to put words in your mouth. I'm just kind of summarizing based upon what I read from your submissions. So you think that that tree line will be sufficient to ensure privacy between your property and that of your neighbor?

11:11Speaker 9

I have no problem putting the fence up there if that's...

11:13 – 11:24Speaker 13

Is the tree line sufficient to insure property? Can you see your neighbor's house through that tree line? I'm sorry? Can you see your neighbor's house through that tree line?

11:25Speaker 9

In the wintertime, you can. Yeah, you can actually.

11:27Speaker 13

Can you see it now, now that it's all leafed out?

11:31 – 11:52Speaker 13

Okay. And you've indicated as well that the location of the ADU cannot be adjusted on the lot. Because you have lack of space on the west side. And is that where the power line easement is on the left side?

11:52Speaker 9

No, the power line is in the back.

11:55Speaker 13

Where is the septic system? Is that also in the rear?

12:00 – 12:14Speaker 12

Okay. In the paperwork, Mr. Chair, it indicated that If it was on the other side, you'd be requiring the same relief regardless of which side of the house that's going to be attached.

12:14Speaker 13

Is that true, Mr. Spinetto?

12:17Speaker 13

Speak up, Mr. Poirier.

12:18Speaker 12

He's having trouble hearing. You require the same relief even if you were attaching it to the opposite side of the house. Is that correct?

12:28Speaker 9

It's my family because my house is pretty much directly in the middle of the east and west side of that lot.

12:35Speaker 13

I'm not sure you answered Mr. Poirier's question. Are you going to be short on both sides?

12:42 – 12:58Speaker 13

Thank you, Mr. Poirier. Okay. That's what I gleaned from the paperwork. What do you have, Ms. Dahl?

13:00 – 13:20Speaker 5

Just a couple questions. So you want to do 30 by 30. Are you opposed to making the front shorter and then going back further? Would that work? So you could gain some footage basically so you wouldn't have to ask for so much on that right-hand side?

13:22Speaker 9

the easement will allow me to go back and pretty much if you...

13:27Speaker 5

So that dotted line is that easement that you really can't go beyond?

13:31Speaker 9

If you look at the plot plan that the surveyor did, the easement goes right up, almost right up to the... To the back of where you're proposed and where the back of the house is now?

13:47Speaker 13

Do you have any plans you would like to show us? I see some rolled up papers in front of you.

13:52Speaker 9

These are a full set of plans.

13:54Speaker 13

Yeah, we like show and tell, so come on up.

13:58Speaker 4

Do you have the picture that Jake did, too? We didn't do this. I don't know nothing about AI.

14:08Speaker 13

Sure. Potentially.

14:12Speaker 4

Potentially.

14:15Speaker 9

AI rendition that my son did about what it's going to look like. This is the new edition. This is the existing house.

14:31 – 15:04Speaker 13

Can you believe that? All right. We can figure this out. You can go back and sit. So give us a couple of minutes to take a look at this. A lot of brain power up on this side of the table. Let's go on this side, right?

15:04Speaker 12

I would agree with that wholeheartedly, yes.

15:06Speaker 5

Did you get to see the picture yet?

15:13Speaker 5

He did? Oh, okay.

15:46 – 16:03Speaker 5

I think it's because they found out during, from what I read in the notes. So did you find out during the surveying that your lot was off by seven feet? Yes, very much so. So that's why the fence kind of runs at an opposite way?

16:03Speaker 9

The back story is that the I don't know, maybe eight years ago.

16:08Speaker 5

Who built your house?

16:10Speaker 9

Eversource, clear cut everything.

16:12Speaker 5

Yep, they did.

16:13Speaker 9

And everybody screamed and yelled. And they offered to put out the fence.

16:18 – 16:50Speaker 9

I said, well, yeah, that's fine. Right. And they put the fence up. Well, now, when I got the surveyor's plan back... You found out that it's not... We found out that we're way into... You're way into someone else's... To Joe's property. And also, the surveyor told me that... They were virtually no markers on Bisbee Drive. He found one out on the Bog Road, and he had to go all the way up to South Meadow Road to come back and get it. And he said there's virtually no plot plan on the street.

16:50Speaker 5

My mom lived on South Meadow. That's correct.

16:55Speaker 9

I believe that, yeah.

16:58Speaker 5

So is your neighbor here?

17:00Speaker 5

Oh, okay. So your neighbor is still eating out.

17:10Speaker 6

This is bigger than that.

17:13Speaker 8

Yeah, this fence. This fence line over here on this.

17:24Speaker 5

So are you planning on removing the fence when you do the actual?

17:31Speaker 9

I have the surveyor coming out a bit next week. Okay.

17:42Speaker 8

Yes. And it goes back in on the Navis property.

18:02 – 18:23Speaker 12

This was a subdivision back in February. Is the space that you're building there above, there's a garage underneath, right? Yes. Is it at the same level as the main house?

18:23Speaker 9

Yeah, the floor is going to be the exact same level as the existing home.

18:28Speaker 12

As the existing ground floor of your house, right? Right. Okay.

18:36Speaker 6

I didn't understand anything else. Yeah.

18:47Speaker 13

You have an extra set of plans? I'm sorry?

18:50Speaker 8

You have an extra set of plans.

18:52Speaker 10

I do. I have another one at home.

18:55Speaker 13

Yeah. You're going to have to submit these plans. Can you hear me?

19:01Speaker 13

Yes. You're going to have to submit these plans.

19:04Speaker 9

Okay. Mr. Palmer has a set of plans.

19:06Speaker 13

You have a set of plans, Mr. Palmer?

19:09Speaker 13

That's the building commissioner for the town of Carver. We're honored to have him here again this evening. Good.

19:15Speaker 9

But you can have those if you'd like.

19:17 – 19:42Speaker 13

No, you're going to take them back because Mr. Palmer is the guy that needs them eventually. Okay? Now, Mr. Poirier asked a good question. That is, you've got a garage on the first level, and the accessory is going to be on the second level above the garage. Is that true?

19:45Speaker 13

And what's above the accessory? Is there some sort of floor up there that you're going to use for some purpose?

19:52Speaker 9

No, it's basically an attic.

19:59Speaker 13

And this attic, is it a full floor or is it just a... Like a crawl?

20:05Speaker 9

No, it's short.

20:07Speaker 13

You wouldn't be able to... Couldn't even walk in there, is that right?

20:09Speaker 12

You couldn't, no.

20:13Speaker 13

And the height of this accessory is going to be below the peak of the primary residence. Is that true?

20:19Speaker 9

Yes, correct. I have those dimensions if you'd like them.

20:24Speaker 13

Those are always good to have.

20:25 – 20:42Speaker 9

Go. The height of the accessory from the back of the house, which is up higher, is 19 feet 8 inches. The height from the driveway, which is in the front, It's 23.1.

20:47Speaker 13

And what's the height of the peak of the roof of the primary residence?

20:53Speaker 9

That I do not have.

20:57Speaker 13

It would be less than 23 feet 1 inch, correct? It would be more.

21:03Speaker 9

I mean, it would be more. The existing home is higher.

21:05Speaker 13

It would be higher? Yes. Okay. Thank you. I misspoke.

21:19Speaker 8

Mr. Chair, may I ask a question?

21:21Speaker 13

You don't have to ask me.

21:22Speaker 8

Go. Does Eversource or New England, whatever, Edison like, do they have a required setback for their easement?

21:33Speaker 8

I don't believe so.

21:36Speaker 4

Question again?

21:38 – 22:24Speaker 8

So the question I'm asking is they have an easement through your property, correct? Yes. typically with easements you know they they in my experience they usually have a setback that so that they can get equipment or whatever they're doing in that location usually they you know the statute has a setback on that and i'm not sure i believe you could be right it isn't in i think it's like 20 feet or something if i show you the uh And the reason why I'm asking is it looks like part of your ADU and there's a deck off of the rear of it is in within that easement. So I'm just curious to see if they would have any concern about that. That's all.

22:24Speaker 9

I don't know that. That little piece that's in is basically a back stairs and porch.

22:31 – 22:45Speaker 8

It's not part of the... No, it's still a structure, though, that'll be in that easement area. That's all I'm concerned about. I'd hate to have you build something and if they had to do something, ask you to remove it because it's within their easement. That's all. That's all I'm saying.

22:48 – 23:20Speaker 13

So from a common sense approach, it might be a good idea to communicate with the holder of that easement to see whether anything that you're intending or wanting to do might be opposed in the end. You don't want them coming close to the back of your house with big pieces of equipment and disturbing your peace, right?

23:22Speaker 8

So it looks like your existing structure, you're like right on that line. That deck crosses a line and gets into the backyard based on what I'm looking at. That's all.

23:33Speaker 13

You ever have construction equipment from... Is it Eversource?

23:38Speaker 8

Is that what you said?

23:40Speaker 13

Yeah, Eversource. You ever have equipment come on there?

23:44 – 23:56Speaker 9

Just when they cut the trees down, when they trim. But I've never had any, you know, right. How often do they do that? Five years or so. Five to seven.

23:56Speaker 5

Do they come in your backyard? They do. They come right down the backyard.

24:01Speaker 4

They've gotten much, much better.

24:04 – 24:30Speaker 9

There are two towers, and the tower that's closest to our house is one that, I think it's a spare. It's a training. It's energized. And that is, I believe, that when it comes across the back of the house is the outside of the, whatever it is, 20 feet or something from the lines that it goes.

24:32Speaker 8

I would just ask that question, that's all. But it's a good question to be asking.

24:36Speaker 5

Yeah, just to make sure they don't... Just to protect yourself.

24:38Speaker 8

I mean, I don't want you to spend money for nothing.

24:41 – 25:03Speaker 13

I mean, we can go ahead and act anyway, one way or the other. But if I were you, I would want to make sure that the holder of that easement is not going to feel as if they're right to enter. and use that property for whatever purpose it sees fit is going to be impaired by the construction of your proposed ADU.

25:08Speaker 6

Would Mr. Palmer know anything on restrictions like that?

25:13 – 25:53Speaker 11

Well, typically Eversource, the width of their easement with high tension lines is typically 125 foot easement. I'm not sure what yours is. But typically that easement is where structures should not be built. But it's right out to that easement line. Correct. There's no actual... additional setback from that line okay these properties they just have access easement okay they can't build within that easement so is that and thank you for that clarification is that dotted line that's on this plan the inner side of that easement yes

25:55Speaker 8

And then the outer part of the easement would be, and I'm just using 125 as a number, would be the backside?

26:01Speaker 11

Yeah, it's been a while since I looked at the site plan. Could I take a look at it?

26:06Speaker 5

Yeah, please.

26:08Speaker 13

It looks like... Because normally it's shown. It looks like the deck invades that easement. Well, that's what I'm saying.

26:17Speaker 8

That's why I asked that question, Stephen.

26:20 – 26:35Speaker 11

Yeah, so it looks like there's even a shed... So that deck, you may have to rethink that. Within their easement, it's stated that no structures.

26:35Speaker 8

But even the fence line on that right side. That goes through the neighbors, goes through that easement as well.

26:42Speaker 5

Yeah, that's going to get, yeah.

26:44Speaker 8

I mean, even if it gets moved, I'm just saying that.

26:46Speaker 5

Yeah, they still have the right to plow.

26:48Speaker 8

So if they service you, do they come in from the left? They come in from the back. The back gate.

26:54Speaker 9

There's a big gate at the end.

26:57Speaker 5

So you leave it for access for them so they're used to, okay.

27:00 – 27:21Speaker 4

They usually come to the front door, say we're coming in to cut down all the brush. I mean, all the trees are already gone, so it's just maintenance. Yeah, maintaining. Now it's just maintenance, which is, I'm actually fine because they're all thorns and half of them stick in the dog. So when they come and take all the thorns down, I don't have to deal with it.

27:21Speaker 12

That's a good thing.

27:26 – 27:43Speaker 13

I'm kind of wondering out loud whether we need to save you from yourselves here. And what I mean by that is whether we should defer making a decision tonight until you communicate with Eversource to let them know what you're doing.

27:47 – 28:02Speaker 8

They may not object. However, if you show the plan with that, they may have some discretion with it. And then you're you'd be honed in on that easement not to build that, and it may change your configuration, that's all.

28:03 – 28:16Speaker 5

Not to say that you can't try to fit it some other way, just maybe bringing it up a little further. Yeah.

28:17Speaker 9

Can I ask one further question?

28:18 – 28:30Speaker 8

Your ADU, the setback that you have from the house, Is there a reason why you said it was to give you driveway space? Why is it set back so far into that easement?

28:30 – 29:08Speaker 9

Pretty much driveway space. In my home, there's a two-car garage under. We're going to cover over one of them. um for the adu i was kind of hoping to keep the other one oh i see what you're doing so for convenience sake you were trying to keep one of the two stalls got it yeah and also It also covers all the windows on the first floor of my home. It's already covered over my kitchen windows. And at the end now, I kind of wanted to keep the dining room window open so that they have some light on that side of the house as well.

29:08Speaker 8

So I would definitely ask Eversource just what you can and can't do because I'd hate to have you.

29:15 – 29:29Speaker 12

Because if we voted this tonight and then you found out you had to change it, then you'd have to come back again with your revised plans because you have to build whatever has been submitted that we vote on.

29:30 – 30:18Speaker 13

And they have the legal right, as you know, as the holder of an easement, to use that property to maintain whatever equipment that they have out there. They've got the legal right to do this. And that legal right exists in conjunction with your legal right to your own property. So you're kind of sharing that easement, that piece of land there on which the easement rests with Eversource. So I think the members up here raised some very good points. And there's a shed on there too which invades the easement. So you have the shed, you've got It would be the deck.

30:20 – 30:31Speaker 13

Yeah, you've got a shed and a deck which are clearly within that easement. And now you're going to build further into that easement, it looks like. So...

30:33 – 30:56Speaker 12

How long has the shed been where it's located? Roughly. And they've never said anything? I'm not saying they're going to be objective. But you don't know what thing they're going to object to. That's really your point. They may not care about the shed, but for some reason they might just care about the fact that the deck is two feet out into the easement.

30:57 – 31:19Speaker 8

Let's say there is a structure in the easement, and when you add a secondary... build onto that. Now you're creating an obstacle for them to try to maneuver around for equipment. The shed may not be an issue for them. When the deck gets on there, their piece of equipment may not be able to maneuver as easily for them. That's all. And they'll tell you instantly whether it's a problem or it's not.

31:20Speaker 11

Do you know who it is that I would call them? I don't.

31:25Speaker 6

The wires that go across your property, how far back are they in that easement?

31:32Speaker 9

From your house. 20 feet.

31:35Speaker 8

That's pretty close.

31:37Speaker 13

Wow, that's really close.

31:40Speaker 8

You don't lose power very often, huh?

31:46Speaker 13

I mean, one fix here would be to remove that deck.

31:49Speaker 8

But where would you put it? They would need something off of that ADU. Right.

31:53Speaker 9

For an egress purpose. I'd just rearrange. If you look on the left side of the ADU, it goes out to a patio.

32:03Speaker 13

Yes, I see it.

32:05Speaker 9

I could probably put a door there and then make that a solid wall to the back of the house if that was an issue.

32:13Speaker 8

Well, it's not an issue to me right now until you talk to Eversource.

32:16Speaker 9

Right. If it's an issue with them, then that's what we'll have to rearrange. We'll rearrange the deck furniture, so to speak.

32:26Speaker 13

So I get the sense that the consensus is to defer judgment tonight.

32:32Speaker 8

To continue.

32:33Speaker 13

Yeah, defer judgment tonight, continue this case to allow you an opportunity to speak to Eversource.

32:43 – 33:08Speaker 13

And what I would suggest for your own protection and also for our own records here, that you get some sort of letter or memo from them saying that they have no issue with you constructing an ADU on your property based upon the plot plan that you show them. And you don't have to show it to them.

33:09Speaker 9

Anybody have any idea how and whom that I would... Go online.

33:15 – 33:33Speaker 13

I'm sure that there's some sort of contact information that you can get on the Eversource website about questions concerning easements. Okay? I don't have that number. I get a lot of numbers in my head. I don't have that one in my head.

33:35Speaker 12

I don't imagine that you're the first person who's ever called about building something that's bumping up against an easement. I'm sure they have to deal with this on a fairly regular basis.

33:45Speaker 5

A lot of people in town use the easement as part of their property even.

33:52Speaker 13

We're not saying this is going to blow everything up for you by any stretch. Ms. Bonetto.

33:59Speaker 5

I know. Breathe. It's all good. It's all good.

34:01Speaker 13

But we want to make sure that you're not getting involved in a project that is going to end up causing you problems. When are you looking to begin construction?

34:11Speaker 9

As soon as I can.

34:12Speaker 13

Well, it's going to have to wait for a little while until you get this squared away.

34:16Speaker 9

Yeah, I understand.

34:20 – 34:42Speaker 6

The suggestion would be while we're delaying to the next meeting, gives them time to get the answers. What if we did a site visit? And then we'd have a better picture of exactly where everything is, how close to the tree line.

34:43Speaker 8

The survey is coming out. Can he stake out the ADU? Could he put stakes in the ground or where the proposed ADU is going?

34:49Speaker 9

Yeah, in fact, stake the amount.

34:52Speaker 8

I mean, I'd take a right of it.

34:57Speaker 6

He's got that blank look on his face.

34:59Speaker 13

No, I'm looking at Ms. Dahl.

35:01Speaker 5

It's all good with me.

35:04Speaker 13

What's all good with you?

35:05Speaker 5

To do that, to go do a site visit.

35:07 – 35:19Speaker 13

Mr. Poirier has a very busy schedule. What about you, Mr. Poirier? Depends on the day of the week. Why do we need to do a site visit?

35:20Speaker 8

Just to get a visual. I mean, I can see what's going on here. You don't have to. No.

35:27Speaker 6

Yeah, I'm just suggesting, since we're going to have a delay anyways, to get a better picture. Do you want a site visit?

35:38Speaker 6

I would like to go see.

35:39 – 35:55Speaker 13

Okay, it's the custom of this board that if one of us wants a site visit, we all go. So blame this guy here. All right, so we're going to come up now with two dates. Before we do, do you have anything else you want to add?

35:57Speaker 9

My neighbors are here.

35:58Speaker 13

Yeah, we'll hear from them. But do you have anything else you want to add at this point?

36:02Speaker 9

As far as I'm concerned, no. Okay.

36:05Speaker 13

Mrs. Spinetto.

36:07Speaker 9

I'm breathing.

36:09Speaker 13

Good, good. Breathing is good. All right.

36:12Speaker 4

Oh, I do have one question.

36:14Speaker 4

So as soon as the surveyor comes out, then do we get in touch with you and let us know that everything's all staked out so you don't waste your trip coming? Come out for nothing?

36:26 – 37:01Speaker 13

CALL THE PLANNING DEPARTMENT DOWNSTAIRS AND LET THEM KNOW IT'S ALL STAKED OUT AND READY TO ROCK AND ROLL. NOW, USUALLY WE HAVE ONE MEETING A MONTH. OKAY? SO THAT OUGHT TO GIVE YOU PLENTY OF TIME TO GET IT STAKED OUT FOR US. OKAY? AND USUALLY WE COME IN THE MORNINGS LIKE ON A SATURDAY. IF IT'S LATE MORNING, THEN YOU PROVIDE THE PIZZA. If it's early, the coffee and the donuts. I'm teasing. Do you have anything else you want to add?

37:05Speaker 6

Okay. So you do have some stakes out there already.

37:09Speaker 9

I do have a stake out there. Just one.

37:11Speaker 6

Just... Okay, so we would like to see the four corners.

37:16Speaker 9

I'll take care of that.

37:19 – 37:40Speaker 13

Okay, the four corners. That one ought to be easy. And again, when you contact Eversource, see if you can get some sort of memo from them saying that they have no issue with the proposed construction. And they're not going to be able to say yes or no until they see a copy of the plot plan. So you're going to have to be prepared to give them a copy of that. So they know what they're saying, yes or no, too.

37:42Speaker 13

Okay. Now there are some people here that may want to speak as to this particular petition. Is there anyone here? Yes, sir. What is your name?

37:54Speaker 13

Joseph what? I didn't hear. What's your last name, Joseph? Can you spell that?

38:04Speaker 13

Okay, Joseph.

38:05Speaker 6

Come up a little closer, please. Yeah. That's good.

38:10Speaker 7

Close enough. I can be shallow or really loud.

38:17Speaker 13

Go ahead. Or in between.

38:22Speaker 1

My concerns are the variance that they require.

38:26Speaker 7

How does that impact if I have any future plans?

38:32Speaker 13

Well, what side of the property are you on? I'm on the right. So we're facing their house.

38:39Speaker 5

So you're on the other side of the trees? Yeah. Okay.

38:44Speaker 13

So you have some future plans?

38:46Speaker 7

If I did, I'd like to know because

38:52 – 39:24Speaker 13

Well, any future, you have to have a 30-foot setback with whatever you do, right? That's the bylaw in town. So whatever you decide to do, you've got to stay 30 feet away from their line. Now, his problem is, what he wants to do is not 30 feet away from your line. So he needs 8.4 feet relief from us. Because he's a little too close to you. He likes you, by the way, but he's a little bit too close.

39:24 – 39:35Speaker 7

My question is, is that by granting this 88 foot, 8.4 feet, I need a future variance.

39:36 – 39:49Speaker 12

It doesn't hurt you at all. It doesn't. It doesn't hurt me. No, no, your case would be your case. Your property line is in the same spot where it's always been. It just means that his construction would be less than 30 feet from where that line is.

39:49Speaker 8

On his property. It has nothing to do with your property.

39:51 – 40:07Speaker 7

Nothing to do with you. Now, also, there's a fence line. I'm a VP. You trust that or not? It is like 20 feet off of my property. My property exceeds the fence block.

40:07Speaker 8

That'll be addressed from what I was told.

40:12Speaker 5

So he said that they're going to move the fence to where it should be properly?

40:17Speaker 9

Take it down and move it, yeah.

40:21 – 40:37Speaker 9

The surveyor, after I talked to you the other day, I called my surveyor and he's coming out next week and he's going to stake off the whole thing so we know where to put the fence. And when that's done, I'm going to go 10 inches my side of that line.

40:43Speaker 7

I just want things right so they don't cut my off. Right.

40:47Speaker 5

No, that's fair. That's a fair ask.

40:50Speaker 12

We understand.

40:51Speaker 5

No, that's totally fair.

40:53Speaker 12

Was there anything else? Okay.

40:59Speaker 13

Thank you, Joseph. Anyone else want to be heard on this? Okay. Anything further from any of the board members?

41:10Speaker 13

So I think the next order of business, unless the petitioner has anything further to add, would be to schedule... Yeah, yeah, go ahead.

41:18 – 41:33Speaker 4

Unfortunately, this whole fence thing, that fence has been there for over 15 years. We all were just aware of all this when we started this project. So we deeply didn't know.

41:33Speaker 8

We don't hold that against you.

41:35Speaker 5

It happens when the original survey lines are off, and you're not the first person in town that's gone through that. Trust me.

41:42Speaker 12

And you're rectifying the issue, so that's fine.

41:45Speaker 13

No problem. We don't hold it against you.

41:50 – 42:11Speaker 13

All right, so we need two dates. We need a date for our next regular meeting, and then we need a date for Mr. Barrington's site visit. So I think we're looking probably towards the end of July. Mr. Poore, do you have your phone out? Somewhere.

42:11Speaker 6

July 23rd? No. Is it Thursday? The last week of July is not good for me.

42:16Speaker 13

It's not the last week.

42:19Speaker 12

27th is. Oh, let me take a look. Okay. Hold on a second.

42:22Speaker 13

This is why he has to get his phone out.

42:24Speaker 6

He's going on a cruise again.

42:25 – 42:38Speaker 12

No, no cruise. Hurry up, would you? I think the 23rd is okay.

42:38 – 42:59Speaker 13

I've got to double check. What day of the week is that? Thursday. Okay, so July 23. And let's decide as well on a date for the site visit. We should be closer to the 23rd than... Not, because you're going to have to get your surveyor out and you're going to have to stake it and so forth.

43:00Speaker 9

Saturday the 18th.

43:01Speaker 13

Saturday the 18th. Does that work for you, Mr. Poirier?

43:06Speaker 13

Mr. Poirier? Hold on one second.

43:09Speaker 12

Let me just double check there.

43:12Speaker 13

This guy's schedule is busier than mine.

43:18Speaker 12

18th is fine. Okay. Do you have anything? That's a Saturday. Somebody will be around.

43:22Speaker 13

Hold on just a minute, Mr. Berryman. That's a Saturday, right? So what time of morning would you folks like for the 18th?

43:30Speaker 8

4.30, too early?

43:32Speaker 2

Yeah. No joke.

43:33Speaker 13

Good answer. Why don't we say 9 o'clock? 9 o'clock.

43:43Speaker 9

That's July.

43:44 – 44:07Speaker 13

All right, so July 18th at 9, we're going to go out and visit you. And on July 23, we will reconvene in these quarters. And hopefully you'll be able to provide us with some sort of communication, written, not verbal, from Eversource. And also a survey plan.

44:08Speaker 9

What kind of puppets do you like?

44:10 – 45:02Speaker 13

Just keep them under $50. That's right. Exactly. I'm a general manager of James Dinah, so I... Oh, okay. Okay, does anybody have anything else? No, I'm good. All right, so I think we can move on. Let's vote to continue the case to July 23rd. Let's do that vote first. Do I hear a motion? So moved. Second? Second. All in favor? Aye. And let's do a vote to do a site visit on July 18th at 9 a.m. Do I hear a motion? So moved. Second? Second. All in favor? Aye. So we are squared away. You know what you got to do, right? Shouldn't be difficult. And any questions, you can coordinate with the building commissioner who sits behind you or any of the nice ladies in the planning department.

45:02Speaker 9

She is a nice lady.

45:04Speaker 13

Well, there's three of them down there.

45:06Speaker 9

The lady in the zoning office is very patient.

45:13Speaker 13

Good. That's nice to hear. Very good. Nice to see you both tonight. Thank you. See you in a month.

45:24Speaker 8

Yes. Thank you. Thank you.

45:28 – 46:21Speaker 13

Okay, we have another matter on the agenda for this evening. Okay. This is case number 17-28-0-R. The property location is 18 Brockton Avenue. And Mr. Barrington, could you read the public hearing notice into the record?

46:23 – 47:14Speaker 6

Case 17-28-0R, Petitioner Raquel Feria, requesting a special permit pursuant to section 290-2-2.5-D, also 290-5-2.2-A, and 290-5-3.3 of the Carver Zoning Bylaw for property located at 18 Brockton Avenue in Carver, Mass. Assessors map 17, lot 28-0-R so as to reconstruct and extend the legal nonconforming nature of said single family dwelling in the residential agricultural district.

47:15 – 48:09Speaker 13

Very good. Thank you, Mr. Barrington. And I observe that the petitioner is present. You may approach. Before I turn this over to the rest of the board, I have a couple of quick questions. The home that you're intending to build there, is short on frontage how many feet so it's currently 16 feet you're short 16 feet you only have 16 feet um it's

48:12Speaker 3

From the street to the...

48:14 – 48:38Speaker 13

I don't know if you can see this. Is this what you're looking at? Yes. Mr. Palmer, could you take a look at what you're doing? Because I'm going to want... I want to know if they're short on frontage and also short on sideline dimension. So they are. I want to know how many feet.

48:38Speaker 11

I don't see a dimensional set.

48:41Speaker 13

Yeah, and I didn't either. That's why I'm inquiring.

48:43 – 48:54Speaker 11

So I think the intent is that the footprint is in the same position that the original house was. I believe the applicant has an as-built from the original house.

48:56Speaker 13

Do you have an as-built from the original?

49:00Speaker 3

I do. It's the floor.

49:06Speaker 13

Because the original was short on the left, short on the right. And was it short in the front as well, Mr. Palmer? Yes. But okay in the back?

49:18 – 49:37Speaker 13

Okay. So those three dimensions did not meet bylaw guidelines. Current bylaw. That's correct. Guidelines. And you have an as-built plan, do you?

49:37Speaker 3

Yes, I submitted it.

49:39Speaker 13

You don't have one with you, right? Mr. Palmer, would that be in your file back in the office?

49:48Speaker 11

It was submitted, yes.

49:51Speaker 13

Okay, he says it was. So, just want to make sure.

50:00Speaker 8

It would have been under the first permit that they pulled, probably. Yeah.

50:04Speaker 11

Yeah, I required a site plan for the original building permit application. Yeah.

50:09 – 51:57Speaker 13

Okay. Now, we know from last month's meeting that although it would appear that this home that you're now building is within the same footprint, right, Mr. Palmer, within the same footprint, the shape is different. The box is different. You now have, get my notes out. The configuration is different. Yes. Yeah, you now have a roof. The original home did not have a rooftop deck. But the building permit that was issued recently by Mr. Palmer included that rooftop deck because it was within the previously approved scope and setbacks. But the addition you want to do was not approved. That was a new piece of this construction. Is that true, Mr. Palmer?

51:58 – 52:12Speaker 11

So the original building permit was to do a renovation on the existing wall to include a rooftop deck. And that application met the...

52:14Speaker 11

the requirements of our zoning bylaws.

52:18Speaker 11

I don't believe that the actual shape of or the footprint of the new structure is different than the old.

52:26 – 52:44Speaker 11

I believe the reason that we're here today is because they razed the building. The building was essentially razed in its entirety and rebuilt. That cannot happen without a special department. And that is what brought the applicants to the board today.

52:45Speaker 13

The question that I was asking, though, is the original house had no addition. You're intending to build an addition to the original house?

52:55Speaker 8

No, sir. They're just adding a roof deck. The only thing we have is the square footage of the building is no more than it is today.

53:01Speaker 5

So they just changed the internals. So they're trying to put a kitchen where the living room used to be.

53:06Speaker 8

Yeah, internal, yeah.

53:07Speaker 5

Okay. And did you approve the newer...

53:11Speaker 8

The renovation?

53:12Speaker 5

The new renovation with the kitchen? I did. You did?

53:15Speaker 11

I have no jurisdiction over how somebody designed it.

53:17Speaker 5

Designed the inside. That doesn't matter. Right. Right.

53:21Speaker 5

Again, the house was raised without being approved or without them approaching you and letting you know what happened. That's right.

53:29Speaker 11

So if you have a home and you want to raise it in its entirety and it's legally not conforming, that requires a special permit.

53:37Speaker 5

A special permit.

53:40Speaker 13

And we know it's not conforming based upon the configuration of the lot.

53:45Speaker 8

Yeah, and the existing conditions.

53:48Speaker 13

Well, the dimensions, the dimensions on the sides.

53:54 – 54:43Speaker 6

Ms. Dahl and gentlemen. Okay, so I have a few kind of statements, questions. Last time we were here, we talked about soil erosion and correcting that situation. And I assume that was before this meeting happened. took place, I drove by today, I did see kind of a silt attached to the metal fence that was there that's tipped over, which in my mind, you're still gonna get stuff draining right underneath it, so that really didn't mitigate.

54:45Speaker 3

Sorry, but we didn't put any silt fence yet. They're the stop work wear, so we didn't step on the property. We have the silt fence, but we did not put anything up.

54:56Speaker 6

Okay, there's some black covering.

54:59Speaker 1

There was that from the beginning.

55:05Speaker 6

So nothing has been done to mitigate.

55:09 – 55:23Speaker 8

So to your point, the engineer record for the civil was going to propose a recommended So mechanism to catch any of that. Was that done?

55:23 – 55:45Speaker 3

Yes. So I contacted Outback Engineering on May 28. And I spoke with Jason Youngquist, which is a civil engineer. And he also contacted Ron Palmer to verify all the information. We do have the plans right here. If you want to take a look, may I step forward?

55:45 – 56:00Speaker 8

And the reason they didn't install it yet, because it's a stock. Technically. Thank you. Thank you. Mr. Palmer, have you seen this plan?

56:04 – 56:18Speaker 8

Can I ask a question? On the silt fence, why would that not be permissible prior to any other hearing just for the watershed, I guess?

56:18Speaker 11

I can't answer that. It sounds like the applicant had reservations about going to the property while there was a software order.

56:27 – 56:48Speaker 8

Okay. it just like with that but if she had brought these to you would you have allowed the stop order to be lifted uh it really would have come to me that i'm not going to probably that was their that was their project okay i've worked with jason and he's pretty good yeah okay

56:49 – 57:27Speaker 11

i can i can tell you that i had a in-depth conversation with jason and i explained to him i sort of articulated what your concerns were i also talked to him about being responsible and doing a site visit during the construction of this permanent erosion control so i think if you look at that document that you have you'll see if you have a right-hand corner the lower paragraph And there will be an inspection done after everything is ready as well.

57:29Speaker 8

Does that inspection and that site visit include the restoration that's going to be needed to the adjacent neighbors?

57:39Speaker 11

I'm not sure. All I can say is this plan that they created was to ensure the stabilization on both sides to prevent any further erosion.

57:50 – 58:11Speaker 8

But it was my understanding some of the neighbors, not only the fencing, but some of the neighbors experienced some of the silt runoff onto their property. So that restoration more than likely will, I would like to see it included as part of the... So Barry is saying, you know, before, I mean, it doesn't make any sense to do it until you restore what they had, you know?

58:16Speaker 8

That was some of the neighbor's concerns, if you remember.

58:18 – 58:29Speaker 13

Yeah, one in particular, and I observed the gentleman to be present tonight. Sure. What else would you like to say?

58:30Speaker 3

I also contacted John Woods from DPW. I contacted him as well on May 28, but he wasn't in. He was on vacation.

58:40Speaker 5

So he answered me on June 1.

58:43 – 59:07Speaker 3

And I have the email as well, because I just requested him to have it in writing, which he states that, after our conversation this morning, I took a ride to Brockton Avenue. The road is in OK shape. It definitely needs some potholes patched, which I will have done. But other than that, I did not see anything that should cause any safety issues. Please reach out if you need to discuss this further. That's all we have.

59:07Speaker 13

Let's make that email part of the record. Absolutely.

59:12Speaker 8

It's my understanding that's a private way anyway.

59:16Speaker 6

Yeah, is that a private road?

59:20Speaker 5

Is it accepted by the town?

59:22Speaker 11

Yeah, I don't know. The town maintains it. It isn't a private road. The town maintains it. They do the bombing. They do the maintenance of it.

59:30Speaker 13

That does not sound like a private road.

59:32Speaker 5

Yeah, but it's something that they take care of because there's enough people down there to take care of it.

59:42 – 1:00:19Speaker 6

Continuing on with some notes that I've made, I went on your website, Boston Dream Group, And you talk a lot about professionalism and doing high quality work and all of that stuff. So that brings me back to what I said last time was how did we not find these issues before buying the property or right afterwards and then you inspect and say, uh-oh, we can't rebuild it the way we wanted to.

1:00:20 – 1:00:46Speaker 1

We can't imagine, we can't see inside the walls. It's just, it is what it is. So we have our reputation, and if you look up reviews and everything, but I can't see inside the walls. It's real limited. So I wish we could help better. I wish we could just, you know, see it, but some of the areas, if you look at it, the first that we have, it was just discovered after the Bible was ripped out, and now the stair walls, you know, nothing we could have done.

1:00:46Speaker 5

There was no way to get underneath the building prior, like when you looked at it.

1:00:51Speaker 1

So the major structural issues that you found

1:01:02Speaker 12

were discovered when you took the walls down? Is that what you're saying?

1:01:06Speaker 1

And the floors? Yup.

1:01:19Speaker 12

So the joists were shot. Was coming up with it.

1:01:26 – 1:01:39Speaker 5

Can I ask you just a question? Why you didn't just stop right then before you ripped it up and go talk to Mr. Palmer and just say, hey, I got a problem. I mean, I get it. You're totally trying to have a business.

1:01:40 – 1:02:15Speaker 1

I mentioned on the last meeting, so it was on Saturday when we took the demolition. But there's a Monday after. I know, there was a Monday after. Call me. But like I said, it was on Saturday, and then I came by the job, and I looked at everything, and I ran by, and my guys were working on Sunday, and I didn't know. I talked to my man who was late on, and that was when the demolition was way too quick. They just stacked work. But I took the blame. I was supposed to be there, but I didn't. Would I have told you on Sunday? I couldn't make it. And then they were there working on Sunday, and then one day he called me, and I was surprised as well. The same as he was.

1:02:16Speaker 12

So, I'm going to make sure I got this straight. Are you saying that by Monday that the house had substantially been taken down?

1:02:24Speaker 5

So your crew took it down Sunday?

1:02:26 – 1:02:49Speaker 1

Gotcha. Who gave the crew direction to take it down? Well, there's no direction. So when you had a suit contract, it was full. You know, we built the addition in the back and took the whole roofing. That's why we got the permit for it. But he just said, in his imagination, that's why I have a tax email with him and I exchanged an email because... Not at this point because of him, but I took the blame because it's my father's fault.

1:02:49 – 1:03:09Speaker 8

Are you the responsible party for the construction? Who pulled the permit? Yeah. So ultimately, it doesn't matter who you hired. It could have been Sammy. You're ultimately responsible. I know. Okay. You know, whether he thought it was the right thing to do or not.

1:03:10 – 1:03:25Speaker 1

I'm not blaming him. I'm just explaining what happened. And unfortunately, he did. He thought it was way faster. Does he still work for you? He's with his imagination. But I told him, we've got to stop and talk to do this right now and see when he wants to do it. But, you know, that's not what happened.

1:03:27Speaker 8

Mr. Palmer, when did you issue the stop work order?

1:03:30 – 1:03:42Speaker 1

It was on Tuesday, October 21st. Yeah, he called me Monday, October 20th, and he said, you've got to stop, and that's what I told him. You've got to get out of there and stop the work.

1:03:43 – 1:04:15Speaker 8

But my question is, and it was my understanding, you didn't reach out to him. He reached out to you because he got a complaint from a neighbor. Would the, and my concern is, would your crew have continued working? You can't say no because he issued and not stopped work on it. That's why they said no. When you saw it Monday or you got whatever happened, the only reason you... you came in contact with him was because he had issues.

1:04:15Speaker 1

No, I was on my way to the project to check on the job and then he called me and said, yeah, I'm on the way to meet you. That's why I met him after 20 minutes.

1:04:23Speaker 8

I understand that, but you only met him because there was a problem.

1:04:26Speaker 1

No, I was driving down to the project to check on the project. So I didn't know until then.

1:04:31Speaker 8

I was surprised that... When did you get notified that there was a problem? He was that one. Of Monday?

1:04:40Speaker 5

And what time did you end up meeting?

1:04:47Speaker 8

Did you visit? Before noon. Before noon. Did you visit the site when you got the complaint first, obviously?

1:04:54Speaker 11

I received the complaint at home call. And then within an hour or two, I wrote it down. Okay.

1:05:04Speaker 5

And his crew was still there at that point? Yes.

1:05:09Speaker 13

Mr. Barrington, continue. I'm sorry.

1:05:12 – 1:05:47Speaker 6

That's OK. We've kind of answered or made a few points. So you're the purchaser of the property, and you're the builder. okay because i again you have a website advertising your company i went online and i saw you showing the house and and what your hopes and plans were uh for it and you know it sounded like this was going to be good until we ran into this wall um that we're all discussing right now so

1:05:49Speaker 5

It's probably a little unfortunate that you put it up there for sale as all said and done before you had all your permits and stuff issued as well.

1:05:57Speaker 3

Yeah, no, it was only we were going to, if someone wanted it, it would be finished. Like, we would go through this process anyways.

1:06:03Speaker 8

Like the roof of this. Yeah. Yeah. It was just pre-advertised.

1:06:09Speaker 6

Yeah. I'm good.

1:06:18Speaker 12

Pretty much everything that we've discussed are things that we've missed all.

1:06:23 – 1:07:29Speaker 13

Mr. Sullivan? I'm good right now. So there was a question that we entertained when we were last in session. And it is what to do with what appears to be a clear violation of the scope of the permit that was issued in this particular case. And you know that the bylaw allows us to enact a penalty in situations such as this. So I want to kind of take a poll of the board and get a feel for whether or if you folks feel that that's appropriate in this situation. And if so, what sort of penalty you have in mind. Mr. Barrington as Vice Chair will lead with you.

1:07:30 – 1:08:04Speaker 6

I do believe a penalty should be assessed. There was a lot of time in between when it was taken down and the stop work order. I just think there was a number of violations that was included that occurred. And I'm, for a dollar amount, easily a thousand plus. In my mind. Without getting down to nitty gritty, let's count the exact number of days.

1:08:06 – 1:08:43Speaker 6

And X number of dollars for every single day. I want to be careful that whatever a financial penalty might be, that we don't kill the project altogether and then we're stuck with a monstrosity sitting there. But I also think we need to, again, make sure that rules are followed, policies, and that people are doing the right thing and not trying to circumvent. So that's my thought on the matter.

1:08:44Speaker 13

Ms. Dahl, your thoughts, please.

1:08:46 – 1:09:37Speaker 5

I say I feel the same way. I feel that you really should have just stopped when you hit the floor and just sent everybody home and got a hold of him first. I get it. I mean, I own a business, too. I get it. Stuff happens. People work for you. Ultimately, you're responsible. But still, there's rules. And if we don't follow the rules, then why bother, right? And, yeah, I do feel that you should pay a financial penalty for it because... Again, you've been in business since like 21. I think I looked up online. So it's not like it's your first property. It's not your first flip, whether you live there in some of the previous flips you've done or someone else. So it's stuff that you guys should know. So it's just not cool to kind of go around him because we need him to keep everything going in a good direction.

1:09:38Speaker 13

Do you have a number in mind, Ms. Dahl?

1:09:40Speaker 5

I would say more than $1,000, yeah. Because otherwise you could be fined $300.

1:09:45Speaker 1

What is the minimum bylaw? What is the minimum penalty per day? And what is the maximum?

1:09:51Speaker 5

Like $300 a day. Minimum? Yeah, minimum. For like every day that you're in violation.

1:09:56Speaker 1

So what is the maximum? Longer than two days.

1:10:00Speaker 2

Yeah, three days.

1:10:02Speaker 1

But the verbal, when you stop by on Monday, it requires two days. But, you know, put on the paper, it's Tuesday.

1:10:14 – 1:11:07Speaker 12

Mr. Poirier. Well, I guess to be honest with you, after the last time, I didn't have quite as clear of a timeline as I got today. And what I heard makes me feel... a little bit better about how this kind of went down. But, you know, we've had other petitioners who have had things that are outside the scope of the bylaw, and people need to know that that can't be allowed to happen. So, I mean, I'm I probably would be in agreement with Jim somewhere in that vicinity, I guess, once we decide. I don't know if we have an exact number of days at this point.

1:11:09 – 1:11:22Speaker 13

It depends on whether we want to get into the weeds and calculate an exact number of days or whether we just want to impose a penalty. It would be within... That's what we're allowed to do.

1:11:23 – 1:11:42Speaker 13

And it is $300 a day. This project, as I understand it, and correct me if I'm wrong, was basically abandoned between October and when you came and filed your request for a special permit. So that's months. Nothing happened out there.

1:11:42 – 1:11:54Speaker 3

Yeah, it was winter. There was nothing that could be done because the step deck needs to be installed before the house is built. Yep. And we haven't even had the septic yet because the land was too, like, hard.

1:11:54Speaker 1

Yeah, they couldn't do it.

1:11:55Speaker 3

Yeah, they couldn't do it.

1:11:56 – 1:12:07Speaker 8

Yeah, they're not going to allow a septic to go until you have a building plan with the building department. I mean, that's typical. They're not just going to put a septic system in a vacant lot.

1:12:07Speaker 5

So is your septic system in now?

1:12:09Speaker 3

No, they haven't even put it in yet.

1:12:11Speaker 5

So you started building without...

1:12:13Speaker 3

No, we have. The septic plan was approved and everything, but they have not installed the septic.

1:12:21Speaker 5

But you started building.

1:12:23Speaker 3

No, we have not started building.

1:12:25Speaker 5

I drove by today. There's walls.

1:12:29Speaker 1

I mean, so you started rebuilding.

1:12:30Speaker 5

Yeah, we started rebuilding.

1:12:32Speaker 1

We put up the wall. Once we're done with roofing, we wrap it up, and then we come into the second. So we have everything on the schedule.

1:12:43 – 1:13:06Speaker 8

The sequence, and this is where I'm having a hard time with everything right now. There was a permit pulled for renovation with a proposed deck addition on the roof. Your crew came in, they tore down, they tore apart the building for the renovation. Was there a new foundation put in place?

1:13:07Speaker 11

It was a partial foundation replacement slash repair on the back of the house. Okay, so that... The same footprint.

1:13:14 – 1:13:35Speaker 8

All right, so that was put in place where you discovered the floor being, or the support mechanism, the structure, not being able to support it The crew tore that apart. And what were they doing when Mr. Palmer visited?

1:13:35 – 1:13:52Speaker 1

So this whole back here, so we took out this whole back here. And with excavation, and the footing was inspected, and we did the walls. And only the back. And after we did the back, we raised it, the whole back, and we came to the front.

1:13:53 – 1:14:11Speaker 8

So those walls that you saw standing, was it was on the... inspected footings and foundations of that section. The pot came into question was when they took down the entire structure and started doing the front. What work was, when you get on site, what were they doing?

1:14:13Speaker 11

On October 21st, they were voiding the roof or finishing the rafters.

1:14:19Speaker 8

And what was going on with the front of the, was the spot that was knocked down, was it reconstructed already?

1:14:47 – 1:15:59Speaker 11

going. It's the applicant. Sometimes I'll get a call once a week. Sometimes I'll get a call for six months later. So in this particular case, I had done an inspection of a partial foundation replacement slash repair on the back of the house. That was my last Now, I had received a number of complaints from neighbors about erosion, so there were site visits that I made, not to do a building inspection, but to look at the erosion, the concerns of the neighbors. So that was my only actual building inspection. On October 21st, I received a phone call that the house was razed and rebuilt. So I went out there on Monday morning, and when I went out there Monday morning, all of the walls, the main building, was reconstructed. New floor system, new walls, and they were, at that time, constructing the roof. I don't think there was plywood on the roof, or there may be some plywood, but most of the rafters, I think, were in. And that is when I placed a stock worker or a quarter on the project.

1:16:00Speaker 8

So to clarify, just so, you know, because I'm running into a wall, the area that they tore down and brought upright, what was that bearing on?

1:16:10Speaker 11

I think just, you know, it was an old house built in the 1940s or 50s maybe.

1:16:19Speaker 11

Yeah, mostly pier footings or piers on top of cylinder footings or just...

1:16:35Speaker 8

So when you, and I'm just going off of what you said where the walls and they were putting on the roof, but the front area that was supposed to remain, was that, any work done to that?

1:16:51Speaker 11

LBL. Carry and beam, yeah. Yeah, so I think that was in before they decided to raise the remainer.

1:17:00Speaker 8

So I'm going to ask you now, when did that occur? So, like the footings.

1:17:08 – 1:17:25Speaker 1

So, yeah. Concrete has to secure before you put a carrying beam on it. So, it wasn't... It happened together with the back. Everything together. When they spec the foundation in the back, they spec the front. So, what do you mean they inspect the front? Yeah, the front footings because we add that in the pyramid.

1:17:25Speaker 8

That wasn't going to be removed, though. How could it be inspected?

1:17:28Speaker 1

Yeah, no. We removed the bottom and then we just support it so to put footings on it because there was no footing in the front.

1:17:37Speaker 8

As a construction supervisor, any inspection of footings would have to be done by the building commissioner to verify that it- And it was inspected?

1:17:45Speaker 11

They were done.

1:17:46Speaker 1

They were done?

1:17:46Speaker 11

Yeah. Just a hole.

1:17:48Speaker 1

Just a hole. A hole in the cylinder. So, I'm done.

1:17:56Speaker 13

We have taken a poll of everyone on this board but you. What would you like to see happen here?

1:18:05 – 1:18:53Speaker 8

Being in this career, you get held accountable for issues that arise, and that's part of your ownership of having a construction supervisor's license. The training, the classes, all of the education you get, it's to minimize an impact of this nature. I haven't been through it, and I've been through enough zoning board hearings to understand there are repercussions and responsibilities held by the construction supervisor. I'm going to leave it up to the board. I think an infraction happened and there needs to be accountability. That's all. Do you have a number in mind? I'll go along with whatever the board decides.

1:18:58 – 1:19:09Speaker 13

Let's take a look at the bigger issue, which is a special permit is being requested at this point so the construction can continue and eventually finish. Is that true, Ms. Ferry?

1:19:09Speaker 8

Yes, that's true. I want that done just so the neighbors don't have to deal with this for the next two years as well.

1:19:22Speaker 13

Before we go any further, there are people in the audience that might like to be heard. Does anyone have any comment or comments they would like to make or questions they'd like to ask?

1:19:34Speaker 13

Identify yourself, please.

1:19:36Speaker 10

Scott Hanson, 20 Broughton Ave. I'm standing in front of my father.

1:19:41Speaker 13

Okay, and you are right next door or across?

1:19:44Speaker 10

Right next door on the right-hand side is the face of the building.

1:19:47Speaker 13

Go ahead. We've had a lot of rain lately. What's been happening out there?

1:19:51 – 1:20:48Speaker 10

The erosion is still coming down. I've seen they had it surveyed a little different than we thought to, because up in the back, the fence is actually on their property. So that we've got to address with them, however they want to work that out. But up in the front, there's more property loss. So the fence is on the property now, and there's erosion on that side more. So my concern is I want them to finish. I want them to get through this. I want them to get it done. What do we have on the drawing that's going to protect our property from erosion going down there? That's all I want. If we have something in writing that you guys have on this drawing, I'm all for it. Let them continue. As long as I have something to cover us, at the end of the day, this is all inspected, and let's take it. Let's go there now and put Silsak up there, protect it so it don't fall down there anymore. And if there's going to be a wall there later, I'm all for it. Let them move forward. I appreciate your time.

1:20:49Speaker 13

You bet. Anyone else like to be heard on this?

1:20:58Speaker 2

What's your name? Judy. Yes. I live at 13 Brockton Ave. I live across the street.

1:21:07Speaker 13

I remember you. Yes. Yes. Go ahead, Judy.

1:21:10 – 1:21:34Speaker 2

So, I don't know, maybe I'm being too kind or too nice, but, you know, I think they get it. I think they know they made a big mistake. But I also do think that let's try to figure out how to get the project going. I'm not trying to break any laws or anything like that, but just to kind of

1:21:37 – 1:25:30Speaker 13

If at all possible. Okay. Okay. Unless somebody else has something they want to say. Mr. Palmer, do you have any final remarks? I do not. I think we all understand that there are certain local laws by which we must abide. And if we don't, then these laws allow for certain repercussions to occur in our discretion. So if we don't follow the laws, if we don't follow the rules, and I think we all understand that in order to do a project of this kind, you have to have the appropriate permit when you decided that you would need to do something different by way of your construction. That is to say, no longer a renovation, but a total rebuild. That required a special permit. And you folks should have been aware of that. You can't plead ignorance. People who sign or request a building permit have to live by what is issued by the building commissioner. And if they don't, as I said, there are potential repercussions that have to be paid, potentially. So I don't think anybody on this board is looking to bankrupt you by imposing a penalty. But I'm the one person that hasn't weighed in on this just yet. Everybody else has. And I'm inclined to agree that these rules are in place for a reason. These bylaws are in place for a reason. These are the laws of the town of Carver. These are our laws. And in this case, they were broken. either intentionally or negligently or recklessly they were broken and you say maybe you weren't quite aware but you should have been because the building code says that if you pull the permit you're responsible for the work that's being done so i'm inclined to agree as well that there probably should be something that we do in this case to recognize that work was done here well beyond the scope of what was allowed, that this work was being done and would still be continuing today perhaps had there not been complaints from neighbors. In other words, you didn't say, after encountering the structural deficiencies in this building, you didn't say, okay, well, we've got to stop right now. Can't go any further. We have to figure this out. And you should have made a beeline to Mr. Palmer's office. So, yes, I'm inclined to agree that there should be something done here but we're not looking to squelch or kill the project either. So speaking just for myself I'm inclined to grant you the special permit that you need but there are going to be conditions attached to this and I'd like to get a sense of the board as to what conditions they'd like to see in the event that we decide

1:25:32 – 1:26:00Speaker 5

to grant the special permit which is what you're requesting now correct yes okay let's start with ms doll what condition or conditions would you like to see well i'd like to see the i mean it's such tight borders down there and i drove down there today to see exactly where the project stood like just the way that everything is kind of torn apart you're going to have to like Be responsible to do something to protect your neighbors on both sides.

1:26:01Speaker 13

And what would that be? What do you want to see?

1:26:05Speaker 5

They recommend that you do to keep the dirt back. I mean, obviously, you're going to cut down, whether it's retaining walls on your own self or...

1:26:12Speaker 1

So we do less time.

1:26:13 – 1:26:41Speaker 3

So we have, as I said, we already have the silt fence. Once Building Commissioner authorizes us to step on the property, we will put up the silt fence during construction. After it's done, there will be, as you guys can see on both sides, there will be a drenching chain. drainage trench yeah on both sides done and it will be inspected after construction but the drainage can only be done after the house is done

1:26:43 – 1:27:21Speaker 8

So that drainage trench is to retain it within your property. It's not draining into any structures, right? It's on our property, yes. So a logistics plan is what you're actually asking for. There's a couple of things that she's pointing out. It is a tight site. It's going to be your responsibility to make sure that your construction staff, equipment, materials all stay within that site without impeding the neighbor in any shape, way, or form. They should not wake up and see a fence getting hit with an excavator. Any of that.

1:27:21Speaker 3

This fence is already on our property. I understand, but it got...

1:27:26 – 1:28:32Speaker 8

hit and it affected the neighbor, obviously. So a logistics plan is something that you're going to show a lay down of where your materials are going to go. I mean, you know exactly what I'm looking for on that plan. yeah on the plan he circles where all the temporary construction period fill material stockpile area right it's like right there and that includes you know if there needs to be off street parking so you're not impeding the neighbors the plan should show something because of how tight it is and use that and i would submit that for record i mean that would be one condition right out of the box and what do you call that a log a logistics plan logistics yeah And it just shows the contractors taking a lot of deep dive into their thought process at how they're gonna keep all of the material and the staff and their work on that particular site without impeding the neighbors at all. And part of the erosion control, which we've gotten now, that would have to be in place, obviously. Once the special permit is issued, that would be your first task. Yeah, absolutely.

1:28:33Speaker 3

We have everything here.

1:28:35Speaker 8

And who's installing that?

1:28:38Speaker 3

So the civil engineer can be there to check that we're installing it correctly?

1:28:42Speaker 8

That's not what I asked you. I asked you who would be installing it. You don't have a site guy right now?

1:28:48Speaker 1

No, we contact the same person that's going to do the sat-deck system. He does all the sidewalks.

1:28:54Speaker 13

We're just waiting on them. So we need a logistics plan, and what else do we need?

1:28:59Speaker 8

Well, you have an erosion control plan.

1:29:03Speaker 12

Drainage trench is the term that they used. Can you explain a little bit more what does that look like? It's a picture right here. It's wonderful.

1:29:14 – 1:29:31Speaker 8

Did you get a set of it? You've got a plan, right? What's it made of? So it looks like it's gravel and stone. And it's got a silt sock that looks like it wraps the stone to encapsulate the water. And it will retain it and slowly disperse it into the soil. That's what the intent of it is. It's two by two holes.

1:29:32Speaker 10

I don't mean to pipe in, but do you think that's the best route? I've seen the stuff. I've done it around my house. Sometimes it's not the best route.

1:29:42 – 1:29:54Speaker 8

I think that depth is probably a better route than just putting a French drain in, in my opinion. I mean, it looks like it's running along the whole perimeter.

1:29:54Speaker 10

Don't look back. I'm not saying for long. figured you were on that subject.

1:30:03 – 1:30:37Speaker 8

Short of that, an infiltration system would be the only other option. So basically, they would be corrugated Trenches in this in the stone would capture the water and let it infiltrate into the ground slowly, but I mean He had to have done a takeoff off these slopes in the watershed. I mean, that's how he came up with that dream So the bottom line is this guy right here that yeah, it's ultimately going to be responsible Yeah, so so this is where my ignorance and construction shows up so

1:30:39Speaker 12

We've heard talk about a retaining wall.

1:30:42Speaker 12

So, I mean, is that...

1:30:45Speaker 8

I think that was a comment about retaining the soil, but I... Well, there's a retaining wall there now.

1:30:53Speaker 1

No, there isn't. No. On the left-hand side? Yes.

1:30:57Speaker 5

There's one on the left-hand side.

1:31:00Speaker 5

So is that going to be repaired before you guys are done? Is that on your property?

1:31:06Speaker 1

Not on our property. I think it's on the 16 Rockland Ave. Scott.

1:31:11Speaker 12

So that retaining wall has nothing to do with that address.

1:31:15Speaker 8

So your solution would be the trenches.

1:31:19Speaker 3

That's what the civil engineer requested. And that was his best opinion was to do this.

1:31:26Speaker 8

How many trenches? Two on each side.

1:31:28Speaker 3

One on each side.

1:31:30Speaker 8

And they're using three quarters, two inch and a half double wash stone. It's almost like a septic field, basically.

1:31:41 – 1:31:58Speaker 10

Another question, the septic's not in right now. It's not on the straw. Is that in the back of the house? Yep, it's in the back of the house. The only reason I'm asking is I don't mind working with them. Like I said, I'd like to see them get done. How are they going to get the equipment packed? I was just going to ask that.

1:31:58Speaker 5

I was just going to ask that.

1:31:59 – 1:32:13Speaker 10

Yeah, because I don't mind working with them. That's what I'm saying. I want to see the project get done. We can have some access that we could, you know... and work out the defense thing before we leave tonight. I want all that worked out. That's all. I want this put to rest tonight. Mr.

1:32:13 – 1:32:43Speaker 8

Chair, the special permit that you're considering on issuing would allow them to continue the construction based on the new submission of drawings to the building commissioner? So they applied for a renovation, and now it's going to be a basic total rebuild. Is there a new set of drawings that were issued? Yeah, there'll be a revised set of plans to reflect what you're approving tonight. Okay, so that special permit would reflect that?

1:32:43Speaker 5

The new revised set of plans?

1:32:44Speaker 11

Yeah, that's a condition.

1:32:46Speaker 5

With the condition.

1:32:47Speaker 11

As a condition. And I want to... The applicant should have house plans with them this evening. And those plans that you review and approve are the same plans that I'll approve

1:32:59Speaker 5

So do you have the final plan?

1:33:01Speaker 3

It's the same plan that was submitted. We're not changing anything.

1:33:03Speaker 8

But I'm going to want a wet stamp drawing just with the order of conditions on there.

1:33:08Speaker 5

So just like with...

1:33:09 – 1:33:25Speaker 8

So that when we sign it, they're providing to every single condition that we're putting in place. So, I mean, it's just a... You can have your engineer record just give you a wet stamp drawing. They're going to stamp a wet set drawing, a myline drawing that we can sign that gets recorded.

1:33:28Speaker 13

So the conditions are revised plans have to be filed.

1:33:34 – 1:33:47Speaker 13

Erosion control plan has been issued. A logistics plan. And a logistics plan. Yep. Drainage trench, one on each side. What else?

1:33:49Speaker 5

Then the wet stamp has to be on the revised plans.

1:33:54Speaker 8

What's the limit of work as far as hours of operation?

1:34:01 – 1:34:34Speaker 11

So we have no by-law that regulates when you can start and when you can't stop. Most people typically don't start before 7 a.m. And depending on the time of year, this time of year it's not uncommon for frames to work with dark. We don't see that in the wintertime. But we don't have any regulations. The planning board on occasion will limit hours of operation for things that require a special permit or a site plan approval. So this board may choose.

1:34:34Speaker 8

And that's where I was going with it. I think because of the tight proximity of the neighbors, they're not going to want to see them working seven days a week over there.

1:34:41 – 1:34:58Speaker 8

And the hours of operation, you know, if they've worked all day and they come home at 5, unless there's a special provision where you need to work past a certain hour, you would notify the building department, and then he would use his discretion whether to allow you to continue.

1:35:00Speaker 13

What hours would you think, Ms. Gall, Mr. Barrington, Mr. Boring?

1:35:04Speaker 5

Yeah, 7 to 5.

1:35:08 – 1:35:26Speaker 8

Monday through Friday. Yep, and if you had to work weekends, you'd notify the building department and let him use his discretion on allowing it. Yeah. And on Saturdays and Sundays, Mr. Palmer, I'd like to see it not start as early. So we could put that as a condition as well.

1:35:26Speaker 6

So as a neighbor, you've heard our suggestion of 7 to 5 Monday through Friday.

1:35:33Speaker 10

I'm just going to ask him because he's there all the time.

1:35:36 – 1:35:56Speaker 10

I don't think it bothers him. Even if it was after five. On Saturdays and Sundays. I wasn't going to say that. Just get it done. If you were having a family, you know, party,

1:36:09 – 1:36:23Speaker 8

I'm just saying that you try to put limits of work from 7 to 5. If they needed to work, I'm not saying they can't. They just got to notify the building inspector. So if a call comes in and they're complaining, he's aware of it. That's all.

1:36:24 – 1:36:42Speaker 11

With all due respect to the board, I would prefer not to be that person. I would prefer that you said... that they set now. Okay. Because it may be Sunday morning and I'm not at work. Maybe I'm on vacation.

1:36:42 – 1:37:15Speaker 8

My expectation, Mr. Palmer, is that they wouldn't tell you on Sunday that they've got to work. They would let you know on Friday that they would like to work on a weekend. If they work over that... So... I've been in so many developments where they have free reign, and they're trying to get it done. The excavators, they got spotlight. I've been through it 100 times, and all I'm saying is if they want to work a weekend, they'll notify you well in advance. It's not a catastrophe that they're trying to do that. It's just a matter of them reaching out and communicating appropriately.

1:37:15 – 1:37:36Speaker 13

Let's see if we can agree on a list of conditions. Sure. Because we have... been all over the place here. Yeah. Logistics plan. An erosion control plan, which may or may not include silt fencing, but that's part of the erosion control.

1:37:38 – 1:38:11Speaker 13

Right. They have to file revised plans with a wet stamp. Hours of operation would be Monday through Friday, 7 to 5. And on weekends... Mr. Palmer is enjoying his time off, so let's say 10 to 4, something like that. Yeah, I was going to do 10 to 5, but... What do you want, 10 to 4 or 10 to 5? Can we do 9 to 4?

1:38:12Speaker 13

Yeah, I'm all right with that, too. Okay.

1:38:19Speaker 13

And those are the conditions that I wrote down. Oh, and there will be a drainage trench, too, one on each side.

1:38:25Speaker 8

It's on the erosion control.

1:38:26Speaker 13

That's part of the erosion control, but I'll mention that.

1:38:29Speaker 8

And my only other part that I would add to is, do you have a downstream site?

1:38:33 – 1:38:47Speaker 13

Excuse me just a second. On the fencing, now we recognize this on your property, right? But to the extent that fencing has been damaged on anybody else's property... Well, pushed over onto their property.

1:38:47Speaker 5

Has that been fixed? Yes, that was fixed.

1:38:50Speaker 1

Scott, yeah, we fixed it.

1:38:51Speaker 8

He spoke less time to that.

1:38:52Speaker 1

Okay, so fencing really is a condition.

1:38:54Speaker 13

Fencing and everything. Okay. So I've got about four or five conditions, and I'll run through them again before we take our vote, or after we take our vote. Mr. Barrington.

1:39:05 – 1:39:28Speaker 6

Well, you know, not being first, you lose out because everybody else is sending stuff your way. Okay. As part of the conditions, is that what we would include a penalty? Yes. That would need to be taken care of? That will have to be voted on separately. Okay.

1:39:32Speaker 8

Mr. Sullivan? I just have the trash and debris. You're going to have a 20-yard dumpster. What do you have on site?

1:39:41Speaker 3

We don't have anything on site right now at the moment.

1:39:44 – 1:39:58Speaker 8

I didn't say you did right now, but when you construct and you start to handle that, will you have a dumpster, and that should be on the logistics plan, and it should be maintained on a daily basis so that neighbors aren't getting all the debris. That's what I'm trying to say.

1:40:01Speaker 8

That's it. I'm done.

1:40:04Speaker 12

Mr. Poirier. This has been a group exercise. I think we've done a nice job here. Can you see him patting himself on the back?

1:40:15Speaker 8

He's got fancy glasses. I see you do that.

1:40:20Speaker 12

Okay. Do you have anything, Mr. Chair?

1:40:23 – 1:41:17Speaker 13

No. I've listened very carefully to everybody. And now, if there's nothing further that anybody would like to add, either the petitioner or members of the public, we move on to this motion. A motion to close the hearing. So moved. Second. All in favor? Aye. And now we move on to findings, and I'm going to suggest this finding. The board finds that the benefits of the proposed use outweigh its detrimental impacts on the town and the neighborhood in view of the particular characteristics of the site and of the proposal in relation to that site. That's the legal language for the issuance of special permits under the local bylaws. Do I hear a motion to accept that finding? So moved. Second?

1:41:21 – 1:43:44Speaker 13

Now we move on to the decision. That a special permit may be granted under the following sections. 290-5-3.3, 290-5-2.2A, and 290-2-2.5D of the Town of Carver Zoning Bylaw. These are the bylaws that were referenced in the publication of this case and the bylaws which apply to this particular project. Do I hear a motion to grant the special permit? So moved. Based upon... the rebuild that you're seeking to do or have begun to do. Right? Mr. Poirier has stolen some of my thunder. He says yes. He moves. And second? Second. All in favor? Aye. So your special permit is granted. Now, we're going to attach to this decision a number of conditions. If these conditions are not complied with, I am certain that the building commissioner will hear about this. He's going to keep an eye on this, and I know neighbors will as well. First of all, that the petitioner will use a qualified civil engineer to draw a site plan that would address earth stabilization issues at the subject site and the construction of a retaining wall, if necessary, for the purpose of erosion control. Now, I know you've already retained somebody, or you say you have. but this should be one of our conditions. Does everybody agree to that? Yep. All in favor? Actually, let me ask for a... We're going to do them individually? Yes, we are going to. Okay.

1:43:44Speaker 12

So you want to make the... I'd like to move that, please.

1:43:47Speaker 13

Second? Second. All in favor?

1:43:54 – 1:44:19Speaker 13

So that civil engineer will have particular attention to erosion control so that neighboring properties are not going to be affected. This decision will also be conditioned upon the drawing of a logistics plan. Motion. So moved. Second?

1:44:29 – 1:45:11Speaker 13

I know this will probably be included as part of the erosion control, but I think it's worth mentioning it as a separate and distinct condition. The construction of drainage trenches, one on each side of the subject property. Again, this will be part of the erosion control, but I want that mentioned specifically in the event that there's any confusion or decision made by somebody along the way that maybe that isn't necessary. So do I hear a motion that this special permit is conditioned upon the construction of drainage trenches, one on each side?

1:45:13 – 1:45:51Speaker 13

Second. Second. All in favor? Aye. All right. So we have erosion control plan. We have a logistics plan. We have the drainage trenches. I probably should have started with this. You're going to have to draw revised plans for the building commission with a wet stamp. You know what that is? Yes. Before construction begins. Before. Everybody agree on that? Yes. All right. So let's hear a motion on that. So moved. Second?

1:45:52 – 1:46:13Speaker 13

All in favor? Aye. So that... That should be the first condition, and I will make sure on the decision that it appears in the number one position. Next. Hours of operation, 7 to 5, Monday through Friday, 9 to 4 on Saturdays. We're not going to do Sundays.

1:46:21Speaker 12

Okay. So moved. Second. All in favor? Aye. Aye.

1:46:27 – 1:47:24Speaker 13

Next, in view of the history of this case and the fact that this was planned as a reno but turned into something very different, and after hearing extensive testimony on this issue, the board moves that a penalty be assessed against the petitioner in the amount of $1,000 to be paid before construction recommences. Not to be paid after you move the machines back on the property. This is a precondition. What does everybody think about that? Yes. Ms. Dahl is writing furiously.

1:47:26 – 1:51:50Speaker 13

So moved. Second. All in favor? Aye. Okay. So I think those were the... I know there was talk about making sure there was a dumpster out there to clear debris. And what else? The silt fences, that's part of the erosion control. But again, I want to emphasize that this board, and you've heard this now through two hearings, is disquieted by the behavior in this case. You pull a permit, you're required to comply with your construction within the four corners of that permit. And Mr. Palmer should not have to act as policeman here. Nor should neighbors have to be calling saying, hey, you know, I got serious erosion problems from this project that is now encroaching on my property. That should not have happened. So this project went way beyond the pale initially, way beyond. I'm not saying that it wasn't necessary, but you didn't go through the proper process or procedure. And now this house, this incomplete house out there, the new house, there's nothing happened on that property since October. That is nine months ago. So this $1,000 will be paid as a precondition to recommencing construction. Check will be made payable to the town of Carver, delivered to the planning department. Okay? Otherwise, this doesn't get off the ground. Are you in agreement with that? Yes. That's good. Does anyone else have anything they'd like to say? No. Silence is deafening. I want you both to understand as well that this board could have come down much more heavily. Do you know what the bylaw says? $300 a day. And it's been since October. It's a long time, folks. So we are taking, I think, a very conservative approach. This is a slap on the wrist, really. And I know this is a flip. That's fine. Everybody's entitled to make money. And you'll make your money on this. Minus $1,000. You don't think you're going to make your money? He's shaking his head no. You'll make money. You'll make money on this. You'll make money on this. Mr. Palmer knows you're going to make money on this. So those are the comments that the board chair is making after having listened very closely to everybody and you know this has been a vigorous discussion. I've tried to step back as much as possible and just kind of let them discuss with you what their concerns are and what their expectations are going forward. So I don't think there's going to be any question in anybody's mind up here that if this goes off the rails again, it's not going to end happily. So let's get this done. Let's get the house finished so the neighbors will be happy. They don't have to live with this construction all around them. Don't leave dumpsters in the street, which is what some of them told us last time. You're shaking your head no, but apparently dumpsters were observed at some point either on the street or on the side of the street, which is narrow as it is. Just make sure that this is good, clean construction within the four corners of the special permit that Mr. Palmer is being directed to issue now through the action of this board. Mr. Palmer.

1:51:53Speaker 8

I understand. I think the communication is the biggest thing. I mean, the lack of communication only escalated everything that we went through. That's all.

1:52:01Speaker 3

I just have a quick question as well.

1:52:03 – 1:53:27Speaker 13

And I'm concerned, not to interrupt you, but I am interrupting you. I'm concerned that this situation festered since October of 2025. Now, there may have been good reasons for that. I think somebody alluded to the fact that there were personal issues that somebody was experiencing, you or you. I don't know, and I don't care to ask. But for whatever reason, there's a lot of time that's gone by. And that's unfortunate. Unfortunate for you, unfortunate for neighbors, unfortunate for this board now, which is being put in a position where it's going to try to make things right for everybody. So this is the concern that I had, that amount of time that went by before we could cross swords on this and get to a final decision. Just because a stop work order is issued doesn't mean that you can't immediately file new plans and then come back before us. We've had many meetings since October. Anyone? Nope. Anything further?

1:53:28Speaker 3

I just have a quick question. So all these plans, do I give it to the planning department and the building commissioner or just to the building commissioner?

1:53:38 – 1:53:55Speaker 11

I think to make things simple, bring all the information into my office. And then from there, I'll share it with the administrator, for example. Absolutely. And make sure that the plans that were approved tonight are the same plans that are recorded.

1:53:57 – 1:54:24Speaker 13

Now, keep in mind that when you file your new plans, don't deviate from those plans. Unless you come and speak to the building commissioner again. Do not deviate. If you run into more construction issues, you've got to hightail it back into his office. Don't go solo. That's what got you into the problem in the first place.

1:54:24 – 1:54:43Speaker 5

And if you have trouble with getting into the back to do the excavation for the septic, you're going to have to work together or with Mr. Palmer or... just to make sure that it's not a problem. Yeah, it's really tight space and we're going to... Yeah, I don't know how you're going to get anything through there.

1:54:43Speaker 1

This is where being a good neighbor... A nine-ton excavator should be fit there. I don't think they need more than a nine-ton excavator. It should be completely fine.

1:54:55 – 1:56:20Speaker 13

But I will make these final remarks, and that is we take no pleasure in assessing the penalty that we did tonight. It is unusual for us to do so. And it's only in the clearest of circumstances that we even think about doing something like this. We're not in the process of playing gotcha games and trying to raise money for the town. That's not what we're about. But we are, and I've heard this said before, we are the guardians at the gate. These are the bylaws that we are required to interpret and issue decisions about. And these bylaws do allow us the ability to assess penalties in the right situations. This is one of those situations. But again, we take no delight in doing this. I hope that you've both learned a lesson and that you will cooperate with the planning department and the building commissioner going forward. Thank you, Mr. Palmer. Enjoy the rest of your vacation. Thank you for your time. Appreciate it.

1:56:22Speaker 5

Have a good night.

1:56:37Speaker 13

Does anyone have any further subject or issue about which they'd like to be heard?

1:56:45Speaker 13

Do I hear a motion to adjourn? Motion to adjourn. Do I hear a second?

1:56:54Speaker 13

All in favor? Aye. Good night, Carver.