Historic District / Board of Architectural Review - meeting_joint_regular
Tuesday, June 2, 2026Official site
About this meeting
- Government Body
- Historic District / Board of Architectural Review
- Meeting Type
- Historic District / Board Of Architectural Review
- Location
- Summerville, SC
- Meeting Date
- June 2, 2026
Video will appear here as soon as Summerville Historic District / Board of Architectural Review posts it — usually within a day of the meeting
Tuesday, June 2, 2026
11 items on the agenda.
Oath of Office•Item I
Oath of Office
Approval of Minutes•Item a
May 5, 2026
PUBLIC HEARING•Item 1
N/A
PUBLIC HEARING•Item 1
210 S Gum St – Request approval to convert the existing garage into an ADU, remove the existing asphalt shingle roof and replace in kind, add wood siding to the CMU exterior walls, and add windows and doors to match existing. A new bathroom along the back wall of the proposed ADU is proposed. In addition, a pavilion over an exterior kitchen on the existing patio is proposed.
PUBLIC HEARING•Item 2
127 W Richardson Ave – (Conceptual approval) Renovate the rear patio and access lane area for the Montreux Bar and Grill. The front driveway will be converted into a courtyard; the existing hardscape will be demolished, and a new hardscape will be designed. The existing chain-link fence will be replaced with a masonry wall. A shade structure is proposed for over the existing patio.
PUBLIC HEARING•Item 3
214 E 4th South St – Demolish existing cinder block home to allow the construction of a new home.
PUBLIC HEARING•Item 4
401 S Magnolia St – Applicant is applying to add wood steps and railings to the front porch, replace the existing concrete front walk with a brick lined gravel walk, and remove the existing vinyl siding to reveal the wood siding under it. All siding and trim to be painted white.
PUBLIC HEARING•Item 5
100 Marion Ave – Applicant would like to extend the roof of the accessory building to create a pavilion with an outdoor fireplace for the recently installed in-ground pool. The existing roof will be removed, and a new roof will be installed to match the existing one.
PUBLIC HEARING•Item 6
200 Salisbury Dr – This application is an after the fact approval. The contractor assured the homeowner that they had received all the necessary permits to replace their existing windows with new ones. They were in the process of getting the permits but did not provide the information that was requested for approval. Most were in-kind replacements, but the bow window was not. Four (4) picture windows with interior grids were used to replace the divided light bow window.
Miscellaneous:•Item 1
N/A
Adjourn: